Nuclear Decommissioning Authority

The Nuclear Decommissioning Authority (NDA) is a of the government, sponsored by the Department for and Net Zero, tasked with the decommissioning, cleanup, and remediation of civil nuclear legacy sites inherited from decades of nuclear operations. Established under the Energy Act 2004 and operational since April 2005, the NDA assumed responsibility for managing 17 principal sites, including reactor stations and facilities like , with a mandate to execute these activities in a manner that prioritizes safety, security, environmental protection, and cost-effectiveness over timelines spanning centuries. The NDA's mission addresses one of Europe's most complex and protracted environmental challenges, involving the retrieval, treatment, and disposal of while mitigating risks from aging infrastructure built during the mid-20th century's rapid expansion. Key responsibilities encompass contracting with operators for site-specific execution, for , and ensuring compliance with regulations, all funded through government allocations projected to exceed £200 billion in total liabilities. Notable achievements include the successful defueling of all reactors ahead of initial projections, advancements in remote handling technologies for hazardous waste retrieval, and demonstrations of safe waste conditioning at sites like , where operations have processed millions of liters of liquids into stable forms. However, the program faces inherent controversies stemming from escalating costs—such as the site's estimated £136 billion price tag through 2125—and scrutiny over efficiency, as highlighted in independent audits revealing delays and value-for-money concerns in contracts like . These challenges underscore the causal realities of nuclear : radioactive half-lives demand indefinite oversight, compounded by initial design shortcomings and evolving regulatory standards that amplify long-term fiscal burdens without precedent for full-scale completion.

History and Establishment

Pre-NDA Nuclear Legacy

The United Kingdom's nuclear legacy predates the civil power era, originating from military plutonium production efforts post-World War II, with initial development tied to the but pursued independently after U.S. restrictions in 1946. The civil programme commenced with Calder Hall at , which became operational on 17 October 1956 as the world's first commercial-scale reactor, designed to produce both and . This marked the start of the reactor series, with 26 units constructed between 1953 and 1971 across sites including , Hunterston, and Oldbury, eventually generating up to one-third of the UK's but leaving behind graphite-moderated structures requiring specialized decommissioning. Key facilities contributing to the legacy included (originally Windscale, established 1947 for military purposes), Harwell, , Capenhurst, , and , encompassing reprocessing plants, fuel fabrication, and research reactors. 's B205 plant began fuel reprocessing in 1964, accumulating untreated high-level waste () vitrification products and intermediate-level waste (ILW) in ponds and silos, while the site handled nearly all public-sector , 80% of ILW, and 95% of low-level waste (). Legacy wastes comprised sludges, fuel cladding, and resins stored in deteriorating structures like the Swarf Storage Silo, with inadequate initial planning leading to risks such as a 1970s liquor leak into the ground. Prior to 2005, these liabilities were overseen by the (UKAEA, established 1954) for research sites and British Nuclear Fuels Limited (BNFL, formed 1971) for commercial operations, amid Cold War-era secrecy that prioritized production over long-term waste strategies. Decommissioning faced delays from regulatory pressures, cost uncertainties, and failed disposal plans, including the 1976 Flowers Report's call for geological repositories, which encountered setbacks like the 1997 rejection of a proposal. By early 2005, estimated liabilities totaled approximately £42 billion (£7 billion for UKAEA sites and £35 billion for BNFL), underscoring fragmented management and safety concerns from aging infrastructure, such as a plant leak in April 2005 that highlighted reprocessing vulnerabilities.

Creation and Legislative Foundation

The Nuclear Decommissioning Authority (NDA) was established as a body corporate under Part 1, Chapter 1 of the Energy Act 2004, which received on 18 November 2004. The Act created the NDA to assume responsibility for the decommissioning, clean-up, and management of civil nuclear sites and installations previously handled by entities such as British Nuclear Fuels Limited (BNFL), addressing the UK's accumulating public sector nuclear liabilities estimated at that time to exceed £56 billion over an indefinite period. This legislative framework empowered the NDA to enter into contracts, manage sites, and oversee contractors for the safe and efficient remediation of nuclear waste and facilities, with the Secretary of State retaining oversight through directions and funding via the Nuclear Liabilities Financing Assurance Board. The NDA formally commenced operations on 1 April 2005, transferring ownership and control of 20 principal nuclear sites from BNFL and the (UKAEA), marking a shift from fragmented management to a centralized, government-sponsored entity focused on long-term reduction. This transition was driven by prior inquiries, including the House of Commons Trade and Industry Committee's examination of nuclear liabilities, which highlighted inefficiencies in existing arrangements and recommended a dedicated to prioritize value for money and risk mitigation. The Energy Act's provisions also integrated mechanisms for annual strategy approvals by the Secretary of State, ensuring alignment with national while insulating operations from short-term political interference. Subsequent amendments and framework documents, such as the 2017 NDA Framework Document updated under the Office's governance guidelines for non-departmental , have refined the NDA's without altering its foundational statutory powers. The legislative foundation emphasizes empirical and cost containment, reflecting a causal recognition that deferred decommissioning exacerbates environmental and financial hazards, as evidenced by the Act's mandate for site-specific plans and on progress.

Mandate and Objectives

Core Responsibilities

The Nuclear Decommissioning Authority (NDA) is tasked with leading the decommissioning and remediation of 17 historic nuclear sites across the , including power stations, research facilities, and fuel reprocessing plants such as , to render them suitable for future reuse. This encompasses the safe retrieval, treatment, and disposal of radioactive wastes, with a focus on higher activity wastes through the development of a Geological Disposal Facility (GDF), an underground repository designed for long-term isolation. Central to its duties is the management of and separated nuclear materials, prioritized as the most urgent hazard due to their and volume, involving , , and eventual disposal to minimize risks to people and the environment. The NDA oversees these activities through subsidiary operating companies, ensuring compliance with stringent , security, and environmental standards while promoting value for money via competitive contracting and commercial revenue generation to offset public expenditure. Additional responsibilities include formulating a five-year strategy, annual business plans, and performance reports to guide progress toward site end-states, projected to extend to 2380 for full remediation given the multi-decade timelines driven by radiological decay and technical challenges. The authority also invests in , capabilities, skills, and to accelerate clean-up, support local economies, and integrate lessons from operational experience.

Strategic Priorities

The Nuclear Decommissioning Authority (NDA) articulates its strategic priorities in its Draft Strategy 2025, which emphasizes long-term hazard reduction, integrated , and sustainable site remediation across its 17 sites, with operations extending to 2050 and beyond. These priorities align with the NDA's statutory duty under the Energy Act 2004 to decommission facilities securely and cost-effectively while minimizing environmental impact. and security remain foundational, informing all activities through risk-based approaches, including a cross-estate Safety Improvement Plan for 2025–2028 to enhance operational standards. Hazard reduction constitutes a core priority, focusing on retrieving and conditioning high-hazard materials from legacy infrastructure, such as 's First Generation Storage Pond and silos, with the majority of retrievals targeted for completion by 2050. This includes consolidating spent fuels at —oxide fuels by 2035, fuels by 2042, and exotic fuels by 2045—to facilitate safer storage and eventual disposal by 2125. For nuclear materials, priorities encompass repackaging all plutonium unsuitable for extended storage by 2060 and immobilizing 141 tonnes of civil at by 2025, alongside consolidating 70,000 tonnes of at Capenhurst by the same year for treatment and disposal via a Geological Disposal Facility (GDF) operational in the 2050s. Decommissioning and priorities aim to delicence most ex-Magnox sites by 2050, releasing approximately 947 hectares of land for reuse by 2380, while treating for interim storage by 2039 and intermediate-level waste by 2059. Integrated strategies prioritize retrieval from high-risk legacy facilities, diversion of 95% of from over the past decade at sites like the Repository, and elimination of avoidable non-radioactive by 2050 through principles. Cost-effectiveness is pursued via lifecycle optimization, efficiencies yielding £900 million in savings over the last decade, and in , , and digital twinning to accelerate progress. Sustainability efforts support net-zero goals by reducing emissions and fostering land remediation for economic and environmental benefits.

Organizational Structure and Governance

Internal Organization

The Nuclear Decommissioning Authority (NDA) operates under a governance framework established by the Energy Act 2004, with a Board of nine members providing strategic oversight and accountability to the Secretary of State for Energy Security and Net Zero. The Board, chaired by a non-executive chair, includes the Group Chief Executive Officer and Group Chief Financial Officer as executive members, and meets approximately 11 times per year to approve business plans, budgets, and major investments while ensuring compliance with risk management and internal controls. Day-to-day executive authority is delegated to the Group Chief Executive Officer and the Executive Leadership Team, which comprises directors responsible for core central functions including strategy, commercial operations, finance, supply chain management, assurance, and people services. The NDA's internal structure separates central policy and oversight roles from site-level operations, with the Executive Team directing subsidiary companies—such as , , and Nuclear Transport Solutions—that hold contracts for decommissioning delivery. Key directorates include the Office of the Chief Executive for overall leadership; Commercial and Business Services for contract management, including UK and overseas reprocessing; Finance for budgeting and reporting; and Strategy for nuclear liabilities and fuel cycle planning. Assurance functions encompass , , and teams that monitor performance across the group, with dedicated heads for internal audit and senior auditors ensuring independent oversight. Organizational changes, such as the integration of as a division of effective 1 April 2023, reflect efforts to streamline delivery while maintaining centralized control over strategy and funding allocation. The structure is supported by for commercial oversight and aligns with guidelines for non-departmental public bodies, emphasizing value for money and transparency in reporting to .

Leadership and Accountability

The Nuclear Decommissioning Authority (NDA) is governed by a Board of nine members, including a non-executive Chair, the Group (CEO), and the Group as executive directors, with the remainder comprising non-executive directors to provide independent oversight. The Board is responsible for setting strategic direction, approving business plans, ensuring robust risk management, and maintaining compliance with statutory duties under the Energy Act 2004. The Chair leads the Board, oversees its effectiveness, and ensures alignment with government objectives, while also communicating with ministers on key issues. Peter Hill CBE has served as Chair since April 2024, succeeding Chris Train OBE who acted as interim Chair from September 2023. The Group CEO, currently David Peattie, holds ultimate responsibility for the NDA's operational management, implementation of Board-approved strategies, and day-to-day leadership of the executive team. As the designated Accounting Officer, the CEO is personally accountable for the propriety, regularity, and value for money of public expenditure, reporting directly to the Board and on performance and risks. Peattie, who has led the for several years, announced in October 2025 his intention to step down in March 2027, prompting a search for a successor to maintain continuity in managing the NDA's complex decommissioning portfolio. Recent Board appointments include non-executive directors Catriona Schmolke CBE FREng and Dr. Neil Bruce OBE in May 2025, enhancing expertise in and operations. Accountability mechanisms emphasize transparency and parliamentary scrutiny, with the Secretary of State for Energy Security and Net Zero holding ultimate responsibility to for the NDA's activities. The NDA submits annual reports and accounts to , undergoes quarterly performance reviews by the sponsor (Department for Energy Security and Net Zero) and , and maintains an and Assurance Committee chaired by an independent to monitor internal controls. Board minutes are published (with redactions for sensitive matters), and the CEO provides evidence to select committees such as the when required, ensuring oversight of financial and operational risks in decommissioning legacy sites.

Sites and Operations

Principal Sites Managed

The (NDA) oversees the decommissioning of 17 sites across , , and , reflecting the UK's historical activities in power generation, research, and fuel processing. These facilities, dating back to the post-World War II era, encompass approximately 1,000 hectares of licensed land and require over a century of sustained effort to achieve safe end states. Sellafield in Cumbria stands as the most prominent and challenging site, managing the UK's largest stockpile of and high-level from reprocessing operations. Originally established as Windscale in for production, it evolved to include the Calder Hall reactors—the world's first to generate electricity for public supply, operational from 1956 until 2003—and the (THORP), which processed commercial spent fuel until its closure in 2018. The site holds about 80% of the NDA's total nuclear liability due to its complex legacy of legacy ponds, silos, and plants. The fleet constitutes 12 sites dedicated to the decommissioning of the UK's initial commercial nuclear reactors, which used fuel and gas cooling. Key locations include Berkeley (Gloucestershire), Bradwell (), Chapelcross (), Dungeness A (), Hinkley Point A (), Hunterston A (), Oldbury (Gloucestershire), Sizewell A (), Trawsfynydd (), and Wylfa (), with operations spanning 1956 to 1989. These sites involve defuelling, reactor graphite removal, and land decontamination, managed via subsidiary . Dounreay in Highland Scotland represents advanced reactor research, featuring the Dounreay Fast Reactor (DFR) prototype operational from 1959 to 1977 and the Prototype Fast Reactor (PFR) from 1974 to 1994, alongside earlier materials testing reactors. Decommissioning focuses on fuel discharge, waste retrieval from shafts and silos, and site restoration, incorporating the adjacent Vulcan Naval Reactor Test Establishment. Capenhurst in Cheshire addresses legacy from gaseous diffusion uranium enrichment halted in 1960, with ongoing management of depleted uranium tails and chemical plants, distinct from active Urenco enrichment. Research-oriented sites include Harwell (Oxfordshire), site of early atomic research and materials test reactors decommissioned by 1990, and Winfrith (Dorset), home to the Dragon high-temperature gas-cooled reactor prototype run from 1965 to 1975. These collectively demand specialized processes to mitigate radiological hazards and prepare land for unrestricted release.

Decommissioning and Clean-Up Processes

The decommissioning and clean-up processes managed by the (NDA) follow a risk-prioritized framework to safely retire facilities, encompassing administrative and technical actions such as , radiological and physical characterisation, , dismantling, and remediation to enable regulatory release for reuse or unrestricted access. These activities address legacy hazards from the UK's early programs, prioritizing sites with intolerable risks for immediate intervention while deferring others to leverage natural , with deferred periods typically ranging from short-term (10-15 years) to long-term (over 50 years) under care and maintenance regimes. Core stages include post-operational clean-out (), which focuses on initial reduction by removing spent and process residues immediately after shutdown; to minimize residual radiological contamination through chemical, mechanical, or thermal methods; and active dismantling using remote-handled tools and to segment structures in high-radiation environments. Final demolition and site remediation follow, targeting brownfield ( reuse) or (unrestricted) end states, with waste-led approaches ensuring retrieval aligns with available disposal routes before full structural removal. Clean-up emphasizes integrated , beginning with retrieval from legacy like ponds and silos—such as the deployment of specialized inverted segment lifters and retrieval machines at Sellafield's Swarf Storage Silo, installed as of March 2023 to excavate solidified waste remotely. Retrieved materials undergo treatment to reduce volume and hazard, including supercompaction for intermediate-level waste, and permitted for very low-level waste, and surface of metals to enable or low-level classification. follows in certified containers for interim above-ground , pending geological disposal facilities, with processes governed by a prioritizing minimization, , and secure isolation. Innovative techniques, supported by NDA-funded under the Energy Act 2004, incorporate autonomous systems for in-situ and using sensors and robotic manipulators to classify items non-destructively, reducing human exposure and operational costs. addresses plumes and through pump-and-treat systems or in-situ fixation, ensuring compliance with environmental permits and facilitating site restoration, as demonstrated in ongoing legacy pond retrievals that have processed over 1,000 tonnes of sludge annually at select facilities. These methods collectively aim for secure, cost-effective elimination, though constrained by unique facility designs lacking original blueprints, necessitating bespoke engineering solutions.

Costs and Funding

Magnitude of Financial Commitments

The (NDA) oversees decommissioning and clean-up of the Kingdom's civil legacy, entailing substantial long-term financial commitments primarily borne by the taxpayer through government funding. As of 31 March 2025, the undiscounted nuclear provision—the total nominal future expenditure required without adjusting for the —stands at £215.954 billion, reflecting the estimated lifecycle costs across 17 principal sites and associated facilities. This figure increased from £198.898 billion the prior year, driven by (£3.6 billion), unwind of (£2.5 billion), and net revisions (£0.9 billion after releases). The discounted best estimate provision, accounting for at a real , is £110.1 billion, underscoring the program's multi-decade horizon extending to 2137 for major sites like . Annual operational costs amplify the scale, with total expenditure reaching £4.145 billion in 2024/25, comprising £2.825 billion at legacy sites (68% at alone) and supported by £2.887 billion in government funding alongside £1.258 billion in commercial revenues. Planned expenditure for 2025/26 is £4.164 billion, including £3.975 billion for site activities and £3.305 billion from direct government allocation, with the remainder from non-government sources. , managing 59% of the UK's intermediate-level , dominates liabilities with a £78.1 billion discounted provision and projected lifecycle costs of £79 billion, subject to ongoing efficiencies that reduced estimates by £1.2 billion but offset by delays in waste retrievals. These commitments represent a material fiscal risk, as provisions incorporate uncertainties in waste volumes, technological feasibility, and regulatory requirements, with potential revisions pending post-Spending Review assessments. Net liabilities total £109.821 billion, dominated by the provision (£110.101 billion), highlighting the NDA's reliance on sustained public funding absent viable alternatives for hazards.
Category2024/25 Value (£ billion)Prior Year (£ billion)Key Drivers of Change
Undiscounted Provision215.954198.898, cost revisions
Discounted Provision110.1105.3Discount unwind, releases
Total Expenditure4.1453.997Site operations increase
Discounted Provision78.1N/AWaste management delays

Funding Sources and Oversight

The Nuclear Decommissioning Authority (NDA) receives its primary funding from the UK Government through allocations from the , which supports the decommissioning and clean-up of publicly owned civil nuclear sites. For the 2025/26, the NDA's total planned expenditure is projected at £4.164 billion, with £3.305 billion provided directly by government and the remaining £0.859 billion derived from contributions by site licence companies, primarily through mechanisms like the Nuclear Liabilities Fund (NLF) for legacy reactor sites. The NLF, a segregated fund managed by independent trustees, holds assets provisioned by historical nuclear operators such as and is underwritten by the government to cover decommissioning liabilities, ensuring costs do not fall short of requirements. This funding model reflects the government's commitment to bearing the financial burden of historical nuclear activities, with annual notional allocations detailed in the Nuclear Decommissioning Funding Account statements presented to . Oversight of the NDA's funding and operations is exercised through its status as a (NDPB) sponsored by the Department for and Net Zero (DESNZ), which provides strategic direction and approves major financial decisions via a . (UKGI) delivers strategic oversight on , performance monitoring, and commercial transactions, collaborating with DESNZ to ensure value for money and . The NDA's board, chaired by an appointee and including executive and non-executive members, holds ultimate accountability for financial stewardship, with annual reports and accounts audited by the National Audit Office (NAO) and laid before for scrutiny. This structure has been refined since 2018 to address prior governance weaknesses, such as inadequate , through enhanced NAO recommendations on oversight and cost forecasting. Parliamentary select committees, including the , periodically review funding efficiency, highlighting instances where underwriting has mitigated shortfalls in segregated funds like the NLF.

Achievements and Progress

Key Milestones Reached

The (NDA) marked the completion of fuel reprocessing at the (THORP) at in November 2018, ending operations that had processed oxide fuels from and overseas sources since 1994. This milestone facilitated a shift toward decommissioning the facility, with THORP having contributed to reprocessing approximately 9,000 tonnes of overall across NDA-managed operations. In September 2019, the NDA completed defueling across all Magnox reactors, removing the final spent fuel elements from the last operational site and eliminating 99 percent of the radioactive hazard posed by reactor cores at these facilities. All Magnox reprocessing at Sellafield concluded in the financial year 2022–2023, allowing transition to waste retrieval and site care phases. By July 2023, three sites—, , and Oldbury—reached major milestones in decommissioning their fuel ponds, successfully retrieving legacy wastes from challenging radioactive environments after decades of storage. In April 2025, the group, in partnership with EDF, achieved on-time and on-budget defueling of Hunterston B, the first (AGR) station transferred to oversight, signaling expansion of the mission to include AGR decommissioning. These achievements, including consolidation of all UK civil plutonium stocks at Sellafield, have generated £9 billion in revenue for the UK economy through reprocessing contracts while advancing risk reduction at 17 legacy sites. Commencement of simultaneous waste retrievals from Sellafield's highest-hazard legacy facilities, such as the First Generation Magnox Storage Pond and legacy silos, further progressed hazardous inventory reduction post-2020.

Risk Mitigation and Efficiency Gains

The () prioritizes high hazard risk reduction as its core mission, focusing on the retrieval, , and of materials to minimize long-term environmental and threats at legacy sites. This involves targeted interventions such as emptying legacy fuel ponds and , which contain degraded radioactive inventory, to prevent potential releases from corrosion or structural failure. For instance, at , ongoing efforts include fuel and waste removal from facilities like the Magnox Swarf Storage and Pile Fuel Cladding Store, contributing to a strategic reduction in Category A risks—those involving the highest potential consequences. Risk mitigation strategies emphasize integrated frameworks that incorporate probabilistic risk assessments and contingency planning for uncertainties inherent in decommissioning complex, aged . The NDA's approach has yielded measurable progress, as evidenced by improvements in delivering major risk-reduction projects at , where the National Audit Office noted enhanced performance in scope definition and contractor oversight between 2013 and 2018, reducing delays in high-priority hazard retrievals. These efforts align with the NDA's statutory duty under the Energy Act 2004 to deliver clean-up with minimal burden on future generations, prioritizing actions that accelerate hazard immobilization and secure storage over less urgent site restoration. Efficiency gains have been pursued through optimizations, digital tools for , and competitive contracting models that incentivize cost control without compromising safety. , a key site licensee, committed to £1.4 billion in mission spend reductions by 2029 via its Transformation Plan, achieved partly through streamlined procurement and workforce redeployment, with verified savings tracked against baseline contract estimates. Broader initiatives, including the 2025 Spending Review's mandate for at least 5% operational efficiencies across the Department for Energy Security and Net Zero portfolio, have focused on standardizing treatment processes and leveraging shared capabilities across sites to lower unit costs for decommissioning activities. These measures have contributed to downward revisions in lifetime cost estimates for , from an initial £79 billion (discounted), by enhancing productivity in high-volume tasks like retrieval. Independent verification by the National Audit Office underscores the importance of robust baseline adjustments to ensure reported efficiencies reflect genuine value rather than deferred expenditures.

Challenges and Criticisms

Cost Overruns and Delays

The (NDA) has encountered substantial cost overruns across its portfolio of legacy nuclear sites, with the estimated lifetime undiscounted cost for decommissioning alone rising to £136 billion as of 2024, an increase of £21 billion from prior forecasts. This escalation reflects challenges in waste retrieval from ageing facilities, where progress has lagged, contributing to higher operational expenditures and extended timelines. For instance, in the financial year 2023-24, reported a of £1.9 billion, exceeding revenues amid delays in four major projects that were already underway in 2018. Delays have compounded these overruns, with Sellafield's full decommissioning now projected for 2125, placing the programme 13 years behind initial schedules and amplifying risks from deteriorating infrastructure. The highlighted in 2025 that waste retrieval rates remain insufficient, warning of "intolerable" safety and financial risks if unaddressed, despite some recent improvements in project delivery. Broader efforts, such as site decommissioning, have seen costs rise by up to 45%—or £2.7 billion—due to unforeseen complexities in care and maintenance phases as of 2020. The National Audit Office (NAO) has criticized the and site operators for insufficient evidence of value for money, noting persistent issues in cost forecasting and since at least , when projects alone faced £913 million in overruns and multiyear delays. These patterns stem from technical difficulties in handling high-hazard materials, disruptions, and regulatory hurdles, though the 's 2025 spending review settlement increased annual funding to £2.8 billion to support efficiencies. Despite mitigation efforts, such as enhanced oversight and contractor accountability, the NAO emphasized in 2024 that systemic improvements in programme controls are needed to curb further escalations.

Safety Incidents and Regulatory Scrutiny

The Office for Nuclear Regulation (ONR) provides ongoing oversight of Nuclear Decommissioning Authority (NDA) sites, conducting inspections and issuing enforcement actions for non-compliance with safety standards. , the NDA's largest and most hazardous site, has faced multiple regulatory interventions due to operational lapses. In November 2024, two rail wagons carrying nuclear waste collided during shunting operations at , prompting ONR to issue an improvement notice requiring enhanced rail safety measures. This incident was one of seven rail-related events at notified to ONR since 2020, contributing to a total of 13 such occurrences across nuclear sites in that period. Separately, in August 2024, breached regulations on handling hazardous substances, leading ONR to serve an enforcement notice for inadequate . ONR issued another improvement notice in October 2025 after failed to adequately control risks from nickel nitrate during maintenance work, highlighting deficiencies in prevention. Earlier, in December 2022, ONR enforced upgrades at a facility via notice, addressing faulty detection systems and repair needs. In a cybersecurity domain, received a £332,500 fine in October 2024 from ONR for policy shortfalls between 2014 and 2018, though no public safety compromise was reported. A National Audit Office report in October 2024 criticized Sellafield's slow progress in mitigating "intolerable" risks from legacy waste stores, with some hazard reduction efforts lagging since assumed control in 2016 and full remediation projected beyond 2125. Parliamentary scrutiny in June 2025 echoed these concerns, with the urging faster waste retrieval and stronger accountability to avert escalating dangers from aging infrastructure. Despite a reported year-on-year decline in overall incidents across operations in the 2024-2025 annual accounts, regulatory bodies continue to demand accelerated hazard reductions.

Future Outlook and Strategic Direction

Long-Term Plans

The 's long-term strategy, refreshed in July 2025 for , targets the safe, secure, and sustainable decommissioning of the 's earliest sites by 2050, emphasizing reduction and across 17 sites. This fifth iteration of the strategy aligns with government policy on spent fuels and materials, prioritizing the retrieval of high- wastes—such as those at —and the delicensing of most former reactor sites within that timeframe. By 2050, the aims to transition the majority of sites to lower- states, enabling economic regeneration and minimizing long-term environmental risks, while developing clear plans for and stocks. Integral to these plans is integrated waste management, including interim storage of spent and wastes for up to 120 years at select sites, consistent with policy for new builds and legacy facilities. The strategy commits to annual progress reporting against milestones, such as fuel retrieval at and remediation at , with a focus on cost-effective innovation to address the estimated 100+ year cleanup horizon. Oversight from the Department for Energy Security and Net Zero ensures alignment with broader policy, though execution depends on and regulatory approvals. Looking beyond 2050, the envisions a "positive " through site release for alternative uses, supported by ongoing R&D in decommissioning technologies and to mitigate socioeconomic impacts. This includes fostering skills development and economic benefits in host regions, with projected reductions in lifecycle costs through phased hazard elimination rather than indefinite storage. Challenges such as evolving disposal options, including potential geological repositories, remain under review to inform adaptive .

International Context and Lessons

The (NDA) operates within a global framework where addresses legacies from commercial power plants, reactors, and programs, with over 200 reactors worldwide projected for shutdown by 2040, necessitating coordinated international strategies for and site restoration. The (IAEA) facilitates knowledge sharing through initiatives like the International Decommissioning Network, which disseminates lessons from projects emphasizing early planning, radiological characterization, and dismantling to minimize long-term liabilities. Comparisons between the NDA's government-led model and international counterparts highlight variations in organizational efficiency; for instance, the U.S. Department of Energy (DOE) increasingly incorporates private sector contractors for decommissioning, achieving faster progress in some sites compared to the UK's parent body organization approach, which prioritizes public oversight but has faced delays. In France, Électricité de France (EDF) manages decommissioning under regulatory frameworks similar to the UK's, focusing on deferred strategies for Magnox-style reactors, while Japan's post-Fukushima efforts underscore the need for rapid radiological surveys and international technical assistance to handle accident-damaged facilities. Key lessons for the include integrating decommissioning considerations into new reactor designs from the outset, as advocated by OECD Nuclear Energy Agency guidelines, to reduce future costs through features like modular construction and waste-minimizing materials. U.S. experiences, shared via bilateral agreements with the , emphasize risk-based contracting and supply chain incentives to enhance productivity, contrasting with challenges in cost control and revealing that hybrid public-private models can accelerate timelines without compromising safety. Globally, persistent issues like underestimating waste volumes and regulatory harmonization underscore the value of IAEA-coordinated best practices in characterization and recycling, which the has adopted to inform its strategies for sites like .

National Nuclear Laboratory

The National Nuclear Laboratory (NNL) is a government-owned entity established in 2008 to consolidate the United Kingdom's research and development capabilities into a single organization focused on research, technology development, and industry support. Launched in July 2008, its ownership was fully transferred to the UK government in April 2009, operating as a state-owned under oversight from the Department for Energy Security and Net Zero. NNL draws on over 65 years of nuclear expertise, employing specialists with a collective 10,000 years of experience in and engineering to address complex challenges in the sector. In relation to the Nuclear Decommissioning Authority (NDA), NNL provides pivotal across the NDA estate, enabling the safe, secure, and cost-effective clean-up of legacy nuclear facilities. It collaborates directly with the NDA and its subsidiary through a Technical Services Agreement signed in 2017, which has delivered £7 billion in cost savings since 2008 by optimizing decommissioning processes and identifying further efficiencies worth hundreds of millions. NNL's contributions include practical into , fuel cycle solutions, and reactor operations support tailored to decommissioning needs, helping to mitigate risks and accelerate site restoration. NNL advances decommissioning technologies such as thermal treatment methods that vitrify or ceramicize to reduce volumes, and autonomous robotic systems for remote handling of radioactive materials, with goals to eliminate routine human access to high-risk areas by 2030. These innovations directly aid the NDA's long-term mission to manage the UK's civil , estimated to span decades and tens of billions of pounds, by enhancing and in environmental restoration efforts. Through such partnerships, NNL bridges clean-up with broader sector growth, including international applications like support for the decommissioning since 2011.

Partnerships with Industry

The Nuclear Decommissioning Authority (NDA) engages private industry primarily through its site licence companies (SLCs), which manage decommissioning operations at specific facilities and procure specialized services via competitive tenders and framework agreements to leverage expertise in areas such as waste processing, , and remediation. These partnerships emphasize value for money, , and risk-sharing, with the NDA overseeing SLC performance under parent body organization (PBO) contracts that incentivize efficient delivery. For instance, frameworks established through Crown Commercial Services enable SLCs like and to access pre-qualified suppliers for engineering, construction, and technology services, reducing timelines while ensuring compliance with nuclear safety standards. A key mechanism for industry collaboration is the NDA's Supply Chain Charter, launched in 2017 and updated periodically, which promotes transparency, long-term planning, and performance incentives across tiers of suppliers supporting the estate, including small and medium-sized enterprises (SMEs). This charter has facilitated over £1 billion in annual supply chain expenditure, fostering relationships that enhance capability in high-hazard environments. Notable examples include the Decommissioning Delivery Partnership, comprising firms like KBR and Cavendish Nuclear, which received the 2024 NDA Supply Chain Award for integrating social value metrics—such as local and skills —into contracts at sites like . In innovation-driven initiatives, the NDA has committed £9.5 million over four years starting in June 2025 to a with Restoration Services (NRS), , and technology providers for deploying advanced characterization tools, aiming to accelerate processing of intermediate-level by integrating and . Similarly, the Innovation , established in April 2024, unites the NDA, Services, and specialists to develop solutions for asbestos-contaminated materials, addressing a legacy challenge at sites with projected cost savings through reduced reliance. awards underscore this model, such as NRS's October 2025 selection of Costain as principal contractor for demolishing reactor buildings at , valued at an undisclosed multi-million sum and focused on height reduction to mitigate weather exposure risks. These engagements, while achieving efficiencies like a 10-15% reduction in lifecycle costs via competitive frameworks, have drawn scrutiny for dependency on a concentrated supplier base, prompting NDA strategies to diversify the supply chain.

References

  1. [1]
    About us - Nuclear Decommissioning Authority - GOV.UK
    We're charged, on behalf of government, with the mission to clean-up the UK's earliest nuclear sites safely, securely and cost effectively.
  2. [2]
    [PDF] The Nuclear Decommissioning Authority's Magnox contract
    Oct 11, 2017 · 1. In 2005, the Nuclear Decommissioning Authority (NDA) was established as a non-departmental public body under the Energy Act 2004. Sponsored ...
  3. [3]
    Nuclear Decommissioning Authority - YouTube
    The Nuclear Decommissioning Authority (NDA) - Addressing one of the most complex, long-term environmental challenges in Europe.<|separator|>
  4. [4]
    [PDF] Nuclear Decommissioning Authority (“NDA”) Framework Document
    Aid for the purposes of discharging its duties and responsibilities. (section 22 of the Act). • maintenance of appropriate funding mechanisms (the Act ...
  5. [5]
    Decommissioning Sellafield - Parliament UK
    Jun 4, 2025 · The NDA expects that the task of decommissioning buildings and cleaning up the Sellafield site will not be completed until 2125 and will cost £136 billion.
  6. [6]
    [PDF] The Nuclear Decommissioning Authority's management of the ...
    Nov 27, 2020 · It can point to some notable achievements in relation to the decommissioning of the Magnox sites alone, such as the successful defueling of ...Missing: controversies | Show results with:controversies
  7. [7]
    [PDF] Decommissioning Sellafield: managing risks from the nuclear legacy
    Oct 23, 2024 · 2.13 Sellafield has also had some other significant achievements in demonstrating that waste can be removed safely: • In April 2022 it ...Missing: controversies | Show results with:controversies
  8. [8]
    Nuclear Decommissioning 44 in the UK - Ingenia
    The term 'legacy' covers the facilities, nuclear materials and radioactive wastes that have originated from the early nuclear programmes that fall within the ...
  9. [9]
    Nuclear Development in the United Kingdom
    Jun 12, 2025 · The world's first commercial-scale nuclear power reactor started up in the UK in 1956. A fleet of 26 Magnox power reactors was built.
  10. [10]
    What is Sellafield? – Cleaning up our nuclear past - NDA blog
    Sep 7, 2018 · Sellafield is a remote site in north-west England, opened in 1947 for plutonium production, and now a significant environmental remediation ...<|control11|><|separator|>
  11. [11]
    Discovering the secrets in the ground underneath Western Europe's ...
    Nov 7, 2024 · Sellafield's legacy waste store, the Magnox Swarf Storage Silo, leaked radioactive liquor into the ground in the 1970s and in 2019 a new leak was discovered.
  12. [12]
    Energy Act 2004 - Legislation.gov.uk
    An Act to make provision for the decommissioning and cleaning up of installations and sites used for, or contaminated by, nuclear activities; ...
  13. [13]
    Cross Heading: Establishment of NDA - Energy Act 2004
    An Act to make provision for the decommissioning and cleaning up of installations and sites used for, or contaminated by, nuclear activities; ...
  14. [14]
    [PDF] The Nuclear Decommissioning Authority - Parliament UK
    Oct 29, 2003 · The Government argued that the first extension of the Authority's remit is necessary as a consequence of its intention to underwrite the costs ...Missing: date | Show results with:date
  15. [15]
    About us – Cleaning up our nuclear past: faster, safer and sooner
    Taking a group-wide view, our core objective is to decommission these sites safely, securely, cost-effectively and in a manner that protects the environment.Missing: establishment | Show results with:establishment
  16. [16]
    [PDF] The NDA group Draft Strategy - GOV.UK
    Jul 7, 2025 · National Nuclear Strategic Plan for. Skills 2024. 40. Nuclear Decommissioning Authority. Case Study: NDA's Connected. Infrastructure Project ...
  17. [17]
    Nuclear Decommissioning Authority: Business Plan 2025 to 2028
    Jun 5, 2025 · The Plan's purpose is to provide a summary of activities and expected progress for our 17 nuclear sites over the next three years.
  18. [18]
    [PDF] The NDA group Draft Strategy - GOV.UK
    Strategic Objective: To leverage the unique capabilities and infrastructure of the NDA group to support the UK nuclear enterprise while ensuring the successful ...
  19. [19]
    Our governance - Nuclear Decommissioning Authority - GOV.UK
    The NDA is a body corporate governed through the Energy Act 2004, the Government's NDA Framework Document and Cabinet Office guidelines for Non- Departmental ...
  20. [20]
    [PDF] Nuclear Decommissioning Authority (“NDA”) Framework Document:
    Objectives. 2.1. DESNZ and the NDA share the common objective of cleaning up the UK's earliest nuclear sites safely, securely and cost effectively with care ...
  21. [21]
    Nuclear Decommissioning Authority: Organisation Chart - GOV.UK
    Nuclear Decommissioning Authority organisation chart showing senior positions and names, with structure for other functions.Missing: internal | Show results with:internal
  22. [22]
    [PDF] The NDA organisational structure - GOV.UK
    The NDA is sponsored by DESNZ, with UKGI providing oversight. The NDA has a board, and operating company subsidiaries. UKGI provides strategic oversight.Missing: internal | Show results with:internal
  23. [23]
    Nuclear Decommissioning Authority: Annual Report and Accounts ...
    Oct 9, 2024 · The NDA group​​ Our group is made up of the Nuclear Decommissioning Authority (NDA), an executive non-departmental public body, and the following ...
  24. [24]
    [PDF] NDA Organisational Chart - GOV.UK
    Head of Internal. Audit (subs). 8-9. Senior Internal. Auditor. 5-7. Senior ... Nuclear Liabilities. Strategy Manager. 7-8. Strategy. Nuclear Fuel Cycle. Manager.
  25. [25]
    Peter Hill CBE appointed as new Chair of the NDA
    Apr 12, 2024 · He succeeds Chris Train OBE who has been Interim Chair since September 2023. Chris will continue in his role as a Non-Executive Director on the ...
  26. [26]
  27. [27]
    NDA appoints two new Non-Executive Board Members - Public now
    May 16, 2025 · The Nuclear Decommissioning Authority (NDA) has announced that Catriona Schmolke CBE FREng and Dr Neil Bruce OBE CEng have been appointed to ...
  28. [28]
    [PDF] Nuclear Decommissioning Authority: departmental review - GOV.UK
    Jun 29, 2017 · It does so on 17 sites across England, Scotland, and Wales, covering more than 1000 hectares of land designated as nuclear licensed sites, and.
  29. [29]
    Decommissioning Sellafield: managing risks from the nuclear legacy
    Oct 23, 2024 · While workers at Sellafield have started retrieving and safely storing waste, the NDA expects full site remediation will take until 2125.
  30. [30]
    Our sites - GOV.UK
    Sep 27, 2018 · Our sites. Magnox is responsible for defuelling and decommissioning 12 nuclear sites and operating one hydro-electric plant in the UK.
  31. [31]
    NDA Mid-year performance report 2024 to 2027 - GOV.UK
    Feb 20, 2025 · This report provides a summary as to how each of the organisations in the NDA group is performing against the key activities and milestones set out in the 2024 ...<|control11|><|separator|>
  32. [32]
    Decommissioning, fuel and waste (DFW)
    Jul 24, 2025 · Providing advice to government and others on decommissioning policy and strategy;; Land quality management;; Proportionate regulatory control; ...
  33. [33]
    Determining the timing and pace of decommissioning - GOV.UK
    Nov 27, 2023 · Decommissioning includes activities such as planning, physical and radiological characterisation, facility and site decontamination, dismantling ...
  34. [34]
    [PDF] Nuclear Decommissioning - Attracting and retaining skills - GOV.UK
    To decommission some of these oldest, one-of-a-kind nuclear facilities, where no blueprint exists, we need people managing ground-breaking engineering projects.
  35. [35]
    Second waste retrieval machine installed at Sellafield
    Mar 9, 2023 · A video showing how waste is removed and the Magnox Swarf Storage Silo prepared for decommissioning has been posted to YouTube and can be found ...
  36. [36]
    How NWS is making sure the right waste, is in the right place with ...
    May 10, 2024 · So, how are we doing this? Through incineration, sending lower activity waste to permitted landfill, super-compaction and metal decontamination ...
  37. [37]
    [PDF] Integrated Waste Management Radioactive Waste Strategy - GOV.UK
    In the 2016 Nuclear Decommissioning Authority (NDA) Strategy, we made a commitment to develop this document, a single radioactive waste strategy for.
  38. [38]
    Sort and Segregate Nuclear Waste: specification - GOV.UK
    Jul 27, 2020 · An integrated, autonomous toolkit which sorts and segregates radioactive waste generated from nuclear decommissioning activities into containers ...3. Drivers And Outcomes · 7. Future Market... · 7.5 Sellafield Routine Waste...Missing: techniques | Show results with:techniques
  39. [39]
    Research at NDA - Nuclear Decommissioning Authority - GOV.UK
    Under the Energy Act 2004, the NDA is required to promote and, where necessary, carry out research to support decommissioning and clean-up.
  40. [40]
    Environmental Restoration - United Kingdom National Nuclear ...
    Our ability to control, manage and remove the hazardous materials of the past in order to restore the environment for future generations.
  41. [41]
    [PDF] Nuclear Decommissioning Authority Annual Report and Accounts ...
    Jul 21, 2025 · 8. Chair's statement. 10. Group Chief Executive's statement. 12. Group Chief Financial Officer's review. 14. The NDA and our mission.
  42. [42]
    [PDF] Department for Business, Energy & Industrial Strategy The Nuclear ...
    1: PAC conclusion: There remains significant uncertainty over the cost and timetable for decommissioning the Magnox sites and estimates continue to increase. 1: ...
  43. [43]
    Nuclear Decommissioning Funding Account: statement for 2024 to ...
    Jul 17, 2025 · This statement sets out: the notional funding available from the consolidated fund for use by the Nuclear Decommissioning Authority ( NDA ) ...
  44. [44]
    [PDF] Nuclear decommissioning costs - OBR
    In the event that the fund's assets are insufficient to meet its liabilities, outstanding liabilities will fall to government. •. New generation sites (at ...Missing: magnitude | Show results with:magnitude
  45. [45]
    End of reprocessing at Thorp signals new era for Sellafield - GOV.UK
    Nov 16, 2018 · The NDA has reached a major milestone in its decommissioning mission with the end of nuclear fuel reprocessing at Thorp.
  46. [46]
    NDA celebrates 20 years of making the nation safer
    The UK boasts a proud nuclear history, and the NDA has been pivotal in cleaning up the legacy facilities once at the heart of national defence ...
  47. [47]
    Final nuclear fuel removed from last Magnox reactor - GOV.UK
    Sep 19, 2019 · The successful completion of the Magnox defueling programme is testament to the hard work and commitment of the highly skilled workforce ...
  48. [48]
    The Nuclear Decommissioning Authority Mission Progress Report ...
    Nov 6, 2023 · The following milestones were all completed in the financial year 2022 to 2023 thanks to reprocessing coming to an end: All Magnox reprocessing ...
  49. [49]
    Decommissioning milestones - Cleaning up our nuclear past
    Jul 10, 2023 · Three Magnox sites have achieved major milestones in their ponds decommissioning programme, working in a challenging radioactive environment to ...
  50. [50]
    NDA group deliver defueling milestone with EDF - GOV.UK
    Apr 25, 2025 · Yesterday (24 April) EDF announced Hunterston B nuclear power station has been successfully defueled on time and on budget, ...
  51. [51]
    A strategy for Sellafield – Cleaning up our nuclear past
    Nov 19, 2020 · At its most basic level, the reduction of high hazard and risk at Sellafield means emptying and demolishing old nuclear facilities that are no ...
  52. [52]
    The Nuclear Decommissioning Authority: progress with reducing risk ...
    Jun 20, 2018 · The NDA's work includes reprocessing spent fuel from old nuclear reactors, managing and storing nuclear materials, removing and managing ...Missing: mitigation | Show results with:mitigation
  53. [53]
    Nuclear Decommissioning Authority Strategy effective from March ...
    Mar 18, 2021 · Our strategy is founded on our commitment to overcoming the challenges of nuclear clean-up and decommissioning, leaving our sites safe and ready for their next ...
  54. [54]
    Transformation Plan - GOV.UK
    Jul 31, 2017 · Sellafield Ltd made a commitment to the Nuclear Decommissioning Authority and government to reduce mission spend by at least £1.4bn by 2029 ...
  55. [55]
    Nuclear decommissioning budget increased despite fears of cuts ...
    Jun 12, 2025 · Fresh state spending commitments made as part of the Spending Review bring the NDA's settlement up from £2.4bn to £2.8bn per year.
  56. [56]
    Assurance of reported savings at Sellafield - National Audit Office
    Oct 29, 2013 · The Authority tracks savings by comparing the cost of work carried out with the estimated cost of that work in the contract baseline, adjusted ...
  57. [57]
    Sellafield's race against time: nuclear waste clean-up not going ...
    Jun 4, 2025 · Report highlights latest picture on delays and cost rises in c.£136bn 100-year nuclear decommissioning project.
  58. [58]
    Sellafield nuclear site runs up 'considerable' costs - BBC
    Oct 23, 2024 · Sellafield spent £1.9bn more than it earned in 2023-24. Four projects that were under way when the NAO last reported in 2018 were "significantly ...Missing: increases | Show results with:increases
  59. [59]
    [PDF] Decommissioning Sellafield - UK Parliament Committees
    The NDA expects that the task of decommissioning buildings and cleaning up the Sellafield site will not be completed until 2125 and will cost £136 billion (on ...
  60. [60]
    Cost of Magnox D&D has increased by up to 45 percent
    Sep 16, 2020 · The total cost of the work needed to put the country's Magnox nuclear sites into “care and maintenance” has increased by up to an estimated £2.7 billion.Missing: budget | Show results with:budget
  61. [61]
    Sellafield nuclear site not yet achieving value for money
    Oct 23, 2024 · Please read paragraphs 2.17 to 2.21, pages 32 to 33. The forecast cost of decommissioning Sellafield has risen to £136 billion (undiscounted, ...<|control11|><|separator|>
  62. [62]
    Enforcement - Office for Nuclear Regulation
    As the nuclear regulator, we must take enforcement action when licensees are found to be failing to meet the safety and security standards required by law.
  63. [63]
    Sellafield nuclear waste rail wagons crash spark ONR notice - BBC
    Jan 31, 2025 · The nuclear watchdog has issued an improvement notice after two railway wagons carrying nuclear waste crashed. It happened on the Sellafield ...
  64. [64]
    ONR reveals 13 rail incidents at nuclear sites since 2020, including ...
    Mar 11, 2025 · The Office for Nuclear Regulation (ONR) has was notified of 13 rail-related incidents at UK nuclear sites since 2020, seven of which were at Sellafield.
  65. [65]
    Sellafield nuclear site breaches hazardous substance regulations
    Aug 27, 2024 · A nuclear site has breached hazardous substance handling regulations, a watchdog said. The Office for Nuclear Regulation (ONR) has served ...
  66. [66]
    Sellafield Ltd complies with improvement notice
    Oct 2, 2025 · The enforcement action was taken after Sellafield Ltd failed to manage the risks of working with nickel nitrate and to prevent or adequately ...
  67. [67]
    ONR calls for fire safety improvements at Sellafield facility
    Dec 22, 2022 · The superintending inspector for the ONR, Kulvinder McDonald, said: “The enforcement notice requires Sellafield Ltd to either replace or repair ...<|control11|><|separator|>
  68. [68]
    Sellafield Ltd fined in court for cyber security shortfalls
    Oct 2, 2024 · Sellafield Limited was today fined £332,500 for cyber security shortfalls during a four-year period following a prosecution brought by the ...
  69. [69]
    Sellafield nuclear clean-up too slow and too costly, say MPs
    Jun 3, 2025 · MPs have warned about the speed and cost of cleaning up the Sellafield nuclear waste dump and raised concerns over a “suboptimal” workplace ...
  70. [70]
    Nuclear Decommissioning Authority: Annual Report and Accounts ...
    Jul 22, 2025 · Our Annual Report and Accounts 2024 to 2025 sets out the progress made towards our mission of reducing hazards and decommissioning the UK's ...Missing: provision total
  71. [71]
    NDA calls for engagement on refreshed decommissioning strategy
    Jul 7, 2025 · The NDA has published its strategy for consultation, setting out the roadmap to decommission the UK's earliest nuclear sites safely, securely and sustainably.Missing: processes | Show results with:processes
  72. [72]
    Nuclear Decommissioning Authority Strategy Unveiled - THX News
    Jul 7, 2025 · Safely decommissioning UK's earliest nuclear sites by 2050 with hazard reduction at Sellafield. · Strategic Focus on Safety and Sustainability.
  73. [73]
    [PDF] Approaches for decommissioning strategies and lessons learned so ...
    4. Stages of decommissioning in the UK. 5. UK wide strategic priorities across the United Kingdom – high hazard and risk reduction.
  74. [74]
    [PDF] NDA Strategy 2021 - GOV.UK
    Our purpose is to clean up the UK's earliest nuclear sites safely, securely and cost effectively. Doing this with care for our people, communities and the ...
  75. [75]
    Nuclear Decommissioning Authority - GOV.UK
    We're charged, on behalf of government, with the mission to clean-up the UK's earliest nuclear sites safely, securely and cost effectively.About usWorking for NDAOur governanceProcurement at NDAOffice access and opening times
  76. [76]
    NDA releases revised strategy for public consultation - letsrecycle.com
    Jul 9, 2025 · The strategy outlines plans through to 2050 and reaffirms the NDA's priority to safely retrieve and manage high-hazard materials stored in ...
  77. [77]
  78. [78]
    [PDF] Nuclear Decommissioning: Addressing the Past and Ensuring the ...
    The IAEA ensures that lessons and innovations from successful decommissioning projects are shared, including through the International Decommissioning Network.
  79. [79]
    Organizational models for the decommissioning of nuclear power ...
    Magnox Electric was later assumed by state-owned British Nuclear Fuels Limited (BNFL), established in 1971 to operate nuclear fuel production and reprocessing ...
  80. [80]
    [PDF] Design Lessons Drawn from the Decommissioning of Nuclear ...
    Design lessons include features to consider during planning, design, construction, and operating stages to facilitate decommissioning.
  81. [81]
    [PDF] Decommissioning Considerations for New Nuclear Power Plants
    Studies aim to ensure decommissioning considerations are taken into account from the outset for new reactor projects, applying experience from decommissioning ...
  82. [82]
    [PDF] statement of intent no. 2 - between - Department of Energy
    The Department of Energy (DOE) of the United States of America and the Nuclear. Decommissioning Authority (NDA) in the United Kingdom of Great Britain and ...
  83. [83]
  84. [84]
    About us - National Nuclear Laboratory - GOV.UK
    Established in 2008, the National Nuclear Laboratory brought together the UK's nuclear research and development capability into one organisation.Missing: history date ownership
  85. [85]
    Strategic review of the National Nuclear Laboratory ... - GOV.UK
    Dec 18, 2024 · NNL supports both the legacy of the nuclear sector through its pivotal role across the Nuclear Decommissioning Authority ( NDA ) estate, and ...
  86. [86]
    [PDF] Nuclear Decommissioning Authority PhD Research Seminar for ...
    Jan 17, 2018 · The NDA's mission to clean up the UK's civil nuclear legacy is going to take many decades and cost tens of billions of pounds.
  87. [87]
    [PDF] Commercial Models for Decommissioning
    The NDA does not directly manage the UK's nuclear sites. It oversees the work through contracts with specially designed companies known as site licence.<|separator|>
  88. [88]
    [PDF] Nuclear Decommissioning Authority - Business Plan - GOV.UK
    Apr 1, 2024 · Collaboration, with our. UK supply chain, other sectors and abroad, is a core part of our strategy to deliver value for money. Our areas of.
  89. [89]
    Procurement at NDA - Nuclear Decommissioning Authority - GOV.UK
    Tendering for contracts and transparency · General terms and conditions of contract · SME action plan · Supply chain charter · Supply chain event.Missing: partnerships | Show results with:partnerships
  90. [90]
    Supply Chain Charter for Nuclear Decommissioning Sites - GOV.UK
    The Supply Chain Charter aims to improve relationships, planning and performance through all tiers of the supply chain supporting the NDA estate.
  91. [91]
    Decommissioning Delivery Partnership Wins 2024 NDA Award for ...
    Nov 4, 2024 · The Decommissioning Delivery Partnership wins the 2024 NDA group supply chain award for 'best approach to achieving social value'.
  92. [92]
    NDA group launches £9.5m partnership to revolutionise nuclear ...
    Jun 26, 2025 · The NDA has committed to invest up to £9.5m in the project over four years, which is a collaboration with Nuclear Restoration Services (NRS), Sellafield Ltd ...<|separator|>
  93. [93]
    NDA establish asbestos partnership - Nuclear Industry Association
    Apr 23, 2024 · The Asbestos Innovation Partnership (AIP) will work with the NDA, NWS and the supply chain, to test and develop new solutions to treat asbestos waste.
  94. [94]
    Major decommissioning contract awarded at Trawsfynydd site
    Oct 7, 2025 · NRS has appointed Costain as the principal contractor to reduce the height of two reactor buildings at Trawsfynydd former nuclear site, ...