Fact-checked by Grok 2 weeks ago

Relativity Space

Relativity Space is an aerospace company specializing in the design, , and launch of reusable rockets to enable more accessible and sustainable . Founded in 2015 by Tim Ellis, a former engineer, and , a former engineer, the company is headquartered in , and aims to revolutionize rocket production through large-scale additive manufacturing and , reducing costs and increasing launch frequency. The company's pioneering use of metal allows for the fabrication of entire stages and engines with minimal parts, exemplified by its engine family, which uses and propellants. Relativity Space's first , the small-lift , was the world's first 3D-printed orbital-class launch vehicle; it successfully launched on March 22, 2023, from , reaching space but failing to achieve orbit due to a second-stage anomaly, after which the program was retired to focus on larger vehicles. Its current flagship, the medium-to-heavy-lift , is a two-stage reusable designed for high-cadence launches starting in late 2026 from Launch Complex 16 in , capable of delivering 23,500 kg to in reusable mode or 33,500 kg expendably, powered by 13 R engines on the first stage and one Aeon V on the second. With over $3 billion in pre-sold launch contracts from more than a dozen customers, including deals for satellite constellations and a planned Mars mission with Impulse Space, Terran R targets the growing demand for reliable access to orbit. Relativity Space has raised more than $1.3 billion in funding, achieving a $4.2 billion valuation in 2021, and employs around 2,000 people across facilities in , , , and , including a NASA-partnered engine test site at . In March 2025, former CEO assumed the role of chief executive and acquired a with substantial investment, steering the company toward advanced reusable launch capabilities, potential applications like orbital data centers to meet AI-driven demands, and continued progress on , including expanded contracts such as with SES in November 2025.

History

Founding and early funding (2015–2018)

Relativity Space was founded in 2015 by Tim Ellis, a former propulsion engineer at , and Jordan Noone, a former structures engineer at , in , . The duo, who had met as undergraduates at the , aimed to disrupt the industry by applying large-scale additive manufacturing—commonly known as —to rocket production, enabling faster design iterations, reduced part counts, and lower manufacturing costs compared to traditional methods. The company secured its initial seed funding in March 2016, raising $620,000 from and investor , which allowed it to establish operations and begin prototyping 3D-printed rocket components. This was followed by a of $10.1 million in July 2016, led by with participation from Y Combinator Continuity, , and others, to expand the engineering team and printing capabilities. By March 2018, Relativity Space closed a $35 million Series B round led by , with participation from , Y Combinator Continuity, and , bringing total funding to over $45 million and supporting facility growth in . In 2017, Relativity Space achieved an early milestone by developing and testing its first 3D-printed components, including a full-thrust demonstration of the Aeon 1 engine prototype at NASA's in December, marking one of the largest metal 3D-printed engines tested at the time. The company's mission emphasized of design, manufacturing, and launch operations to create a more efficient and sustainable ecosystem, with a focus on reducing environmental impact through innovative production techniques and long-term goals of supporting humanity's expansion into .

Terran 1 development and first launch (2019–2023)

Following the completion of earlier funding rounds, Relativity Space secured $140 million in its Series C funding round in October 2019, led by and Capital, which fully funded the full-scale development and launch of the rocket. This investment supported the integration of advanced techniques, with approximately 85% of the rocket's structural mass manufactured additively, including major components of the first and second stages as well as the Aeon 1 engines. The design emphasized rapid iteration and reduced part counts, aiming to demonstrate scalable for future orbital launch vehicles. Key development milestones advanced throughout 2020 and 2021, including the first full-duration hot-fire test of the Aeon 1 engine in November 2020, which ran at full thrust for 187 seconds to simulate flight conditions. Additional engine testing occurred in 2021, building toward vehicle integration. By 2022, the company conducted static fire tests of the first stage, including a 57-second hot fire in September and an 82-second test later that month, validating the nine Aeon 1 engines' performance under load. The fully stacked was shipped from Long Beach to in late 2022 for final integration at Launch Complex 16 (LC-16), where preparations included engine spin-start tests and propellant loading rehearsals. The inaugural and only launch of , designated "Good Luck, Have Fun" (GLHF), occurred on March 22, 2023, at 7:25 p.m. EST from LC-16 at . The two-stage, methane-fueled rocket lifted off successfully, with the first stage's nine 1 engines powering it through maximum dynamic pressure (Max-Q) and achieving an altitude above the 100 km , marking the first such flight for a mostly 3D-printed vehicle. Stage separation occurred as planned, but the second stage's Aeon Vac engine failed to achieve full due to a anomaly involving delayed fuel valve opening and a vapor bubble in the pump inlet, preventing proper ignition of the , resulting in a suborbital trajectory and no orbital insertion. The mission carried no , serving instead as a demonstration to validate processes and systems. In the wake of the launch, Relativity Space retired the program in April 2023, citing the successful achievement of primary objectives like first-stage performance and scalability despite the upper-stage anomaly. Lessons from the flight, including data on additive manufacturing durability and engine reliability, were incorporated into the development of subsequent vehicles to enhance overall program efficiency.

Leadership transition and Terran R focus (2023–2025)

Following the failure of its rocket during its debut launch on March 22, 2023, Relativity Space announced a strategic pivot on April 12, 2023, to focus exclusively on developing the as its medium-lift successor, shelving further flights to accelerate progress toward reusability and higher payload capacity. This shift was underpinned by an internal motto of "Good Luck, Have Fun," which embodied the company's agile, experimental amid the rapid transition from demonstration to production-scale rocketry. The announcement emphasized redesigned elements for , including hybrid manufacturing approaches combining with traditional welding to enhance reliability and scalability. To fund the intensified Terran R development, Relativity Space benefited from prior capital infusions, including a $650 million Series E round in June 2021 led by , which valued the company at $4.2 billion and brought total funding to over $1.3 billion at the time. By late 2023, the company's valuation had risen to approximately $4.5 billion, reflecting sustained investor confidence in the pivot despite market challenges in the space sector. In early 2025, Relativity Space underwent a significant transition when co-founder and CEO Tim Ellis stepped down on March 10, 2025, to transition to a board role, allowing him to focus on strategic advisory while remaining involved in the company's direction. , former CEO of , was appointed as the new CEO on the same date, bringing his expertise in scaling technology enterprises to expedite R's commercialization and operational efficiency. Terran R development advanced through key 2025 milestones, including the completion of 54% of design reviews by April, which encompassed vehicle-level review and the initiation of flight hardware . In March, the team achieved the first friction stir weld for structural components, marking a critical step in fabrication. By , assembly of the thrust section was completed, integrating the primary structure with engine mounts to support upcoming integration tests. Ongoing Aeon R engine hot-fires continued throughout the year, validating propulsion performance for the first stage. Relativity Space issued monthly progress reports highlighting steady advancements, such as tank welding operations that produced multiple circumferential friction stir welds for the first stage by September, with three complete on flight hardware. Preparations at Launch Complex 16 in Cape Canaveral Space Force Station progressed in parallel, including infrastructure upgrades for vertical integration and launch operations. In the October 2025 update, the company reported completing 11 additional component-level critical design reviews, advancing first stage tank welding with initial circumferential friction stir welds, and beginning acceptance testing for stage one engines at NASA Stennis. On November 6, 2025, Relativity expanded its multi-launch agreement with SES, adding services for geostationary or medium Earth orbit satellites. These efforts positioned the company for a targeted Terran R maiden launch in late 2026.

Leadership and organization

Founders and initial team

Relativity Space was co-founded in 2015 by Tim Ellis and , both young engineers with prior experience at prominent aerospace companies. Tim Ellis served as the company's initial CEO from its inception until March 2025, bringing expertise in and from his time at , where he led efforts to integrate into development and worked as a on projects including the engine and vehicle. His background emphasized processes, enabling faster prototyping and refinement of components through , which became a cornerstone of Relativity's approach. Jordan Noone, the co-founder and inaugural CTO until 2020, transitioning to executive advisor thereafter, contributed his experience from as an in-space development , focusing on integrating advanced software systems into and operations from the company's earliest stages. As CTO, Noone drove the development of software architectures that supported automated and flight , aligning with Relativity's goal of streamlining production. The initial team expanded quickly after founding, growing from the two co-founders to approximately 50 employees by late 2018 through targeted hires of experts in and from , , and other firms, forming core groups in , , and systems integration. Relativity's early board comprised partners from , its seed accelerator, along with aerospace investors such as , who provided strategic direction during the company's pivot toward large-scale for rockets in its formative years.

Current executives and board

Eric Schmidt serves as Chief Executive Officer and Executive Chairman of Relativity Space since March 2025, bringing extensive expertise in scaling technology companies from his tenure as CEO of from 2001 to 2011 and Executive Chairman of until 2015. Zachary Dunn holds the position of , a role he assumed following his promotion in 2023 after joining the company in 2020 as Vice President of Factory Development; he previously served as Senior Vice President of Production and Launch at , where he oversaw manufacturing and launch operations. In this capacity, Dunn manages engineering and manufacturing divisions, contributing to the operational scaling of Relativity's programs. Other key executives include Kevin Wu as and Mo Shahzad as . The includes key figures such as Arjun Sethi, a co-founder of Carta and Scale AI, who joined in 2016, along with advisors like Arman Zand of ; the board expanded in 2025 with Schmidt's appointment as Executive Chairman to facilitate strategic partnerships amid the company's focus on commercialization. Co-founder Tim Ellis remains on the board following the leadership transition. By late 2025, Relativity Space's workforce has grown to approximately 2,000 employees, organized into core divisions including engineering, operations, and business development to support expanded production and launch activities. The company maintains a strong emphasis on inclusive hiring practices in fields, fostering diversity through initiatives like employee resource groups and targeted recruitment efforts.

Technology and manufacturing

3D printing and additive processes

Relativity Space has pioneered the use of large-scale to revolutionize rocket production, focusing on wire arc (WAAM) and powder bed fusion (PBF) techniques to fabricate complex components with minimal assembly. Their proprietary printers represent the world's largest metal 3D printing systems, featuring a horizontal build volume of 120 feet in length and 24 feet in width, enabling the production of entire rocket stages, fuel tanks, and engine assemblies in weeks rather than the months required by traditional subtractive methods. The company employs high-strength aluminum alloys for structural elements, such as propellant tanks and airframes, which provide yet durable properties essential for launch vehicles. For high-temperature components like engine nozzles and combustion chambers in the series, Relativity utilizes proprietary nickel-based superalloys, including variants of , deposited via WAAM to withstand extreme thermal and mechanical stresses. These material choices, combined with advanced process controls, support the fabrication of near-net-shape parts that minimize post-processing and enhance overall structural integrity. A key advantage of Relativity's approach is the drastic reduction in component complexity and assembly time; for instance, the Aeon 1 engine consists of approximately 100 parts, a significant decrease from the thousands typically required in conventional rocket engines, allowing for faster design iterations and improved reliability. This streamlined manufacturing enabled Relativity to 3D print over 85% of Terran 1's dry mass. For Terran R, the company has adjusted its approach, incorporating 3D printing for key components like engines while integrating other manufacturing methods for scalability. By 2023, Relativity had secured 26 registered patents in , covering innovations in real-time adaptive control, for defect detection, and customizable configurations for large-scale objects. These intellectual properties protect advancements in WAAM and post-processing, ensuring proprietary efficiency in producing flight-qualified hardware. Additive processes at Relativity promote by depositing material only where needed, achieving higher material utilization rates than traditional and thereby reducing scrap waste by up to 90% in some applications while lowering the overall of production. This efficiency aligns with broader goals of resource conservation in aerospace .

Stargate platform and automation

The platform, developed by Relativity Space's Horizon Manufacturing Technologies division, represents an AI-enabled autonomous robotic system designed to revolutionize complex hardware through integration of large-scale additive processes, robotics, and data-driven controls. Unveiled in late 2022, functions as an intelligent factory ecosystem that orchestrates end-to-end production from design to launch, leveraging algorithms, , sensors, and for real-time monitoring and optimization. Key capabilities of Stargate include full automation of the design-to-launch workflow, which reduces component counts by up to 100 times and compresses production timelines to months, while in-process monitoring enables failure prediction and during . The platform supports scalable output, with each printer unit capable of producing four rockets annually at full capacity, enabling over 1,000 builds across a fleet to meet high-volume demands in production. As of 2025, Stargate incorporates advancements in AI and for design optimization and production efficiency, supporting Terran R development. Looking ahead, 's is envisioned as expandable beyond components to support diverse variants, ultimately facilitating the establishment of autonomous industrial bases on Mars to aid efforts. This builds on Relativity Space's foundation, where Stargate controls and automates operations for seamless scalability.

Facilities

Headquarters in Long Beach

Relativity Space's primary headquarters serves as the central hub for corporate operations, research and development, and manufacturing in . The main facility, known as "," is located at 2400 E. Wardlow Road within the Goodman Commerce Center, a 93-acre former C-17 production site repurposed for advanced activities. This expansive campus spans over 1 million square feet and was established in 2021 to support large-scale rocket assembly and innovation. The headquarters incorporates specialized R&D laboratories, extensive 3D printing farms equipped with the company's proprietary additive manufacturing systems, and administrative offices to facilitate end-to-end vehicle design and production. Prior to this major expansion—which was enabled by substantial funding to accelerate development—Relativity relocated from to an initial 120,000-square-foot site at 3500 E. Burnett Street in early 2020, marking the company's entry into Long Beach's burgeoning "Space Beach" ecosystem. Central to the facility's role is the pilot factory, where large-format metal 3D printers produce up to 95% of a rocket's components in a streamlined process, reducing traditional steps. This site also hosts initial hot-fire engine tests for the series and final vehicle integration, enabling rapid iteration from to flight-ready . By 2025, upgrades to the have included enhanced structural test stands and advanced capabilities to support production ramp-up. The headquarters employs more than 1,200 staff, including engineers, technicians, and operations specialists focused on additive manufacturing and systems integration. Relativity contributes to the local economy and talent pipeline through involvement in the Space Beach initiative, collaborating with institutions like (CSULB) on internships, externships, and workforce development programs to train the next generation of professionals.

Testing and production sites

Relativity Space operates its primary offsite testing facilities at NASA's in , where it has conducted engine hot-fire and structural qualification activities since securing a 20-year in 2018 for a 25-acre engine test complex. This infrastructure supports the development of the company's Aeon engines, enabling full-duration firings and integrated system validations essential for the . In 2019, Relativity expanded its presence at Stennis fourfold to over 280,000 square feet, incorporating production, testing, and office capabilities to streamline engine iteration. Further expansions included a 2022 agreement with to construct new test stands and infrastructure dedicated to Aeon R engine testing, positioning Stennis as one of the largest commercial test sites . In 2023, the company leased the historic A-2 vertical test stand, originally built in the Apollo era to withstand up to 1.5 million pounds of , with plans to upgrade it for higher-capacity qualification efforts. By late 2023, Relativity's footprint at Stennis had grown to nearly 300 acres, the largest commercial operation on the site. Key testing activities at Stennis encompass hot-fire campaigns for engines, structural load tests, and environmental simulations, including vibration and acoustic chambers to replicate launch conditions for payloads and reusable components. The site's thrust stands, such as those in the E Test Complex and the upgraded A-2, accommodate engines generating significant —up to 269,000 lbf per R unit—while the surrounding 125,000-acre acoustical minimizes noise impacts during operations. These facilities have enabled hundreds of hot-fire tests. Earlier subscale and component testing occurred at sites in the from 2020 to 2023, focusing on initial 1 development before transitioning to Stennis for full-scale efforts. In 2025, progress advanced the program, including the completion of thrust structure acceptance testing in at the Long Beach headquarters, where the structure endured 3.7 million lbf of tension to confirm reusability and launch readiness. A flight-ready Aeon R engine achieved a 475-second static at Stennis in , matching the first-stage burn duration. Relativity has upheld rigorous safety protocols across more than 500 test runs at Stennis, contributing to incident-free operations that underscore the reliability of its testing infrastructure.

Launch infrastructure

Relativity Space's primary launch infrastructure is centered at Launch Complex 16 (LC-16) at in , which the company has leased on an exclusive basis since 2019 following approval from the U.S. Air Force. This site served as the launch pad for the vehicle's debut flight in March 2023 and is now undergoing extensive renovations to accommodate the , with its first launch targeted for late 2026. Key upgrades at LC-16 include a new facility for vehicle assembly, a launch mount with transporter erector system, lightning suppression towers, and a deluge system to support high-cadence operations. As of October 2025, construction continues on the facility and supporting infrastructure, including a . To enable launches into polar orbits, Relativity Space secured a right-of-entry agreement in 2020 for Building 330 at in , with plans to develop the site into a dedicated west coast launch facility. This location, adjacent to existing infrastructure, is intended to support and processing for future missions, complementing the east coast operations at LC-16. The company's infrastructure developments emphasize reusability, incorporating landing zones for first-stage recovery, propellant storage farms for and , and downrange sites in the Atlantic Ocean to facilitate rapid turnaround. These enhancements align with regulatory frameworks, including a 2021 FAA operator license for operations at LC-16 and a 2020 environmental assessment by the U.S. that found no significant impacts from up to 12 annual launches. Ongoing work supports scalability for multiple launches per year once becomes operational.

Products

Terran 1 launch vehicle

Terran 1 was a two-stage, partially reusable developed by Relativity Space as a proof-of-concept demonstrator for advanced techniques. The stood approximately 33.5 meters tall with a of 2.28 meters and utilized liquid methane and (methalox) as propellants. Its first stage was powered by nine arranged in an octagonal pattern with a central , while the second stage employed a single Aeon Vacuum . Approximately 85% of the vehicle's dry mass consisted of 3D-printed components, enabling rapid iteration and reduced part count compared to traditional rockets. The vehicle's performance targeted a payload capacity of 1,250 kg to () in reusable mode, increasing to around 1,500 kg when flown expendably, though these figures prioritized validation of processes over maximizing capability. Development of began shortly after Relativity Space's founding in 2015, with the vehicle first publicly revealed in 2019 as the company's inaugural orbital launch system. Key milestones included full vehicle stack in 2022 at the company's Long Beach factory and successful hot-fire testing of the first stage at NASA's later that year, confirming structural integrity under flight-like conditions. The program emphasized end-to-end production speed, with the entire vehicle assembled in under 60 days using in-house additive . Terran 1 incorporated several innovative features to streamline operations and reduce complexity, including a heliumless autogenous pressurization system that used vaporized propellant to maintain tank pressure, eliminating the need for external helium supplies. Additionally, the rocket relied on fully autonomous flight software developed in-house, incorporating guidance, navigation, and control algorithms tested via hardware-in-the-loop simulations for real-time decision-making without ground intervention. These elements supported the vehicle's role as a pathfinder for scalable production. Its sole launch attempt in March 2023 from Cape Canaveral's Launch Complex 16 reached the Karman line but failed to achieve orbit due to a second-stage engine anomaly. Following the flight, Relativity Space retired in April 2023, having successfully validated its core manufacturing and technology goals, though its payload capacity proved insufficient to compete effectively in the small-lift market. Data from the program, including performance and propulsion insights, directly informed the pivot to the larger vehicle.

Terran R launch vehicle

The is a two-stage, medium-to-heavy-lift developed by Relativity Space, designed as a fully reusable with a focus on high-volume production and cost-effective access to . The stands 86.6 tall with a of 5.4 for both the core stages and , constructed primarily from high-strength aluminum alloys such as 7140 and 7050 to balance durability and manufacturability. Its first stage is powered by 13 Aeon R engines arranged in an octagonal pattern, each delivering 269,000 pounds of thrust at using a and combination in a , while the second stage employs a single Aeon V vacuum-optimized engine producing 323,000 pounds of thrust. In terms of performance, is capable of delivering 23,500 kilograms to () in reusable mode with downrange landing of the first stage, or 5,500 kilograms to geosynchronous transfer orbit (), establishing it as a scalable option for satellite constellations and interplanetary missions. In expendable configuration, the payload capacity increases to 33,500 kilograms to , providing flexibility for missions requiring maximum mass to orbit. The total liftoff reaches 3,497,000 pounds, enabling reliable insertion of large s while prioritizing reusability from the outset as a pathfinder toward more advanced systems like full rapid reusability. As of 2025, significant milestones have advanced the program toward its inaugural flight. The first stage thrust section, one of the vehicle's most complex components, was completed in August 2025 using precision-machined aluminum rings and tested to withstand loads exceeding 3.7 million pounds in tension, with integration of brackets, fluid systems, and now underway. First stage tank welding progressed rapidly, with all eight structural barrels joined by August and assembly into the full body ongoing, while the second stage tank section was finalized and painted in September. In October 2025, the program completed 11 component-level reviews, released designs for second stage fluids components and , finished first stage friction stir welding and barrel painting, installed second stage downcomer and forward test adapter, began interstage fabrication, and advanced Launch Complex 16 construction including HIF siding, water tower, and foundations. Engine development included a 475-second hot-fire test of the first flight-ready Aeon R, validating performance under mission conditions, and the program targets a maiden launch in the second half of 2026 from Launch Complex 16 at . Reusability is integral to Terran R's design, with the first stage engineered for downrange landings using four grid fins for atmospheric reentry control and four deployable landing legs for touchdown, complemented by a base heat shield incorporating advanced thermal protection materials to endure reentry heating. Engine relight capability and throttle valves enable precise deceleration and landing burns, aiming for at least 20 flights per booster through robust component design and streamlined refurbishment processes. This approach, supported by 3D printing for select complex parts, reduces production complexity and supports goals of rapid turnaround integrated with Relativity's Stargate automation platform. Variants of include an expendable mode that sacrifices the first stage post-separation to maximize payload for demanding missions, while the baseline reusable configuration emphasizes sustainability for frequent deployments. These options allow adaptation to diverse customer needs, from commercial satellite operators to payloads, without altering the core vehicle architecture.

rocket engines

The engine family, developed by Relativity Space, consists of liquid engines designed to power the company's launch vehicles, utilizing liquid (CH4) and liquid (LOX) as propellants. These engines emphasize additive to reduce part counts and enable rapid iteration, with the majority of components produced via . The family includes the 1 for smaller applications and the more powerful R series for medium-lift operations, both incorporating restart capabilities to support reusable flight profiles. The Aeon 1 engine, a single-chamber design intended for the first stage of the vehicle, delivers approximately 25,000 pounds-force (lbf) of vacuum thrust. Over 90% of the engine's components, including the thrust chamber, are 3D-printed, allowing for integrated channels that circulate to manage thermal loads during operation. The engine's first full-duration hot-fire test occurred in late , with subsequent qualification involving more than 190 hot-fire tests accumulating over 10,900 seconds of runtime by early 2023. A key feature is its helium-free autogenous pressurization system, which uses heat exchangers to vaporize propellants for pressurization, simplifying and reducing dependency on external gases. The engine represents an evolution for higher-thrust applications on the vehicle, with sea-level thrust uprated to 269,000 lbf per engine following iterative development from earlier targets around 115,000–165,000 lbf. It employs a for reliable power delivery, with the first-stage variant optimized for atmospheric performance and a vacuum-optimized version, designated Aeon V, providing 323,000 lbf of thrust for second-stage duties. Like its predecessor, the is predominantly 3D-printed, with extensive use of the technology for complex geometries in the injector and nozzle assembly. Qualification testing at NASA's , ongoing through 2025, has included over 60 hot-fires simulating full mission profiles, such as 475-second burns at varying throttle levels, with October 2025 activities encompassing engine and high-flow thermal shock testing on stage press valves. Across the family, engines are engineered for restartability, enabling multiple firings in flight to facilitate reusability and precise orbital insertions. Testing has been conducted primarily at , where hot-fire campaigns validate performance under simulated flight conditions up to 2025. Cumulative development efforts have surpassed 200 hot-fire tests by mid-2025, demonstrating reliability and iterative improvements in design. Innovations include integrally printed channels within the thrust chamber walls, which enhance heat transfer efficiency without additional welds, and AI-assisted optimization of injector patterns to achieve stable combustion across a wide range of operating conditions. These advancements contribute to a high exceeding 100, supporting efficient vehicle performance.

Operations

Launch history

Relativity Space conducted its first and only launch with the rocket on March 22, 2023, from Launch Complex 16 at in . The mission, designated as a demonstration flight under the Federal Aviation Administration's commercial space transportation license, lifted off successfully using nine Aeon 1 engines on the first stage, achieving main engine cutoff and stage separation while passing through maximum (). The vehicle reached an apogee of approximately 134 kilometers, crossing the into space, but the second stage experienced an engine ignition anomaly due to fuel pressure and timing issues, preventing orbital insertion. The second stage reentered the atmosphere and splashed down in the Atlantic Ocean, providing recovery data that informed subsequent reusability designs for Relativity's next-generation vehicles. Despite the failure to reach , the flight validated key technologies, including the performance of the 3D-printed first stage and overall integration, marking it as a successful . Following the Terran 1 flight, Relativity Space retired the program without additional launches, redirecting resources to accelerate development of the larger rocket. The company has obtained FAA licenses for operations, planning the no earlier than late 2026 from the same LC-16 pad, with all missions focused on uncrewed commercial and government payloads under commercial space regulations.

Contracts and customers

Relativity Space has secured several contracts with U.S. government entities to provide launch services, primarily for responsive and missions. In March 2021, the company was awarded its first orbital launch contract by the U.S. Department of Defense for low-cost, responsive access to space using the vehicle. Later that year, in August 2021, Relativity received an indefinite-delivery/indefinite-quantity contract under the U.S. Space Force's Orbital Services Program-4 (OSP-4), enabling rapid procurement of up to approximately 20 missions for payloads over 400 pounds, with a ceiling value of $986 million over nine years. In 2020, selected Relativity for the Venture-Class Launch Services Demonstration 2 program to deploy CubeSats into . Additionally, in April 2024, the U.S. Air Force awarded Relativity an $8.7 million contract to advance flaw detection in additive for production. On the commercial side, Relativity has signed multi-launch agreements with satellite operators focused on () constellations and () missions. In June 2022, the company entered a multi-year, multi-launch deal with OneWeb to deploy satellites starting in 2025 using the vehicle. In October 2023, Intelsat agreed to multiple launches for its satellites, beginning as early as 2026, to support operations. Earlier, in July 2022, Impulse Space contracted Relativity for a dedicated launch of its Mars Cruise Vehicle and Mars Lander, marking the first commercial . In November 2025, SES expanded its multi-launch agreement with Relativity for to include services for GEO and MEO satellites, with launches planned starting in late 2026. As of late , Relativity's contract backlog exceeded $3 billion across more than a dozen customers, encompassing both dedicated and rideshare opportunities primarily on the vehicle. The company maintains partnerships to enhance integration and , including a 2020 collaboration with to launch a cryogenic fluid management demonstration under NASA's program. Relativity's customers span government agencies and commercial entities, with a focus on LEO satellite deployments for constellations, missions for , and interplanetary probes such as Mars landers. While the majority of launches target commercial needs, the firm actively pursues opportunities to diversify its revenue.

References

  1. [1]
    About - Relativity Space
    Relativity Space is on a mission to better connect humanity to space and to the universe beyond our planet. We aim to make space more accessible, ...Missing: sources | Show results with:sources
  2. [2]
    Relativity Space: 2024 CNBC Disruptor 50
    May 14, 2024 · Founders: Tim Ellis (CEO), Jordan Noone Launched: 2015. Headquarters: Long Beach, California Funding: $1.3 billion. Valuation: $4.2 billion
  3. [3]
    Who is Relativity Space and what do they do?
    Apr 25, 2023 · Relativity Space was founded in 2015 by Tim Ellis and Jordan Noone, engineers formerly at Blue Origin and SpaceX, respectively. The company ...
  4. [4]
    Relativity shelves Terran 1 after one launch, redesigns Terran R
    Apr 12, 2023 · Relativity Space has decided to retire its Terran 1 small launch vehicle after a single flight that failed to reach orbit.
  5. [5]
    Relativity overachieves Terran 1 debut objectives
    Mar 22, 2023 · Relativity Space conducted the first flight of its Terran 1 rocket Wednesday. The Good Luck, Have Fun (GLHF) mission lifted off at 11:25 PM ...
  6. [6]
    Terran R
    ### Summary of Terran R Rocket Key Features
  7. [7]
    Impulse Space and Relativity Space Announce First Commercial ...
    Jul 19, 2022 · Relativity is building humanity's multiplanetary future. Relativity invented a new approach to design, print, and fly its own rockets, starting ...
  8. [8]
    New Agreement with NASA Puts Relativity Space on Path to ...
    Oct 18, 2022 · Through an agreement with NASA, Relativity is significantly expanding its facilities and infrastructure at NASA's historic Stennis Space Center ...Missing: sources | Show results with:sources
  9. [9]
    Eric Schmidt Joins Relativity Space as C.E.O. - The New York Times
    Mar 10, 2025 · The former Google chief executive is taking a controlling interest in Relativity Space, which aims to build low-cost, reusable rockets to compete against Elon ...
  10. [10]
    Relativity names Eric Schmidt as CEO as it updates Terran R ...
    Mar 10, 2025 · A company spokesperson confirmed March 10 that Eric Schmidt is the new chief executive of Relativity, a move that was announced internally earlier in the day ...
  11. [11]
    Relativity Space provides a teaser for its stealthy rocket venture
    Jul 13, 2017 · ... $10 million. The round was led by Silicon Valley venture firm Social Capital, with participation by Y Combinator Continuity, Phillip Spector ...
  12. [12]
    Mark Cuban-backed startup raises $500M to launch 3D-printed ...
    Nov 27, 2020 · That $620,000 funding came in 2016 and included Y Combinator and entrepreneur David Spector. In an interview at the CB Insights A-ha ...
  13. [13]
    Relativity Space Series B round: 3-D printing rockets gets $35 million
    Mar 27, 2018 · A start-up that manufactures rockets with giant 3-D printers just scored $35 million in funding · Start-up Relativity Space's latest round of ...
  14. [14]
    Relativity Space aims to 3D print entire launch vehicles - SpaceNews
    Dec 5, 2017 · The Aeon 1 engine, powered by methane and liquid oxygen and producing more than 15,000 pounds-force of thrust, has undergone tests at NASA's ...
  15. [15]
    Relativity Space Closes $140 Million Series C Funding Round Led ...
    Oct 1, 2019 · Founded in 2015 by Tim Ellis and Jordan Noone, Relativity Space is building the world's first autonomous rocket factory and launch services for ...
  16. [16]
    Relativity Space ready to launch 3D-printed, methane-fueled orbital ...
    Mar 8, 2023 · A company spokesperson said Relativity has completed six ignitions and more than 185 seconds of hotfire time for all nine Aeon 1 engines on the ...
  17. [17]
    Relativity's 3D-printed engine has completed a mission duty cycle ...
    Nov 9, 2020 · Relativity Space said Monday that the company has successfully completed a full-duration test-firing of its Aeon 1 rocket engine, running it at full power for ...
  18. [18]
    Terran 1 and Terran R testing in full swing before Relativity's debut
    Dec 21, 2022 · The first fully integrated static fire test of Relativity Space's Terran 1 rocket is expected any day now as the company prepares for its first-ever launch ...
  19. [19]
    Relativity Space Looks to Wednesday for Maiden Terran-1 Launch
    Mar 7, 2023 · After multiple delays, Relativity Space's Terran-1 finally stands ready for its maiden launch, as early as 1 p.m. EST Wednesday.
  20. [20]
    Relativity's 3D-printed Terran 1 rocket reaches space, but falls short ...
    Mar 22, 2023 · The methane-fueled, 3D-printed rocket climbed into space powered by nine main engines, but an upper stage failure prevented it from reaching orbit.
  21. [21]
    Terran 1 - Relativity Space
    Launched in March 2023, Terran 1 was our first pathfinder vehicle – a two-stage, small-lift rocket that is now retired. Terran 1 demonstrated our ability to ...Missing: 2019-2023 | Show results with:2019-2023
  22. [22]
    Relativity launches first Terran 1 - SpaceNews
    Mar 23, 2023 · Relativity Space's first Terran 1 rocket successfully got off the launch pad March 22 but failed to reach orbit because of an upper stage malfunction.<|control11|><|separator|>
  23. [23]
    Relativity Space shelves Terran 1 rocket, focuses on bigger ...
    Apr 12, 2023 · The first-ever 3D-printed rocket is being retired after a single flight. That vehicle, Relativity Space's Terran 1, launched on its debut test flight on March ...
  24. [24]
    Relativity 'all in' on Terran R rocket, shifting 3D-printing approach
    Apr 12, 2023 · Although Relativity expects it will be another three years until Terran R debuts, with a target goal of 2026, the company has so far won launch ...
  25. [25]
    Relativity Space - Wikipedia
    Founding and funding (2015–2023)​​ Relativity Space was founded in 2015 by CEO Tim Ellis and CTO Jordan Noone on the idea that existing private spaceflight ...Terran R · Tim Ellis (engineer) · Jordan Noone · Terran 1
  26. [26]
    Relativity raises $650 million round, announces Terran R rocket
    Jun 8, 2021 · Relativity Space announced June 8 it has raised $650 million in a new funding round to support development of a fully reusable large launch ...
  27. [27]
    Nearly two years after its radical pivot, Fidelity slashes Relativity's ...
    Jan 7, 2025 · A significant investment would give Relativity Space some funding runway to continue working on the Terran R rocket and possibly bring the ...
  28. [28]
    Eric Schmidt joins Relativity Space as CEO - TechCrunch
    Mar 10, 2025 · In a post on X, Ellis noted he will continue to support Relativity Space as a director on the company's board. Schmidt is joining Relativity ...
  29. [29]
    Former Google CEO Eric Schmidt is the new leader of Relativity Space
    Mar 10, 2025 · Former Google chief executive Eric Schmidt has taken a controlling interest in the Long Beach, California-based Relativity Space.
  30. [30]
    Today marks a bold new chapter for Relativity Space | Tim Ellis
    Mar 10, 2025 · Today marks a powerful new chapter as Eric Schmidt becomes Relativity's CEO, while also providing substantial financial backing.
  31. [31]
    Relativity Space Achieves Major Design and Production Milestones ...
    Mar 7, 2025 · We've Completed Vehicle-Level Critical Design Review and Begun Flight Production We're excited to share a major update on Terran R, ...
  32. [32]
    Relativity completes Terran R thrust section, continues testing ahead ...
    Oct 22, 2025 · Terran R's first flight, though presently scheduled for the second half of 2026, is subject to change, and much work remains. The 82 m tall ...
  33. [33]
    Terran R July 2025 Program Update - YouTube
    Aug 11, 2025 · This July, we completed a critical milestone on the path to launch: qualification of our first stage engine, Aeon R. From propulsion and ...
  34. [34]
    September 2025 Company Update - Relativity Space
    Oct 14, 2025 · Welding of the first stage tank is progressing, with three circumferential friction stir welds now complete. ... thrust structure's ability to ...
  35. [35]
    Terran R program update: design, build, test, and launch progress
    Oct 14, 2025 · Recent wins include hot firing Aeon V with densified liquid oxygen, performing a 475-second mission duty cycle burn, and conducting suction ...<|separator|>
  36. [36]
    Terran R August 2025 Program Update - YouTube
    Sep 8, 2025 · August program update: From thrust structure build and test to first stage tank welding, engine hot fires, and site progress at Cape ...Missing: reports 2026
  37. [37]
    Relativity Space accelerates production and testing of first Terran R
    Jun 20, 2025 · The company highlighted progress on its upcoming Terran R launch vehicle and supporting infrastructure for the rocket's first flight, scheduled for 2026.
  38. [38]
    Relativity Space Raises $35M Series B Funding Led by Playground ...
    Mar 27, 2018 · Relativity is disrupting 60 years of aerospace tradition by creating an entirely new process to build and fly rockets. Led by co-founders Tim ...Missing: sources | Show results with:sources
  39. [39]
    Leadership - Relativity Space
    Tim Ellis. COFOUNDER & CHIEF EXECUTIVE OFFICER ; Mo Shahzad. Chief Financial Officer ; Zach Dunn. Chief Operations Officer ; Josh Brost. SVP of Revenue Operations.Missing: transition | Show results with:transition
  40. [40]
    Tim Ellis of Relativity Space - Family Office Insights
    Tim Ellis (CEO) - Founder of Blue Origin's metal 3D printing program. Early Blue Origin propulsion engineer working on BE-4, Crew Capsule, New Glenn.
  41. [41]
    Tim Ellis | MIT Technology Review
    Jun 25, 2019 · Relativity Space says it will soon be able to print and iterate a design in as little as 60 days, compared with the industry standard of 18 ...<|control11|><|separator|>
  42. [42]
    Relativity Space Co-founder Jordan Noone on What it Takes to Run ...
    May 25, 2023 · “We started Relativity when I was 22, so they essentially saw me grow up professionally through the Relativity experience and that put me in a ...
  43. [43]
    Relativity to Build New Autonomous Rocket Factory and Expand ...
    Jun 11, 2019 · Disrupting 60 years of global aerospace manufacturing, Relativity is developing the first and only aerospace platform to integrate machine ...
  44. [44]
    Veteran aerospace executive joins Relativity Space - SpaceNews
    Aug 20, 2018 · The company recently hired its first director of business development and sales, as well as engineers who previously worked at Blue Origin, ...
  45. [45]
    This 3D printing rocket start-up just hired a legendary SpaceX ...
    “When I was at SpaceX, Tim's stellar reputation for breadth and depth of engineering and operations was legendary in the industry,” Jordan Noone, Relativity's ...Missing: background | Show results with:background
  46. [46]
    Relativity Space: Building humanity's multiplanetary future.
    Relativity is building humanity's multiplanetary future. We invented a new approach to design, build, and fly our own rockets.
  47. [47]
    How Much Did Relativity Space Raise? Funding & Key Investors
    Founded in 2015 by Jordan Noone and Tim Ellis, Relativity Space is headquartered in Long Beach, California. ... Date: March 2016; Lead Investors: Mark Cuban ...
  48. [48]
    Eric Schmidt Takes Over Helm of Relativity Space - Space Insider
    Mar 11, 2025 · Former Google CEO Eric Schmidt has taken control of Relativity Space as its new chief executive, providing substantial financial backing.
  49. [49]
    Zachary Dunn - Crunchbase Person Profile
    Zachary Dunn is the President and Chief Operating Officer of Relativity Space. Zachary was previously the Sr. Vice President of Production and Launch at SpaceX.
  50. [50]
    Zachary Dunn Email & Phone Number | Relativity Space Chief ...
    Zachary Dunn Work · 2023 - now Chief Operating Officer @ Relativity Space · 2020 - 2023 Senior Vice President of Engineering and Manufacturing @ Relativity Space.
  51. [51]
    Relativity Space - Crunchbase Company Profile & Funding
    Board Members and Advisors. Photo of Arjun Sethi. Arjun Sethi Board Member Oct 2016. Photo of Arman Zand. Arman Zand Advisor Sep 2016. Photo of Phillip Spector.
  52. [52]
    Relativity Space Changes Course On Path To Orbit - Hackaday
    Mar 17, 2025 · Similarly, co-founder Jordan Noone stepped down from chief technology officer to take on an advisory role back in 2020. Eric Schmidt. With ...Missing: propulsion | Show results with:propulsion
  53. [53]
    Relativity Space 2025 Company Profile - PitchBook
    Relativity Space has 1,193 total employees. What industry is Relativity Space in? Relativity Space's primary industry is Aerospace and Defense. Is ...
  54. [54]
    Careers - Relativity Space
    Relativity is a place for builders with big ideas and the drive to make them real. We believe our best work happens side by side, collaborating in person, ...
  55. [55]
    Relativity Space unveils new fourth-gen Stargate 3D printer
    Oct 24, 2022 · Print Capacity, 120 (L) x 24 (W) feet ; Print Throughput, Four Terran Rs per year ; Material, Proprietary lightweight alloy ; Sensors, Robotics-led ...
  56. [56]
    Building the Future - Relativity Space
    From precision welding to high-efficiency CNC machining, every process at Relativity is optimized for speed, scalability, and cost. Our production system in ...Missing: sources | Show results with:sources
  57. [57]
    Terran R Rocket from Relativity Space Will Be Completely 3D ...
    Jun 10, 2021 · While traditional rocket engines may contain thousands of parts, Relativity's Aeon engine is composed of just three direct metal laser sintered ...
  58. [58]
    Relativity advances toward 2020 3D printed rocket launch with new ...
    Feb 18, 2019 · The most recent patent award to Relativity is for a machine learning process capable of automatically detecting and correcting faults within the ...
  59. [59]
    Going Metal? Here's What You Need to Know to 3D Print Metal
    Nov 18, 2024 · For example, Relativity Space uses metal 3D printing to create up to 85% of the body of its rockets, and also engines. It utilizes wire arc ...
  60. [60]
    Relativity Space announces 4th generation of its Stargate metal 3D ...
    Oct 24, 2022 · Relativity has proprietary, high-performance materials which will be used for products produced with Stargate 4th Generation AM machines. “Large ...<|separator|>
  61. [61]
    Relativity Space Maps Path To Terran R Production At Scale with ...
    Relativity is building humanity's multiplanetary future. Relativity invented a new approach to design, print, and fly its own rockets, starting ...Missing: sources | Show results with:sources
  62. [62]
    Horizon - Relativity Space
    The company initially developed large-scale additive manufacturing techniques for its Terran 1 rocket, which was the largest and most technically challenging 3D ...
  63. [63]
    Relativity Space: 2023 CNBC Disruptor 50
    May 9, 2023 · Relativity Space is transforming the market with automated aerospace manufacturing that integrates intelligent robotics, algorithms, machine learning and 3D ...Missing: platform | Show results with:platform
  64. [64]
    Relativity Announces New 1M+ Sq. Ft. Factory Headquarters in ...
    Jun 30, 2021 · The new 1M sq. ft. headquarters is at Goodman Commerce Center, a 93-acre former Boeing plant, with capacity for 2,000+ employees, and is part ...
  65. [65]
    Locations - Relativity Space
    Spanning one million square feet, the facility's layout will enable a seamless flow from design and build to shipment for testing and launch operations.Missing: pilot | Show results with:pilot
  66. [66]
    Relativity Space Secures New Headquarters Facility In The Heart Of ...
    Feb 28, 2020 · The new headquarters is at 3500 E Burnett, Long Beach, a 120,000 sq. ft. space with a manufacturing facility for the 3D printed Terran 1 rocket.
  67. [67]
    August 2025 Company Update
    Sep 8, 2025 · In parallel, the final first stage barrels for first flight have been welded on the vertical friction stir welder. With this milestone, all ...
  68. [68]
    Partnerships | California State University Long Beach - CSULB
    Sep 16, 2021 · “Over 2,000 space jobs are coming to Long Beach just from Relativity Space taking over Boeing's former C-17 facility,” Steimetz added. “And the ...
  69. [69]
    Relativity startup strikes deal with NASA for rocket engine test facility
    Mar 21, 2018 · Relativity, a rocket startup with roots at Blue Origin and SpaceX, says it has been awarded an exclusive 20-year lease to use a 25-acre engine test complex at ...Missing: hires employees
  70. [70]
    Relativity Space Signs Lease On Historic NASA Test Stand
    Sep 7, 2023 · September 7, 2023 – Bay St. Louis, Mississippi – Relativity Space, the preeminent 3D printed rocket company, has signed an enhanced use lease ...
  71. [71]
    Relativity Space signs lease on historic NASA test stand at Stennis ...
    The expansion brings Relativity's total footprint at NASA Stennis to nearly 300 acres, the largest commercial presence on the site says the company. “New ...<|control11|><|separator|>
  72. [72]
    How MSET is Helping Relativity Space Grow at Stennis Space Center
    Sep 17, 2021 · The Stennis Space Center Buffer Zone​​ Relativity's testing platforms are located within SSC's 125,000-acre acoustical Buffer Zone.
  73. [73]
    NASA Stennis - An Ideal Place for Commercial Companies
    Nov 13, 2024 · Virgin Orbit, a satellite-launch company, conducts a Thrust Chamber Assembly test on the E-1 Test Stand at NASA's Stennis Space Center in 2021.
  74. [74]
    Relativity Space Achieves Milestone with Aeon R Engine Qualification
    Aug 22, 2025 · Next up: stage 2 vacuum engine development testing and qualification, along with production and acceptance testing of stage 1 flight engines.Missing: 2017 | Show results with:2017
  75. [75]
    Relativity Space: General Thread - NASA Spaceflight Forum
    Aug 15, 2022 · The company is already underway testing Aeon R components across Relativity's E2 test complex, with plans to build the first Aeon R engine and ...Missing: December | Show results with:December
  76. [76]
    Relativity Space obtains Air Force approval for Cape Canaveral ...
    Jan 18, 2019 · Relativity announced Jan. 17 the Air Force approved the company's plan to move in at Launch Complex 16, a long-dormant facility at Cape ...Missing: SLC- | Show results with:SLC-
  77. [77]
    Launch Complex 16 (Active) - Cape Canaveral Space Force Museum
    Relativity Space entered a 5-year agreement to use LC-16 for its Terran 1 orbital launch vehicle; Terran 1 maiden launch on 23 March 2023; Relativity Space ...Missing: infrastructure investments approvals capacity
  78. [78]
    Exclusive: Relativity Space ready for first rocket at Cape Canaveral
    May 27, 2022 · Changes at LC-16 · A new hangar for horizontally processing Terran 1 stages and payloads; · Four new lightning suppression towers; · New "rainbird" ...
  79. [79]
    Relativity Space Expands Footprint Via Launch Site at Vandenberg ...
    Jun 24, 2020 · If approved, the B-330 launch site at Vandenberg will be capable of supporting Relativity's rocket, Terran 1, the world's first and only fully ...Missing: SLC- approvals capacity
  80. [80]
    Relativity Space to Launch Iridium Satellites from New Vandenberg ...
    Jun 24, 2020 · The location chosen for Relativity's new launch complex is the current site of Building 330 and the adjacent land. Building 330 is a storage ...
  81. [81]
    FAA proposes issuing operator license to Relativity Space - Reuters
    Oct 6, 2021 · The company plans to launch from Cape Canaveral Space Force Station in Florida and the environemntal assessment was prepared by the U.S. Air ...Missing: LC- 2030
  82. [82]
    [PDF] Terran 1 Launch Program Cape Canaveral Air Force Station
    Apr 24, 2020 · CCAFS LC-16 was selected for Relativity's Terran 1 Space Launch Program because: ... SLC-16, Relativity Launch. Complex at Cape Canaveral ...
  83. [83]
    Relativity Space shares key findings from Terran 1 launch
    Apr 12, 2023 · ' A two-stage, 270-foot-tall rocket with an 18-foot diameter and a 5-metre payload ... reliable metal parts and reduce costs. Sponsored ...
  84. [84]
    [PDF] PAYLOAD USER'S GUIDE - Squarespace
    This Payload User's Guide provides generalized information about Relativity Space's launch services using the Terran 1 launch vehicle.<|control11|><|separator|>
  85. [85]
    Relativity Unveils Its Plans for Terran R, the First Fully Reusable ...
    Jun 8, 2021 · Terran R will be outfitted with seven 3D-printed Aeon R rocket engines capable of 302,000 lb. ... Space and its multiplanetary mission, visit ...
  86. [86]
    Additive Manufacturing Subtracts from Rocket Build Time
    Jan 29, 2024 · The Terran 1 rocket that launched in March of 2023 was 85% 3D printed by mass, including its body and engines. Credit: Relativity Space Inc. The ...
  87. [87]
    Terran 1 3D Printed Rocket - Airport Technology
    Mar 9, 2021 · The engines provide enhanced mission reliability through reduced part count in the engine combustion chambers, reaction control thrusters, ...
  88. [88]
    Relativity Space Shares Updated Go-to-Market Approach for Terran R
    Apr 12, 2023 · Starting in 2026, Terran R will launch from Space Launch Complex 16, the company's orbital launch site at Cape Canaveral, Florida. Designed for ...<|control11|><|separator|>
  89. [89]
    Deep Dive: Aeon R Engine Qual Campaign - YouTube
    Aug 22, 2025 · ... fire #testing. Deep Dive: Aeon R Engine Qual Campaign. 13K views · 2 months ago #aerospace #engines #rockets ...more. Relativity Space. 53.7K.Missing: 2017 | Show results with:2017
  90. [90]
    The World's Largest 3D Metal Printer Is Churning Out Rockets
    Oct 25, 2019 · ... Propulsion Laboratory, in Los Angeles. Noone went on to work at SpaceX and Ellis at Blue Origin before they got back together and formed ...
  91. [91]
    [PDF] Commercial Space Transportation License
    Feb 21, 2023 · Authorization: Relativity Space, Inc. is authorized to conduct pre-flight ground operations and flight: a) Using the Terran 1 launch vehicle; b) ...
  92. [92]
    3D-Printed Rocket Startup Relativity Pivots Weeks After First Flight ...
    Apr 12, 2023 · Relativity Space Inc. plans to abandon future flights of its Terran 1 rocket less than a month after it first tested the 3D-printed vehicle.
  93. [93]
    Fuel pressure, timing led to Stage 2 failure during historic mission ...
    Apr 12, 2023 · Due to multiple malfunctions aboard Stage 2 of Relativity Space's Terran 1 rocket, the engine did not reach full power, causing the company's historic mission ...
  94. [94]
    Relativity Space is moving on from the Terran 1 rocket to something ...
    This rocket is getting even bigger than before. A fully expendable version will now be able to lift a staggering 33.5 metric tons.
  95. [95]
    Department of Defense awards Relativity Space new Responsive ...
    Mar 12, 2021 · The DoD contract is for low-cost, responsive access to space using Relativity's 3D-printed Terran 1 launch vehicle, with a capacity of 450-1, ...Missing: CHIPS Act
  96. [96]
    Relativity Space Awarded U.S. Space Force Orbital Services ...
    Aug 9, 2021 · To date, Relativity has secured multiple contracts across eight customers for Terran 1 launches from both commercial and government entities, ...<|separator|>
  97. [97]
    NASA Awards Relativity Space a Venture Class Launch Services ...
    Dec 11, 2020 · NASA has selected Relativity Space to place CubeSats into low Earth orbit as part of its Venture Class Launch Services Demonstration 2 (VLCS ...Missing: Mojave Desert 2020-2023
  98. [98]
    Relativity Space wins $8.7 million U.S. Air Force contract for additive ...
    Apr 14, 2024 · Relativity Space wins $8.7 million U.S. Air Force contract for additive manufacturing research.Missing: CHIPS | Show results with:CHIPS
  99. [99]
    Relativity and OneWeb Sign Multi-Launch Agreement for Terran R
    Jun 30, 2022 · Located in the company's new 1MM+ square-foot factory headquarters, these new, fourth generation Stargate printers will allow Relativity to take ...
  100. [100]
    Relativity Space and Intelsat Sign Multi-Launch Agreement for ...
    Oct 11, 2023 · Deal marks the latest announcement of Relativity's Terran R launch contracts, totaling $1.8 billion in backlog across nine customers.
  101. [101]
    Lockheed Martin Teams with Relativity Space for NASA Tipping ...
    Oct 19, 2020 · This mission will allow Lockheed Martin and their partners to test more than one dozen cryogenic fluid management technologies over the next ...
  102. [102]
    Space launch firms seek to balance government, commercial client ...
    Feb 10, 2023 · While most of Relativity's launches will be commercial, the company is keeping an eye on national security requirements, Schenewerk said, which ...