HMCS Windsor

HMCS is a diesel-electric of the Royal Canadian Navy (RCN), serving as the third unit in a fleet of four long-range patrol submarines acquired to enhance 's underwater surveillance and operational capabilities. Originally constructed as for the Royal Navy and commissioned on 25 June 1993, the vessel was decommissioned in October 1994, acquired by in 2000, renamed on 5 July 2001, and formally commissioned into RCN service on 4 October 2003 at , her home port. With a complement of 49 crew members and up to 10 trainees, Windsor ( SSK 877) is designed for stealthy operations, including intelligence gathering, support to naval task groups, and contributions to and North American defense efforts. Built by in , , Windsor underwent an initial Canadianization work period following a minor flooding incident in March 2002, before entering her first operational cycle in June 2005, which included tracking a U.S. and sovereignty patrols off 's east coast. From January 2007 to November 2012, she completed an extended docking work period for major upgrades, followed by further maintenance in 2014 to address a defective and install a new bow system. Notable deployments include a three-and-a-half-month exercise in Western European waters in 2015, participation in NATO's Dynamic Mongoose and RCN's Cutlass Fury exercises in 2016, and a historic 133-day deployment to the in 2018 under Operation Projection, marking the longest submerged patrol by a Canadian at that time. Capable of reaching speeds of 12 knots surfaced and 20 knots submerged with a endurance of approximately eight weeks, Windsor exemplifies the Victoria class's role in providing persistent, lethal underwater presence for global operations while supporting domestic maritime security. As part of ongoing modernization efforts, her transition docking work period concluded in 2021, restoring full operational readiness, and she entered an extended docking work period in June 2025 at Fleet Maintenance Facility Cape Scott for additional upgrades, including an integrated upgrade, to sustain her strategic value through the decade.

Construction and Design

Construction

HMCS Windsor, originally constructed as HMS Unicorn, was the fourth and final vessel in the Royal Navy's Upholder-class program, a series of diesel-electric hunter-killer submarines developed in the to replace aging Oberon-class boats and enhance capabilities. The program's Naval Staff Requirement was approved in January 1980, with construction contracts awarded to Limited (VSEL) for the lead ship and for the subsequent vessels; the total estimated cost for the four submarines was approximately £620 million, including long-lead items. Construction of HMS Unicorn began at the shipyard in , , where her keel was laid down on 13 March 1989. The yard, known for its expertise in building, followed modular assembly techniques to integrate the , systems, and suites efficiently. Key milestones included the fabrication of the pressure sections and installation of the diesel-electric powerplant, drawing on designs optimized for quiet operation and extended submerged endurance. The was launched on 16 1992, marking the completion of her assembly and initial outfitting. Following sea trials to verify structural integrity and basic systems functionality, HMS Unicorn was commissioned into the Royal Navy on 25 June 1993 under the command of her first captain, entering service as S43. This event concluded the Upholder-class build program, with Unicorn representing the culmination of British efforts to produce advanced conventional submarines before shifting focus to nuclear-powered fleets.

Design Specifications

HMCS Windsor, originally commissioned as HMS Unicorn in the Royal Navy, was constructed to the specifications of the Upholder-class diesel-electric attack submarines, emphasizing stealth, endurance, and versatility for anti-submarine warfare. These vessels featured a robust, single-hull design optimized for littoral operations, with a displacement of 2,220 tonnes when surfaced and 2,455 tonnes when submerged. The dimensions included a length of 70.3 meters, a beam of 7.6 meters, and a draught of 7.6 meters, providing a compact profile that enhanced maneuverability while accommodating essential systems. The propulsion system was a diesel-electric arrangement, consisting of two 8PA-200 CZ diesel alternators each rated at 1,280 kW, driving a single 3.2 MW connected to one shaft with a seven-bladed fixed-pitch . Power was stored in two 120-cell batteries, enabling silent submerged operation. This setup delivered a maximum speed of 12 knots (22 km/h) when surfaced and 20 knots (37 km/h) when submerged, balancing performance with acoustic discretion. The range extended to 10,000 nautical miles (19,000 km) at 8 knots (15 km/h) surfaced or 8,000 nautical miles (15,000 km) at 12 knots (22 km/h) while , supporting extended patrols without frequent surfacing. Armament in the as-built configuration centered on six forward-facing 21-inch (533 mm) torpedo tubes, capable of launching up to 18 heavyweight es, initially the wire-guided Mk 24 Tigerfish. The design allowed for modular loading, with provisions for mines in a 2:1 torpedo replacement ratio, though anti-ship missiles like the UGM-84 Sub were incorporated in later adaptations. The sensor suite was the Type 2026 integrated system, including a Type 2007 bow-mounted active/passive , Type 2040 hull-mounted passive , and Type 2046 towed array for long-range detection. Complementing these systems, the submarines accommodated a of 48 personnel, comprising 7 officers and 41 enlisted ratings, with provisions for additional specialists during missions. Operational depth was rated up to 200 meters, ensuring survivability against depth charges while maintaining structural integrity under pressure. Canadian service later involved modifications to armament and sensors for compatibility with standards.

Refits and Modifications

Prior to its formal handover to Canada on July 5, 2001, HMS Unicorn underwent minor reactivation updates in the , including inspections that revealed cracks in the hull and backup valves, which were addressed as part of transfer preparations at Faslane. Following arrival in on October 19, 2001, HMCS Windsor entered a comprehensive commissioning refit lasting until 2003, during which Canadian-specific systems were integrated for (RCN) compatibility. This included installation of the Librascope (SFCS), derived from Oberon-class components, to enable operation of Mk 48 heavyweight torpedoes in place of the original Mk 24 . Communication upgrades were also implemented, incorporating RCN-standard and data links to support joint operations. The was formally commissioned on October 4, 2003, and returned to sea trials on April 5, 2004. From 2007 to 2012, HMCS Windsor underwent an extended refit at Dockyard, initially budgeted at $17 million but escalating to $209 million due to extensive discoveries, including widespread , faulty welds in the pressure hull, and structural weaknesses requiring reinforcement. In 2010 alone, repair costs reached $45 million against the planned $17 million, addressing in multiple hull sections and malfunctions that delayed completion until December 2012. The refit also involved hull strengthening to restore full diving depth, though compromises on treatment initially limited operational depth until further work in 2011. In March 2014, HMCS Windsor entered an unscheduled drydocking at for $18 million in repairs, primarily replacing a defective that had failed during operations, along with battery system enhancements to improve reliability. upgrades were incorporated, including integration of the BAE Type 2007 bow sonar array and the Canadian System (CANTASS) for improved passive detection, enhancing acoustic performance over the original Type 2040 suite. The submarine was undocked on October 8, 2014, and resumed trials thereafter. Armament modifications during Canadian service focused on enhancing torpedo capabilities while simplifying the weapons suite. The original Sub-Harpoon anti-ship missile launch capability was removed during the initial refit, as it was deemed unnecessary for RCN priorities. torpedoes were replaced with Mk 48 Mod 4 heavyweight models for better effectiveness. In 2014, acquired 12 upgrade kits to convert existing Mk 48 Mod 4 torpedoes to the advanced Mod 7AT variant, improving guidance and warhead performance; these were integrated into Windsor's inventory during subsequent maintenance periods. HMCS Windsor entered an extended docking work period in 2025 at Fleet Maintenance Facility Cape Scott, following its return to in March 2025 after recent operations. As of November 2025, the refit is ongoing, with a focus on propulsion system maintenance, structural integrity assessments, and capability enhancements to extend service life into the mid-2030s. The 2025 refit includes upgrades to tactical navigation systems and cryptographic modernization for improved interoperability. Additional modifications have included integration of Canadian cryptographic systems under the Canadian Cryptographic Modernization Program, providing secure for classified communications across naval platforms, including . Navigation upgrades encompass a new tactical system with inertial and enhancements for improved precision in submerged operations. Ongoing minor updates ensure NATO interoperability, such as standardized data links for joint exercises and secure satellite communications.

Operational History

Royal Navy Service

Following her commissioning on 25 June 1993 at , HMS Unicorn (S43), the fourth and final Upholder-class diesel-electric , underwent post-commissioning shakedown trials in waters to verify systems integration and proficiency. These trials were followed by initial training exercises off the British coast, focusing on submerged operations, performance, and tactical maneuvers essential for the 's role in . In late 1993, Unicorn embarked on her primary deployment, a six-month operational cruise to demonstrate the class's capabilities amid efforts to promote export sales. This included patrols in the for maritime surveillance and security, transitioning to the and in 1994, where she supported regional stability operations during heightened tensions following the . During these deployments, Unicorn participated in joint exercises with allied navies, enhancing interoperability in contested waters, though no major incidents were recorded. Unicorn's active Royal Navy service lasted approximately 16 months, curtailed by post-Cold War budget reductions and the 's decision to adopt an all-nuclear fleet, which also led to the cancellation of further Upholder-class beyond the initial four boats. She returned to Devonport Dockyard and was decommissioned on 16 October 1994, marking the end of operational diesel-electric service in the ; the vessel was then placed in reserve with limited total sea time due to the program's abrupt termination.

Transfer to Royal Canadian Navy

In the early 1990s, following the end of the , the decommissioned its Upholder-class submarines as part of broader fleet reductions, seeking to transition to nuclear-powered vessels. In 1993, the offered the four submarines to as potential replacements for the aging Oberon-class fleet, which was approaching the end of its service life and lacked modern capabilities for coastal defense and surveillance. , recognizing the opportunity to modernize its submarine force at a reduced cost, initiated negotiations after initial interest from other nations like fell through. The acquisition agreement was finalized on July 2, 1998, through a lease-to-buy contract valued at approximately $750 million CAD for all four submarines, including training equipment and support. HMS Unicorn, the fourth and newest unit of the class (launched in 1992 and decommissioned on October 16, 1994), was designated for transfer to become the second Canadian submarine. From decommissioning until 2001, Unicorn was placed in reserve at Barrow-in-Furness with only minimal preservation maintenance, such as periodic system checks using shore power, to maintain basic seaworthiness; her overall condition remained relatively good compared to her sisters due to her recent commissioning. Canada formally accepted on July 5, 2001, marking the handover from the Royal , after which she was renamed HMCS Windsor in honor of the city. The submarine was then towed under her own power from Faslane, , departing on , 2001, and arriving at on October 19, 2001, for initial preparations. Following a period of modifications to align with standards, including systems integration and crew familiarization, Windsor was commissioned on October 4, 2003, at . This process involved shifting the class naming convention from Upholder to (after the lead boat HMCS Victoria), and incorporating the submarines into the Canadian fleet structure, which required adjustments for operational doctrines and logistics support distinct from the Royal Navy's.

Service in Royal Canadian Navy

HMCS Windsor was commissioned into the on October 4, 2003, at (CFB) Halifax, , where it has been homeported as part of the Atlantic Fleet ever since. Following commissioning, the submarine underwent initial sea trials and training exercises, returning to operational status on April 5, 2004. From June 2005 to December 2006, Windsor completed its first operational cycle, conducting sovereignty patrols in , supporting U.S. Navy carrier groups, and tracking U.S. submarines during international exercises; it also achieved a milestone with the first-ever parachute rendezvous involving Canadian Patrol Pathfinders. In January 2007, Windsor entered an Extended Docking Work Period (EDWP) at the Fleet Maintenance Facility Cape Scott in , which lasted until November 30, 2012, significantly interrupting its operational availability. The refit addressed maintenance backlogs but delayed the submarine's return to full service until 2013, after which it logged 174 days at sea before a brief in March 2014 for repairs. Post-refit, Windsor resumed active operations, participating in multinational exercises that emphasized , stealth operations, and intelligence gathering. In fall 2015, it deployed for NATO's Joint Warrior and Trident Juncture exercises in and , coordinating with allied forces including surface ships from HMCS Athabaskan, , Montréal, Goose Bay, and Summerside to enhance combat readiness. The following year, in September 2016, Windsor joined Exercise Cutlass Fury off the east coast of , a major drill involving over 3,000 personnel from , , , , and , with 11 surface ships, three submarines, and 25 aircraft. From February 2017 to June 2018, the submarine conducted patrols monitoring international shipping lanes in , contributing to . A highlight of Windsor's service came in 2018 with a 133-day deployment under Operation Projection in the Euro-Atlantic region, marking the first operational Canadian submarine presence in the since the . During this mission, Windsor participated in NATO exercises, including Dynamic Mongoose in March, alongside submarines from , , , , and the , and tracked elements of a U.S. to support allied intelligence objectives. Windsor's operations have not been without challenges. In February 2016, while returning from a exercise off the U.S. East , the experienced a compartment leak when one cell discharged into another, forcing it to dock in , for repairs that delayed its to by about a month. More recently, in September 2023, a flooding incident involving stored injured three sailors and required the to abort a exercise and to ; repairs took approximately four weeks, after which the injured crew returned to duty. From 2021 to early 2025, Windsor was the sole operational Victoria-class submarine in the fleet, undertaking critical missions amid ongoing refits for its sisters. It spent 43 days at in 2022 and 14 days in 2023, focusing on commitments and training. A period of intensified operations culminated in its return to in March 2025, ahead of an extended refit to sustain its capabilities. As of November 2025, HMCS Windsor is undergoing an extended refit at to sustain its capabilities through the decade, remaining homeported there as part of the Navy's force for stealthy deterrence, , and interoperability. The typically carries a complement of 48 to 53 personnel, including officers and enlisted submariners, who undergo specialized training for extended underwater patrols and multinational exercises.

References

  1. [1]
    Victoria-class Submarines - Canada.ca
    Oct 13, 2022 · A submarine, when warranted, may be part of a Naval Task Group – the core Royal Canadian Navy (RCN) operating concept. ... HMCS Windsor (SSK 877) ...
  2. [2]
    HMCS Windsor - Canada.ca
    Feb 26, 2020 · HMCS Windsor (877) / Victoria-class submarine. The former HMS Unicorn was laid up by the Royal Navy in October 1994. She was accepted by Canada and named ...
  3. [3]
    His Majesty's Canadian Submarine Windsor (SSK 877) - Canada.ca
    Oct 13, 2022 · HMCS Windsor returns to its home port of Halifax in 2018, after an historic deployment to the Mediterranean Sea.
  4. [4]
    Victoria-class capability - Canada.ca
    Apr 14, 2022 · Specifications · Speed: 12 knots (surfaced), 20 knots (submerged) · Patrol endurance: approximately 8 weeks · Complement: 49 crew and 10 trainees ...
  5. [5]
    HMCS Windsor returns from multi-national overseas exercises
    Dec 17, 2015 · Her Majesty's Canadian Submarine (HMCS) Windsor returned to Halifax today after a successful three and a half month deployment to Western European waters.
  6. [6]
    Victoria-class Modernization - Canada.ca
    Canada's four Victoria-class submarines form the core of the Royal Canadian Navy's (RCN) underwater surveillance capabilities.<|control11|><|separator|>
  7. [7]
    Departmental Plan 2025-26 - Canada.ca
    Jun 18, 2025 · HMCS Windsor will enter an Extended Docking Work Period in 2025, managed by Fleet Maintenance Facility Cape Scott. This work will include ...
  8. [8]
    Upholder Class Submarines (Hansard, 14 March 1988)
    Mar 14, 1988 · However, information about the total cost of the programme was published in table 3.2 of volume 2 of the "Statement on the Defence Estimates ...
  9. [9]
    HMCS Windsor SSK-877 Upholder Submarine Royal Canadian Navy
    Laid down: March 13, 1989. Launched: April 16, 1992. Commissioned: June 25, 1993. Decommissioned: October 14, 1994. Royal Canadian Navy service: Acquired: 1998
  10. [10]
    Upholder class submarines (1986) - Naval Encyclopedia
    HMS Unseen was laid down at Cammell Laird, Birkenhead on 12 August 1987, launched on 14 November 1989, completed on 20 July 1991 and in refit by 1992 after sea ...
  11. [11]
    Upholder class Attack Submarine SSK Royal Navy - Seaforces Online
    The second submarine, Unseen, was laid down at the Cammell Laird shipyard at Birkenhead on 12 August 1987 and launched on 14 November 1989. Ursula was laid ...
  12. [12]
    Paxman Submarine Diesel Engines
    May 13, 2021 · With an overall length of 70.3 metres, each relies on two 16 cylinder Paxman Valenta engines for its diesel-electric propulsion system. Built ...
  13. [13]
    SSK Victoria Class Long-Range Patrol Submarines
    Dec 4, 2002 · The UK's Upholder (Type 2400) class submarines were built by Vickers Shipbuilding and launched in the late 1980s and early 1990s. They were ...<|control11|><|separator|>
  14. [14]
    [PDF] Type 2400 Upholder Class - Archived 1/98 - Forecast International
    Jan 3, 1997 · The Type 2400 Upholder class submarines are the Royal Navy's first conventional diesel electric submarines in over 20 years. The last ...
  15. [15]
    1990 - 1994: Upholder Class - RN Subs
    Built by Cammell Laird, Birkenhead. Launched Nov 1989, commissioned Summer 1991. Paid off 1994. Mothballed at Barrow. Ursula Built by Cammell Laird, Birkenhead.
  16. [16]
    Radio Research Paper - Victoria Class
    The original intent of the Upholder class was to augment the Royal Navy's nuclear submarine fleet.
  17. [17]
    Evidence - NDDN (38-1) - No. 4 - House of Commons of Canada
    During the reactivation of HMS Upholder in 2001, cracks in the diesel exhaust hull and backup valves were discovered. A joint investigation ascertained that the ...
  18. [18]
    Victoria class Attack Submarine SSK Upholder Canadian Navy
    Windsor was commissioned into Maritime Command during her CWP on 4 October 2003. The crew of Onondaga, the last Canadian Oberon, transferred to Upholder, the ...Missing: history | Show results with:history
  19. [19]
    Victoria-class Submarines | The Canadian Encyclopedia
    Mar 9, 2023 · A class of twelve was planned, but in the end only four were built: Upholder, Unseen, Ursula and Unicorn. Construction on the lead vessel – ...
  20. [20]
    HMCS Windsor gets $18 million overhaul - Ottawa Citizen
    Jun 11, 2014 · HMCS Windsor spent five years in a $209 million refit from 2007 until December 2012, when it was returned to service for what was supposed ...Missing: modifications | Show results with:modifications
  21. [21]
    Submarine refit wildly over budget | CBC News
    Feb 24, 2011 · In the year 2010 alone, the Canadian navy spent $45 million on repairs to HMCS Windsor. It had budgeted to spend just $17 million, the documents ...Missing: details | Show results with:details
  22. [22]
    Compromise in rust treatment on navy submarine results in depth ...
    Jul 31, 2011 · Helga Budden recommends repairing seven areas of general rust and three regions of localized pitting rust on HMCS Windsor. Budden recommends the ...Missing: 2007-2012 | Show results with:2007-2012
  23. [23]
    HMCS Windsor to begin equipment tests and trials in harbour and at ...
    Oct 10, 2014 · On March 31, 2014, HMCS Windsor underwent a docking period for maintenance and repairs at the Captain Bernard Leitch Johnson facility in HMC ...Missing: drydocking | Show results with:drydocking
  24. [24]
    Status Report on Transformational and Major Crown Projects
    The objective of the Canadian Cryptographic Modernization Program ... Her Majesty's Canadian Submarine (HMCS) VICTORIA and WINDSOR completed their ...
  25. [25]
    RCN submarines to receive new tactical navigation system | Shephard
    Aug 7, 2020 · They were dry-docked in 2019 for long-term upgrades to ensure they remain operational until the late 2020s.Missing: modifications | Show results with:modifications
  26. [26]
    Navigation: Out with the old - Marine Log
    Sep 14, 2016 · The first vessel slated for conversion to the new autopilot system is HMCS Windsor. She measures 70.3 meters long by 7.6 meters across the ...Missing: modifications | Show results with:modifications
  27. [27]
    Some history of the Upholder-class submarines
    May 3, 2012 · The period of time the class was in British hands is shown in the table. RN Name, Laid Down, Launched, Commissioned, Paid Off, RCN Name. SSK01 ...Missing: construction | Show results with:construction
  28. [28]
    Committee Report No. 1 - NDDN (38-1) - House of Commons
    The cold war prompted Canada's Navy to acquire a few submarines in the ... British Upholder Submarines Become Available for Acquisition (1993-1994). In ...
  29. [29]
    [PDF] PROCUREMENT OF CANADA'S VICTORIA CLASS SUBMARINES ...
    Apr 12, 2005 · 2001-2003 period was yet another unforeseen development which caused delays. ... The members of the Committee met Canadian submariners during the ...
  30. [30]
    U.K.'s Upholder-Class Subs Go to Canada | Proceedings
    They were offered to several navies, and Canada decided to accept them as replacements for its own flotilla of old O-class SSKs.
  31. [31]
    Royal Canadian Navy concludes successful anti-submarine warfare ...
    Sep 23, 2016 · CUTLASS FURY 2016 brought together more 3,000 participants from Canada, the United States, the United Kingdom, Spain, and France, and included ...
  32. [32]
    Navy submarine HMCS Windsor returns to Halifax after 5-month ...
    Jun 20, 2018 · In March, HMCS Windsor participated in a NATO anti-submarine warfare ... interoperability with all the other nations to achieve what ...
  33. [33]
    HMCS Windsor battery malfunction delays submarine's return to ...
    Feb 21, 2016 · HMCS Windsor's return to Halifax has been delayed due to a battery cell malfunction, a spokesman from Maritime Forces Atlantic said Friday.
  34. [34]
    HMCS Windsor forced to return to Halifax after trouble during ...
    Sep 19, 2023 · In 2018, the Windsor embarked on a 133-day outing to the Mediterranean Sea for a pair of NATO training and counter-terrorism missions. It ...<|separator|>
  35. [35]
    Submarines: Canada's underwater prospects foundering
    Nov 8, 2023 · Meanwhile, the navy is pitching the purchase of up to 12 new submarines at a cost of $60 billion. The defence chief, General Wayne Eyre, told a ...
  36. [36]
    Canada's sub-standard submarines - The Hill Times
    Apr 28, 2025 · HMCS Windsor was the first of the renamed Victoria-class submarines to enter RCN service on June 2005. So, for roughly half a decade Canada was ...<|control11|><|separator|>
  37. [37]
    HMCS Windsor set for refit after returning to Halifax
    Mar 10, 2025 · HMCS Windsor set for refit after returning to Halifax. 2025-03-10 12:04. SUBMITTED. HMCS Windsor, seen ...
  38. [38]
    HMCS Windsor - Wikipedia
    Laid down, 13 March 1990. Launched, 16 April 1992. Commissioned, 25 June 1993 ... Upholder/Victoria-class submarine. Displacement. 2,185 long tons (2,220 t) ...