Pebble bed modular reactor

The Pebble Bed Modular Reactor (PBMR) is a small modular high-temperature gas-cooled design that utilizes as the and a core composed of thousands of pebbles, each embedding thousands of TRISO-coated fuel particles containing or other , enabling passive safety through inherent heat removal without active systems or operator intervention. The design operates at outlet temperatures around 900°C, supporting high for via gas turbines or cycles, as well as potential applications in process heat and . Originating from German experimental reactors like the AVR (operational 1967–1988) and the commercial-scale (1983–1989), which validated pebble bed fuel handling and helium cooling, the PBMR concept emphasizes modularity for factory fabrication and incremental deployment to reduce . South Africa's PBMR (Pty) Ltd pursued starting in 1994, targeting 165 MWe modules, but the project faced severe cost overruns exceeding initial estimates by factors of ten or more, failure to secure anchor customers, and technical redesigns, leading to government termination of funding in 2010. Despite the South African setback, which highlighted economic challenges over safety deficiencies, pebble bed technology has advanced elsewhere; China's High-Temperature Reactor-Pebble Module (HTR-PM) demonstration plant, with two 250 MWth modules driving a 210 MWe turbine, achieved criticality in 2020, grid connection in 2021, and full commercial operation by late 2023, recently confirming inherent safety in loss-of-coolant tests where core temperatures stabilized without meltdown. In the United States, X-energy's Xe-100, a 200 MWth (80 MWe) per module design using similar TRISO pebbles, is progressing through licensing and partnerships for deployment, leveraging the technology's walk-away safety and fuel proliferation resistance.

Design and Technology

Fuel and Core Configuration

The fuel elements of the Pebble Bed Modular Reactor (PBMR) consist of tri-structural isotropic (TRISO) coated particles embedded in a matrix within spherical pebbles. Each TRISO particle comprises a (UO₂) kernel enriched to 9.6% , with a of approximately 0.5 , surrounded by a porous carbon layer, inner (PyC), a (SiC) layer for fission product retention, and an outer PyC layer. These TRISO particles, typically numbering 9,000 to 15,000 per , are dispersed randomly in a cold-molded matrix and overcoated with an additional shell to form fuel of 60 mm diameter, containing about 9 grams of per pebble. s also include non-fuel spheres to maintain core geometry and neutron moderation. The configuration features a prismatic reflector surrounding a cylindrical , with an active of approximately 3.5 meters and of 10 meters, accommodating 360,000 to 452,000 pebbles depending on the specific PBMR variant (e.g., 165 output). structures, including inlet and outlet pedestals, support the and direct coolant flow axially through interstitial voids, achieving a of about 40%. Online refueling involves continuous circulation: fresh pebbles enter the top, migrate downward via gravity and flow, and exit the bottom for burnup assessment, with viable pebbles recirculated up to six times to reach 90-100 GWd/t before final discharge. This multi-pass scheme optimizes fuel utilization while maintaining criticality through controlled pebble inventory.

Coolant System and

The pebble bed modular reactor (PBMR) utilizes as its primary coolant, selected for its chemical inertness, low absorption, high thermal conductivity, and capacity to maintain gaseous state across operational ranges without or . This single-phase gas enables efficient removal via , avoiding the complexities of phase changes inherent in water-cooled systems. enters the reactor core at an inlet of approximately 450°C and a of 6-7 , flowing downward through the interstitial voids among the spherical fuel pebbles, where it absorbs fission-generated primarily through convective from the pebble surfaces. Heat transfer within the core relies on the high surface area-to-volume ratio of the randomly packed pebble bed, facilitating rapid warming to an outlet of up to °C under nominal conditions. The process involves from TRISO fuel particles embedded in graphite pebbles to the pebble exterior, followed by to the streaming , with minimal radiative contributions at operational velocities. This configuration achieves effective thermal extraction at low core power densities (around 3-4 MW/m³), supporting high outlet temperatures that enable thermodynamic efficiencies exceeding 40% in direct-cycle applications. Post-core, the hot transits via insulated ducts to a recuperated system, where it expands to generate before recirculation via compressors and precoolers. In the South African PBMR design, the system's integration emphasizes modularity, with circulation driven by axial-flow compressors and contained within a housing the core, reflectors, and circulators. modeling accounts for effects and local heterogeneities, such as pebble-to-pebble contact points that can create hotspots, though empirical tests confirm adequate margins under design-basis transients. The inert precludes or products, enhancing long-term system integrity compared to aqueous coolants.

Modular Construction and Scalability

The Pebble Bed Modular Reactor (PBMR) design incorporates modular construction principles, with key components including the , core structures, and power conversion systems prefabricated in settings for subsequent on-site . This approach shifts much of the from field-based to controlled industrial environments, enabling higher precision, standardized processes, and reduced exposure to weather or labor variability. Major elements, such as the circulators and exchangers, are engineered for transport via standard heavy-lift methods, minimizing site-specific custom work and aiming for construction durations of approximately three years per . Each PBMR module is rated for a nominal electrical output of 165 from a MWth , facilitating deployment as standalone units or in configurations suited to or needs. The modular architecture supports scalability by allowing multiple units—typically up to four or ten per plant—to share auxiliary systems like halls and cooling , scaling total capacity to 660 or more without proportional increases in complexity. This scalability emphasizes economies of serial production, where repetitive factory builds lower per-unit costs through learning curves and efficiencies, rather than oversized single reactors dependent on scale alone. Plants can expand incrementally, distributing capital risk and enabling adaptation to varying demands, such as in developing regions or for heat applications.

Historical Development

Early Concepts and Prototypes

The pebble bed reactor concept originated in the United States during the , when Farrington Daniels proposed using spherical fuel elements inspired by wartime innovations in technology. German physicist Rudolf Schulten advanced this idea in the 1950s at the KFA research center, developing the key innovation of embedding TRISO-coated fuel particles within pebbles to integrate fuel, moderator, and containment in robust, tennis-ball-sized spheres that could withstand high temperatures and enable continuous refueling. Schulten's design emphasized through low-power density and passive heat removal, aiming for helium-cooled, high-temperature gas reactors suitable for and process heat. The first prototype, the Arbeitsgemeinschaft Versuchsreaktor (AVR), was constructed adjacent to the Jülich Research Centre in , with construction beginning on August 1, 1961, and initial criticality achieved in 1966. This 46 MWth (15 MWe) experimental helium-cooled featured a core of about 100,000 graphite pebbles, each containing thousands of TRISO particles, and operated from 1967 to 1988, accumulating over 21 years of runtime with an of approximately 70%. The AVR demonstrated multi-pass fuel circulation, where pebbles were recirculated through the core until fully burned, achieving burnups up to 10% FIMA and coolant outlet temperatures reaching 950–990°C, which validated the design's thermal stability and low fission product release even during transients. Operational data from the AVR confirmed the pebble bed's robustness, with no significant fuel damage observed despite experiments simulating loss-of-coolant accidents, where core temperatures peaked at 1,600°C but self-stabilized via conduction and radiation without meltdown. Post-operation analysis in the 2010s by an expert group at Forschungszentrum Jülich re-evaluated safety, noting minor graphite dust accumulation and helium impurity issues but affirming the prototype's success in proving continuous fueling and high-temperature operation without reliance on active safety systems. These results informed subsequent developments, though decommissioning revealed trace contamination from particle failures, estimated at less than 0.001% of fuel inventory.

South African PBMR Initiative

The South African Pebble Bed Modular Reactor (PBMR) initiative originated in , when , the country's primary electricity utility, began evaluating technologies as part of its integrated electricity planning to address projected demand growth of approximately 1200 MW per year over the subsequent two decades. This effort drew on prior German developments, including the operational from 1967 to 1988, adapting pebble bed concepts for modular deployment with cooling, moderation, and TRISO-coated fuel particles in spherical pebbles recirculated through the core. In 1999, established PBMR (Pty) Ltd as a dedicated entity to spearhead design, feasibility studies, and commercialization, with initially holding all shares while securing financing from international partners. The company's objectives centered on delivering inherently safe, high-efficiency modules rated at 165 each, leveraging a direct gas turbine for exceeding 40%, enabling applications in , process heat, and potential . South African government support materialized in 1995 through initial endorsement, followed by Cabinet approval in 2000 for a five-to-ten-year , emphasizing localization of to foster industrial capacity and job creation. Key milestones included completion of a multi-year feasibility study by the early 2000s, which validated the design's viability and led to Eskom issuing a letter of intent for a demonstration plant plus ten follow-on modules. PBMR (Pty) Ltd pursued aggressive industrialization, establishing domestic supply chains for components like fuel pebbles and reactor vessels, while forming partnerships with entities such as for turbine expertise, and from the for investment and design input, and British Nuclear Fuels Ltd for additional funding. By 2007, the initiative had advanced to pre-licensing engagement with the Regulator, including safety analyses and prototype fuel testing, positioning as a potential exporter of Generation IV nuclear technology.

Project Termination in 2010

The South African government formally announced on September 17, 2010, that it would cease further investment in the Pebble Bed Modular Reactor (PBMR) project, effectively terminating the initiative after more than a decade of development. Public Enterprises Minister Barbara Hogan cited the absence of viable commercial customers and insufficient private sector commitment as primary factors, noting that the project had failed to secure the necessary external funding to proceed toward commercialization. By this point, approximately ZAR 9.244 billion (about $1.3 billion) had been expended since the late 1990s, with over 80%—roughly ZAR 7.419 billion—sourced from public funds through entities like Eskom Holdings. Financial pressures intensified in the preceding months, with the PBMR facing acute shortages as early as February 2010, prompting plans for retrenchments affecting up to 75% of its staff. emphasized that continuing to a functional demonstration plant would require an additional R30 billion or more, rendering the endeavor economically unsustainable amid broader fiscal constraints and the global financial crisis's aftermath. The decision aligned with parliamentary conditions set in prior funding approvals, which mandated attracting non-government by early 2010—a unmet due to persistent technical risks, escalating capital demands, and competitive pressures from alternative energy . Following the announcement, the PBMR entity shifted focus to winding down operations, preserving , and exploring potential licensing opportunities rather than pursuing domestic deployment. This closure marked the end of South Africa's ambition to pioneer commercial high-temperature gas-cooled reactors, though proponents argued it forfeited a strategic technological asset developed at significant public expense. No full-scale prototype was ever constructed, leaving the project as a costly experiment in advanced without realized economic returns.

Inherent Safety and Operational Advantages

Passive Safety Mechanisms

The pebble bed modular reactor (PBMR) employs passive safety mechanisms rooted in its low , robust fuel design, and inherent physical processes, allowing automatic reactivity control and removal without active components, pumps, electrical power, or operator action. Core power density is approximately 1/20th that of pressurized water reactors, minimizing heat generation per unit volume and facilitating efficient passive dissipation. These features ensure the reactor achieves a safe shutdown state and cooldown even in bounding accidents like depressurized loss of forced cooling (DLOFC). TRISO (tristructural isotropic) fuel particles form the basis of this safety, comprising a fissile oxycarbide kernel coated in porous carbon, inner , , and outer layers, which retain over 99% of fission products up to 1600°C—well above design-basis peak fuel temperatures of 1250–1600°C. The billions of independent particles in pebbles distribute heat and provide redundant containment, preventing meltdown or significant release as the matrix withstands thermal shocks and oxidation absent in metallic fuels. Reactivity is self-regulated by a strongly , driven by of neutron resonances in the fuel and of the moderator, which reduces rates as temperatures rise and excess reactivity is limited to under 3%. This inherent feedback shuts down within minutes of transients, as validated in the German AVR prototype where halting coolant flow resulted in natural power reduction to levels without control rods or fuel damage. Decay heat, typically 6–7% of full power initially, is removed passively via conduction through the reactor vessel walls, thermal radiation from the core, and natural convection in the helium primary circuit or surrounding air, leveraging the high thermal conductivity of graphite and helium. In DLOFC events, maximum core temperatures stabilize below 1600°C after peaking, with heat transferred to the environment over hours without vessel breach or radioactivity release exceeding 10^{-6} of inventory. Analogous tests on China's HTR-PM demonstration plant in 2024 confirmed this for commercial-scale pebble beds, achieving natural cooldown from 200 MWth per module without emergency systems, with fuel temperatures remaining subcritical and below integrity limits. For spent fuel, dry storage in tanks or casks relies on passive air circulation, capable of dissipating heat from aged pebbles indefinitely without conditioning.

Thermal Efficiency and Fuel Utilization

Pebble bed modular reactors (PBMRs) achieve thermal efficiencies of 41-45%, surpassing the approximately 33% efficiency of conventional light water reactors, primarily due to the high outlet temperature of helium coolant reaching 900°C and the direct Brayton cycle employing gas turbines for power conversion. The PBMR-400 design specifies a minimum cycle efficiency of 41%, with detailed analyses confirming up to 43.2% under optimal conditions, as the inert helium avoids corrosion and boiling limitations inherent in water-cooled systems. This elevated efficiency reduces heat rejection and enhances overall plant performance, though it requires advanced materials to withstand prolonged high-temperature exposure. Fuel utilization in PBMRs is optimized through a multi-pass, continuous refueling scheme, where spherical TRISO-coated pebbles are recirculated through up to six times, achieving discharge burnups of 90-100 GWd/tU or higher. This approach contrasts with once-through cycles in light water reactors, which typically reach only 40-60 GWd/tU, by enabling progressive fission of and bred in situ, thereby extracting greater energy per unit of heavy metal loaded. Pebbles are discharged only upon reaching target , verified via or other nondestructive assays, minimizing waste and improving resource efficiency without reprocessing. In equilibrium core operation, this yields average burnups exceeding 80 GWd/tU, as demonstrated in benchmark models for the PBMR-400. The combination of high and supports lower fuel cycle costs and reduced risks, as the deep-burn capability in TRISO particles retains products effectively even under conditions. However, achieving these levels demands precise control of pebble flow and neutronics to avoid uneven distribution, with optimizations using tools like genetic algorithms or particle swarm methods to balance core reactivity and power peaking. Comparable designs, such as China's , report thermal efficiencies over 40% and similar multi-pass fueling for burnups around 90 GWd/tU, validating the approach in operational prototypes.

Environmental and Economic Benefits

Pebble bed modular reactors (PBMRs) offer environmental advantages through their high , typically achieving around 40-50% compared to 33% for conventional s, due to coolant enabling outlet temperatures of 750-950°C. This efficiency reduces fuel consumption per unit of generated, with TRISO-coated fuel particles supporting burnups exceeding 100 GWd/t, higher than the 40-60 GWd/t of fuel, thereby minimizing the volume of relative to energy output. The robust ceramic encapsulation of TRISO particles retains fission products even under accident conditions, enhancing waste form stability for long-term geological disposal. Life-cycle greenhouse gas emissions for high-temperature gas-cooled reactors like PBMRs are estimated at 5-15 g CO2-eq/kWh, comparable to or lower than other technologies and far below alternatives, supporting decarbonization without reliance on intermittent renewables. Their features, including passive removal via natural , minimize risks of radiological releases that could impact ecosystems, as demonstrated in prototypes where temperatures self-limit below damage thresholds during simulated loss-of-coolant events. Additionally, PBMRs' high-temperature output enables applications, such as process heat for industries or via thermochemical splitting, potentially displacing carbon-intensive methods like steam reforming. Economically, the facilitates factory of reactor modules, reducing on-site time to 3-4 years versus 7-10 years for large reactors and mitigating overruns associated with custom field assembly. Scalability allows incremental capacity addition, matching demand growth and spreading capital costs, with projections for deployments like China's at approximately 0.4-0.5 USD/kWh under favorable financing. Online refueling with continuous pebble circulation enables capacity factors above 90%, exceeding those of reactors requiring full shutdowns for refueling, thus improving revenue stability. High-temperature operation also supports cycles, such as combined gas-steam turbines, potentially lowering costs by 5-10 USD/MWh through enhanced . These attributes position PBMRs for competitive in niche markets like remote power or industrial heat, though realization depends on standardized manufacturing and regulatory streamlining.

Challenges and Criticisms

Cost Overruns and Economic Viability

The South African Pebble Bed Modular Reactor (PBMR) project, initiated in , exemplifies significant cost overruns that undermined its economic viability. Initial projections estimated a demonstration plant completion by 2004 at R2 billion (approximately $300 million USD at the time), positioning the technology as competitive with coal-fired plants at around $1 million per MW installed capacity. However, by 2010, total expenditures exceeded R9.2 billion (about $1.3 billion USD), with annual outlays peaking at R2.5 billion, yet without a functional or completed . These overruns, attributed to technical complexities in pebble fuel fabrication and systems, as well as mismanagement, led to the project's termination amid and fiscal , highlighting failures in public funding for unproven modular designs. China's HTR-PM demonstration project, a 210 MWe pebble bed reactor with two 250 MWt modules connected to a single turbine, faced similar first-of-kind cost pressures despite state support. Construction began in December 2012 with an estimated investment of 3 billion yuan (roughly $476 million USD), equating to about $2,270 per kWe, though actual timelines extended to commercial operation in December 2023—over a decade—due to integration challenges. Economic analyses project a levelized cost of electricity (LCOE) of $95.56/MWh at a $4,500/kW overnight capital cost and 10% discount rate, higher than contemporary coal or gas options in many markets, though optimistic scaling to 600 MWe plants anticipates reductions to under $2,500/kWe through modular replication. These figures underscore that while pebble bed designs benefit from inherent safety reducing regulatory costs, the expense of TRISO fuel pebbles and graphite components offsets modularity gains without mass production. Contemporary pebble bed-inspired designs, such as X-energy's Xe-100 (80 MWe per module, scalable to 320 MWe four-packs), promise improved viability through factory fabrication and TRISO-X fuel, with pre-deployment estimates targeting LCOE below $60/MWh. A proposed four-module is budgeted at $2.4 billion, implying around $7,500/kW—elevated compared to large light-water reactors but potentially declining with series builds and private investment, as seen in partnerships with and for up to 5 GW by 2039. Nonetheless, broader assessments of small modular reactors (SMRs), including high-temperature gas-cooled types, indicate persistent economic hurdles: higher per-kW capital costs (1.06–1.26 times large reactors) due to in early deployments, supply chain immaturity for specialized materials, and from renewables with lower upfront investments. Achieving viability requires overcoming these via sustained government subsidies and learning curves, as historical overruns in both South African and projects demonstrate that modular promises have yet to materialize in practice without extensive replication.

Technical and Manufacturing Issues

The pebble bed modular reactor (PBMR) design faces significant technical challenges related to the integrity of its TRISO-coated particles under operational conditions. Independent analysis from the Research Centre in 2008 concluded that fuel particle coatings are likely to fail at the high core temperatures anticipated in the PBMR, potentially exceeding 1130°C maximum fuel temperature limits, leading to contamination of reactor components at levels orders of magnitude higher than in light-water reactors. This vulnerability stems from mechanical stresses and pressure buildup from gases within the multilayer coatings, which can compromise the silicon carbide layer and release products even in scenarios. Historical data from the German AVR prototype, which operated until 1988, recorded peak temperatures over 1400°C and substantial metallic product releases, indicating that improved quality alone may not mitigate such excursions in scaled-up designs like the South African PBMR. Graphite dust generation represents another core technical issue, arising from frictional wear between pebbles, core structures, and reflector elements during continuous recirculation. This dust, produced at rates estimated from pebble-bed simulations and empirical tests, can adsorb products and circulate through the primary loop, exacerbating risks and potentially leading to releases in depressurization events. Quantifying and mitigating dust accumulation remains unresolved, as it contributes to of exchangers and , with studies highlighting the need for advanced and modeling to prevent hotspots or disruptions. In the , dust-related reached several percent of the core inventory, underscoring causal links between pebble interactions and radiological hazards that persist in modular variants. Manufacturing complexities further compound these issues, particularly in fabricating defect-free spherical fuel elements containing up to 15,000 TRISO particles embedded in a matrix. The PBMR pilot fuel plant, operational by 2008, produced 9.6% enriched particles but struggled with achieving the required low failure fractions (below 3 × 10^{-5}) at scale, necessitating extensive qualification testing that inflated costs and delayed progress. Coating processes for TRISO layers demand precise control to avoid defects like kernel migration or cracking, yet historical efforts in and revealed persistent variability, with production costs dominated by particle fabrication rather than content. Pebble flow irregularities, including jamming risks from surface degradation or uneven packing, add to operational uncertainties, as discrete element modeling shows potential for avalanches or blockages that could induce reactivity insertions. These manufacturing hurdles contributed to the 2010 termination of the initiative, as unresolved fuel and handling defects undermined economic viability.

Regulatory and Political Obstacles

The development of the Pebble Bed Modular Reactor (PBMR) in encountered significant regulatory hurdles from the National Nuclear Regulator (NNR), which mandated a multi-stage licensing process requiring a comprehensive documenting the reactor's design, operation, and risk mitigation for the novel pebble bed fuel cycle and high-temperature gas-cooled configuration. The NNR faced challenges in formulating a tailored , as existing guidelines were primarily aligned with light-water reactors, necessitating adaptations for passive features, behavior, and continuous pebble recirculation—elements lacking extensive operational precedents. Informal collaborations with international bodies like the U.S. provided some analytical support, but the absence of formal agreements delayed validation of probabilistic risk assessments and licensing basis events. These gaps contributed to protracted pre-licensing reviews, exacerbating timeline uncertainties for the demonstration plant. Public and environmental appeals further complicated regulatory progress, as demonstrated by 2007 challenges against the pilot fuel fabrication plant's record of decision, which contested radiological risks, , and the separation of fuel plant authorization from the full licensing—though these were ultimately rejected by authorities. Broader licensing paradigms, applicable to PBMR's modular design, highlight systemic issues such as high regulatory fees, assessor expertise shortages in advanced fuel technologies, and extended review periods often spanning years, which deterred investor confidence and amplified financial risks. Politically, the PBMR initiative faltered amid shifting government priorities and fiscal austerity, culminating in Finance Minister Pravin Gordhan's February 2010 announcement to withhold further public funding for the demonstration plant, following 's parent body halting contributions in September 2010. Under Zuma's administration, the program was terminated due to ballooning costs—escalating from initial estimates of around ZAR 2 billion to over ZAR 10 billion by 2009—and perceived political opposition within cabinet circles wary of expansive commitments amid emerging allegations in energy procurement. The global intensified pressures on state-owned , redirecting resources toward immediate power shortages rather than long-term R&D, while inadequate parliamentary oversight exposed vulnerabilities in public fund allocation, fueling debates over accountability. These decisions reflected a pragmatic retreat from ambitious indigenous technology development in favor of proven imports, though they preserved South Africa's nuclear regulatory infrastructure for potential future advanced designs.

Contemporary Projects and Deployments

Chinese HTR-PM Reactor

The HTR-PM (High-Temperature Reactor-Pebble bed Module) is a demonstration high-temperature gas-cooled reactor (HTGR) project located at the Shidao Bay Nuclear Power Plant in Shandong Province, China, featuring two 250 MWth pebble-bed reactor modules coupled to a single 210 MWe steam turbine generator, yielding approximately 200 MWe net output. Developed by the Institute of Nuclear and New Energy Technology (INET) at Tsinghua University in collaboration with China Huaneng Group and others, it represents the world's first modular pebble-bed HTGR to achieve commercial operation, marking a milestone in Generation IV nuclear technology. Each reactor core operates with helium coolant at 7 MPa pressure and an outlet temperature of 750°C, utilizing a once-through steam generator to produce steam at 568°C for the turbine cycle, achieving a thermal efficiency around 40%. Construction of the began in December 2012, with the reactor pressure vessels installed by 2016 and fuel loading completed in phases leading to first criticality for one in December 2020 and the second in 2021. The achieved initial grid connection at 25% power in December 2021, followed by full-power operations and extensive testing, culminating in commercial operation approval by China's National Nuclear Safety Administration (NNSA) on December 6, 2023, after nearly 400 licensing tests. Each is fueled with over 400,000 TRISO-coated particle pebbles, each 60 mm in diameter containing 7 g of fuel enriched to less than 8.5% U-235, enabling high and through passive removal via conduction and radiation without active systems. In July 2024, the underwent industry-first loss-of-cooling accident (LOCA) tests at full power, confirming its : under simulated complete loss of , the core peaked at 87°C above normal but cooled passively to safe levels within hours, with peak fuel temperatures remaining below 1,600°C—well under TRISO integrity limits of 1,800°C—demonstrating no risk of meltdown or significant fission product release. Operational performance has included stable multi-modular coordination, with coordinated control systems managing load-following and turbine trips across both reactors, as validated in 2023-2025 simulations and real-world runs. By early 2025, the project had progressed to evaluating scalability for multi-module deployments, including applications commissioned in April 2024, supplying steam at up to 150°C for industrial use. The HTR-PM's success validates pebble-bed technology's commercial feasibility, contrasting with earlier project terminations elsewhere by achieving fuel qualification, modular construction (75% localization), and a 50-month build timeline for the twin-unit setup, positioning it as a template for future HTGRs aimed at high-efficiency power and process heat. No major technical setbacks have been reported in peer-reviewed assessments, though ongoing monitoring focuses on long-term fuel performance and economic optimization for export variants.

X-energy Xe-100 Developments

The Xe-100 is a high-temperature gas-cooled pebble bed modular reactor design developed by , featuring four 80 units per plant for a total of 320 output, utilizing TRISO-X fuel pebbles and coolant to achieve through passive removal. Each reactor module incorporates approximately 220,000 graphite-moderated fuel pebbles, enabling a 60-year operational life and thermal output up to 200 MW per unit at outlet temperatures of 565°C suitable for applications. The design builds on decades of HTGR research, emphasizing modular factory fabrication for scalability and reduced on-site construction risks. X-energy has advanced the Xe-100 through significant funding milestones, including $139 million in U.S. Department of Energy awards since 2016 for reactor and TRISO fuel development under the Advanced Reactor Demonstration Program. In February 2025, the company closed an upsized $700 million Series C-1 financing round to accelerate commercialization. Additional investment came from in October 2024, supporting Xe-100 deployments for power needs, with potential mobilization of up to $50 billion in public-private funds through partnerships including and announced in August 2025. Regulatory progress includes pre-application engagement with the U.S. Nuclear Regulatory Commission since September 2018, culminating in a construction permit application submitted in April 2025 for a four-unit Xe-100 plant at Dow Inc.'s Seadrift site in Texas. The NRC established an expedited 18-month review schedule in June 2025 for this docketed application, alongside an environmental assessment, though commercial operations are projected no earlier than the early 2030s pending approvals. Key partnerships drive deployment plans, such as the July 2023 joint development agreement with for a site adjacent to in , expanded in October 2025 with funding for an initial four Xe-100 units and potential scaling to 12, supported by a design-build contract awarded to a including . Internationally, a September 2025 joint development agreement with targets up to 12 Xe-100 units at , , adding 960 MWe capacity, while a feasibility study funded by Alberta's Emissions Reduction Alberta confirmed Xe-100 viability for industrial heat and power there in September 2025. Fuel fabrication advances include selection of Clark Construction Group in August 2025 for a $48.2 million TRISO-X facility phase, enabling commercial-scale production to support initial Xe-100 plants. These efforts position the Xe-100 as a leading pebble bed design for baseload and industrial applications, though challenges remain in achieving first-of-a-kind licensing and scaling.

South African Revival Plans

South Africa's government announced plans in October 2025 to revive the Pebble Bed Modular Reactor (PBMR) project, which had been placed in care and maintenance since 2010 due to escalating costs exceeding 20 billion rand. and Minister stated that the process to end the maintenance phase is at an advanced stage, targeting completion by the first quarter of 2026 at the latest. This revival forms part of the 2025 Integrated Resource Plan (IRP), which aims to expand nuclear generation capacity to contribute 16% of total by 2040, adding up to 2,500 megawatts from small modular reactors like the PBMR alongside gas-fired plants. The PBMR initiative seeks to leverage South Africa's prior investment in technology, originally developed to produce 165 megawatts per module with inherent safety features. Proponents argue that reactivating the program could position as a leader in exporting Generation IV , building on prototypes tested in the that demonstrated fuel integrity under accident conditions. However, the government has not detailed funding mechanisms, with estimates for full commercialization potentially requiring billions of , amid fiscal constraints and the need to reconstitute expertise lost over 15 years of dormancy. Critics within the energy sector have raised concerns over the feasibility, citing the original project's technical delays, such as fuel fabrication issues that halted progress in 2009, and questioning whether private investment can be secured without state guarantees. Despite these hurdles, the administration views the PBMR revival as essential for and decarbonization, aligning with broader commitments to new nuclear builds using advanced modular designs.

Future Prospects and Broader Implications

Role in Decarbonization and

Pebble bed modular reactors (PBMRs), as a type of (HTGR), contribute to decarbonization by generating dispatchable, and high-temperature process heat essential for electrifying and decarbonizing industrial sectors that are challenging to abate with intermittent renewables. Unlike fossil fuel-based systems, PBMRs produce no direct emissions during operation, with lifecycle emissions comparable to other technologies at approximately 10-20 grams of CO2 equivalent per , far below coal's 800-1000 g/kWh or natural gas's 400-500 g/kWh. Their ability to operate at outlet temperatures exceeding 750°C enables applications, such as for or direct heating for and manufacturing, potentially displacing coal-intensive processes; for instance, integrating an HTGR like the could reduce CO2 emissions in by up to 3 million tons annually for a 600 plant paired with hydrogen facilities. China's operational demonstration plant at Shidao Bay, which achieved full-load grid connection in December 2022, exemplifies these benefits by supplying 200 MWe of carbon-free power while enabling that replaces 3,700 tonnes of per heating season and cuts CO2 emissions by 6,700 tonnes annually. Similarly, X-energy's Xe-100 PBMR design targets industrial decarbonization through partnerships like the one with Dow Chemical, where a proposed deployment would provide carbon-free process heat and power to reduce emissions at facilities, leveraging the reactor's modular scalability for site-specific integration. These capabilities position PBMRs to support net-zero goals by filling gaps left by variable renewables, as their high capacity factors—often above 90%—ensure reliable baseload output without the requiring extensive backup systems. In terms of , PBMRs enhance through their factory-fabricated modular construction, which shortens on-site build times to 3-4 years versus 7-10 years for traditional large reactors, enabling rapid scaling and deployment near demand centers to minimize losses and geopolitical vulnerabilities associated with long-distance imports. The use of TRISO-coated pebble achieves high rates—up to 15-20% fissile utilization—reducing refueling frequency and raw needs by factors of 2-3 compared to light-water reactors, thereby bolstering domestic cycles and proliferation resistance via embedded safeguards in the design. Designs like the incorporate security-by-design principles, including robust physical protection and minimized high-enrichment , which mitigate risks from or while supporting that diversifies energy sources away from concentrated dependencies. Operational experience from the , with its inherent safety features demonstrated in loss-of-cooling tests maintaining integrity without active intervention, further assures reliability in diverse grids, including those in remote or developing regions.

Comparisons to Alternative Technologies

Pebble bed modular reactors (PBMRs), as high-temperature gas-cooled reactors, offer inherent safety advantages over pressurized water reactors (PWRs), the dominant type, due to their TRISO-coated fuel particles that retain fission products under extreme temperatures exceeding 1600°C, enabling passive decay heat removal without systems or meltdown risks. In contrast, PWRs rely on pressurized water for cooling and moderation, necessitating robust containment and emergency core cooling to mitigate loss-of-coolant accidents, as evidenced by incidents like Three Mile Island in 1979 and in 2011. This passive safety profile positions PBMRs as superior for reducing operator error or external power failure vulnerabilities compared to PWRs, which require multiple redundant safety layers. Thermodynamically, PBMRs achieve higher thermal efficiencies of approximately 45-50% owing to helium coolant outlet temperatures of 750-950°C, enabling direct turbines or advanced applications like , versus PWR efficiencies around 33% limited by steam cycles at 300°C. Fuel utilization in PBMRs supports higher burnups (up to 15-20% fissile utilization) with continuous pebble recirculation, reducing waste volume per gigawatt-hour compared to PWRs' batch refueling and lower burnups of 4-5%. However, PBMRs face higher upfront fuel fabrication costs for TRISO pebbles and unproven large-scale pebble handling, potentially offsetting modularity benefits against PWRs' established supply chains and lower requirements. Relative to other small modular reactors (SMRs) like light-water designs (e.g., NuScale), PBMRs provide elevated operating temperatures for but introduce graphite moderation complexities and helium impurity management, whereas water-cooled SMRs leverage existing PWR expertise for faster licensing at potentially lower initial capital, though with inferior passive margins. Against reactors (MSRs), PBMRs avoid corrosive / salt challenges and online reprocessing complexities, favoring solid-fuel simplicity and demonstrated passive shutdown in full-scale tests like China's in 2024, but MSRs offer theoretical advantages in continuous fuel breeding and fission product removal without pebble recirculation. For decarbonization and , PBMRs deliver baseload capacity factors exceeding 90% with lifecycle emissions under 12 gCO2/kWh, surpassing intermittent renewables like (20-30 gCO2/kWh including backups) and , which require grid-scale for reliability and yield lower energy densities (e.g., at 10-20 W/m² vs. nuclear's 1000x higher). Their modularity supports scalable deployment in remote or developing regions without the land and intermittency drawbacks of renewables, enhancing causal over variable sources dependent on weather and supply chains for rare earths.

Barriers to Widespread Adoption

Despite demonstrations like China's reactor achieving criticality in 2021, scaling pebble bed modular reactors (PBMRs) globally remains impeded by the absence of a mature, cost-competitive for TRISO-fueled pebbles, which requires precise multilayer coating of particles within spheres—a process prone to defects and demanding high-volume production not yet achieved at commercial scales. The continuous online refueling inherent to PBMRs, involving the recirculation of millions of pebbles per reactor over its lifetime, introduces operational complexities such as pebble tracking, sorting burnt from fresh , and managing generation, which have historically strained prototypes and escalated maintenance costs. Regulatory frameworks, largely calibrated for light-water reactors, pose additional obstacles; PBMRs' reliance on passive and necessitates novel assessments of defense-in-depth, probabilistic , and source terms, prolonging licensing timelines and increasing uncertainty for vendors like X-energy's Xe-100, which completed Canadian pre-licensing phases in 2024 but faces U.S. NRC topical reviews extending into the late . Safeguards implementation under IAEA criteria is particularly challenging due to the inability to apply traditional fuel assembly , requiring instead pebble-by-pebble or advanced modeling to detect diversion, a process unproven at scale and raising proliferation concerns for high-burnup spent fuel containing weapons-usable . Market and policy factors further hinder diffusion: the South African PBMR initiative's 2010 termination after R30 billion (approximately $4 billion USD at the time) in overruns without a completed design underscored investor risks from unproven economics, deterring private financing absent firm government commitments or off-take agreements, as seen in X-energy's reliance on grants and corporate partners like for Xe-100 advancement toward 2030s deployment. Globally, inconsistent policy support—evident in South Africa's project shifts due to leadership changes and affordability debates—compounds these issues, limiting the factory standardization essential for modular scalability against entrenched supply chains. While partnerships such as X-energy's with Korean firms aim to mobilize $50 billion for ecosystem expansion, historical failures and the need for international harmonization of standards suggest widespread adoption may lag behind alternatives until multiple full-scale units demonstrate reliability post-2030.

References

  1. [1]
    [PDF] Pebble Bed Modular Reactor. - Nuclear Regulatory Commission
    1. It is small, safe, clean, cost efficient, inexpensive and adaptable. Those, in a nutshell, are the features of the Pebble Bed Modular Reactor (PBMR). The ...
  2. [2]
    Pebble Bed Modular Reactor PBMR Description - MOOSE framework
    The PBMR-400 is a modular thermal reactor with helium coolant and graphite moderator. It utilizes 9.6% enriched uranium dioxide fuel encapsulated with four ...
  3. [3]
    Nuclear Energy Agency (NEA) - PBMR-400 Core Design
    The PBMR functions under a direct Brayton cycle with primary coolant helium flowing downward through the core and exiting at 900°C. The helium then enters the ...
  4. [4]
    [PDF] Pebble Bed Modular Reactor (PBMR).
    Mar 8, 2001 · The PBMR concept is based on German high temperature helium cooled pebble bed reactor technology demonstrated in the AVR and THTR reactors. The ...<|separator|>
  5. [5]
    South Africa Abandons Pebble Bed Modular Reactor Project
    Sep 22, 2010 · South Africa's government on Thursday announced it would no longer invest in the Pebble Bed Modular Reactor (PBMR) project.
  6. [6]
    The Pebble Bed Modular Reactor: An obituary - ScienceDirect.com
    It was the German technology that was taken up by South Africa and China. Germany has a long history of HTGR development using Pebble Bed technology. In 1959, ...
  7. [7]
    Nuclear Milestone: China's HTR-PM Demonstrates Inherent Safety
    Sep 3, 2024 · Chinese researchers confirm the HTR-PM reactor's safety during loss-of-cooling tests, marking a breakthrough for high-temperature gas-cooled ...
  8. [8]
    The pebble bed reactor at the Shidaowan nuclear power plant
    Oct 11, 2024 · Fuel spheres instead of fuel rods · Core meltdown physically ruled out · HTR-PM in commercial operation since December 2023.<|separator|>
  9. [9]
    X-energy is Developing a Pebble Bed Reactor That They Say Can't ...
    Xe-100 pebble bed reactor. How it Works. The Xe-100 is an advanced modular reactor with each unit designed to produce around 76 megawatts of electric power.
  10. [10]
    Xe-100: High-Temperature Gas-Cooled Nuclear Reactors (HTGR)
    The Xe-100 is a Gen-IV HTGR, 80 MWe reactor with 220,000 graphite pebbles, 60-year life, 200 MW thermal output, and 80 MW electric output.
  11. [11]
    [PDF] pebble bed modular reactor pbmr fuel qualification test program
    Mar 18, 2002 · PBMR fuel elements consist of TRISO-coated particles embedded in cold pressed graphite matrix material. The coated particles consist of ...
  12. [12]
    [PDF] High Temperature Gas Cooled Reactor Fuels and Materials
    All these reactors are primarily fuelled by TRISO (tri iso-structural) coated particles. The aim however is to build future nuclear fuel cycles in concert with ...
  13. [13]
    The Pebble Bed Modular Reactor
    PBMRs would have uranium dioxide fuel coated with silicon carbide and pyrocarbon. The fuel would be fabricated into tiny particles, like grains of fine sand, ...
  14. [14]
    [PDF] The Modular Pebble Bed Nuclear Reactor - OSTI.gov
    The MIT pebble bed reactor is normally a 250 Mwth-1 lOMwe indirect cycle helium cooled and helium gas turbine powered plant using pebble bed technology.
  15. [15]
    [PDF] Modular Pebble Bed Reactor High Temperature Gas Reactor - MIT
    Thermal Power. 250 MW - 115 Mwe. Target Thermal Efficiency. 45 %. Core Height. 10.0 m. Core Diameter. 3.5 m. Pressure Vessel Height.
  16. [16]
    [PDF] Nuclear Safeguards Considerations for the Pebble Bed Modular ...
    Regarding the South African PBMR, a reactor ranging in size from 165 MWe to 80 MWe is being considered. 19, 20 The reactor would be a high-temperature, helium ...<|separator|>
  17. [17]
    [PDF] PBMR REACTOR DESIGN AND DEVELOPMENT
    The Core Structures (CS) are the structural components within the RU that define and maintains a stable pebble bed geometry. The CS consists of two major ...
  18. [18]
    [PDF] Chapter 4 THE HIGH TEMPERATURE GAS COOLED REACTOR ...
    After being heated in the pebble bed, helium then enters into a hot gas chamber in the bottom reflector, and from there it flows through the hot gas duct and ...
  19. [19]
    Pebble Bed Modular Reactors - an overview | ScienceDirect Topics
    PBMR, or pebble bed modular reactor, is a type of small modular reactor that utilizes spherical graphite fuel elements with TRISO fuel particles, ...
  20. [20]
    [PDF] Multi-Physics System-level Simulations of a Generic Pebble Bed ...
    The reactor has an installed thermal capacity of 200 MW, cooled by pressurized helium gas with the primary coolant pressure of 6 MPa, inlet and outlet core ...<|separator|>
  21. [21]
    [PDF] Analysis of Fluid Flow and Heat Transfer Model for the Pebble Bed ...
    Jun 15, 2012 · Simulation of flow and heat transport of the pebble bed modular reactor: For the PBMR, the coolant flows downwards through the voids between ...
  22. [22]
    [PDF] Investigation of Local Heat Transfer Phenomena in a Pebble Bed ...
    May 15, 2009 · The objective of this work is to identify the computational tools and techniques available to resolve local fluid behavior in the core of a ...
  23. [23]
    [PDF] Heat Transfer in Pebble-Bed Nuclear Reactor Cores Cooled by ...
    It is crucial to characterize the heat transfer within this unique geometry as this informs the safety limits of the reactor. The work presented in this ...
  24. [24]
    From field to factory—Taking advantage of shop manufacturing for ...
    The move of nuclear plant construction from the field to the factory for small, advanced pebble bed modular reactor (PBMR) designs has significant benefits.
  25. [25]
    PBMR: Clean, Safe, And Affordable Energy - Schiller Institute
    Each module would be sized to produce 400 MWt (165 MWe nominal), which is about 18% of the output of conventional reactors such as the ones at Koeberg near Cape ...
  26. [26]
    Integrated design approach of the pebble BeD modular reactor ...
    A PBMR module consists of a graphite-moderated, helium-cooled reactor in which the gas is heated by the nuclear fission process, and a direct cycle power ...
  27. [27]
    PBMR: the future is now - Modern Power Systems
    Aug 20, 2001 · The design target construction cost for a commercial-scale PBMR plant, consisting of 10 modules with a total output of about 1 200 MWe, is about ...
  28. [28]
    Advanced modularity design for the MIT pebble bed reactor
    Rather than relying on the economies of scale to reduce costs, the economies of mass production will be used. By building smaller plants with factory built and ...
  29. [29]
    Major milestones of HTR development in Germany and still open ...
    For more than 50 years the pebble-bed High Temperature Reactor (HTR) has been under development in Germany. Forschungszentrum Jülich (FZJ), Aachen ...
  30. [30]
    [PDF] Pebble Bed Modular Reactor. - Nuclear Regulatory Commission
    The PBMR system has been designed to deal with nuclear waste efficiently and safely. There will be enough room for the spent fuel to be stored in dry storage ...Missing: factory | Show results with:factory<|separator|>
  31. [31]
    The Atomic Show #033 – Pebble Power (pebble bed reactors)
    We talk a bit about the inventor of the pebble bed concept – Rudolf Schulten – and about the success of the demonstration and testing reactor built using his ...
  32. [32]
    AVR Juelich - World Nuclear Association
    Details. Reactor Type, High Temperature Gas-Cooled Reactor (or HTGR). Model, Pebble bed reactor prototype ; Timeline. Construction Start, Tuesday, 1 August 1961.
  33. [33]
    [PDF] Pebble Bed Evolution. - NRC
    Despite being the first prototype, the AVR achieved a utilisation factor of approximately 70 percent over Its 21-year operating life The value of the ...Missing: early history
  34. [34]
    (PDF) AVR prototype pebble bed reactor: A safety re-evaluation of ...
    May 22, 2025 · The AVR pebble bed reactor (46 MWth) was operated 19671988 at coolant outlet temperatures up to 990 °C, which are suitable for process heat ...
  35. [35]
    avr juelich - PRIS - Reactor Details
    HTGR. Pebble bed reactor prototype. ARBEITSGEMEINSCHAFT VERSUCHSREAKTOR GMBH ; Reference Unit Power (Net Capacity), Design Net Capacity, Gross Capacity ; 13 MW ...
  36. [36]
    OCR Document
    PBMR technology was initially developed in Germany, where two PBMR-type demonstration reactors operated successfully between 1965 and 1989. The PBMR project in ...Missing: timeline | Show results with:timeline
  37. [37]
    The demise of the pebble bed modular reactor
    Jun 22, 2009 · The South African project's appalling budget and time over-runs and the company's inability to complete a finished design may scare away other ...Missing: cancellation | Show results with:cancellation
  38. [38]
    Nuclear Power in South Africa
    Jul 29, 2025 · ... Pebble Bed Modular Reactor (PBMR). It is a high-temperature gas-cooled reactor (HTR) design, for both electricity generation (through a ...
  39. [39]
    South Africa committed to PBMR revival
    Dec 5, 2024 · South Africa began developing the PBMR in the 1990s, but in 2010, the South African government ceased funding for the project due to a lack of viable customers ...Missing: cancellation | Show results with:cancellation
  40. [40]
    [PDF] South Africa Nuclear Chronology
    Minerals and Energy Minister Phumzile Mlambo-Ngcuka states that South Africa's Cabinet has endorsed a five-to- ten year plan to develop the Pebble Bed Modular ...Missing: timeline | Show results with:timeline
  41. [41]
    History - PBMR
    Rudolf Shulten developed the concept for a modular pebble bed reactor in Germany in the late 1950s. Knowledge gained from the German AVR led to the design ...Missing: invention | Show results with:invention
  42. [42]
    [PDF] Pebble bed modular reactor—the first Generation IV ... - Stanford
    The PBMR currently has an average coolant exit temperature of 9008C under normal operating conditions. This was set to ensure that the peak fuel temperature ...
  43. [43]
    MHI Signs MOU with PBMR Pty LtdOn Development of Small-size ...
    Feb 4, 2010 · The new MOU was concluded based on PBMR Pty's high evaluation of MHI's solid record in design and production capability as well as its record of ...Missing: founding | Show results with:founding
  44. [44]
    Want a Proudly South African reactor? Buy one from the USA!
    May 19, 2021 · In fact, PBMR (Pty) Ltd at one point had both a US investor (Exelon and later Westinghouse) and a UK investor (British Nuclear Fuels Ltd).
  45. [45]
    ESI Update: History of nuclear in South Africa - Power Engineering
    Feb 19, 2019 · From 1993, South Africa was developing the Pebble Bed Modular Reactor (PBMR) together with international partners.
  46. [46]
    Why I pulled the plug on the PBMR - Hogan - DOCUMENTS
    Sep 17, 2010 · Why I pulled the plug on the PBMR - Hogan. Barbara Hogan |. 17 September 2010. Minister says it would have cost a further R30bn+ to bring ...Missing: cancellation | Show results with:cancellation
  47. [47]
    SA mothballs Pebble Bed Reactor - Brand South Africa
    Sep 17, 2010 · 17 September 2010. The South African government has taken the tough decision to cut its losses and cancel further investment in the Pebble ...
  48. [48]
    Government drops final curtain on PBMR - World Nuclear News
    Sep 20, 2010 · The government of South Africa has formally announced its decision to no longer invest in the Pebble Bed Modular Reactor (PBMR) project.Missing: termination | Show results with:termination
  49. [49]
    PBMR company 'running out of money' - IOL
    Feb 19, 2010 · The Pebble Bed Modular Reactor (PBMR) company announced yesterday that it was set to retrench 75 percent of its staff because it was running out ...
  50. [50]
    South Africa Government will not finance PBMR nuclear reactor
    Sep 23, 2010 · The South African Government will no longer invest in the Pebble Bed Modular Reactor (PBMR) project, whose cost is estimated at €3.2bn ...
  51. [51]
    PBMR Project Winding Down – Entering Intellectual Property ...
    After about ten years of various design changes and contractor shifts, the project leaders decided last year to abandon the direct cycle gas turbine part of the ...
  52. [52]
    [PDF] PBMR's Safety Features.
    In contrast, the Pebble Bed Modular Reactor (PBMR) is inherently safe as a result of the design, the materials used, the fuel and the natural physics involved ...
  53. [53]
    [PDF] triso-coated fuel particle performance
    The core average exit temperatures currently in the range of 800ºC to 950ºC with peak fuel temperatures of 1200ºC to 1250ºC, which is higher than for LWRs Long- ...
  54. [54]
    [PDF] TRISO Fuel: Design, Manufacturing, and Performance
    • Temperature transients are relatively slow (days). • Peak fuel temperatures are limited to ~1600°C in modular HTGR designs. • Fuel particles are designed to ...
  55. [55]
    Loss-of-cooling tests to verify inherent safety feature in the world's ...
    Jul 17, 2024 · There will be no significant impact on the helium natural convection if the pressure is larger than 1.0 MPa. Even if the malfunction of RCCS is ...
  56. [56]
    Passive cooling of the PBMR spent and used fuel tanks
    Three diverse methods were used to verify the passive cooling ability of the tanks and showed that there is a high confidence that the decay heat can be removed ...
  57. [57]
    [PDF] how the pbmr works
    While a typical LWR has a thermal efficiency (heat in, power out) of 33 percent, a heat efficiency of about. 42 percent is anticipated in the basic PBMR ...
  58. [58]
    Assessment of thermal performance improvement of GT-MHR by ...
    Moreover, a helium cooled Pebble Bed Modular Reactor (PBMR) with 400 MWth power and 43.2% cycle efficiency was under development in South Africa but in 2010 ...
  59. [59]
    [PDF] The Design of a Reduced Diameter Pebble Bed Modular Reactor for ...
    May 21, 2009 · The PBMR design couples very high thermal efficiencies ... PBMR 400. MWth design according to their performance. 3.2.3.2. Power Peaking Factor.
  60. [60]
    Characteristics of a different fuel cycle in a PBMR-400 for burning ...
    Neutronic feasibility study of U-Th-Pa based high burnup fuel for pebble bed reactors ... The objective is to attain a target burnup greater than 100 GWd/T ...
  61. [61]
    Fuel burnup performance of an OTTO refueling pebble bed reactor ...
    ▻ The maximum target burnup of 74 GWd/t is obtained for the core with the OTTO scheme. ▻ The target burnup is 22% less than that of the multi-pass scheme.
  62. [62]
    A possibility of highly efficient uranium utilization with a pebble bed ...
    In order to achieve highly efficient natural uranium utilization with a once-through fuel cycle, an idea of a pebble bed type fast reactor is investigated.
  63. [63]
    Safeguards and Security for High-Burnup TRISO Pebble Bed Spent ...
    Feb 22, 2024 · In both reactors, the TRISO fuel particles are embedded in a graphite matrix, which is the fuel element, and a neutron moderator. Each TRISO ...Missing: configuration | Show results with:configuration
  64. [64]
    [PDF] Assessment of ORIGEN Reactor Library Development for Pebble ...
    The PBMR-400 benchmark problem specification consists of a number of separate conditions, including both neutronic and thermal-hydraulic calculations. A brief ...
  65. [65]
    Pebble bed reactor fuel cycle optimization using particle swarm ...
    Pebble bed reactors (PBR) features, such as robust thermo-mechanical fuel design and on-line continuous fueling, facilitate wide range of fuel cycle ...
  66. [66]
    [PDF] The HTR-PM Plant Full Scope Training Simulator
    A thermal efficiency. (heat in, electric power out) of more than 40% is expected in the HTR-PM power plant, while a typical Pressure Water Reactor has a thermal.
  67. [67]
    [PDF] Waste Characteristics of Spent Nuclear Fuel from a Pebble Bed ...
    The waste form of the spent pebble fuel is more robust and will perform better than light water reactor fuel at the United States repository at. Yucca Mountain.
  68. [68]
    The environmental competitiveness of small modular reactors: A life ...
    Life cycle GHG emissions of the W-SMR are between 5.9 and 13.2 g of CO2-eq/kwh. · The GHG emissions of the AP1000 are 9% less than the W-SMR. · The W-SMR's ...<|separator|>
  69. [69]
    Economic Feasibility of Hydrogen Generation Using HTR-PM ... - MDPI
    One of the key advantages of the HTR-PM is its ability to supply both high-temperature heat and electricity, making it ideal for hydrogen production through ...
  70. [70]
    Technical and economic analysis of a pebble bed modular reactor ...
    Under a Brayton thermal cycle, a power plant could have a thermal efficiency of around 40%. This efficiency can be increased by combining two or more ...
  71. [71]
    Next Generation Reactors: Safe and Economical Tools for ...
    Nov 16, 2017 · “Thanks to their prefab construction model and their smaller size, the capital cost is lower for SMRs than for the typical large reactors ...
  72. [72]
    Pebble bed modular reactor demonstration plant is funded but not ...
    When the programme was announced in 1998, South Africans were told the demonstration plant would be completed in 2004 and it would cost R2bn. In the event of ...Missing: overruns | Show results with:overruns
  73. [73]
    What happened to the Pebble Bed Modular Reactor?
    Dec 22, 2023 · PBMR Project has never been shut down. Not even one day. PBMR Project is suffering because of the racism of the Eskom Enterprises (EE) Engineers ...
  74. [74]
    PBMR myths and facts - Eloff, Donaldson debate whether SA's ...
    Aug 26, 2022 · The PBMR project had sucked in a staggering R30bn in State investment, employed hundreds of scientists and even created a working prototype at NW University.Missing: cost overruns<|control11|><|separator|>
  75. [75]
    China Begins Construction Of First Generation IV HTR-PM Unit
    Dec 27, 2012 · China has broken ground on a three billion-yuan (about 476 million US dollars, 364 million euro) demonstration high-temperature pebble bed modular nuclear ...
  76. [76]
    China's demonstration HTR-PM enters commercial operation
    Dec 6, 2023 · The HTR-PM features two small reactors (each of 250 MWt) that drive a single 210 MWe steam turbine. It uses helium as coolant and graphite as ...
  77. [77]
    China small modular pebble beds will be $400 million for 200 MW ...
    Aug 15, 2017 · The cost of China's smaller modular pebble bed nuclear reactors should only be $420 million for a 210 MW version and $1.2 billion for a threepack.
  78. [78]
    [PDF] X-Energy-presentation-National-Governors-Association-11-10-21.pdf
    • Results in a Levelized Cost of Electricity well under $60/MWh-e and deployment in less than ... Artist Rendering of Xe-100 Plant. Page 8. © 2020 X-energy ...Missing: per | Show results with:per
  79. [79]
    Amazon Backs Massive Nuclear SMR Deployment: 5 GW with X ...
    Oct 16, 2024 · Amazon will back the deployment of 5 GW of new X-energy small modular reactor (SMR) projects by 2039, starting with an initial four-unit 320-MWe Xe-100 plant.<|control11|><|separator|>
  80. [80]
    Economic Competitiveness of Small Modular Reactors in a Net Zero ...
    SMRs have higher cost per kW but can be a complement at low prices, and a competitor at higher prices, with overnight costs 1.06-1.26 times that of large  ...
  81. [81]
    Techno-economic analysis of advanced small modular nuclear ...
    SMRs do not represent dramatic improvements in economics compared to large reactors. •. Factory production allows SMRs to contain construction delays and cost ...
  82. [82]
    [PDF] The Pebble Bed Modular Reactor An obituary
    The Jülich report found that such fuel failure would contaminate reactor components on orders of magnitude higher than similar con- tamination in ...
  83. [83]
    Pressure buildup analysis of TRISO-coated fuel particles
    Aug 15, 2021 · In this paper we analyzed pressure buildup inside TRISO particles including also binary and ternary fission gases.
  84. [84]
    [PDF] Safety issues with the South African Pebble Bed Modular Reactor
    temperature were not relevant to the South African PBMR because the fuel quality problems ... build a demonstration module PBMR and nuclear fuel manufacturing ...
  85. [85]
    [PDF] HTGR Dust Safety Issues and Needs for Research and Development
    Dust generation in pebble bed reactors is presumed to result primarily from friction, both between pebbles within the core, and between pebbles and the fuel ...
  86. [86]
    Nuclear graphite wear properties and estimation of graphite dust ...
    Apr 15, 2017 · Due to the fuel element cycling in the pebble bed gas-cooled reactor, there are lots of kinetic interactions between the graphite components ...
  87. [87]
    Integrated internal-external thermal modeling for packed pebble beds
    Jul 1, 2024 · ... pebble avalanches and DEM jamming may occur leading to reactivity issues in PBRs. Such events are known to happen at a random time and a ...Missing: manufacturing | Show results with:manufacturing
  88. [88]
    [PDF] The first stage of Licensing of PBMR in South Africa and Safety Issues
    With reference to the above issues raised it is also difficult at this stage to see how the extreme fuel parameters in the PBMR core can be calculated when the ...Missing: fabrication | Show results with:fabrication
  89. [89]
    South African Safety Assessment Framework for the Pebble Bed ...
    At the HTR 2006 Conference, the framework and major challenges on safety assessment that the South African National Nuclear Regulator (NNR) faces in developing ...<|separator|>
  90. [90]
    Appeals rejected against PBMR fuel plant - World Nuclear News
    Jan 30, 2007 · Moreover, appellants also opposed the delinking of the pilot fuel plant and the demonstration PBMR, which were granted RoDs simultaneously. Van ...Missing: political | Show results with:political
  91. [91]
    Licensing small modular reactors: A state-of-the-art review of the ...
    The licensing challenges are: (1) fees charged by regulators; (2) regulatory capability gaps; and (3) lengthy licensing duration. The identified barriers and ...
  92. [92]
    Pebble bed modular reactor demonstration plant is funded but not ...
    The R6bn was approved by parliament on two conditions: (1) by February 2010, the PBMR needed to attract additional private investment - other than the US ...Missing: issues overruns
  93. [93]
    South Africa cancels PBMR funding
    Sep 20, 2010 · The parent agency of South African electricity utility Eskom has announced plans to cut off the funding of the Pebble Bed Modular Reactor ...
  94. [94]
    A No-Regret Option? South Africa's Nuclear Future - SAIIA
    Mar 1, 2021 · However, he also terminated the PBMR programme. It became evident that the project would not commence owing to its expense and political ...
  95. [95]
    Pebble bed project's closure generates explosive debate - IOL
    Kelvin Kemm bemoans the decision to abandon the pebble bed modular reactor (PBMR), appearing to argue that South Africa was abandoning an investment programme ...<|separator|>
  96. [96]
    Chinese pebble-bed reactor passes “meltdown” test
    Jul 24, 2024 · New testing done at China's Shidaowan nuclear power plant has confirmed its ability to be naturally cooled down, an industry-first milestone ...
  97. [97]
    Testing the feasibility of multi-modular design in an HTR-PM nuclear ...
    Mar 21, 2025 · The HTR-PM plant consists of two inherently safe nuclear reactors of 200 MWt, adopts the scheme of two reactor modules driving a common steam ...
  98. [98]
    [PDF] DESIGN, SAFETY FEATURES & PROGRESS OF HTR-PM
    Feb 21, 2018 · HTR-PM is a High Temperature Reactor- Pebble-bed-Module, with a steam turbine cycle, two NSSS, and a cylindrical core. It aims to keep inherent ...
  99. [99]
    The Shandong Shidao Bay 200 MWe High-Temperature Gas ...
    The thermal power of a single HTR-PM reactor module is 250 MWth, the helium ... Construction of the high-temperature gas-cooled reactor pebble-bed module ...Missing: specifications | Show results with:specifications
  100. [100]
    Coordinated Control of the World's First Multi-Modular High ...
    Sep 27, 2025 · The HTR-PM is the world's first multi-modular high temperature gas-cooled reactor power plant, having successfully entered to its commercial ...Missing: benefits | Show results with:benefits
  101. [101]
    HTR-PM heating project commissioned - World Nuclear News
    Apr 2, 2024 · Each reactor is loaded with more than 245,000 spherical fuel elements ('pebbles'), each 60 mm in diameter and containing 7 g of fuel enriched to ...Missing: specifications | Show results with:specifications<|separator|>
  102. [102]
    Overview and Progress of High Temperature Reactor Pebble-bed ...
    Jan 16, 2025 · Overview and Progress of High Temperature Reactor Pebble-bed Module Demonstration Project (HTR-PM) ; Place: Weihai (China) ; Country of ...
  103. [103]
    Nuclear Power in China
    Construction cost is expected to be CNY 15,751/kWe ($2450/kWe) and power cost CNY 0.403/kWh for the first unit and dropping to CNY 0.38/kWh (5.9 ¢/kWh) ...
  104. [104]
    Impressive Milestones Achieved on Chinese Advanced Nuclear ...
    Dec 7, 2023 · 1. Built on a site near Shidao Bay, also known as Shidaowan, the HTR-PM is the world's first fourth-generation nuclear design to enter commercial operation.
  105. [105]
    Radiation safety and fuel performance of pebble-bed modular high ...
    Aug 1, 2025 · This study focused on the 10 MW high-temperature gas-cooled experimental reactor (HTR-10), the only operational pebble-bed modular HTGR for testing that can ...
  106. [106]
    INET HTR Fuel Pebble Qualification | NRG PALLAS
    China is the place of the first demonstrator of a High-Temperature Reactor (HTR). This reactor type is known for its high efficiency due to the high temperature ...
  107. [107]
    X-energy Selects Constructors for Design and Deployment of Xe ...
    Jul 21, 2022 · X-energy's Xe-100 is a next generation high-temperature gas reactor built on decades of research, development, and operating experience. Each ...
  108. [108]
    Advanced Reactor Demonstration Program (ARDP) - X-energy
    The Xe-100 consists of four 80 MWe reactors and a total output of 320 MWe of flexible, reliable, carbon-free power. The design includes the ability to scale-up ...
  109. [109]
    X-energy Closes Upsized $700 Million Series C-1 Financing Round ...
    Feb 6, 2025 · X-energy, a leader in advanced nuclear reactor and fuel technology, today announced the closing of its upsized Series C-1 financing round of $700 million.
  110. [110]
    Amazon Invests in X-energy to Support Advanced Small Modular ...
    Oct 16, 2024 · X-energy's pioneering Xe-100 advanced small modular reactor and TRISO-X fuel are among the safest and most reliable clean energy technologies.Missing: per | Show results with:per
  111. [111]
    X-energy, Amazon, Korea Hydro & Nuclear Power, and Doosan ...
    Aug 25, 2025 · The parties aim to mobilize up to $50 billion in public and private investments for Xe-100 projects and the expansion of associated supply chain ...<|separator|>
  112. [112]
    Xe-100 - Nuclear Regulatory Commission
    The U.S. Nuclear Regulatory Commission (NRC) is currently engaged in pre-application activities with X Energy, LLC. (X-energy) starting in September 2018. X- ...
  113. [113]
    Dow And X-energy Submit Construction Application For Texas ...
    Apr 1, 2025 · X-energy has completed the engineering and preliminary design of the Xe-100, has begun development and licensing of a Triso-X fuel fabrication ...<|separator|>
  114. [114]
    NRC Publishes 18-Month Review Schedule for Xe-100 Construction ...
    Jun 16, 2025 · The NRC published an 18-month review timeline for the Texas Gulf Coast project and will concurrently proceed with its environmental assessment.Missing: progress | Show results with:progress
  115. [115]
    NRC speeds timeline for Dow/X-energy reactor permit review
    Jun 18, 2025 · The 18-month timeline halves NRC's “generic schedule” for a construction permit application. But Dow is unlikely to greenlight the Texas project before 2028.Missing: progress | Show results with:progress
  116. [116]
    Energy Northwest and X-energy Sign Joint Development Agreement ...
    Jul 19, 2023 · Under the JDA, the Xe-100 project is expected to be developed at a site controlled by Energy Northwest adjacent to Columbia Generating Station.
  117. [117]
    Washington nuclear facility will deploy 12 Amazon-funded SMRs
    Oct 16, 2025 · X-energy's “advanced reactor design, the Xe-100, will be used in Amazon's partnership with Energy Northwest to develop four SMRs in the first ...
  118. [118]
  119. [119]
    Centrica and X-energy Sign Joint Development Agreement to ...
    Sep 14, 2025 · A 12-unit Xe-100 deployment at Hartlepool could add up to 960 megawatts (“MW”) of new capacity, enough clean power for 1.5 million homes and ...
  120. [120]
    X-energy Confirms Feasibility of Xe-100 Advanced Small Modular ...
    Sep 25, 2025 · X-energy's Xe-100 SMR is an 80-megawatt (“MW”) high-temperature gas-cooled reactor uniquely suited to Alberta's energy needs. In addition to ...Missing: pebble bed
  121. [121]
    X-energy Selects Clark Construction Group for $48.2 Million ...
    Aug 5, 2025 · X-energy is advancing its initial Xe-100 plant at Dow Inc.'s UCC Seadrift Operations manufacturing site on the Texas Gulf Coast. Once complete, ...
  122. [122]
  123. [123]
  124. [124]
    South Africa To Revive Abandoned Pebble Bed Modular Reactor ...
    South Africa plans to revive its small modular nuclear reactor (SMR) project and increase nuclear and gas to 16% of total generation capacity within 14 years, ...Missing: Regulator | Show results with:Regulator
  125. [125]
  126. [126]
    South Africa 'committed to new nuclear and PBMR'
    Dec 3, 2024 · The South African government remains committed to the use of nuclear energy and is planning to revive its Pebble Bed Modular Reactor programme and embark on ...Missing: revival | Show results with:revival
  127. [127]
    Welcome - PBMR
    "The South African PBMR technology is the leader in the world for generation IV type reactor and a leader in HTGR fuel developments." how safe is PBMR ™? The ...<|control11|><|separator|>
  128. [128]
  129. [129]
  130. [130]
    Decarbonizing aluminum production: Integrating high-temperature ...
    Oct 3, 2025 · Decarbonizing aluminum production: Integrating high-temperature modular nuclear reactors for sustainable energy supply ... HTGR pebble-bed reactor.
  131. [131]
    [PDF] HTR-PM Project and Nuclear Hydrogen Production
    Sep 21, 2024 · A 600MWe (1500MWth) HTGR integrated with hydrogen plant can meet energy/gas demand of ~1.8 Mt / Year steelmaking, reducing ~3 Mt CO2 emissions.
  132. [132]
    China's HTR-PM heating project begins operation
    Apr 16, 2024 · It can replace 3,700 tonnes of coal every heating season and reduce carbon dioxide emissions by 6,700 tonnes. The plant was declared to be in ...
  133. [133]
    Dow, X-energy to drive carbon emissions reductions through ...
    The Xe-100 reactor plant would provide cost-competitive, carbon free process heat and power to the Dow facility. Dow also intends to take a minority equity ...
  134. [134]
    Powering Heavy Industry & Manufacturing with Advanced Nuclear ...
    Jul 18, 2025 · X-energy is leading the development of Small Modular Reactors (SMRs) with the Xe-100 high-temperature gas-cooled reactor. Designed for safety, ...
  135. [135]
    [PDF] U.S. Domestic Pebble Bed Reactor: Security- by-Design
    “Plant features include inherent reactor characteristics combined with engineered safety and security features that allow for facility recovery and ...
  136. [136]
    [PDF] High Temperature Reactors Technology Assessment
    High temperature reactor (HTR) systems (i.e., reactors with core outlet temperatures between 700°C and. 950°C) offer higher thermodynamic efficiency of ...<|separator|>
  137. [137]
    Nuclear Power Reactors
    Two will be gas-cooled. Most are expected to run at much higher temperatures than today's water-cooled reactors. See Generation IV Reactors paper.Missing: disadvantages | Show results with:disadvantages
  138. [138]
    The pebble bed reactor at the Shidaowan nuclear power plant - etson
    Nov 27, 2024 · The HTR-PM is a so-called pebble bed reactor, a type of HTR that uses fuel spheres instead of fuel rods, which are piled up in large numbers in ...
  139. [139]
    Proliferation resistance of light water reactor versus pebble bed reactor
    The objective of this study was to compare the PR of a PBR used fuel with that of a light water reactor (LWR) of an equivalent thermal power. Only four ...
  140. [140]
    Water vs. Gas Cooled Reactors: Round 1 - Atomic Insights
    Large pressurized water reactors, on the other hand, have a significant cost disadvantage compared to gas cooled reactors; their pressure vessels are more ...
  141. [141]
    Advanced Nuclear Power Reactors
    Apr 1, 2021 · These and other nuclear power units now operating have been found to be safe and reliable, but they are being superseded by better designs.Missing: alternatives | Show results with:alternatives
  142. [142]
    The packing factor of the pebble bed in molten salt reactor
    Fuel pebbles are loaded from the bottom of the reactor cavity and float in molten salt, and finally settle at the top part of the core. Thousands of fuel ...<|separator|>
  143. [143]
    Advanced nuclear energy: the safest and most renewable clean ...
    Nuclear energy is much safer than solar and wind renewables and has a lower life cycle carbon footprint. The disadvantage of nuclear is its long-lived nuclear ...
  144. [144]
    Pebble Bed Nuclear Reactors Emerge as Leading Decarbonization ...
    Dec 1, 2021 · Advanced new reactor designs offer the potential to transform the nuclear power industry, providing safe, carbon-free electricity that ...
  145. [145]
    New capabilities for rapid depletion analysis of pebble-bed reactors ...
    A new pebble bed depletion modeling capability has been developed for ORIGAMI for the SCALE 7.0 release. ORIGAMI facilitates rapid estimation of pebble-bed ...
  146. [146]
    [PDF] Safeguards Challengers for Pebble-Bed Reactors (PRRs)
    This design (1) enables the use of passive nuclear safety systems in a power plant with a large electrical output, (2) allows instant scale-up after.
  147. [147]
    [PDF] Advanced Reactor Safeguards & Security Nuclear Material Control ...
    It provides a summary of material control and accounting (MC&A) for pebble bed reactors (PBRs) and addresses some of the main challenges with current PBR ...
  148. [148]
    [PDF] USDC20061213-1 PBMR White Paper: Defense-in-Depth Approach.
    Dec 13, 2006 · This paper identifies the regulatory issues related to the PBMR approach to defense-in-depth for which U.S. Nuclear Regulatory Commission ...Missing: widespread adoption
  149. [149]
    [PDF] Transcript - ACRS - X Energy Xe-100 Topical Report Reviews
    Jun 3, 2025 · These three topical reports are. 10 important to understand the safety basis for the. 11. Xe-100 small module reactor as we get closer to these.
  150. [150]
    Safeguards Challenges for Pebble-Bed Reactors (PBRs):Peoples ...
    Sep 12, 2025 · The modular characteristics of the reactor match much of the need elsewhere in the world. PBRs have major safety advantages and a radically ...
  151. [151]
    SMR Developer X-Energy Completes Canadian Pre-Licensing ...
    Jan 18, 2024 · Upon completion of these phases, CNSC concluded there are no fundamental barriers to licensing the Xe-100. X-energy said the outcome “increases ...<|separator|>
  152. [152]
    The rise and fall of South Africa's PBMR nuclear project - LinkedIn
    Apr 15, 2025 · But politics happened. Inconsistent government support and major leadership turnover started to weaken the project.
  153. [153]
    Small Modular Reactors: A Realist Approach to the Future of ...
    Apr 14, 2025 · Small modular reactors (SMRs) are the future of nuclear power, and they could become an important strategic export industry in the next two decades.
  154. [154]
    Small modular reactors: what are the barriers to deployment?
    Apr 26, 2022 · A harmonised regulatory system ... One of the key challenges facing SMRs is the need to secure design and operating licences within a reasonable ...<|separator|>