Sahibganj loop

The Sahibganj Loop is a 404-kilometre railway line in eastern India that connects Khana Junction in West Bengal to Kiul Junction in Bihar, serving as an alternative route parallel to the shorter Grand Chord. Originally constructed as the primary segment of the East Indian Railway's Howrah–Delhi main line in the early 1860s, it was opened to traffic in stages starting from 1860 and fully operational by 1866, facilitating the transport of passengers and goods along the Ganges River valley. Following the completion of the First Chord line in 1871, which provided a more direct path from Khana to Luckeesarai near Kiul, the longer original route was redesignated as the Sahibganj Loop to accommodate growing traffic demands. The route traverses diverse terrains across three states—West Bengal, Jharkhand, and Bihar—passing through culturally significant areas such as the Santiniketan region near Bolpur and the temple town of Deoghar via a branch line. Key stations include Bolpur Shantiniketan (38 km from Khana), Rampurhat Junction (99 km), Sahibganj (232 km), and Bhagalpur (306 km), with the line historically featuring river ferries like those at Sakrigali Ghat before full bridging. Today, it supports numerous express and local trains, including connections to major cities like Howrah, Patna, and Delhi, while handling freight such as coal and construction materials from regional quarries. Historically, the Sahibganj Loop played a pivotal role in colonial India's connectivity, with construction beginning in 1860 from Panduah to Rajmahal and extending to Bhagalpur by 1861, amid the East Indian Railway's expansion under British administration. The Jamalpur Locomotive Workshop, established in 1862 along the route, became Asia's oldest railway workshop, underscoring the line's engineering importance. As of 2020, the route is fully electrified, and track doubling has been substantially completed, including the historic Kiul–Sahibganj section, enhancing its capacity and ongoing relevance in India's rail network alongside upgrades on parallel corridors.

Overview

Description

The Sahibganj loop is a 404 km broad gauge (1,676 mm) railway loop connecting Khana Junction in West Bengal to Kiul Junction in Bihar. It is owned and operated by Indian Railways, primarily under the Eastern Railway zone, with the Kiul end under the East Central Railway zone. The line supports a maximum speed of up to 110 km/h, with upgrades to 130 km/h in progress as of 2025, and functions as an alternative route to the Howrah–Delhi main line via the Grand Chord. Historically, it constituted the original Howrah–Delhi main line prior to the 1871 rerouting via the chord line, which shortened the primary path and relegated this section to loop status. The route traverses the states of West Bengal, Jharkhand, and Bihar. The entire line has been electrified since 2020.

Geographical Extent

The Sahibganj loop railway line spans 404 kilometers, connecting Khana Junction in West Bengal to Kiul Junction in Bihar while passing through Jharkhand. This route traverses three states: starting in West Bengal from Khana through areas like Bolpur and Rampur Hat, entering Jharkhand near the Sahibganj district, and continuing into Bihar via Bhagalpur before reaching Kiul. The line predominantly follows the Ganges River valley, meandering through a mix of landscapes that reflect the region's diverse topography. In Jharkhand, it crosses the undulating hilly terrains of the Rajmahal hills, part of the Chhotanagpur Plateau embedded within the Ganges floodplains, while in Bihar, it navigates the low-lying, flood-prone alluvial plains susceptible to seasonal inundation from the river and its distributaries. Significant geographical challenges along the route include the construction and maintenance of bridges over major tributaries, such as the , , and Kiul River, as well as a at Jamalpur to accommodate variations in the central sections amid varying . By linking remote interiors with urban centers, the Sahibganj loop plays a crucial role in improving connectivity for rural and tribal populations, particularly in Jharkhand's Santhal region, enabling better access to economic opportunities, healthcare, and education in otherwise isolated areas. This infrastructure supports the socioeconomic integration of these communities into the broader Howrah–Delhi rail network.

History

Construction Phase

The construction of the Sahibganj loop began in the 1850s as part of the East Indian Railway (EIR) Company's ambitious project to link Calcutta (now Kolkata) with northern India via a line along the Ganges River. Formed in 1845 with initial capital of £4,000,000 raised primarily in London through British investment, the EIR undertook surveys and groundwork starting around 1851 for an experimental line from Howrah to Rajmahal, incorporating what would become the core of the Sahibganj loop. The first significant section from Khana Junction to Rajmahal, spanning approximately 190 kilometers along the southern bank of the , opened to traffic on July 4, 1860, marking the initial operational segment of the and enabling the first through train from to powered by steam locomotives. This involved extensive earthworks and single- to navigate the riverine terrain, with engineering challenges including flood-prone soils and the need for stable embankments to prevent erosion from the . relied on colonial funding guaranteed at 5% return by the , supplemented by private investors, while mobilizing thousands of laborers for manual tasks such as track laying, quarrying, and bridge building over tributaries. Subsequent extensions progressed northward, connecting Rajmahal to Bhagalpur in 1861 and further to Kiul Junction by the mid-1860s, rendering the full 403.8-kilometer loop operational by 1866 as a vital artery for passenger and goods traffic using steam-powered services. Key engineering feats included the single-track configuration with minimal gradients to suit the undulating Gangetic plain and the strategic placement of modest girder bridges over local rivers, though the route avoided a direct crossing of the Ganges itself at Sahibganj, relying instead on its parallel alignment for efficient connectivity. The project exemplified Victorian-era railway engineering adapted to tropical conditions, with British oversight ensuring adherence to broad-gauge standards (5 ft 6 in) throughout.

Operational Evolution

Upon its completion in 1866, the Sahibganj loop functioned as the primary segment of the main line under the East Indian Railway (), facilitating direct connectivity between eastern and northern . This role persisted until 1871, when the shorter First Chord line—providing a more direct path from Khana to Luckeesarai near Kiul and completed by the —diverted long-distance main line traffic, relegating the Sahibganj route to secondary status and earning it the designation of a "loop" line. Following this shift, the Sahibganj loop primarily handled local passenger services, freight movements between and regions, and occasional diversions for main line maintenance or blockages, thereby supporting regional connectivity while the First Chord bore the bulk of express and through traffic. Its operational focus evolved to emphasize shorter-haul operations, including goods handling at key yards like Sahibganj, where shunting and pilot services managed quarry and local freight demands. In 1880, the British government took over the working of the , though the company retained ownership until . The of in 1951 integrated the , including the Sahibganj loop, into a unified state-owned network, standardizing operations and administration across former private companies. Throughout the 20th century, the line transitioned from predominant steam traction—reliant on coal-fired locomotives—to and later electric systems, mirroring ' broader modernization to enhance efficiency and reduce operational costs, with introductions accelerating post-1950s and gaining momentum from the onward. A pivotal reorganization occurred on April 14, 1952, when the Sahibganj loop was incorporated into the newly formed , which amalgamated the 's divisions for improved regional oversight.

Route and Infrastructure

Route Alignment

The Sahibganj Loop is a 404 km railway line that originates at Khana Junction, situated near Burdwan in West Bengal, and extends to Kiul Junction in Bihar, forming a secondary route parallel to the primary Howrah–Delhi main line. This alignment begins by departing Khana Junction and traversing westward through the district of Birbhum, passing key intermediate stations including Bolpur (at approximately 38 km) and Rampurhat (at 99 km), before reaching Pakur (at 152 km), which marks the border between West Bengal and Jharkhand. The path in this initial segment winds through fertile plains and forested areas, avoiding steeper terrains to the north. Entering , the route continues to Sahibganj (at 232 km), where it turns northeastward along the southern bank of the River for the central segment to (at 306 km) in , characterized by meandering alignments that parallel the river's course and include several loops to navigate around its tributaries and flood-prone zones. From , the line proceeds inland via Jamalpur (at 359 km), crossing varied topography with gentle gradients, before culminating at Kiul Junction. This configuration intentionally diverts from the more direct route to , incorporating circuitous paths around riverine obstacles for operational feasibility during its construction era. At both termini, the Sahibganj Loop integrates seamlessly with the Howrah–Delhi main line: Khana Junction serves as a critical interchange point on the eastern end, facilitating connectivity from Howrah, while Kiul Junction links to the western segments toward Gaya and beyond, enabling through services across the broader network.

Major Stations and Facilities

The Sahibganj loop includes several key stations that facilitate both passenger and freight operations, with facilities tailored to their roles as junctions and hubs. Sahibganj Junction serves as an important interchange point with historical connections to river port activities, including a former large steam locomotive shed and marine operations setup featuring a dedicated jetty and steamers. The station has three platforms, sidings for freight handling such as coal and goods via its public siding, and basic passenger amenities including waiting areas. Bhagalpur Junction stands as a primary hub on the route, categorized as an A-1 with high daily footfall of approximately passengers (as of 2024), supported by multiple platforms, waiting rooms, computerized ticketing, and refreshment facilities. Jamalpur Junction functions as a critical stop linked to the locomotive workshop, offering four platforms, eight tracks, signaling systems for efficient routing, and passenger amenities like waiting halls and parking. Kiul Junction acts as a major interchange for connections to the broader network, equipped with waiting rooms, computerized reservation counters, vehicle parking, and platforms handling diverse traffic flows.

Jamalpur Locomotive Workshop

The Jamalpur Locomotive Workshop, located at Jamalpur station, was established on 8 February 1862 as the locomotive workshop for the , earning it the distinction of being the oldest locomotive workshop in . Initially focused on repairing and assembling imported , it quickly expanded to support the growing demands of the railway network during the British colonial era. The workshop's functions encompass comprehensive locomotive repair and periodic overhauling of diesel and electric locomotives, as well as manufacturing specialized equipment such as 140-ton breakdown cranes, high-capacity Jamalpur jacks, broad-gauge wagons, and tower wagons. It was the first facility in India to build broad-gauge steam locomotives, with the inaugural one, CA 764 "Lady Curzon," completed in 1899 at a cost of Rs. 33,000, which operated for 33 years. Additionally, it serves as a key training center for railway personnel through the Indian Railways Institute of Mechanical and Electrical Engineering (IRIMEE), which provides professional courses for mechanical officers, supervisors, and probationers in mechanical engineering. Historically, the workshop played a pivotal role in sustaining operations along the Sahibganj loop and the broader East Indian Railway system by handling repairs and producing components during the steam era. Today, as part of the , it focuses on maintenance for electric and diesel locomotives, contributing to the modernization of rail services. The facility employs approximately 10,000 workers and remains essential for overhauling electric locomotives to support ongoing initiatives.

Developments

Track Doubling Projects

The track doubling project for the Sahibganj loop was initiated in 2017, when the Railway Board approved the conversion of the historic single-track line into a double line to accommodate growing traffic demands. The initial phase focused on a 111 km stretch between Bhagalpur and Sahibganj, divided into four segments: Tinpahar-Sahibganj (32 km), Sahibganj-Pirpainty (28 km), Pirpainty-Kahalgaon (21 km), and Kahalgaon-Bhagalpur (30 km), with an estimated cost of ₹200 crore for this section. This effort addressed long-standing delays caused by the single track, exacerbated by increased rail movement following the construction of the Farakka Barrage in the 1970s. Progress on the doubling continued in subsequent years, with key sections such as Kiul-Bhagalpur and Pirpainty-Sahibganj completed by 2017. The Ratanpur-Jamalpur segment continues to pose engineering challenges due to the need for a parallel second tunnel at Kali Pahari, adjacent to the 157-year-old Bariakol tunnel. As of 2025, construction of this new tunnel remains in progress. The project incorporated new bridges and realignments in flood-prone areas along the Ganga river basin to enhance resilience against seasonal flooding. These engineering measures, combined with the expanded track capacity, have enabled higher train frequencies and improved operational efficiency on the loop. The doubling facilitates greater integration with ongoing electrification initiatives, supporting higher speeds for both passenger and freight services. Most of the Sahibganj loop now operates as a double line, though the Ratanpur-Jamalpur section remains single-tracked.

Electrification Efforts

The electrification of the Sahibganj loop was initiated in 2017 as part of ' Mission Electrification, a strategic program launched to accelerate the conversion of the broad gauge network to electric traction and reduce reliance on imported . This effort aligned with the broader goal of electrifying approximately 41,000 route kilometers by 2025, emphasizing and environmental . The project progressed in phases, with the Khana–Sahibganj section completed in 2018, followed by the Sahibganj–Kiul section spanning 2019 to 2020, culminating in full of the 403.8 km route by June 2020 using standard 25 kV AC overhead lines. The final stretch between Shivnarayanpur and underwent commissioning in March 2020, with statutory safety inspections (CRS) conducted on June 30, 2020, marking the loop's complete transition to electric operation. Challenges during implementation included installing overhead wiring in riverine and flood-prone areas along the , requiring specialized engineering to ensure stability over bridges and embankments. This electrification has significantly reduced diesel dependency, lowering operational costs and carbon emissions by an estimated 20-35% per passenger kilometer compared to diesel traction, while enabling higher acceleration and speeds for trains. It has facilitated the integration of the Sahibganj loop into premium electric-hauled services, such as routes, supporting faster long-distance connectivity between eastern and northern . The total investment for the project was approximately ₹1,500 crore, contributing to ' overall savings of over ₹5,600 crore in energy costs from 2015 to 2017 alone through similar initiatives.

Branch Lines and Extensions

The Sahibganj loop has seen significant expansion through branch lines and extensions primarily originating from Bhagalpur Junction, a key station on the loop, to improve regional connectivity in Bihar and Jharkhand. These developments have added over 300 km of new rail infrastructure, facilitating access to previously underserved areas and supporting economic growth. One major branch is the Bhagalpur–Rampurhat line, spanning approximately 184.9 km through Bihar, Jharkhand, and West Bengal. This line, connecting Bhagalpur on the Sahibganj loop to Rampurhat via Dumka, became fully operational for passenger services in 2018 following the completion of the Bhagalpur-Dumka section, completing the route's integration. The project aims to enhance connectivity to pilgrimage sites like Tarapith in West Bengal and boost freight movement of coal and minerals from Jharkhand's resource-rich regions. The Bhagalpur–Deoghar line, measuring about 107.1 km, extends from via Banka to in and was completed for full operations in 2022. This branch primarily serves to improve access to the religious center of (Baidyanath Dham), a major site, while also enabling efficient transport of minerals and agricultural goods from interior districts to the main loop. New stations such as Banka Junction have been upgraded along this route to handle increased traffic. Another key extension is the Bhagalpur–Godda line, covering roughly 106 km via Hansdiha, which achieved operational status in 2021 following the inauguration of the 32 km Hansdiha–Godda section. This branch targets connectivity to district's coal fields and power projects, promoting freight haulage of minerals to the Sahibganj loop for onward distribution, alongside passenger services to remote areas. Several new halts and intermediate stations, including Poreyahat, have been established to support local communities. Recent developments on these branches include the of additional stations and ongoing doubling initiatives; for instance, in 2025, the Cabinet approved doubling of the 177 km Bhagalpur–Dumka–Rampurhat section at a cost of ₹3,169 to increase capacity for both passenger and freight traffic. These extensions integrate seamlessly with the Sahibganj loop, enabling through-running trains from major hubs like or directly to , , and without needing to detour via longer routes.

Operations

Passenger Services

The Sahibganj loop facilitates extensive passenger services, with over 50 trains operating daily along its route, including key express services such as the –Gaya Express (13023/13024) and the –Sahibganj (13235/13236). These trains connect major cities in , , and , providing vital connectivity for commuters and long-distance travelers. In October 2024, the daily Sahibganj– Intercity Express (13427/13428) was introduced, further improving regional links. Passenger services on the loop are primarily divided into mail/express categories, with more than 20 such trains running daily, alongside local passenger trains concentrated in the sections between Kiul and . Local services, such as the Sahibganj–Bhagalpur Passenger (53037), operate frequently to serve short-distance needs. Trains typically halt at major stations including Kiul Junction, Jamalpur Junction, Junction, and Sahibganj Junction to facilitate boarding and alighting. Halt patterns vary by train type, with express services stopping at 10–15 intermediate stations for efficiency. Amenities on these trains include both air-conditioned (AC) and non-AC coaches, along with onboard catering services through the Indian Railway Catering and Tourism Corporation (IRCTC). Following the completion of electrification across the entire loop in 2020, passenger trains now operate at improved maximum speeds of up to 110 km/h, enhancing travel times and service reliability.

Freight and Strategic Role

The Sahibganj loop serves as a vital corridor for freight transportation in eastern India, facilitating the movement of coal from Jharkhand mines to power plants and ports in West Bengal, such as the route from Lalmatia in Godda to NTPC Farakka. This route supports the transport of essential commodities including coal, cement, and food grains, contributing to the overall freight loading in the Eastern Railway zone, which reached over 100 million tonnes in FY 2024-25. As an alternative to the congested Grand Chord line, the loop alleviates pressure on the primary Howrah-Delhi main line, enhancing capacity for industrial growth in Bihar, Jharkhand, and West Bengal by providing parallel routing for bulk cargo. In August 2025, a third railway line was approved between Jamalpur and Bhagalpur to further boost freight and passenger capacity. Key facilities along the loop include yards at major junctions like Sahibganj and , which aid in efficient sorting and assembly of freight trains. Following the completion of electrification in June 2020, electric locomotives now haul freight services across the 247 km stretch from Kiul to Malda via Bhagalpur-Sahibganj-Barharwa, improving energy efficiency and operational speeds. Economically, the loop connects agricultural heartlands in Bihar and Jharkhand to industrial hubs and ports in Bengal, fostering regional development by enabling reliable bulk commodity flows. It reduces transit times for certain eastern routes through congestion avoidance, supporting faster delivery of goods like coal and cement to end-users.

Incidents

Historical Accidents

The Sahibganj loop, traversing flood-prone terrain along the Ganges River, has been susceptible to railway incidents influenced by natural hazards throughout its history. Although detailed records of major pre-2000 accidents are limited, the district's disaster management documentation acknowledges that railway accidents have occurred in the area, often linked to environmental challenges such as flooding that weaken infrastructure. These historical vulnerabilities underscore the route's exposure to seasonal monsoons, which have periodically disrupted rail services and prompted early engineering responses to mitigate risks. Overall, the loop's geography contributed to operational hazards, leading to incremental safety enhancements over the decades.

Recent Derailments

A more recent collision occurred on July 3, 2025, at the Barharwa railway yard in Sahibganj district, where a stone-laden freight train traveling at high speed collided with a stationary goods train, causing 14 wagons to derail and pile up. No casualties were reported, but the event caused significant disruption to freight operations on the loop, with tracks blocked for several hours and requiring heavy machinery for clearance. Preliminary investigations attributed the accident to excessive speed and a possible lapse in signaling protocols, leading to an inquiry by the Eastern Railway. On April 1, 2025, two NTPC-operated goods trains collided head-on near Bhognadih in Sahibganj district on a railway line connected to the Sahibganj loop, killing two loco pilots and injuring four others. The accident was attributed to an operational error. Following these incidents, implemented enhanced track patrols in flood-prone areas and advanced systems, including the indigenous Kavach technology on key corridors such as Delhi-Howrah, to prevent signal passing errors and overspeeding. These measures have contributed to a broader decline in consequential accidents, with accidents per million train kilometers dropping significantly in recent years. The route's historical susceptibility to floods continues to inform ongoing safety protocols.

Route Visualization

Detailed Route Map

The Detailed Route Map of the Sahibganj loop illustrates the linear progression of the 404-kilometre railway line from Khana Junction at 0 km to Kiul Junction at 404 km, serving as a key alternative to the Grand Chord for northbound traffic from eastern India. This map typically depicts the route in a schematic or scaled format, highlighting major stations at regular intervals to facilitate navigation and operational planning, with the line traversing parts of West Bengal, Jharkhand, and Bihar. Prominent stations marked on the map include Bolpur Shantiniketan at 38 km, at 99 km, Barharwa Junction at 178 km, Sahibganj at 232 km, at 306 km, Jamalpur at 359 km, and Kiul at 404 km, among over 70 halts that provide connectivity to regional towns and rural areas. Junctions such as (51 km), (71 km), and Jamalpur are emphasized as points where multiple lines converge, enabling route diversification for passenger and freight services. The map incorporates branch divergences for comprehensive visualization, notably the 106 km line to branching from Junction, which supports local connectivity in and . River crossings are distinctly shown with bridge symbols, including the between Bolpur and Ahmadpur (around 31-38 km), the near (71-78 km), and other major bridges over tributaries such as the Dwaraka, Brahmani, Bansloi, and Kiul , underscoring the engineering challenges of the terrain. The Ganga crossing is located near the end of the route, between Ratanpur and Jamalpur via the (approx. 370 km). Track configurations are often color-coded on such maps to reflect infrastructure upgrades, with solid lines for double-track sections—as of November 2025, nearly the entire route is doubled except the remaining single-track portion between Ratanpur and Jamalpur (approx. 20 km)—and dashed lines for any single-track segments, aiding in understanding capacity enhancements. For digital access, interactive versions are available on platforms like the India Rail Info atlas, where users can zoom into the Sahibganj loop route, toggle layers for stations and branches, and trace alignments interactively, including recent updates to doubling projects.

Elevation and Terrain Profile

The Sahibganj loop traverses predominantly low-lying terrain across the Gangetic plains of West Bengal and Bihar, with elevations generally ranging from 36 meters above mean sea level (MSL) at Barharwa Junction to modest rises in the Jharkhand section amid undulating hills near the Rajmahal hills (up to approx. 100-120 m MSL). Starting from Khana Junction at approximately 39 meters MSL, the route maintains near-flat profiles through stations like Rampurhat (42 meters MSL) and Nalhati Junction (46 meters MSL), before descending slightly toward Sahibganj at 34 meters MSL and rising modestly to Bhagalpur (43 meters MSL) and Jamalpur Junction (39 meters MSL). This elevation profile underscores the line's alignment through alluvial floodplains, transitioning to more varied topography near the Rajmahal hills, where short climbs introduce minor undulations up to 1 in 100 ruling gradients typical of the region's secondary main lines. The terrain shifts from expansive, flat Gangetic plains in the West Bengal and northern Bihar segments—characterized by fertile lowlands prone to seasonal flooding—to gently rolling and undulating landscapes in the Jharkhand portion, particularly around Sahibganj and extending toward Bhagalpur. These undulations, influenced by the proximity to the Rajmahal hills, impose occasional steeper sections with gradients not exceeding 1%, but they contribute to a more challenging alignment compared to the broader Howrah-Delhi main line. The route's passage through this transitional zone demands careful engineering to manage soil stability and water flow, with the overall profile facilitating freight and passenger movement at average speeds while highlighting the loop's role as a vital corridor. Key topographical challenges include numerous river crossings and a historic tunnel, exacerbating vulnerability to erosion in the flood-susceptible Ganga basin. The line features several major bridges over tributaries such as the Ajay, Mayurakshi, Dwaraka, Brahmani, Bansloi, and Kiul rivers, which are susceptible to scour and sediment deposition during monsoons, necessitating regular reinforcements to prevent breaches, including the Munger Ganga Bridge crossing near Jamalpur. Additionally, the Jamalpur Tunnel—measuring 275 meters in length, 7 meters in height, and 8 meters in width—pierces the Jamalpur hills between Ratanpur and Jamalpur, addressing the route's most pronounced elevation shift in this segment; originally constructed in the 1860s, it remains operational, though doubling efforts include a parallel 276-meter tunnel completed for enhanced capacity. Flood mitigation measures, including embankments along vulnerable stretches, have been implemented to protect the alignment, as outlined in regional disaster management plans that emphasize strengthening against Ganga overflows affecting up to 20,000 people in nearby areas during high-water events. As of November 2025, ongoing doubling projects, such as the approved Bhagalpur–Dumka–Rampurhat section, further enhance resilience and capacity. These features directly influence operations, imposing speed restrictions in the approximately 50-kilometer undulating stretch through 's hilly terrain to ensure safety amid curves and minor gradients, limiting maximum speeds to around 100-110 km/h in affected sections. Embankments and bridge protections further mitigate flood risks, reducing downtime from erosion-related disruptions, though periodic maintenance remains essential for maintaining reliability on this 404-kilometer loop.

References

  1. [1]
    Table 132: Khana - Kiul - Gaya - Patna (via Sahibganj Loop)
    Khana - Kiul - Gaya - Patna (via Sahibganj Loop). Km, Km, MSL, Code, Name, To, Table. 0, 42, KAN, Khana Jn. BDC, 130 ↗. ASN, 130 ...
  2. [2]
    Railways completes 158 years of journey | Patna News
    Apr 12, 2011 · ... Sahibganj loop line, was thrown open to people in 1860. A direct link between Howrah and Delhi was provided in the early 1860s. The railways ...
  3. [3]
    Sahibganj Loop EIR Line - FIBIwiki
    Feb 16, 2022 · Sahibganj Loop EIR Line. The Khana Junction-Bhagalpur-Jamalpur-Luckeeserai section was originally part of the Howrah-Delhi EIR Main Line ...<|control11|><|separator|>
  4. [4]
    More on Operations: Sahibganj loop - Boloji
    Apr 11, 2020 · Except for a short stretch between Sainthia and Barharwa link cabin - the rest of the section was on single line, with branches to Mandar Hill ...
  5. [5]
    The Chronology of Railway development in Eastern India - IRFCA.org
    1860 : Sahibganj loop line from Panduah to Rajmahal. 1861 : Rajmahal connected to Bhagalpur. 1862 : (a) The Jamalpur Locomotive workshop established. (b) The ...
  6. [6]
    Green light to double rail on oldest route - 135-year-old Kiul ...
    Sep 21, 2010 · Passengers on a train on the Kiul-Sahibganj loop section. Telegraph ... km-long stretch of Bhagalpur to Sahibganj (falling under Jharkhand).
  7. [7]
    East Indian Railway - Lines owned and worked - FIBIwiki
    Dec 1, 2020 · ... Railway to Barharwa on the Sahibganj Loop. This 110 Mile (170km) track was worked by EIR. Central Indian Coalfields Railway, opened 1927.
  8. [8]
    [PDF] 2025-26 - Indian Railways
    Provision of safety fencing for rising of sectional speed to 130 Kmph (28.11 Km) in BGP-JMP ... No.253) in Sahibganj loop. RRSK. 4.27. EBR(S). 0.40. RRSK. 2.16.
  9. [9]
    Howrah Division: Mission Accomplished - Boloji
    Mar 28, 2020 · It also included the whole of the Sahibganj loop from Khana (120 km from Howrah) to Kiul (410 km) and the BAK loop from Bandel (39 km from ...
  10. [10]
    Floodplain - Banglapedia
    Jun 17, 2021 · In the context of physiography, Bangladesh may be classified into three distinct regions, viz (a) Floodplain, (b) Terrace, and (c) Hill areas, ...Missing: Sahibganj | Show results with:Sahibganj
  11. [11]
    Indian Railways' Sahibganj-Howrah Intercity Express
    Oct 30, 2024 · Indian Railways' Sahibganj-Howrah Intercity Express: How improved connectivity will benefit Jharkhand and why it's essential · This expanded ...
  12. [12]
    East Indian Railway - Banglapedia
    Jun 17, 2021 · The transplanting of the Victorian railway technology in East India was the accomplishment of British capital and Indian labour. Millions of ...Missing: Sahibganj loop
  13. [13]
    The 1846 plan for India's first Railway line - Google Arts & Culture
    In 1845, the East Indian Railway Company was formed with the objective of building a line from Calcutta to Delhi. Such a railway would connect the Company Raj's ...
  14. [14]
    Malda's oldest station building Rajmahal restored - The Statesman
    Sep 2, 2019 · The first train in this section from Howrah to Rajmahal had started on 4 July 1860. The old station building, with its thick brick mortar ...
  15. [15]
    Railways weren't Britain's 'gift' to India—we paid with blood, sweat ...
    Jun 19, 2024 · It would acquire the land for the project at its own cost for the company, and would pay it a guaranteed return of 5 per cent on the capital.
  16. [16]
    Grand Chord EIR Line - FIBIwiki
    Dec 1, 2020 · The 'First Chord EIR Line' that had been completed in 1871 connecting Raniganj with Luckeesarai was not providing sufficient capacity. By ...Missing: Sahibganj usage
  17. [17]
    [PDF] indian railways timeline - India Rail Info
    Sahibganj Loop. From Rajmahal, EIR's lines proceeded westwards along the ... This is the highest broad-gauge line in the world and sees some of the ...
  18. [18]
    [PDF] The first private Railway in India: Deoghur Railway
    Similar was the story of renaming of Sahibganj loop line, which was constructed as main line initially and Sitarampur –Jhajha –Lakhisarai main line which ...
  19. [19]
    How India electrified 45% of its railway network in just five years
    Feb 2, 2024 · Until the 1980s, the network had been largely steam-powered. Modernisation efforts introduced the diesel locomotive – but this brought with it ...
  20. [20]
    Eastern Railway
    Eastern Railway was formed on 14th April, 1952 by integration of the East Indian Railway consisting of Sealdah, Howrah, Asansol and Danapur Divisions and ...Missing: loop | Show results with:loop
  21. [21]
    [PDF] Preservation and Restoration of Malda Division
    ... opened on 1913 as a branch line from katwa on hoogly katwa Railways to Barhrwa on the Sahibganj loop. Katwa to Jangipur road sec- tion was commissioned on ...
  22. [22]
    Virtual Junction - RBS
    Sahibganj Public Siding, MLDT, ER. 904, SEDS, SANGIDALAM EAST SDG RJL, MLDT ... M/S SMIORE plant siding served by Vyasa Colony Railway station, UBL, SWR. 2857 ...
  23. [23]
  24. [24]
    12 Railway Stations in Malda Division Set for Upgrade | Patna News
    Oct 22, 2024 · Bhagalpur: The railways has initiated steps for redeveloping and upgrading 12 railway stations under Malda division of Eastern Railway under ...
  25. [25]
    Jamalpur Jn (JMP) Railway Station - RailYatri
    Jamalpur Jn (JMP) is a Grade B station in Munger, Bihar, with 56 weekly unique trains, 4 platforms, and 144 trains passing through it.
  26. [26]
    Kiul Railway Station in Kiul,Lakhisarai - Justdial
    Rating 3.6 (22,721) Kiul Junction is a major railway junction and connected to metropolitan areas of India.Waiting rooms, computerized reservation facility, vehicle parking, and ...
  27. [27]
    About Us - Eastern Railway
    Jamalpur Workshop was established on 8th February, 1862 as Locomotive Workshop of East India Railway. It completed its Glorious 150 yrs in 2012.
  28. [28]
    CWM/JMP - Eastern Railway
    Eastern Railway was formed on 14th April, 1952 by integration of the East Indian Railway consisting of Sealdah, Howrah, Asansol and Danapur Divisions and ...
  29. [29]
    Jamalpur workshop to build diesel locos | Patna News - Times of India
    Jul 20, 2011 · Incidentally, Jamalpur workshop was the first to manufacture the first steam locomotive CA 764 'Lady Curzon' in 1899 in India, the CWM said.<|control11|><|separator|>
  30. [30]
    About IRIMEE
    From 1997, HQ of IRSME Probationers was shifted to Jamalpur. Training activities at IRIMEE comprise of: 1.Professional courses for serving officers and ...
  31. [31]
    Jamalpur railway workshop gets best workshop award | Patna News
    May 19, 2014 · The strength of employees of the workshop has increased to 10,000 yielding an impressive revenue to Indian Railways. It is one of the oldest ...
  32. [32]
    Delhi green light for new Jamalpur railway tunnel - Telegraph India
    Dec 13, 2017 · "Double tracking work is over between Kiul and Bhagalpur, as well as from Pirpainty to Sahebganj. Work has started on the Pirpainty to Bhagalpur ...
  33. [33]
    Sahibganj loop - Wikipedia
    The Sahibganj loop is a railway line connecting Khana Junction and Kiul Junction. Originally a part of the Howrah–Delhi main line, it was opened to traffic in ...
  34. [34]
    Indian Railways: Mission electrification to cover 24000 km track in 5 ...
    Nov 3, 2016 · Currently about 2000 km track is being electrified in a year and the aim is to reach 4000 km per year by 2017-18 and 6000 km in subsequent year.
  35. [35]
    [PDF] Mission 41k Through Integrated Rail Energy Management System(1 ...
    balancing technologies. Indian Railways has also embarked upon mission Electrification with an aim to reduce dependence on imported fuel & rationalise the.<|control11|><|separator|>
  36. [36]
    Bhagalpur to Shivnarayanpur Electrification Completed - YouTube
    Mar 24, 2020 · Bhagalpur to Shivnarayanpur Electrification Completed- 410Km Sahibganj Loop 100% Electrified ... Indian Street Food on Indian Railways ...
  37. [37]
    Ushering Green Railways: Accelerating Electrification of Indian ...
    It is reckoned that electric trains produce 20-35 percent fewer carbon emissions per passenger mile than diesel trains8. Furthermore, efforts are being made ...
  38. [38]
    Greenwashing Indian Railways - Shankar IAS Parliament
    Increased speed - Electrification will help in increasing average speed of Freight Trains thereby help in achieving objective of "Mission Raftar".
  39. [39]
    Indian Railways accomplishes major savings in its 'ElectricTraction ...
    Nov 23, 2017 · The total cumulative savings from April, 2015 to October, 2017 reaches ₹5636crores. Cumulative savings in 10 years time (2015-2025)likely to ...
  40. [40]
    Shortest Rail Distance: Bhagalpur to Deoghar 22 Stations. 107.66 km.
    Shortest Rail Distance: Bhagalpur to Deoghar 22 Stations. 107.66 km. India Rail Info is a Busy Junction for Travellers & Rail Enthusiasts.
  41. [41]
    Dumka – Rampurhat single railway line section (177 Km) in Bihar ...
    Sep 10, 2025 · Cabinet approves doubling of Bhagalpur – Dumka – Rampurhat single railway line section (177 Km) in Bihar, Jharkhand and West Bengal with total ...
  42. [42]
    Operating. - Eastern Railway
    Malda Town, New Farakka, Sahibganj, Bhagalpur and Jamalpur are five major stations of Malda Division being supervised by Station Superintendent.Missing: Loop | Show results with:Loop
  43. [43]
    New Hansdiha-Godda 32 Km Railway Line Inaugurated In Jharkhand
    Apr 8, 2021 · With introduction of superfast Humsafar Express train, commuters will enjoy comfortable journey from Godda to New Delhi via Bhagalpur. On ...
  44. [44]
    52 Departures from Sahibganj ER/Eastern Zone - Railway Enquiry
    Zone: ER/Eastern Railway Zone. Type: Regular. Category: NSG-4. Track: Double Electric-Line. 12 Originating Trains. 12 Terminating Trains. 40 Halting Trains.Missing: loop daily services
  45. [45]
    Sahibganj Jn (SBG) Railway Station - Trains - EaseMyTrip
    Local passenger trains and express services operating towards Patna, Saharsa, Katihar and Bhagalpur are some of the essential stops. Book Train Tickets to/from ...Missing: loop | Show results with:loop
  46. [46]
    Sahibganj - Bhagalpur Passenger (UnReserved) 53037 Train - Ixigo
    Rating 4.7 (3,675,467) It starts from Sahibganj Jn station and ends at Bhagalpur. Due to its 14 stoppage stations, the total time taken by this train is around 2hr 15min.
  47. [47]
    52 Departures from Nagaur NWR/North Western Zone - Railway Enquiry
    ### Summary of Train Departures from Bhagalpur (BGP)
  48. [48]
    Now, electric trains will run on Bhagalpur-Kiul railway section
    Jun 4, 2019 · “The total route electrification between Kiul-Bhagalpur-Sahibganj-Barharwa-Malda is 247 km. ... The electrification of the railway route is ...
  49. [49]
    Two drivers burnt alive, 5 injured in Jharkhand train crash
    Apr 1, 2025 · According to reports, a coal-laden freight train traveling from Lalmatia, Godda, to NTPC Farakka, West Bengal, crashed into an empty stationary ...
  50. [50]
    View Archives - Eastern Railway
    ... AMENITIES AT SABOUR AND SULTANGANJ STATIONS UNDER “AMRIT ... 77 BETWEEN PRANTIK & KOPAI STATIONS ON SAHIBGANJ LOOP LINE SECTION OF ER'S HOWRAH DIVISION.
  51. [51]
    [PDF] Railway Convention Committee (1999) - IRFCA.org
    The Ministry of Railways have submitted before the Committee that further investment on Gauge Conversion works as a means to create alternative routes and ...<|separator|>
  52. [52]
    [PDF] DISTRICT DISASTER MANAGEMENT PLAN OF SAHEBGANJ (2017)
    The history of Sahibganj district is rich and interesting. It centers mainly on the history of Rajmahal, Teliagarhi Fort and. Sahibganj Town itself.
  53. [53]
  54. [54]
    Goods train derails in Sahibganj | Ranchi News - The Times of India
    Jul 3, 2025 · Several wagons of a stone-laden goods train derailed at the Barharwa railway yard under malda division in Sahibganj after hitting a stationery goods train on ...
  55. [55]
    Goods Train Wagons Derail in Sahebganj Railway Yard, No Injuries ...
    Jul 3, 2025 · Rail Mishap: Several stone-laden wagons derailed in Sahebganj, Jharkhand; no casualties reported, operations unaffected, says Eastern ...
  56. [56]
  57. [57]
    Indian Railways' Safety Push Brings Down Consequential Train ...
    Aug 8, 2025 · Another important index showing improved safety in train operations is Accidents Per Million Train Kilometer (APMTKM) which has reduced from ...Missing: Sahibganj loop automatic
  58. [58]
    New blueprint for Rail control and ops in the works - ET Infra
    Jun 28, 2025 · This upgrade, featuring an integrated command center, seeks to address traffic congestion, reduce accidents, and improve train speeds.
  59. [59]
    Tilrath- Jamalpur Passenger Train Crossing Munger Ganga Bridge ...
    May 5, 2018 · ... Sahibganj Loop line of Eastern Railway through a new junction namely Sabdalpur Junction on north end of bridge to Sahebpur Kamal and ...<|control11|><|separator|>
  60. [60]
    Route Map - Eastern Railway
    This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various ...Missing: scale | Show results with:scale
  61. [61]
    Indian Railways Map - Railway Enquiry - India Rail Info
    The Living Atlas of Indian Railways India Rail Info is a Busy Junction for Travellers & Rail Enthusiasts ... Search Routes · Main · Old Atlas. Show Station. Sat.Missing: Sahibganj | Show results with:Sahibganj
  62. [62]
    SBG/Sahibganj Railway Station Map/Atlas ER/Eastern Zone
    Number of Platforms: 3. Number of Halting Trains: 38. Number of Originating Trains: 11. Number of Terminating Trains: 11. Station Address. NH-33 ...Missing: sidings | Show results with:sidings
  63. [63]
    Rail service and travel by rail in the Indian subcontinent | Page 5
    Dec 6, 2022 · The original train ran via what is known today as Sahibganj Loop, later moved to the Main Line through Jhajha, and finally to Grand Chord in ...
  64. [64]
    Jamalpur Tunnel - FIBIwiki
    Dec 23, 2020 · The original line, which included the Jamalpur Tunnel, became the Sahibganj Loop. The line and tunnel is still in use, the entire ...Missing: delay geological
  65. [65]
    Design Of A Railway Tunnel | ISRM International Symposium
    Nov 24, 2008 · 1. Introduction. The existing Sahibganj Loop on the Kiul- Bhagalpur section of the East Central Railway crosses the Jamalpur hills through a ...
  66. [66]
    River Ganga crosses danger mark in Sahibganj, around 20k people ...
    Aug 11, 2025 · SAHIBGANJ: (Aug 11) Around 20,000 people are affected due to flood-like situation in Jharkhand's Sahibganj district, with the water level of ...Missing: embankments | Show results with:embankments