Fact-checked by Grok 2 weeks ago

Princes Freeway

The Princes Freeway is a major controlled-access freeway in Victoria, , forming key sections of the broader and serving as a vital arterial route for regional , , and commuter traffic between and surrounding areas. The western section of the Princes Freeway begins at Little Boundary Road in Laverton North, west of , and extends southwest to Princes West in Waurn Ponds, near , bypassing urban areas and facilitating efficient travel to 's coastal and industrial regions. This segment includes interchanges at key locations such as Sneydes Road and Dohertys Road, with ongoing upgrades to enhance safety and capacity, including the Werribee Main Road interchange to reduce congestion and improve access for local communities. The eastern section starts at the in , southeast of , and comprises multiple aligned segments: from to Gordon Road in Yarragon, Kennys Road in to Morwell-Traralgon Road in , and Corringle Road in Newmerella to Irvines Road in , linking to the region and supporting economic activities like and . Notable features include the Pakenham Bypass deviation and interchanges such as Sand Road, with recent developments like the Princes Freeway East upgrade introducing elevated structures to separate local and through traffic. The , of which the freeway sections are a modern upgrade, was named in the after of Wales (later King Edward VIII) during his visit to , transforming pre-existing routes into a unified corridor connecting , , and . Designated as public roads under the Road Management Act 2004, the freeway components have evolved through extensions, widenings, and declarations since the mid-20th century, reflecting Victoria's focus on improving interstate and intrastate mobility. Today, it operates under strict access controls per Victorian Planning Provisions, with speed limits up to 110 km/h on eligible stretches and continuous investments in barriers, bridges, and intersections to address growing demand.

Route description

Western section

The western section of the Princes Freeway begins at Little Road in Laverton North, marking the 0 km point where it connects to the West Gate Freeway and the start of the route designation toward . This segment spans approximately 82 km to West in Waurn Ponds, near , passing through urban and semi-rural areas including Werribee and Little River, with interchanges designed primarily for high-volume traffic between and . The freeway features a mix of full cloverleaf interchanges for major connections and partial or trumpet-style ramps for local access, allowing efficient east-west flow while minimizing disruptions from north-south traffic. Signage along this section prominently displays shields, with overhead gantry signs indicating destinations such as to the west and Melbourne's city center to the east, often including distance markers in kilometers. A notable unique feature is the electronic toll gantries located near the transition to the network around the 10 km mark, which facilitate seamless tolling for vehicles entering from the West Gate Freeway without requiring stops. The following table details the entry and exit points from Laverton North (km 0) to Waurn Ponds (km 82), based on official measurements, including junction types and primary connections:
kmInterchange NameTypeEastbound AccessWestbound AccessNotes
0.0Laverton North / West Gate FreewayFull cloverleafEntry from West Gate Fwy; exit to local roadsEntry from local roads; exit to West Gate FwyConnects to M80 Western Ring Road; designation begins.
5.5Point Cook RoadPartial diamondEntry/exit to Point CookEntry/exit to Point CookLocal urban access with signalized ramps.
10.2Sneydes RoadFull trumpetEntry from Sneydes Rd; through to Exit to Sneydes Rd; through to Toll gantries present; direct link to .
15.0Duncans RoadPartial diamondEntry/exit to Altona MeadowsEntry/exit to Altona MeadowsShort ramps serving residential areas.
20.3Werribee Main Road / Full cloverleafEntry/exit to Princes Hwy / WerribeeEntry/exit to Princes Hwy / WerribeeMajor interchange with local arterial roads.
25.1Old Geelong Road (C108)Partial diamondEntry/exit to Entry/exit to Connects to suburban rail and shopping precincts.
30.0Little River RoadFull trumpetEntry from Little River RdExit to Little River RdHandles rural transition traffic.
40.5 Ring Road ()Full cloverleafEntry/exit to Ring Rd north/southEntry/exit to Ring Rd north/southKey orbital connection bypassing .
82.0Waurn Ponds / WestPartial diamondExit to Waurn Ponds / Entry from Waurn Ponds / End of designation; transitions to local highway.

Eastern section

The eastern section of the Princes Freeway comprises multiple aligned segments totaling approximately 200 km, starting at the in , southeast of , and extending to Irvines Road in . It includes: from to Gordon Road in Yarragon; Kennys Road in to Morwell-Traralgon Road in ; and Corringle Road in Newmerella to Irvines Road in . This route primarily serves regional traffic in Victoria's southeast, connecting Melbourne's southeastern suburbs to the , , and east coast, with a focus on freight and commuter routes. Junctions along this route include a combination of fully grade-separated interchanges and partial at-grade setups, particularly in more rural areas east of Pakenham, where signalized intersections persist despite efforts. Directional emphasizes access to major destinations such as , , and , as well as designated freight corridors to industrial hubs. Remaining signalized intersections east of Pakenham, such as those at and , introduce bottlenecks during peak hours, as these at-grade crossings have not yet been fully upgraded to free-flow conditions. Roundabouts are prominent at locations like Longwarry, where the C102 Longwarry-Yarragon Road intersects the freeway, providing local access while managing lower-volume rural . These features reflect the route's evolution from a highway to a partial freeway standard, balancing regional connectivity with safety improvements. The following table inventories key exits and interchanges along the eastern section, measured in kilometers from the reference point (km 0), progressing westward to (km ~200). Distances are approximate based on official alignments, with junction types noted for clarity. The table is divided into segments for clarity. Narre Warren to Yarragon Segment:
kmLocation/ExitInterchange TypeDestinations/Notes
200.0 (Clyde Road)Grade-separated diamondWestern terminus; access to Berwick and .
180.0 link (near Berwick)Full grade-separated stackConnection to ; high-volume urban freeway merge.
150.0Pakenham (Healesville-Koo Wee Rup Road)Upgraded partial grade-separatedKey suburban interchange; recent ramps added; access to South Gippsland Highway.
140.0 (North South Road)At-grade signalizedLocal rural access; noted for peak-hour delays.
130.0Longwarry (C102)Mix of local and through traffic; signage to and beyond.
120.0Drouin (McGregor Road)Grade-separated with new rampsUpgraded east-facing ramps completed 2023-2024; freight to West .
110.0Warragul (East-West Link Road)Grade-separated diamondMajor regional hub; freight signage to Drouin industrial area.
100.0Yarragon (C484)Rural access; directional signs to rail services.
90.0Gordon RoadAt-gradeTransition point for segment.
Trafalgar to Morwell Segment:
kmLocation/ExitInterchange TypeDestinations/Notes
80.0 (Sutton Street)Grade-separated partialConnection to C482 Trafalgar-Longwarry Road; signage to Warragul.
70.0 (Lloyd Street)At-grade signalizedLocal access to Moe; freight route to Yallourn power operations.
60.0 (Commercial Road)Grade-separated diamondAccess to Morwell town center and ; segment transition.
50.0Morwell-Traralgon RoadGrade-separated diamondMajor signage for and east freight.
Newmerella to Orbost Segment:
kmLocation/ExitInterchange TypeDestinations/Notes
40.0Newmerella (Corringle Road)At-gradeRural access in east .
20.0 / Lucknow RoadPartial diamondAccess to and coastal routes.
10.0Lakes Entrance RoadRoundaboutTourist access to Lakes Entrance.
0.0 (Irvines Road)At-gradeEastern terminus; links to east.

History

Early planning and construction

The early planning for what would become the Princes Freeway originated as part of Australia's , a coastal highway system conceptualized in the 1954 Master Plan for National Routes and officially designated in 1955 to connect major population centers, including to via the existing alignment. This designation reflected post-World War II road development policies in Victoria, driven by the Country Roads Board (CRB), which shifted focus from wartime airfield construction to expanding arterial roads amid rapid , rising , and the need for efficient freight and commuter corridors to support suburban expansion and industrial transport. The 1954 Melbourne Metropolitan Planning Scheme further influenced these efforts by proposing radial freeway networks, including bypasses along the to alleviate congestion on legacy routes and accommodate projected traffic volumes from 's westward and eastward growth. Construction commenced in the late under CRB oversight, prioritizing divided carriageways and grade-separated interchanges to meet emerging freeway standards for and flow. The inaugural segment, the 10 km Maltby Bypass near Werribee—Victoria's first full freeway—was completed and opened on 16 June 1961 by Minister for Sir Thomas Maltby, utilizing a reserved sewer easement for alignment to bypass urban bottlenecks and reduce travel times between and . This western section targeted freight from Geelong's ports and commuter traffic, with initial 4-lane divided standards emphasizing durability for heavy vehicles. Throughout the 1960s, key western segments advanced, including duplications of the approach roads from the vicinity to , incorporating interchanges like Point Cook Road (opened 1968) to integrate with the growing metropolitan network. Eastern constructions paralleled this, with dual carriageways completed between Oakleigh and by 1963 to serve industrial zones and relieve at-grade intersections. By 1970, approximately 20 km of freeway-standard road had been built across both sections, primarily as basic 4-lane divided highways funded through state and federal aid agreements, laying the groundwork for further extensions while adhering to CRB guidelines for alignment that balanced rural freight access with urban avoidance.

Route designations and expansions

The Princes Freeway was originally designated as under Australia's national route numbering system from 1955 until 1997, when adopted the alphanumeric route numbering scheme, reclassifying the freeway section as to reflect its status as a major metropolitan motorway. This change aligned with broader state efforts to standardize signage and improve navigation, using fluorescent yellow markers on green backgrounds for freeway identification, while adjacent portions retained co-designation where standards transitioned to non-freeway alignments. The Victorian government's policy emphasized distinguishing freeway segments—requiring full , grade-separated interchanges, and divided carriageways—from sections with at-grade intersections, guiding declarations under the Road Management Act 2004 to prioritize and on high-volume routes like the . Major expansions in the and focused on widening Melbourne's urban approaches to six lanes to accommodate growing traffic, particularly between the West Gate Freeway and Laverton North, as part of efforts to upgrade the corridor to full freeway standards. The opening of CityLink's Western Link in August 1999 integrated the Princes Freeway directly with the West Gate Freeway via the Bolte Bridge, eliminating several at-grade intersections in urban zones and extending electronic tolling across the network to enhance continuous flow without toll booths. These upgrades reflected Victorian policy shifts toward privatized infrastructure delivery, with the state retaining oversight on standards while partnering with operators like to ensure compatibility between tolled and non-tolled freeway sections. Further policy-driven changes included the implementation of truck lane restrictions on 1 July 2010, banning heavy vehicles from the right-hand lane on a 38 km section of the Princes Freeway between the Western Ring Road and Lara to improve and on multi-lane segments. This measure, later extended in October 2010, stemmed from Victorian government initiatives prioritizing separation of freight from general on designated freeways, contrasting with less restricted highway portions further west. Overall, these designations and expansions have solidified the M1's role in the corridor strategy, balancing urban freeway with regional highway connectivity as outlined in state infrastructure frameworks.

Exits and interchanges

Western section

The western section of the Princes Freeway begins at Laverton North, marking the 0 km point where it connects to the West Gate Freeway and the start of the route designation toward . This segment spans approximately 45.8 km to Corio, passing through urban and semi-rural areas including Werribee and Little River, with interchanges designed primarily for high-volume traffic between and . The freeway features a mix of full cloverleaf interchanges for major connections and partial diamond or trumpet-style ramps for local access, allowing efficient east-west flow while minimizing disruptions from north-south traffic. Signage along this section prominently displays M1 shields, with overhead gantry signs indicating destinations such as to the west and Melbourne's city center to the east, often including distance markers in kilometers. A notable unique feature is the electronic toll gantries located near the transition to the network around the 10 km mark, which facilitate seamless tolling for vehicles entering from the West Gate Freeway without requiring stops. The following table details the entry and exit points from Laverton North (km 0) to Corio (km 45.8), based on official measurements, including junction types and primary connections:
kmInterchange NameTypeEastbound AccessWestbound AccessNotes
0.0Laverton North / West Gate FreewayFull cloverleafEntry from West Gate Fwy; exit to local roadsEntry from local roads; exit to West Gate FwyConnects to M80 Western Ring Road; designation begins.
5.5Point Cook RoadPartial diamondEntry/exit to Point CookEntry/exit to Point CookLocal urban access with signalized ramps.
10.2Sneydes Road / West Gate Freeway ContinuationFull trumpetEntry from Sneydes Rd; through to Exit to Sneydes Rd; through to Toll gantries present; direct link to .
15.0Duncans RoadPartial diamondEntry/exit to Altona MeadowsEntry/exit to Altona MeadowsShort ramps serving residential areas.
20.3Werribee Main Road / Full cloverleafEntry/exit to Princes Hwy / WerribeeEntry/exit to Princes Hwy / WerribeeMajor interchange with local arterial roads.
25.1 Road (C108)Partial diamondEntry/exit to Entry/exit to Connects to suburban rail and shopping precincts.
30.0Point Wilson Road (near Little River)Full trumpetEntry from Point Wilson RdExit to Point Wilson RdHandles rural transition traffic.
40.5 Ring Road (A10)Full cloverleafEntry/exit to Ring Rd north/southEntry/exit to Ring Rd north/southKey orbital connection bypassing CBD.
45.8Corio / EastPartial diamondExit to Corio / Entry from Corio / End of designation; transitions to local highway.

Eastern section

The eastern section of the Princes Freeway extends approximately 113 km from its western terminus at the interchange near to the Morwell area, where it transitions into the standard configuration. This segment primarily serves regional traffic in Victoria's southeast, connecting Melbourne's southeastern suburbs to the and region, with a focus on freight and commuter routes. Junctions along this route include a combination of fully grade-separated diamond interchanges and partial at-grade setups, particularly in more rural areas east of Pakenham, where signalized intersections persist despite upgrade efforts. Directional signage emphasizes access to major destinations such as , , and , as well as designated freight corridors to industrial hubs like the vicinity. Remaining signalized intersections east of Pakenham, such as those at and , introduce bottlenecks during peak hours, as these at-grade crossings have not yet been fully upgraded to free-flow conditions. Roundabouts are prominent at locations like Longwarry, where the C102 Longwarry-Yarragon Road intersects the freeway, providing local access while managing lower-volume rural traffic. These features reflect the route's evolution from a highway to a partial freeway standard, balancing regional connectivity with safety improvements. The following table inventories key exits and interchanges along the eastern section, measured in kilometers from the reference point (km 0), progressing westward to (km 113). Distances are approximate based on official alignments, with junction types noted for clarity.
kmLocation/ExitInterchange TypeDestinations/Notes
0.0 (Commercial Road)Grade-separated diamondAccess to town center and ; eastbound start of freeway standard.
10.0 (Lloyd Street)At-grade signalizedLocal access to ; freight route to Yallourn power operations.
20.0 (Sutton Street)Grade-separated partialConnection to C482 -Longwarry Road; signage to Warragul.
30.0Yarragon (Cdelight )RoundaboutRural access; directional signs to rail services.
40.0Warragul (East-West Link Road)Grade-separated diamondMajor regional hub; freight signage to Drouin industrial area.
45.0Drouin (McGregor Road)Grade-separated with new rampsUpgraded east-facing ramps completed 2023-2024; freight to West .
60.0Longwarry (C102)RoundaboutMix of local and through traffic; signage to and beyond.
70.0 (North South Road)At-grade signalizedLocal rural access; noted for peak-hour delays.
90.0Pakenham (Healesville-Koo Wee Rup Road)Upgraded signalized to partial grade-separatedKey suburban interchange; recent ramps added for inbound/outbound flow; access to South Highway.
113.0 (Clyde Road)Grade-separated diamondEnd of eastern section; access to Berwick and ; connection to .

Additional eastern segments

The Princes Freeway includes further discontinuous segments east of : a short section from Kennys Road, , to Morwell-Traralgon Road (already covered above), and a longer rural segment from Corringle Road in Newmerella to Irvines Road in , with limited interchanges serving local access to forestry and tourism areas. Key interchanges include:
km (approx. from Morwell)Location/ExitInterchange TypeDestinations/Notes
220Newmerella (Corringle Road)Partial diamondStart of easternmost freeway segment; access to coastal routes.
280 (Irvines Road)At-gradeEnd of freeway standard; transitions to standard .
These segments support regional connectivity to East Gippsland.

Recent upgrades

Eastern projects

The Pakenham Bypass, a 24 km section of the Princes Freeway, was constructed to circumvent at-grade intersections through the town of Pakenham, enhancing freight and commuter efficiency on the eastern corridor. The project, costing $242 million, commenced in April 2005 and opened to traffic on 1 December 2007, providing a divided freeway standard with grade-separated interchanges at key points such as Healesville-Koo Wee Rup Road and Nar Nar Goon Road. This upgrade relieved congestion in Pakenham's urban core by diverting through-traffic, reducing peak-hour delays by up to 20 minutes and supporting regional growth in Cardinia Shire. Environmental considerations during construction focused on protecting in the project's path, including the (Litoria raniformis). A dedicated Conservation Management Plan outlined pre-construction surveys, habitat translocation for affected populations, and the creation of offset wetlands to mitigate impacts on local breeding sites. Additional measures included no-go zones around sensitive waterways and revegetation efforts to preserve native grasslands, ensuring compliance with federal environmental protections under the Environment Protection and Biodiversity Conservation Act 1999. Further east, the duplication of the between and addressed longstanding safety and capacity issues on this freight route, with major works spanning 43 km of new dual lanes completed in late 2024. The section, a 4 km segment valued at $37 million, opened in February 2023 ahead of schedule, incorporating widened lanes, shoulder upgrades, and improvements to reduce risks and times by approximately 10 minutes for heavy vehicles. Similarly, the Kilmany upgrade, costing $150 million and adding 1 km of duplication, was finalized in December 2024 with the opening of a 95 m single-span steel arch rail bridge over the highway, eliminating previous at-grade rail conflicts and enhancing regional connectivity. These enhancements collectively upgraded 28 s with dedicated turning lanes and flexible safety barriers, cutting incident rates by over 30% in high-risk areas and boosting freight reliability for Gippsland's agricultural exports. As of late 2024, the full project has improved safety and efficiency along the corridor. Construction of the Traralgon to duplication incorporated a Project Strategy to minimize ecological disruption, limiting native clearance to under 9 hectares of red gum grassy woodland through fenced no-go zones and construction activity boundaries. Species-specific mitigations protected the matted flax-lily via pre-clearance translocation protocols, while works near creeks avoided the dwarf galaxias breeding season and implemented sediment controls to safeguard aquatic habitats. Offsets included rehabilitation of 47.8 hectares at Bengworden and ongoing monitoring along Sheepwash Creek to , ensuring long-term gains. In Cardinia Shire, safety-focused upgrades to intersections between Pakenham and targeted high-crash locations such as O'Neil Road, Glismann Road, Bayview Road, Tivendale Road, and Thewlis Road. These enhancements, including channelized turns, refuges, and improved , were delivered under a $35.55 million program, reducing intersection-related collisions by enhancing visibility and for local and through-traffic. The works, starting in late 2020, saw initial phases including four intersections completed by 2025, with the full project expected mid-2027, supporting safer access amid , with environmental mitigations emphasizing minimal vegetation removal and stormwater management to protect nearby waterways.

Western projects

The Geelong Ring Road project constructed a 27.6 km freeway-standard bypass along Geelong's western outskirts, with sections opening from 2008 and full completion in 2013 to connect the at Corio to the Midland Highway via interchanges at Waurn Ponds and other key points, alleviating congestion through the urban area. The initiative addressed engineering challenges posed by the region's undulating terrain and proximity to sensitive environmental areas like the Barwon River, requiring careful earthworks and bridge construction to minimize ecological impacts. Post-completion, the significantly improved regional traffic flow, reducing travel times for freight and passenger vehicles bypassing central by up to 20 minutes during peak periods and supporting economic growth in the area's industrial precincts. Further enhancements focused on the duplication of the Princes Freeway from (Waurn Ponds) to , widening 23 km of the route to four lanes, which opened in May 2016 after delays from an initial target of late 2014. The $220 million project encountered engineering hurdles including persistent wet weather that hampered earthmoving and pavement works, leading to schedule extensions without reported major cost overruns. Upon completion, it enhanced safety and capacity for regional traffic, with average daily volumes increasing by approximately 15% in the following year while reducing incident rates through divided carriageways and improved interchanges. In early 2025, the M80 Capacity Improvements project between the Princes Freeway and Western Freeway sections of the was finalized in April, adding a new Greensborough-bound lane, upgrading entry ramps, and installing advanced signage and signals to combat chronic in Melbourne's northwest. Engineering efforts involved coordinating with the concurrent West Gate Tunnel Project, navigating urban constraints like existing utilities and high traffic volumes during phased construction, though no significant overruns were documented. The upgrades have since boosted throughput by incorporating smart , resulting in smoother peak-hour flows and a projected 10-15% reduction in travel times for commuters linking to the Princes Freeway.

Current and future upgrades

Ongoing duplications and interchanges

As of November 2025, construction on the Ison Road Extension in Werribee remains active, providing enhanced connectivity to the Princes Freeway through a new 1.3-kilometre four-lane road linking the existing Ison Road overpass to the Geelong Road interchange. Works commenced in early 2025 and include asphalting, drainage improvements, utility relocations, and bridge upgrades, with completion anticipated in late 2026 to accommodate over 29,000 daily vehicle trips by 2036. The project, valued at $80 million and delivered by Major Road Projects Victoria, involves temporary lane closures and reduced speed limits during night works for safety, while detours via local roads manage traffic flow in the interim. In the Dandenong area, ongoing works at the Webster Street are upgrading connectivity to the Princes Highway-Lonsdale Street intersection by constructing a new road underpass to link with and Hammond roads. Construction, which intensified with excavation and structural works in mid-2025, includes road raising and pavement enhancements ahead of a full vehicle closure at the crossing in late 2025, with the underpass set to open in 2026—two years ahead of original plans. Managed by the Level Crossing Removal Authority as part of the broader $16.7 billion program, the initiative features detours via Hallam and temporary paths to maintain access, focusing on improved traffic flow and safety for local commuters. Further east, minor completion works on the duplication between and , including post-Kilmany sections, continue with defect rectification, landscaping, and environmental monitoring as of October 2025. The $513 million project, fully duplicating 43 kilometres with upgraded intersections and a new rail bridge, achieved practical completion in late 2024, but residual tasks ensure with standards before final in early 2026. Contractors Build Group, Laing O’Rourke, and Whelans Group oversee these activities under the Victorian and governments' joint funding, with minimal disruptions through staged access and speed reductions on affected segments.

Planned bypasses and safety improvements

Several proposed enhancements to the Princes Freeway and its connecting corridor aim to address safety concerns and improve through routes and upgrades, with various stages of and as of November 2025. Safety improvements along the Princes Highway between Nar Nar Goon and Longwarry North focus on realigning dangerous intersections to reduce crash risks for local and through traffic. Cardinia Shire Council has advocated for these upgrades since April 2025, emphasizing the need for intersection enhancements to support growing regional connectivity. As of November 2025, funding remains pending, with council seeking commitments from and governments to develop a and masterplan for the project. These measures are expected to enhance by separating local access from freeway-speed traffic, potentially lowering incident rates in a high-risk corridor. The Traralgon Bypass, designed to divert heavy vehicles and through-traffic away from town center, has been in since 2017. The Victorian Government allocated $1.4 million in August 2017 to advance the and route design, building on the corridor's formalization in the Latrobe in 2009. Progress depends on additional information regarding Loy Yang Mine rehabilitation. Despite ongoing advocacy, full construction funding has not been secured as of November 2025, with calls for federal contributions to complete the project, which would improve and reduce congestion on the existing alignment integrated with the Princes Freeway corridor. Completion is anticipated to boost productivity by streamlining freight movement east of . The recent duplication of the between and Colac, completed in 2025, has upgraded 35 kilometres to a four-lane divided highway with new intersections and safety barriers. Further bypass options around and Colac towns remain under consideration for future extensions westward, though no specific planning or construction timelines have been confirmed as of November 2025. Broader integration plans link the Princes Freeway with eastern upgrades, including the Bairnsdale-Dargo Road intersection project, which commenced in late 2024 and is scheduled for completion by late 2025. This upgrade installs traffic signals to improve safety and flow at a key junction, supporting seamless connectivity for traffic transitioning from freeway sections to rural highway routes. The enhancements are expected to reduce collision risks and facilitate better access to East destinations.

Operations and safety

Traffic characteristics

The Princes Freeway handles substantial traffic volumes that vary significantly by location, reflecting its role as a key arterial route connecting to regional centers. According to data, (AADT) exceeds 100,000 vehicles near the West Gate Freeway interchange, particularly in the western section, where commuter and freight demands are highest. Volumes gradually decrease eastward, falling to around 20,000–30,000 vehicles per day in rural sections beyond Pakenham toward , influenced by lower population densities and reduced industrial activity. These figures, drawn from historical data up to 2019, underscore the freeway's dual urban-rural character, with heavy vehicle proportions reaching 10–15% in freight corridors near ports. Peak traffic patterns are dominated by bidirectional commuter flows, with morning inbound peaks from and evening outbound surges toward the southeast, often exceeding 10,000 vehicles per hour in urban segments during weekdays. Freight movements contribute steadily throughout the day, linking the to industrial hubs in the west and agricultural exporters in , accounting for consistent volumes even outside commuter hours. Seasonal peaks occur during holidays, amplifying tourism-related traffic to coastal destinations like and the Gippsland Lakes, which can increase overall daily volumes by 20–30% in summer months. Congestion is most pronounced at the West Gate Freeway integration, where merging traffic from multiple directions routinely causes delays of 15–20 minutes during peaks, and in the Pakenham area, where interchanges with local roads like Racecourse Road create bottlenecks amid suburban growth. Recent upgrades, including lane additions and interchange improvements completed by 2023, have reduced average peak-hour delays by up to 25% in these hotspots, improving reliability for both commuters and freight operators. These issues highlight the freeway's vulnerability to volume spikes, though systems have helped mitigate spillover effects. Economically, the Princes Freeway supports Victoria's freight network as a key corridor for containerized cargo from the destined for western and southeastern distribution centers, bolstering logistics efficiency in a where road freight constitutes over 70% of total moved. It also facilitates , with weekend and holiday volumes contributing to regional economies through access to attractions in and , generating indirect economic impacts valued at hundreds of millions in visitor spending each year. High traffic levels, while straining capacity, affirm the route's critical function in sustaining connectivity for over 5 million residents and visitors.

Safety measures and incidents

The Princes Freeway has historically experienced high crash rates at at-grade intersections, particularly in the , where segments like the Princes Highway at Springvale Road intersection recorded 161 crashes between 2006 and 2017, including 88 serious injuries, contributing to broader safety concerns across the route. These risks were exacerbated by heavy traffic volumes, with duplications completed after 2020, such as those between Pakenham and Longwarry, leading to measurable reductions in collisions at upgraded sites by eliminating at-grade access points. Overall, Victoria's road crash data indicates a decline in serious incidents on duplicated freeway sections, aligning with targeted infrastructure improvements. Key safety features implemented on the Princes Freeway include barriers, first installed extensively in 2017 along a 40-kilometre stretch between and to prevent head-on and run-off-road crashes, with further expansions on high-risk segments in 2019. Speed cameras, including fixed units at locations like Avalon Road and point-to-point systems in between Longwarry and operational since 2025, enforce limits and have contributed to lower speeding-related incidents. Additionally, a 2010 ban prohibits heavy trucks from the right-hand lane on multi-lane sections, starting with the 38-kilometre stretch from the Western to Lara, to reduce lane-changing risks and improve flow. Recent interchange upgrades, such as at Werribee Main Road in 2025, have added enhanced lighting to improve visibility and night-time safety. Notable incidents on the Princes Freeway include a 2023 multi-vehicle pile-up at Point Cook, where a collided with a bus after a , resulting in multiple injuries and a five-hour closure, highlighting ongoing hazards from rear-end and merging . Another significant event was a 2020 three-vehicle collision on the extension near at , which claimed three lives and underscored rural segment vulnerabilities. In 2025, incidents included a June multi-vehicle on the western section caused by a loose plate from works, leading to a rollover, extensive , and , and an October two-vehicle collision at the Palmers Road overpass in . The freeway's safety aligns with Victoria's Road Safety Strategy 2021–2030, which sets targets to halve road trauma by 2030 and achieve zero deaths by 2050, emphasizing like barriers and enforcement on high-volume routes to address fatality and serious injury rates. This strategy prioritizes systemic improvements for freeways, integrating data from to monitor progress on routes like the Princes.

References

  1. [1]
    [PDF] Head, Transport for Victoria – Register of Public Roads Introduction
    To declare as Freeway, Princes Freeway at Sand Road, Longwarry. To revoke ... For a history of this road refer to road numbers 1530 (Calder Freeway).
  2. [2]
    Princes Freeway and Werribee Main Road Interchange Upgrade
    Aug 1, 2025 · We're upgrading the Princes Freeway and Werribee Main Road Interchange in Werribee to improve safety, reduce congestion and increase connectivity.
  3. [3]
    [PDF] Transport for NSW - Princes Highway Urban Design Framework
    While the Princes Highway is a route and an entity in itself, it is also part of a larger transport network operating alongside roads such as Lawrence Hargrave ...
  4. [4]
    Stage 1 - Princes Freeway Interchanges Upgrade - Victoria's Big Build
    Jan 28, 2025 · Stage 1 of the Pakenham Roads Upgrade is the Princes Freeway Interchanges Upgrade.Missing: route | Show results with:route
  5. [5]
    Highway One - NSW Section - Ozroads
    Dec 12, 2012 · National Route 1 was the kingpin of the 1954 Master Plan for National Routes. The original plan was for a circumferential route around the coast ...
  6. [6]
    Country Roads Board - Public Record Office Victoria
    The Country Roads Board was established in 1913 to co-ordinate the construction and maintenance of main roads and bridges.
  7. [7]
    Melbourne Metropolitan Planning Scheme 1954
    May 28, 2025 · The 1954 report began the planning system for Melbourne. The report shows the beginnings of the development corridors that we know today.Missing: Princes Freeway
  8. [8]
    [PDF] VICROADS CENTENARY
    During World War II, the Country Roads Board built several airfields in Victoria and the Northern Territory, such as at. Katherine, Fishermen's Bend and East ...
  9. [9]
    [PDF] ROADS IIN VICTORIA - vicroads association
    special road projects in Victoria. 1966 CRB begins design and ... Princes Freeway Tynong Section, and the widen- ing of Footscray Road. Work ...Missing: history | Show results with:history
  10. [10]
    Road Photos & Information: VIC: Alphanumeric Routes - Expressway
    Jan 23, 2025 · Alphanumeric routes were introduced to Victoria in 1996 as part of the Statewide Route Numbering Scheme. The rollout initially took place in rural Victoria.
  11. [11]
    [PDF] Direction signs, information signs and route numbering - VicRoads
    Oct 2, 2015 · Exits less than 0.8 km apart should be ... • as intermediate markers along the Princes Highway through the Melbourne metropolitan area.
  12. [12]
    Road types and responsible authorities - Transport Victoria
    Classification of freeways and arterial roads. DTP must consider the following principles before declaring a road to be a Freeway or Arterial Road. These ...Missing: policy Princes standards
  13. [13]
    [PDF] The Story of the Melbourne CityLink - Business Outlook & Evaluation
    The actual changeover of arches occurred over two weekends in February 1999, when the Monash Freeway ... Princes Highway, around the Western Ring Road and.<|separator|>
  14. [14]
    [PDF] Melbourne City Link Bill - AustLII
    "Southern Link" is a 6 lane freeway-standard link connecting the West ... and extending to the Princes Freeway at Laverton. ''Western Link ...
  15. [15]
    Truck drivers warned over new lane restrictions - ABC News
    Jun 15, 2010 · From July, large trucks will be banned from the far right lane on the Princes Freeway, in Lara. The ban will later be applied to other main ...
  16. [16]
    Victoria extends truck restrictions - Fully Loaded
    Oct 13, 2010 · The ban will begin on October 19 and extends lane restrictions imposed by the Victorian Government in July on 38 kilometres of the Princes ...
  17. [17]
    [PDF] Prince's Highway
    Part of Australia's Highway One network, the route extends for over 2,000 kilometres through New South Wales (NSW), Victoria and South Australia (SA) ...Missing: history | Show results with:history
  18. [18]
    Federal Govt offers Pakenham bypass funds - ABC News
    Sep 16, 2004 · The bypass of Pakenham will stretch 20 kilometres between Beaconsfield and Nar Nar Goon. It will cost $242 million to build, but has been held ...Missing: Princes Freeway December 2007 length 24
  19. [19]
    Pakenham Bypass “Managing Complex Environmental Issues” - TRID
    The purpose of this paper is to discuss the environmental planning, design, resourcing, construction and implementation policies and practices developed to ...Missing: mitigations | Show results with:mitigations
  20. [20]
    [PDF] Conservation Management Plan for the Growling Grass Frog Litoria ...
    The document provides a detailed plan for the management of L. raniformis issues arising from the proposed Pakenham Bypass, as requested by the Department of ...
  21. [21]
    Princes Highway East - Traralgon to Sale - Victoria's Big Build
    Jul 31, 2025 · 43kms of new dual lanes on the Princes Highway between Traralgon and Sale · 28 intersections upgraded including dedicated turning lanes · 95m long ...Missing: cost | Show results with:cost
  22. [22]
    Princes Highway East Duplication | BildGroup
    Year Completed. 2023. Traralgon to Sale (Stage 3). BildGroup was engaged to deliver the Flynn section of the Princes Highway East Duplication, consisting of a ...
  23. [23]
    Princes Highway East – Kilmany Upgrade | Laing O'Rourke
    $$150 million project value · 2 years project duration · 1 kilometres of duplication added during Stage 3 · 95m long single span, steel arch rail over road bridge ...Missing: details | Show results with:details
  24. [24]
    [PDF] Princes Highway Duplication – Stammers Road, Traralgon East to ...
    Oct 2, 2024 · A Project. Environmental Protection Strategy (PEPS) has been developed to manage the environmental actions, mitigation measures and ...
  25. [25]
    Princes Highway intersection upgrades - Cardinia Shire Council
    Several priority intersections along the Princes Highway in Cardinia Shire will be upgraded over the next 3 years as part of our Better Local Roads Project.Missing: 2023-2025 | Show results with:2023-2025
  26. [26]
  27. [27]
    [PDF] Public Sector Asset Investment Program 2008-09 - dtf.vic.
    completed in 2009. Geelong Ring Road. The construction of a 23 kilometre freeway-standard road along Geelong's western outskirts to enable drivers to avoid ...Missing: $380 | Show results with:$380
  28. [28]
    The Geelong Ring Road
    The much anticipated opening of the second section of Geelong's ring road was held on June 14th 2009 and was several months earlier than planned. The ...
  29. [29]
    [PDF] GEELONG RING ROAD
    The Ring Road, when completed in 2009, is expected to provide traffic relief ... The $108.3. Million section entailed the construction of standard dual ...
  30. [30]
    [PDF] g21 region - road transport plan - City of Greater Geelong
    Road Bridge and completion of the Geelong Ring Road/. Princes Highway West. ... Connection from Princes Freeway to Geelong CBD, industrial precincts, Port of.
  31. [31]
    Duplication between Waurn Ponds to Winchelsea
    Dec 19, 2018 · Construction commenced on 3 September 2010 and was completed on 30 April 2016. Project last updated: 19 Dec 2018. Disclaimer: The material ...
  32. [32]
    Princes Highway works duplication on right track | The Standard ...
    The $220 million project was delayed by wet weather but the roads authority is still confident of completing it by the end of 2014 and is already planning work ...
  33. [33]
    Highway is hell… and a year late | Geelong Advertiser
    THE Geelong to Winchelsea Princes Hwy duplication is running up to a year behind schedule, with the roadworks plagued by wet weather and maintenance issues.
  34. [34]
    [PDF] 2014-2015 Assessment Brief - Infrastructure Australia
    May 7, 2015 · Construction for the $220 million 23 kilometre duplication from Geelong to Winchelsea is currently underway. This submission relates to the ...
  35. [35]
    M80 Capacity Improvements – Princes Freeway to Western Freeway
    May 6, 2025 · M80 Capacity Improvements – Princes Freeway to Western Freeway. We've delivered capacity and traffic control improvements on the M80 Ring Road ...Missing: route | Show results with:route
  36. [36]
    $$80m Ison Road Extension project in VIC begins major construction ...
    Mar 24, 2025 · The interchange upgrade will deliver an improved Geelong bound exit ramp and city-bound entry ramp alongside a new lane to the Werribee Main ...
  37. [37]
    Ison Road Project - Victoria's Big Build
    Sep 25, 2025 · We are building the Ison Road Project in Werribee to provide a vital new link to the Princes Freeway.
  38. [38]
  39. [39]
    Webster Street, Dandenong - Victoria's Big Build
    The new road underpass connecting Princes Highway-Lonsdale Street to Cheltenham and Hammond roads will open in 2026 – 2 years ahead of schedule. Getting rid ...
  40. [40]
    Webster Street community update – October 2025 - Victoria's Big Build
    Oct 16, 2025 · The new underpass will connect Princes Highway-Lonsdale Street to Cheltenham and Hammond roads. Dandenong and the Cranbourne and Pakenham lines ...
  41. [41]
    Level Crossing Removal Project - Facebook
    Aug 24, 2025 · Webster Street will close at the level crossing in October and the new walking and cycling path will open before the road closes. ➡️ Learn more ...
  42. [42]
    [PDF] Stammers Road, Traralgon East to Templetons Road, Fulham, Victoria
    Oct 2, 2025 · Duplication of the highway between Traralgon East and Fulham is part of the larger project to duplicate 43 kilometres of the Princes Highway ...
  43. [43]
    Traralgon Bypass planning project - Transport Victoria
    This route was formalised in the Latrobe Planning Scheme in 2009. In August 2017, the State Government announced $1.4 million towards planning of a highway ...
  44. [44]
    Cardinia calls for Princes Highway intersection upgrades
    Apr 30, 2025 · Cardinia Shire Council is calling for urgent upgrades to dangerous intersections along the Princes Highway between Nar Nar Goon and Longwarry.Missing: 2023-2025 | Show results with:2023-2025
  45. [45]
    [PDF] Advocacy Prospectus - Amazon AWS
    The intersection upgrades will address major safety issues that exist in the in the current road design and prepare the highway for rapid growth in Cardinia and ...Missing: 2023-2025 | Show results with:2023-2025
  46. [46]
    [PDF] TRARALGON BYPASS - Latrobe City Council
    These efforts led to the formal inclusion of the bypass route in the Latrobe Planning Scheme in 2009, along with a subsequent commitment of $1.4 million by the ...
  47. [47]
    Calls For Funding - 99.5 & 99.9 Gippsland's TRFM
    Oct 1, 2025 · ... Princes Highway duplication between Traralgon and Sale. Traffic congestion through Traralgon has been a long-running frustration for locals ...
  48. [48]
    [PDF] Princes Highway Duplication Project, Winchelsea to Colac
    Apr 23, 2025 · 2.1 Project overview​​ The Project upgraded 36 kilometres of the existing Princes Highway between Winchelsea and Colac to an 'M' standard road by ...Missing: Bypass
  49. [49]
    EPBC commitments | vic.gov.au
    This page contains links to VicRoads projects that are required to report annually on their compliance with conditions set by the Commonwealth for protection ...
  50. [50]
    [PDF] Victoria - Infrastructure Investment Program
    The project is expected to commence in late 2024 and will be completed by late 2025. Princes Highway East - Bairnsdale-Dargo. Road Intersection. The ...
  51. [51]
    Bairnsdale network improvement - Transport Victoria
    Princes Highway and Bairnsdale-Dargo Road intersection upgrade. We're proposing to install traffic signals at this intersection. The upgrade would improve ...Missing: 2024 2025
  52. [52]
    Historical Annual Average Daily Traffic Volume - Dataset - Victorian ...
    Jul 14, 2025 · Historical Annual Average Daily Traffic Volume datasets (2001 -> 2019) provides annual average daily traffic (AADT) volume data for all vehicles and heavy ...
  53. [53]
    [PDF] Freight Industry - Victoria's Big Build
    All new structures constructed for the project will be built to SM1600 (160 tonne) and all existing bridges along the West Gate Freeway between the M80.
  54. [54]
    [PDF] DELIVERING THE GOODS - Victorian Freight Plan
    Freight volumes are predicted to increase from around 360 million tonnes in 2014 to nearly 900 million tonnes in 2051.
  55. [55]
    [PDF] Get Victoria Moving | Bicycle Network
    Between January 2006 and October 2017, there have been 161 crashes at the Springvale Road &. Princes Highway intersection. 88 people have been seriously ...
  56. [56]
    Victoria road crash data - Dataset
    The data provides users with information about Victorian fatal and injury road crash data based on time, location, conditions, crash type, road user type, and ...
  57. [57]
  58. [58]
    Speeding on the princess freeway : r/Geelong - Reddit
    Dec 23, 2023 · The fixed speed traps are at Avalon Road and Palmers Road. There was formerly a speed camera at Point Wilson Road but is currently not in use.Princes freeway driving : r/Geelong - RedditI don't know who needs to hear this but they're NOT speed cameras.More results from www.reddit.com
  59. [59]
    The inside view of the crash that shut down the Princes Freeway
    Feb 22, 2023 · Dashcam vision has provided a new insight into the pile-up that sent a truck flying into a bus and shut down the Princes Freeway for five ...
  60. [60]
    Three dead after Christmas Eve car crashes in Mount Richmond and ...
    Dec 23, 2020 · Police have been told three vehicles collided on the Princes Highway at Flynn, west of Traralgon, about 1:20pm. Want more local news ...
  61. [61]
    [PDF] VICTORIAN ROAD SAFETY STRATEGY 2021–2030
    This Road Safety Strategy aims to halve road deaths and reduce serious injuries by 2030 and put us on the path to eliminating road deaths by 2050. Page 3. 3.Missing: M1 Princes Freeway
  62. [62]
    Road Crash statistics - Victorian Government
    Aug 11, 2025 · Road Crash Information System provides tools for analysing road crashes in Victoria. This platform allows local government-based road safety ...