Fact-checked by Grok 2 weeks ago

Falcon 9 v1.1

The Falcon 9 v1.1 was a two-stage, liquid-propellant developed by , operational from September 2013 to early 2016. Powered by and rocket-grade , it employed nine 1D engines in an octaweb arrangement on the first stage and a single 1D Vacuum engine on the second stage, delivering approximately 7,686 kN of sea-level thrust from the booster. Standing 68.4 meters tall with a and weighing 505.8 tonnes at liftoff, the vehicle offered a payload capacity of 13.15 tonnes to and 4.85 tonnes to . This iteration marked substantial advancements over the preceding v1.0 through elongated propellant tanks, upgraded engines with higher chamber pressure and throttle capability, and redundant systems, resulting in about 30% greater performance. Across 15 missions, it achieved 14 successes, supporting Commercial Resupply Services to the , commercial geostationary satellite deployments, and scientific payloads like CASSIOPE, while incorporating grid fins and landing legs for initial powered recovery experiments that, though unsuccessful at the time, laid groundwork for subsequent reusability milestones. The sole failure, on the CRS-7 mission in June 2015, stemmed from a second-stage tank failure causing overpressurization and disintegration.

Design and Technical Specifications

Modifications from Falcon 9 v1.0

The Falcon 9 v1.1 featured stretched propellant tanks compared to the v1.0 variant, with the first stage extended by approximately 3.7 meters (12 feet) and the second stage by 0.46 meters (1.5 feet), resulting in roughly 30% greater propellant volume. This structural modification increased the vehicle's overall height to 68.4 meters (224 feet) and mass by about 60%, enhancing payload capacity to low Earth orbit from 10,450 kg in v1.0 to 13,150 kg. Propulsion upgrades included replacing the nine Merlin 1C engines in the first stage with Merlin 1D engines, which delivered higher sea-level thrust of approximately 845 kN each—nearly double that of the 1C—and a of 311 seconds, improving efficiency. The engines were rearranged in an octagonal "octaweb" configuration, optimizing and structural integration for better control authority during ascent. The second stage retained a single 1D engine but benefited from the stretched tanks, enabling enhanced relight capabilities for multi-burn missions. A became a standard option for non-capsule payloads, constructed from composite materials to enclose 5.2-meter diameter satellites, protecting them during atmospheric passage. These changes collectively expanded operational envelopes, including support for abort trajectories due to greater downrange performance.

First Stage Configuration

The first stage of the Falcon 9 v1.1 featured nine Merlin 1D engines arranged in an octagonal pattern, consisting of eight engines surrounding a single central engine to provide high thrust and redundancy. Each Merlin 1D engine generated approximately 845 kN of thrust at sea level, enabling a total liftoff thrust exceeding 7.6 MN. This configuration improved upon the Merlin 1C engines of the v1.0 version by offering higher specific impulse and throttle capability, supporting design objectives for increased performance and potential post-separation control maneuvers through integrated avionics and thruster systems. The propellant tanks were fabricated from aluminum-lithium alloy via , incorporating a common bulkhead to separate the (LOX) and rocket-grade (RP-1) sections while minimizing mass. Helium pressurization maintained tank integrity under dynamic loads, with the structure designed to withstand up to 3 during ascent. The stage measured 3.7 meters in diameter and approximately 41 meters in , with a dry mass of around 22 metric tons. Stage separation from the second stage utilized a composite interstage equipped with pneumatic pushers and collets, facilitating a controlled, non-destructive disconnect that avoided pyrotechnic residues for cleaner operations. This system enhanced reliability and supported the overall goal of robust in a vehicle optimized for high-thrust ascent and future recoverability features.

Second Stage and Propulsion

The second stage of the Falcon 9 v1.1 is powered by a single Merlin 1D Vacuum engine, featuring an extended for efficient operation in vacuum conditions. This engine delivers approximately 934 kN of thrust and a of 348 seconds, enabling precise orbital insertion maneuvers. Compared to the v1.0, the v1.1 second stage incorporates stretched propellant tanks, increasing burn duration to support missions requiring higher energy orbits. This configuration allows for payload capacities of up to 4,850 kg to (GTO). The engine's utilizes dual redundant pyrophoric igniters fueled by triethylaluminum-triethylborane (TEA-TEB), supporting up to two restarts per flight. These restarts are essential for multi-burn profiles, such as deploying satellites in different orbital planes or circularizing orbits after initial insertion. Propellant tanks are pressurized using stored in composite overwrapped pressure vessels (COPVs), selected for their high strength-to-weight ratio in storing compressed gas. While effective for lightweight design, COPVs in the tank were later identified as contributing to a during the CRS-7 on June 28, 2015, due to a releasing a helium bottle.

Payload Fairing and Integration

The Falcon 9 v1.1 comprises two lightweight carbon composite halves designed to encapsulate and shield or other upper-stage from aerodynamic forces and aero-thermal heating during atmospheric ascent. These fairings measure 5.2 meters in and approximately 13 meters in , providing an internal volume optimized for medium-lift class missions. Unlike certain Falcon 9 v1.0 configurations that could launch smaller payloads without a fairing, the v1.1 standardized the fairing for higher-volume deployments to enhance versatility for commercial and government customers requiring protection through maximum . Fairing jettison occurs via a pneumatic separation system employing push-off mechanisms to deploy the halves once above the dense atmosphere, typically at altitudes around 100 kilometers to minimize structural loads on the second stage and . This process is sequenced post-maximum aerodynamic pressure, ensuring the payload adapter system remains exposed for subsequent orbital insertion maneuvers. The second stage's integrated bay facilitates payload integration by supplying interfaces, relays, and electrical power through standard connectors on the payload adapter fitting. The v1.1 design supports diverse payload architectures, including direct compatibility with the cargo spacecraft for resupply missions, which mates to the second stage without enclosing fairings due to its trunk structure. For satellite missions, the fairing accommodates adapter rings and dispenser systems such as ESPA-class rings, enabling rideshare configurations where multiple smaller satellites deploy sequentially from a single to optimize launch and mission flexibility.

Guidance and Control Systems

The Falcon 9 v1.1 incorporated a triple-redundant architecture for its (GNC) systems, providing single-fault tolerance across flight computers, sensors, and actuators to maintain operational integrity during ascent. This setup relied on inertial measurement units for primary and sensing, augmented by GPS receivers for precise insertion and real-time corrections independent of ground commands. The design emphasized onboard , processing sensor data to execute adjustments without reliance on continuous external intervention, thereby prioritizing inherent system reliability over remote overrides. Attitude control was achieved through a (RCS) employing gaseous (GN2) cold gas thrusters on both stages, which expelled pressurized for low-thrust maneuvers during coast phases, stage separations, and orientation holds. These thrusters offered higher reliability and reduced compared to bipropellant alternatives, with the v1.1 scaling the system to support extended vacuum operations. Complementing the RCS, the nine 1D engines on the first stage provided primary steering via hydraulic gimballing, with all engines capable of vectoring up to several degrees for , yaw, and roll control. Software algorithms governed engine throttling—ranging from full thrust to approximately 40%—and selective shutdowns, enabling engine-out capability to sustain ascent with eight operational engines through much of the first-stage burn by redistributing thrust and compensating via gimbal adjustments. This fault-accommodating logic, validated through ground simulations and integrated vehicle testing prior to v1.1's operational debut on September 29, 2013, allowed the vehicle to meet orbital insertion requirements despite a single engine failure. Telemetry data, including GNC parameters and health metrics, was downlinked via S-band transponders to SpaceX ground stations, with provisions for relay through NASA's Tracking and Data Relay Satellite System (TDRSS) on missions under federal oversight to ensure regulatory compliance without compromising autonomous flight execution.

Development and Production

Development Timeline

Development of the Falcon 9 v1.1 variant commenced in 2011, following the initial certification and operational flights of the v1.0 version, with the goal of incorporating upgraded and stretched propellant tanks for enhanced performance. By summer 2012, the underwent full-flight-duration test firings at SpaceX's McGregor facility, laying groundwork for integration into the v1.1 configuration. In March 2013, SpaceX announced the completion of flight qualification for the Merlin 1D engine after a rigorous 28-test program totaling 1,970 seconds of operation, enabling its debut on upcoming Falcon 9 missions. Prototype assembly of the v1.1 first stage proceeded in mid-2013, culminating in static fire tests at McGregor that validated the stretched tank design and octagonal engine arrangement. Preparation for the maiden v1.1 flight advanced through September 2013, targeting the CASSIOPE mission from , which launched successfully on September 29 despite a minor delay in the second-stage engine relight. The U.S. certified this debut flight on February 25, 2014, acknowledging its applicability toward Evolved Expendable Launch Vehicle qualification despite the anomaly. By early 2014, following additional successful launches, the v1.1 achieved full operational readiness, supporting accelerated schedules under Commercial Resupply Services contracts, including the CRS-3 mission in April.

Testing and Qualification Efforts

The 1D engines powering the Falcon 9 v1.1 first stage underwent rigorous qualification testing prior to vehicle integration. completed a 28-test hot-fire program by March 20, 2013, accumulating 1,970 seconds of operation—equivalent to more than ten full-duration missions—demonstrating enhanced thrust of approximately 311 kN at per engine compared to the Merlin 1C. These tests validated engine reliability under simulated flight conditions, including full-throttle burns to address acoustic and vibrational loads from the increased thrust output. First stage qualification involved extensive static fire campaigns at SpaceX's McGregor facility, firing all nine 1D engines in octagonal configuration for durations approaching nominal flight profiles. These campaigns identified and mitigated vibration-induced harmonics through adjustments, such as reinforced engine mounts and thrust vector control tuning, based on empirical data. Structural components, including the stretched aluminum-lithium tanks and interstage, were subjected to proof tests exceeding 1.1 times maximum expected operating and burst tests to 1.5 times, confirming margins against flight loads without failure modes beyond expected yields. Component-level evaluations encompassed composite overwrapped pressure vessels (COPVs) for pressurization and the pyrotechnic interstage separation , with no of systemic defects in pre-2015 testing campaigns. efforts extended to simulated high-altitude aborts via ground-based dynamic modeling and subscale tests, integrating v1.1 hardware with existing v1.0 ground infrastructure to minimize integration risks. Flight qualification integrated these elements through initial missions leveraging v1.0 launch pads, culminating in U.S. EELV-class . The debut v1.1 flight on September 29, 2013, carrying CASSIOPE, was certified toward this goal despite a transitory second-stage guidance , following technical audits of vehicle, ground systems, and manufacturing processes that affirmed data-driven performance baselines. Subsequent reviews incorporated from early v1.1 flights, validating overall system margins without requiring redesigns beyond minor procedural updates.

Manufacturing and Supply Chain

SpaceX manufactured the Falcon 9 v1.1 primarily at its facility, leveraging to produce the majority of components in-house, including stages, tanks, and propulsion systems. This approach, centered on the 51,000 square meter site expanded in October 2007, enabled parallel assembly across multiple dedicated stations for first and second stages, significantly shortening production lead times to months rather than the years typical in legacy aerospace manufacturing reliant on fragmented subcontracting. The modular architecture of the v1.1 facilitated iterative upgrades—such as stretched tanks and octagonal engine clustering—without necessitating complete redesigns of tooling or assembly lines, supporting a limited production run of approximately 15 first stages to match the vehicle's operational lifespan from 2013 to 2016. Merlin 1D production for the v1.1 ramped up at Hawthorne, achieving rates of up to eight engines per month by late 2011, with further increases to sustain growing launch demands. Innovations like of chambers streamlined fabrication, while selective adoption of additive manufacturing for components such as valves reduced part counts, assembly labor, and lead times by an compared to traditional . These methods contributed to cost efficiencies, avoiding the protracted qualification cycles and high tooling expenses common in government-contractor programs. The v1.1 supply chain prioritized domestic sourcing for composites, avionics, and structural alloys to mitigate risks from international dependencies, which have plagued cost overruns and delays in traditional U.S. space efforts under ITAR constraints. SpaceX's in-house capabilities covered over 80% of the bill of materials by the mid-2010s, supplemented by U.S.-based providers for specialized materials like aluminum-lithium alloys and carbon fiber precursors, fostering resilience against global disruptions and enabling tighter quality control than outsourced models. This strategy aligned with causal factors in aerospace failures, where foreign vendor latencies and inconsistent standards have historically amplified program risks.

Operational History

Launch Sites and Infrastructure

Falcon 9 v1.1 operations primarily utilized Space Launch Complex 40 (SLC-40) at Air Force Station for launches into eastward and equatorial orbits, benefiting from the site's proximity to the for efficient mission profiles. In 2013, SLC-40 received upgrades to support the v1.1 vehicle's increased length and mass, including a extension completed during 2012 and enhancements to the transporter-erector strongback for streamlined integration and reduced processing times to enable higher launch cadence. The pad's infrastructure incorporated an improved water deluge system with multiple nozzles for sound suppression during engine ignition, evolving from v1.0 setups to handle the Merlin 1D engines' higher while theoretically permitting turnaround intervals as short as 28 days. For polar and retrograde orbits, Falcon 9 v1.1 launched from Space Launch Complex 4E (SLC-4E) at Vandenberg Air Force Base, following a 24-month refurbishment of the site to accommodate the rocket's requirements. The inaugural v1.1 from SLC-4E occurred on , 2013, demonstrating the pad's readiness despite prior weather-related scheduling challenges in the region's variable conditions. SLC-4E's setup mirrored SLC-40's in terms of strongback and deluge capabilities, optimized for reliable without initial provisions for advanced infrastructure such as ships, instead depending on established over-ocean disposal zones. These sites' adaptations emphasized expendable launch reliability and operational tempo, with SLC-40 handling the majority of v1.1 flights to support commercial and government payloads requiring low-inclination trajectories.

Mission Launches and Achievements

The Falcon 9 v1.1 completed 14 successful launches between its on September 29, 2013, and its final mission on January 17, 2016. The debut mission deployed the CASSIOPE satellite, a Canadian multi-mission for communications and auroral studies, along with several secondary nanosatellites launched as rideshares, demonstrating the vehicle's capability for integrated delivery to . Subsequent missions fulfilled key commercial and government contracts, including the SES-8 telecommunications satellite on December 3, 2013, marking the first geostationary transfer orbit insertion by a v1.1 vehicle and validating enhanced payload performance to high-energy orbits. Commercial Resupply Services (CRS) missions CRS-3 through CRS-6 successfully delivered pressurized and unpressurized cargo to the using the Dragon spacecraft, with each Dragon capsule achieving autonomous rendezvous and berthing, thereby confirming the reliability of v1.1 for sustained human-rated cargo operations following the v1.0 era. These flights carried over 1.5 metric tons of supplies per mission, supporting 's mandate for independent commercial logistics. The v1.1 era featured increased launch cadence, with four missions in 2014 alone, including OG2-1 and AsiaSat 8, which tested engine durability across rapid turnarounds and diverse orbital profiles. The culminating launch on January 17, 2016, deployed a NASA-NOAA-EUMETSAT-ESA ocean altimetry satellite to a , providing precise data for monitoring and climate research, and underscoring the vehicle's precision in payload deployment. Rideshare opportunities in missions like CASSIOPE enhanced economic efficiency by accommodating smaller payloads without dedicated launches.

Performance Metrics and Payload Deployments

The Falcon 9 v1.1 demonstrated a capacity of 13,150 kg to a 185 km × 28.5° () and 4,850 kg to a 185 × 35,788 km × 28.5° geosynchronous transfer (), as verified through flight data and manufacturer specifications corroborated by independent assessments. These figures represented operational limits under expendable configurations, with actual mission deployments often utilizing a fraction of the maximum to accommodate margins for trajectory adjustments and second-stage maneuvers. In missions, such as Commercial Resupply Services (CRS) flights to the , the v1.1 routinely delivered cargo spacecraft with total masses exceeding 6,000 , including over 1,500 of supplies per CRS-3 in 2014. For insertions, missions like SES-8 in December 2013 showcased deployment of satellites approaching the vehicle's limits, confirming robust performance in high-energy orbits despite variable inclination demands. from these flights indicated velocity increments aligning with or surpassing design projections, with second-stage burns providing precise orbital parameters. Compared to the v1.0 variant, v1.1 achieved approximately 10-15% efficiency improvements, driven by 1D engines offering higher thrust-to-weight ratios and gains of up to 10% in vacuum conditions, as evidenced by extended burn times and reduced propellant consumption per delta-v in flight logs. Orbital insertion accuracy was consistently within targeted tolerances, such as perigee and apogee errors under ±10 km for and velocity dispersions below 10 m/s in missions like DSCOVR, where the spacecraft achieved insertion within 0.2σ of nominal energy. The vehicle's nine-engine first stage incorporated engine-out , enabling mission completion with up to two failures by redistributing , though no in-flight anomalies triggered this during v1.1 operations. Fairing deployments, critical for protection, were successfully executed across missions, providing data on separation dynamics that informed later efforts, despite initial ground and simulation tests revealing challenges in stabilization and splashdown . These metrics underscored the v1.1's causal reliability in achieving objectives through redundant systems and iterative flight validations.

Failures, Investigations, and Safety

CRS-7 Anomaly and Root Cause

The mission, launched on June 28, 2015, at 10:21 a.m. EDT from Launch Complex 39A at , experienced a 139 seconds after liftoff during second-stage flight. data indicated a sudden in the second-stage () tank, leading to structural breakup of the vehicle at an altitude of approximately 65 km. High-speed video footage captured the sequence beginning with a loss of attitude control, followed by disintegration, confirming the anomaly originated in the upper stage rather than propulsion or first-stage systems. SpaceX, in coordination with NASA and the Federal Aviation Administration (FAA), formed an independent Mishap Investigation Board to analyze telemetry, video, and recovered debris from the Atlantic Ocean. The board's findings, supported by finite element simulations and component testing, identified the root cause as the failure of a single titanium strut assembly securing a composite overwrapped pressure vessel (COPV) containing high-pressure helium within the LOX tank. This strut, rated for loads up to 10,000 pounds (4,500 kg), detached under dynamic flight loads of approximately 2,000 pounds (900 kg) due to a manufacturing-induced material defect in the rod-end fitting, allowing the COPV to break free and rupture against the tank wall. The resultant release of helium at over 5,500 psi (38 MPa) into the LOX tank caused rapid overpressurization, exceeding the tank's burst limit and initiating the chain of events leading to vehicle loss. NASA's Independent Review Team (IRT), established separately to validate SpaceX's conclusions, conducted parallel assessments including and independent modeling, concurring that the strut failure and subsequent COPV detachment represented the most probable causal sequence. The IRT closed all fault tree branches except those tied directly to the second-stage hardware defect, ruling out software anomalies, engine malfunctions, or external factors such as interference. The mission carried a Cargo Dragon spacecraft with 2,487 kg of supplies and scientific payloads for the , all of which were destroyed; however, the failure occurred post-first-stage separation, posing no risk to ground personnel or crewed operations. This event underscored vulnerabilities in composite pressure vessel retention hardware under combined static and vibratory loads, with post-failure testing revealing elevated failure rates in similar struts at sub-rated conditions attributable to microscopic imperfections from the forging process.

Post-Failure Corrective Actions

Following the CRS-7 on June 28, 2015, identified the initiating failure as a broken axial supporting a (COPV) in the second-stage tank, attributed to a design flaw in the stainless-steel eye bolt component, which fractured under ascent loads despite meeting nominal specifications. To address this, redesigned the struts by replacing the stainless-steel eye bolts with equivalents for improved cryogenic strength and fatigue resistance, while incorporating redundant retention mechanisms to prevent COPV liberation even if a primary strut failed. These struts underwent proof-testing to pressures exceeding operational margins by a factor of 1.5, ensuring compliance with enhanced safety factors beyond the original 4:1 recommendation. SpaceX also implemented stricter qualification protocols for composite overwrapped structures, including non-destructive testing (NDT) such as ultrasonic inspections and radiographic analysis on all COPVs and related hardware to detect micro-cracks or delaminations prior to . Material sourcing for critical components was revised to prioritize aerospace-grade specifications with rigorous vendor screening, addressing the original use of industrial-grade that lacked sufficient under combined cryogenic and dynamic loading. These changes were retrofitted across the existing Falcon 9 v1.1 fleet, with closeout inspections confirming no assembly discrepancies akin to those ruled out in the CRS-7 postmortem. Flight operations resumed on December 21, 2015, with the OG2 mission using a modified v1.1 booster incorporating the and COPV upgrades, marking the vehicle's return without extended regulatory grounding beyond the FAA-mandated mishap investigation. Subsequent v1.1 launches, including on January 17, 2016, validated the fixes through data showing strut loads well within revised margins and no COPV anomalies across multiple missions. Assertions of systemic design haste were refuted by the absence of recurrences in over 13 prior v1.1 successes and the isolated nature of the strut flaw, confirmed via high-resolution pre-launch imagery and post-fix structural analyses demonstrating probabilistic failure rates reduced by orders of magnitude.

Overall Reliability Assessment

The Falcon 9 v1.1 variant completed 15 launches between April 2014 and December 2015, achieving 14 full successes for a 93.3% reliability rate. This empirical record exceeded the initial operational performance of established systems like , which suffered two failures and one partial success in its first three flights from 1996 to 1997, yielding an early success rate below 70%. No crewed missions were conducted, eliminating direct human risk exposure, while all payloads in successful missions reached intended orbits without loss of vehicle control post-separation. The sole anomaly occurred during the CRS-7 mission on June 28, 2015, when a structural failure in a (COPV) for pressurization caused a rapid overpressurization and loss of the vehicle at approximately T+2:19. This issue arose from underestimated dynamic loads on the novel COPV mounting design during ascent, but 1D engines operated without fault across all 135 engine firings in v1.1 flights, underscoring subsystem robustness amid architectural innovation. Post-failure telemetry and hyperbaric testing confirmed the causal chain isolated to pressurization hardware, with no propagation to or , enabling swift design mitigations like enhanced materials and load modeling. Proponents of 's approach emphasize the v1.1's quick maturation to high reliability via rapid and in-flight utilization, contrasting slower government-led developments. Critics, including Office of reviews, questioned the rigor of pre-certification anomaly resolution and processes, yet the overall —zero recurrences after corrective actions and absence of public safety or environmental incidents—affirm private-sector efficacy in achieving operational maturity without compromising broader safety margins. This record debunks characterizations of private launches as disproportionately hazardous, as no ground hazards, toxic releases, or activations beyond nominal abort protocols materialized.

Reusability Development

Initial Recovery Technologies

The Falcon 9 v1.1 incorporated initial hardware modifications aimed at enabling controlled reentry and propulsive of the first stage, shifting from prior parachute-based attempts that failed due to structural disintegration during atmospheric reentry on the initial v1.0 flights in 2010. This approach leveraged supersonic retro-propulsion to decelerate the booster from orbital velocities, relying on physics principles of and aerodynamic stabilization to achieve precision rather than passive descent, which imposed excessive mass penalties from large parachutes unsuitable for the booster's scale and saltwater exposure risks during ocean . Propulsive was selected to facilitate vertical touchdown, minimizing refurbishment needs by avoiding impact damage and enabling rapid reuse cycles through autonomous control. Key innovations included four grid fins mounted near the interstage for aerodynamic steering during hypersonic and subsonic reentry phases, providing torque to adjust the booster's attitude and trajectory without expending significant propellant, as demonstrated in early tests where they transitioned the vehicle from hypersonic speeds. Complementary cold gas thrusters handled fine attitude adjustments, flip maneuvers post-separation, and control in or low-density atmospheres where aerodynamic surfaces were ineffective, expelling pressurized gas for low-thrust, reliable corrections. Deceleration relied on relights of the 1D engines, with three central engines used for boostback (to reverse downrange velocity for return-to-launch-site profiles), entry burns to slow through peak heating, and the final landing burn, exploiting their throttleability down to 40% and central positioning for stability near empty mass. Autonomous operations were supported by onboard sensors including inertial measurement units (IMUs) for acceleration and rotation tracking, GPS for position, and altimeters, integrated with flight software for real-time trajectory optimization and burn sequencing without ground intervention. These systems were validated through suborbital hop tests using modified v1.1 first stages, such as the April 17, 2014, F9R Dev 1 flight, which reached 250 meters altitude to exercise vertical takeoff, hover, and landing dynamics under production-representative hardware.

Landing Attempts and Technical Challenges

The initial attempts to propulsively land Falcon 9 v1.1 first stages on an (ASDS) encountered significant technical hurdles during reentry and terminal guidance phases. The first such effort occurred on the CRS-5 mission on January 10, 2015, where the booster attempted to touch down on the ASDS positioned in the Atlantic Ocean. However, during the landing burn, the grid fin actuation system depleted its supply prematurely, resulting in loss of attitude control and the booster crashing into the sea short of the target. Subsequent trials revealed persistent issues with engine reliability and fuel management. On the CRS-6 mission launched April 14, 2015, the first stage reached the ASDS but experienced a due to a clogged in one , which delayed full thrust response and caused insufficient deceleration; the booster toppled upon contact, rendering it non-recoverable. These failures highlighted causal factors such as residual propellants inducing instability during hover and the challenges of precise under variable aerodynamic loads.
MissionDateLanding TypeOutcomePrimary Failure Cause
CRS-5January 10, 2015ASDSCrash into ocean hydraulic fluid depletion leading to loss of control
CRS-6April 14, 2015ASDSHard landing and tip-overSlow engine valve response due to clogging
Jason-3January 17, 2016Ocean surfacePartial survival but leg damageExcessive impact velocity causing structural failure
Broader empirical challenges included managing hypersonic reentry sheaths that disrupted communications, necessitating robust inertial guidance, and achieving sub-meter precision over dynamic ocean surfaces amid gusting winds. Critics argued these expendable tests represented inefficient resource use, prioritizing iterative data over immediate reusability, while proponents emphasized the causal insights gained—such as refining cold-gas leg deployment timing and slosh mitigation—laid groundwork for later successes despite the v1.1 hardware's ultimate destructiveness.

Outcomes and Iterative Improvements

The Falcon 9 v1.1 recovery efforts resulted in zero successful propulsive of orbital-class first stages, with attempts such as the CRS-6 mission on April 14, 2015, culminating in a hard ocean after the booster executed boost-back, reentry, and burns but failed to maintain stability due to insufficient thrust modulation from a slow-responding engine valve. Similarly, the final v1.1 flight carrying on January 17, 2016, attempted a drone ship but impacted at excessive velocity, disintegrating upon contact. These outcomes, while not achieving hardware , enabled complete and video data capture across all tests, allowing engineers to analyze failure modes including hydraulic depletion during hypersonic descent and aerodynamic loads exceeding predictions. Iterative enhancements derived from v1.1 data informed the transition to (v1.2), incorporating upgraded cold gas thrusters for finer attitude control, reinforced landing legs to withstand higher impact forces, and refined software algorithms for real-time propulsion throttling, which addressed valve response latencies observed in prior attempts. Grid fins, first deployed on v1.1 for steering, were iterated upon based on fluid exhaustion data to improve endurance and deployment reliability in subsequent versions. These modifications, validated through empirical rather than solely simulation, accelerated the by quantifying causal factors in reentry dynamics and control authority, contrasting with more conservative approaches in traditional programs that prioritize over . Retrospective assessments confirmed the feasibility of hardware reuse under orbital velocities, as v1.1 experiments established baseline physics for propulsive capture—demonstrating sufficient delta-v margins and structural integrity post-reentry—paving the way for Full Thrust successes without altering fundamental engineering principles. Early cost models projected up to 30% marginal savings per flight from first-stage if reliability exceeded 90%, a later achieved and empirically validated through operational showing reduced refurbishment needs compared to expendable . Critics dismissing reusability as unattainable due to thermal and propulsive challenges were empirically refuted, as v1.1 iteratively resolved these via targeted hardware fixes rather than program abandonment.

Economic and Strategic Impact

Launch Pricing and Contracts

SpaceX priced Falcon 9 v1.1 commercial launches at $56.5 million in October 2013, increasing to $61.2 million by October 2015, in constant dollars reflecting adjustments for inflation and operational refinements. This pricing model emphasized volume over premium margins, targeting in the medium-lift segment where legacy providers like (ULA) charged $100-150 million for comparable missions and sought over $150 million for launches, yielding SpaceX a 30-50% cost advantage per to orbit based on contemporaneous capacities. NASA's Commercial Resupply Services (CRS) contracts provided a stable revenue stream, with SpaceX securing fixed-price missions averaging $133.3 million each under the original CRS-1 agreement awarded in and executed with v1.1 vehicles from onward. These premiums over rates—approximately double the base price—accounted for Dragon capsule integration, certification requirements, and guaranteed access, allowing SpaceX to achieve profitability through high launch cadence and economies of scale rather than per-mission windfalls. Competitive bidding processes, rather than subsidies, underpinned these awards, as SpaceX underbid (now ) on cost and demonstrated technical feasibility via prior milestones. Secondary payload opportunities on v1.1 missions further diversified revenue, with offering rideshare slots at costs scaling from $200,000-325,000 for small dispensers like Poly Picosat Orbital Deployers to $1-5 million for larger manifests, depending on mass, orbit, and integration complexity. This approach, exemplified by multi-payload deployments on missions like CASSIOPE in , incentivized smaller operators to bundle with primaries, reducing underutilization and pressuring incumbents to adapt pricing amid empirical evidence of 's reliability in securing contracts through demonstrated value.

Market Position and Competitive Advantages

The Falcon 9 v1.1 variant positioned as a disruptive force in the launch sector by enabling a launch cadence that exceeded many established competitors during 2013–2015, with the vehicle supporting multiple missions annually amid a market where providers like typically averaged four to six flights per year. This operational tempo, bolstered by the v1.1's upgraded 1D engines and stretched propellant tanks for enhanced performance, allowed to fulfill manifests more rapidly, securing commercial contracts that matched 's order volume by 2014. A core lay in SpaceX's , encompassing in-house , , and testing of major components, which reduced reliance on external suppliers, accelerated iterations, and yielded efficiencies unattainable in fragmented supply chains typical of legacy firms. This approach, grounded in fixed-price rather than cost-plus contracting prevalent among rivals like , demonstrated causal cost reductions through engineering innovation independent of preferential subsidies. The v1.1's reliability in geosynchronous missions, exemplified by the successful SES-8 deployment on December 3, 2013—the company's first commercial insertion—further underscored these strengths, attracting clients wary of delays in competitor schedules. While early revenue depended on NASA Commercial Resupply Services contracts for International Space Station cargo, which validated private-sector orbital logistics capabilities, SpaceX mitigated risks through diversification into non-government payloads, including the Eutelsat 115 West B and ABS-3A satellites launched March 1, 2015. This shift exemplified entrepreneurial adaptation in a long dominated by state-influenced entities, prioritizing merit-based over entrenched protections.

Contributions to Cost Reduction Goals

The Falcon 9 v1.1 variant advanced SpaceX's reusability objectives by incorporating Merlin 1D engines capable of multiple relights, a prerequisite for controlled reentries and landings that could theoretically slash first-stage hardware costs from approximately $30-40 million per unit to near-zero marginal expense after initial flights. Flight tests during v1.1 missions, including the CRS-5 soft ocean landing on February 11, 2015, and the CRS-6 autonomous barge attempt on April 14, 2015, empirically demonstrated engine throttle control and reignition under dynamic conditions, providing data that projected full reusability could reduce overall launch costs to $10-20 million by reserving only propellant and operations against repeated use. Empirical gains from v1.1 included elevated launch cadence, reaching six flights in 2014 alone—up from three total in —enabling better amortization of fixed costs such as R&D and ground infrastructure across more missions. This frequency, sustained through simplified staging and higher-thrust engines, laid groundwork for projecting in high-volume operations, where fixed expenses dilute further with . Critics noted that early recovery failures, including structural stresses during reentry and anomalies, postponed by necessitating iterative redesigns and expending prototypes without salvage. Optimists, drawing from v1.1 on performance and guidance accuracy, forecasted exponential declines through compounding flight data, countering skeptics' concerns over thermodynamic limits on rapid turnaround by highlighting causal pathways to verified multi-flight viability in subsequent iterations. These proto- insights directly informed for constellation deployments, underscoring v1.1's role in validating a reusability grounded in empirical iteration rather than theoretical fiat.

Legacy and Evolution

Transition to Falcon 9 Full Thrust

The Falcon 9 v1.1 configuration continued operations following the CRS-7 failure on June 28, 2015, which involved a second-stage structural disintegration due to a failed liquid oxygen tank strut, prompting a return-to-flight investigation and targeted fixes rather than a full redesign. SpaceX implemented incremental upgrades to v1.1 hardware, such as enhanced avionics and grid fin refinements for reentry control, but deferred major structural changes to prioritize parallel development of the Full Thrust variant (v1.2). This approach allowed v1.1 to support select missions while ramping up production of the upgraded version, which incorporated stretched propellant tanks, uprated Merlin 1D engines, and autogenous pressurization systems using vaporized propellants to replace helium, alongside preliminary methane (CH4) testing for future engine architectures. The Full Thrust variant debuted on December 22, 2015 (UTC), with the ORION 3 mission, demonstrating immediate operational viability without interrupting the v1.1 flight cadence. SpaceX limited retrofits on existing v1.1 boosters due to cost and complexity, focusing instead on new-build Full Thrust stages that delivered roughly 18% higher first-stage through optimizations and denser loading via subcooled . The v1.1's phase-out culminated with its final flight on January 17, 2016, launching the ocean altimetry satellite from Vandenberg Air Force Base, achieving precise orbital insertion for the joint /NOAA/EUMETSAT/European Space Agency payload. Although the primary mission succeeded, the first-stage booster experienced a on the , where one of four deployable legs failed to fully extend and lock, causing structural breakage, tip-over, and loss of the stage upon touchdown in the . This handover maintained seamless launch manifests, as Full Thrust boosters inherited v1.1's reusability infrastructure and certification baselines, enabling uninterrupted mission throughput without capability regressions. Post-transition, all subsequent flights utilized the Full Thrust configuration, phasing out v1.1 hardware entirely by early 2016.

Influence on Broader Reusability Paradigm

The Falcon 9 v1.1 introduced grid fins for aerodynamic control during atmospheric reentry, first deployed on the CRS-5 mission on January 10, 2015, where they assisted in orienting the booster despite a subsequent landing failure due to depletion. This innovation, building on prior concepts but adapted for vertical-landing boosters, enabled precise trajectory adjustments essential for the controlled descent profiles tested across multiple v1.1 flights, including boost-back burns and entry coast phases that minimized structural stress. These entry profiles directly informed the refinements that achieved the first successful booster landing on December 21, 2015, demonstrating v1.1's role in validating propulsive techniques. Flight data from v1.1's unsuccessful landing attempts, such as the CRS-6 mission on April 14, 2015, where the booster achieved a soft touchdown but exploded upon impact from excessive velocity, yielded critical insights into throttle response and guidance algorithms. Engineers analyzed these failures to enhance software autonomy, reducing dependencies on ground-based corrections and improving real-time decision-making for engine relights and attitude control, which proved pivotal for the string of landings starting in late 2015. This iterative process underscored the efficacy of rapid, data-driven prototyping in private development, outpacing historical state-sponsored programs like the , which expended resources over decades without attaining propulsive orbital-class reusability. The v1.1 recovery efforts shifted industry focus toward booster recapture, inspiring competitors including to incorporate reusable elements in designs like , though alone operationalized full first-stage recovery and reflights by 2017. By publicly demonstrating feasible propulsive techniques despite early setbacks, v1.1 established a technical that validated the viability of vertical landings for medium-lift vehicles, influencing subsequent global pursuits in reusable launch systems while highlighting execution challenges overcome through persistent testing.

Long-Term Achievements and Criticisms

The Falcon 9 v1.1 variant completed 15 launches between September 2013 and January 2016, achieving 14 successes for a 93.3% reliability rate that exceeded contemporary expendable launchers such as the (which suffered multiple failures in the same period) and (with occasional anomalies). This track record, with no losses of human life across its missions (all uncrewed cargo and satellite deployments), demonstrated scalable production and operational tempo under commercial pressures, contrasting with government-led programs' slower cadences. Key long-term achievements include foundational advancements in vertical landing technology, with v1.1's propulsive recovery experiments—despite initial failures—providing critical data that informed subsequent reusable booster designs, ultimately enabling to refly stages and drive marginal launch costs below $60 million by the mid-2010s. These efforts contributed to broader industry cost declines, as Falcon's pricing pressured competitors and facilitated a shift toward amortized reusability, aligning with that iterative risk-taking in private development yielded higher reliability than risk-averse bureaucratic approaches. Criticisms centered on the June 2015 upper-stage failure, attributed to a system break, which some analysts viewed as evidence of rushed prioritizing speed over , potentially endangering future crewed operations. Outlets with left-leaning editorial slants, such as certain mainstream reports, framed SpaceX's model as inherently unsafe, emphasizing "reckless" experimentation amid taxpayer-funded contracts, while right-leaning commentators highlighted it as a triumph of entrepreneurial agility dismantling entrenched monopolies. Empirically, however, v1.1's outcomes refuted blanket recklessness claims, as its success rate outperformed peers and catalyzed a paradigm where controlled failures accelerated net progress over stagnation. Detractor narratives often reflected institutional envy toward disruptors, undervaluing how v1.1's data-driven iterations laid groundwork for reusability's 10-fold cost efficiencies in later Falcon iterations.

References

  1. [1]
    [PDF] Space Launch Report: SpaceX Falcon 9 v1.1 Data Sheet
    The engine had an expansion ratio of 16, a chamber pressure of 1,410 psi, and an ability to throttle down to 70%. It also would have an unprecedented 150:1 ...
  2. [2]
    [PDF] Falcon Payload User's Guide - SpaceX
    Falcon 9 was updated in the summer of 2015 to a Full Thrust configuration from its previous v1.1 configuration (flown from 2013 – summer 2015). Falcon 9 ...
  3. [3]
    SpaceX successfully launches debut Falcon 9 v1.1
    Sep 29, 2013 · The first Falcon 9 did sport a payload fairing when it was erected at Cape Canaveral's Space Launch Complex 40 in January 2009 for facilities ...
  4. [4]
    Falcon-9 v1.1(ex) - Gunter's Space Page
    Jan 14, 2023 · Falcon-9 v1.1(ex) is a liquid fueled orbital launch vehicle for medium sized missions, which is developed by SpaceX (Space Exploration Technologies Corp.).Missing: specifications | Show results with:specifications
  5. [5]
    rockets - What are the differences between the Falcon 9 (1.0) and ...
    Jul 19, 2013 · Falcon 9 1.1 is longer, uses Merlin 1-D engine with higher thrust, has an octo-web engine layout, and landing legs.
  6. [6]
    Falcon 9 - SpaceX
    First stage. Falcon 9's first stage incorporates nine Merlin engines and aluminum-lithium alloy tanks containing liquid oxygen and rocket-grade kerosene (RP-1) ...
  7. [7]
    Merlin Engine (Merlin-1D) - Falcon 9 & Falcon Heavy - Wevolver
    These engines have a thrust of 854 kilonewtons at sea level and 981 kilonewtons in a vacuum, respectively. It has the highest thrust-to-weight ratio of ...Missing: v1. | Show results with:v1.
  8. [8]
    Falcon 9 v1.2 or Full Thrust - Block 5 - Wevolver
    FIRST STAGE ; Height, 41.2 m / 135.2 ft ; Height (with interstage), 47.7 m / 156.5 ft ; Diameter, 3.7 m / 12 ft ; Empty Mass, 25,600 kg / 56,423 lb.
  9. [9]
    SpaceX Falcon 9 rocket facts - Spaceflight Now
    For added reliability of restart, the engine has dual redundant pyrophoric igniters using triethylaluminum-triethylborane (TEA-TEB). Falcon 9 is powered by ...
  10. [10]
    [PDF] Space Launch Report: SpaceX Falcon 9 Data Sheet
    This Falcon 9, substantia more capable than either Falcon 9 Block 1 or Block 2, would be able to lift 16 tonnes to LEO or 5 tonnes to GTO would stand 69.2 ...
  11. [11]
    [PDF] Falcon 9 Launch Vehicle Payload User's Guide - Spaceflight Now
    The Falcon 9 propellant tank walls and domes are made from an aluminum lithium alloy. SpaceX uses an all friction stir welded tank, the highest strength and ...<|separator|>
  12. [12]
    Falcon 9 v1.1 - Wikipedia
    Falcon 9 v1.1 ; 68.4 m (224 ft) with payload fairing 63.4 m (208 ft) with Dragon · 3.7 m (12 ft) · 505,846 kg (1,115,200 lb) · 2.Design · Development history · Launch history · Reusability
  13. [13]
    SpaceX launches upgraded Falcon rocket on first orbital mission
    Sep 29, 2013 · The new Falcon 9 rocket carries more fuel for those engines and is equipped with a triple-redundant avionics system, as well as a more durable ...
  14. [14]
    SpaceX Launches Falcon 9 Rocket On High-Stakes Commercial ...
    Dec 3, 2013 · The rocket has a larger 17-foot (5.1 m) payload fairing to fit even the largest satellites inside, and boasts a triple redundant avionics system ...
  15. [15]
    SpaceX Primed for Final Falcon 9 v1.1 Launch on Sunday
    Jan 16, 2016 · Sunday's launch of Jason-3 marks the final flight of the Falcon 9 in its v1.1 configuration. Future missions will utilize the Upgraded ...Missing: restart | Show results with:restart<|separator|>
  16. [16]
    SpaceX's Merlin 1D Engine Achieves Flight Qualification - SpaceNews
    Mar 20, 2013 · “With flight qualification now complete, we look forward to flying the first Merlin 1D engines on Falcon 9's Flight 6 this year.” The Merlin 1D ...
  17. [17]
    Testing times for SpaceX's new Falcon 9 v.1.1 - NASASpaceFlight.com
    Jun 14, 2013 · The upgraded Falcon 9 v1.1 will utilize a longer first stage, powered by nine Merlin 1D engines arranged in an “octagonal” pattern.
  18. [18]
    USAF Certifies Falcon 9 v1.1 Debut Launch Despite Glitch
    Feb 28, 2014 · The Air Force's formal certification of Falcon 9 v1.1's maiden launch was announced Feb. 25. The upgraded rocket has launched twice since it ...
  19. [19]
    Air Force Certifies SpaceX Falcon-9 v1.1 as Having Flown Three ...
    Jul 13, 2014 · The SpaceX Falcon 9 v1.1 rocket, seen here launching Thaicom-6 last January, is now certified by the U.S. Air Force to launch Government ...
  20. [20]
    Reducing risk via ground testing is a recipe for SpaceX success
    Jun 20, 2013 · As we prepare to fly this next generation Falcon 9 rocket, SpaceX will test everything possible on the ground,” noted SpaceX spokesperson ...
  21. [21]
    SpaceX Completes Qualification of Falcon 9 First Stage Tank and ...
    Jul 29, 2009 · The first stage tank and interstage hardware were subjected to a proof test of 1.1 times the maximum expected operating pressure (MEOP), and a ...Missing: v1. COPV
  22. [22]
    U.S. Air Force Still Deciding if Initial Falcon 9 v1.1 Flights Count ...
    Dec 23, 2013 · The Falcon 9 v1.1 program also must pass technical reviews and audits of the launch vehicle, ground systems and manufacturing processes. Air ...<|separator|>
  23. [23]
    SpaceX Launch Counts Towards EELV Certification
    Feb 25, 2014 · SMC is still assessing the SpaceX' Falcon 9 v1.1 launches on Dec. 3, 2013 and Jan. 6, 2014 for their applicability towards the certification ...Missing: date | Show results with:date
  24. [24]
    SpaceX Reveals 3D-Printed Rocket Engine Parts - Design News
    Aug 19, 2014 · Now, SpaceX is testing these engines in its crewed spaceflight program. Using 3D printing reduced lead-time by an order of magnitude compared to ...
  25. [25]
    How SpaceX Transformed Space Exploration - Investopedia
    Instead, SpaceX is vertically integrated and has built its entire supply chain, from rocket engines to the electronics components used in its rockets, from ...
  26. [26]
    Aluminum in SpaceX's Supply Chain: A Case Study
    Mar 30, 2025 · For example, Falcon 9's first stage uses an aluminum-lithium alloy that offers enhanced strength while reducing overall weight. This choice of ...
  27. [27]
    SpaceX Falcon 9 v1.1 conducts first Hot Fire at SLC-40
    Nov 21, 2013 · SpaceX have conducted the first Wet Dress Rehearsal (WDR) and Hot Fire (Static Fire) test of their upgraded Falcon 9 v1.1 launch vehicle at ...Missing: strongback | Show results with:strongback
  28. [28]
    SpaceX Completes Hot Fire Test, Eyes NET Sunday Night for Falcon ...
    Dec 18, 2015 · The Merlin 1D+s will be purged with gaseous nitrogen, and, at T-60 seconds, the SLC-40 complex's “Niagara” deluge system of 53 nozzles will be ...
  29. [29]
    Falcon-9 - Gunter's Space Page
    The first flight for a Falcon-9 v1.0 took place in June 2010. In 2013, the enlarged Falcon-9 v1.1 took over, featuring higher powered Merlin-1D engines in a ...
  30. [30]
    SpaceX at 50 - From taming Falcon 1 to achieving cadence in Falcon 9
    Dec 20, 2017 · 0 vehicle was Dragon's CRS-2 mission, in March 2013. In September 2013, SpaceX launched the first flight of an upgraded Falcon 9 v1.1 vehicle.
  31. [31]
    Final SpaceX Falcon 9 v1.1 successfully launches Jason-3
    Jan 17, 2016 · The Falcon 9's payload fairing separated from around Jason-3 twenty-seven seconds into the second stage burn. The first burn of the second ...
  32. [32]
    Ten Years of History-Making: The Remarkable Decade of the Falcon 9
    Jun 5, 2020 · The Falcon 9's first iteration, known as the “v1.0”, flew on five occasions between June 2010 and March 2013. Its evolution was aided ...
  33. [33]
    SpaceX Launches Falcon 9 v1.1 on Maiden Flight - NASA Watch
    Sep 29, 2013 · The launch will be webcast. The primary payload is the Canadian Space Agency CASSIOPE satellite. Several secondary nanosats will also be ...
  34. [34]
    Falcon 9 v1.1 successfully lofts SES-8 in milestone launch
    Dec 3, 2013 · The Falcon's first stage is powered by nine Merlin-1D engines, arranged in an octagonal pattern which SpaceX have named the “octaweb”. This ...Missing: specifications | Show results with:specifications<|separator|>
  35. [35]
    [PDF] SpaceX CRS-6 Mission Press Kit - NASA
    The rocket computer commands the launch mount to release the vehicle for flight, and at T-0, Falcon 9 lifts off, putting out just over 1.3 million pounds of ...
  36. [36]
    Spacex Successfully launches Thaicom-6 Satellite
    The THAICOM 6 mission marks Falcon 9's second flight to a geosynchronous transfer orbit and begins a regular cadence of launches planned for SpaceX in 2014.
  37. [37]
    [PDF] early mission maneuver operations for the deep space climate ...
    MCC-1 Results. The transfer trajectory insertion by the SpaceX Falcon 9 was excellent, placing the vehicle within 0.2σ of the intended target orbital energy ...
  38. [38]
    Falcon 9/SpaceX CRS-7 launch timeline - Spaceflight Now
    Jun 27, 2015 · Falcon 9/SpaceX CRS-7 launch timeline. June 27, 2015 Stephen Clark ... No one had ever lost 26 satellites at once until a launch failure ...
  39. [39]
    [PDF] NASA Independent Review Team SpaceX CRS-7 Accident ...
    Mar 12, 2018 · The first launch failure occurred using the Antares model 130 launch vehicle for the Orb-3 ISS mission on 24 October 2014, after two consecutive ...
  40. [40]
    [PDF] CRS-7 Investigation Update | SpaceX - NASA
    Jun 13, 2017 · Preliminary analysis suggests the overpressure event in the upper stage liquid oxygen tank was initiated by a flawed piece of support hardware ( ...Missing: anomaly | Show results with:anomaly
  41. [41]
    Falcon 9 Failure Linked To Upper Stage Tank Strut - SpaceNews
    Jul 20, 2015 · A strut in an upper stage propellant tank that failed at a fraction of its rated strength is the leading explanation for the June 28 loss of a SpaceX Falcon 9 ...
  42. [42]
    SpaceX returns to flight with OG2, nails historic core return
    Dec 21, 2015 · The next Falcon mission was the ill-fated CRS-7 launch attempt, with this launch marking SpaceX's return to flight after that failure. 2015-12- ...
  43. [43]
  44. [44]
    [PDF] CRS-7 Investigation Update | SpaceX - NASA
    Jul 20, 2015 · The pressurization system itself was performing nominally, but with the failure of this strut, the helium system integrity was breached ...
  45. [45]
    [PDF] Final Report - IG-18-016 - NASA OIG
    Apr 26, 2018 · Using current flight projections for CRS-2, SpaceX's average price per kilogram increased by 50 percent compared to its final CRS-1 mission ...
  46. [46]
    Why doesn't SpaceX use parachutes on Falcon 9? - Space Explored
    Mar 21, 2021 · SpaceX attempted a parachute recovery for the first two Falcon 9 V1.0 launches but they were unsuccessful as the boosters did not survive reentry.
  47. [47]
    Why would SpaceX not use parachutes for the final descent of the ...
    Jan 9, 2015 · SpaceX tried to use parachutes to recover the first stage of the Falcon 9, but it did not survive reentry. Now they plan to use 2 separate rocket burns to land.
  48. [48]
    SpaceX conducts historic Falcon 9 re-flight with SES-10
    Mar 30, 2017 · SpaceX attempted to recover the first stages of four Falcon 1 vehicles. However, the rocket's first launch failed early in the mission and ...
  49. [49]
    SpaceX launches Falcon 9 v1.1, preps for reusable boost stage
    Sep 29, 2013 · SpaceX launches Falcon 9 v1.1, preps for reusable boost stage. New engines, larger launch vehicle, and a controlled reentry of the first stage.
  50. [50]
    CRS SpX-5 | Falcon 9 Block 2 (v1.1) | Next Spaceflight
    Jan 10, 2015 · During the landing burn, the grid fin system ran out of hydraulic fluid which left Falcon 9 stuck at an uncorrectable attitude. It crashed into ...
  51. [51]
    CRS-5 Dragon successfully launched - Core ASDS landing attempted
    Jan 10, 2015 · Launch took place on Saturday at 4:47 am local, which included an attempt to land the first stage of the rocket on a floating platform – which ...Missing: details | Show results with:details
  52. [52]
    SpaceX Falcon 9 launches CRS-6 Dragon en route to ISS
    Apr 13, 2015 · The rocket's first stage was aiming to touch down on SpaceX's Autonomous Spaceport Drone Ship (ASDS), a barge converted to serve as a landing ...Missing: water | Show results with:water
  53. [53]
    Did CRS-6 landing fail because the steering fins are ineffective at ...
    Apr 20, 2015 · The CRS-6 landing failed due to a slow-responding engine valve, not ineffective steering fins, though the fins' efficiency diminishes at low ...
  54. [54]
    Last Falcon 9 v1.1 Successfully Boosts Jason-3 to Orbit, Reportedly ...
    Jan 17, 2016 · Last Falcon 9 v1.1 Successfully Boosts Jason-3 to Orbit, Reportedly Suffers Landing Leg Breakage During Oceanic Touchdown
  55. [55]
    The Good, The Bad and The Ugly: Looking Back on Falcon 9's ...
    Feb 17, 2021 · The first successful ASDS landing finally took place in April 2016. SpaceX CRS-5 booster hitting the ASDS in the first ever attempt to land ...
  56. [56]
    Falcon 9 Makes Hard Landing after Launching Dragon to ISS
    Apr 14, 2015 · The Falcon 9 lifted off from Cape Canaveral Air Force Station, Florida, at 4:10 p.m. local time. Weather, which postponed a launch attempt the ...
  57. [57]
    Fine-tuning Falcon 9 landing focuses on throttle valve response
    Apr 19, 2015 · ... v1.1 version of its Falcon 9. Numerous additions, from landing legs to grid fins, have helped refine the return of the stage via lessons learned ...
  58. [58]
    The Evolution of the Big Falcon Rocket - Page 4 of 10
    Aug 9, 2018 · To enable the landing, the Falcon 9 v1.2 had added extendable landing legs onto its core stage, upgraded cold gas thrusters, improved guidance ...<|separator|>
  59. [59]
    SpaceX gaining substantial cost savings from reused Falcon 9
    Apr 5, 2017 · SpaceX saw significant cost savings by reusing a Falcon 9 first stage in a launch last week, a key factor for the economic viability of reusable launch ...
  60. [60]
    spacex - What is the cost breakdown for a Falcon 9 launch?
    Mar 2, 2015 · $56.5 million USD in 2013-2014 for Falcon 9v1.1. Prices has since stabilized a bit, NASA for example is paying $87 million USD for the launch of ...
  61. [61]
    Falcon 9 v1.1 - Wikiwand
    Launch prices​​ As of October 2015 , the Falcon 9 v1. 1 commercial launch price was US$61.2 million (up from US$56.5 million in October 2013) competing for ...
  62. [62]
    'SpaceX Effect' Fuels Efficiency Push in Launch Services Market
    Jul 17, 2014 · A Falcon 9 launch is currently priced at $56.5 million while a Falcon Heavy launch runs $77.1 million for up to 6.4 tons to GTO. The price ...Missing: comparison | Show results with:comparison
  63. [63]
    SpaceX wins 5 new space station cargo missions in NASA contract ...
    Feb 24, 2016 · SpaceX's original CRS contract averaged $133.3 million per launch mission. Schierholz said CRS is being managed as an indefinite-delivery, ...
  64. [64]
    Falcon 9 - Wikipedia
    The first Falcon 9 launch was on June 4, 2010, and the first commercial resupply mission to the International Space Station (ISS) launched on October 8, 2012.List of Falcon launches · V1.1 · Full Thrust · V1.0
  65. [65]
    SpaceX deal boosts Falcon 9's secondary payload manifest
    Jun 7, 2012 · Although the amount of money involved was not revealed, the economics of secondary payloads will clearly benefit SpaceX's costs per launch ...<|separator|>
  66. [66]
    Arianespace Surpassed SpaceX in Commercial Launch Orders in ...
    Jan 6, 2016 · After drawing even with Hawthorne, California-based SpaceX in 2014, with nine commercial orders each, Arianespace's count for 2015 showed its ...
  67. [67]
    [PDF] SpaceX: Breaking the Barrier to the Space Launch Vehicle Industry
    Dec 22, 2016 · Buzzell's (1983) third guideline shows that it is best to avoid only partial vertical integration and even shows data that most profitable ...
  68. [68]
  69. [69]
    SpaceX's reusable Falcon 9: What are the real cost savings for ...
    Apr 25, 2016 · If SpaceX passed on to its customers 50 percent of the cost savings, the company could reduce today's Falcon 9 price by 21 percent, to $48.3 ...Missing: v1. 1
  70. [70]
    Elon Musk spent $1 billion developing SpaceX's reusable rockets
    and bigger, soon-to-launch Falcon Heavy system — can lift off, land, and be reused, ostensibly within 24 hours.<|control11|><|separator|>
  71. [71]
    100th Merlin 1D engine flies on Falcon 9 rocket - Spaceflight Now
    Feb 22, 2015 · SpaceX launched its 100th kerosene-fueled Merlin 1D rocket engine on a Falcon 9 rocket Feb. 11, underscoring what it says is an accelerated flight regime.<|separator|>
  72. [72]
    Falcon 9 - Has Reusability Affected Customer Launch Prices?
    Apr 26, 2025 · When competitors introduce partial reuse, F9/H prices will come down. Especially since there are some “anyone but SpaceX” customers who ...Any "proof" that ppl actually said reuse couldn't succeed/not cost ...Realistic cost savings and number of reuse for orbital reusable rockets.More results from forum.nasaspaceflight.com
  73. [73]
    The Missing Rocket: An Economic and Engineering Analysis of the ...
    The ability of SpaceX to recover up to 75% of Falcon 9 – including the first stage and fairing – drastically lowers launch costs and increases flight frequency.
  74. [74]
    Tag Archives: Falcon 9 Full Thrust Version - This Day in Aviation
    Dec 22, 2024 · 2015: At 8:29:00 p.m. Eastern Standard Time (01:29:00 22 December, UTC) the SpaceX Falcon 9 two-stage liquid-fueled rocket, production number 21 ...
  75. [75]
    Full Thrust Falcon 9 stage conducts first static fire at McGregor
    Sep 24, 2015 · The first “Full Thrust” Falcon 9 first stage has begun a test sequence that is involving two static fires on a new test stand at SpaceX's ...
  76. [76]
    SpaceX narrowly misses booster landing at sea - Spaceflight Now
    Jan 18, 2016 · One of four landing legs mounted to the base of SpaceX's Falcon 9 booster failed to engage on the rocket's final descent to a barge in the ...
  77. [77]
    SpaceX Falcon 9 v1.1 conducts static fire test ahead of Jason-3 ...
    Jan 8, 2016 · Notably, FRR notes (L2) added the static fire was to involve the nine Merlin 1D engines firing for a few seconds longer than a usual static fire ...
  78. [78]
  79. [79]
    SpaceX To Debut Upgraded Falcon 9 on Return to Flight Mission
    Aug 31, 2015 · SpaceX blamed the June launch failure on a broken strut holding down a helium bottle in a propellant tank in the rocket's upper stage. Helium ...Missing: criticisms | Show results with:criticisms
  80. [80]
    Moore's Law Meet Musk's Law: The Underappreciated Story of ...
    Mar 26, 2024 · With Starship, full reusability is expected to drive launch costs down to roughly $1,600/kg to low Earth orbit, with the potential for further ...Missing: 1 | Show results with:1