Interstate 81

Interstate 81 is a north–south Interstate Highway spanning 855 miles (1,376 km) across the , from its southern terminus at in , to its northern terminus at the on , , where it connects via the to Highway 137. The route traverses six states—, , a brief segment in , , , and —following the and providing an inland parallel to the congested coastal Interstate 95 for regional connectivity. As a critical component of the National Highway System, Interstate 81 facilitates substantial freight movement, with trucks accounting for more than 30 percent of traffic in over half of its length and comprising up to 27 percent of daily vehicles in segments like Maryland's portion, positioning it among the nation's highest truck-volume corridors relative to total traffic. It serves key urban centers such as and Harrisonburg in , Harrisburg in , and Syracuse in , supporting economic links between the Southeast and Northeast while enduring capacity strains from surging commercial loads that exceed original design standards. Constructed primarily between the late 1950s and 1970s as part of the federal authorized in 1956, the road has prompted infrastructure upgrades and debates over expansion, including Virginia's efforts to widen it amid safety concerns from high crash rates involving heavy vehicles, which constitute 41 percent of the state's trucking activity on this route. In Syracuse, the aging elevated , built in the and displacing over 1,300 families from the adjacent 15th Ward neighborhood, now requires replacement due to structural decay, with proposals favoring removal to restore urban connectivity rather than reconstruction. These challenges underscore the highway's evolution from a post-World War II engineering feat to a focal point for multimodal freight solutions and maintenance investments exceeding billions in recent state and federal initiatives.

Route Description

Overall Path and Length

Interstate 81 (I-81) extends approximately 855 miles (1,376 km) as a major north-south corridor through the . It serves as a key artery paralleling the , facilitating freight and passenger traffic between the Southeast and Northeast regions. The highway's southern terminus is at a trumpet interchange with (I-40) in , approximately 30 miles (48 km) east of Knoxville. From there, I-81 trends northward through rural and mountainous terrain in eastern , crossing into near . It continues through the in Virginia, briefly entering and near Hagerstown, before traversing Pennsylvania's Susquehanna Valley and entering near Binghamton. In New York, the route passes Syracuse and extends northward along the eastern shore of to its northern terminus on at the . At the northern end, I-81 connects directly to Ontario Highway 137 via the , providing a vital link for cross-border commerce despite the absence of customs facilities on the U.S. side. The highway traverses six states in total: , , , , , and , with Virginia hosting the longest segment at over 320 miles (515 km).

Tennessee Segment

Interstate 81's Tennessee segment extends 75.63 miles (121.75 km) northward from a interchange with I-40 approximately 2 miles (3.2 km) west of Dandridge in County to the Virginia state line north of in County. The route parallels the and the , serving as a primary north-south corridor through eastern 's rural and semi-urban areas while closely following U.S. Route 11E. It is designated as part of the National Highway System and carries significant freight traffic, including trucks bound for the region. From its southern terminus at I-40 (milepost 0), I-81 proceeds north through Jefferson County, providing access to White Pine via Exit 4 (SR-32) and passing near . Entering Hamblen County, the highway skirts the eastern edge of Morristown with exits at mileposts 8 (SR-160), 12 (US-25E), and 15 (SR-113), connecting to local industries and the Morristown Regional Airport. The four-lane divided freeway then crosses into Greene County, offering rural interchanges at Baileyton (Exits 23 and 26, SR-70 and US-11E) amid rolling terrain that requires occasional truck climbing lanes for the grades. In , I-81 intersects I-26 and US 23 at Exit 57 near Fall Branch, a completed in phases during the 1970s that links to Johnson City and westward routes. The route continues into Sullivan County, bypassing Kingsport to the east with key exits at mileposts 63 (SR-93 to the city center) and 66 (US-11W/US-58), serving manufacturing hubs and the Kingsport Municipal . Approaching , exits include access to the (Exit 74, SR-394) and a brief overlap with US 421 before the highway ascends to the state line at milepost 75.63, transitioning seamlessly into Virginia's longer segment. Throughout, the roadway maintains a 70 (113 /h) speed limit for cars and 65 (105 /h) for trucks, with ongoing improvements under the I-40/I-81 Multimodal Corridor Study addressing congestion and safety.

Virginia Segment

Interstate 81 enters Virginia from Tennessee at mile marker 0 near Bristol in Washington County, marking the start of its 325-mile course through the state. The highway parallels U.S. Route 11 northward through the Appalachian Mountains and into the Shenandoah Valley, serving as a primary north-south corridor for freight and passenger traffic in western Virginia. From , I-81 proceeds through , passing Exit 1 for U.S. Routes 58 and 421, then reaches Abingdon at Exits 17–19 for U.S. 58 and U.S. 11. Continuing into Smyth County, it serves near Exit 45 for U.S. 11, followed by a crossing into Wythe County. At Exit 70 in Wytheville, I-81 intersects , a key junction connecting to and providing access to the New River Valley. North of Wytheville, the route enters Pulaski County, bypassing Pulaski city to the east, then reaches Montgomery County and Christiansburg at Exit 118, where it meets U.S. 460 and the . In the Roanoke Valley, I-81 traverses Roanoke County and the city of , with Interstate 581 branching off at Exit 143 to serve downtown and . The highway then continues through Botetourt and Rockbridge counties, approaching . Northeast of Lexington in Augusta County, I-81 intersects Interstate 64 at Exit 205 near Verona, facilitating connections to Richmond and Charlottesville. It passes Staunton and enters Rockingham County, serving Harrisonburg between Exits 240 and 250, including Exit 247 for U.S. 11 and Virginia State Route 257. In Shenandoah County, Exit 291 provides access to Interstate 66 toward Washington, D.C. The northern terminus in Virginia occurs in Frederick County near mile marker 323 north of at Exit 323 for U.S. 11 and U.S. 522, where I-81 crosses into . Exit numbers in Virginia align with mile markers, starting at 1 near and increasing sequentially northward. Throughout its path, I-81 features ongoing improvements under the Virginia Department of Transportation's Corridor Improvement Plan, including widening projects to address congestion and enhance safety.

West Virginia Segment

Interstate 81 traverses 26 miles (42 km) entirely within Berkeley County in West Virginia's Eastern Panhandle, paralleling U.S. Route 11 throughout its length. The segment connects the Virginia state line to the Maryland state line, providing primary highway access to the city of Martinsburg and surrounding communities including Inwood, Bunker Hill, and Hedgesville. Completed in 1966, the route serves as a key north-south corridor through the region, facilitating freight movement and regional travel. Entering from near , I-81 heads northeast as a four-lane divided freeway. The highway passes through rural and semi-urban terrain, initially serving the community of Inwood with Exit 5 for West Virginia Route 51. Further north, Exit 8 provides access via County Route 32 (Tabler Station Road) to Bunker Hill and Tabler Station. Approaching Martinsburg, the , I-81 skirts the western edge of the city. Exit 12 connects to West Virginia Route 45 (Apple Harvest Drive), offering access to Martinsburg and the Eastern West Virginia Regional Airport. Exits 13 and 14 serve downtown Martinsburg via County Route 15 (King Street) at Exit 13 and County Route 13 (Dry Run Road/Tennessee Avenue) at Exit 14, with both also linking to U.S. Route 11. North of Martinsburg, the route continues through Hedgesville, where Exit 16 splits for West Virginia Route 9 east to Shepherdstown and west toward Berkeley Springs. I-81 then crosses the into , ending the West Virginia segment at mile marker 26.
ExitDestinations
5WV 51 – Inwood
8CR 32 – Tabler Station Road
12WV 45 – Martinsburg, Apple Harvest Drive
13US 11/CR 15 – King Street, Downtown Martinsburg
14CR 13 – Dry Run Road, Tennessee Avenue, Martinsburg
16E/WWV 9 – Hedgesville, Shepherdstown (east), Berkeley Springs (west)

Maryland Segment

Interstate 81 enters Maryland from West Virginia across the Potomac River near Williamsport in Washington County. The segment extends 12.1 miles north through the county to the Pennsylvania state line near State Line, paralleling U.S. Route 11 and serving as a key north-south corridor in the region. The highway begins with Exit 1 for MD 63 and MD 68 (Lappans Road) south of Williamsport, providing access to residential and commercial areas along the Potomac. It then proceeds north across Conococheague Creek before reaching a with at Exit 4, which carries approximately 55,000 vehicles per day including 34% trucks and connects to Hagerstown, , and eastward. North of the I-70 junction, I-81 passes west of Hagerstown, with Exit 5 serving Halfway Boulevard for local traffic to the city's western suburbs and industrial zones. The route continues to a at Exit 7 with MD 58 (Salem Avenue southbound and Cearfoss Pike northbound), linking to and further Hagerstown approaches. Beyond these interchanges, I-81 maintains four lanes amid rolling terrain before crossing into without additional exits in .

Pennsylvania Segment

Interstate 81 enters from at the state line in Franklin County near the community of State Line, approximately 1.5 miles north of . The highway proceeds northeast through rural farmlands of Franklin County, paralleling , and passes through Chambersburg via exits for Pennsylvania Route 16 and U.S. Route 30. It continues into Cumberland County, serving with interchanges for U.S. Routes 11 and 15. Entering Dauphin County, I-81 approaches Harrisburg, intersecting the Pennsylvania State Capitol Complex area with key connections including Pennsylvania Route 581 (Harrisburg Expressway), U.S. Routes 22 and 322, and at a major near . North of Harrisburg, the route crosses the and enters Lebanon County, where it meets near Fredericksburg in a . From there, I-81 travels through Schuylkill County, intersecting Interstate 80 near Hazleton in Luzerne County. The highway then proceeds northeast through the Wyoming Valley, serving Wilkes-Barre in Luzerne County with an interchange for Interstate 476 (Pennsylvania Turnpike Northeast Extension). Entering Lackawanna County, I-81 passes Scranton, featuring a complex interchange with Interstate 84, Interstate 380, and U.S. Route 6 in Dunmore. The route continues into Susquehanna County through rural terrain paralleling U.S. 11, reaching the New York state line near Great Bend after 232 miles in Pennsylvania.

New York Segment

Interstate 81 in New York spans 183.42 miles (295.31 km) from the state line near Conklin in Broome County to the at in St. County, where it connects via the International Bridge to Highway 137. The route parallels for its entire length through the state. It traverses Broome, Chenango, Cortland, Onondaga, Oswego, , and St. Lawrence counties, serving the cities of Binghamton, Syracuse, and Watertown. Entering just north of the in the town of Kirkwood, I-81 heads north into Binghamton, intersecting Interstate 86 and New York Route 17 at Exit 4. In Binghamton, it briefly overlaps NY 17 before continuing north through rural areas of Broome and Chenango counties to Whitney Point, where it meets Interstate 88 at Exit 8. The highway then proceeds through Cortland County, bypassing Cortland to the east via a four-lane divided freeway. North of Cortland, I-81 enters Onondaga and approaches Syracuse, intersecting Interstate 481 at Exits 16A and 29, Interstate 690 at Exit 18, and Interstate 90 () at Exit 25A. Through , the route features a 1.4-mile elevated constructed in the , which carries four lanes over the city and connects to Almond Street north of the . Beyond Syracuse, I-81 passes through suburban areas in Onondaga and Oswego counties, including and , before reaching rural . In Jefferson County, I-81 serves Watertown, intersecting New York Route 3 at Exit 42 and spurring to Interstate 781 east toward military base at Exit 48. The freeway then turns northeast through St. Lawrence County, bypassing Alexandria Bay to reach Collins Landing at Exit 50, the northern terminus where traffic enters the system crossing the River. The bridge, maintained by the Thousand Islands Bridge Authority, spans approximately 8.5 miles to Ivy Lea, .

History

Planning and Designation

The corridor that would become Interstate 81 was identified during early federal planning for a national toll-free highway network in the 1940s, as part of efforts to establish efficient north-south routes through the Appalachian Mountains by leveraging the relatively low-relief terrain of the Great Appalachian Valley and paralleling the historic alignment of U.S. Route 11. This selection prioritized accessibility for freight and military movement while avoiding steeper ridges to the east and west, reflecting first-principles engineering considerations for cost-effective construction in rugged topography. The Federal-Aid Highway Act of June 29, 1956, provided the authorizing framework for the Interstate System, allocating initial funding for 41,000 miles of highways, including the I-81 alignment from Tennessee northward. Route numbering for the Interstate System, including designation of the corridor as I-81, was approved by the American Association of State Highway Officials (AASHO) in August 1957, following Bureau of Public Roads validation of alignments earlier that year. In , the route appeared in preliminary maps as early as 1939 within long-term national planning precursors to the Interstate era, emphasizing connectivity from the Knoxville area to the Northeast. Pennsylvania's segment planning in the initially considered toll financing but ultimately proceeded as a non-tolled facility under federal guidelines. State's master plan, outlined in the 1947 Urban Area Report for the Syracuse region, incorporated the northern terminus concept, with a 1958 decision formalizing the elevated structure through urban areas. Designation facilitated phased federal-state cooperation, with states responsible for right-of-way acquisition and matching federal standards for divided, limited-access roadways. Early approvals emphasized strategic defense utility, as articulated in the 1956 Act's "National System of Interstate and Defense Highways" nomenclature, though empirical traffic projections underscored civilian economic benefits along the underdeveloped valley corridor. By , initial contracts were let in near Scranton, marking the transition from to implementation across the 855-mile route spanning six states.

Construction Phases

Construction of Interstate 81 advanced through segmented phases primarily during the late 1950s to 1970s, aligned with the broader rollout following the Federal-Aid Highway Act of 1956. Initial work focused on key corridors in and , with subsequent completions northward and southward to connect the full 855-mile route from to . Phases varied by state due to terrain challenges, funding allocations, and local priorities, resulting in piecemeal openings rather than uniform progression. In , where I-81 spans its longest segment at 325 miles, predominantly occurred between 1957 and 1971, emphasizing four-lane divided standards through the Appalachian Valley. By November 1963, roughly 85 miles were operational, primarily in the southern and central portions near and . Full across the achieved operational status by the early , though some rural stretches required additional grading and bridging over rugged . Pennsylvania's 232-mile portion saw groundbreaking in 1958, targeting initial segments around Scranton and the northern border with to facilitate cross-state commerce. Subsequent phases extended southward, with contracts awarded for the line to early exits by 1959 and progressive builds through the Susquehanna Valley. The route reached completion in 1976, costing approximately $443 million in contemporary dollars, after addressing steep grades and river crossings. In , the 155-mile northern terminus incorporated three main construction stages, with openings from 1959 to 1969, including the Syracuse viaduct elevated structure to bypass urban density. Early mid-1950s work connected Tully southward into Syracuse, while later phases linked northward to the Canadian border via approaches. The and segments, totaling under 20 miles combined, aligned with mid-1960s timelines, featuring early 1960s builds in Hagerstown and a 1966 opening over the to integrate with Virginia's network. Tennessee's brief 14-mile southern end tied into I-40 by the early 1960s, completing the endpoint linkage.

Post-Completion Modifications

In Virginia, the Interstate 81 Corridor Improvement Plan, launched in 2017 following legislative authorization and funded partly by a 2018 state gas tax increase generating over $2 billion for transportation, includes more than 100 targeted projects such as widening segments to three lanes northbound and southbound, adding truck climbing lanes in mountainous areas, rehabilitating 120 bridges, and enhancing interchanges to reduce crash rates. Specific implementations encompass the widening of approximately 21 miles by 2030 in high-congestion zones, with ongoing work like the $74 million project between exits 221 and 225 through Staunton, expected to conclude in June 2027, and bridge expansions over rail lines near Strasburg starting in 2025. A 2025 update to the plan, incorporating public input from meetings held in July and October, refines these efforts amid projected traffic growth exceeding 20% by 2040. Pennsylvania's modifications have focused on structural and expansion, including the $74.5 million of six lanes and shoulders from mile marker 1 to the state line, completed with interchange ramp upgrades and bridge deck replacements to mitigate deterioration from heavy freight loads. The I-81 Susquehanna Bridges Project, a multi-phase initiative replacing northbound and southbound spans over the river to preserve two lanes per direction during peak hours, advanced to Phase 3B in March 2025, addressing seismic vulnerabilities and corrosion identified in inspections. Further, the seven-mile Section D46 from Avoca to Scranton, initiated post-2020 studies, widens the roadway to three 12-foot travel lanes plus 12-foot shoulders in each direction to correct design deficiencies and reduce congestion bottlenecks. Resurfacing efforts, such as the project from State Line to milepost 6 anticipated for July 2027 completion, incorporate nighttime operations to minimize disruptions. In , the $2.25 billion I-81 Viaduct Project targets the Syracuse elevated structure, completed in 1959 but deemed structurally deficient by federal assessments due to non-standard features and aging components; rather than widening, it involves removal and replacement with a ground-level , new ramps, roundabouts, and a community grid to enhance urban connectivity and . Key milestones include in July 2023, award of the fifth in April 2025 for $251 million to advance gateway , and permanent closures like Fineview Place in June 2025 to facilitate rerouting. Additional northern modifications, such as a proposed $68 million exit near for industrial access, support regional economic demands. Shorter segments in , , and have seen targeted upgrades, including bridge replacements and shoulder additions in Tennessee's tri-city area to handle local freight increases, though less extensive than northern states due to lower volumes. These modifications collectively respond to post-1980s traffic surges, with over 10,000 daily trucks in peak sections contributing to wear, but implementation varies by state funding and environmental reviews.

Economic and Strategic Importance

Freight and Commercial Role

Interstate 81 serves as a vital north-south freight corridor in the , channeling substantial commercial truck traffic parallel to the denser urban routes of I-95 and providing an alternative pathway for goods movement from southeastern hubs to northeastern markets. As part of the National Highway Freight Network, it accommodates high volumes of heavy trucks, with freight volumes in segments like Maryland ranking among the highest nationally on a per-lane-mile basis despite the road's four-lane configuration in some areas. This role stems from its positioning through less congested terrain, enabling efficient long-haul transport of commodities such as automotive parts, chemicals, and consumer goods. Truck traffic constitutes a dominant share of overall volume on I-81, often exceeding 20-26% of average annual daily traffic (AADT) across states. In , trucks average 26% of , accounting for 42% of the state's interstate truck miles traveled and roughly 11.7 million trucks annually. In , current truck percentages surpass 20%, outpacing the highway's original design threshold of 15%. These elevated proportions reflect I-81's function as a preferred for commercial carriers avoiding coastal bottlenecks, though they contribute to accelerated pavement wear and operational strains. The corridor's freight emphasis has spurred , including logistics parks, distribution centers, and manufacturing facilities in regions like central and the . For instance, proximity to I-81 has facilitated industrial clustering by reducing shipping times and costs for truck-dependent supply chains. However, reliance on trucking—rather than diversified modes like rail—amplifies vulnerabilities to capacity limits, with studies indicating potential for modal shifts to alleviate pressure but limited implementation to date.

Regional Connectivity and Development

Interstate 81 spans approximately 855 miles from , to the at , , serving as a primary north-south that links southeastern manufacturing and agricultural regions with northeastern urban centers while traversing the across six states. This routing provides an essential bypass to the heavily congested Interstate 95 coastal corridor, enabling efficient regional interconnectivity for passenger travel, freight logistics, and options, including rail integrations like the Norfolk Southern Crescent Corridor. The highway intersects key east-west routes such as I-40 in , I-64 in , I-78 in , and I-90 in , facilitating cross-regional trade flows that connect ports in the Southeast to markets in the Northeast. In Virginia's 325-mile segment, I-81 connects 13 counties and 45 cities and towns, linking 30 colleges and universities while paralleling scenic routes like the , and it handles 43% of the state's interstate truck vehicle miles traveled, supporting 21 million annual truck trips valued at over $300 billion in goods. These dynamics have historically fostered development in and hubs, such as the I-81/I-77 crossroads in Wythe County, where proximity to the corridor has driven growth and attracted centers by unlocking access to southern markets. Ongoing improvements under the Corridor Improvement Program, including lane widenings and truck climbing lanes, aim to enhance this connectivity, reducing bottlenecks to promote job creation and commerce efficiency. Northern segments further amplify regional development; in , the highway supports five of the area's ten largest employers by providing access to downtown, University Hill, and the , with viaduct projects designed to integrate pedestrian, , and facilities for improved multi-modal access. Strategies like boulevard conversions or reconstructions are expected to alleviate , lower travel costs, and stimulate property development in industrial and commercial zones, enhancing economic competitiveness and . In , the corridor carries freight equivalent to 10% of national economic output in goods value, with expansions like the Phase 2 project adding lanes and interchanges to boost capacity and regional GDP contributions through better freight reliability. Across the corridor, I-81's infrastructure has positioned rural and suburban growth areas, such as Franklin County, Pennsylvania, for targeted redevelopment by aligning transportation access with urban centers and suburban expansions, though population growth rates along the route have averaged 1.0% annually from 1969 to 2002, trailing statewide figures due to its rural character. These connections underscore the highway's role in integrating Appalachian economies with broader mid-Atlantic networks, supporting projected employment increases tied to freight demand.

Traffic Patterns and Safety Issues

Volume and Congestion Data

Interstate 81 experiences varying traffic volumes along its 855-mile corridor, with average annual daily traffic (AADT) ranging from approximately 5,600 vehicles per day in rural segments to over 100,000 vehicles per day in denser areas of and . Peak volumes occur near urban centers, such as , where daily traffic reaches about 60,000 vehicles, and , reflecting the highway's role as a primary north-south freight artery parallel to the congested I-95 corridor. In specific segments, such as near Staunton between mile markers 128 and 140, 2024 AADT figures range from 45,700 to 48,200 vehicles per day. Trucks constitute a significant portion of I-81's traffic, often 20-30% of total vehicles, exceeding the original design capacity of 15% and contributing to operational strain. In , I-81 handles 41% of the state's overall truck traffic despite comprising only a fraction of the interstate mileage, with over 3.4 million trucks annually in recent years. The Maryland segment sees about 21,000 trucks daily, representing 27% of all vehicles. Congestion on I-81 is exacerbated by high truck percentages, limited lanes in many sections (primarily two per direction), and bottlenecks at interchanges, merges, and zones, leading to frequent delays during hours and periods. The corridor features multiple freight bottlenecks identified in national assessments, with truck travel times delayed by factors including terrain, weather, and through-traffic volumes that have grown 10% in truck usage since 2008 in . Improvement plans target reductions in person-hours of delay by up to 40%, underscoring current levels that impair reliability for both freight and passenger travel.
StateAADT Range (vehicles/day)
5,609 – 103,968
5,609 – 103,968
5,609 – 67,195
5,609 – 67,195
5,609 – 67,195

Accident Statistics and Causal Factors

Interstate 81 experiences elevated crash rates compared to many other U.S. interstates, primarily due to its role as a major freight corridor with high volumes of commercial motor vehicles. In , the longest segment of the highway, approximately 2,000 crashes occur annually along I-81, with about 22 percent involving trucks. Over the five-year period from 2018 to 2022, more than 5,000 crashes involving commercial motor vehicles were reported across key states including , , , , and . In a specific study area near (mileposts 128 to 137), 794 crashes were recorded over five years, with trucks—comprising 30 percent of traffic—accounting for 30 percent of those incidents. Causal factors for these accidents center on the disproportionate , which averages 26 to 35 percent of daily vehicles on portions of I-81, far exceeding the original design assumption of 15 percent. This leads to higher risks of rear-end collisions and lane-change errors, exacerbated by trucks' longer stopping distances and larger blind spots. The highway's alignment through the hilly and terrain contributes to issues like speeding on downgrades and reduced visibility in adverse weather, which frequently combine with human factors such as driver fatigue and improper following distances. In , the fatal accident rate on I-81 is nearly double that of other state interstates, directly linked to these truck concentrations and geometric constraints.
FactorContribution to CrashesEvidence
High truck volume (26-35% of )Increases collision severity and Trucks involved in 22-30% of incidents despite lower overall vehicle share
and rear-end collisionsPrimary crash type due to mixed speedsCommon in freight-heavy corridors like I-81
and Amplifies speeding and control lossHilly routes in / segments elevate risks
Driver behaviors (fatigue, distraction)Undermines safe operation of heavy vehiclesPrevalent in CMV data across I-81 states

Comparative Risks with Other Interstates

Interstate 81 experiences elevated crash and fatality risks compared to the national average for interstate highways, where the fatality stood at 0.55 per 100 million vehicle miles traveled (VMT) in 2019. This disparity stems from I-81's function as a primary north-south freight corridor, carrying volumes that exceed 20-30% of total in segments across and , far above the national interstate average of around 10%. High percentages correlate with increased crash severity, as large trucks involved in fatal crashes result in higher occupant death rates due to mass disparities and load dynamics, even though trucks themselves have lower involvement rates per mile traveled (1.3 fatal crashes per 100 million miles for trucks versus 1.6 for vehicles in ). In , I-81 segments demonstrate crash rates approximately 15% higher than comparable interstate sections in the same district, exacerbated by geometric constraints, grades, and merging conflicts in rural areas. data further indicate that I-81 records fatalities at rates exceeding those of other Virginia interstates like I-66 or I-66, with absolute numbers on par with or surpassing busier routes such as I-95 and I-64, despite lower overall VMT. reports similarly disproportionate truck-related incidents on I-81, accounting for 1,600 crashes annually—second only to Virginia nationally—highlighting systemic overload from bypass freight diverting from congested coastal interstates. By contrast, interstates with lower truck reliance, such as I-70 in flatter midwestern segments, exhibit fatality rates closer to the system-wide average, underscoring I-81's outlier status driven by causal factors like extended braking distances for heavy vehicles on undulating terrain rather than inherent design flaws alone. Truck-dominant routes like I-40, which logged 270 fatalities in 2020 (10.6 per 100 miles), share analogous risks but benefit from broader lanes and fewer legacy alignments in some states, yielding marginally lower normalized rates than I-81's compounded exposures. While raw fatality counts on high-volume corridors like I-95 reached 284 in 2019 (14.88 per 100 miles), I-81's per-VMT risks remain amplified by its undercapacity for freight, with truck crashes comprising over 25% of incidents in key states versus the national 10-15% baseline.

Controversies and Improvement Debates

Truck Traffic Concentration

Interstate 81 serves as a critical freight corridor, with trucks comprising 20 to 30 percent of total traffic volume across much of its length, significantly exceeding the design standard of 15 percent heavy vehicles established during the Interstate Highway System's construction. In Virginia's 325-mile segment, the highway handles an average of 26 percent truck traffic relative to all vehicles, while carrying more than one-third of the state's total trucks and nearly half of its freight value by weight. Specific corridors, such as between Exits 137 and 141 near , record 21 to 22 percent heavy trucks amid average annual daily traffic (AADT) volumes of 63,000 to 67,000 vehicles. Overall, I-81 accounts for 41 to 42 percent of Virginia's interstate truck vehicle-miles traveled (VMT), with annual truck flows estimated at 11.7 million units transporting $312 billion in goods as of recent counts. In Pennsylvania, truck percentages remain elevated, reaching 24 percent of northbound traffic in segments like northern Cumberland County, where AADT exceeds 72,000 vehicles daily. Similar patterns extend to adjacent states: Maryland's portion sees trucks exceed 30 percent of total traffic in expansion project limits, with daily volumes around 19,400 trucks. Across the broader I-81 corridor—from Tennessee through New York—truck shares climb to 27 percent in high-volume interchanges like those near I-70 in West Virginia. These figures contrast sharply with national interstate averages of 10 to 15 percent trucks, underscoring I-81's role as a truck-dominant route. The concentration arises from I-81's function as an bypass for north-south freight, linking manufacturing hubs in the Southeast to centers in the Northeast while circumventing on coastal routes like I-95. data indicate volumes have doubled over three decades, from 30,000 to 50,000 AADT in 1989 to current levels often surpassing 70,000, driven by growth and just-in-time . In alone, truck traffic rose 10 percent from 3.4 million annual units in 2008 to higher contemporary estimates, amplifying reliance on the corridor for over 40 percent of statewide trucking activity. This pattern persists despite the highway's original two-lane-per-direction design, ill-suited for sustained heavy-haul loads exceeding projected thresholds.

Funding and Tolling Proposals

In 2019, the established the I-81 Corridor Improvement Fund, allocating 43.7 percent of revenues from the Interstate Operations and Enhancement —derived primarily from a 4.15 percent regional in the corridor counties—to support safety and capacity enhancements along the highway's 325-mile stretch in the state. This funding mechanism, approved by the Commonwealth Transportation Board, underpinned the initial $2 billion Corridor Improvement Plan, which targeted 27 projects including upgrades, climbing lanes, and operational improvements, with total costs later expanding to approximately $4 billion for 65 initiatives by 2025. Additional sources have included $48.2 million from the Interstate O&E , $102.9 million in state bonds, $42 million in federal grants, and $175 million from General Fund surpluses in fiscal year 2024, enabling completion of 35 projects, ongoing construction on 16, and planning for 14 more by 2035. Tolling proposals emerged as a contentious alternative amid funding shortfalls, with Governor advancing a 2019 plan to impose truck-only tolls averaging 15 cents per mile across the corridor to generate $2.2 billion over 50 years, explicitly avoiding automobile tolls under state law that prohibits general tolling on I-81 without legislative approval. Opposition from trucking associations, local governments, and residents—coordinated through campaigns like Keep Tolls Off I-81—highlighted risks of traffic diversion to secondary roads, economic burdens on freight-dependent regions, and inequity favoring out-of-state haulers, leading the General Assembly to reject the measure and pivot to the sales tax-based fund. Federal TIFIA loans, including a $1.2 billion traditional loan and smaller rural initiative awards totaling up to $1.5 billion, have supplemented state efforts without toll reliance, accelerating implementation despite debates over long-term debt servicing. In Pennsylvania, funding for I-81 maintenance has drawn from Act 89's multi-year transportation package, providing over $74.5 million for specific reconstructions like six-lane widening in Franklin County, though bridge-specific projects such as the crossings have prompted tolling discussions. PennDOT proposed tolls of $1–$2 per car via public-private partnerships for nine major interstate bridges, including I-81 spans, to fund repairs amid a $4 billion statewide shortfall, but these faced legal invalidation by the Commonwealth Court in 2022 for procedural flaws and were amended to exclude tolling by the General Assembly. Critics, including legislators like Senator Lisa Baker, argued the plans would impose undue costs on regional commuters and freight without addressing root congestion causes. Federal advocacy has sought to bolster non-toll options, as evidenced by U.S. Representative Ben Cline's July 2025 bill proposing $17 million for corridor widening and upgrades, emphasizing safety over revenue extraction. In , while the I-81 Viaduct replacement lacks direct toll proposals, a February 2025 bill aimed to waive or reduce New York Thruway tolls for diverted traffic during construction, reflecting indirect funding debates tied to interstate improvements. These efforts underscore persistent tensions between user fees and taxpayer/general revenue models, with tolling repeatedly sidelined due to diversion risks and political resistance across states.

Environmental and Local Opposition

Opposition to Interstate 81 improvement proposals, particularly widening and capacity expansions in , has centered on environmental degradation and disruption to local communities. Conservation organizations, including the Alliance for the , have criticized plans for their potential to harm air and through increased emissions and runoff, as well as fragmenting habitats in the region. A 2003 Tier 1 for the corridor acknowledged needs for alternatives but advanced highway-focused concepts, prompting lawsuits from groups like the Network, which argued the final inadequately protected economic and environmental resources along the route. Local stakeholders have raised concerns over irreversible impacts to historic sites, including Civil War-era landscapes, and residential areas, with expansions projected to displace homes and businesses while exacerbating noise and visual pollution. Public input during the Improve 81 program, which encompasses 63 projects at an estimated $2.2 billion cost, has shown strong preference—up to 70% in some meetings—for non-structural fixes like enhanced truck enforcement and traffic management over lane additions, citing insufficient evidence that widening would resolve congestion without inducing more traffic. An earlier corridor proposal in the early 2000s collapsed amid similar backlash over environmental costs and alternatives like freight rail investment, leading communities to advocate for integrated planning rather than highway-centric solutions. In and segments, analogous debates highlight cumulative effects, such as elevated particulate and emissions from heavy truck volumes contributing to regional air quality issues, though state-level opposition has focused more on in Syracuse's I-81 replacement, where community grid plans face scrutiny for not fully addressing past environmental injustices in minority neighborhoods. Despite ongoing environmental assessments for projects like Staunton-area widening, critics maintain that federal and state processes underprioritize mitigation, with groups urging deferral of records of decision until comprehensive rail and operational analyses are exhausted.

Ongoing and Planned Improvements

Virginia's Improve 81 Program

Virginia's I-81 Corridor Improvement Program, commonly referred to as Improve 81, targets safety enhancements, congestion relief, and capacity expansion along the 325-mile segment of Interstate 81 traversing the state from the border to the line. Signed into law in spring , the $4 billion initiative funds dozens of projects, including interstate widening to three lanes in congested zones, addition of truck climbing lanes, and operational upgrades like intelligent transportation systems. These interventions address chronic issues stemming from I-81's role as a primary freight corridor, where trucks comprise over 40% of northbound in some sections, contributing to elevated crash rates and delays. The program's foundation traces to a 2017 corridor study by the Virginia Department of Transportation (VDOT), which identified $2 billion in priority improvements subsequently approved by the Commonwealth Transportation Board (); this evolved into the broader $4 billion framework incorporating additional revenue mechanisms. Funding derives from state allocations, including $70 million from the general fund in 2025, TIFIA loans totaling up to $280.7 million to front-load the $2.7 billion capital plan, and tolling revenues pledged from designated corridors. Smaller and operational projects, such as upgrades and improvements, starts within 2-3 years of funding, while major widening efforts—six projects spanning multiple counties—aim for completion by 2031. As of October 2025, VDOT has initiated construction on initial phases, with ongoing assessments refining priorities through the 2025 Corridor Improvement Plan update. This study emphasizes segments with the highest crash severity and traffic delays, excluding areas already programmed for major work, and incorporates public input via meetings held October 27-30, 2025, ahead of final recommendations by December 2025. The program extends through at least 2033, adapting to evolving freight demands while balancing local impacts through advisory committees involving stakeholders from affected counties. ![View south along Interstate 81 from the overpass for Carrier Drive in Harrisonburg, Virginia][float-right]

Projects in Other States

In Tennessee, the Tennessee Department of Transportation (TDOT) completed the I-40/I-81 Multimodal Corridor Study in 2023, which analyzed 18 months of data to recommend short- and long-term improvements for congestion and safety along the I-40/I-81 overlap near Knoxville, including potential interchange enhancements at Watt Road and potential capacity additions, though no major construction contracts have been awarded as of October 2025. Ongoing maintenance includes periodic lane closures for resurfacing and bridge inspections, such as southbound I-81 near mile markers 5.1 and 0.4 in Jefferson County scheduled for October 29, 2025. West Virginia's segment of I-81 in Berkeley County features limited improvements focused on facilities rather than roadway expansion; the West Virginia Division of Highways (WVDOH) planned of welcome centers and overnight truck parking areas along I-81, with consultant contracts for design issued in 2023. Additional work includes lighting installations completed in 2021 and a right lane closure on eastbound WV 9 with northbound I-81 exit ramp adjustments announced for early 2025 to enhance safety. Maryland's Maryland Department of Transportation State Highway Administration (MDOT SHA) has pursued phased widening on its short I-81 segment in ; Phase 1 bridge replacements and improvements at the West Virginia line, costing $104.6 million, enhanced safety for truck traffic and were completed in 2021. Phase 2 involves expanding from four to six lanes over 3.5 miles with four interchange upgrades at MD 58, Maugansville Road, Maugans Avenue, and Showalter Road, with design finalized in 2018 and construction pending funding as of 2025. Phase 3 plans to widen to six lanes from MD 63/MD 68 to the CSX railroad, independent of prior phases, with advancement noted in the 2025-2030 State Transportation Improvement Program. In Pennsylvania, the (PennDOT) addresses I-81 through targeted interchange and pavement projects; District 4-0 proposes modifications at I-81 and SR 848 (MPMS 75976) for safety and operations, with planning ongoing via the initiative. Concrete pavement repairs on I-81 near the I-80 interchange in Luzerne County are scheduled for letting on September 3, 2026, increasing funding from $25 million to $30 million. Other efforts include safety upgrades at Exit 219 in Susquehanna County and SR 424 interchange improvements in Luzerne County, both aimed at reducing crash risks without full corridor widening. New York's New York State Department of Transportation (NYSDOT) leads the I-81 Viaduct Project in Syracuse, a $2.25 billion initiative to replace the structurally deficient 1950s-era viaduct spanning 1.4 miles, converting the elevated section to a street-level Business Loop 81 while reconfiguring interchanges with I-481 and enhancing connectivity to I-90. The project, approved via a 2021 Record of Decision, includes multiple contracts: Contract 1 reconstructs the northern I-81/I-481 interchange with lane expansions and new ramps, begun in spring 2023; Contract 5 for southern Business Loop 81 conversion and viaduct removal starts in 2025; and Contract 6 for Phase 2 advancements. Recent milestones include the redesigned I-481 off-ramp to Exit 3 in DeWitt, completed in 2024 to improve traffic flow. The effort addresses non-standard features like sharp curves and aims for completion by 2028, prioritizing safety over preservation of the aging structure.

Long-Term Expansion Challenges

Long-term of Interstate 81 faces substantial fiscal hurdles, as the corridor spans approximately 855 miles across six states, requiring coordinated mechanisms that have proven difficult to secure at scale. Virginia's I-81 Corridor Improvement Program, aimed at addressing 325 miles within the state, has an estimated exceeding $2.2 billion for initial phases including lane additions and safety upgrades, yet full widening to six lanes throughout remains underfunded and phased over decades due to reliance on federal grants and state bonds. Similar projects in and , such as bridge replacements and lane expansions, encounter budget constraints, with projections indicating worsening congestion despite targeted investments, as truck volumes are expected to grow beyond current capacity enhancements. Environmental and topographic challenges exacerbate delays, given the highway's path through the , where steep grades, narrow medians, and proximity to sensitive ecosystems necessitate extensive mitigation. Widening efforts trigger reviews, assessing impacts on habitats, stormwater runoff, and historic sites, with advocates pushing for wildlife crossings to reduce animal-vehicle collisions by up to 90% based on similar implementations. In , stormwater management issues linked to adjacent rail lines have forced project segmentation, prolonging timelines. Air quality compliance under ozone standards further complicates approvals, as expanded capacity could initially increase emissions before long-term traffic efficiencies materialize. Interstate coordination and local opposition pose additional barriers, as disparate state priorities—such as New York's viaduct reconstruction debates versus Virginia's widening—hinder unified strategies for the freight-heavy route. Community groups, including those citing induced demand from added lanes, advocate for operational fixes like managed lanes over comprehensive expansion, arguing that full builds risk amplifying truck traffic without resolving root congestion causes. Construction restrictions, including limited nighttime hours to minimize disruptions, extend project durations, while economic analyses question the return on investment amid competing infrastructure needs. These factors collectively suggest that achieving corridor-wide resilience against projected freight growth will demand innovative financing and phased, evidence-based approaches rather than monolithic widening.

Spur and Loop Routes

Interstate 81 features three active spur routes that branch off the parent highway to provide direct freeway access to urban centers and a installation, along with one loop route serving as a partial beltway around a major city. These auxiliaries enhance connectivity while minimizing through-traffic intrusion into local areas. Spur Routes Interstate 381 travels 1.7 miles (2.7 km) southwest from Interstate 81 in , to Commonwealth Avenue (SR 381) near downtown . Completed in 1961 as part of early Interstate development, it facilitates efficient entry to the city's commercial district from the main north-south corridor. Interstate 581 extends 6.7 miles (10.8 km) southeast from Interstate 81 near Hollins in , paralleling into downtown and Roanoke-Blacksburg Regional Airport. Designated in the and opened progressively through the , the route primarily handles commuter and airport traffic for the . Interstate 781 runs 4.5 miles (7.2 km) east from Interstate 81 in the town of Pamelia, , to near the main gate of in Le Ray. Built to bypass the congested two-lane NY 342 and support , the four-lane divided opened on December 6, 2012, at a cost of $57 million. Loop Route Interstate 481 serves as a 15.8-mile (25.4 km) eastern semicircular loop and bypass for Interstate 81 around , connecting back to I-81 south of the city and to I-81/NY 481 north near North Syracuse. Initially planned and partially signed as Interstate 281 in the before redesignation, it diverts longer-distance traffic from Syracuse's denser western and central sections, with construction completed by 1971. A prior spur, Interstate 181, operated as a 23.8-mile (38.3 km) branch from I-81 near , to , until its 2003 decommissioning and integration as a northern extension of to improve regional continuity.

Decommissioned or Renumbered Auxiliaries

Interstate 181 (I-181) served as a 23.8-mile (38.3 km) auxiliary spur of I-81 in northeastern from 1985 to 2007, extending northwest from I-81 near Blountville to a terminus at US 11E/US 19W/US 421 in . Originally built as an upgrade to US 23 to promote in the region, the route's designation facilitated interim signing while plans advanced to extend I-26 eastward from . The renumbered I-181 as the continuation of I-26 in 2003 to align with federal Interstate completion goals, with physical sign replacements for I-26 shields occurring in Sullivan County during February 2007. In Pennsylvania, the 28-mile (45 km) segment now comprising I-380 was temporarily designated as I-81E from its completion near Scranton in October 1971 until August 28, 1972. This branch connected I-81 in Wilkes-Barre Township to I-84 near Milford, providing access to the and northeastern . The redesignated it as I-380 to resolve numbering conflicts with the mainline I-81, adhere to auxiliary conventions (reflecting its spur role toward I-80 via I-84), and avoid driver confusion during the period when full I-81 connectivity remained incomplete. The loop route encircling Syracuse, New York—now I-481—was initially signed as I-281 starting in the late 1960s, with its southern segment proposed separately from a northern extension tied to NY 481. Spanning 15.75 miles (25.35 km) from I-81 near Liverpool to I-81 south of Syracuse, it functioned as a bypass for the city's congested downtown viaduct. New York State renumbered it to I-481 effective January 1, 1970, to correctly classify it as an auxiliary to I-81 under updated federal guidelines, as I-28 does not exist and the prior number implied an erroneous tie to a non-existent parent route. This adjustment ensured consistency in the Interstate auxiliary system without altering the physical alignment.

References

  1. [1]
    [PDF] I-81 Corridor Freight Information System (CFIS) FHWA Grant ...
    Source: Google Earth. Interstate 81 is 855 miles long and travels through 6 states: TN, VA, WV, PA, MD, and. NY. The I-81 Corridor is a key part of the nation's ...<|separator|>
  2. [2]
    [PDF] Economic Development History of I-81 Corridor*
    Nov 3, 2008 · I-81 is a North-South interstate highway connecting from a northern terminus at the US-Canadian border along the. Saint Lawrence Seaway, to a ...<|separator|>
  3. [3]
    [PDF] I-81 Freight Capacity & Connections
    May 23, 2022 · Currently, the Maryland I-81 corridor carries an average of 21,000 trucks per day, more than one-quarter – 27 percent – of all vehicles. In a ...
  4. [4]
    Project: Interstate 81 (PA) - View Case Study | AASHTO
    Description: Interstate 81 (I-81) is an 855-mile interstate highway with a general North-South orientation, traversing six states from Tennessee to New York.
  5. [5]
    [PDF] Environmental Assessment I81 Widening | Virginia Department of ...
    Jul 31, 2025 · The Virginia Department of Transportation (VDOT) in cooperation with the Federal Highway. Administration (FHWA) proposes to widen Interstate 81 ...
  6. [6]
    [PDF] Truck Diversion from Interstate 81 to Rail
    Up to 37.7% of I-81 truck traffic could be diverted to rail, potentially generating 350,067 to 700,134 rail cars and saving almost $25 million per year. 88.7% ...Missing: importance | Show results with:importance
  7. [7]
    Project: Interstate 81 (VA) - View Case Study | AASHTO
    In Virginia, truck traffic on I-81 averages 26 % of all traffic. The highway is considered one of the most strategically important north-south trucking routes ...
  8. [8]
    Interstate 81 (I-81) - Exitlists.com
    Its southern terminus is at Interstate 40 near Dandridge, Tennessee (Map ); its northern terminus is on Wellesley Island (near Fishers Landing, New York) at the ...
  9. [9]
    I-81 Interstate 81 Road Maps, Traffic, News
    The i-81 travels thru 6 US states, those being; Maryland, New York, Pennsylvania, Tennessee, Virginia, and West Virginia. At it's north-end, the i-81 starts/ ...Missing: path | Show results with:path
  10. [10]
    Interstate 81 - IHOZ
    INTERSTATE 81. Number of Miles- 824. Tennessee- 75 miles; Virginia- 323 miles; West Virginia- 23 miles; Maryland- 11 miles; Pennsylvania- 234 miles ...Missing: total | Show results with:total
  11. [11]
    National Highway Freight Network Map and Tables for Tennessee ...
    The Primary Highway Freight System (PHFS) in Tennessee includes routes like I124 from I24 to S58 (1.70 miles) and I24 from KY/TN Line to I65 (44.77 miles). The ...
  12. [12]
    Interstate 81 Tennessee to New York
    A 4.1 mile section of I-81 in the city of Syracuse, New York opened to traffic north from U.S. 11 (Exit 16) at Neadrow to Exit 17 (Calthrop Avenue) in December ...Missing: length | Show results with:length
  13. [13]
    I-40 / 81 Multimodal Corridor Study - TN.gov
    The study area for the I-40/81 Multimodal Corridor Study stretches across the state of Tennessee and includes the entire lengths of I-40 and I-81, from state ...
  14. [14]
    Interstate 81 Tennessee - AARoads
    Aug 9, 2021 · Interstate 81 branches northeast from I-40 along a 75.5 mile long course to Bristol and the Virginia state line. Connecting the Tri-Cities ...
  15. [15]
    I-81NB I-26 interchange - TDOT SmartWay
    Statewide: Interstates and State Routes. Message Signs on Interstate 81. I-81NB I-26 interchange. No Current Message.
  16. [16]
    Improve 81 Home | Improve 81
    The CIP includes dozens of innovative, focused construction projects and traffic-operations improvements along the 325 miles of I-81 in Virginia.2025 Corridor Improvement... · Upcoming projects · Advisory Committee · ProjectsMissing: length | Show results with:length
  17. [17]
    Exit numbers | Virginia Department of Transportation
    Nov 7, 2024 · Interstate 81. Interstate 81 crosses more than 320 miles through western Virginia, from Bristol, Tenn., to just south of Martinsburg, W.Va. < ...
  18. [18]
    I81-I77 Crossroads | Virginia Economic Development Partnership
    The I81-I77 Crossroads is a prime location at the intersection of two major interstates, with a diverse manufacturing base, and a population of over 185,000.
  19. [19]
    I-81/I-581 auxiliary lane transportation study | Virginia Department of ...
    May 22, 2025 · The Interstate 81/Interstate 581 corridor experiences significant ... The study area included an approximately 1.5-mile-long segment along I-81 ...<|separator|>
  20. [20]
    [PDF] draft report - I-81 Corridor Coalition
    Aug 3, 2012 · FHWA's Freight Analysis Framework (FAF) database estimates commodity movements and volume of long distance trucks on the Nation's highways.
  21. [21]
    Interstate 81 Harrisonburg-area widening (Exit 243 to Exit 247)
    Mar 20, 2025 · The purpose of this project is to improve safety, traffic operations and reliability along Interstate 81 by adding a third travel lane in each direction.
  22. [22]
    Interstate mile markers | Virginia Department of Transportation
    Apr 8, 2024 · Many exit numbers correspond to the nearest mile marker. For example, Exit 317 on Interstate 81 is located at mile 317.
  23. [23]
    2025 Corridor Improvement Plan Update - Improve 81 - Virginia.gov
    Interstate 81 2025 Corridor Improvement Plan. The Virginia Department of Transportation (VDOT), in partnership with the Office of Intermodal Planning and ...
  24. [24]
    Interstate 81 - East Coast Roads
    I-81 is a north/south interstate extending from Tennessee to the Canadian border in New York. It has a relatively short section in West Virginia.
  25. [25]
    Interstate 81 in West Virginia - Exit Explorer
    The Interstate Highway, completed in 1966, spans 26.00 miles (41.84 km) through Berkeley County, paralleling U.S. Route 11 (US 11) for its entire length. I-81 ...
  26. [26]
    Interstate 81 South West Virginia - AARoads
    Exits 14-13-12 all provide access to the Berkeley County seat of Martinsburg to the east. Interstate 81 straddles the western city limits between Dry Run Road ...
  27. [27]
    Interstate 81 West Virginia (I-81 WV) - Exitlists.com
    Aug 6, 2009 · Last revision ; 8. CR-32. Tablers Station Road ; 12. WV-45. Winchester Ave. Charles Town ; 13. CR-15. King Street Downtown ; 14. CR-13. Dry Run Rd
  28. [28]
    [PDF] Exits - With Facilities - WV Department of Transportation
    ... /Moundsville. 470. 2. Bethlehem. 470. 4. I-70. Interstate Exit. Details. 77. 18. REST AREA - SCENIC OVERLOOK. 81. 19. TRUCK PARKING AREA - SB ONLY. Exits - No ...
  29. [29]
    [PDF] INTERSTATE 81 PHASE 2 CORRIDOR EXPANSION:
    Improve interchanges at the three interstate exits within project limits: U.S. 11 interchange in. Williamsport, and southwest of Hagerstown, the interchanges at ...
  30. [30]
    MDOT SHA I81 MD63 MD68 to Halfway Blvd P2 WA0925172
    Phase 2A will be from MD 63/MD 68 to the I-70 interchange. Phase 2B will be from the I-70 interchange to north of Halfway Boulevard. Interactive Project Map ...
  31. [31]
    Maryland Department of Transportation State Highway Administration
    The I-70/I-81 interchange carries 55,000 vehicles per day – 34 percent of which is truck traffic. SHA awarded the contract to C. William Hetzer, Inc. of ...
  32. [32]
    I-81 Halfway Boulevard interchange work in Maryland
    Aug 15, 2025 · The affected ramps include the southbound I-81 ramp to westbound Halfway Boulevard, the northbound I-81 ramp to westbound Halfway Boulevard and ...
  33. [33]
    Maryland Highway Administration To Make Traction Improvements ...
    Aug 15, 2025 · The ramps impacted will be the southbound I-81 ramp to westbound Halfway Boulevard, the northbound I-81 ramp to westbound Halfway Boulevard and ...
  34. [34]
    Interstate 81 Pennsylvania - AARoads
    Nov 18, 2022 · Interstate 81 runs northeast through Pennsylvania for 232 miles from State Line adjacent to Maryland and the New York state line near Great ...
  35. [35]
    Interstate 81 Exit Guide | Pennsylvania Highways
    Mar 16, 2025 · SOUTH, EAST ; I-83 marker, US 322 marker ; Veterans of Foreign Wars of the. United States Memorial Highway South Harrisburg York ...
  36. [36]
    New York Routes (I-81)
    Southern Terminus: PA Line at Conklin. Northern Terminus: US-Canada Border at Wellesley Island (Continues as ON 137). Length: 183.42 miles (295.31 km).
  37. [37]
  38. [38]
    I-81 Viaduct Project Overview - Department of Transportation
    The I-81 Viaduct Project addresses structural deficiencies and non-standard features of the 1.4-mile elevated section of I-81, which is integral to Syracuse.
  39. [39]
    Interstate 81 New York - AARoads
    Nov 17, 2022 · Interstate 81 travels north through Upstate New York from Binghamton to Cortland, Syracuse, Watertown east of Lake Ontario and the Thousand
  40. [40]
    Interstate 81 North - Binghamton to Whitney Point - AARoads
    Nov 16, 2022 · Interstate 81 enters New York State at the town of Kirkland and heads north to Binghamton, Dickinson, Chenango, Barker and Whitney Point in ...<|control11|><|separator|>
  41. [41]
    OKRoads -- Interstate 81 New York
    Jan 5, 2006 · Major Junctions, New York 17. Interstate 88. Interstate 481 (Exit 16A & Exit 29). Interstate 690. Interstate 90 (Exit 25A). OKRoads Coverage.
  42. [42]
    U.S - Interstate 81 (I-81) is a major north–south highway in New York ...
    Mar 13, 2025 · The highway merges briefly with New York State Route 17 (NY17) in Binghamton before continuing northward, passing through rural landscapes and ...
  43. [43]
    Interstate 781 New York - Interstate-Guide - AARoads
    Interstate 781 leads east to a single point interchange (Exit 4) with U.S. 11 south to Watertown and north to Evans Mills, and the gate to Fort Drum.
  44. [44]
    Crossing the Bridge
    Crossing the Bridge Main Office (US) 43530 Interstate 81, Collins Landing Alexandria Bay, New York 13607 P: 315-482-2501 F: 315-482-5925 E
  45. [45]
    Our History
    The Thousand Islands Bridge system extends from Collins Landing near Alexandria Bay, New York to Ivy Lea near Gananoque, Ontario covering a distance of 8.5 ...
  46. [46]
    Part I - Engineering Data - Interstate System - Highway History
    Following enactment of the NHS act in 1995, portions of high priority corridors totalling 109.7 miles have been added to the Interstate System in North Carolina ...
  47. [47]
    Interstate 81 - Pennsylvania Highways
    The longest north-south Interstate in Pennsylvania, which was also planned to be a toll highway, has its beginnings back in the 1950s.
  48. [48]
    [PDF] TITLE I—FEDERAL-AID HIGHWAY ACT OF 1956 - GovInfo
    Federal-aid highway systems, including the Interstate System, he may advance to any State out of any existing appropriations the Federal share of the cost ...Missing: 81 | Show results with:81<|control11|><|separator|>
  49. [49]
    Interstate 81 - Virginia Highways Project
    Apr 20, 2024 · In 2019, I-81 NB received a truck lane from the Holston River to TN 357. New Exits Added: TN 357, 1976. Jearoldstown Rd, 1979. Tri-Cities ...<|separator|>
  50. [50]
    National Interstate and Defense Highways Act (1956)
    Feb 8, 2022 · This act authorized the building of highways throughout the nation, which would be the biggest public works project in the nation's history.Missing: 81 | Show results with:81
  51. [51]
    [PDF] Economic Development History of Interstate 81 in Virginia [1]
    Nov 3, 2008 · I-81 generally links the Northeast with the non-Atlantic South; more than 800 miles from its northern terminus at the Canadian border in upstate ...
  52. [52]
    I-81 Transformation Continues: Updates to Corridor Study – CSPDC
    Aug 20, 2025 · Widening to three lanes between Exit 221 and Exit 225 in both directions through the City of Staunton (completion projected for June 2027) ...
  53. [53]
    I-81 Widening Project Aims to Improve Safety, Ease Congestion in ...
    Jan 25, 2025 · The project includes major upgrades to bridges along the route. The I-81 bridge over the CSX rail line will be widened, with its existing ...Missing: modifications | Show results with:modifications
  54. [54]
    VDOT sets meetings for I-81 2025 Corridor Improvement Plan
    Jul 15, 2025 · The Virginia Department of Transportation will host a series of public meetings July 14-17 to gather feedback regarding potential improvements along Interstate ...
  55. [55]
    I-81 Susquehanna Bridges Project - Commonwealth of Pennsylvania
    The purpose of the I-81 Susquehanna Bridges Project is to address aging pavement and infrastructure along I-81 including the bridge over the Susquehanna River, ...
  56. [56]
    I-81 Susquehanna River Bridges Replacement - S&B USA
    Fay will replace the northbound and southbound Susquehanna River bridges in three phases to ensure two lanes of traffic in each direction during peak hours.
  57. [57]
    SR 81, Section D46 Reconstruction Project
    The Pennsylvania Department of Transportation (PennDOT) held a plans display regarding the SR 81 (Interstate 81) Section D46 reconstruction project, which ...
  58. [58]
    PennDOT I-81 Resurfacing Project - Borough of Greencastle
    Apr 14, 2025 · Night construction work is planned to occur from State Line to Milepost 6 with work expected to be completed by July 2027.
  59. [59]
    Governor Hochul Announces Major Milestone as Part of the ...
    Apr 22, 2025 · Governor Hochul Announces Major Milestone as Part of the Transformative I-81 Viaduct Project With Award of Fifth and Final Construction Contract ...Missing: modifications | Show results with:modifications
  60. [60]
    New York builders awarded $251M contract on I-81 viaduct
    Apr 25, 2025 · The New York State DOT awarded a $251 million contract to Salt City Constructors for the next phase of the $2.25 billion I-81 Viaduct project.Missing: modifications | Show results with:modifications
  61. [61]
    Permanent road closure announced as construction begins on 81 ...
    Jun 11, 2025 · On Wednesday, June 11, at 7 am, Fineview Place, between Renwick Avenue and Standart Street, in Syracuse, will permanently closed to traffic in both directions.Missing: modifications post-
  62. [62]
    NYSDOT is progressing on a $2.25 billion project to modernize the I ...
    Oct 5, 2025 · New York state has already proposed building a new I- 81 exit in Cicero near Micron at a cost of $68 million. It would include on and off ...
  63. [63]
    [PDF] Interstate 81 Franklin County: - Project Priorities
    The MPO organized the Interstate into nine study segments to facilitate corridor analysis. Methodologies from the Highway Capacity Manual (HCM) were used along ...
  64. [64]
    [PDF] I-40/81 Corridor Study Executive Summary - TN.gov
    The I-40/81 corridor stretches more than. 530 miles across the entire length of. Tennessee, from Memphis to Bristol. It.
  65. [65]
    Virginia Proposes Tolling 325 Miles of Interstate 81
    How to spend $2.2 billion. The report notes that I-81 carries 42 percent of Interstate truck VMT through the Commonwealth – 11.7 million trucks per year ...
  66. [66]
    About the program | Improve 81
    Sep 19, 2025 · I-81 is a key north-south backbone of the East Coast's freight network and has the highest per-capita truck volume in Virginia. More than one- ...Missing: importance | Show results with:importance
  67. [67]
    The I-81 Corridor Manufacturing Success: I81-177 Crossroads
    The region is named after the point where interstates 81 and 77 merge in Wythe County, an intersection positioned to unlock markets to the south, including ...
  68. [68]
    [PDF] The I-81 Corridor Study - nysdot
    The official I-81 corridor decision-making process begins with this ... 81/I-690 interchange project along with I-81 north approach improvements to ...
  69. [69]
    [PDF] Average Annual Daily Traffic - I-81 Corridor Coalition
    I-81 Counties. 0. 10. 20. 30. 5. Kilometers. 0. 9. 18. 27. 4.5. Miles. E. Average Annual. Daily Traffic !(. Cities. I-81. Interstate Highway. Highway. Major ...Missing: volume | Show results with:volume
  70. [70]
    Congestion along Interstate 81 trucking along - Truckers Report
    Feb 18, 2008 · An estimated 60,000 vehicles a day use Interstate 81 at Roanoke, and trucks are an ever-growing presence.<|control11|><|separator|>
  71. [71]
    The dangers of Interstate 81 in Virginia
    Dec 23, 2024 · Recent data indicates that trucks constitute 20% – 30% of total traffic on the highway. This amounts to 11.7 million trucks carrying $312 ...Missing: major | Show results with:major<|control11|><|separator|>
  72. [72]
    Special Report: Has Interstate 81 become more dangerous? - WDBJ7
    Dec 19, 2019 · In fact, 41 percent of all truck traffic in the Commonwealth is on Interstate 81. But it's not just trucks. All traffic has increased. VDOT ...Missing: levels | Show results with:levels
  73. [73]
    [PDF] i-81 cORRiDOR imPROvement PlAn
    Dec 5, 2018 · capital improvements are completed, the Maintenance Program budget will absorb the operations and ... completed projects. Looking ahead, Norfolk ...<|separator|>
  74. [74]
    Top 100 Truck Bottlenecks – 2024
    The table below the map contains the top 100 bottleneck locations in rank order. You can view an individual congestion profile by clicking on each location's ...<|separator|>
  75. [75]
    [DOC] FMCSA I81 talking points 2023.docx
    In 2018-2022, there were over 5,000 crashes on I-81 involving commercial motor vehicles in the key states of New York, Pennsylvania, Maryland, Virginia, West ...Missing: accident statistics
  76. [76]
    [PDF] SAFETY ANALYSIS - I-81 Widening
    Over the five years analyzed, 794 crashes occurred in the study area, with 455 (57%) along the northbound mainline I-81, 294 (37%) along the southbound mainline ...Missing: statistics | Show results with:statistics
  77. [77]
    Truck Accidents on Interstate 81 - The Virginia Trial Firm
    Rating 4.9 (163) The average daily truck traffic on I-81 is 26%, with some sections seeing as high as 35%. This is significantly higher than the 15% truck traffic that I-81 was ...Missing: rates | Show results with:rates
  78. [78]
    Big Rigs Cause Big Problems on Interstate 81 - The Warren Firm
    Rating 5.0 (36) 1 in every 4 vehicles on the interstate is a big rig. On some sections of the road, that number increases to nearly 2 in every 4 vehicles.
  79. [79]
    Virginia's Interstate 81 and the Danger of Auto Accidents - Attorneys
    Aug 13, 2025 · Truck accidents on Virginia's I-81 pose a significant danger due to the high volume of commercial trucks on the highway. These large vehicles ...
  80. [80]
    I-81 Car & Trucking Accidents | Why Do They Happen? | Learn More
    In fact, 41% of all trucking traffic in Virginia happens on I-81, surpassing the hustle and bustle of metropolitan areas located around Interstates 95 and 66.Missing: freight percentage
  81. [81]
    [PDF] AMERICA'S INTERSTATE HIGHWAY SYSTEM AT 65:
    The fatality rate per 100 million vehicle miles of travel on the Interstate system in 2019 was 0.55, compared to 1.30 on non-Interstate routes. Daily Interstate.
  82. [82]
    Large trucks - IIHS
    Large truck drivers were involved in 1.3 fatal crashes per 100 million miles traveled in 2023. This was lower than the rate for passenger vehicle drivers (1.6).
  83. [83]
    [PDF] Table of Contents - NHTSA
    Interstates I-64, I-81, and I-95 each had a much high number of fatalities than other Virginia. Interstates. Although fatalities didn't change much in each ...
  84. [84]
    Pennsylvania Police Launch I-81 Truck Safety Initiative - TT
    Jul 14, 2023 · Pennsylvania accounts for 1,600 of those crashes, second to only Virginia. I-81 begins in Tennessee, then passes through Virginia, West Virginia ...
  85. [85]
    I-95 named the deadliest highway in the United States | ABC27
    May 2, 2022 · I-40. – Fatalities in 2020: 270 – Fatalities per 100 miles: 10.6 ... Along the East Coast, I-95 is infamous for bad traffic and accidents ...
  86. [86]
    The 10 most dangerous roads in the U.S. - The Zebra
    Sep 9, 2025 · I-95 is the most dangerous highway in the United States. In 2019, it had the highest number of overall fatalities (284) and fatalities per 100 miles (14.88).
  87. [87]
    Interstate 81 widening Exit 137 to 141 - Roanoke County and City of ...
    Sep 23, 2025 · It started on the inside and outside shoulders along a five-mile section of both northbound and southbound Interstate 81 in Roanoke County and ...
  88. [88]
    Three Lanes Open on I-81 North and South - Cumberland County, PA
    Nov 20, 2017 · * This section of northbound I-81 carries an average daily traffic of 72,003 vehicles. Trucks account for 24 percent of this traffic volume in ...
  89. [89]
    [PDF] I-81 and I-70 - hepmpo
    Jun 30, 2020 · The study area includes the entire length of. I-81 in Maryland and I-70 from the Frederick County line to the Clear Springs Exit 18. The limits ...<|separator|>
  90. [90]
    CHAPTER 4.0 OPERATIONAL CHARACTERISTICS - FHWA
    Table 4-1 shows the traffic volume and percentage of trucks by State on the I-80 and I-90 highways between Chicago and New York City. Truck traffic as a ...
  91. [91]
    Using interstate 81 increases the odds of truck crash involvement
    May 19, 2021 · More than 40% of statewide trucking traffic occurs on I-81. Over 2,000 vehicle accidents occur on I-81 each year. About one-quarter of vehicle ...
  92. [92]
    Interstate Operations and Enhancement Program
    43.7 percent distributed to Interstate 81 Corridor Improvement Fund · 8.4 percent distributed to the Northern Virginia Transportation Authority · Remaining funds ...
  93. [93]
    Project Profile: I-81 Corridor Improvements, Virginia
    The I-81 project includes adding lanes in Roanoke County and improvements in several other counties, part of a program to improve safety and reliability.
  94. [94]
    I-81 Corridor Improvement Plan Updates
    Jan 10, 2025 · ... I-81 with proposed stops in many localities along the I-64 corridor. The anticipated launch date for this route is October 2025. The full ...Missing: designation | Show results with:designation<|separator|>
  95. [95]
    [PDF] I-81 Widening MM 221.45 to MM 225.6
    Nov 30, 2024 · The Code of Virginia (§33.2-119.C) prohibits tolling on I-81 without prior approval of the General. Assembly. As a result, the Interstate 81 ...
  96. [96]
    Keep Tolls Off I-81
    In April 2019, the Virginia General Assembly passed a proposal from Governor Ralph Northam to fund significant upgrades to Interstate 81—abandoning prior ...
  97. [97]
    VA. General Assembly Tables I-81 Tolls This Session - NATSO
    Va. Gov. Ralph Northam in early January announced plans to place tolls on existing lanes along Interstate 81 to fund $2.2 billion in improvements to the western ...
  98. [98]
    I-81 Susquehanna Project Virtual Public Meeting
    The I-81 Susquehanna Project is a 9-mile corridor reconstruction and repair project along Interstate 81 from the New Milford Interchange with SR 492 (Exit ...
  99. [99]
    Commonwealth Court finds PennDOT's public-private partnership ...
    Jun 30, 2022 · A Commonwealth Court decision has scuttled a statewide plan to use tolls to fund repairs and replacement of highway bridges across Pennsylvania.
  100. [100]
    Senator Lisa Baker Voices Opposition to Costly Bridge Tolling Plan
    Jun 8, 2022 · Governor Tom Wolf's tolling plan applies to nine major bridges across the state, including a nine-mile stretch along Interstate 81 in ...
  101. [101]
    Cline announces funding for I-81 improvements
    Jul 18, 2025 · According to a media release, 17-million dollars has been set aside to support key upgrades and potential widening along the corridor. More than ...
  102. [102]
    I-81 could see $17 million in funding for improvements - WHSV
    Jul 24, 2025 · (WHSV) - Republican Congressman Ben Cline is hoping a bill will pass that will give $17 million for improvements on Interstate 81. By Olivia ...
  103. [103]
    Proposed bill could mean free or reduced Thruway tolls during I-81 ...
    Feb 20, 2025 · Proposed bill could mean free or reduced Thruway tolls during I-81 construction ... toll-free for commuters during the I-81 project. Assemblyman ...<|separator|>
  104. [104]
    I-81 Corridor - Alliance for the Shenandoah Valley
    VDOT will host an informational meeting and accept comments on the design Tuesday, June 28, 2022, 4-7 p.m. · Chime in on I-81 Widening in Staunton. May 19, 2022.Missing: timeline | Show results with:timeline
  105. [105]
    Boondoggle: Virginia's Unlovable I-81 Expansion - Streetsblog USA
    Jul 1, 2019 · Virginia will expand Interstate 81, changes that will cost a whopping $2.2 billion and affect Civil War landscapes. In this year's installment ...
  106. [106]
    Environmental Impact Statement: Interstate 81 Corridor Improvement ...
    Nov 14, 2003 · The Tier 1 EIS will study a range of improvement concepts that will address the purpose and need, including highway concepts, rail concepts, and ...
  107. [107]
    [PDF] Shenandoah Valley Network, et al v. J. Richard Capka, et al.
    economic, and environmental resources along the entire. I-81 corridor in Virginia. Defendants circulated the FEIS to approximately 680 federal, state and ...
  108. [108]
    My World: How Does I-81 Effect the Environment? - WMRA
    Aug 7, 2019 · He says that while particulates, carbon monoxide and other air pollutants caused by cars and trucks are all problems, Virginia and the nation ...Missing: opposition | Show results with:opposition
  109. [109]
    For I-81 and environmental justice, details matter more than words ...
    Feb 26, 2021 · Officials say they want to right past wrongs but current highway redevelopment plan misses that goal, writes NYCLU's Lanessa Chaplin.
  110. [110]
    Projects | Improve 81
    The program includes 65 capital projects and numerous operational improvements throughout the interstate's 325-mile corridor in Virginia.Missing: length | Show results with:length
  111. [111]
    I-81 Corridor in Virginia | Build America - Department of Transportation
    Dec 7, 2022 · The Bureau provided two TIFIA loans, one through the Rural Project Initiative (RPI) for up to $15 million (49 percent of the $30.5 million ...
  112. [112]
    CTB funds first round of I-81 Corridor Improvement Plan Projects
    Oct 29, 2019 · Smaller projects have a construction horizon of 2-3 years, but larger widening and capacity projects have a 7-14 year horizon until construction ...
  113. [113]
  114. [114]
    I-81 2025 Corridor Improvement Plan - PublicInput
    The goal of the I-81 Corridor Improvement Plan is to identify recommended improvement projects at locations of highest need in the corridor.
  115. [115]
    Improve 81 Home - Virginia.gov
    Get involved | Improve 81 Updates, involvement and future impacts The Improve 81 Corridor Improvement Plan is expected to last until at least 2033, with ...<|control11|><|separator|>
  116. [116]
  117. [117]
    Upcoming Highways Consultant Contracts
    I-81 WELCOME CENTERS & OVERNIGHT TRUCK PARKING, located in Berkeley County, West Virginia on I-81. The project shall consist of preparing construction ...
  118. [118]
    2025 Releases - WV Department of Transportation
    WVDOH hosts public meeting to discuss Beckley Z-way project 02/18/2025 ...read more · Right Lane on WV 9 East and Exit Ramp on Northbound I-81, in Berkeley ...
  119. [119]
    WVDOT Accepts Bids for 17 Projects - WV.gov
    Oct 20, 2021 · Interstate 81 lighting (Berkeley County); WV 127 to Pin Oak paving (Hampshire County); US 460 sign replacements (Mercer County); Upper Tract to ...
  120. [120]
    MDOT SHA completes I-81 bridges project at Maryland/West ...
    Feb 11, 2021 · The four-year, $104.6 million project improves safety and mobility, accommodating higher commercial truck volumes and capacity for travel into ...
  121. [121]
    [PDF] WASHINGTON COUNTY - Maryland Department of Transportation
    PROJECT: I-81, Maryland Veterans Memorial Highway. DESCRIPTION: Project to upgrade and widen I-81 to a six-lane divided highway from MD 63/MD 68 to the CSX ...
  122. [122]
  123. [123]
    Project Home - PATH
    Project Description: The Pennsylvania Department of Transportation (PennDOT) District 4-0 is proposing to modify the Interstate 81 and State Route 848 ...
  124. [124]
    Package Document
    I-81 Exit 219, 04 / Susquehanna, 0081 / 590, Interchange/Safety Improvement on Interstate 81 (Exit 219) in Harford and New Milford Townships, Susquehanna County ...
  125. [125]
    Package Document
    SR 424 at Interstate 81, 04 / Luzerne, 0424 / 353, Interchange Improvement on State Route ... For federally funded projects where the ... pa.gov ...
  126. [126]
    Contract 1 - Northern Interchange | Department of Transportation
    Contract 1 reconstructs the I-81/I-481 interchange, expands I-481 to three lanes, adds new ramps, and a new South Bay Road bridge. Construction began in Spring ...<|separator|>
  127. [127]
    Contract 5 - Southern Business Loop 81
    Contract 5 converts I-81 to Business Loop 81, removes viaduct spans, adds a new exit ramp, and includes a new railroad bridge. Construction starts in 2025, ...
  128. [128]
    I-81 Press Releases and Announcements
    The New York State Department of Transportation will host an open house on Wednesday, August 13 from 6 p.m. to 8 p.m.. Learn more ...
  129. [129]
    I-81 Project Library | Department of Transportation - NY.Gov
    The I-81 Project Library contains documents like the Record of Decision, Environmental Impact Statements, Coordination Plan, and traffic simulations.I-81 FDR, FEIS Comment... · Coordination Plan · I-81 Project Renderings and...
  130. [130]
    Interstate 81, Virginia
    As of August 2025, the Interstate 81 “Corridor Improvement Plan” project was under construction. Original story from Highway Boondoggles 5: Virginia's I-81 ...
  131. [131]
    Wildlife advocates weigh in on I-81 expansion - WVTF
    Sep 27, 2023 · "It reduced vehicle crashes around 90%, and it also increased wildlife use of those culverts by 400% in some areas.” She also hopes the state ...
  132. [132]
  133. [133]
    [PDF] Interstate 81 NEPA Tier II Input
    According to this approach: “The Tier 1 DEIS, prepared in accordance with the National Environmental Policy Act of 1969 (NEPA), identifies needs, develops ...<|control11|><|separator|>
  134. [134]
    Reasonable Solutions and Background
    “Reasonable Solutions for the Future of I-81,” a combination of fixes. First, data showing known safety and congestion hotspots can be used to target solutions.<|separator|>
  135. [135]
    [PDF] Major New Project Joins Improve81 - Virginia.gov
    What has been the biggest challenge of the I-81 CIP? A big challenge for construction is staying within the restrictions on allowable working hours (generally ...Missing: term | Show results with:term
  136. [136]
    Interstate 381 Virginia
    Jul 6, 2021 · Interstate 381 constitutes a short freeway spur in southwestern Virginia joining I-81 with Commonwealth Avenue in the city of Bristol.
  137. [137]
    I-381 - Virginia Highways Project
    Jan 6, 2024 · I-381 is shown as complete on the 1961 Washington County map while I-81 is shown as under construction. I-381 first appears on Official maps in ...
  138. [138]
    Interstate 581 Virginia - AARoads
    Interstate 581 spurs southeast along side U.S. 220 from I-81 to Roanoke-Blacksburg Regional Airport (ROA) and Downtown Roanoke, Virginia.
  139. [139]
    Interstate 581 in Virginia - Roads to the Future
    Interstate 581 in Virginia is the 6.75-mile-long freeway from I-81 in Roanoke County to downtown City of Roanoke. I-581 serves as an Interstate spur from ...
  140. [140]
    Interstate 781 New York
    Interstate 781 is the Fort Drum Connector1 leading 4.52 miles east from I-81 in the town of Pamelia to U.S. 11 in the town of Le Ray in Upstate New York.
  141. [141]
    I-781 to Fort Drum opens | NCPR News - North Country Public Radio
    Dec 6, 2012 · The road is, officially designated I-781, is a 4.8 mile divided highway with no exits in the middle. It took two years and $57 million to build.
  142. [142]
    Interstate 481 New York
    Jan 26, 2024 · Interstate 481 provides a bypass route for I-81 around the east side of Syracuse. The freeway was originally designated Interstate 281.<|separator|>
  143. [143]
    New York State Roads - I-481/NY 481 Exit List
    Sep 7, 2025 · NY 481 is a freeway/divided highway connecting Syracuse to Fulton and Oswego. The road was proposed as two separate highways: the portion ...
  144. [144]
    I-181 Becomes I-26: The Economic Development Dimension - FHWA
    Jun 28, 2017 · In March 2007, Interstate I-181 in Tennessee was renumbered to I-26. ... date. Post Trip Events regarding Gateway Industrial Park. Within ...
  145. [145]
    TDOT Will Change I-26 Exit Numbers Next Week - TN.gov
    Feb 28, 2007 · Interstate 181 shields on signs in Sullivan County will also be replaced by Interstate 26 shields. “This is a significant change for this region ...Missing: date | Show results with:date
  146. [146]
    I-181 (numbered as another interstate) Tennessee (link) - Kurumi.com
    Originally a freeway upgrade to US 23 in northeastern Tennessee, Interstate 181 survived nearly 20 years with the 181 designation, and is now part of the ...