Extradosed bridge

An extradosed bridge is a hybrid structural typology that integrates the primary features of a box- with those of a , utilizing low-height pylons and external prestressing tendons or stays anchored near the deck's upper surface to support medium-length spans typically ranging from 100 to 250 meters. This design results in a whose external appearance resembles a due to the visible stays, but whose mechanical behavior is closer to that of a prestressed , with the deck providing significant stiffness and the stays contributing to reduced material usage in the superstructure. The concept of the extradosed bridge was first formally proposed by French engineer Jacques Mathivat in 1988 for the Arrêt-Darré Viaduct in , although the design was not implemented at the time; it drew inspiration from earlier works like Christian Menn's Ganter Bridge in (completed in 1980), which featured similar low-pylon cable arrangements. The first true extradosed bridge, the Odawara Blueway Bridge in , was constructed in 1994 with a main span of 122 meters, marking the typology's practical debut and subsequent popularity, particularly in seismic-prone regions like due to its enhanced resilience from the stiff deck and distributed load transfer. Key structural characteristics include a slenderness ratio of L/30 to L/55 (where L is the main ), pylon heights of L/8 to L/12, and stay cables stressed to 45-60% of their , often arranged in a or semi-fan configuration to minimize and allow for up to 200 meters without excessive deflection. Construction typically employs the balanced method, using , , or composite materials, with side sized at 0.4-0.8 times the main to optimize distribution. These features make extradosed bridges more economical than full cable-stayed designs for medium , reducing volume by up to 20-30% compared to traditional bridges while maintaining aesthetic appeal and lower maintenance needs through corrosion-protected stays. Notable examples worldwide include the Sunniberg Bridge in (1998, 140-meter spans), the North Arm Bridge in (2008, seismic considerations), and the Vidin-Calafat Bridge spanning and (2012, total length over 1.3 kilometers), demonstrating the typology's versatility for both road and rail applications in varied environmental conditions. As of , more than 240 such bridges have been built globally since the 1990s, with ongoing adoption in regions like , , and for their balance of efficiency, durability, and visual elegance.

Overview

Definition and Terminology

An extradosed bridge is a hybrid structural form that integrates the primary load-bearing capacity of a box deck with supplemental support from external prestressing tendons, or stay cables, anchored to low-profile towers rising above the deck but at heights significantly less than those in traditional cable-stayed bridges. This configuration allows the deck to function as the main structural element, handling most live loads through , while the stays provide additional reinforcement for longer spans, typically ranging from 100 to 250 meters. The design emphasizes efficiency for medium-span applications, blending the simplicity of construction with cable-assisted stiffness without the full complexity of cable-stayed systems. The term "extradosed" derives from the placement of prestressing tendons outside the main , specifically along the extrados—the upper convex surface—enhancing without embedding them internally, which distinguishes it from conventional post-tensioned girders. This nomenclature was coined in 1988 by French engineer Jacques Mathivat, who proposed the concept as an innovative cabling arrangement for bridges like the Arrêt-Darré viaduct in , aiming to optimize prestressing for replaceable external tendons. Related terminology includes the "kingpost system," referring to the low-height pylons acting as kingposts to tension the stays and bolster the beam superstructure, often in combination with cable supports. V-shaped towers, or pylons, are a common variant, where inclined supports converge at the deck level to provide both structural anchorage and aesthetic integration, reducing wind and hydrodynamic loads in certain designs. In a basic schematic, the serves as the primary load-bearer, with its stiff box spanning between piers and carrying vehicular or pedestrian traffic, while the stays—anchored at intervals along the and deviated over the towers—offer supplemental vertical support, primarily alleviating dead loads by 60–70% through tension. This arrangement results in shallow cable inclinations and pylon heights typically 0.07 to 0.13 times the main span length, ensuring the structure behaves more like an enhanced than a fully suspended system.

Comparison to Other Bridge Types

Extradosed bridges typically accommodate spans ranging from 100 to 250 meters, significantly shorter than those of , which can extend up to 1000 meters or more. The stay cables in extradosed designs are inclined at shallower angles, generally between 15 and 30 degrees, compared to the steeper angles in , while the towers are proportionately shorter, often less than one-quarter of the span length. These characteristics position extradosed bridges as an intermediate solution for mid-range spans where longer become uneconomical. In comparison to cable-stayed bridges, extradosed designs treat the stay cables primarily as external prestressing tendons rather than as the main load-bearing supports, which allows for reduced tower heights and overall construction costs. Unlike cable-stayed bridges, extradosed structures do not require backstays to anchor the towers, enabling simpler multi-span arrangements without complex transition piers. This approach enhances efficiency for spans under 200 meters, where the prestressing effect minimizes cable vibrations and fatigue. Relative to prestressed bridges, extradosed bridges incorporate external stays to extend achievable spans without substantially increasing girder depth, achieving height-to-span ratios of 1:15 to 1:35. This hybrid configuration provides greater stiffness and reduced deflection compared to pure designs, particularly for spans exceeding typical girder limits of around 100 meters. When contrasted with arch or bridges, extradosed designs use less for mid-range spans due to their balanced load and simpler paths, making them more suitable for seismic-prone areas where the reduced tower height and cable prestressing contribute to better energy dissipation. Aesthetically, extradosed bridges offer a sleeker profile than bulky girders while appearing less dramatic than the towering, fan-like cable arrays of cable-stayed or bridges.

History

Origins and Early Concepts

The conceptual foundations of extradosed bridges trace back to advancements in during the 1960s and 1970s, building on the pioneering work of French engineer Eugène Freyssinet, who developed the core principles of prestressing in the 1920s and 1930s to counteract tensile stresses in concrete structures. Freyssinet's innovations, including high-strength concrete and post-tensioning techniques, enabled longer spans and more efficient designs, influencing subsequent and Asian bridge engineering by addressing the limitations of traditional girders for medium-length crossings exceeding 100 meters. In , particularly and , the 1960s saw the rise of segmental post-tensioned box girder bridges using cantilever construction, which optimized material use and construction speed for spans in the 100-200 meter range. Similarly, in Asia, adopted these post-tensioning methods during the 1970s to construct durable, earthquake-resistant bridges, adapting Freyssinet's concepts to local seismic conditions and high-traffic demands. These developments highlighted the need for systems that blended the simplicity of bridges with enhanced support for longer spans, leading to early theoretical proposals in the late 1970s and 1980s. engineer Jacques Mathivat, drawing from his expertise in prestressed bridges, formally proposed an "extradosed" configuration in 1988 as a low-height cable-stayed system to fill the structural gap between conventional prestressed s (typically under 100 meters) and full cable-stayed bridges (over 200 meters). Mathivat's concept emphasized external prestressing tendons positioned above the deck—termed "extradosed" from the for "outside the back"—to provide efficient load distribution while minimizing tower height to about one-third that of traditional cable-stayed designs, thereby reducing costs and visual impact for medium spans. This approach was influenced by ongoing refinements in post-tensioning across and , where engineers sought economical alternatives to pure or stayed systems for urban and river crossings over 100 meters, prioritizing material efficiency and constructability. Initial conceptual sketches and studies emerged primarily in and during the 1980s, focusing on the cost-efficiency of extradosed prestressing for spans of 100-250 meters. In , Mathivat proposed the system for projects like the Arrêt-Darré Viaduct, Mirabeau Bridge, and Joinville Bridge, illustrating how extradosed cables could act as extended tendons to optimize bending moments and reduce depth without the complexity of tall pylons. Japanese engineers, building on their extensive use of since the , conducted parallel studies to adapt these ideas for seismic zones, emphasizing the hybrid nature that combined stability with cable support for enhanced and lower lifecycle costs in medium-span applications. These early explorations laid the groundwork for practical implementation, demonstrating potential savings in volume and time compared to traditional methods.

Evolution and Key Milestones

The concept of the extradosed bridge evolved from earlier cable-supported designs, with Swiss engineer Christian Menn's Ganter Bridge in , completed in 1980, serving as a seminal precursor that influenced the type's development through its hybrid beam-cable configuration. Building on theoretical foundations from French engineer Jacques Mathivat's 1988 proposal for the Arrêt-Darré viaduct, the first structure explicitly classified as an extradosed bridge was Japan's Odawara Blueway Bridge in 1994, marking the type's formal debut and rapid adoption for medium-span applications. In the 1990s, expansion occurred primarily in Japan, where seismic adaptations drove innovation, contributing to over a dozen such structures by decade's end. Switzerland's Sunniberg Bridge in 1998 further advanced the form with rigid towers enabling slimmer decks, while Europe's first post-conceptual example, France's Saint Rémy de Maurienne Bridge in 1996, demonstrated versatility in viaduct designs. The 2000s saw global growth, with European adoption in beginning with the 2007 Konin Bridge over the River—the country's inaugural extradosed —featuring concrete pylons and a 135-meter main span. In , additional examples around 2008 integrated the type into high-volume highway networks. The entered the field in 2011 with the initial segments of the Pearl Harbor Memorial (Q) Bridge in , a extradosed replacing a prior to handle urban traffic loads. Post-2015 milestones emphasized regional adaptations, including seismic-resistant designs in for cold climates, such as the (completed 2009) incorporating earthquake performance features. By 2025, over 240 extradosed bridges had been constructed worldwide, incorporating innovations like composite materials for enhanced durability in diverse environments. Key engineers, including Menn and Japanese pioneers like A. Kasuga, shaped the field, supported by standards from the International Federation for Structural Concrete (fib), whose Bulletin 30 (2002) on stay cables provided foundational guidelines for extradosed systems, later updated in Bulletin 89 (2018).

Design Principles

Structural Components

The primary structural components of an extradosed bridge include the main , towers (or pylons), and stay cables, which together form a that blends elements of prestressed and cable-stayed designs. The typically consists of a box , providing the primary load-carrying capacity through its inherent bending stiffness, while the low-profile towers and inclined stay cables offer supplemental support to reduce deflections and enhance overall rigidity. This configuration allows for efficient spanning of medium-length distances, often up to 200-300 meters for the main span, without the need for excessively tall pylons characteristic of full cable-stayed bridges. The deck is usually constructed as a continuous or segmental box , with a span-to-depth ratio ranging from 30 to 55, resulting in a relatively shallow profile compared to traditional bridges (e.g., depths of 3.5-4.0 meters for spans around 120-270 meters). The box section, often multi-cell for wider decks, incorporates internal and external post-tensioning tendons to counter dead and live loads, carrying 60-80% of the permanent load via flexural action. Stay cables are anchored directly to the top slab or near the webs via reinforced diaphragms or transverse ribs, ensuring efficient force transfer without significantly altering the deck's aerodynamic form; for instance, in the Blueway Bridge, anchors are placed near the webs to distribute stresses evenly. is the dominant material, though or composite sections may be used for longer spans exceeding 200 meters to improve durability and reduce weight. Towers in extradosed bridges are notably low-profile, with heights typically 1/10 to 1/15 of the main length (approximately 0.07-0.13 times the span), distinguishing them from taller cable-stayed pylons and minimizing visual impact and material use. Common shapes include V- or A-forms, often constructed from using slip-form or climbing methods, though steel options exist for prefabricated segments; these configurations provide while integrating seamlessly with the . Towers are frequently mounted on single or directly embedded into the , reducing the number of substructure elements and foundation demands—for example, in the Narmada Bridge, Y-shaped towers rise from compact pier bases to limit seismic vulnerabilities. Variations such as fin-like or slender designs further adapt to site-specific aesthetics and load paths. Stay cables, serving as external prestressing elements, are primarily made of high-strength strands (typically 15-15.2 mm , galvanized and sheathed in HDPE or tubes for protection), though emerging applications incorporate carbon reinforced (CFRP) for lighter weight and higher resistance in corrosive environments. Each comprises 19-93 strands, with 4-19 cables per tower in smaller configurations, spaced 4-7 meters along the and 0.5-1.0 meters at the tower to optimize load distribution. layouts commonly adopt , harp, or semi-fan patterns, where strands converge toward the tower top in a arrangement or maintain alignment in a harp setup, enhancing structural efficiency and aesthetics; for vibration mitigation, deflector systems such as guide saddles or deviators are integrated at anchor points to control oscillations from or .

Prestressing and Stay Cable Systems

In extradosed bridges, prestressing is primarily achieved through external tendons that are draped over saddles on the pylons, generating both vertical uplift to counteract dead loads and horizontal to enhance the girder's axial . These tendons, often consisting of parallel strands in (HDPE) ducts, are positioned outside the section but within the bridge envelope, allowing for large eccentricities that optimize load distribution. This external is frequently combined with internal post-tensioning tendons within the girder, particularly in or continuous spans, to provide additional localized prestress and improve under varying loads. The stay cable systems in extradosed designs function as specialized prestressors, distinct from full cable-stayed configurations by their shallower angles and integration with the . These s, typically composed of galvanized strands encased in HDPE sheathing, are tensioned to 40-60% of their guaranteed (GUTS) to balance permanent loads while accommodating live load stress variations of 20-50 . Anchorage zones are reinforced with deviators or diaphragms near the girder webs to efficiently manage concentrated s from cable deviation, minimizing local stresses and ensuring smooth transfer without excessive . Force transfer from the stay cables supplements the 's inherent self-prestress, effectively reducing mid-span bending moments by approximately 30-40% compared to conventional prestressed bridges, thereby allowing shallower depths and longer spans. This supplementation arises from the cables' eccentric positioning, which introduces counteracting moments that align with the 's primary flexural demands. Maintenance of these systems benefits from the external positioning of cables, enabling straightforward replacement on a strand-by-strand basis without major structural disassembly, a feature emphasized in designs for . Corrosion protection is ensured through multi-barrier systems, including HDPE sheathing that seals strands against environmental exposure, combined with or grease fillers and periodic inspections to detect degradation early.

Construction and Engineering

Building Techniques

The construction of extradosed bridges typically begins with the establishment of foundations and piers to provide stable support for the superstructure. Foundations often employ caisson or pile cap systems, depending on soil conditions, followed by the erection of slender piers using climbing forms or precast elements to minimize material use while ensuring seismic resilience. For instance, in the Canal Lachine Bridge in Canada, mono-pile foundations and single-column piers without cap beams were utilized to reduce seismic demands, with friction-pendulum isolation bearings integrated at the pier bases. Once piers are in place, tower installation proceeds, often involving low-height concrete or steel pylons cast monolithically with the piers or erected via cranes for precise alignment; these towers, typically 0.07 to 0.13 times the main span length, serve as anchor points for the stay cables. The deck is then constructed using segmental launching methods, such as balanced cantilever or span-by-span erection, to assemble precast concrete segments into a continuous box girder superstructure. In the balanced cantilever approach, segments are cast and erected progressively from the piers outward using form travelers or derrick cranes, with each segment epoxy-jointed and post-tensioned upon placement to maintain structural integrity during extension. Span-by-span methods, employed for efficiency in multi-span configurations, involve placing segments sequentially over temporary supports between piers, as seen in the Selmon West Extension project in Florida, where precast segments were delivered via the completed bridge sections and positioned with swivel cranes. This sequence allows for controlled deflection and alignment, with the deck often reaching closure before full cable integration. Cable erection follows deck advancement, incorporating progressive tensioning to manage deflections and ensure load distribution. , typically composed of strands in HDPE ducts, are installed and tensioned strand-by-strand using hydraulic jacks, starting with an initial strand to bear the duct weight, and achieving 60-80% of the dead load force per segment during cantilever construction. Temporary supports, such as or additional stay cables, are commonly used to stabilize the structure during this phase, as demonstrated in the Wadi Abdoun Bridge in , where interim cables prevented excessive flexure. In the Deh Cho Bridge in , locked-coil cables were tensioned post-launching using the superstructure's weight, supported by Hilman rollers for precise positioning. For longer spans, incremental launching techniques enhance feasibility by assembling the deck at the abutments and winching it forward over temporary prestressed supports, reducing the need for extensive . This method, applied in the Deh Cho Bridge's 1,045-meter length with spans up to 190 meters, involves stage-by-stage analysis to account for launching stresses, often incorporating temporary towers and cable stays for stability. Alignment is maintained through GPS-monitored to control deformations and ensure geometric accuracy throughout the process. The Odawara Blueway Bridge in , the first extradosed structure completed in 1994, utilized such cantilever-based incremental elements with saddle anchorages to achieve its 122-meter main span. Post-2010 advancements have emphasized and streamlined for greater and reduced on-site labor. Precast full-depth segments, as in the Narmada Bridge in (completed 2017), are fabricated off-site and erected using specialized frames like the Bridge Builder system, allowing for rapid assembly in balanced or span-by-span sequences over 1,344 meters total length. Automated spinning, while less commonly detailed, supports parallel-strand systems with improved anchorage designs for quicker tensioning in modern extradosed viaducts. These methods, evident in projects like the Selmon West Extension (completed 2021), combine extradosed tendons in finback structures with unbonded, replaceable post-tensioning to optimize construction timelines and material savings. Recent projects, such as the Western Hills Viaduct in Cincinnati, Ohio (construction ongoing as of 2025), continue to employ these methods with enhanced .

Materials and Challenges

Extradosed bridges primarily utilize high-performance of C50/60 grade for the deck and towers to achieve the necessary and durability required for spans up to 250 meters. The stay cables typically consist of strands with diameters of 15.2 mm or 15.7 mm and a tensile strength of 1860 , often protected by coatings such as , , or sheathing to enhance resistance. In corrosive environments, advanced options include fiber-reinforced polymers, particularly carbon fiber-reinforced polymer (CFRP) cables, which offer superior corrosion resistance, high strength-to-weight ratios, and fatigue endurance compared to traditional strands. Ultra-high-performance concrete (UHPC), a fiber-reinforced cementitious composite, is employed for joints and repairs due to its rapid strength gain—achieving full capacity within 24 hours—and exceptional durability against . Key engineering challenges in extradosed bridge construction include seismic design, particularly in regions like and , where ductile towers with widened bases or high-strength (up to C70/80) are required to absorb energy and prevent brittle failure during earthquakes. Cold-weather curing poses difficulties in areas such as , where low temperatures slow ; solutions involve chemical admixtures to accelerate setting and maintain temperatures above 10°C during protection phases. Cable vibrations induced by wind or traffic loads represent another hurdle, as the shallower cable angles in extradosed designs can amplify dynamic responses. To address these issues, finite element modeling is extensively applied to simulate and traffic-induced loads, accounting for construction stages, , shrinkage, and cable-deck interactions for optimized structural behavior. In the , sustainability efforts have increasingly incorporated recycled aggregates into mixes for decks and substructures, contributing to reduced embodied carbon over the lifecycle while maintaining , as demonstrated in broader bridge engineering practices. Vibration is achieved through viscous or high-damping rubber devices installed at cable anchorages, effectively mitigating oscillations for cables up to 250 meters long.

Applications and Performance

Advantages and Limitations

Extradosed bridges offer significant advantages in cost-effectiveness for medium spans, typically ranging from 100 to 200 meters, where they can be less costly in construction and maintenance compared to conventional concrete cable-stayed bridges due to shorter pylons, simpler anchorages, and reduced material requirements. This economic benefit arises from their hybrid design, which minimizes the depth of the girder while leveraging external prestressing via stays, leading to lower self-weight and smaller foundations than traditional prestressed girder bridges. Additionally, their aesthetic appeal stems from low-profile towers and shallow-angle cables that create an elegant, unobtrusive profile, making them suitable as landmarks with minimal visual intrusion in sensitive environments. Construction is often faster than that of full prestressed concrete girders, facilitated by methods like balanced cantilevering with active deformation control, which reduces the need for extensive temporary supports and enables efficient on-site assembly. From an economic perspective, extradosed bridges exhibit lower lifecycle costs owing to their durability and reduced fatigue in stay cables, allowing higher allowable stresses (up to 60% of the guaranteed ) and fewer long-term repairs compared to cable-stayed designs. They are particularly ideal for settings where height restrictions limit taller pylons and for seismic-prone areas, as their stiff girders and fixed tower-girder connections provide enhanced control and structural under dynamic loads. Environmentally, these bridges promote through reduced usage—often ~20% less than equivalent options for medium spans—lowering the associated with material production and transportation. Despite these benefits, extradosed bridges have notable limitations, primarily their suitability restricted to medium spans not exceeding 300 meters without extensions, beyond which the 's diminishes relative to full cable-stayed systems. The of stays as eccentric external tendons introduces higher initial in prestressing the , requiring specialized expertise and potentially increasing upfront efforts compared to simpler bridges. poses challenges due to the low tower heights, which can complicate access to cables, anchorages, and saddles, necessitating annual inspections by trained personnel and potentially elevating long-term operational costs in hard-to-reach configurations.

Span Capabilities and Load Analysis

Extradosed bridges are particularly effective for spans ranging from 60 to 250 , with main spans typically reaching up to 200 , where their structural efficiency is optimized in the 100- to 200-meter range due to the balanced integration of prestressed girders and external tendons. In terms of load distribution, the primarily bears 70-80% of the dead load through its structure, while the stays function as external post-tensioning elements that manage live loads via induced prestress, resulting in low stress variations in the cables under variable loading. This configuration reduces bending moments in the . Design analysis commonly employs equivalent frame models to simulate the between the , towers, and stays, facilitating efficient evaluation of static and dynamic responses. Extradosed bridges exhibit improved dynamic performance against wind and seismic loads compared to conventional bridges, attributable to the provided by the stay cables. Key performance metrics include deflection limits typically controlled to L/800 under live loads per standards such as AASHTO LRFD to ensure serviceability, and a life exceeding 100 years when stays are properly tensioned to minimize ranges.

Notable Examples

Asia

Asia has emerged as a significant region for the development and application of extradosed bridges, driven by the need for efficient in seismically active zones and rapidly urbanizing areas. These structures offer a balance between the simplicity of girder bridges and the span capabilities of cable-stayed designs, making them suitable for medium-span crossings over rivers, highways, and urban corridors. Japan's pioneering work in the 1990s set the stage, with subsequent adoption in , , , and adapting the technology to local challenges such as resistance and high-traffic demands. In , the Blueway Bridge, completed in 1994, represents the country's first major extradosed bridge with a main span of 122.3 meters and a total length of 269 meters. This three-span structure (73.3 + 122.3 + 73.3 meters) features two planes of stays anchored near the web for reduced tower height (10.7 meters) and incorporates seismic innovations like a widened tower base, saddle anchorages, and high-damping rubber dampers to mitigate vibrations during earthquakes. These design elements addressed Japan's frequent seismic activity while ensuring navigational clearance for port access, establishing extradosed bridges as a viable option for urban and coastal environments. Subsequent Japanese projects, such as the Ibi River Bridge (2001, main span 271.5 meters), further refined seismic performance through single-plane stays and precast segmental construction. China has extensively utilized extradosed bridges for urban integration and high-speed rail corridors, exemplified by the Wuhu Yangtze River Bridge, opened in 2000 with a main span of 312 meters and total length of 672 meters. This hybrid road-rail structure (180 + 312 + 180 meters) employs a double-girder steel truss with concrete slabs, allowing dual use in densely populated areas while minimizing environmental impact through composite materials. In the 2020s, extradosed designs have been applied to high-speed rail projects, providing efficient spans up to 400 meters to support rapid urbanization and connectivity in earthquake-prone regions. These adaptations emphasize low maintenance and aesthetic harmony with surrounding infrastructure. Thailand's adoption focuses on traffic efficiency in growing metropolitan areas, with the Maha Chesadabodindranusorn Bridge (also known as Bridge), completed in 2018, marking the nation's first extradosed structure. Spanning 460 meters with a width of 32.4 meters across the , this two-pylon bridge combines prestressed box girders with cable stays to handle eight lanes of heavy urban traffic, reducing on parallel crossings. Its design prioritizes economic construction using multi-epoxy tendons and supports regional trends toward multi-span configurations for expressways, as seen in the Second Bangkok-Chonburi Expressway enhancements around 2017, which incorporated similar hybrid elements for seismic resilience and flood-prone terrains. In , extradosed bridges address rugged terrains and high-load requirements, with the Aunta-Simaria Bridge (part of the Patna-Purnea Expressway) emerging as a key example of . Inaugurated in August 2025 with a maximum span of 115 meters, this structure is India's widest extradosed bridge at 34 meters wide, designed for heavy freight in seismic zones using to withstand and vibrations. While not directly linked to the Chenab project, it reflects regional innovations for challenging landscapes, such as integrated prestressing for stability in flood- and quake-vulnerable areas. Sri Lanka's New Kelani River Bridge, opened in 2021, introduced the extradosed type to the country with a main span of 180 meters and total length of 380 meters across the near . This six-lane structure, funded by Japanese ODA, features a box girder with stays for pier-free navigation, enhancing urban connectivity and serving as a gateway to the capital amid rapid population growth. Its design avoids riverbed piers to protect ecosystems, aligning with broader Asian emphases on sustainable . Across , extradosed bridges trend toward enhanced resistance through features like dampers and low-profile towers, as pioneered in and adopted in and for seismic zones. Rapid drives their use in multi-lane expressways and rail integrations, prioritizing spans of 100-400 meters for cost-effective urban expansion without excessive material use.

Europe

The Ganter Bridge in , completed in 1980, represents a pioneering achievement in extradosed bridge design, featuring three spans with two main segments of 125 m each, crossing the Ganter River valley at an elevation of 1,450 m. Designed by engineer Christian Menn, the structure integrates with external tendons to navigate the alpine challenges of steep gradients, high winds, and limited construction access in the region, establishing a model for efficient medium-span crossings in mountainous terrain. In , extradosed bridges emerged prominently in the 2000s and 2010s, beginning with the Bridge of the in , opened in 2007 as the country's first such structure, spanning 80 m over the River with concrete pylons to support urban connectivity. The Bridge near Korzeniewo, completed in 2011, advanced this trend with two main spans of 204 m across the River, employing extradosed tendons for optimized load distribution and economic construction in a seismically stable but flood-prone area. By 2015, multiple multi-span extradosed river crossings, such as the flyover in , incorporated advanced techniques to enhance durability and reduce long-term maintenance in variable climatic conditions. In , extradosed designs in and during the 2000s prioritized low-profile pylons for aesthetic integration into urban motorways, as seen in Parisian infrastructure projects emphasizing visual harmony and reduced visual intrusion. Further north, Norway's Harpe Bridge, completed in 2016, adapted extradosed principles for environments, using robust prestressing to withstand severe weather, ice loads, and corrosive marine conditions. In , post-2010 seismic designs like the Çallı Bridge, the nation's first extradosed structure, incorporated lead-rubber bearings and external tendons for enhanced earthquake resilience in high-risk zones. European extradosed bridges consistently comply with for reliability and safety, particularly EN 1992 for structures and EN 1998 for seismic actions, ensuring standardized prestress and detailing. Sustainability trends emphasize material efficiency, with reduced volumes through optimized layouts and incorporation of recycled aggregates to lower carbon footprints during and operation.

Americas and Other Regions

In the , extradosed bridges have been adopted for urban infrastructure replacements in the , particularly where cost-effective solutions are needed to address aging viaducts in densely populated areas. A prominent example is the planned replacement for the Western Hills Viaduct in , , which will feature an extradosed design spanning the and an active railyard to connect Interstate 75 with downtown and uptown districts. This $398 million project, funded through federal grants and local contributions, aims to enhance mobility and safety in an urban corridor handling heavy commuter traffic, with construction starting in 2026 and completion targeted for 2030. In , extradosed bridges have been engineered for cold climates and seismic zones since the , incorporating features to withstand extreme temperatures and ground movements common in regions like . The , opened in 2012 near in the , exemplifies adaptations for sub-zero conditions, with a 1,045-meter structure featuring nine spans up to 190 meters and a lightweight Warren-truss design using locked-coil cables and full-depth precast deck panels to enable rapid assembly in -40°C weather while minimizing seismic loads. Similarly, the Canal Lachine Bridge in downtown Montréal, Québec, completed post-2015, spans 365 meters across five segments up to 88 meters, utilizing a curved composite grillage with friction-pendulum isolation bearings to isolate the from seismic activity in this cold, urban ; precast panels facilitated construction during harsh winters. These designs often integrate considerations for de-icing through durable materials and phased builds, though specific integrations vary by site, reflecting broader performance-based seismic guidelines in . In , Bolivia's high-altitude terrain has prompted the use of extradosed bridges in the 2010s to navigate steep valleys efficiently. The Trillizos ("The ") bridges in , completed in 2010, consist of three consecutive extradosed structures forming part of a northern beltway to alleviate city across parallel valleys at elevations around 3,600 meters. With total lengths of 233.5 meters, 191.5 meters, and 218.8 meters respectively—including a maximum span of 113.5 meters—these box-girder decks, 14.8 meters wide for four lanes, rise 40-60 meters above the valley floors on pylons under 25 meters tall, using 6-7 stays per tower to balance structural efficiency against the challenging topography. Funded by the Corporación Andina de Fomento, the project earned the Eugene C. Figg Medal in 2012 for its innovative adaptation to rugged, high-elevation conditions. In , has embraced extradosed bridges for critical river and lake crossings in the 2020s to bolster regional infrastructure. The John Pombe Magufuli Bridge, opened in June 2025, spans 3.2 kilometers across , linking Kigongo in the to Busisi in the as part of Tanzanian T4. This $270 million extradosed cable-stayed structure, constructed over five years despite delays, replaces a 35-minute crossing with a five-minute drive, projecting daily traffic of 10,200 vehicles compared to 1,600 ferry users and facilitating trade with , , , and . Built by China's CCECC and Railway 15th Bureau under the , it represents a self-funded push for connectivity in a developing , though similar projects in the region often draw on international aid. Other regions, including , have seen extradosed adoption in the 2010s and 2020s for efficient spans over waterways. 's first extradosed bridge, the River Erne Bridge completed in 2013 near in , features a 142-meter cable-stayed structure as part of the N3 Butlersbridge to upgrade, marking the inaugural use of this hybrid typology in the country for a three-span river crossing. A more ambitious example is the , finished in 2019 over the River Barrow in as part of the N25 New Ross Bypass, with a 900-meter length across nine spans up to 230 meters—the longest post-tensioned extradosed spans worldwide at the time—rising 36 meters above the on three asymmetrical towers up to 27 meters high. Utilizing 70,000 tonnes of and 500 kilometers of cabling, this public-private partnership project earned multiple awards, including the IABSE Outstanding Structure Award in 2021, for its blend of prestressed girder and cable-stayed elements in a scenic, navigable setting. Across the and other regions, extradosed bridges demonstrate adaptability to diverse terrains, from high-altitude Andean valleys and winters to tropical lakes and temperate rivers, prioritizing low-profile pylons and efficient material use for site-specific challenges like seismic activity and . Recent growth from 2023 to 2025 in developing areas, such as Tanzania's aid-influenced builds, underscores their role in aid-funded to enhance and without excessive heights or costs.

References

  1. [1]
    [PDF] Structural behavior and design criteria of extradosed bridges
    This study introduces the typology, by highlighting basic features that define its structural behavior and the project criteria stated by literature. 2.
  2. [2]
    [PDF] Extradosed Bridges - Concrete
    To provide in-depth information to practicing structural engineers, in reports of high scientific and technical standards on a wide range of structural.
  3. [3]
    [PDF] synthesis on cost-effectiveness of extradosed bridges: technical report
    Oct 28, 2012 · An extradosed bridge is a unique bridge type that utilizes both prestressed girder bridge and cable-stayed bridge concepts.
  4. [4]
    Extradosed Bridges in Poland—Design and Construction - Frontiers
    The extradosed bridge can be defined as the structure being between the girder bridge and the cable-stayed bridge (Mermigas, 2008; Collings and Gonzalez, 2013).
  5. [5]
    [PDF] Design and Construction of Extradosed Bridges in Cold ...
    Extradosed bridges are often described as a cross of a conventional prestressed concrete girder bridge and a traditional cable-stayed bridge because most ...
  6. [6]
    Lessons learned from construction of several extradosed bridges
    The creation of the concept and denomination of the extradosed bridge is attributed to the French engineer Jacques Mathivat, who, in 1988, coined this term for ...
  7. [7]
    Extradosed bridges|Bridges|Fuji P.S Corporation
    In general, this form is adopted for bridges with span lengths shorter than cable-stayed bridges, and the height of the main tower installed atop the pier is ...
  8. [8]
    [PDF] Extradosed Cable Stayed Bridge - IJERA
    The recent research has shown that a. Extradosed bridge, variant of cable stayed bride ... (2002), the angle of inclination of cables is between 16 to 27 degrees ...
  9. [9]
    [PDF] Extradosed Prestressed Concrete Bridges
    Cable-stayed bridges are typically either two-span or three-span arrangements. These span arrangements are ideal for cable-stayed bridges because back stay.
  10. [10]
    [PDF] study of extradosed bridges
    Extradosed bridges would be a mid way between a cantilever constructed box-girder bridge and a cable-stayed bridge, working part on the bending of the girder ...
  11. [11]
    Extradosed and Intradosed Cable-Stayed Bridges with Continuous ...
    The height-to-span ratio of the girder in extradosed bridges ranges between 1:15 and 1:35, lower than in ordinary girder bridges, but still rather large to ...<|control11|><|separator|>
  12. [12]
    [PDF] COMPARATIVE STUDY BETWEEN GIRDER BRIDGE AND EXTRA ...
    Extra-dosed bridges have longer spans, less deflection, and less piers than pre-stressed girder bridges. Extra-dosed is a hybrid of cable-stay and girder  ...
  13. [13]
    Optimization of extradosed concrete bridges subjected to seismic ...
    To enhance the prestress structural efficiency, the tendons are installed outside and above the main girder and deviated by short towers located at supports.
  14. [14]
    Comparative analysis of single plane and double plane cable ...
    Single-plane extradosed bridges are known for their aesthetics ... Extradosed bridge provides improved aesthetics as it looks similar to cable stayed bridge.
  15. [15]
    [PDF] Eugene Freyssinet - Precast/Prestressed Concrete Institute
    It is well known that Eugène Freyssinet was the inventor of prestressed concrete. However, it is not as well known that he was a skilled craftsman.
  16. [16]
    Development of prestressed concrete bridges
    Jun 3, 2025 · The first major prestressed concrete road bridge was the replacement for Northam Bridge, Southampton (1954). Prestressed precast concrete bridge ...
  17. [17]
    [PDF] Twenty Five Years of Progress in Prestressed Concrete Bridges
    Since 1970, more than 50 percent of the total area of bridges going to contract each year has been prestressed concrete. In 1975, for ex- ample, reinforced ...
  18. [18]
    [PDF] Prefabricated Bridge Elements and Systems in Japan and Europe
    The use of extradosed bridges allowed for longer span lengths and fewer foundations. Railroad Bridges. The Japanese economy is very dependent on the railway.
  19. [19]
    [PDF] The Development of Extradosed Bridge Concept ... - Semantic Scholar
    Mar 1, 2021 · Mathivat of France who is recognized as the inventor of this bridge type, envisioned a new bridge type suitable for medium span ranges in 1979.
  20. [20]
    The Evolution of Post-Tensioning Technology: A Brief History
    Apr 3, 2023 · In the 1960s and 1970s, post-tensioning technology began to spread rapidly, and it was used in a wide variety of structures, including bridges, ...Missing: Europe Asia 100m
  21. [21]
    [PDF] Extradosed bridges in Japan - Concrete
    This paper shows five extradosed bridges that were designed and built by the author, and explicates the difference between extradosed and cable-stayed bridges ...Missing: 1970s | Show results with:1970s
  22. [22]
    Structural behavior and design criteria of extradosed bridges
    Generally a rigid deck extradosed bridge shall have a similar behavior to the prestressed bridge's, thus avoiding high stress oscillations of stay cables and, ...<|separator|>
  23. [23]
    Extradosed bridges: evolution and current trends - ResearchGate
    Aug 10, 2025 · Since their appearance in 1994, extradosed bridges have played an important role in road and railway projects, competing (in medium span lengths) ...
  24. [24]
    Analysis of Eduardo Torroja's Tempul Aqueduct an important ...
    The “extradosed” term was first used by the French engineer Jacques Mathivat in 1988 [3] to describe a novel cable arrangement developed for the Arrêt-Darré ...Missing: milestones | Show results with:milestones
  25. [25]
    'Extradosed' Crossing To Help Connecticut Traffic Problems
    May 6, 2009 · The six-lane steel-plate girder bridge is being replaced by a three-span 1,013-ft-long side-by-side extradosed structure, a hybrid cable-stayed, ...
  26. [26]
    (PDF) Extradosed Bridge Part of the Third Ring Road of Mecca
    Apr 29, 2024 · 1988, extradosed Bridges have spread worldwide. More than 240 extradosed Bridges constructed. worldwide were reported by Schlaich et al. [2] ...
  27. [27]
    (PDF) Application of Carbon Fibre Reinforced Polymer Cable in ...
    Aug 20, 2024 · This study offers a novel application of CFRP cables in an extradosed cable-stayed bridge, providing economic and environmental benefits, ...
  28. [28]
    (PDF) CONCEIVING OF EXTRADOSED BRIDGES - ResearchGate
    Aug 8, 2025 · bridge between 1/4 to 1/5. For extradosed bridges, the role of the cables is to act as. external post-tensioning tendons and provide prestress ...
  29. [29]
    [PDF] Extradosed Finback Design and Progressive Span-by-Span ...
    The extradosed tendons (tendons exterior to the superstructure cross section) in the finback replace several of the typical internal or external tendons.
  30. [30]
    [PDF] EXTRADOSED BRIDGES
    Providing stiffness either in the girder or in the piers of an extradosed bridge are both found to be effective stategies that lead to competitive designs. Page ...
  31. [31]
    On the design and optimization of hybrid carbon fiber reinforced ...
    CFRP cable has a good corrosion-resistant property. It can work in the environments of acid, alkali, salt solutions, and humidity. Therefore, the cost of life- ...
  32. [32]
    BBR Carbon stay cable technology - BBR Network
    The patented BBR Carbon stays have an exceptional high fatigue strength combined with light weight, corrosion-free properties.
  33. [33]
    EDC-6: UHPC for Bridge Preservation and Repair
    Aug 18, 2023 · Ultra-high performance concrete (UHPC) offers enhanced durability and improved life-cycle cost performance for bridge preservation and repair.
  34. [34]
    Innovative & Sustainable Materials for Bridge Construction - NBM&CW
    Feb 12, 2025 · This article explores innovative & sustainable materials and technologies for bridge construction, including recycled aggregates, ...
  35. [35]
    [PDF] Sustainability of Rural Steel and Concrete Bridges
    Jan 4, 2022 · The results show that, over the life cycle, the concrete bridge (1) results in 26.3% more embodied CO2e emissions, (2) consumes 8.7% more energy ...
  36. [36]
    [PDF] Cost Optimization of Extradosed Bridge by varying Cable Position
    This innovative cable-stayed bridge system made it possible to reduce each of the construction and maintenance costs by 20% compared to the conventional ...
  37. [37]
    Probabilistic Seismic Sensitivity Analyses of High-Speed Railway ...
    Jun 11, 2023 · Commonly extradosed cable-stayed bridges have the advantages of both ordinary cable-stayed bridges and of continuous girder bridges in their ...
  38. [38]
    [PDF] Design of the Canada Line Extradosed LRT Bridge
    Extradosed Bridges. ○ Extend span range of box girder bridges. ○ Optimize tendon profile for negative bending. ○ Cost effective for medium spans up to 200m.Missing: capabilities | Show results with:capabilities
  39. [39]
    [PDF] Optimization and Comparative Study Bridge and Extradosed Bridge ...
    Mathivat Jacques is France engineer who is recognized as the inventor of extradosed bridge type. According to Mathivat in recent new type bridges which are ...
  40. [40]
    [PDF] Practical analysis methods for continuous girder and ... - SciSpace
    In frame analysis, the model of a bridge adopts general frame elements for the concrete web and CWB elements for the corrugated web. The former have three ...<|control11|><|separator|>
  41. [41]
    Damping in seismic response of cable-stayed bridges - ResearchGate
    Seismic design and analysis of most cable-stayed bridges typically assumes 5 percent damping, and response spectra values are set based upon this value.
  42. [42]
    Lifetime Deflections of Long-Span Bridges under Dynamic and ...
    Aug 24, 2017 · The probability of exceedance of a deflection limit is a serviceability criterion for a bridge under traffic loading. ... bridge fatigue ...
  43. [43]
    Safety Evaluation of Stay Cables of Cable-Stayed and Extradosed ...
    For cable-stayed bridges, ultimate strengths of stay cables are more critical than their fatigue strengths and a minimum safety factor of 2.3 is essential to ...
  44. [44]
    Extradosed Bridges in Japan | Request PDF - ResearchGate
    Aug 7, 2025 · The concept, first proposed by the French engineer Jacques Mathivat in 1988 [1,2] is based on the fact that the stay cables provide ...
  45. [45]
    Extradosed bridges from around the world - Structurae
    Directory and listing of extradosed bridges from around the world including images, technical data, literature and other project information.
  46. [46]
    Economic Construction of an Extradosed Bridge - DYWIDAG
    The 460m long two pylon bridge is Thailand's widest bridge with a width of 32.4m, and also the first extradosed bridge in the country.
  47. [47]
    [PDF] Extradosed Bridge in Thailand — Nonthaburi Bridge —
    Nonthaburi Bridge is the first extradosed bridge in. Thailand. After project completion, the bridge was named the Maha Jessada Bodin Bridge after the third.
  48. [48]
    Which is the Widest Bridge in Asia? Key Features and Trivia Facts!
    Aug 22, 2025 · Aunta-Simaria bridge is not only the widest bridge in Asia but also the widest extradosed cable-stayed bridge in India, built on National ...<|separator|>
  49. [49]
    Opening of the New Kelani Bridge, Colombo's new gateway - JICA
    Dec 15, 2021 · The New Kelani Bridge utilizes high-quality Japanese technology. The bridge adopts the first extradosed design in Sri Lanka (a bridge in ...
  50. [50]
    From Kolkata to Colombo - Mageba-group
    The New Kelani River Bridge, recently constructed in the island nation of Sri Lanka, is the country's first extradosed bridge – combining the main elements ...<|separator|>
  51. [51]
    Ganter Bridge (Ried-Brig, 1980) - Structurae
    May 23, 2022 · Ganter Bridge is a three-span extradosed bridge, road bridge and prestressed concrete bridge that was built from 1976 until 1980.
  52. [52]
    Ganter Bridge - HighestBridges.com
    Jan 6, 2011 · Ganter is a cross between a cable stayed bridge and a beam bridge. The natural beauty of the bridge comes from the geometric shape of these triangular supports.Missing: 1991 | Show results with:1991
  53. [53]
    The two largest Polish concrete bridges – design and construction
    Aug 7, 2025 · This paper describes the design and construction of the cable-stayed bridge in Wroclaw and the extradosed bridge in Kwidzyn. Both structures ...Missing: Korzeniewo | Show results with:Korzeniewo<|separator|>
  54. [54]
    Harpe – the first extradosed bridge in Norway - PORR AG
    The Harpe bru structure is the first extradosed type bridge in Norway. This bridge combines elements of a beam and a cable-stayed bridge. Extradosed bridges ...Missing: fjord 2010s
  55. [55]
    [PDF] The evolution of Eurocodes for bridge design
    In line with the EU's strategy for smart, sustainable and inclusive growth (EU2020), Standardization will play an important part in supporting the strategy. The ...
  56. [56]
    Western Hills Viaduct - Transportation & Engineering
    The team has secured the funding to build a new “extradosed” bridge immediately to the south of the current viaduct. ... after construction of the new bridge is ...
  57. [57]
    Trillizos, “The Triplets” Extradosed Road Bridges - PEDELTA
    Project Description. The construction of a beltway allowing traffic decongestion in the city of La Paz, Bolivia, was completed in 2010.Missing: altitude 2020s
  58. [58]
    $$270 million Tanzania bridge opens - Global Highways
    Jul 2, 2025 · Construction of the extradosed, cable-stayed bridge took five years to complete, with delays to the work stemming from the COVID-19 epidemic.
  59. [59]
    First extradosed bridge in Ireland - Ferrovial Blog
    Erne River extradosed bridge is part of the N3 Road Improvement Project in Cavan County, Ireland. The solution adopted is a 142 m long.Missing: history milestones<|control11|><|separator|>
  60. [60]
    Rose Fitzgerald Kennedy Bridge - BAM Ireland
    This Extrados Bridge is 900 meters long, has 8 piers and 3 towers. Bridge Statistics: Nine spans of the following lengths: 36m, 45m, 95m, 230m, 230m, 95m, 70m, ...