Fact-checked by Grok 2 weeks ago

Union Pearson Express


The Union Pearson Express (UP Express) is a dedicated airport rail service operated by Metrolinx, an agency of the Ontario government, providing a direct higher-speed connection between Union Station in downtown Toronto and Toronto Pearson International Airport in Etobicoke, with a standard travel time of 25 minutes and trains departing every 15 minutes throughout the day.
Launched on June 6, 2015, coinciding with the Pan American Games, the service represents North America's first purpose-built air-rail link, featuring brief intermediate stops at Bloor and Weston GO stations, free Wi-Fi, level boarding, and fares starting at $12.35 one-way for adults.
Over its first decade of operation, UP Express has transported more than 26 million passengers and removed approximately 1.2 million car trips from roads in its inaugural year alone, earning top ratings for transportation in Toronto from Tripadvisor travelers in 2024 and 2025.
Despite optimistic pre-launch projections of 2.35 million annual riders and ambitions for financial self-sufficiency, the service encountered early challenges with lower-than-expected ridership, prompting fare reductions from an initial $27.50 and ongoing provincial subsidies estimated at over $10 per trip in the mid-2010s, though recovery in usage has since stabilized it as a key component of the region's transit network.

History

Planning and Early Proposals

The Toronto Air-Rail Link project originated from a proposal in April 2001 to establish a dedicated rail connection between in and International Airport, addressing growing demand for efficient airport access amid increasing air traffic and urban congestion. The initiative aimed to leverage existing rail corridors while adding dedicated infrastructure to achieve non-stop service in approximately 25 minutes, reducing reliance on roadways prone to delays. In May 2003, Transport Minister David Collenette announced the first phase of implementation, emphasizing to finance, build, and operate the service without direct government funding for construction. This phase focused on securing a concessionaire responsible for designing the route, which would utilize about 23 km of the rail corridor shared with commuter trains, plus a new 3 km elevated spur from the mainline to the airport's Terminal 1 area. On November 13, 2003, Union Pearson AirLink Group (UPAG), a led by SNC-Lavalin Profac, was selected as the winning bidder from three proposals, tasked with financing, constructing, and operating the link under a 35-year concession that included revenue from fares and potential or at stations. UPAG's plan proposed diesel-electric trains capable of speeds up to 130 km/h on upgraded tracks, with dedicated platforms at and Pearson to minimize transfers, though environmental assessments and negotiations delayed progress beyond initial planning. Early estimates projected construction costs around CAD 685 million, largely covered by private investment expecting 10,000 daily riders.

Development Under Private Consortium

In November 2003, the Union Pearson Group (UPAG), a of SNC-Lavalin Engineers & Constructors, was selected to finance, , and operate the proposed (ARL), a dedicated airport rail connection from to the existing rail network near . The 's Blue 22 proposal envisioned a 23-kilometer multiple-unit service with a 35-minute travel time from to the airport, emphasizing private financing to minimize public costs, though it required government guarantees for viability. Development progressed slowly under UPAG, with preliminary design work and environmental assessments completed by 2008, when the Ontario government advanced a public-private partnership (PPP) structure to accelerate the project amid growing airport demand projections exceeding 50 million annual passengers. However, the global eroded private lender confidence in the , which relied heavily on airport surcharges and ridership forecasts of 9,000 daily passengers; UPAG failed to secure the necessary C$500 million in private debt by mid-2010. Faced with stalled progress and mounting delays—originally targeting a 2007 launch—the Ministry of Transportation terminated the PPP agreement with UPAG in July 2010, citing the consortium's inability to meet financial milestones without additional public subsidies that contradicted the private-led model. , the provincial transit agency, assumed full responsibility for the project, rebranding it as the Union Pearson Express (UP Express) and shifting to a publicly funded approach with C$456 million in total investment, marking the end of private consortium-led development. This transition highlighted risks in airport rail PPPs, where optimistic ridership assumptions often clashed with economic realities, as evidenced by similar delays in other North American projects.

Construction and Metrolinx Involvement

Construction of the Union Pearson Express infrastructure began on December 19, 2011, following 's assumption of responsibility for building, owning, and operating the service after earlier private-sector proposals encountered challenges. As the provincial agency tasked with regional development, awarded a $128.6 million design-build-finance to AirLINX Transit Partners—a of Construction and Dufferin Construction—for a 3-kilometer elevated spur line connecting to Toronto Pearson International Airport's Terminal 1, along with a new passenger station there. Spur line work started in January 2012, with station construction at Terminal 1 commencing in March 2013; these efforts integrated with upgrades to the shared rail corridor along the former Canadian National subdivision, including track improvements and electrification preparations for future compatibility with services. coordinated additional contracts for four stations— (platform enhancements), Bloor, , and Pearson—plus a maintenance facility, ensuring the diesel-powered, self-propelled trains could operate at speeds up to 140 km/h with 15-minute frequencies. The project aligned with broader South corridor expansions to accommodate increased rail traffic. Metrolinx's direct involvement emphasized public accountability and integration with Ontario's transit network, contrasting with prior consortium models that had stalled over financing disputes; the agency prioritized value-for-money, achieving an estimated $19.7 million in savings through competitive bidding. concluded on July 31, 2014, ahead of the , enabling testing and on-time, on-budget service launch in June 2015 after approximately three years of work.

Launch and Early Operations

The Union Pearson Express (UP Express) initiated public service on June 6, 2015, delivering a non-stop, 25-minute rail connection between in and Terminal 1 at via diesel multiple-unit trains operating on dedicated tracks. The launch followed three years of construction and aligned with preparations for Toronto's hosting of the in July, positioning the service to handle anticipated event-related travel demand. Initial adult one-way fares stood at $27.50 for cash payments or $19 with a Presto card, levels that sparked criticism for mirroring or exceeding costs of alternatives like taxis for pairs or small groups, potentially limiting appeal beyond premium airport users. Early daily ridership reached about 3,250 passengers in July 2015, meeting short-term projections of 3,000–5,000 weekday users boosted by seasonal and event factors, though figures soon tapered to an average of roughly 2,200 per day by year's end due to fare sensitivity and competition from buses and rideshares. To address lagging adoption, fares were halved in March 2016 to $12.35 one-way (9 with Presto), prompting an immediate doubling of ridership and underscoring price elasticity in demand during the service's formative phase. Operational challenges persisted, including low commuter uptake despite for intermediate stops at Bloor and , leading to the of the UP Express in March 2016 amid a review of performance shortfalls. By its first anniversary in June 2016, weekday volumes had climbed above 8,200, reflecting adjustments but highlighting initial overreliance on airport-centric traffic forecasts.

Infrastructure and Operations

Route Description

The Union Pearson Express operates on a dedicated 23-kilometer rail corridor connecting in to Toronto Pearson International Airport's Terminal 1 station. Trains depart from and travel northwest along the existing Weston Subdivision, paralleling the GO Transit tracks, which facilitates shared infrastructure for the initial segment. This alignment includes intermediate stops at Bloor GO/UP Station, located near Bloor Street West and serving connections to Line 2 subway, and GO/UP Station, situated in the neighborhood with links to local bus services. Beyond Weston Station, the route diverges from the Weston Subdivision onto a purpose-built 3-kilometer elevated spur line, crossing the Humber River and Highway 427 before entering airport property. This dedicated section features continuous welded rail on a multi-span guideway, designed to minimize conflicts with freight and commuter traffic on the mainline. Upon reaching Pearson Station in Terminal 1, passengers can transfer via the airport's free to Terminal 3, approximately 1 kilometer away. The full journey covers urban rail corridors, river crossings, and highway underpasses, achieving end-to-end travel in 25 minutes despite the two intermediate stops. The route employs standard gauge tracks with wayside signaling throughout, operating as a non-electrified service on this alignment to ensure reliability amid mixed-use environments. Grade-separated infrastructure, including bridges over and the Humber River, supports efficient progression without at-grade crossings in sensitive areas.

Stations and Accessibility

The Union Pearson Express serves four stations along its dedicated 23-kilometre route from downtown Toronto to the airport: Union Station, Bloor GO/UP Station, Weston GO/UP Station, and Toronto Pearson International Airport Terminal 1 station. Union Station, located in downtown Toronto, functions as the primary urban terminus and connects to GO Transit, VIA Rail, TTC subway lines 1 and 3, and regional buses, with platform access via elevators and escalators for seamless transfers. Bloor GO/UP Station, in west Toronto, provides interchange with TTC Line 2 subway and local buses, featuring elevated platforms with ramps and elevators to street level. Weston GO/UP Station, further west, offers connections to GO Kitchener line trains and local bus routes, equipped with similar accessibility infrastructure including elevators and tactile warning strips on platforms. The airport station at Terminal 1 integrates directly with pedestrian walkways to the terminal buildings, baggage claim, and ground transportation, with dedicated UP Express signage and level access from the platform. All UP Express stations incorporate features compliant with Ontario's accessibility standards, including ramps, elevators at platforms and entrances, , and signage using pictograms alongside plain-language text for visual and cognitive support. Platforms enable level boarding onto trains without gaps exceeding regulatory limits, facilitating independent access for users of wheelchairs, scooters, or walkers. Detailed station-specific information, including photos and feature checklists, is available via the AccessNow platform maintained by . UP Express trains feature dedicated spaces for mobility aids accommodating non-folding wheelchairs up to 91 cm wide and 137 cm long, with secure tie-downs, priority seating areas, and fully accessible washrooms equipped with grab bars and fold-down changing tables. Staff assistance is available upon request for boarding, and service animals are permitted without restrictions. These provisions support an estimated 10-15% of riders with disabilities, aligning with broader commitments to inclusive transit design.

Rolling Stock and Technical Specifications

The Union Pearson Express operates a fleet of 18 (DMU) s manufactured by for the North American market. These s include 12 cab-end units and 6 intermediate cars, enabling flexible operation in two-car or three-car trainsets to match demand. Each measures 85 feet (25.9 m) in length, 5 inches in width, and 14 feet 7.5 inches in height, running on 1,435 mm standard-gauge . Power is provided by a Cummins QSK19 Tier 4 rated at 760 horsepower with hydraulic transmission, ensuring compliance with U.S. Environmental Protection Agency emissions standards; the design incorporates crush energy management for safety and provisions for future conversion to electric propulsion. Trains achieve a maximum operating speed of 145 km/h (90 mph), supporting the 25-minute end-to-end travel time over the 23 km route. Passenger capacity in a three-car configuration reaches 173 seated, with dedicated space for luggage and features including level boarding. Two-car sets offer reduced capacity suited to off-peak periods.
SpecificationDetails
Manufacturer
TypeDiesel multiple unit (DMU)
Fleet composition18 cars (12 end, 6 intermediate)
Configurations2-car or 3-car sets
EngineCummins QSK19, 760 hp, Tier 4
Maximum speed145 km/h (90 mph)
Seated capacity (3-car)173 passengers

Service Frequency and Capacity

The Union Pearson Express provides rail service between and with trains departing every 15 minutes in both directions throughout the operating day, equating to four trains per hour. This frequency applies uniformly without distinction between peak and off-peak periods, and all trains make intermediate stops at Bloor GO Station and Weston GO Station. Service operates seven days a week, with the first departure from at approximately 5:07 a.m. and the last at 12:57 a.m.; from Pearson Airport, the first train departs at 6:27 a.m. and the last at 12:57 a.m., accommodating typical and flight schedules. Each UP Express trainset consists of three cars manufactured by , offering a seated of 173 passengers designed for travelers with luggage. Total passenger , including standing room, reaches approximately 180 during periods of higher demand, though actual loads average lower based on ridership patterns. The fleet comprises 18 cars forming multiple three-car consists, enabling the consistent 15-minute headways without reported constraints under current service levels. This configuration supports a theoretical peak throughput of around 692 seated passengers per hour per direction, though utilization remains below full given observed average loads of 57 passengers per train.

Performance and Economics

The Union Pearson Express launched in June 2015 with initial projections of approximately 2.35 million annual passengers, based on estimates that it would divert significant airport-bound traffic from roads. However, early actual ridership fell short of these forecasts; for the ending 2016, figures were substantially lower than the anticipated 3 million passengers cited in documents. By the ending 2017, ridership reached 2.76 million, reflecting gradual uptake amid adjustments and efforts. Pre-pandemic growth accelerated, with ridership climbing to 3.5 million for the ending March 2018, driven by increased awareness, reliable service , and integrations with PRESTO fare systems. This peak represented a more than 25% year-over-year increase from the prior year and aligned closer to revised expectations of steady demand from business travelers and airport users. By 2019, annual usage stabilized around 3.5 million, comprising roughly 70-80% business passengers per operator analyses, underscoring its role as a premium shuttle rather than mass transit. Over the first decade of operation through May 2025, cumulative ridership exceeded 26 million passengers. The COVID-19 pandemic severely disrupted trends, with international travel restrictions causing ridership to plummet. For the fiscal year 2021/22, usage dropped to 0.825 million passengers, a fraction of pre-pandemic levels due to airport throughput declining by over 90%. Recovery began in 2022/23, reaching 2.57 million amid easing restrictions and rebounding air traffic, though still below 2019 peaks. By fiscal 2023/24, combined GO Transit and UP Express ridership grew 43.7% year-over-year to 59 million, with UP Express contributing to this via targeted promotions and capacity enhancements; specific UP figures indicated continued post-pandemic rebound to approximately 83% of pre-2019 levels.
Fiscal YearUP Express Ridership (millions)
2016/172.76
2017/183.5
2021/220.825
2022/232.57
Projections for future ridership emphasize full recovery to 3-3.5 million annually by aligning with Pearson's expected passenger growth to 50 million by 2030, supported by service expansions and fare integrations. strategies target further increases through optimized frequencies and connectivity to GO networks, potentially doubling usage by 2033 under optimistic scenarios factoring urban density and reduced road congestion. However, these depend on sustained demand and from ridesharing, with no guaranteed attainment beyond historical patterns of modest post-launch growth.

Fares, Pricing Adjustments, and Revenue

The Union Pearson Express established an initial one-way adult fare of C$27.50 at its launch on June 22, 2015, positioning it as a comparable to or shuttles. This pricing reflected the private consortium's emphasis on cost recovery through higher-yield passengers, but early ridership fell short of projections, prompting criticism that the rate deterred volume users relative to alternatives like buses or . In response, announced a substantial reduction on February 23, 2016, effective March 9, 2016, lowering the cash fare to C$12 and the fare to C$9, a cut of over 55% from launch levels aimed explicitly at boosting demand. Subsequent adjustments have been incremental and targeted. By 2025, standard one-way adult fares stood at C$12.35 for cash or single tickets and C$9.25 with Presto, incorporating minor inflation-linked increases while maintaining the structure for electronic payments to encourage adoption of integrated . Reduced rates apply to seniors (C$6.20 cash/C5.80 Presto), youth/post-secondary students (40% off adult fares via Presto at C$7.41), and employees (C$7.41 one-way as of January 3, 2025, up from prior levels but retaining a 40% ). Group passes and long-layover returns offer further options, such as C$25 for three adults, but no broad hikes for general passengers have occurred since 2016 despite internal 2019 proposals to raise rates—potentially doubling them—to prioritize business travelers and improve revenue yields. These proposals, outlined in documents, sought to reverse commuter-focused but were not implemented, preserving accessibility over premium segmentation. The 2016 fare slash directly impacted revenue, reducing per-passenger yield and widening the funding gap. Analysis of post-reduction data showed fare and ancillary revenues C$23.3 million below operating costs in the initial full period, underscoring the service's inability to achieve break-even without subsidies even as ridership climbed. This structural deficit stems from high fixed costs—including diesel operations and infrastructure maintenance—outpacing fare income, with the public-private partnership model transferring operational risks to Metrolinx while capping consortium upside. By fiscal year-end March 2018, ridership reached 3.5 million amid record demand, yet detailed revenue figures and cost breakdowns remained undisclosed, limiting public assessment of financial viability. Overall, revenues have proven insufficient for self-sustainability, relying on provincial funding to cover shortfalls and sustain operations as a public good rather than a profit center.

Cost Structure, Subsidies, and Financial Outcomes

The Union Pearson Express operates at a structural , with fare revenues insufficient to cover operating expenses, resulting in reliance on provincial subsidies administered through . Pre-launch estimates projected annual operating costs of approximately $70 million, encompassing labor for and station staff, fuel for multiple units, track and vehicle maintenance, and administrative overhead, against anticipated revenues from 2.5 million riders at premium fares. Actual early fell short, amplifying the funding gap due to lower-than-expected ridership influenced by high initial fares and from alternatives like and rideshares. Subsidies from the have bridged this shortfall since service inception on June 6, 2015. For the period from launch to March 31, 2016, the operating totaled $39.3 million, equivalent to $52.26 per ride based on recorded passenger volumes. By the ending March 31, 2017, rising ridership reduced the per-ride to $11.04, though absolute deficits persisted amid cuts aimed at boosting usage. These interventions, including a one-way from $27.50 to $12.35 in 2016, prioritized over cost recovery but further entrenched dependence, with projections indicating long-term annual shortfalls exceeding $20 million even at stabilized volumes. Financial outcomes reflect ongoing losses, as the service has never achieved break-even operations despite infrastructure investments totaling $456 million for construction and electrification elements. Metrolinx integrated UP Express financial reporting with GO Transit from 2018 onward, obscuring service-specific metrics, but broader rail operations—including UP Express—contributed to Metrolinx's $1.213 billion provincial operating subsidy requirement in fiscal 2023-24, amid total expenses of $1.918 billion against $689 million in revenues. This opacity limits precise assessment of current per-ride economics, though fare revenue growth post-pandemic has not eliminated the need for external funding, underscoring the service's role as a subsidized public good rather than a commercial enterprise.

Efficiency Compared to Private Alternatives

The Union Pearson Express provides a fixed travel time of 25 minutes between and via a dedicated corridor, eliminating variability from . Taxis and ridesharing services such as , by comparison, require 30 to 45 minutes for the same route, with durations extended during peak hours or incidents on Highway 427 and the Queen Elizabeth Way. estimates an average of 28 minutes under optimal conditions, but real-world delays often exceed this due to congestion. One-way fares on the UP Express stand at $12.35 CAD as of 2025, making it substantially cheaper than private options. Taxis charge $50 to $70 CAD for trips, inclusive of airport surcharges, while costs average $42 CAD but fluctuate with demand surges and tolls. This pricing differential favors the UP Express for solo travelers or small groups, though private vehicles offer door-to-door service at the cost of parking fees or drop-off logistics at the airport. Reliability metrics further highlight the UP Express's advantages, with service operating every 15 minutes and on-time performance insulated from automotive bottlenecks. Private alternatives suffer from wait times averaging 5 to 15 minutes at curbside queues, compounded by traffic-induced unpredictability. Rail capacity supports up to 256 passengers per trainset, enabling higher throughput per departure than taxis (limited to 4 passengers) or typical Uber vehicles, which contributes to reduced road congestion for every trip diverted from private modes. Energy efficiency underscores systemic benefits of the UP Express over , as operations consume approximately 3.7 times less energy per passenger kilometer than automobiles or under comparable loads. Dedicated avoids idling and acceleration inefficiencies inherent in road-based services, though limits absolute gains relative to electrified alternatives. Private options, reliant on individual engines, exhibit lower load factors and higher per-passenger fuel use, particularly for underoccupied during off-peak periods.

Environmental and Sustainability Aspects

Diesel Operations and Emissions Profile

The Union Pearson Express (UP Express) employs diesel multiple unit (DMU) trainsets manufactured by Nippon Sharyo, each car powered by a single underfloor Cummins QSK19-R diesel engine rated at 760 horsepower. These engines, introduced in service commencing June 25, 2015, represent the first North American railcar application of Cummins' ultra-low emissions technology. The QSK19-R complies with (EPA) Tier 4 Final standards, mandating reductions exceeding 90% in (PM) and nitrogen oxides () relative to Tier 3 levels, alongside controls on hydrocarbons (HC) and (CO). This certification applies to non-road diesel engines over 2,000 horsepower in aggregate, with the UP Express configuration achieving these limits through advanced exhaust aftertreatment systems including and diesel particulate filters. Operations involve paired two-car consists for most services, drawing diesel fuel supplied via logistics, contributing to Scope 1 from combustion. Despite Tier 4 compliance, propulsion inherently produces CO2 equivalent emissions proportional to consumption, with no publicly detailed tonnage figures specific to UP Express operations available from reports; however, the service's short 23-kilometer route and bi-directional scheduling minimize idling and use relative to longer-haul rail. has initiated assessments for to further reduce local air pollutants and net emissions, underscoring 's interim role amid ongoing combustion-based output of criteria pollutants. The DMU design distributes power across cars, potentially mitigating passenger exposure to exhaust compared to locomotive-hauled trains with centralized engines.

Impact on Traffic Congestion and Urban Mobility

The Union Pearson Express has mitigated traffic congestion in the Greater Toronto Area by diverting passengers from automobiles to rail for airport-bound travel. In its inaugural year of operation commencing June 2015, the service removed approximately 1.2 million car trips from regional roads, easing demand on primary access corridors such as Highway 427 and the Queen Elizabeth Way, which connect downtown Toronto to Pearson International Airport. This reduction equates to fewer vehicles navigating peak-hour bottlenecks, where driving times to the airport can exceed 45 minutes due to recurring delays. The service enhances urban mobility by delivering a consistent 25-minute journey from to the airport, bypassing variable road conditions and offering predictability absent in private vehicle travel. Integration at with and lines supports multimodal trips, enabling commuters to forgo cars entirely for end-to-end journeys involving airport access. However, with a peak capacity of around 800 passengers per hour, the UP Express addresses only a fraction of Pearson's inbound demand, limiting its broader congestion-relief potential amid the airport's high volume of road-dependent arrivals. Ongoing ridership growth, integrated within 's reported 71.8 million annual trips for GO and UP services in fiscal 2024-25, suggests sustained but incremental mode shift benefits.

Comparisons to Road-Based Transport Options

The Union Pearson Express offers a consistent travel time of 25 minutes between and , operating on dedicated tracks insulated from highway congestion. Road-based alternatives, such as driving via Highway 427 or taking a /, typically require 25 to 45 minutes under light traffic but can extend to 60 minutes or more during peak periods, as Toronto's roadways like the 401 and 427 experience frequent delays from volume exceeding capacity. This variability stems from causal factors including commuter influx, construction, and incidents, rendering rail more predictable for time-sensitive airport transfers. Fares for the UP Express stand at $12.35 for a one-way , providing a cost advantage for solo travelers or small groups compared to or rideshares, which average $50 to $75 from to , inclusive of potential surge pricing and tips. Driving incurs variable expenses like fuel (approximately $5–10 round-trip), tolls on alternatives like Highway 407 ($10–20 depending on distance), and airport parking fees starting at $20–50 daily, often exceeding rail costs when factoring in opportunity costs of . Road options enable door-to-door service, beneficial for luggage-heavy groups or off-peak flexibility, but lack the rail's onboard amenities like free and level boarding, which enhance productivity during transit.
AspectUP ExpressTaxi/RidesharePrivate Driving
Average Time25 minutes (fixed)25–60 minutes (traffic-dependent)25–60 minutes (traffic-dependent)
Solo Cost$12.35 one-way$50–75 one-way$15–40 (fuel, tolls, )
ReliabilityHigh; immune to Low; surge delays commonLow; exposed to accidents/volume
Overall, the UP Express outperforms in reliability and per-passenger efficiency, particularly amid Toronto's chronic —where vehicles lose an average of 100+ hours annually—though it requires alignment with access for optimal use. Road modes retain edges in personalization but amplify externalities like emissions and contribution .

Controversies and Reception

Public Criticisms and Opposition

The Union Pearson Express has faced significant public criticism primarily for its high fares, low ridership relative to projections, and operational decisions such as the use of diesel-powered trains. Initial one-way fares of $27.50 (or $19 with a ) were widely decried as unaffordable, particularly for airport employees commuting daily, prompting concerns from workers at Pearson Airport who anticipated costs of $20–$30 per trip. This led to fare reductions in 2016, dropping the round-trip price from $53 to $44 without Presto, in response to ridership stagnating at around 10% . Critics, including transit advocates, argued that the pricing structure prioritized business travelers over broader , with internal documents from 2019 revealing considerations to raise fares to $20 but ultimately shelved due to backlash. Opposition intensified over the service's financial model and perceived lack of value, with ridership figures falling short of pre-launch estimates—e.g., averaging under 10,000 daily passengers against projections of over 20,000—fueling debates on its economic viability and reliance on subsidies. Public petitions and advocacy groups, such as the Riders, pushed for deeper fare cuts and integration into regional transit systems, highlighting the exclusion from programs like Ontario's One Fare initiative as of . A proposal to alternate every second as non-stop (extending waits to 13–17 minutes) drew swift backlash from residents and opposition politicians, who labeled it a service cut favoring commuters over users, leading to a reversal within 34 hours. Environmental and design choices amplified discontent, with the decision to deploy diesel multiple units rather than electrified trains criticized for higher emissions and forgoing opportunities to align with goals, despite the corridor's potential for overhead wiring. Reliability concerns, including incidents like cracks grounding trains in 2023, further eroded confidence among users expecting premium service. Airport staff specifically protested fare hikes for employees, such as a proposed 50%+ increase to $7.41 one-way in 2024, viewing it as punitive amid stagnant wages. Overall, these issues have positioned the UP Express as a of mismatched priorities in Toronto's transit planning, with ongoing calls for affordability reforms and to address public skepticism.

Achievements, Awards, and User Benefits

The Union Pearson Express (UP Express) achieved a significant milestone in June 2025 by completing 10 years of operation as North America's first dedicated express between a downtown station and an . Over this period, the service has transported more than 26 million passengers, reflecting steady ridership growth, including an 18 percent increase in weekday usage and 25 percent on weekends following the restoration of 15-minute frequencies in 2023. In terms of awards, UP Express was named Project of the Year at the Global AirRail Awards in in 2015, recognizing its innovative integration of and connectivity. The project also received Integrated of the Year and additional honors at the same event, highlighting collaborative engineering efforts that improved economic and environmental outcomes. Engineering firm was awarded in 2016 for professional leadership in the UP Express development, emphasizing its contributions to infrastructure quality. Users benefit from the service's non-stop 25-minute travel time between and terminals, bypassing road congestion and offering predictable scheduling with frequencies as low as 15 minutes during peak hours. Features such as level boarding, onboard , power outlets, and real-time next-train displays enhance comfort and reliability, contributing to rates that reached record highs in perceptions (91 percent in August 2019 surveys) and overall train reliability around 80 percent. These attributes have positioned UP Express as a preferred option for airport access, diverting trips from highways and reducing individual travel uncertainties compared to taxis or shuttles. The original public-private partnership () for the Union Pearson Express, awarded to the Union Pearson AirLink Group in 2009, collapsed after two years of unsuccessful negotiations over financing and risk allocation, prompting to assume full operational responsibility in 2012. This shift drew criticism from fiscal conservatives who argued that the failure highlighted the inefficiencies of PPP models for infrastructure reliant on uncertain ridership projections, as private partners balked at bearing construction overruns estimated at over $200 million. Upon launch in June 2015, the service faced political scrutiny over its $27 one-way adult fare, which yielded initial ridership of only about 2,500 daily passengers against a capacity for 25,000, operating at roughly 10% utilization. Liberal government officials, including Transportation Minister , defended maintaining fares to avoid deeper subsidies amid fiscal pressures, while opposition parties and transit advocates contended that the pricing deterred working-class and frequent users, undermining the project's goal of reducing airport road congestion. eventually reduced fares to $12.35 in February 2016, boosting ridership to around 5,000 daily, but this adjustment fueled debates on whether taxpayer-backed adjustments validated early warnings about over-optimistic revenue assumptions. Community opposition in Toronto's neighborhood, where the UP Express shares tracks with , centered on upgrades to the Georgetown corridor—including elevated tracks, barriers, and expropriations—that enabled higher speeds but disrupted local residents. While no major lawsuits halted , local groups challenged aspects of the environmental assessments and acquisitions through consultations and appeals, citing inadequate mitigation for , exceeding 70 decibels, and displacement of over 100 households. In April 2024, the Ford Progressive Conservative government proposed altering UP Express schedules to skip Bloor and stations on every second train starting April 28, aiming to prioritize integration and cost efficiencies amid broader network expansions. The plan triggered immediate backlash, with over 5,600 residents signing an decrying reduced access for airport-bound travelers and west-end commuters reliant on connections, prompting Premier to reverse the decision within 34 hours. NDP and opposition leaders grilled Transportation Minister Prab Gill in the legislature, accusing the government of inconsistent planning and succumbing to public pressure only after political embarrassment, while emphasizing the need for stable service to support tourism and business travel to Pearson Airport.

Future Plans

Station Expansions and Connectivity Improvements

initiated construction of an accessible underground pedestrian tunnel in June 2025 to connect Bloor GO/UP Express Station directly to Dundas West subway station, enhancing multimodal connectivity for airport-bound passengers and reducing transfer times. The approximately 200-meter tunnel includes elevators, escalators, and wide pathways designed for barrier-free access, addressing long-standing gaps in integration between the UP Express and Toronto's subway network. As part of broader upgrades, Bloor GO/UP Express Station is undergoing improvements including a new station entrance, realignment of tracks for future service increases, and integration with a community park at Ernest Avenue, expected to improve pedestrian flows and local access by late 2020s. These enhancements support Metrolinx's program, which aims to quadruple service frequencies but does not include new UP Express stops beyond existing infrastructure. No confirmed plans exist for additional UP Express stations, such as in , despite advocacy; proposed developments there focus on GO service rather than airport rail extensions. Connectivity at Weston Station remains tied to general GO improvements, with emphasis on electrification compatibility rather than station-specific expansions.

Potential Electrification and Technological Upgrades

, the provincial agency overseeing the Union Pearson Express (UP Express), has evaluated the electrification of the line as part of broader network upgrades. A 2022 Project Assessment detailed plans to electrify approximately 25 kilometers of track along the Union Station GO corridor and Kitchener GO corridor, enabling electric multiple-unit trains to replace the current diesel-powered fleet. This initiative aligns with Ontario's program, which aims to introduce electrified services starting in phases from 2025 onward, though timelines have faced delays due to procurement and infrastructure challenges. The proposed upgrades would integrate UP Express operations with the , utilizing a unified fleet of electric trains compatible across the GO network to achieve cost efficiencies and higher frequencies. Existing UP Express trains, numbering 18 units, are slated for retirement in favor of these shared electric vehicles, potentially improving and reducing emissions from the current operations that consume about 1,200 liters of per round trip. feasibility studies have also examined traction power systems and adaptations, emphasizing compatibility with airport terminal at Pearson. Technological enhancements beyond include potential advancements in signaling and control systems under , such as implementations to enhance safety and capacity. However, as of the 2024-25 Business Plan, specific timelines for UP Express integration remain tied to overall network progress, with full rollout projected into the 2030s amid ongoing procurement disputes and funding reallocations. These plans prioritize empirical reductions in operational costs and environmental impacts, though critics note historical delays in similar projects due to fiscal constraints rather than technical barriers.

References

  1. [1]
    About UP - UP Express
    With UP Express, you can travel in 25 mins between Toronto's Union Station and Toronto Pearson International Airport 7 days a week for $12.35 or less.
  2. [2]
    Celebrating a decade of UP Express - Metrolinx
    Jun 4, 2025 · On June 6, 2015, the first UP Express train went into service, connecting Union Station to Toronto Pearson Airport just in time for the 2015 Pan American Games.
  3. [3]
    Train to city (UP Express) - Toronto Pearson Airport
    Union Pearson Express runs from Pearson Airport to Union Station in downtown Toronto in just 25 minutes. Adult one-way fare from Pearson to Union is $12.35.
  4. [4]
    Union Pearson Express Line - Infrastructure Ontario
    For the first time, an express rail service is available between Toronto's Union Station and Toronto Pearson International Airport. Travellers now have quicker, ...
  5. [5]
    Union Pearson Express looks unlikely to break even
    Jun 28, 2017 · The $11.04 UPX subsidy for the year finishing at the end of March was revealed by Transportation Minister Steven Del Duca on the eve of the ...
  6. [6]
    Union Pearson Express ridership up, but still heavily subsidized
    May 25, 2017 · Ridership on the Union Pearson Express (UPX) increased during its first full year in operation with lower fares, but the provincial transit ...
  7. [7]
    Union Pearson Express Air Rail Link - Railway Technology
    Jul 20, 2015 · Transport Canada made a proposal for the airport rail link in April 2001. In November 2003, Union Pearson AirLink Group (UPAG), a subsidiary of ...Missing: early | Show results with:early
  8. [8]
    Transport Minister Announces First Phase of Toronto Air-Rail Link ...
    The service would operate between Toronto's Union Station and the new terminal at Lester B. Pearson International Airport, providing direct access to the ...Missing: early | Show results with:early
  9. [9]
    Toronto's Pearson rail-link project gets a builder - The Globe and Mail
    Nov 13, 2003 · Union Pearson AirLink Group would add a spur line to connect with the airport and build its own ticketing and embarkation area at either end.
  10. [10]
    TRANSPORT MINISTER ANNOUNCES WINNING PROPOSAL FOR ...
    Nov 13, 2003 · TORONTO - Transport Minister David Collenette today announced that Union Pearson AirLink Group has been selected as the successful ...
  11. [11]
    SNC-Lavalin unit wins bid for Toronto rail link to Pearson | CBC News
    Nov 13, 2003 · Union Pearson AirLink Group will finance, design, build and operate the link between the two transportation hub. Union Pearson is expected to ...
  12. [12]
    Union Pearson Express - Rail Fans Canada
    Metrolinx estimates that the line cost 456 millions to build. Service started on June 6, 2015, in time for Toronto's hosting of the Pan American games in July ...Missing: history | Show results with:history
  13. [13]
    Union Pearson Express - Old Time Trains
    Metrolinx took over the project in July 2010 creating Union Pearson Express a.k.a. UP Express as a division of GO Transit. ... operation. Some three dozen signal ...
  14. [14]
    Union-Pearson Express - AECON
    First came the construction of the three-kilometre elevated spur line that connects the line to the airport. Next, Aecon completed the Union Pearson Express ...
  15. [15]
    Metrolinx Mulls UP Express Changes - Railway Age
    Oct 15, 2019 · The C$456 million UP Express began service in June 2015. The project involved construction of four station; upgrading the former CN Weston ...<|separator|>
  16. [16]
    Union Pearson Express to Launch June 6 | Ontario Newsroom
    UP Express is forecast to carry 2.35 million passengers a year by 2018. Toronto Pearson and Union Station are expected to serve 190 million travellers a year by ...Missing: PPP | Show results with:PPP
  17. [17]
    Union Pearson Express opens today | CBC News
    Jun 6, 2015 · Union Pearson Express opens today. The first train on the Union Pearson Express line left for Pearson International Airport at 5:30 a.m. ...
  18. [18]
    Union Pearson Express - CPTDB Wiki (Canadian Public Transit ...
    Jan 8, 2017 · ... private partnership had been terminated, citing financial issues. The Ontario government turned to Metrolinx to oversee design, construction ...
  19. [19]
    Union Pearson Express will cost $27.50 one-way, less with Presto ...
    Dec 10, 2014 · The one-way fare for the express train between Pearson Airport and downtown Toronto will be $27.50 cash fare, and $19 with Presto fare card.Missing: initial | Show results with:initial
  20. [20]
    Ontario drops ticket cost for express train to Pearson Airport
    Feb 23, 2016 · Since the express launched in June 2015, ridership levels have been miserably low and the $27.50 one-way adult fare has been cited by many as ...
  21. [21]
    Toronto's Union Pearson Express opens - Economy Class & Beyond
    Jun 8, 2015 · So, this is all well and good – but how much is it going to cost? Well, prepare to dig deep as fares start at C$27.50 for a single, or C$53 ...
  22. [22]
    Union Pearson Express meeting ridership goals: Metrolinx | Toronto ...
    Jul 11, 2015 · Currently the rail link is averaging 3,250 riders a day, she said. “We are very pleased with numbers so far,” Aikins said. The ridership so far ...
  23. [23]
    The Evolution of Demand on the Union Pearson Express
    Sep 21, 2015 · The history of claims for UPX performance is worth reviewing. December 11, 2014 Board Meeting. During this meeting, Kathy Haley, President of UP ...
  24. [24]
    Union Pearson Express ridership doubles on first day of reduced fares
    Mar 18, 2016 · ... 2015 only saw about 2,200 people using the train every day. READ MORE: Union-Pearson high-speed train ridership falls below 70,000. Aikins ...Missing: early | Show results with:early
  25. [25]
    Reduced Union Pearson Express fares come into effect - Global News
    Mar 9, 2016 · Prices for the entire UPX route are now $12 without a Presto card and from $9 with one. Boarding the train at either the Bloor or Weston ...
  26. [26]
    UPX boss resigns over troubled airport train service - Toronto Star
    Mar 21, 2016 · The head of Toronto's troubled airport train service has quit amid an organization review on its operations.
  27. [27]
    How Toronto Turned an Airport Rail Failure Into a Commuter Asset
    Jan 19, 2018 · The Union Pearson Express launched with expensive rides and low ridership. Now, with fares slashed in half and a light rail connection in the works, it's a ...
  28. [28]
    Union Pearson Express celebrates first anniversary, increased ...
    Jun 6, 2016 · The Union Pearson Express celebrated its first anniversary on Monday, announcing their weekday ridership quadrupled to more than 8200 ...Missing: early | Show results with:early
  29. [29]
    Union Pearson Express Railfan Guide - Toronto ON
    The Scoop: The Union Pearson Express began operation on 6JUN2015, construction started in 2012. The standard gauge line is 14-1/2 miles long (23.3 ...
  30. [30]
    UP Express Stations
    A division of Metrolinx, an agency of the Ontario Government, UP Express connects Toronto Pearson International Airport and Union Station in downtown Toronto.
  31. [31]
    Bloor Station - UP Express
    Bloor GO Station extends service to both GO and UP Express customers. Bloor Station is one of two brief stops between Union and Pearson stations.<|separator|>
  32. [32]
    [PDF] TRA-944: UNION PEARSON EXPRESS SPUR AND T1 STATION
    The Spur Elevated Guideway is a 3 km long, multi span structure carrying two railway tracks. The tracks are made of continuous welded rail (CWR), directly fixed ...
  33. [33]
    Pearson Station - UP Express
    A division of Metrolinx, an agency of the Ontario Government, UP Express connects Toronto Pearson International Airport and Union Station in downtown Toronto.
  34. [34]
    UP Express | Pearson Airport to Downtown Toronto in 25 minutes
    With UP Express, you can travel in 25 mins between Toronto's Union Station and Toronto Pearson International Airport 7 days a week for $12.35 or less.Fares · Stations · Pearson Station · Ways to Pay
  35. [35]
    [PDF] UP Express Route Map - Metrolinx
    ROUTE MAP | PLAN DU TRAJET. GO Kitchener. Union Pearson Express. PEARSON. Ruisseau Etobicoke. Etobicoke Creek/. Kipling. Humber River/. Rivière Humber.
  36. [36]
    [PDF] UP Express Schedule - Metrolinx
    Union ➔ Pearson. Pearson ➔ Union. Travel time to Pearson: 25 mins. Travel time to Union: 25 mins. 1.844.GET.ON.UP upexpress.com. UNION. BLOOR. WESTON PEARSON.
  37. [37]
    UP Express Guide to Accessible Travel - Toronto
    May 11, 2023 · All trains are wheelchair accessible and feature accessible washrooms, as well as places to store mobility aids on board.Up Express Stations · Accessibility At Toronto... · Extra Planning...
  38. [38]
    Guide to Navigating Through Toronto Pearson Airport Arrivals
    Jul 10, 2023 · Our trains and platforms are fully accessible. Every UP Express train board at platform level making it easy for travellers with mobility ...<|separator|>
  39. [39]
    Accessibility | Travelling with Us - GO Transit
    To help make trip planning easier you can use AccessNow when visiting a GO or UP Express station to find detailed accessibility listings and photos. You can ...Accessible Vehicles & Stations · Accessible Local Transit · Advisory CommitteeMissing: Pearson | Show results with:Pearson
  40. [40]
    Accessibility campaign launches on GO Transit and UP Express
    Metrolinx is committed to making GO Transit and UP Express easy to use for everyone by striving to offer accessible trains, buses, and stations.Missing: Pearson | Show results with:Pearson
  41. [41]
    Nippon Sharyo FRA DMU - Canadian Public Transit Discussion Board
    Nippon Sharyo FRA DMU ; Years of manufacture, 2013-present ; Length, 85 feet ; Width, 10 feet 5.2 inches ; Height, 14 feet 7.5 inches ; Power/Fuel, Diesel.Missing: specifications | Show results with:specifications
  42. [42]
    Nippon Sharyo DMU - loco-info.com
    Three different variants of cars were offered, all with a 760 hp Cummins engine with hydraulic transmission and a cab. With the so-called C-car, the end with ...Missing: specifications | Show results with:specifications
  43. [43]
    Union Pearson Express Toronto - The Airport Express Rail
    Apr 11, 2023 · The train is running on a 1,435mm standard gauge track and can run up to 90 mph / 145 km/h. As the tracks are additionally protected with glass ...Missing: specifications | Show results with:specifications
  44. [44]
    Union Pearson (UP) Express | Neptis Foundation
    A high-quality, fast, reliable link to Pearson Airport, not vulnerable to road congestion, is considered important to maintaining Toronto's position as Canada' ...Missing: consortium | Show results with:consortium
  45. [45]
    Ontario transportation minister orders Metrolinx to scrap UP Express ...
    Apr 16, 2024 · Currently, UP Express trains run every 15 minutes between Union Station and Toronto Pearson International Airport. All trains stop at Bloor GO ...
  46. [46]
    The Union Pearson Express Is Now A Toronto Staple - Urbaneer
    Apr 21, 2023 · • A three-car train accommodates up to 173 seated passengers. • There are 18 UP Express cars in service, making 140 trips per day.
  47. [47]
    Despite record ridership, how much it costs to operate Union ...
    Aug 22, 2018 · During the fiscal year that ended in March, 3.5 million people rode the train, up from 2.76 million the year before. Bernard Weil / Toronto Star ...
  48. [48]
    [PDF] UP EXPRESS - Metrolinx
    With a clear focus on providing an oasis from the stress of travel,. UP Express is the long-needed solution to a transit challenge. ... RIDERSHIP SPLIT. Business.
  49. [49]
    [PDF] MEMORANDUM - Metrolinx
    issues affecting our fleet, ridership on UP Express rose from 825k in 2021/22 to 2.57 million passengers this past year. Ridership levels are expected to ...
  50. [50]
    [PDF] Metrolinx Annual Report 2023-2024
    Over the last year, demand for our services continued to grow with GO Transit and UP. Express serving over 59.03 million riders. This represents a 43.65 per ...
  51. [51]
    [PDF] GO Transit and UP Express - Enhancing Our Customer Experience
    UP Express saw similar increases, with ridership recovered to 83.1 ... increasing ridership and record-high customer satisfaction scores. Current ...
  52. [52]
    [PDF] 2024-25 Metrolinx Business Plan
    Our GO and UP Express ridership will reach 74.7 million next year and our operational focus remains on more and new ways to increase customer satisfaction. Our ...
  53. [53]
    Fares on Toronto's struggling Union-Pearson Express train to be ...
    Feb 23, 2016 · A source says the transportation minister will announce that the cash fare will drop to $12 from $27.50 and the Presto fare will be cut to ...
  54. [54]
    Union Pearson Express fare slashed from $27.50 to $12 | CBC News
    Feb 23, 2016 · The one-way cash fare for Toronto's Union Pearson Express (UPX) airport train has been lowered to $12 in an attempt to attract riders.Missing: adjustments | Show results with:adjustments
  55. [55]
    Union Pearson Express launches reduced prices today | CBC News
    Mar 9, 2016 · Starting today, a new one-way fare from downtown Toronto to Pearson airport will be $9 with a Presto card, which is a whopping $10 less than it was yesterday.Missing: history adjustments<|separator|>
  56. [56]
    Tickets & Fares - Toronto - UP Express
    UP Express Fares ; Adult (13-64). $12.35. $24.70 ; Senior (65+). $6.20. $12.40 ; Group Pass°. $25.00 (3 people) $32.50 (4 people) $40.00 (5 people). Available ...Find The Right Fare For You · Standard Fares By Distance · Up Express Fares By Distance
  57. [57]
    UP Express fare increase for airport employees — IATP
    Jan 3, 2025 · The fare for Union to Pearson trips will increase to $7.41. The 40% savings will remain the same for Bloor-Pearson and Weston-Pearson one-way trips for airport ...
  58. [58]
    UP Express fare hike considered as way to focus on ... - Toronto Star
    Nov 19, 2019 · Metrolinx drafted plans last year to dramatically hike fares on the Union Pearson Express in order to raise revenue and deter local commuters ...
  59. [59]
    Union Pearson Express can't break even at lower fare, report finds
    Apr 17, 2016 · The result was a taxpayer subsidy of about $46 a rider, considerably more even than the Toronto Transit Commission gets for each user of its ...<|control11|><|separator|>
  60. [60]
    GO Transit customers on the hook for airport train deficits
    Dec 15, 2014 · Metrolinx estimates that the annual operating costs of the airport line will be $70 million and will attract 2.5 million annual riders by 2018 ...
  61. [61]
    UPX airport train subsidized $52 per ride last year - Toronto Star
    Jun 30, 2016 · The provincial government subsidized passengers on the troubled Union Pearson Express last year at a rate of $52.26 per ride. June 30, 2016.
  62. [62]
    UP Express could cost taxpayers millions in subsidies - Toronto Star
    Apr 18, 2016 · Taxpayers may be forced to subsidize the Union-Pearson Express by more than $20 million annually despite a substantial increase in commuters ...
  63. [63]
    [PDF] Metrolinx 2024-25 Annual Report
    Jul 10, 2025 · By the end of the 2024-25 fiscal year, ridership reached 71.8 million across GO Rail, GO. Bus and UP Express. Through analyzing ridership trends ...
  64. [64]
    Getting from Pearson to Downtown Toronto - All Options Compared
    May 23, 2025 · Public Transit: The UP Express train whisks you from YYZ to Union Station in just 25 minutes, while Toronto's TTC offers the most economical ...
  65. [65]
    Best Transport Options Toronto Pearson Airport to Downtown
    Mar 20, 2025 · Travel Time: 30 to 45 minutes, depending on traffic. · Cost: $50-$70 CAD, depending on demand and ride type. · Availability: 24/7, but wait times ...
  66. [66]
    How to get from Toronto Airport (YYZ) to Toronto - Uber
    Uber: Request an Uber ride from Toronto Pearson International Airport (YYZ) to Toronto city center, taking 28 minutes, costing CA$42, and covering 15 miles.
  67. [67]
    What is the quickest mode of transportation from Toronto Pearson ...
    Jun 16, 2024 · The UP [Union-Pearson] Express, which leaves every 15 minutes and takes 25 minutes to make the trip. A taxi might be faster, but not in heavy ...
  68. [68]
    The Dubious Economics of the Union Pearson Express | Steve Munro
    Apr 4, 2015 · The report estimates that the UPX riders have been diverted from other modes: 62% from taxis, 11% from an express bus and 27% from a car ( ...
  69. [69]
    Public transportation more efficient than private, says UITP
    Mar 1, 2003 · Public transportation consumes 3.7 times less energy per passenger than private modes of transportation.
  70. [70]
    Toronto, SMART DMUs will get Cummins Tier 4-compliant power
    Apr 25, 2014 · Cummins Inc. is now producing its Tier 4 Final-compliant QSK19-R diesel engine, which will power the new Nippon Sharyo diesel multiple-unit (DMU) trainsets.
  71. [71]
    Cummins Clean Diesel Powering Toronto's Up Express
    Jun 18, 2015 · While Toronto's UP Express is the first line to utilize Cummins ultra-low emissions technology, several other projects are in the works. The ...
  72. [72]
    Union Pearson Express, powered by Cummins - Railway Age
    Jun 30, 2015 · An operating division of Metrolinx, the regional transportation agency, UP Express was launched in time to welcome visitors to the 2015 Pan ...<|separator|>
  73. [73]
    Cummins says it's on top of Tier 4 - Railway Age
    Sep 12, 2014 · For Tier 4-compliant railcars, PM and NOx emissions levels must be reduced by more than 90%, compared with Tier 3. Tags: Commuter Regional, ...
  74. [74]
    [PDF] 2020 Sector-Based Greenhouse Gas Emissions Inventory
    GHG emissions = Activity data x Emission factor. Activity data refers to ... Litres of diesel fuel supplied by Metrolinx for UP Express. 3. Electricity ...<|control11|><|separator|>
  75. [75]
    [PDF] Metrolinx Environmental, Social Governance Report
    Nov 15, 2023 · Scope 1 Greenhouse Gas Emissions directly result from diesel, natural gas, and gasoline consumption, while Scope 2 Greenhouse Gas Emissions.
  76. [76]
    [PDF] UP Express Electrification Transit Project Assessment - Metrolinx
    The UP Express Electrification project converts the service from diesel to electric, using an Overhead Contact System (OCS) for power collection.Missing: takeover | Show results with:takeover
  77. [77]
    Diesel trains may expose passengers to exhaust - ScienceDaily
    Feb 8, 2017 · Levels of certain airborne pollutants are up to nine times higher in train cars directly behind diesel locomotives than on a busy city street.
  78. [78]
  79. [79]
    Travel Time vs. Toll Costs: A Traffic Case Study of Toronto's 407 and ...
    The 407 is faster but more expensive, while the 401 is slower and free, but often congested, especially during peak hours. The 407 may save time, but has tolls.<|separator|>
  80. [80]
    Toronto: A Real Solution to Highway 401 Congestion - Next Metro.
    Jun 5, 2025 · You often don't come anywhere close to the stated 100 kph speed limit, lanes merge in and out from both directions, traffic is crushing, and ...
  81. [81]
    Toronto traffic, transit congestion likely to worsen with in-office ... - CBC
    Sep 2, 2025 · Toronto traffic, transit congestion likely to worsen with in-office mandates: experts · Ontario government, big banks have said workers will be ...
  82. [82]
    Cheaper to get a Uber than a Taxi - Review of Toronto Pearson ...
    Rating 5.0 · Review by fm0072018A taxi would have cost around $74 (Canadian) with a 15%tip. You do need the Uber app on your phone to use this service but it's pretty straightforward.Missing: efficiency | Show results with:efficiency
  83. [83]
    The fastest jaunt from YYZ: Riding Toronto's UP Express airport train
    Aug 27, 2021 · According to UP Express, its trains travel at up to 87 mph, which is far faster than any subway or bus. Plus, it avoids traffic you might ...
  84. [84]
    How long does it take to get from Union Station to Pearson Airport by ...
    Oct 21, 2022 · The usual trip time is 25 minutes and it runs every 15 minutes, 24 hours a day every day. Fare is $12.35 per adult, one way. Taxi trips take ...<|separator|>
  85. [85]
    Uber or taxi to Pearson Airport? : r/askTO - Reddit
    Jul 20, 2023 · Aeroport Taxi. They're always on time from my experience, usually a few minutes early. Personally it's worth saving the stress, and it's not that expensive.UP or Uber to Pearson? : r/askTO - RedditCab vs Uber to Pearson from downtown : r/askTO - RedditMore results from www.reddit.comMissing: efficiency | Show results with:efficiency
  86. [86]
    Traffic congestion and travel times are improving on Toronto roads ...
    Sep 12, 2024 · The City of Toronto says traffic congestion and transit reliability are improving due to the city's recent management measures in speeding up travel times.
  87. [87]
    Pearson workers worried Union-Pearson Express too expensive
    Aug 22, 2014 · No one said the UP Express would be cheap, though and the rumoured cost of a one-way fare is in the range of $20 to $30. That has workers at ...
  88. [88]
    Complain all you want — the express train to the airport is a huge ...
    Dec 15, 2014 · Selley: Last week, Metrolinx finally revealed what it will cost to ride the Union-Pearson Express: $27.50, $19 if you use a Presto card.
  89. [89]
    Union Pearson Express fares being cut after poor performance
    Feb 23, 2016 · Prices to ride the Union-Pearson Express are being slashed from $27.50 to just $12 for a one-way trip from Union Station to Pearson Airport.Missing: history adjustments
  90. [90]
    Union-Pearson Express train to reduce some fares as ridership ...
    Nov 30, 2015 · Ridership of the rail link to Toronto's airport has flatlined since the summer, opening up the controversial service to renewed criticism.
  91. [91]
    Metrolinx's reputation on the line with poor figures for Pearson ...
    Sep 25, 2015 · With ridership paltry and apparently in decline, critics are circling asking whether the embarrassing numbers have been fudged.
  92. [92]
    We forced Metrolinx to lower its UPX fares, but the fight isn't over yet
    Feb 22, 2016 · Of course, this isn't over. The fares should be lower, and the Union Pearson train should be integrated into our mass transit system so we can ...<|separator|>
  93. [93]
    Why isn't UP Express included in Ontario's One Fare program ...
    May 8, 2024 · Opposition politicians are calling for Toronto's airport train to be added to a recently launched fare integration program for transit in ...
  94. [94]
    Ontario backtracks on planned UP Express changes after backlash
    Apr 16, 2024 · The Ontario government is backtracking on planned changes to the UP Express service after the announcement drew backlash from Toronto residents.
  95. [95]
    Doug Ford's flip-flop on UP Express draws mockery from opposition
    Apr 17, 2024 · Heaping faint praise on Premier Doug Ford, opposition parties note it took his government just 34 hours to reverse unpopular service cuts ...
  96. [96]
    Opposition grills government on UP Express service change U-turn
    Apr 17, 2024 · Opposition parties questioned the Ontario government on Wednesday about its decision to reverse planned changes to the UP Express service.Missing: criticisms | Show results with:criticisms
  97. [97]
    UP Express: Diesel trains and missed opportunities - Toronto Star
    Sep 10, 2013 · The decision to run diesel trains on Toronto's Union Station-Pearson Airport rail route shows a disturbing disregard for community and ...Missing: controversies | Show results with:controversies
  98. [98]
    Transit reliability issues in Toronto
    Feb 11, 2023 · Transit is great in theory. But it has to be RELIABLE. All UP Express trains taken out of service after cracks found in brake discs.Missing: backlash | Show results with:backlash
  99. [99]
    Stop the Unfair Fare Hike on the UP Express for Airport Employees
    Jan 9, 2024 · The fares are set to rise to $7.41 for a trip from Union to Pearson - an over 50% fare hike from the current fare and a shocking 111% increase ...
  100. [100]
    The Surprisingly Useful White Elephant (On the Union-Pearson ...
    Dec 12, 2014 · They have been hard at work building the Union Pearson Express - a high speed shuttle service that will ferry passengers from Union Station ...
  101. [101]
    10 Years of UP Express
    Jun 2, 2025 · UP Express has served over 26 million travelers in 10 years, has Canada's longest elevated rail track, and has a 3km elevated track. 28,000  ...Missing: capacity | Show results with:capacity
  102. [102]
    Toronto's UP Express air-rail link named Project of the Year - Steer
    The UP Express is due to commence operations in spring 2015. It will provide a fast, direct rail connection for thousands of passengers a day from downtown ...Missing: consortium transition
  103. [103]
    Union Pearson Express's post - Facebook
    May 22, 2015 · We're pleased to announce that UP Express took home Project of the Year, Integrated Partnership of the Year and Personality of the Year (for ...
  104. [104]
    CH2M receives award for Metrolinx Union Pearson Express
    Jun 3, 2016 · The prize honours outstanding professional leadership and engineering innovation to improve the economic, social and environmental quality of ...Missing: achievements | Show results with:achievements
  105. [105]
    UP Express sees record customer satisfaction levels - Metrolinx
    Nov 22, 2019 · Reliability was 80 per cent for train and 77 per cent for bus. August had all-time high safety numbers, with 91 per cent of customers saying ...
  106. [106]
    A Big Cut to Toronto's UP Express Service - Reece Martin
    Apr 16, 2024 · The UP Express in Toronto is known for its frequent and reliable service, including features like level boarding and next train displays.
  107. [107]
    How UP Express Became a Fixture For Toronto Travelers | OCC
    Jan 28, 2019 · Annually – seven days a week and every 15 minutes like clockwork – he's among an estimated 3.5 million customers who use UP Express. Bridging ...
  108. [108]
    Union Pearson Express ridership spikes after fare reduction
    Mar 17, 2016 · The UPX airport train is drawing about 5,000 riders a day since it cut its fares, according to early estimates from Metrolinx.
  109. [109]
    Ontario U-turns on UP Express service changes | CBC News
    Apr 17, 2024 · The province is walking back its decision to reduce UP Express service at two popular stops. On Monday, Premier Doug Ford announced service at Bloor and Weston ...Missing: vehicle | Show results with:vehicle
  110. [110]
    Ontario backtracks on UP Express service changes amid backlash
    Apr 16, 2024 · The province is walking back changes it announced to its UP Express service at two popular stations a day after thousands of Torontonians cried ...
  111. [111]
    Tunnel connecting UP Express to TTC's Dundas West station under ...
    Jun 19, 2025 · Now that those negotiations are settled, MacLeod said the last he heard about the tunnel is that it was set to be completed in spring or summer ...Missing: timeline | Show results with:timeline<|separator|>
  112. [112]
    Bloor Station (TTC Connection) - Metrolinx
    Metrolinx is building an accessible underground pedestrian tunnel extension connecting Bloor GO/UP Station to Dundas West TTC Station.Missing: Mimico | Show results with:Mimico
  113. [113]
  114. [114]
    GO Expansion - Metrolinx
    GO Expansion will bring faster, more frequent train service by delivering new transit infrastructure and operational plans.Missing: Pearson connectivity
  115. [115]
    Is there plans for a Union Pearson Train stop at Liberty Village? : r/TTC
    Apr 8, 2025 · No. There's a planned King-Liberty GO Station, but it is not planned to be a UPX stop – just GO trains on the Kitchener Line.Missing: connectivity | Show results with:connectivity
  116. [116]
    [PDF] UP Express Electrification Transit Project Assessment - Metrolinx
    The TPAP entails a defined timeline of 120 days for the proponent to complete the assessment of environmental effects, prepare the Environmental Project Report ...
  117. [117]
    GO Expansion - Wikipedia
    The expanded services, new infrastructure and electrification is projected to roll out in phases between 2025 and 2030. The 10-year regional express rail plan ...
  118. [118]
    Why it's taking so long to electrify Ontario's GO train lines
    May 13, 2022 · Cleaner, cheaper electric GO trains every 15 minutes: it's a promise Ontario governments keep making, and failing to deliver.
  119. [119]
    Metrolinx in early stages of major overhaul of UP Express service
    Sep 25, 2019 · Metrolinx is planning an extensive overhaul to the UP Express, including relocating the platform and integrating the service with the GO train network.
  120. [120]
    Electrifying Toronto - Hatch