Fact-checked by Grok 2 weeks ago

Oahe Dam


Oahe Dam is a rolled-earth embankment dam on the Missouri River in central South Dakota, approximately 5 miles north of Pierre.
Constructed by the U.S. Army Corps of Engineers under the Flood Control Act of 1944 as part of a comprehensive Missouri River basin development plan, it features an earthen structure, six outlet tunnels, a left-bank powerhouse, and a downstream spillway with eight gates.
At 245 feet in maximum height and 9,300 feet long excluding the spillway, the dam impounds Lake Oahe, a reservoir holding over 23 million acre-feet of water and ranking as the fourth largest in the United States.
Operational since 1962, it primarily serves flood risk reduction by storing and releasing water during high-flow events, generates 786 megawatts of hydroelectric power through seven turbines, and supports navigation, irrigation, water supply, and recreation across multiple states.
The project's construction, which began in 1948, flooded extensive bottomlands and displaced over 190 Standing Rock Sioux families, submerging nearly 56,000 acres of tribal land and prompting relocations that strained community structures.

Geographical and Strategic Context

Location within the Missouri River Basin

The Oahe Dam spans the near in central , at coordinates 44°27′02″N 100°24′05″W. This site lies at river mile 1,072.3 upstream from the Missouri's confluence with the near , . The dam's placement in Stanley and Hughes counties positions it amid the rolling prairies of the , where the river historically followed a broad, meandering channel through sediment-rich floodplains. Oahe Dam forms the third major impoundment in sequence along the Missouri River's , downstream from in and upstream from Big Bend Dam in . This arrangement is part of a system of six principal main-stem dams—Fort Peck, , Oahe, Big Bend, Fort Randall, and Gavins Point—engineered to regulate the upper 's flows for flood mitigation, sustainment, and resource development across the . , the reservoir created by the dam, extends northward over 230 miles to near , capturing drainage from upstream tributaries while influencing downstream . The Basin, encompassing the watershed of the river and its tributaries, spans portions of ten U.S. states from to Missouri, with the originating in the and traversing approximately 2,340 miles southeastward. Oahe's location midway along this integrates it into the basin's hydraulic control network, where upstream reservoirs like Fort Peck and buffer inflows from mountainous headwaters, and Oahe further moderates volumes entering the lower basin's agricultural and urban reaches. The site's selection leveraged stable geological formations in the Pierre Shale and Fox Hills Sandstone formations, providing a narrow constriction suitable for large-scale impoundment.

Authorization and Objectives under the Pick-Sloan Plan

The Oahe Dam was authorized as a key component of the Pick-Sloan Missouri River Basin Program through the Flood Control Act of 1944, enacted on December 22, 1944. This act reconciled competing proposals: the U.S. Army Corps of Engineers' Pick Plan, which prioritized flood control via large storage reservoirs on the Missouri River main stem, and the Bureau of Reclamation's Sloan Plan, which emphasized irrigation and hydropower development. Oahe was designated among the program's four new mainstem dams—alongside Garrison, Fort Randall, and Big Bend—to form the backbone of flood mitigation efforts following devastating basin-wide inundations in the early 1940s. The program's overarching objectives included to prevent downstream devastation, enhancement by regulating flows for a reliable 9-foot-deep channel from Sioux City to , to expand , hydroelectric power generation to meet regional demands, municipal and industrial , , fish and preservation, and improvement. For Oahe specifically, these translated to primary functions of impounding floodwaters in (with a capacity of 23 million acre-feet) to attenuate peak discharges, stabilizing river levels for traffic, and supporting output of approximately 786 megawatts through integrated turbines. While irrigation was authorized under the Sloan-influenced elements, encompassing potential development of up to 750,000 acres in the Oahe Unit, realization has been constrained by soil suitability, economic viability, and shifting priorities toward flood and power benefits. The Corps retained operational authority over the dam and reservoir for flood control and navigation, with power revenues earmarked for repayment of federal investments, underscoring the program's economic self-sufficiency mandate. This multi-objective framework reflected pragmatic engineering to harness the Missouri's variable hydrology for sustained basin prosperity without favoring any single use disproportionately.

Design and Construction

Planning and Site Preparation (1948–1952)

The planning phase for Oahe Dam followed its authorization as a key component of the Pick-Sloan Missouri River Basin Program under the Flood Control Act of 1944, with the U.S. Army Corps of Engineers tasked with detailed engineering assessments to integrate flood control, hydropower, and navigation objectives along the Missouri River mainstream. By 1948, Congress appropriated initial funds for the project, enabling the transition from conceptual design to on-site activities despite opposition from local ranchers and farmers advocating for a smaller structure to preserve bottomlands. A ceremony on September 16, 1948, northwest of , initiated construction under Corps oversight, attended by thousands and signaling federal commitment to the 242-foot-high rolled-earth design. Preliminary site investigations included geological mapping of the Pierre area shales and soils critical for foundation , conducted between 1948 and 1950 to evaluate embankment materials and cut slopes. Archeological surveys, coordinated through the Smithsonian Institution's River Basin Surveys program, documented prehistoric sites in the Oahe Dam vicinity during 1950–1951, excavating features like circular houses at locations such as the Dodd and Phillips Ranch sites to salvage data ahead of reservoir inundation. Site preparation advanced with the first earthwork contract awarded in 1950, focusing on excavation of diversion and spillway channels to manage river flow during dam closure, alongside approach channel work essential for construction access and future operations. Land acquisition for the dam foundation and immediate abutments commenced in the late 1940s, involving negotiations with private owners, though broader reservoir easements—spanning over 370,000 acres—faced delays and required subsequent legislation in 1958 for full federal purchase. Progress was hampered by spring flooding in 1952, which eroded early excavations and necessitated reinforced stabilization measures before core embankment filling could proceed. These efforts established the project's foundation, prioritizing empirical geotechnical data over expedited timelines to mitigate risks from the site's variable shale layers and high water table.

Core Construction Phases (1953–1962)

Construction of the Oahe Dam's primary structural elements accelerated in 1953 following initial site preparation, with earthwork for Stage III commencing in May and Outlet Works Stage I beginning in June; designs for concrete aggregates and were finalized by August to support the rolled-earth embankment and associated concrete features. Progress on the outlet works continued into 1954, including control shafts in September, downstream tunnels in November, and the stilling basin in October, while Public Law 776 authorized land acquisition from the Cheyenne River Sioux Tribe on September 3 to facilitate boundaries. Spillway earthwork Stage I started in September 1955, accompanied by designs for outlet works control gates in July, marking the shift toward infrastructure capable of handling up to 150,000 cubic feet per second. By 1956, engineering reports on power structures were completed in , alongside studies for the structure, laying groundwork for the powerhouse's seven generating units with a total capacity of 786,000 kilowatts. designs advanced in 1957, with further power structure assessments in June, as materials—over 92 million cubic yards of earth sourced from local borrow areas—were mobilized for the 9,300-foot-long, 245-foot-high rolled-earth , which became the world's largest of its type upon completion. Emergency gates for floodwater release were tested for the first time in 1957, demonstrating the system's readiness amid ongoing with heavy machinery. The Missouri River was diverted in 1958 to enable foundation work, culminating in dam closure—initially on August 3 via rapid earth and rock placement, followed by gates sealing on December 2 under Public Law 85-915, which acquired land from the Standing Rock Sioux Tribe—initiating reservoir impoundment and marking 31% project completion. From 1959 to 1961, intensive efforts focused on concrete placement for the powerhouse and spillway, turbine installations, and embankment buildup, with the outlet works' approach channel, six tunnels, stilling basin, and exit channel integrated on the west bank. The dam reached full structural completion in 1962, as Lake Oahe began filling to operational levels after nearly four years of impoundment buildup; the powerhouse went online, with the first two generators dedicated by President John F. Kennedy on August 17, and all units operational by June 1963, ahead of the overall project schedule. The $340 million effort, managed by the U.S. Army Corps of Engineers, emphasized efficient material sourcing and river diversion to mitigate flood risks during embankment construction.

Engineering Challenges and Solutions

The foundation of the Oahe Dam primarily consists of , an overconsolidated clay shale prone to rapid slaking upon exposure to air, substantial strength loss during and cycles, and swelling under load changes, posing significant risks to stability and integrity. These properties necessitated extensive pre-construction investigations, including test excavations and borings, to map shear zones and assess rebound potential, where removal of up to 12 tons per square foot induced measurable vertical displacements in the shale. To address foundation deterioration, exposed surfaces in abutments and areas were treated with bituminous sealants to limit moisture ingress, followed by () layers and slabs for long-term protection against slaking and . For effects, particularly in the outlet works stilling excavation, adjustments incorporated a restrained of elasticity in calculations, derived from field measurements and analogous projects like , to predict and accommodate post-excavation heave without compromising structural safety. Embankment design confronted shale-induced instability risks, including potential slides in abutments and , mitigated through zoned rolled-earth with impervious core materials sourced from local clays, internal filters, and semi-empirical analyses calibrated via Oahe-specific test fills that simulated full-scale loading. Cut slopes in the were stabilized by overexcavation of weak zones, benching, and flattening to angles informed by tests, reducing failure probabilities during the 1953–1962 phases amid variable weather and river flows. Hydraulic structures, including the powerhouse and outlet works, required adaptations for shale's low permeability and deformability, such as deepened foundations with keyed interfaces and provisions for , ensuring seepage control without reliance on extensive grouting due to the formation's natural low transmissivity. These measures enabled completion of the 2.5-mile-long, 242-foot-high dam—then the world's largest rolled-earth structure—ahead of schedule and under its $340 million budget by August 1962, with full reservoir filling by 1966.

Technical Specifications

Dam Structure and Materials

The Oahe Dam is an structure primarily composed of rolled-earth fill with berms, designed to impound the while providing stability against seepage and erosion. The is founded on abutments overlain by alluvial deposits, which form the geological base for the structure. Total fill volume amounts to 92,000,000 cubic yards, sourced largely from on-site excavation including material and from higher ground areas. The main measures 9,300 feet in length (excluding the section) and reaches a maximum height of 245 feet above the riverbed, with a damming height of 200 feet from low to the maximum operating . Crest elevation stands at 1,660 feet above mean . The rolled-earth fill technique involved compacting layers of earth material using hauling and spreading equipment to achieve and impermeability, incorporating excavated material from and outlet works sites to minimize external sourcing. berms provide additional reinforcement on the slopes, enhancing resistance to hydraulic forces. Associated concrete elements include the outlet works, comprising six tunnels embedded in the right abutment for water release, and a gated section with eight radial gates to manage overflow during high flows. These rigid components integrate with the flexible to handle variable loading conditions, with the designed to prevent overtopping of the earthfill sections. The powerhouse, adjacent to the outlet works, features construction housing 10 generating units, but serves primarily as an appurtenant structure rather than part of the main barrier.

Lake Oahe Reservoir Characteristics

Lake Oahe is a large reservoir on the Missouri River, extending 231 miles upstream from Oahe Dam near Pierre, South Dakota, to the vicinity of Bismarck, North Dakota. At full pool elevation of 1,607.5 feet mean sea level, it covers a surface area of 310,000 acres with over 2,000 miles of shoreline. The reservoir reaches a maximum depth of 205 feet and has a mean depth of approximately 60 feet. The total storage capacity totals 23,137,000 acre-feet, making Lake Oahe the fourth-largest reservoir in the United States by volume and the 45th largest in the world. This capacity supports multiple uses including , , , and , with the reservoir's elongated shape facilitating for barge traffic over its length. The water body remains relatively narrow in most sections, with widths varying from less than a mile to several miles at wider points, influenced by the River's meandering valley topography.

Hydropower Generation Capacity

The Oahe Dam powerhouse houses seven vertical turbines, each paired with a rated at 112,290 kilowatts (kW), yielding a total of 786 megawatts (MW). These turbines operate at 100 (rpm) and were originally installed between 1959 and 1962, with significant upgrades to the generators completed in the 1980s to enhance output efficiency and reliability. Power generation at Oahe relies on controlled releases from , the reservoir formed by the dam, which provides headwater for hydroelectric production while prioritizing and navigation objectives under the Main Stem Reservoir System. The facility contributes approximately 31% of the capacity managed by the U.S. Army Corps of Engineers' Northwestern Division, supporting regional electricity needs through integration with the Western Area Power Administration's transmission grid.
SpecificationDetails
Number of Turbines7 Francis-type, vertical
Turbine Speed100 rpm
Capacity per Unit112.3 MW
Total Installed Capacity786 MW

Operations and Management

Flood Control Functions

The Oahe Dam serves as a critical component of the Missouri River Mainstem Reservoir System, authorized under the Flood Control Act of 1944 as part of the Pick-Sloan Missouri Basin Program, with flood control as its primary function. It regulates inflows from upstream reservoirs like Garrison Dam and tributaries, storing excess runoff to attenuate peak flows and mitigate downstream flooding along the Missouri River. The dam coordinates releases with other mainstem projects—Fort Peck, Garrison, Fort Randall, Big Bend, and Gavins Point—to optimize system-wide flood risk reduction, preventing damages estimated at $8.6 billion (indexed to 2015 dollars) during events like the 1997 flood. Lake Oahe provides 4.3 million acre-feet (MAF) of dedicated storage, divided into the Annual Flood Control and Multiple Use Zone (3.2 MAF, elevations 1,607.5 to 1,617.0 feet ) and the Exclusive Flood Control Zone (1.1 MAF, 1,617.0 to 1,620.0 feet). Prior to the annual runoff season, the evacuates storage above 1,607.5 feet to restore this capacity, using real-time forecasts from the and data from the U.S. Geological Survey. During events, inflows exceeding powerplant capacity (up to 54,000 cubic feet per second) are stored, with releases adjusted to maintain downstream stages below levels while minimizing and supporting other uses like . In extreme conditions, the surcharge zone (above 1,620.0 feet up to 1,644.4 feet) offers an additional 10.6 MAF for safety, enabling releases via outlet works (up to 170,000 cfs combined with powerplant) or spillway gates (total capacity 335,000 cfs). For instance, during the 2011 —with system-wide runoff of 61.0 MAF— reached 1,619.7 feet on June 26, utilizing 98% of available storage and recording a peak release of 160,300 cfs on June 20 to coordinate with upstream and downstream operations. Similarly, in 1975, it peaked at 1,617.9 feet, employing the Exclusive Zone to manage releases from without exceeding downstream stages. These operations demonstrate the dam's role in causal attenuation through regulated and phased releases, rather than passive . Local between Oahe and Dams addresses runoff from intervening tributaries like the and Grand Rivers, with monitoring of Bad River flows to prevent inundation of the narrow alluvial below the dam. The system's integrated , guided by annual operating plans and rule curves, prioritizes empirical inflow-outflow balancing—calculated as inflow equaling outflow plus storage change—to sustain flood protection amid variable , without reliance on unverified climate projections.

Hydropower Production and Energy Contributions

The Oahe Dam powerhouse, situated at the base of the dam structure, houses seven Francis-type turbines operating at 100 revolutions per minute. Each turbine drives a generator upgraded in the 1980s to produce 112,290 kilowatts, yielding a total installed capacity of 786,030 kilowatts. Hydropower generation commenced with the first units becoming operational in August 1959, and the facility reached full capacity by 1962 upon completion of the dam. Under typical operating conditions, the Oahe powerhouse generates an average of 2.7 billion kilowatt-hours of electricity annually, contributing significantly to supply in the Basin. This output supports peaking and load demands, leveraging the reservoir's for flexible dispatch in coordination with other mainstem dams like and Fort Randall. The power is marketed by the to utilities across the , forming part of the basin's total mainstem capacity exceeding 2,400 megawatts. Oahe's contributions extend to grid reliability, providing non-carbon-emitting generation that offsets fossil fuel use and aids in meeting regional demand fluctuations, with historical data indicating consistent performance despite variable runoff influenced by upstream precipitation and releases. In , where constitutes a substantial portion of in-state , Oahe ranks among the largest facilities, bolstering through its integration into the broader Pick-Sloan Missouri River Basin Project framework. The Oahe Dam supports on the through coordinated flow regulation within the mainstem reservoir system, which maintains a self-sustaining 9-foot-deep by 300-foot-wide channel for commercial barge traffic from , to the river's mouth at approximately 735 miles. Releases from , typically up to 54,000 cubic feet per second under normal operations, augment low flows during the navigation season ( to ) to ensure adequate depth and velocity, preventing channel shoaling and supporting annual transport of commodities such as agricultural products and coal. System-wide adjustments, informed by runoff forecasts and downstream needs, prioritize after , with historical data showing variable annual releases from 0 to 300,000 cubic feet per second to balance seasonal demands. Although the Oahe Unit was authorized under the Pick-Sloan Missouri River Basin Program to divert water from for irrigating up to 495,000 acres via pumping plants and canals requiring 692,000 acre-feet annually at full development, construction halted in 1977 due to escalating costs and opposition, with subsequent deauthorization of key components by 2006. No large-scale was completed, limiting direct agricultural benefits from the dam to incidental uses via 179 intakes, which draw from the multi-purpose pool to support roughly 130,000 acres regionally, including smaller federal initiatives like the Fort Clark and Dickinson Units totaling 86,000 acres. These releases, integrated into broader system operations, provide supplemental water for local farming without dedicated storage zones. Water allocation at Oahe Dam is governed by the U.S. Army Corps of Engineers' multi-purpose framework, prioritizing flood control and navigation while allocating storage across elevation-based zones to sustain hydropower, water supply, recreation, and other uses amid variable basin inflows. The reservoir's operational pool, spanning 1607.5 to 1620 feet, includes 1,107,000 acre-feet for exclusive flood control and 3,208,000 acre-feet for annual flood control plus multiple uses such as irrigation and navigation; the carryover multiple-use zone below adds 13,353,000 acre-feet for drought protection and municipal-industrial supply serving approximately 121,515 people via 216 intakes, including the Mni Wiconi Project for 51,000 residents.
Storage ZoneElevation Range (ft)Volume (acre-feet)Primary Purposes
Exclusive Flood Control1617.0–1620.01,107,000Flood storage
Annual Flood Control and Multiple Use1607.5–1617.03,208,000Flood control, irrigation, navigation, other multi-use
Carryover Multiple Use1540.0–1607.513,353,000Water supply, drought mitigation, multi-purpose
Permanent1415.0–1540.05,315,000Minimum operational pool
Releases are constrained by powerhouse capacity (54,000 cubic feet per second) or (up to 304,000 cubic feet per second at full ), with adjustments based on real-time to avoid shortages while adhering to interstate compacts and basin-wide demands.

Economic and Infrastructural Impacts

Flood Mitigation and Agricultural Benefits

The Oahe Dam, completed in 1962 as part of the Missouri River Mainstem Reservoir System, plays a critical role in flood mitigation by impounding excess runoff in Lake Oahe to attenuate peak flows and reduce downstream flood risks along the Missouri and Mississippi Rivers. The reservoir allocates 4.3 million acre-feet exclusively for flood control storage, enabling controlled releases that prevent catastrophic inundation during high-water events. This capacity has been instrumental in managing historical floods, such as the 2011 event, where Oahe and upstream dams absorbed significant volumes—utilizing up to the full exclusive flood control zone—to moderate discharges and limit further escalation, despite system-wide challenges from saturated soils and prolonged saturation. Under normal conditions, the dam regulates outflows to a maximum of 54,000 cubic feet per second, avoiding the erratic surges characteristic of the pre-dam Missouri River. Flood mitigation directly benefits by safeguarding riparian farmlands from , , and submergence that historically devastated crops and . The Mainstem System, including Oahe, protects approximately 1.4 million acres of across the basin, minimizing annual damages that could otherwise exceed billions in lost productivity and recovery costs. Prior to dam construction, recurrent s—such as those in the 1940s and 1950s—routinely inundated thousands of acres in and downstream states, eroding topsoil and delaying planting; post-Oahe operations have stabilized seasonal flows, enabling expanded dryland and irrigated farming without the existential threat of total loss. This risk reduction has supported consistent yields in corn, soybeans, and production regions adjacent to the river, where flood-prone bottomlands now contribute reliably to regional output rather than serving as periodic wastelands. Direct irrigation benefits from Oahe Reservoir remain limited, as large-scale diversion projects under the Pick-Sloan Missouri River Basin Program—such as the Oahe Unit, which envisioned supplying 444,000 acre-feet annually to irrigate up to 190,000 acres—were authorized but halted in the due to prohibitive costs and shifting priorities. Consequently, agricultural enhancements derive principally from indirect effects: reliable low-flow augmentation for minor supplemental uses and, above all, the flood security that permits investment in , , and on marginal lands previously too vulnerable for viable .

Regional Power Supply and Economic Growth

The Oahe Dam's powerhouse, equipped with seven turbines, has a total installed capacity of 786 megawatts (MW), making it one of the largest facilities in the Basin. Operations commenced in 1959, with full capacity achieved by 1962, enabling the generation of an average of 2.7 billion kilowatt-hours (kWh) of annually. This output equates to sufficient power for approximately 250,000 average households, providing a reliable source amid variable regional demands. Hydropower from Oahe is marketed by the Western Area Power Administration (WAPA) as part of the Pick-Sloan Missouri River Basin Program, allocated primarily to preference customers including rural electric cooperatives, municipalities, and federal agencies across the upper Missouri Basin states of North Dakota, South Dakota, Montana, and Nebraska. This federal hydropower integrates into the regional grid, offering low-cost peaking and baseload capacity that complements intermittent sources like wind, which now dominates South Dakota's generation mix. The dam's ability to ramp up quickly during high-demand periods enhances grid stability, reducing reliance on more expensive fossil fuel alternatives and mitigating price volatility for consumers. The availability of affordable, dispatchable has underpinned economic expansion in and adjacent states by lowering electricity costs, which averaged below the national median in recent years, thereby supporting energy-intensive sectors such as agriculture processing, ethanol production, and light manufacturing. Since the dam's completion, economic output in the Pierre-Fort Pierre micropolitan area, proximate to the facility, has grown in tandem with broader basin development, with contributing to the region's attractiveness for through sustained low-energy expenses and reliability. Across the mainstem system, yields the predominant economic return, valued at hundreds of millions annually through avoided generation costs and enhanced regional competitiveness, with Oahe's substantial share amplifying these effects locally.

Infrastructure Integration with Broader Missouri Basin Development

The Oahe Dam forms a critical component of the Pick-Sloan Missouri Basin Program, a comprehensive federal initiative authorized under the Flood Control Act of 1944 to manage across the Basin through coordinated infrastructure development. This program merged plans from the U.S. Army Corps of Engineers and the Bureau of Reclamation, establishing a system of reservoirs and dams to address , , , generation, and other multipurpose objectives spanning multiple states. Oahe Dam, constructed between 1948 and 1962, integrates as one of six mainstem reservoirs—alongside Fort Peck, , Fort Randall, , and Gavins Point—forming a chain that regulates flows over approximately 20% of the continental ' drainage area above . Operational integration emphasizes system-wide coordination managed primarily by the ' Omaha and Northwestern Divisions, where Oahe Reservoir serves as an intermediary storage facility downstream of and upstream of . Releases from upstream projects, such as , are modulated at Oahe to optimize downstream by maintaining a 9-foot-deep channel to Sioux City, mitigate floods by storing peak runoff (with Oahe contributing up to 1.5 million acre-feet of flood storage), and support withdrawals totaling around 1.2 million acre-feet annually across the basin. Hydropower output from Oahe's 10 generators, averaging 3.5 billion kilowatt-hours yearly, feeds into the Pick-Sloan power marketing framework administered by the , interconnecting with over 90 tributary projects for regional energy distribution. This infrastructural linkage extends to broader resilience, including —such as Oahe's role in diluting saline inflows from tributaries—and adaptive responses to droughts or high flows, as demonstrated in coordinated drawdowns during the 2011 Missouri River floods where Oahe releases were synchronized with upstream reductions to prevent downstream inundation. By 2025 projections, the system's integrated operations continue to balance below-average runoff forecasts with sustained releases, underscoring Oahe's contribution to long-term stability amid variable conditions.

Social and Land Use Effects

Population Relocations and Compensation Processes

The construction of Oahe Dam, authorized under the Flood Control Act of 1944 as part of the Pick-Sloan Basin Program, required the acquisition of extensive lands along the , leading to the displacement of both Native American tribal members and non-Indian settlers. The resulting reservoir flooded approximately 160,414 acres of tribal lands across affected reservations, primarily the Standing Rock Sioux and Cheyenne River Sioux Tribes, submerging homes, farmland, grazing areas, and cultural sites. Non-tribal displacements involved rural communities and individual farms on fertile bottomlands, including the complete inundation of the town of Forest City, a former agricultural and fur-trading settlement in . Tribal relocations were particularly extensive, with the U.S. Army Corps of Engineers evicting 190 families from the in January 1960 to clear the flood zone. These families, many reliant on and , were relocated to upland areas deemed less suitable for farming, often into temporary that proved inadequate amid harsh winters and logistical delays. The Cheyenne River Sioux Tribe faced similar upheaval, losing over 104,000 acres of reservation land critical for economic and cultural continuity, which fragmented communities and diminished access to traditional resources like hunting grounds and fisheries. Compensation processes for tribal lands proceeded through federal negotiations and , with initial payments calculated via government appraisals focused on surface land value and basic improvements, totaling around $12.2 million for Standing Rock Sioux losses despite tribal claims exceeding $26 million to account for unvalued elements like wildlife habitats and relocation hardships. Cheyenne River Sioux initial settlements were similarly contested, amounting to roughly $5.4 million but later deemed insufficient for indirect damages such as lost productivity and cultural disruptions, prompting extended litigation. Non-Indian property owners received compensation under standard condemnation procedures based on appraised fair market values, though records indicate frequent disputes over adequacy, as displaced farmers transitioned to marginal uplands without equivalent or soil quality. Ongoing claims highlighted systemic undervaluation in early processes, leading to congressional interventions like the Cheyenne River Sioux Tribe Equitable Compensation Act of 2000, which authorized additional payments—initially negotiated around $23.5 million—to rectify uncompensated losses from the dam's multipurpose operations, including benefits not shared proportionally with affected tribes. These later adjustments acknowledged that original settlements prioritized national and goals over localized socioeconomic impacts, with tribes arguing that federal appraisals ignored long-term ecological and subsistence dependencies. Despite supplements, displaced populations on both reservations and surrounding areas have reported persistent economic challenges, including higher rates linked to eroded agricultural bases.

Effects on Local Communities and Reservations

The construction of Oahe Dam resulted in the inundation of approximately 160,414 acres of tribal reservation lands, the largest such loss from any single dam project in the United States, primarily affecting the Cheyenne River Sioux and Standing Rock Sioux Tribes in and . This flooding submerged fertile bottomlands along the that had supported traditional , including crops like corn, , and hay, forcing reliance on less productive upland areas for farming and ranching. Tribal members reported diminished agricultural yields post-relocation, with upland soils proving inadequate for sustaining pre-dam productivity levels, contributing to long-term economic challenges such as reduced self-sufficiency in food production. On the Cheyenne River Sioux Reservation, the dam's reservoir operations have exacerbated and sedimentation issues, hindering farming operations and requiring ongoing mitigation efforts by tribal farmers as of 2019. Similarly, the lost nearly 56,000 acres to the reservoir, disrupting social structures tied to riverine livelihoods, including and gathering, and scattering families across less cohesive upland settlements. These changes altered community dynamics, with historical surveys from 1951 noting strains on due to the shift from river-dependent economies to fragmented upland living. Non-tribal local communities in , such as those near , experienced mixed effects, including the submergence of small settlements like Forest City and the loss of private farmlands, which reduced local agricultural output in the immediate post-construction decades. However, the reservoir's creation later facilitated recreational and industries, providing some economic diversification for nearby towns, though initial disruptions included temporary shifts and infrastructure adaptations to the altered landscape. Overall, reservation communities bore disproportionate burdens, with persistent critiques from tribal leaders highlighting inadequate federal foresight in addressing these cascading social and economic repercussions.

Environmental Considerations

Riverine Ecosystem Modifications

The construction of Oahe Dam between 1958 and 1962 inundated approximately 370 miles of the Missouri River's free-flowing channel, converting diverse lotic habitats—characterized by riffles, pools, and variable flows—into lentic reservoir conditions within Lake Oahe, which spans over 200 miles. This transformation submerged riparian zones and dynamic benthic environments essential for native aquatic species, replacing them with stratified, low-oxygen profundal zones that favor lentic-adapted organisms over riverine specialists. Downstream, the dam's regulated releases from deep reservoir layers produce hypolimnetic outflows with consistently lower temperatures, often below 10–15°C in summer tailwaters, which suppress reproduction and survival of warm-water natives while promoting cold-water invaders like rainbow trout. Hydrologic alterations from Oahe Dam's operations have stabilized flows, reducing annual peak discharges by storing floodwaters and minimizing natural variability, which disconnects the river from its floodplain—eliminating up to 90% of historical connectivity in modified reaches—and curtails scour events that maintain spawning gravels and forage areas. Sediment entrapment behind Oahe and upstream reservoirs like Garrison has slashed downstream suspended-sediment loads by more than 60% (from pre-dam averages of ~400 million metric tons annually), leading to clear-water releases that erode beds (e.g., incision up to 16 feet near Sioux City since 1955) and destabilize banks, degrading shallow sandbar and island habitats vital for fish nursery and insect production. These changes foster channel narrowing and simplification, diminishing structural complexity that supports diverse macroinvertebrate communities and associated food webs. Such modifications have fragmented longitudinal connectivity, blocking migratory pathways for potamodromous species; for instance, endangered and cannot access upstream spawning tributaries above Oahe, confining reproduction to limited, altered downstream sites and contributing to documented declines in 25% of the river's 73 "big river" fish species. Native riverine assemblages, adapted to turbid, warm, and turbulent conditions, have shifted toward reservoir-tolerant species like gizzard shad, with losses in swift-current specialists such as , though no native extirpations have occurred to date. Ongoing management lacks effective fish passage structures, perpetuating these barriers and hindering recovery of imperiled taxa reliant on pre-dam river dynamics.

Sedimentation, Water Quality, and Long-Term Reservoir Dynamics

Sediment deposition in primarily originates from tributaries such as the , leading to accumulation in the upper reaches and a gradual reduction in storage capacity. From 1958 to 2010, the reservoir's storage capacity declined from 22,693,038 acre-feet to 21,865,292 acre-feet, representing a 3.6% loss totaling 827,746 acre-feet, at an average annual depletion rate of 14,800 acre-feet per year. Earlier assessments indicate that between and 1988, 2.6% of storage was lost, or approximately 19.8 acre-feet annually, while measurements from 1964 to recorded an average annual deposition of 28,375 acre-feet. The mainstem reservoirs, including Oahe, collectively trap around 33 million metric tons of each year, altering depositional patterns with coarser sediments forming deltas at inflows and finer particles basin-wide. Water quality in is monitored by the U.S. Army Corps of Engineers since the late at sites near the dam and headwaters, with discharges assessed continuously for parameters like temperature and dissolved oxygen. Near the dam, conditions from 2010 to 2014 showed mean water temperatures of 12.5°C and dissolved oxygen levels of 9.5 mg/L, though temperatures exceeded the 18.3°C limit for coldwater fisheries in 25% of cases; upstream areas exhibit moderately eutrophic to eutrophic trophic states due to enrichment. Key concerns include elevated and mercury concentrations, prompting consumption advisories, alongside broader loading from agricultural runoff that supports the reservoir's for coldwater permanent life propagation under standards. Annual evaporation averages 37.7 inches, equivalent to 178,000 acre-feet, further influencing concentration dynamics. Long-term reservoir dynamics reflect ongoing sedimentation and water quality interactions, projecting a sediment life expectancy of approximately 1,553 years at current rates, though progressive capacity loss threatens , , and water supply reliability. Pool elevations fluctuate between a minimum of 1,540 feet and a normal maximum of 1,617 feet above mean , with record lows at 1,570.2 feet in during and highs at 1,619.7 feet in 2011 from flooding; operations balance exclusive storage (1,107,000 acre-feet) and multi-use zones through coordination with upstream reservoirs like . System-wide modeling evaluates cumulative effects, including reduced downstream sediment delivery and potential shifts, with land treatment measures proposed to mitigate and sustain functionality.
ParameterValue (1958–2010)
Initial Storage Capacity22,693,038 acre-feet
Current Storage Capacity21,865,292 acre-feet
Total Loss827,746 acre-feet (3.6%)
Annual Depletion Rate14,800 acre-feet/year

Controversies and Disputes

Tribal Land Acquisition and Cultural Losses

The Oahe Dam's reservoir, , flooded approximately 160,414 acres of tribal lands as part of the Pick-Sloan Missouri River Basin Program authorized by the Flood Control Act of 1944, with the Standing Rock Sioux and Cheyenne River Sioux reservations bearing the majority of losses. The dam site itself was not on reservation land, but the expansive reservoir inundated bottomlands critical for tribal , timber, and . Construction began in September 1948, and reservoir filling prompted evictions starting in January 1960. The Standing Rock Sioux Tribe lost 55,994 acres, displacing 190 families to higher, less fertile uplands and severing established communities. The Cheyenne River Sioux Tribe forfeited 104,420 acres of prime riverine territory, reducing their reservation's viable farmland and rangeland. These acquisitions proceeded via federal , with initial compensations enacted by Congress: $12.2 million to Standing Rock in 1958 (including $1.95 million for land, $3.3 million for improvements, and $7 million for ) and $10.6 million to Cheyenne River in 1954. Additional payments followed tribal claims of undervaluation—$90.6 million to Standing Rock in 1992 and $290.7 million to Cheyenne River in 2000—though disputes persisted over equitable accounting for lost productivity and future economic potential. Culturally, the inundation submerged burial grounds, sacred sites, and ancestral homelands, disrupting religious practices and familial ties to the landscape. Over 350 archaeological sites in the reservoir area, encompassing villages, burial areas, and trading posts dating to prehistoric and historic periods, were lost or irrevocably altered underwater. Relocations fragmented social structures, with the shift from river-dependent livelihoods to marginal lands contributing to long-term economic and psychological strain on affected communities. Tribes have argued that federal valuations inadequately captured these intangible heritage losses, prioritizing national and power generation over cultural continuity. The construction of Oahe Dam under the Flood Control Act of 1944 resulted in the taking of approximately 104,492 acres from the Cheyenne River Sioux Tribe and 55,994 acres from the Standing Rock Sioux Tribe, primarily fertile bottomlands essential to tribal economies based on , ranching, and timber. authorized these acquisitions through specific legislation, such as the 1954 Cheyenne River Act providing initial compensation of about $10 million and the 1958 Public Law 85-915 for Standing Rock, which settled claims for $12.2 million including $1.95 million for land value, $3.3 million for improvements and damages, and $6.96 million for efforts. These payments were intended to reflect at the time plus support, but tribes contested their adequacy, arguing undervaluation of lost productive lands, cultural sites, and long-term economic disruption, with Standing Rock initially seeking $26.4 million. Legal opposition included injunction attempts by Standing Rock to halt condemnation proceedings, which briefly succeeded in federal district court in 1958 before ratified the settlement, effectively overriding tribal resistance by authorizing U.S. Army Corps of Engineers acquisitions. For , individual tribal members filed suits in 2012 challenging the original taking's compensation as insufficient for flooded allotments, highlighting that the dam displaced 30% of the population without proportional redress for submerged properties. Subsequent congressional reviews, informed by analyses, led to equitable adjustments: Standing Rock received an additional $90.6 million in 1992 via trust fund legislation addressing underestimated losses, while secured $290.7 million under the 2000 Cheyenne River Sioux Tribe Equitable Compensation Act for the same project. Beyond compensation, challenges extended to treaty-based rights over flooded areas. The 1993 Supreme Court decision in South Dakota v. Bourland held that acquisition acts for Oahe Reservoir extinguished Cheyenne River's regulatory authority over hunting and fishing by non-Indians on former reservation lands now submerged, interpreting congressional intent to prioritize federal water project management despite tribal arguments for retained sovereignty under the 1868 Fort Laramie Treaty. Settlements also barred tribes from shoreline use rights, as Congress explicitly denied Standing Rock's requests for reservoir access or power allocations in 1958 negotiations, reinforcing federal dominance and prompting ongoing disputes over water rights and resource jurisdiction. GAO reports noted that while additional payments addressed some economic claims, they did not restore jurisdictional or cultural rights lost to reservoir operations.

Critiques of Federal Management Practices

Critics of federal management practices at Oahe Dam, operated by the U.S. Army Corps of Engineers (USACE) under the Pick-Sloan Missouri River Basin Program, have primarily targeted the prioritization of commercial over upstream reservoir uses, particularly during . The Master Water Control Manual mandates minimum flows to sustain barge traffic on the lower river, often necessitating drawdowns of and other mainstem reservoirs to depths as low as 1.5 million acre-feet by late summer in dry years. This approach, embedded in the 1944 Act's implementation, drew sharp rebukes during the 2003–2004 , when 's level fell to 4.6 million acre-feet—its lowest since impoundment—stranding recreational boats, curtailing for over 200,000 acres, and slashing output by 40% in the upper , while benefiting a transporting roughly 10 million tons of commodities annually. Upper governors and stakeholders, including those in , argued this reflected an outdated bias toward lower economic interests, exacerbating regional inequities without sufficient adaptation to post-1944 shifts like increased recreational demands valued at $1 billion yearly. Flood risk management has also faced scrutiny for rigidity in operational protocols, as evidenced by the 2011 Missouri River , where unprecedented runoff exceeding 100 million acre-feet overwhelmed the system's 18.8 million acre-feet of designated across mainstem reservoirs, including Oahe. USACE withheld releases initially to maximize , averting greater downstream peaks but leading to prolonged high-water inundation upstream and breaches affecting 2,000 miles of riverbank; post-event reviews by USACE itself concluded that augmenting by 1–2 million acre-feet at Oahe and adjacent reservoirs could mitigate 20–30% of damages in a recurrence, highlighting flaws in the Pick-Sloan framework's capacity for extreme events driven by intensified patterns. Critics, including basin congressional delegates, contended that inflexible adherence to the Master Manual delayed adaptive strategies like preemptive drawdowns, contributing to $15 billion in total basin-wide damages despite the system's design intent. Sedimentation dynamics represent another focal point of critique, with accumulating over 100 million tons of sediment since 1958—primarily fine silts from upstream channel instability post-Garrison Dam—reducing usable storage by an estimated 10% and promoting delta formation that impairs and ecology. Tribal representatives from the Cheyenne River Sioux, whose reservation borders the reservoir, have asserted that USACE projections underestimated these rates by factors of 2–3 during planning, leading to unaddressed shoreline erosion spanning 500 miles and persistent flooding of low-lying lands not foreseen in 1940s models. Management responses, such as limited or stabilization confined to 200 miles since 1980, have been deemed insufficient by audits, which note that broader controls could halve inflow rates but remain underimplemented due to interagency coordination gaps. These practices underscore broader institutional critiques of the Pick-Sloan Plan's governance, where USACE's singular authority limits multistate input and adaptation to variables like climate variability, with independent panels recommending biennial manual revisions incorporating probabilistic modeling over deterministic rules—a step partially adopted in 2018 updates but still contested for conservatism.

Notable Events and Adaptations

The 2011 Missouri River Flood Response

The 2011 flood resulted from exceptional winter snowfall in the and heavy spring rainfall across the basin, producing record runoff that challenged the mainstem system's capacity. The U.S. Army Corps of Engineers (USACE) initiated increased water releases from Oahe Dam in early May to preserve storage space, with outflows rising from routine levels to 80,000 cubic feet per second (cfs) by May 27, surpassing the prior record release of 59,000 cfs. This action aimed to balance incoming flows while adhering to the Missouri River Mainstem System Master Manual, which prioritizes across the six dams. As inflows intensified, peaking at 210,000 cfs on June 21, USACE escalated Oahe Dam releases to a record 160,300 cfs on that date, maintaining approximately 150,000–160,000 cfs through late July to prevent reservoir overtopping. reached its historical high elevation of 1,619.7 feet on June 26, operating within 0.3 feet of the surcharge limit and utilizing 96% of its exclusive storage of 4.3 million acre-feet. Operations relied on the dam's outlet tunnels (total capacity 111,000 cfs) and powerhouse turbines, deliberately avoiding the unlined emergency spillway to mitigate risks of erosion-induced failure, despite near-maximum system constraints. High releases persisted into , averaging 117,100 cfs, before gradual reductions as inflows declined to 46,800 cfs by , allowing evacuation of the pool by early August. The strategy successfully averted structural failure at Oahe Dam and upstream reservoirs, with end-of-year elevation stabilizing at 1,606.8 feet, though it contributed to prolonged downstream flooding peaks exceeding 100,000 cfs at . Post-event assessments affirmed the dam's performance under design parameters but highlighted infrastructure limitations, such as vulnerabilities, that restricted surcharge storage use and operational flexibility.

Post-Flood Repairs and System Upgrades (2011–Present)

In the aftermath of the 2011 Missouri River flood, which necessitated sustained high releases from Oahe Dam peaking at 160,300 cubic feet per second in June, the U.S. Army of Engineers' Omaha District conducted targeted repairs to the outlet channel, which sustained and structural stress from the unprecedented flows. These repairs focused on restoring the channel's integrity to prevent further degradation and ensure safe water passage during future high-flow events. To bolster embankment stability against seepage-induced risks, such as internal erosion or —concerns heightened by the flood's saturation effects—the installed additional drainage systems within the earthen and outlet channel. Complementing these physical enhancements, a new automated monitoring system was implemented to provide continuous data on seepage rates, , and overall performance, enabling proactive detection of potential issues. These upgrades were completed in the years immediately following 2011, with immediate post-flood repairs prioritized to restore operational readiness. Unlike upstream facilities such as , which underwent extensive modifications due to 2011 flows over its auxiliary structure, Oahe Dam avoided emergency use owing to risks of backward in its unlined earthen channel; thus, upgrades emphasized outlet works resilience rather than redesign. Subsequent system refinements include the 2018 update to the Oahe Dam Water Control Manual, incorporating refined operational protocols informed by 2011 event analyses to optimize flood risk management across the mainstem reservoirs. Routine dam safety inspections and instrumentation maintenance continue under U.S. Army Corps of Engineers protocols, with no major additional structural overhauls reported through 2025.

Public Access and Utilization

Visitor Tours and Educational Programs

The Oahe Dam Visitor Center, managed by the U.S. Corps of Engineers' Omaha , functions as the main facility for public interpretation and access to the dam site. It houses exhibits detailing the construction history of the dam and power plant, operational aspects of hydroelectric power generation, and the ecological characteristics of and the basin. Public tours of the Oahe Powerhouse emphasize the and production processes, including guided walks through the facility's halls and control areas. These free tours require registration at the , after which participants drive to the powerhouse entrance; they are generally available during summer months from to , operating Tuesday through Saturday with sessions starting at designated times such as 9 a.m., 10 a.m., and afternoons. Tours have occasionally been suspended for safety, maintenance, or operational reasons, as occurred in certain periods post-2020, with resumption announced via official channels; for instance, in 2022, walk-in tours restarted in late May and continued through early September. The itself maintains year-round access, with typically Monday to Saturday from 9 a.m. to noon and 1 p.m. to 4 p.m., offering panoramic views of the reservoir and river. Educational outreach primarily occurs through these exhibits and tours, which inform visitors on , benefits, and environmental management under the Pick-Sloan Basin Program, though no dedicated formal school curricula or off-site programs specific to Oahe are publicly detailed by the . Special events, such as anniversary celebrations, have included extended tours of structures to highlight dam infrastructure.

Recreational Opportunities on Lake Oahe

Lake Oahe supports diverse recreational activities across its 51 managed areas, including camping, picnicking, fishing, hunting, boating, water skiing, swimming, bird watching, hiking, and biking, with facilities ranging from primitive sites to modern amenities like flush toilets and boat ramps. Fishing draws anglers for , the most targeted species with abundance slightly above average at 3.0 fish per net in 2020 surveys of the lower lake, alongside , , , , and . The yields some of the nation's top fishing, with larger adding variety, though commercial harvests historically featured buffalo species. Boating access includes multiple ramps and docks, such as three lanes and two docks at Beaver Creek Area, with paved parking and fish cleaning stations at sites like Hazelton. Marinas with slips and rentals operate at areas like Spring Creek, supporting and general across the 200-mile . Camping options span 51 areas with seasonal facilities including vault and flush toilets, , showers, and electrical hookups at developed sites like Oahe Downstream's three campgrounds, which also feature hiking trails and , though some close November 15 to March to protect roosting. Hunting emphasizes waterfowl, with ducks and geese concentrated in bays and inlets during winter, supplemented by upland game birds and deer in adjacent lands; dedicated access programs like Lower Oahe Waterfowl enhance public opportunities. Bird watching targets eagles and migratory species, while and biking trails provide non-consumptive viewing amid the reservoir's shoreline.

References

  1. [1]
    Oahe Dam - USACE Omaha District
    The dam consists of an earthen embankment, an outlet structure with six tunnels for releasing stored water, a powerhouse, and eight spillway gates on a concrete ...
  2. [2]
    Hydropower - Oahe - USACE Omaha District
    Oahe Dam's layout is unique in that the power house is on the left bank, the outlet works on the right bank, and the spillway is one mile beyond the outlet ...
  3. [3]
    Oahe Project Statistics - USACE Omaha District - Army.mil
    Aug 6, 2012 · The Oahe project began operating in 1962, has a max power of 786,030 KW, is 45th largest reservoir globally, 4th in US, with 23,137,000 acre- ...
  4. [4]
    Building Oahe Dam - 1948-1959 - SDPB
    Mar 4, 2015 · Construction of the Oahe Dam on the Missouri River northwest of Pierre began in 1948 and took 10 years to complete. Final closure was accomplished on August 3, ...Missing: height length capacity<|separator|>
  5. [5]
    [PDF] The Oahe Dam and the Standing Rock Sioux
    The Oahe Dam caused the eviction of 190 Standing Rock Sioux families, flooded nearly 56,000 acres of their land, and forced them into temporary housing.
  6. [6]
    GPS coordinates of Oahe Dam, United States. Latitude
    The dam's powerplant provides electricity for much of the north-central United States. Latitude: 44° 27' 2.39" N Longitude: -100° 24' 4.79" W.
  7. [7]
    Missouri River Dams & Lakes - USACE Omaha District
    Oahe Dam is located near Pierre, S.D. at River Mile 1,072.3. The first of the power house's seven 89,500-kilovolt generators was put into operation in March ...
  8. [8]
    Archeology, Geology, History (Oahe Dam and Oahe Reservoir)
    Sep 8, 2008 · OAHE DAM is located in central South Dakota 1,123 miles above the mouth of the Missouri River and 6 miles northwest of Pierre, the capital of ...
  9. [9]
    Pick Sloan Missouri Basin Program - Bureau of Reclamation
    The Pick-Sloan Missouri Basin Program, formerly called the Missouri River Basin Project, was initially authorized by the Flood Control Act of December 22, 1944.
  10. [10]
    [PDF] An Overview of the Pick-Sloan Missouri Basin Program
    The Pick-Sloan program's authorized purposes include flood control, navigation, irrigation, power, water supply, recreation, fish and wildlife, and water.
  11. [11]
    Historical Vignette: The Pick-Sloan Plan - USACE Omaha District
    Jul 21, 2015 · Pick recommended that the Corps construct multiple-purpose dams in the Dakotas. These dams would store flood-producing water and use it to ...
  12. [12]
    1948 Oahe Dam Advances - NSU: Library
    Congress approved money to build Oahe dam, and construction began soon after. There was determined but unsuccessful opposition to the dam.Missing: 1948-1952 | Show results with:1948-1952<|separator|>
  13. [13]
    The Oahe Project - NSU: Library
    The dam was built 242 feet high. A request by ranchers and farmers owning land along the river that the federal government build a smaller dam and flood...Missing: preparation | Show results with:preparation
  14. [14]
    Oahe Dam project brings tens of thousands to Pierre area, prompts ...
    Sep 18, 2023 · Construction of the Oahe Dam officially started Sept 16, 1948, according to the Lead Daily Call. Thousands attended the groundbreaking and dedication ceremony.Missing: preparation acquisition
  15. [15]
    [PDF] Geology of the Pierre Area South Dakota
    1948 to 1950, and in June and August, 1952. The author was assisted in ... works approach channel excavation, Oahe Dam, 1950. Page 70. GEOLOGIC HISTORY.
  16. [16]
    [PDF] river basin surveys papers - Smithsonian Institution
    ... OAHE DAM AREA, SOUTH DAKOTA, 1950-51, by DONALD J. LEHMER. UNITED STATES ... excavation. 2. Circular houses at the Dodd site. 3. Circular houses at the ...
  17. [17]
    None
    Summary of each segment:
  18. [18]
    [PDF] Final Oahe Dam/Lake Oahe Master Plan - DTIC
    The Oahe project was authorized for flood control, navigation, hydropower ... significance where erosion is b. Cultural Resources likely to take place and ...<|control11|><|separator|>
  19. [19]
    Oahe Dam: Influence of Shale on Oahe Power Structures Design
    Feb 12, 2021 · Pierre shale disintegrates rapidly when exposed to air. Exposed foundation areas are protected by bituminous sealing, guniting, and concrete ...Missing: challenges | Show results with:challenges
  20. [20]
    [PDF] Mechanisms of Strength Loss during Wetting and Drying of Pierre ...
    Extensive problems were encountered during the construction of the Oahe Dam due to the rapid strength loss in the material (Knight 1963).Missing: challenges | Show results with:challenges
  21. [21]
    Oahe Dam: Geology, Embankment, and Cut Slopes | Vol 89, No 2
    Feb 12, 2021 · Study of the bedrock geology and slide experiences at both Fort Peck and Oahe dam projects shows that the solution of embankment and high ...
  22. [22]
    [PDF] Rebound in the Pierre Shale of South Dakota and Colorado Field ...
    Dec 16, 2010 · In addition to the vertical displacements observed along fault planes at the Oahe Dam still ing-basin excavations and along highways near Hayes, ...
  23. [23]
    Rebound in Redesign of Oahe Dam Hydraulic Structures
    Feb 12, 2021 · Excavation for the stilling basin of the outlet works removed a maximum overburden load of 12 tsf from Oahe Dam. Normal foundation rebound ...
  24. [24]
    [PDF] Knight, D.K., 1963. "Oahe Dam - Geo-Institute
    Although many soils and foundation features of the Oahe Dam will be ... In 1950, during the first earthwork contract at Oahe for the excavation of the ...
  25. [25]
    Embankment foundation monitoring using in-place automated ...
    Presented herein is a case history describing the design and installation of an in-place inclinometer system at Oahe Dam located in central South Dakota near ...
  26. [26]
    [PDF] Master Water Control Manual
    Nov 20, 2018 · Oahe Dam Location. Oahe Dam is located at RM 1072.3 in Stanley and ... Land acquisition was based on a guide-taking line at an ...
  27. [27]
    [PDF] Missouri River Strategic Plans - South Dakota Game, Fish, and Parks
    Lake Oahe and its fisheries are part of a reservoir system which supports 40% of the angler use in South Dakota. Strategic planning is required to focus use of ...
  28. [28]
    [PDF] Water Control Manual Oahe Dam – Lake Oahe
    Dec 31, 2018 · The System projects were constructed by the Corps for the purpose of flood control, navigation, recreation, water supply, water quality control, ...
  29. [29]
    Oahe hydroelectric plant - Global Energy Monitor - GEM.wiki
    Apr 24, 2025 · Status, Commissioning year, Nameplate capacity, Turbines, Technology type, Owner, Operator. Operating, 1962, 786 MW, 7 x 112.3 MW ...<|separator|>
  30. [30]
    Power plant profile: Oahe, US
    Oct 21, 2024 · Oahe is a 786.03MW hydro power project. It is located on Missouri ... Allis-Chalmers Power Systems was selected as the turbine supplier for the ...Missing: installed | Show results with:installed
  31. [31]
    Hydroelectricity | Missouri River Energy Services
    The rated capacity of the Red Rock Hydroelectric Project (RRHP) is 43.1 MW, but the project is capable of generating up to 55 MW at certain times of the year ...
  32. [32]
    South Dakota's total in-state electricity - EIA
    The state's only other utility-scale (1 megawatt or larger capacity) hydroelectric power plant, Spearfish Hydro, has 4 megawatts of generating capacity and has ...<|control11|><|separator|>
  33. [33]
    Missouri River Navigation - USACE Omaha District - Army.mil
    The Missouri River Bank Stabilization and Navigation Project provides a 9-foot deep, 300-foot wide navigation channel.
  34. [34]
    [PDF] Oahe Unit - Bureau of Reclamation
    The Oahe Unit is a planned irrigation project by the Bureau of Reclamation, utilizing water from the Oahe Dam, created by the Army Corp of Engineers.
  35. [35]
    [PDF] Post 2011 Flood Event Analysis of Missouri River Mainstem Flood ...
    The model does allow utilization of the full flood control storage capacity of Fort Peck, Garrison, and Oahe up to the top of the exclusive flood control zone ...
  36. [36]
    [PDF] summary - missouri river
    Agricultural lands, residential areas, business districts, and navigation benefit from flood control provided by the System. Approximately 1.4 million acres of ...Missing: mitigation | Show results with:mitigation
  37. [37]
    Oahe Dam: Celebrating 50 years of Energy Production and Recreation
    Aug 3, 2012 · The dam was designed to control the wild fluctuations of the Missouri River and to protect property developments and agricultural lands from ...
  38. [38]
    [PDF] Missouri River Reservoirs in a Century of Climate Change
    the diversion of 444,000 acre feet of water from Oahe Dam, and irrigated. 190,000 acres of land. Allowing for return flows and water from downstream tributaries ...
  39. [39]
    None
    Summary of each segment:
  40. [40]
    Pierre's hidden powerhouse: A closer look at the Oahe Dam
    Jul 13, 2023 · Nestled in the plains just north of Pierre lies a project so powerful, so important, and yet so hidden. It provides hydropower to a great part of the nation.Missing: significance | Show results with:significance
  41. [41]
    Western Area Power Administration – Safely provide reliable, cost ...
    Each year, WAPA transmits around 25,000 gigawatt hours of electricity across its more than 17,000 circuit mile transmission system. This power comes from 57 ...Power Projects · Jobs · Regions · Power Transmission
  42. [42]
    WAPA Hydropower - Missouri River Energy Services
    WAPA markets the Missouri River hydropower and is the base-load power supplier to 59 of the 61 MRES member communities.Missing: Oahe | Show results with:Oahe
  43. [43]
    Hydropower - Institute for Water Resources
    Economic Impact​​ The greatest benefit from the USACE hydropower program is the abundant low-cost energy the projects contribute to electric power grids. Because ...
  44. [44]
    [PDF] Operation of the Missouri River Reservoir System and Its Effect on ...
    Between 1946 and 1963, five additional large earthen dams were constructed by the U.S. Army Corps of. Engineers (USACE) on the main stem in up- per basin states ...
  45. [45]
    [PDF] Pick-Sloan Missouri Basin Program - Bureau of Reclamation
    Originally called the Missouri River Basin Project, the project name was changed to the Pick-Sloan. Missouri Basin Program in 1970, “in honor of two great men ...
  46. [46]
    [PDF] Pick-Sloan Missouri River Basin Program
    • Integrated Fort Peck Dam. • Five Main Stem Dams. • Garrison, Oahe, Fort Randell, Gavins Point,. Big Bend. • Approximately 90 dams authorized for construction ...
  47. [47]
    [PDF] Oahe Water Control Manual - Water Resources
    Sep 25, 1978 · One important means of water resource development in this section of the Missouri Basin is the construction of dams controlling sizeable ...
  48. [48]
    [PDF] Missouri River Mainstem Reservoir System - System Description ...
    Apr 1, 2020 · reservoir surveys can be supplemented with reconnaissance ... prevent ice formation in the channel directly below Oahe Dam. In ...
  49. [49]
    [PDF] Pick-Sloan Missouri Basin Program
    The Yellowtail Dam on the. Bighorn River in south-central Montana produces power for both the Eastern and the Western. Divisions of the Pick-Sloan. Including ...
  50. [50]
    Below-average runoff and reservoir storage expected for ... - DVIDS
    Jan 8, 2025 · Navigation flow support for the Missouri River is forecast to be 4,000 cfs below full service for the first half of the 2025 season, which ...
  51. [51]
    Dams and tribal land loss in the United States - PMC - PubMed Central
    Aug 9, 2023 · Dams have displaced at least 40–80 million people worldwide and have negatively impacted over 472 million people downstream, including numerous ...
  52. [52]
    What Lies Beneath Lake Oahe | Lapham's Quarterly
    Jul 11, 2018 · “The Oahe Dam destroyed more Indian land than any other public works project in America,” writes Michael L. Lawson in Dammed Indians: The Pick- ...Missing: problems | Show results with:problems
  53. [53]
    [PDF] Federal Water Projects and Indian Lands: The Pick-Sloan Plan, A ...
    Aug 11, 2023 · It also represented an attempt to head off growing support for an alternative plan to develop a Missouri Valley Authority. (MVA)--an independent ...Missing: objectives | Show results with:objectives
  54. [54]
    [PDF] Compensation Claims Analyses Overstate Economic Losses
    In 1968 the Standing. Rock Sioux Tribe stated that $26,370,663 would compensate for their lands, which was $14,169,110 more than the $12,211,663 that the Con-.
  55. [55]
    [PDF] Cheyenne River Sioux Tribe's Additional Compensation ... - DTIC
    May 21, 1991 · The figure for indirect damages is obtained by subtracting this amount from the total of $5,384,014, which the law states was to be "in final ...
  56. [56]
    INDIAN ISSUES: Cheyenne River Sioux Tribe's Additional ... - GovInfo
    In 1948, the federal government began to construct the Oahe dam as a flood control project on the Missouri River. The reservoir created by the.
  57. [57]
    The Effects of Dams on Tribal Lands, with Heather Randell
    Feb 20, 2024 · Randell discusses the history of the development of dams on reservation lands, the social and economic effects of dams on Native nations.<|separator|>
  58. [58]
    Oahe Dam and the Cheyenne River Reservation
    Apr 30, 2020 · Thesis- The formation of the Oahe dam and lack of foresight to address effects of flooding from said dam upon the Cheyenne River Reservation ...Missing: local | Show results with:local
  59. [59]
    Cheyenne River Tribe Says Oahe Dam Has Caused Problems For ...
    Oct 17, 2019 · Some tribal officials say the series of dams built in the 1950s have created problems for farmers and on reservation land.Missing: difficulties | Show results with:difficulties
  60. [60]
    Report of Socio-economic Survey - 1951: Standing Rock Indian ...
    The study or analysis which follows is concerned primarily with the effects of the Oahe Dam and Reservoir on the economy and social organization of the ...
  61. [61]
    [PDF] A Brief History and Summary of the Effects of River Engineering and ...
    Reproduction of paddlefish may have been adversely affected by dams, which impede access to suitable spawning habitats. Fishes that inhabit swift-current ...
  62. [62]
    [PDF] Characteristics of Sediment Transport at Selected Sites along the ...
    Downstream from the dams, water releases retain substantial sediment-transport capacity but have lost the natural supply of sediment to reser- voir trapping.
  63. [63]
    2 Changes in Missouri River Sediment and Related Processes
    Impoundment of the Missouri River behind mainstem dams sharply reduced upstream sources of sediment needed to create and maintain sandbars for tern and plover ...
  64. [64]
    [PDF] Fisheries and Aquatic Resources Adaptive Management System
    The eastern shore is composed of less-erodible, glacial till. From 1964-1968, the average annual rate of sediment deposition in Lake Oahe was 28,375 acre-feet.
  65. [65]
    [PDF] The impacts of the Garrison and Oahe Dams on the - SWC.nd.gov
    During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of.
  66. [66]
    [PDF] The 2022 South Dakota Integrated Report Surface Water Quality ...
    The major water quality problems in South Dakota lakes continue to be excessive nutrients, and ... were also used in determining waterbody support on Lake Oahe ...
  67. [67]
    [PDF] Summary of Actual 2017 Regulation
    downstream flood control regulation, thus helping to alleviate large pool increases in Oahe and ... Oahe Dam to reduce river ice formation directly below the dam.
  68. [68]
    [PDF] Water Quality Modeling Report
    Jun 4, 2025 · A long range goal of reservoir water quality modeling is to evaluate water quality impacts in the. Mainstem reservoirs as a result of system ...
  69. [69]
    [PDF] 7.3.1 Sedimentation and Erosion 7.3.2 Ice Processes
    Obviously, if erosion increases in one location, deposition must increase in another location, in this case, the headwaters of Lake Oahe. Storage losses due to ...
  70. [70]
    GAO-06-517, Indian Issues: Analysis of the Crow Creek Sioux and ...
    ... compensation to the Missouri River Tribes impacted by the Pick-Sloan dam projects. Congress has used other approaches more often than it has followed the ...
  71. [71]
    Lost Waters, Broken Promises: The Oahe Dam Atrocity
    The flooding caused by the Oahe Dam submerged ancestral homelands, burial grounds, and sacred sites, displacing countless Native American families from their ...
  72. [72]
    Archeological Investigations in the Oahe Reservoir
    Sep 8, 2008 · More than 350 archeological sites have been found within the Oahe Reservoir area. A great many of these are of major scientific importance.
  73. [73]
    From Dams to DAPL, the Army Corps' Culture of Disdain for ... - NRDC
    Sep 13, 2023 · “The Oahe Dam destroyed more Indian land than any other single public works project in the United States. The Standing Rock and Cheyenne River ...
  74. [74]
    [PDF] cheyenne river sioux tribe equitable compensation act - GovInfo
    The second finding is that the Oahe Dam and Reservoir project: (A) is a major component of the Pick-Sloan program, and contrib- utes to the economy of the ...
  75. [75]
  76. [76]
    [PDF] Damages and Compensation for Tribes at Seven Reservations ...
    Nov 1, 2007 · Dams flooded over 350,000 acres of seven reservations, causing loss of land, resources, and improvements. Tribes received initial compensation, ...
  77. [77]
    Senate Report 109-343 - CHEYENNE RIVER SIOUX TRIBE ...
    Title I of this law provided additional compensation in the amount of $290,722,958 to the Tribe for 104,492 acres of land taken as a result of the Oahe Dam ...Missing: Native American
  78. [78]
    South Dakota v. Bourland, 508 U.S. 679 (1993).
    One of the largest of these takings involved the Oahe Dam and Reservoir Project, for which Congress required the Cheyenne River Sioux Tribe to relinquish ...Missing: lawsuit | Show results with:lawsuit<|separator|>
  79. [79]
    [PDF] GAO-08-249T Indian Issues: Damages and Compensation for Tribes ...
    Nov 1, 2007 · The three largest additional compensation amounts—Cheyenne River, $290.7 million in 2000; Fort Berthold, ... Sioux Tribe Equitable Compensation ...
  80. [80]
    - WATER RESOURCE MANAGEMENT ISSUES ON THE MISSOURI ...
    Managing the river to support a marginal annual barging industry leaves upstream reservoirs and boat ramps high and dry, particularly during droughts like the ...
  81. [81]
    Army Corps of Engineers Civil Works Program: Issues for the 109th ...
    Missouri River Reservoir Conditions, Water Availability, and Navigation. This is considered by some to be the sixth year of drought for the Missouri River basin ...<|separator|>
  82. [82]
    [PDF] The Missouri: River of Promise or River of Peril?
    Jun 6, 1989 · The failure of the Pick-Sloan Plan is the result of deficiencies in substantive public policies and in river management institutions. This.Missing: criticisms | Show results with:criticisms
  83. [83]
    It Takes Two Sides to Debate, But Only One Side to Dictate
    Sep 21, 2016 · The Pick-Sloan Plan, as constructed, has failed to provide one of its primary functions: Flood Control. In 2011, an epic flood caused about a ...
  84. [84]
    [PDF] Evaluation of Erosion Problems on Upper Missouri River - GAO
    What legislative authority exists to relieve the bank erosion problems on the Missouri River in general and between Garrison Dam and Lake Oahe in particular?
  85. [85]
    [PDF] Review of the Regulation of the Missouri River Mainstem Reservoir ...
    The high levels of runoff from both snowpack and rainfall stressed the System's capacity to control flood waters and caused massive damage and disruption along ...
  86. [86]
    Missouri River Spring Flood | U.S. Geological Survey - USGS.gov
    May 27, 2011 · Release of 80,000 cfs from Oahe Dam, near Pierre SD on May 27, 2011. This is the largest release since Oahe Reservoir Filled in 1959.Missing: peak | Show results with:peak
  87. [87]
    Governor's Column: Memories Of The 2011 Flood - News
    May 20, 2016 · At the time I had no idea that flood response would be our primary focus for the next several weeks. The Army Corps of Engineers told us the ...
  88. [88]
    [PDF] Summary of Actual 2011 Regulation
    The Missouri River Basin “Flood of Record” occurred during 2011. A separate report, Summary Report on Regulation – 2011 Flood chronologically discusses the.
  89. [89]
    [PDF] Missouri River 2011 flood facts
    Oahe Dam. Release. 102,100 cfs. Inflow - 87,000 cfs. Elevation - 1,613.7 ft. msl. 2011 peak release – 160,300 cfs, June 21, 2011 ... 2011 inflows for FLOOD SEASON ...Missing: water | Show results with:water
  90. [90]
    [PDF] Missouri River Flood 2011 : Vulnerabilities Assessment Report
    In 2011, the flood tunnels at Oahe Dam released a record volume of water. ... Comprehensive studies are recommended to identify greater flood damage reduction ...
  91. [91]
    The Oahe Dam Dedicated on August 17 by President John F ...
    Aug 16, 2021 · It was created by the Oahe Dam, which is 245 feet tall and 9,360 feet long and is the fifth largest dam on the planet based on water volume.Oahe Dam and Lake Oahe History in North Dakota and South DakotaOahe dam and lake oahe information - FacebookMore results from www.facebook.com
  92. [92]
    Oahe Project Resumes Powerhouse Tours; Visitor Center Summer ...
    Jun 7, 2022 · Public walk-in tours will be available Tuesday through Saturday beginning May 28 or June 4 and ending on September 6. Tours will start at the ...Missing: educational | Show results with:educational
  93. [93]
    Oahe Dam (2025) - All You Need to Know BEFORE ... - Tripadvisor
    Rating 4.3 (81) The free tour of the Oahe Dam starts with registration at the visitor center (brown building next to the white chapel. Everyone then drives down to the dam, ...
  94. [94]
    Oahe Dam Visitor Center | SD Missouri River Tourism
    The Corps of Engineers typically offers public tours of the dam powerhouse, but tours have been suspended this summer until further notice. Exterior of the Oahe ...Missing: navigation | Show results with:navigation
  95. [95]
    The Oahe Dam Visitor Center welcomes South Dakota's ... - Facebook
    May 2, 2025 · Guests can swing by the Visitor Center at our regular hours Monday through Friday at 9am-4pm. Check out the cultural artifacts, Lewis & Clark ...
  96. [96]
    Touring Oahe Dam's Intake structures - USACE Omaha District
    Among the festivities of Oahe's 50th Anniversary celebration was an opportunity for visitors to see and tour the dam's intake structure and receive free guided ...
  97. [97]
    Corps Lakes Gateway: South Dakota - Lake Oahe
    The 51 recreation areas located around the reservoir offer camping, picnicking, fishing, hunting, boating, water skiing, swimming, bird watching, hiking, biking ...
  98. [98]
    Oahe Hunting & Fishing Details - USACE Omaha District
    Lake Oahe has some of the best fishing in the country, with many anglers targeting walleye, smallmouth bass, and salmon. Excellent opportunities also exist ...Missing: reservoir characteristics
  99. [99]
    [PDF] Lake Oahe – Lower Fish Population Survey Summary
    Walleye: Walleye are the most targeted fish by anglers on Lake Oahe. Walleye abundance was slightly above average at 3.0 fish/net in 2020 with the average of 2 ...
  100. [100]
    [PDF] Lake Oahe – Upper Fish Population Survey Summary
    Many larger fish do exist within Lake Oahe. Catching a few. Smallmouth Bass can add excitement to your fishing trip. • Walleye: Walleye are the most targeted ...
  101. [101]
    Catalog Record: The commercial fishery in Lake Oahe, North...
    Summary: Ten species were commercially harvested in Lake Oahe, among which bigmouth buffalo predominated (63.8% of the total weight), smallmouth buffalo and ...
  102. [102]
    Beaver Creek Recreation Area, Lake Oahe
    Rating 3.9 (97) Amenities include seasonal flush toilets, vault toilets and drinking water (peak season). A three-lane boat ramp and two docks are on-site with another single ...
  103. [103]
    Hazelton Recreation Area, Lake Oahe
    Rating 4.3 (33) Picnic tables and campfire rings are provided. Amenities include vault toilets and a playground. A boat ramp is located on-site and has a large paved parking ...
  104. [104]
    Spring Creek Recreation Area | South Dakota Game, Fish, and Parks
    Park Size: 10 modern cabins and 12 suites. Convenience store and marina with boat slips. On-site restaurant managed by concessionaire. Directions: 15 miles ...
  105. [105]
    Oahe Downstream Recreation Area | South Dakota Game, Fish, and ...
    The park's three campgrounds give visitors a variety of recreational opportunities, from boating to hiking to disc golf.
  106. [106]
    Oahe Downstream Recreation Area - South Dakota GFP Reservations
    Campgrounds 1 & 2 at Oahe Downstream are closed from November 15 through the last Friday in March every year to minimize disturbance to roosting bald eagles.
  107. [107]
    Lower Oahe Waterfowl Access Program | South Dakota Game, Fish ...
    Lower Oahe Waterfowl Access Program. Please call 605.264.5380 for the most recent information on the Lower Oahe Waterfowl Access Area.