Ryfast

Ryfast is a major subsea road tunnel system in Rogaland county, Norway, comprising three interconnected tunnels that form a fixed link across the Horgefjord, replacing ferry services between the city of Stavanger and the municipality of Strand while integrating into European route E39 (Kyststamvegen). The project, Norway's largest road infrastructure initiative to date, includes the Ryfylketunnelen—the world's longest and deepest subsea road tunnel at 14.4 kilometers long and reaching a maximum depth of 292 meters below sea level—the Hundvågtunnelen (5.5 kilometers, connecting the island of Hundvåg to the mainland), and the Eiganestunnelen (3.7 kilometers, a city tunnel bypassing central Stavanger). Collectively, the tunnels span 23.5 kilometers, supplemented by approximately 53 kilometers of new roads, enhancing regional connectivity, reducing travel times from over 45 minutes by ferry to about 15 minutes through the main tunnel, and diverting heavy traffic from urban areas. Construction began in 2012 under the Norwegian Public Roads Administration (Statens vegvesen), with a total cost of approximately 8,070 million NOK (2019 values) for the core Ryfast components plus 3,514 million NOK for the Eiganestunnelen extension, funded through state, municipal, and toll revenues. The Ryfylketunnelen opened on December 30, 2019, followed by the full system—including tolling—on April 22, 2020, marking a significant advancement in Norway's coastal highway network and supporting economic development in the Ryfylke region. Notable engineering features include advanced safety systems, such as distributed temperature sensing for fire detection across the entire network, and the tunnels' design to withstand high overburden pressures and seismic activity in the fjord environment.

Overview

Project Description

The Ryfast project is a 23.5 km network of road tunnels that connects the city of to Strand municipality in county, , by crossing beneath the Boknafjord as part of the E39 coastal highway upgrade. This subsea tunnel system, comprising interconnected underwater and urban tunnels, provides a fixed-link alternative to traditional in the region. The primary objective of Ryfast is to replace the existing ferry service between and , eliminating dependencies on weather-affected crossings and significantly enhancing connectivity between northern and Ryfylke districts. By providing a direct road route, the project reduces overall travel time from approximately 45 minutes—including ferry waiting and crossing—to about of driving. Upon completion in , Ryfast became the world's longest subsea road system, marking a major advancement in Norway's for reliable year-round access. The total cost of the project reached approximately 11.6 billion in 2019 figures (8.07 billion for core components plus 3.51 billion for the Eiganestunnelen), funded through a combination of national government allocations, contributions from local municipalities, and revenues from collected via dedicated stations. fees, for example, stand at 116 for standard vehicles without AutoPASS as of 2025 (reduced from 179 ), supporting ongoing debt repayment until 2039.

Significance and Route

The Ryfast project plays a crucial role in 's national transport infrastructure as part of the E39 Kyststamvegen highway, which aims to create a continuous ferry-free route connecting southern , including , to central regions like , thereby enhancing overall national connectivity and reliability along the west coast. By eliminating key ferry dependencies in , it contributes to the broader goal of modernizing the E39 corridor for safer and more efficient long-distance travel. On a regional level, Ryfast significantly improves access to the Ryfylke area, home to approximately 19,500 residents across municipalities such as Suldal, Hjelmeland, Strand, and Forsand, while benefiting the wider county by reducing in the area and supporting daily , , and industrial activities. The project eases pressure on urban routes in Nord-Jæren, promotes in peripheral areas, and facilitates better links to key facilities like Sola and the Risavika port, fostering growth in business and residential opportunities. The route begins in the urban area of , where the Eiganestunnelen provides a city tunnel connection, followed by the Hundvågtunnelen linking to the mainland, and culminates in the subsea Ryfylketunnelen crossing the Boknafjord to emerge at Solbakk in the municipality of Strand, from where it integrates with National Road 13 heading northward. Prior to Ryfast, travel between and Ryfylke relied heavily on the Tau- , which carried about 1,580 vehicles daily in 2010 and was plagued by seasonal delays, peak-hour congestion in 's city center, and operational vulnerabilities, alongside the parallel Lauvvik-Oanes handling roughly 1,573 vehicles per average day in 2009. These created bottlenecks for both local commuters and regional traffic, underscoring the need for a fixed-link alternative to ensure year-round accessibility.

Components

Ryfylke Tunnel

The serves as the primary subsea component of the Ryfast project, functioning as the core link across the fjords to connect the region with Ryfylke. This twin-tube road extends 14.4 kilometers, with one tube dedicated to each direction of traffic, establishing it as the world's longest subsea road tunnel. The tunnel's western portal is located in Hundvåg within municipality, while the eastern portal lies near Solbakk in Strand municipality. It passes beneath the Horgefjord and Boknafjord, reaching a maximum depth of 292 meters below with an overburden of 290 meters. Each tube features a cross-sectional area of 50 square meters, following the standard Norwegian T8.5 profile with a width of 8.5 meters at road level and a clearance of 4.6 meters, accommodating two lanes plus emergency shoulders. Safety provisions include six ventilation shafts, 16 lay-bys per tube for emergencies, and cross passages connecting the tubes.

Connecting Tunnels

The connecting tunnels of the Ryfast project function as essential auxiliary infrastructure, linking the primary subsea to the surface road network and facilitating smooth integration with urban and regional traffic flows along the European route E39. These partially subsea, land-based, and urban connectors, totaling 9.2 km in length including ramps and interchanges, enable efficient access from central while bypassing surface congestion. The Hundvåg Tunnel spans 5.5 km and connects the western portal of the on Hundvåg Island to central , serving as a key approach for commuters entering the city. With a maximum depth of 95 meters below , it features twin single-tube sections, each 9.5 meters wide to accommodate two lanes in each direction, and includes emergency cross passages every 250 meters for safety. Entry and exit ramps at Buøy provide local access, enhancing connectivity to nearby residential and industrial areas. The Eiganes Tunnel, measuring 3.7 km, runs beneath Stavanger's Eiganes district as a dedicated city tunnel, handling urban traffic by diverting vehicles from heavily congested surface roads and reducing bottlenecks on the E39 north-south route. It maintains an of 15 to 25 meters and employs a similar dual-lane, twin-tube design with tunnelled ramps for entry and exit, ensuring minimal disruption to overlying urban development. An interchange with the Hundvåg Tunnel and a southern approach from Stavanger's support local access for daily commuters. Design features across these tunnels prioritize urban compatibility, including single-tube configurations in densely populated zones to conserve space and over 10,000 m² of permanent noise protection measures to attenuate traffic sounds and protect nearby residents. These elements, combined with strategic interchanges, allow for seamless E39 integration and improved regional mobility.

History

Planning and Approval

The Ryfast project originated in the as part of Norway's broader initiative to develop a ferry-free along the west coast, aiming to enhance connectivity between coastal regions. Initial concepts focused on replacing services across the Boknafjord, with early discussions dating back to the mid-1970s but gaining political momentum in the through regional agreements. Detailed feasibility studies were carried out from 2005 to 2011 by the Norwegian Public Roads Administration, evaluating options such as subsea tunnels versus bridges, traffic volumes, and economic viability; these studies confirmed the tunnel approach as the most practical alternative for linking Ryfylke to Nord-Jæren while minimizing surface disruption. Key stakeholders in the planning phase included the Norwegian Public Roads Administration (Statens vegvesen), which led the technical and regulatory efforts, County for regional coordination, and local municipalities such as and Strand, which provided input on community impacts and contributed to funding discussions. These entities collaborated on route alignment, land acquisition, and preliminary designs to ensure alignment with national transport goals. The project was formally presented to the (Norwegian Parliament) in 2011 via Proposition No. 109 S (2011–2012), emphasizing its role in reducing travel times and boosting regional development. Approval was granted by the Storting on 12 June 2012 as part of the National Transport Plan 2010–2019, with 77 votes in favor, enabling immediate progression to financing and construction preparations. The initial cost estimate stood at 5.22 billion NOK, covering tunnels, roads, and ancillary infrastructure, financed through a mix of state grants, toll revenues, and local contributions. Environmental impact assessments, integrated into the feasibility studies and proposition, verified minimal marine disruption, with tunnel alignments designed to avoid sensitive seabed ecosystems and limit construction-related emissions through controlled blasting and waste management protocols.

Construction and Opening

Construction of the Ryfast project began in spring 2013, following the award of multiple contracts to construction firms including AF Gruppen for the E03 contract covering a 6.3 km twin-bore tunnel and associated surface works, and Marti Contractors for the E02 contract covering drill-and-blast sections of the subsea Solbakk Tunnel. The project progressed through key excavation phases, with the eastern breakthrough of the Solbakk Tunnel achieved on 26 October 2017, marking a significant milestone in the world's longest undersea road tunnel. Full excavation was completed by early 2018, after the second tube breakthrough in January, allowing the focus to shift to fit-out works such as installation of ventilation systems, lighting, and safety infrastructure throughout 2019. In 2024, the tunnels underwent a technology upgrade including AI-based incident detection. The , the project's centerpiece, officially opened to traffic on 30 December 2019, providing the primary subsea connection between and Strand municipality. The Hundvåg and Eiganes Tunnels followed, opening on 22 April 2020 after delays related to final testing and commissioning, rendering the full Ryfast system operational by mid-2020 and eliminating the previous dependency. The core Ryfast project's final cost reached 8.07 billion Norwegian kroner () in 2019 prices, a substantial overrun from the initial estimate of 5.22 billion , attributed primarily to unforeseen geological challenges and inflationary pressures during construction. Upon completion, responsibility for Ryfast was transferred from Statens vegvesen Utbygging to Statens vegvesen Drift og vedlikehold in 2020 for ongoing operations and maintenance. Toll rates were reduced by 33% starting July 2025.

Design and Engineering

Technical Specifications

The Ryfast tunnel system adheres to road standards for subsea infrastructure, designed to support a of 80 km/h with a maximum of 7.85%. It features a twin-tube configuration, with separate bored tubes for each direction of travel—each accommodating two lanes—except in urban sections where configurations may vary to integrate with local s. This setup ensures efficient bidirectional while maintaining separation for safety. Safety features are integral to the design, including evacuation crossovers positioned every 250 meters to facilitate rapid egress during emergencies. The system incorporates advanced via optic linear detection cables spanning the full length of the tunnels, enabling early identification of anomalies, alongside automated incident detection using and camera-based systems for real-time monitoring of stopped vehicles, wrong-way driving, and other hazards. systems are engineered to handle a 100 MW load, supporting extraction and air . Overall, the is rated for a 100-year , aligning with standards in tunnelling practices. The geological conditions encountered consist primarily of hard metamorphic and igneous rocks, such as and , characteristic of western Norway's basement. Water ingress from surrounding aquifers is mitigated through systematic pre-excavation grouting to seal fractures and reduce leakage to acceptable levels, ensuring under high overburden pressures up to 292 meters below . Utilities support operational reliability, with power drawn from the regional electricity grid and supplemented by backup systems for critical functions like , , and . The Ryfast system is projected to accommodate up to 10,000 vehicles per day, facilitated by an electronic multilane free-flow tolling infrastructure that enables seamless collection without gantries disrupting traffic. The core spans 14.4 km, forming the longest segment of the network.

Construction Methods and Challenges

The Ryfast tunnels were primarily constructed using the drill-and-blast method, a conventional technique well-suited to Norway's hard rock geology, involving the drilling of blast holes with jumbo rigs followed by controlled explosions to advance the tunnel face in cycles of approximately 20-30 meters. This approach allowed for a cross-sectional profile of around 50 m², enabling efficient excavation while accommodating site-specific adjustments for rock quality and support needs. The method's flexibility was crucial for navigating variable conditions, with probe drilling integrated to assess ahead-of-face geology before each blast round. Geological challenges were prominent, particularly in fault zones like the Tungenes fault, where poor rock quality, swelling clays, and high-pressure water inflows—up to 20 —threatened stability and excavation rates. These inflows, common in subsea tunnels, could exceed 5 liters per minute per 100 meters in weakness zones, risking flooding and delays; they were mitigated through systematic pre-grouting to seal fractures and voids, combined with probe for targeted sealing. Seismic via the Tunnel Seismic Prediction (TSP) method, employing TSP 303 systems, provided real-time 3D modeling of rock mass up to 150 meters ahead, identifying low-velocity damage zones with velocity drops (e.g., P-wave to 4,900 m/s) and Poisson's ratios indicating water presence, achieving prediction accuracy of ±1-4 meters and reducing reliance on costlier core by up to 97%. Logistical hurdles arose from the remote eastern portal's fjord location, necessitating barge transport for heavy equipment and materials, which complicated supply chains amid Norway's rugged . Excavation proceeded simultaneously across up to five headings to meet timelines, demanding coordinated for muck removal and . Deep, humid conditions—exacerbated by seawater proximity and high humidity levels—posed safety risks to workers, addressed through enhanced , dehumidification, and strict protocols for heat stress and prevention in the harsh coastal climate. Innovations like systems enabled continuous rock stability monitoring via the Q-system for support design, integrating geological mapping with real-time data to adjust bolting and applications proactively. The project excavated approximately 4 million cubic meters of rock overall, with the main contracts, such as the Solbakk award valued at around 1.2 billion (excluding ), supporting peak employment of over 500 workers across multiple phases.

Impact

Economic and Social Effects

The Ryfast project incurred a total construction cost of approximately 8.1 billion Norwegian kroner for the core components (2019 values), with an additional 3.5 billion for the Eiganestunnelen extension. Financing was primarily managed through toll revenues collected by Ryfast AS, a special-purpose company owned by county and municipality, with repayment structured over a 25-year period ending in 2039. This toll-based model covered the bulk of the investment, supplemented by loans such as a 120.5 million facility from the . Economically, Ryfast has lowered logistics expenses for key Ryfylke sectors including and by replacing ferry-dependent with a direct road link, enhancing regional . The project has also driven property value appreciation in Strand municipality, where house prices rose by 10.1–12.8% following the approval of construction plans, with stronger gains (up to 23.6%) observed in lower-priced homes closer to the opening. These increases reflect anticipated improvements in accessibility, spurring residential development and bolstering local markets. On the social front, the tunnel has enhanced access to emergency services in remote Ryfylke areas by providing a reliable, all-weather route that bypasses ferry schedules, enabling faster response times for ambulances and other aid. It delivers substantial daily time savings for commuters, shortening the journey from to Ryfylke from about 62 minutes (including ferry waits) to 24 minutes, benefiting commuters between urban and rural Ryfylke and improving work-life balance and labor market integration. Traffic volumes have surpassed initial forecasts since opening in late , with early post-opening average annual daily traffic (AADT) reaching around 10,000 vehicles per day in connecting tunnels as of , exceeding the projected 4,000 vehicles at launch, and fully eliminating reliance on the previous ferry service. In July 2025, toll rates were reduced by approximately 33%, potentially further increasing usage and economic benefits.

Environmental and Operational Aspects

The environmental assessments for the Ryfast project highlighted minimal disruption to the fjord ecosystem, as the subsea method eliminated the need for or extensive surface alterations, thereby preserving marine habitats. Excavated material was deposited at sea to cover contaminated sediments, resulting in limited and temporary negative impacts on local , such as lobsters and fish populations. By replacing ferry services, Ryfast has significantly reduced associated with maritime transport. For instance, the cessation of the Tau ferry route contributed to an annual CO2 reduction of approximately 6,200 tons in municipality starting from 2020, supporting broader regional efforts to lower transport-related emissions. Mitigation measures during construction focused on protecting sensitive environmental elements, including careful management of spoil disposal to limit contamination and the use of pre-excavation grouting techniques to seal pathways and prevent potential . These approaches aligned with Norwegian standards for sustainable tunneling, emphasizing local material reuse and emission controls to minimize long-term ecological footprints. Operationally, the Ryfast tunnels incorporate advanced 24/7 monitoring systems to ensure safety and efficiency, including Navtech radars for traffic detection and management to prevent congestion and incidents. is handled via AP Sensing's distributed temperature sensing using optics, integrated with the central control system for rapid response to potential hazards in the enclosed environment. Maintenance follows structured cycles, typically every five years, to address wear on infrastructure components like and . Post-opening challenges include managing high humidity levels in the deepest sections, which reach 292 meters below , requiring ongoing and dehumidification to prevent and ensure air quality. Incident response protocols have been established to handle emergencies at such depths, incorporating evacuation simulations and coordination with regional emergency services. Looking ahead, Ryfast forms a key segment in the E39 coastal highway upgrades, with plans for integration into the forthcoming project, which will extend the ferry-free corridor further north and enhance overall connectivity along Norway's west coast.

References

  1. [1]
    Ryfast er åpnet - Statens vegvesen
    May 5, 2021 · Fakta og nøkkeltall ... Totalkostnad: Ryfast: 8070 mill. 2019-kr. Eiganestunnelen: 3514 mill. 2019-kr. Oppstart: 2012. Antatt åpnet: 2019 ...
  2. [2]
    World's deepest subsea tunnel opens in Norway - New Civil Engineer
    Jan 6, 2020 · The tunnel reaches a maximum depth of 292m below sea level. It is part of the Ryfast road project to link national highway 13 between Stavanger with Strand in ...
  3. [3]
    [PDF] THE RYFAST PROJECT
    The Ryfast Project comprises the construction of two subsea tunnels and a city tunnel under the fjord in the west coast of Norway:.Missing: infrastructure | Show results with:infrastructure
  4. [4]
    Ryfast tunnel: A challenging undersea record
    Sep 4, 2014 · The whole Ryfast project involves the construction of three tunnels and 53 kilometres of new roads, all due for completion by the end of 2018.Missing: infrastructure | Show results with:infrastructure
  5. [5]
    Norges største veiprosjekt åpnet i Stavanger onsdag
    Apr 22, 2020 · Ryfast-prosjektet er det største vei- og tunnelprosjekt i Norgeshistorien. Onsdag er hele prosjektet åpnet for trafikantene.
  6. [6]
    Vegvesenet hever Ryfast-kontrakt med Tecsidel - Statens vegvesen
    Aug 13, 2020 · Ryfast-prosjektet består av Ryfylketunnelen (åpnet 30. desember 2019), Hundvågtunnelen og Eiganestunnelen (åpnet 22. april 2020). Etter en ...
  7. [7]
    Fire Detection in the Ryfast Tunnel System - AP Sensing
    Project Overview. The Ryfast tunnel system in Norway is the world's longest subsea road tunnel network, stretching nearly 14 km beneath the fjords. It consists ...
  8. [8]
    NIB finances record undersea road tunnel in Norway
    The new road connection, between National road 13 and European route 39, will replace two ferry connections and reduce average travel time by 45 minutes. At ...
  9. [9]
    Subsea Selection - Tunnels
    Jun 18, 2014 · The Ryfast link will be 19.5km long, built almost entirely underground, and will establish the Rv13 road as an all weather link between ...
  10. [10]
    Dette svaret fikk Høyre om de ekstra statlige pengene til Ryfast
    May 29, 2023 · I svaret fra administrasjonen pekes det på at Ryfast-prosjektet sto ferdig med en kostnad på i overkant av 8 milliarder 2019-kroner, og ...
  11. [11]
    Ryfast - What does the tolls cost? - Ferde.no
    In Ryfast, the price for zero-emission vehicles is 70 percent of ordinary vehicles after the AutoPASS discount.
  12. [12]
    Bakgrunn - Ryfast - Statens vegvesen
    Ryfast er eit typisk ferjeavløysingsprosjekt der problema i samband med ferjebruk forsvinn når prosjektet er ferdig. I Stavanger legg ferja til kai i sentrum, ...
  13. [13]
    Inauguration of the Ryfylke tunnel in Norway - AFTES
    Jan 5, 2020 · The 14.4 km long Ryfylke tunnel between Solbakk in Strand and Hundvaag in Stavanger, Norway, was opened. It is the longest and deepest underwater road tunnel ...
  14. [14]
    The world's longest and deepest road tunnel opens - Tunnelbuilder
    Jan 13, 2020 · The 14.4-km tunnel, has the steepest climb of 7%, which applies for 4 km of the distance up to Solbakk, and its deepest point is 292 m below sea level.
  15. [15]
    World's deepest subsea tunnel opens to traffic in Norway
    Jan 6, 2020 · The 14.4km Ryfylke tunnel near Stavanger, which reaches a maximum depth of 292m below sea level making it the world's deepest subsea tunnel.
  16. [16]
    [PDF] OUR FIBRES MAKE TUNNELS SAFER. - krampe harex
    IN SITU/SHOTCRETE. FOR THE MOST. EXTREME STRESSES. 14.3 km long and up to 290 m be- neath the sea: the Ryfylke tunnel is the longest ...
  17. [17]
    [PDF] Road Tunnels
    Figure 4.6 Tunnel cross-section T8.5 (measured in metres) T8.5 is used for tunnels with two-way traffic in tunnel categories B and C, and for each tube in ...
  18. [18]
    No blanket solution - Tunnels
    Dec 29, 2021 · While more expensive to install, precast panels provide combinations of better traffic safety, fire protection, life span and are easier to ...Missing: lanes | Show results with:lanes
  19. [19]
    The longest road tunnels in the world | Autocar
    Oct 25, 2025 · There are 16 laybys in each of the tunnel's tubes, as well as six ventilation shafts. It was also built with 40 connecting tunnels between ...
  20. [20]
    [PDF] Eiganes Tunnel - Svenska bergteknikföreningen
    Nov 25, 2024 · As the south western connection to the Ryfast project, the E39 Eiganes tunnel will be constructed and managed jointly with the Ryfast project.Missing: Kyststamvegen | Show results with:Kyststamvegen
  21. [21]
    E39 Eiganestunnelen - Implenia
    The Eiganes Tunnel cross an existing sewer tunnel and the Byhaugtunnel with little overburden. ... 10,000 m² temporary and permanent noise protection ...
  22. [22]
    Prop. 109 S (2011–2012)
    **Summary of Prop. 109 S (2011–2012):**
  23. [23]
    Stortinget - Møte tirsdag den 12. juni 2012 kl. 10 - Sak nr. 14
    Jun 12, 2012 · Sak nr. 14 [15:44:18]. Innstilling frå transport- og kommunikasjonskomiteen om utbygging og finansiering av rv. 13 Ryfylkesambandet (Ryfast) og ...
  24. [24]
    Norway advances Ryfast mega-project - TunnelTalk.com
    Jul 1, 2014 · Construction of the 6.5km long E03 western section of the 14.3km long Solbakk Tunnel was awarded to AF Gruppen (Norway) in June last year (2013) ...
  25. [25]
    Rv13 Ryfast - AF Gruppen
    About the project · NOK 1168 million. Contract value · 8. kilometres of dual carriageway. 6.5 km forms part of the 14 km long subsea Solbakk Tunnel. Four portal ...
  26. [26]
    Breakthrough RV 13 Ryfast / Solbakktunnel - Marti Norge
    Oct 27, 2017 · ​The breakthrough of the first tube of the world deepest underwater road tunnel took place yesterday. Page Content. ​The event was celebrated ...
  27. [27]
    Both Tubes of the Solbakk Tunnel broken through
    The tunnel belongs to the northern contract section of the Ryfast project between Stavanger and Tau. The breakthrough of the second tube took place in January ...
  28. [28]
    Ryfast Tunnel - Navtech Radar
    Statens vegvesen's innovative Ryfast tunnel project is benefitting the people of Stavanger in Norway every day, replacing a 45-minute ferry crossing.
  29. [29]
    [PDF] Sustainability in Norwegian Tunnelling
    This year's publication is devoted to sustainability in Norwegian tunnelling. The publication is targeted towards both an international and national audience, - ...
  30. [30]
    [PDF] SUBSEA TUNNELS - Publication No. 18 NORWEGIAN ...
    Tunnelling projects have a strict focus on cost and time. The Owners would ... The construction cost for the tunnel project has been estimated to 50.2 to 63.4 ...
  31. [31]
    Right fast tolling for Kapsch | Global Highways
    Norway has installed multilane free-flow tolling from Kapsch in one of world´s deepest undersea road networks, the Ryfast tunnel system.
  32. [32]
    None
    Summary of each segment:
  33. [33]
    [PDF] challenges for deep subsea tunnels based on norwegian experience
    Poor stability weakness zones with large water inflow can be particularly problematic. At the pre-construction investigation stage, geological and engineering ...
  34. [34]
    [PDF] Expected Transport Accessibility Improvement and House Prices
    We identify the effect exploiting a quasi-natural experiment created by the approval and construction of the Ryfast tunnel system in Rogaland, Norway, which ...
  35. [35]
    Ryfast AS (Norway) - Loan - Nordic Investment Bank
    Mar 6, 2014 · The new road will replace two ferry connections and reduce the average travel time by 45 minutes. Ryfast AS is a special-purpose company ...
  36. [36]
    Ryfast AS (Norway) - Loan - Nordic Investment Bank
    Ryfast AS. Date: 20.12.2017. Country: Norway. Customer: Ryfast AS. Amount in NOK: NOK 1,000 million. Amount in EUR: EUR 101.31 million. Maturity: 21.5 years.Missing: contract value
  37. [37]
    [PDF] Klimabudsjett 2021 - Stavanger kommune
    Total reduksjon tonn CO2-ekv. (ikke inkludert rad 3) i forhold til ... 30.12.19 som følge av Ryfast - ca 6200 tonn reduksjon pr år for Stavanger kommune fra 2020.
  38. [38]
    [PDF] evaluering av rv13 ryfast og e39 eiganestunnelen - ntnu
    Feb 2, 2024 · I KS2 ble styringsrammen og kostnadsrammen anslått til henholdsvis 5,25 milliarder og 5,5 milliarder (2011- kroner) for Ryfast. For ...
  39. [39]
    Work on world's longest subsea road tunnel advances with ...
    Nov 28, 2024 · The 14.3km-long Ryfast Tunnel east of Stavanger claimed the title when it opened in 2019, but it is due to be unceremoniously ousted from pole ...