Upfield line

The Upfield line is an electrified suburban railway line in , , , branching from the Craigieburn, Werribee, and Sydenham lines at Junction and extending northward to Upfield station via , , and Moreland, parallel to Sydney Road. It forms part of the city's metropolitan rail network, operated by , with a total length of approximately 19 kilometres from central . The line features double track from to Gowrie station and single track thereafter, which constrains capacity and contributes to operational challenges. Opened in stages beginning with the to section on 9 September 1884 and extended to Somerton by 1889, the line experienced closures and partial reopenings, including electrification from to Fawkner in 1920 and to Upfield in 1959. The Upfield Railway Line Precinct holds state historical significance as a rare intact segment of Melbourne's early system, reflecting 19th-century engineering and suburban development. Recent projects include removals and rail elevation in and to improve safety and reliability, alongside advocacy for track duplication to address bottlenecks.

History

Origins in the 19th century

The Upfield line traces its origins to the Coburg railway line, authorized amid Melbourne's speculative land boom of the early as part of broader suburban expansion efforts by the Victorian government. The Railway Construction Bill, gazetted on 31 December 1880, enabled the development of approximately 475 miles (764 km) of new suburban and country lines, including the route from northward to serve emerging industrial and residential areas in the northern suburbs. Construction contracts were awarded to Robert Thornton, with work commencing around 1881; the alignment departed from the down end of station, crossing Moonee Ponds Creek via an embankment before proceeding through to as the initial terminus. The line officially opened for passenger traffic on 9 September , facilitating commuter access to factories, quarries, and housing developments spurred by the era's economic fervor. Early infrastructure included single-track formation with timber viaducts over creeks and basic station facilities, reflecting standard practices for branch lines built to 5 ft 3 in (1,600 mm) broad gauge using iron rails weighing around 75 lb/yd (37 kg/m). Services operated from Spencer Street (now Southern Cross) station, with the extension promoting subdivision and settlement along the corridor, though patronage initially lagged due to incomplete suburban connectivity. Further northward extension from to Somerton followed in 1889, reaching a total length of approximately 13 miles (21 km) from the city junction and opening intermediate stations such as North Campbellfield (later renamed Upfield) on 8 October of that year. This segment supported agricultural and extractive industries, including quarrying sidings at North Campbellfield, but remained lightly used as steam-hauled passenger and goods trains contended with the era's financial overextension, foreshadowing operational challenges ahead. The 1889 works adhered to similar standards, emphasizing over duplication, which preserved much of the original single-track character observable in surviving heritage elements today.

Early 20th century electrification and expansions

The section of the line from to was electrified on 2 December 1920, as part of the ' broader suburban electrification program that commenced in 1919 with the Essendon to Sandringham route. This upgrade replaced with electric multiple units, enabling faster and more frequent services to support growing suburban populations north of . Electrification extended only to at this stage, with the outer sections remaining unelectrified due to lower traffic volumes and industrial freight priorities. Following its closure beyond Coburg in July 1903 due to insufficient patronage, the line reopened from to Fawkner on 12 1906 primarily to serve Fawkner Cemetery traffic, with the station initially renamed Fawkner Cemetery. Passenger services resumed fully in 1914, reverting the station name to Fawkner and reflecting renewed demand from residential development in the northern suburbs. A new intermediate station, originally named North , opened in 1926 between and Moreland to accommodate expanding local commuter needs. Further expansion occurred on 5 March 1928 when the Fawkner to Somerton section reopened, utilizing AEC railmotors for passenger services amid housing estate growth in the 1920s. This extension provided a temporary dead-end terminus at Somerton with turntables for railmotor reversal, enhancing connectivity for freight to industrial areas while passenger operations relied on non-electrified diesel units. Infrastructure improvements included a new signal box at Coburg on 30 September 1928, replacing the 1892 structure to manage increased traffic post-electrification. These developments prioritized operational efficiency and suburban access over full electrification of outer segments, which deferred major upgrades until later decades.

Mid-20th century connections and industrial service

In the post-World War II era, the Upfield line supported freight operations through goods sidings at key stations such as and , facilitating the transport of materials and products for local industries. At , a 1.5-mile siding handled general freight, including connections to a , reflecting the line's role in serving Melbourne's expanding northern industrial suburbs amid . These sidings enabled regular goods trains to deliver , timber, and building materials, complementing passenger services until electrification reached Fawkner in August 1959. A pivotal development occurred in July 1959, when the previously closed Upfield-Somerton link—dismantled in 1956—was reopened specifically for goods traffic to access the newly established assembly plant near Upfield and . This reconnection, spanning approximately 3 km, provided direct rail access to Ford Sidings at 14 miles 51 chains 76 links, initially secured by staff locks and oriented toward the sidings. The initiative addressed the surge in automotive manufacturing, with Ford's plant commencing operations that year and requiring inbound shipments of components alongside outbound completed vehicles and bodies. The Ford Sidings complex expanded to serve multiple industries, incorporating connections for Metters Clow (domestic appliances), Station Pipes Australia, Shaw’s/Kauri Timber, and Union Steel by , underscoring the line's utility for diverse freight needs in the heavy manufacturing sector. In January 1963, the sidings were upgraded to dual-gauge gauntlet track to accommodate standard-gauge wagons from northern lines, enhancing efficiency for interstate and bulk goods movements. These enhancements sustained industrial service through the 1960s, with diesel-hauled freights operating alongside electrified passenger trains, though volumes began declining by the 1970s as competed.

Late 20th century proposals and near-closures

In the late 1980s, the Upfield line faced declining and deteriorating services, prompting rumors of closure or conversion to under Victoria's Labor . These pressures stemmed from high maintenance costs and fiscal constraints, as the line required significant upgrades that governments were reluctant to fund. Between 1988 and 1994, formal proposals emerged to either close the line entirely or repurpose it as a corridor, citing weak ridership in northern Melbourne's working-class suburbs like , , and Gowrie. Advocates for closure argued that resources should prioritize bus services or other infrastructure, while opponents highlighted the line's role in serving industrial areas, including the Ford factory at Upfield, and its connectivity for low-income commuters. Community campaigns, including protests and by local residents and rail user groups, ultimately thwarted these initiatives across both Labor and administrations in the cash-strapped era. By the mid-1990s, the line persisted as heavy rail, though late-evening and Sunday services continued to rely on supplementary routes until fuller in subsequent decades.

21st century initial modernizations

In the early , rising patronage on the Upfield line prompted the Victorian government to initiate basic infrastructure improvements as part of broader suburban rail investments under the Connex operator. These included station refurbishments to enhance passenger facilities and reliability, with efforts focused on addressing aging assets from prior decades. Track renewal programs in the mid-to-late replaced worn across metropolitan lines, including the Upfield corridor, where approximately 1,000 new were installed daily to mitigate defects and reduce disruptions; this addressed systemic backlogs contributing to the line's lower reliability compared to parallel routes like Craigieburn. The Premium Station Upgrade Program, rolled out from 2006, designated and enhanced key Upfield line stations with features such as staffed ticket offices during service hours, , improved lighting, and customer help points, aiming to boost security and usage; by , this supported better operational consistency amid growing demand. Service frequency enhancements were also trialed and planned to redistribute loads from congested lines, encouraging greater Upfield utilization without major capacity expansions. These measures represented incremental steps rather than transformative projects, prioritizing operational stability over duplication or extensions.

Future developments

Level crossing removal initiatives

The Level Crossing Removal Project (LXRP), administered by the Victorian Government, aims to eliminate 110 dangerous and congested rail-road across Melbourne's metropolitan rail network by 2030, with specific initiatives targeting the Upfield line to enhance safety, reduce delays, and support future capacity upgrades. On the Upfield line, five crossings had been removed prior to 2022, including the Camp Road crossing in , which was grade-separated by lowering the rail track beneath the road in 2017. In September 2022, the government announced the removal of eight additional crossings along a 2.1 km section of the Upfield line between Park Street in Parkville and Brunswick Road in Brunswick, scheduled for completion by 2030. These crossings—at Albion Street, Hope Street, Victoria Street, Albert Street, Dawson Street, Union Street, and Brunswick Road in Brunswick, plus Park Street in Parkville—will be eliminated through the construction of an elevated rail bridge spanning the roads, accompanied by upgraded signalling and track duplication to allow more frequent services. The project includes closing three existing stations in central Brunswick (Brunswick, Jewell's, and an intermediate stop) and replacing them with two new, fully accessible stations positioned north and south of the current cluster, designed to improve connectivity and urban integration. Ancillary benefits include the creation of approximately 2 hectares of new community open space equivalent to two Cricket Grounds, alongside enhancements to the adjacent Upfield Bike Path with separated pedestrian and cyclist facilities. As of December 2024, the project remains in planning and early design phases, with no major construction disruptions reported, though community consultations have addressed concerns over station relocations and visual impacts of the elevated structure.

Extension and duplication proposals

Proposals for duplicating sections of the Upfield line have focused on the single-track segment between Gowrie and Upfield stations to enhance capacity, reliability, and service frequency amid growing and operational constraints from shared freight use. A 2025 analysis estimated the cost of adding a second track beyond Gowrie at $246 million, which would enable more frequent passenger services by reducing conflicts with freight trains and allowing maneuvers. The Public Transport Users Association advocated for this duplication as part of the Brunswick level crossing removal project in 2024, arguing it would address the line's status as Melbourne's least reliable due to single-track limitations. A Parliamentary Budget Office assessment supported duplicating this stretch alongside an additional platform at Upfield to facilitate expanded timetables. In March 2025, the Federal Coalition pledged $2 million for a specifically targeting duplication between Gowrie and Upfield, integrated with broader corridor upgrades sought by Merri-bek City Council. The Victorian government's 2025-26 budget allocated $98.7 million to improve Upfield services to a minimum 20-minute frequency daily, though this funding emphasizes timetable enhancements rather than immediate track duplication. Local advocacy groups, including the Upfield Alliance, have referenced a 2019 Rail Futures Institute study recommending duplication to support extensions, highlighting persistent delays in implementation despite identified bottlenecks. Extension proposals primarily envision northward growth beyond Upfield to serve expanding suburbs and reduce road congestion in Melbourne's north. Mitchell Shire Council endorsed plans in 2025 to extend and electrify the line to Wallan, incorporating new stations at Beveridge and Cloverton to accommodate population growth projected in these areas. The Northern Councils Alliance has prioritized funding for this extension alongside duplication and electrification, citing both major parties' commitments during the 2025 federal election campaign as a result of sustained advocacy. Earlier concepts from the 2019 Rail Futures study proposed initial extension to Craigieburn by 2024 via the Somerton link, followed by double-tracking to Wallan, though these timelines have not been met. Additional extension ideas include a new station at as a medium-term project in the , potentially linking to broader electrification efforts toward Kalkallo. Federal Labor announced $7 million in May 2025 for Upfield and upgrades, which could inform feasibility for looping services between Upfield and Craigieburn to boost connectivity. These proposals remain in planning stages, driven by local governments and advocates rather than committed programs, with emphasis on addressing freight-passenger conflicts and developments in outer northern .

Electrification and capacity enhancements

The Upfield line, primarily single-tracked north of , faces capacity constraints that limit train frequencies to every 15–20 minutes during peaks and less frequently off-peak, contributing to overcrowding and delays. Proposals for track duplication between Gowrie and Upfield stations aim to add a second track, enabling higher frequencies, improved reliability, and reduced wait times, with an estimated cost of $246 million for the section past Gowrie. A cheaper alternative turn-back facility has also been suggested to allow short-turning trains without full duplication, potentially alleviating bottlenecks at a lower . Level crossing removal projects on the Upfield line, including at and Parkville, are underway to eliminate eight crossings, enhancing safety, reducing road congestion, and facilitating additional train services by permitting faster operations and higher throughput. Completion of the , operational since 2025, is expected to relieve constraints, supporting frequency upgrades such as trains every 20 minutes during evenings, Sundays, and off-peak periods on the Upfield line. Local councils and advocacy groups have secured federal commitments, including $2 million for planning duplication and capacity boosts in March 2025, though full implementation remains contingent on further funding. Electrification enhancements focus on proposed northward extensions beyond Upfield station, as the existing corridor to Upfield is already electrified under 25 kV overhead wiring standard for Melbourne's metropolitan network. Long-term plans outlined in the Network Development Plan include electrifying the line to via reinstatement of the Somerton–Upfield link, enabling diversion of regional services and integration with the electrified suburban fleet for seamless operations. Recent has yielded pledges in May 2025 for feasibility studies covering extension, duplication, and electrification to , prioritizing capacity for growing northern suburbs demand, though no construction timelines have been confirmed. These initiatives, if realized, would expand electrified services to support up to 70% capacity increases through combined infrastructure and timetable revisions.

Operations and services

Route and network integration

The Upfield line integrates into Melbourne's suburban rail network as a radial commuter route extending northward from the () to serve inner and outer northern suburbs. Trains operate from Upfield station through 17 intermediate stops to Flinders Street station, incorporating the for CBD access via the underground platforms at , Melbourne Central, and Flagstaff stations, before surfacing at Southern Cross and Flinders Street. This configuration allows seamless connectivity within the CBD core, with services typically running in an anti-clockwise direction through the Loop during off-peak periods and select peak configurations, enabling transfers to other Loop-utilizing lines such as the Hurstbridge or Lilydale routes. At station, the line diverges from the primary western and northern rail corridors, functioning as a key interchange hub. Passengers can transfer to Sunbury, Werribee, Williamstown, and services on adjacent platforms, as well as regional trains bound for Seymour and , facilitating broader metropolitan and inter-regional travel. This junction underscores the line's role in distributing northern suburban demand across parallel corridors, though single-track sections limit concurrent operations. Further integration occurs at Southern Cross station, where Upfield services connect to regional trains, metropolitan trams (routes 96, 109), buses, and SkyBus airport shuttles, supporting multimodal journeys to regional and . Flinders Street provides additional tram and bus interchanges, while stations like and link to local bus routes for feeder services. These connections enhance the line's utility within the (PTV) system, though capacity constraints and shared freight paths with the adjacent Moonee Ponds Creek freight line occasionally disrupt integration during maintenance or peak freight movements.

Stopping patterns and timetables

The Upfield line employs a uniform all-stations stopping pattern, with every serving all intermediate stations between Flinders Street and Upfield, including Southern Cross and in the . This approach reflects the line's relatively short length of approximately 19 kilometres and closely spaced suburban stations, which preclude the need for express services. Occasional variations occur only at the city end, where some services may route via the to access additional platforms at Flinders Street, but no skipping of suburban stations is implemented. Service frequencies on the Upfield line, operated by , were enhanced in May 2025 as part of a initiative to improve evening and weekend operations. During weekday peak periods (approximately 7:00–9:00 a.m. and 4:00–6:00 p.m.), trains run every 15–20 minutes. Off-peak weekday services operate every 20 minutes, a unchanged by the recent upgrades but consistent since prior timetable adjustments. Evenings and all-day weekends now feature 20-minute intervals following the 2025 changes, which addressed previous gaps of 30–40 minutes on Sunday mornings and evenings. The line operates from around 5:00 a.m. to midnight daily, with extended late-night services on Fridays and Saturdays aligning to the 20-minute where applicable. These frequencies support approximately 3–4 trains per hour in most periods, though actual departures may vary due to operational factors, and real-time updates are available via official apps or station displays.

Operators and crew practices

The Upfield line is operated by , a holder responsible for metropolitan rail services in under contract with the . This operator manages daily train services, maintenance coordination, and crew deployment across the network, including the Upfield line's 17 stations spanning 20.1 km from Flinders Street to Upfield. Train crews on the Upfield line consist of a driver and an authorized officer, with no driver-only operations implemented as of 2025. The driver operates the train from the cab, handling acceleration, braking, signaling responses, and route adherence, often using systems where available on the line's older signaling infrastructure. Authorized officers, stationed in passenger areas, perform ticket inspections, assist with accessibility features such as manual ramp deployment for wheelchairs, monitor for safety issues including overcrowding or antisocial behavior, and communicate with the driver via intercom for operational needs like door operations. Their duties extend to providing passenger information, reporting offences to the Department of Transport, and supporting emergency responses, with shifts covering 24/7 operations including nights and weekends. Crew practices include adherence to safety protocols such as pre-departure checks, real-time monitoring via onboard cameras and , and coordination with network controllers for disruptions common on the single-track northern section. A notable operational practice is short-shunting, where crews terminate trains short of Upfield station—often at or intermediate points—due to low off-peak , allowing faster turnaround for city-bound services; this occurred in 520 instances in 2019 and has drawn criticism for inconveniencing despite Metro Trains reporting reductions. Crews manage passenger disembarkation during these events, citing , though groups argue it exacerbates unreliability on the line. Rostering draws from 's operations team, with drivers and officers based at depots like the nearby Dynon or network-wide facilities, undergoing regular training for line-specific challenges such as shared freight paths and interactions.

Infrastructure

Track configuration and freight sharing

The Upfield line features a mixed track configuration optimized for suburban passenger services, with double tracks extending from Flinders Street station through North Melbourne to Gowrie station, spanning approximately 11 kilometers. Beyond Gowrie, the line transitions to a single track for the remaining 7 kilometers to Upfield station, which constrains train frequencies to a maximum of three trains per hour in each direction due to the absence of continuous passing loops in this section. A short double-track segment exists immediately beyond Upfield for access to the Fawkner stabling yard, facilitating train storage and maintenance without impacting mainline operations. The entire line utilizes 1,600 mm broad gauge tracks, electrified at 1,500 V DC overhead, consistent with Melbourne's metropolitan network standards. Freight operations on the Upfield line have been discontinued for decades, rendering it exclusively passenger-oriented since the cessation of goods services, which historically utilized the corridor's connection to the Somerton via an extension beyond Upfield. This single-track northern section, while limiting passenger capacity, avoids conflicts with freight movements, as no scheduled freight trains traverse the suburban portion from Gowrie to Upfield. Proposals to reintroduce freight, such as those considered by the Linking Melbourne Authority in the early , faced strong local opposition, including from Moreland City Council, citing incompatibility with dense urban residential areas and potential disruptions to commuter services. Current planning emphasizes passenger duplication over freight integration, with the single track serving as a addressed in recent government studies rather than a shared-use asset.

Signalling and safety systems

The Upfield line primarily utilizes automatic block signalling from Flinders Street to Gowrie station, with automatic and track control sections applying between Gowrie and Upfield. This configuration supports three-position signalling, which displays clear, caution, and stop aspects to drivers, a system introduced progressively along the line starting with to Macaulay on 10 June 1928 and extended to Royal Park by 8 April 1972. Automatic signal designations govern operations from to Somerton, enabling fail-safe progression under normal conditions but relying on driver vigilance without advanced automatic train protection overlays network-wide. Re-signalling efforts in the late 1990s modernized from earlier manual setups, which had constrained operations due to labor-intensive controls and limited headways, closing redundant level crossings such as Barkly Street and Shorts Road. The Upfield signal panel, handling local , was decommissioned as part of broader rationalization. These upgrades improved reliability but have not incorporated high-capacity signalling systems like , which are reserved for Tunnel-integrated corridors such as the Pakenham/Cranbourne lines; the Upfield remains on fixed-block technology, contributing to its single-track between Gowrie and Upfield that restricts peak frequencies to approximately every 15 minutes. Safety systems emphasize protections, with remaining active crossings equipped with boom barriers, flashing lights, pedestrian gates, and coordination to mitigate collision risks. initiatives have removed several high-risk sites, including Camp Road in 2017 and Moreland Road, Reynard Street, and Munro Street in 2020, reducing exposure to vehicle-train conflicts amid rising suburban traffic volumes. The single-track segment north of Gowrie heightens operational risks during turnarounds, prompting proposals for duplication and enhanced signalling to enable safer, more frequent services without compromising buffers. Incidents, such as fatalities at Gowrie crossing, underscore persistent vulnerabilities despite these measures, with advocacy groups citing underinvestment in full duplication as a causal factor in reliability shortfalls.

Stations, platforms, and accessibility upgrades

The Upfield line comprises 16 stations extending from Flinders Street in central to Upfield in the city's north, with most featuring side platforms suited to the predominantly single-track alignment and passing loops at locations such as Macaulay, Flemington Bridge, and Fawkner to facilitate overtaking services. Platforms are typically low-level, historically requiring steps for boarding, though recent reconstructions have incorporated raised designs aligned with high-capacity train doors for level access. Accessibility upgrades have accelerated under Victoria's (LXRP), targeting compliance with the Disability Discrimination Act 1992 through step-free access via lifts, ramps, and tactile paving. At Moreland and stations, reconstruction completed in December 2020 elevated the rail corridor over removed crossings at Reynold Road and Bell Street, respectively, with new platforms extended for six-car trains, integrated lifts, and enhanced pedestrian linkages including bike path upgrades. These works eliminated five level crossings along the line since 2019, prioritizing safety and mobility while maintaining service continuity during phased closures. Further enhancements are planned for the Brunswick to Parkville segment, where eight additional crossings at Albion Street, Hope Street, Victoria Street, and others will be removed by elevating 2.1 kilometres of track starting in 2028, with completion by 2030. This includes consolidating the existing Jewell, , and Anstey stations into two new modern facilities positioned 200 to 450 metres from current sites, each with dual-end entrances, lifts, and full step-free access to support increased frequencies post-Metro Tunnel opening. The designs emphasize raised platforms and integrated , though community advocacy has highlighted potential gaps in full DDA implementation at elevated structures without redundant lift systems. Older stations like Macaulay and Newmarket retain partial via ramps but lack lifts, relying on ongoing Metro Trains maintenance for compliance audits. Overall, LXRP interventions have upgraded or added features at 11 s network-wide, with Upfield benefiting from systematic prioritization to address pre-2015 deficiencies where fewer than half of platforms offered step-free .

Rolling stock deployment

The Upfield line is operated using six-car (EMU) trains drawn from the shared fleet of , which manages approximately 269 such sets across the metropolitan network as of 2023. Currently, services primarily utilise Comeng-pattern trains, originally constructed between 1981 and 1995 by Commonwealth Engineering (Comeng) for the Victorian government, featuring steel bodied cars with a top speed of 115 km/h and powered by four traction motors per set. These trains, numbering around 59 sets in active service, are allocated flexibly across northern suburban lines including Upfield due to their reliability on lower-demand routes and compatibility with existing infrastructure, though they lack some modern features like full compared to newer models. Occasional deployment of trains, built from 2002 to 2006, supplements Comeng sets on the line during peak periods or maintenance rotations, providing similar six-car configurations with for improved energy efficiency. All on the Upfield line operates under 1,500 V DC overhead electrification on standard 1,600 mm broad track, with no dedicated stabling or allocation exclusive to the route; trains are typically stabled at depots such as or and rostered via central control. From late 2025, 25 new trains—high-floor EMUs manufactured by in —will progressively enter service specifically on the Upfield, Craigieburn, and Frankston lines to replace ageing Comeng sets, offering enhanced accessibility, passenger information systems, and capacity for up to 1,080 passengers per six-car set. These $986 million acquisitions, funded in the 2021–22 Victorian budget, aim to address fleet obsolescence on growth corridors, with initial testing commencing in 2025 and full deployment targeted by 2027 to support potential frequency increases post-Metro Tunnel opening.

Performance and economic role

The Upfield line carried 5.1 million passengers in the 2018–19 financial year, reflecting modest growth from earlier periods driven by population increases in inner northern suburbs such as and , where urban infill has boosted local commuting needs. This figure positioned it among Melbourne's lower-patronage metro lines, with demand concentrated on short trips to the amid service frequencies of 15–20 minutes during peaks. The COVID-19 pandemic triggered a severe contraction, with metropolitan train boardings across Melbourne plummeting over 80% in 2020–21 due to extended lockdowns, remote work adoption, and reduced economic activity, affecting lines like Upfield proportionally as myki tap-on data captured near-total usage halts. Recovery commenced in 2022, supported by eased restrictions and hybrid work patterns, yet by 2023–24, overall metro rail patronage hovered at 70–75% of pre-pandemic levels, with Upfield experiencing similar lags owing to its reliance on CBD-bound commuters sensitive to office return rates below 50% in northern Melbourne precincts. Persistent demand pressures stem from demographic shifts, including a 10–15% population rise in serviced postcodes from 2016 to 2021, exacerbating overcrowding on existing timetables and prompting calls for frequency upgrades to match comparable lines like the Hurstbridge. Station-level data underscores uneven recovery: for example, station entries rebounded to approximately 400,000 annually by 2023–24 from lows, while shared city terminals like saw 20–30% gains tied to broader effects. Forecasts indicate sustained upward trends through 2025, contingent on infrastructure enhancements, as current single-track constraints limit peak throughput to six trains per hour despite latent demand evidenced by extensions at key stops.

Reliability metrics and operational efficiency

The Upfield line's reliability is measured primarily through punctuality, defined as trains arriving at destination within 4 minutes and 59 seconds of schedule, and reliability, as the percentage of scheduled services delivered. Metropolitan train network-wide reliability has consistently exceeded the 96% threshold required to avoid passenger compensation, with figures such as 98.8% timetable delivery reported for the July–September 2016 quarter. However, line-specific data from the same period indicate Upfield punctuality at 94.1% during peak hours and 95.1% off-peak, outperforming the network averages of 91.1% and 93.4% respectively, though these metrics predate recent infrastructure pressures. More contemporary assessments highlight Upfield as Melbourne's least reliable line, with ongoing delays attributed to capacity constraints and no observed improvement amid the Metro Tunnel project as of August 2024. Operational efficiency on the Upfield line is hampered by a 3.2-kilometer single-track section between Gowrie and Upfield stations, which enforces a maximum peak-hour of one every 15 minutes and frequently results in 20-minute gaps or cancellations due to bunching and recovery times. This , compounded by shared freight paths on the corridor, reduces throughput compared to duplicated lines elsewhere in the network, where 10-minute headways are standard during peaks. Advocacy groups and local councils have emphasized that without duplication, efficiency gains from upgrades or signaling improvements remain marginal, as the single track caps overall capacity at levels insufficient for demand growth. As of January 2025, proposed turn-back facilities at Gowrie have not been implemented, perpetuating these limitations despite calls for expansion to enable higher-frequency services.

Economic contributions and costs

The Upfield line contributes to Melbourne's economy by providing vital commuter links between densely populated northern suburbs, including , , and Fawkner, and the , thereby supporting workforce mobility and access to employment in services, , and sectors. Infrastructure improvements, such as level crossing removals on the line, have yielded productivity benefits through reduced travel times and fewer disruptions, with associated gains from lower congestion-related stress estimated to enhance commuter efficiency. These enhancements facilitate economic activity in adjacent industrial zones and residential growth areas, as evidenced by advocacy for expansions to accommodate increases in regions like Whittlesea and Mitchell Shire. Operational costs for the line fall under Metro Trains Melbourne's franchise agreement, subsidized by the to cover shortfalls from fare revenues, which typically fund less than half of metropolitan rail expenses amid broader network demands. Recent state budget commitments include $46 million for service expansions on the Upfield line, enabling more frequent off-peak and weekend trains to align with demand trends driven by suburban development. Capital investments, such as the proposed duplication of the single-track segment from Gowrie to Upfield, are projected at $246 million, addressing capacity constraints that currently limit peak-hour frequencies to every 15 minutes and hinder economic throughput. Long-term economic viability hinges on balancing these costs against projected benefits from higher and reduced road dependency; scoping studies funded at $2 million federally underscore expectations of returns via unlocked housing and job growth in northern corridors, though full duplication estimates reach $600 million without detailed benefit-cost ratios publicly available. Single-track limitations impose ongoing opportunity costs by constraining service reliability, contributing to the line's status as one of Melbourne's least efficient routes despite its role in serving high-density inner-north communities.

Controversies and debates

Service disruptions and commuter impacts

The Upfield line has been identified as Melbourne's least reliable metropolitan railway, prone to frequent delays and cancellations stemming from operational faults, single-track bottlenecks, and signal issues that propagate disruptions across the network. Incidents such as train faults at stations like Flemington Bridge have led to full line suspensions between North Melbourne and Coburg, necessitating bus replacements and causing journey times to extend beyond 15 minutes on affected segments. These events, reported sporadically through 2025, compound the line's baseline 20-minute peak frequency, resulting in effective waits of up to 40 minutes when services are curtailed or skipped. Commuters face heightened frustration from during partial service recoveries and unreliable timetables, contributing to the line's lowest passenger satisfaction rating in the metropolitan network at 53.7 out of 100, compared to a system-wide average of 60 percent. Northern suburbs residents, reliant on the line for access to central , report amplified impacts during peak hours, with delays often forcing reliance on alternative amid limited bus augmentation. Advocacy groups, including the Upfield Transport Alliance, have mobilized in 2025 to demand track duplication, citing persistent unreliability as a barrier to equitable service in growing areas like and . Such disruptions underscore broader operational vulnerabilities, where minor faults escalate due to the line's shared constraints, disproportionately affecting daily commuters who endure extended travel times and missed connections without compensatory measures like automated refunds or enhanced real-time alerts. Community feedback, channeled through platforms like dedicated social groups, emphasizes psychological tolls including stress from unpredictability, though official metrics from prioritize on-time running percentages over qualitative impacts.

Construction disturbances and resident opposition

During the Level Crossing Removal Project's works on the Upfield line between Bell and Moreland streets from July 28 to November 15, 2020, residents in reported severe noise disturbances from 24-hour operations, including loud drilling that caused up to 25 consecutive sleepless nights for affected families. These efforts, costing $542.4 million, involved removing four , elevating 2.5 km of track, and rebuilding Moreland and stations, with authorities offering temporary relocation to over 300 nearby properties but rejecting requests to shorten night shifts to avoid prolonging overall disruption. Local opposition intensified over inadequate consultation, with the Upfield Corridor Coalition criticizing the project for ignoring resident proposals on design elements like pedestrian and cycling access during closures. A petition launched on February 20, 2019, by Upfield line communities highlighted preemptive concerns about post-construction noise pollution, privacy intrusions from elevated tracks, and unfulfilled 2019 consultation promises, garnering 215 signatures and demanding noise barriers, heritage station preservation, and quarterly reviews. Subsequent phases, including the removal of eight additional crossings between Park Street in Parkville and Albion Street in by 2027, have faced scrutiny for potential delays and ongoing path closures disrupting the Upfield shared , though specific construction complaints from 2023 onward remain less documented amid efforts. Residents, including frontline healthcare workers, emphasized impacts like exhaustion during the 2020 works, underscoring tensions between safety-driven upgrades and livability.

Policy critiques on investment priorities

Critics of Victorian government transport policy have argued that investments favor ambitious new projects like the (), estimated at up to $125 billion, over targeted upgrades to underperforming existing lines such as the Upfield line, which suffers from capacity constraints due to single-track sections north of Fawkner. This prioritization is seen as inefficient, given the Upfield line's role in serving rapidly growing northern suburbs with housing developments, yet it maintains peak-hour frequencies of only 15-20 minutes—the lowest in Melbourne's metropolitan network—limiting patronage potential despite demand pressures. Public transport advocates, including the Public Transport Users Association (PTUA), contend that duplicating the single track from Fawkner to Upfield would enable 10-minute services at a fraction of costs, addressing reliability issues that plague the line as Melbourne's least dependable corridor, with delays exacerbated by shared tracks and removals that failed to include full duplication. The PTUA has criticized partial upgrades, such as off-peak frequency increases without track works, as insufficient, arguing that dropped elements from earlier plans represent a failure to optimize existing infrastructure before pursuing orbital links with unclear net benefits. Federal opposition figures like have echoed this by pledging to redirect funding—over $2 billion federally committed—toward higher-priority rail enhancements, including airport links, highlighting opportunity costs amid Victoria's debt spiral and 's critiqued business case by Infrastructure Australia, which found overstated benefits and urged contingency planning. State-level critiques from the Greens and local councils emphasize political , with calls for $600 million in federal duplication funding to unlock capacity for projected patronage growth, accusing Labor of perpetual studies and delays rather than committing to "real investment" in core lines amid SRL's fiscal dominance. This perspective aligns with empirical assessments, such as Parliamentary Budget Office costings for ancillary works like turnbacks, which underscore the feasibility of incremental fixes yielding immediate efficiency gains over decade-long mega-projects. Independent analyses, including from the Institute of Public Affairs, further question SRL's value, labeling it a "" that diverts resources from practical upgrades, potentially exacerbating congestion on overburdened radials like Upfield without addressing causal bottlenecks in track infrastructure.

References

  1. [1]
    Infrastructure - Line Data Upfield line - VICSIG
    Jul 27, 2023 · The Upfield line is a suburban electrified railway line which branches from the Craigieburn, Werribee and Sydenham lines at North Melbourne Junction.
  2. [2]
    Upfield | Metro Trains
    Accessibility · Bike Facilities · Lost Property · Safety. Upfield line. Zones, Station, Facilities, Timetable. 2. Upfield · From City · To City.
  3. [3]
    Upfield Railway (Brunswick & Coburg) - Victorian Heritage Database
    The Upfield Railway Line Precinct is of state historical significance as a rare and remarkably intact section of Melbourne's metropolitan railway system.
  4. [4]
    Brunswick and Parkville community update – September 2024
    Sep 19, 2024 · We're removing the level crossings by building a 2.1km rail bridge over the roads. ... Engineering assessments determined elevating the Upfield ...Missing: length | Show results with:length
  5. [5]
    Federal Election 2025 Funding Announcements on the Upfield Train ...
    May 2, 2025 · Council is asking for federal funding for a feasibility study to upgrade and duplicate the Upfield Rail Corridor; and the extension and electrification of the ...
  6. [6]
    [PDF] FORMER COBURG RAILWAY LINE - Victorian Heritage Database
    Jun 7, 2022 · Upfield Railway Line Precinct ... of 475 miles (764 kilometres) of new suburban and country railway lines including a line from North Melbourne.
  7. [7]
    [PDF] xmmttwg. - Victorian Collections
    Feb 6, 2024 · The guide introduces the history and heritage of the Upfield line. It can be used by walkers, cyclists and train travellers. A map of the.
  8. [8]
    Former Coburg Railway Line - Victorian Heritage Database
    The gazettal of the Railway Construction Bill on 31 December 1880 allowed for the construction of 475 miles (764 kilometres) of new suburban and country railway ...Missing: length | Show results with:length
  9. [9]
    North Melbourne to Upfield line. - Victorian Railways
    With housing estates opening during the 1920's the line was reopened on 5th March 1928 from Fawkner to a deadend provided at Somerton and 26 foot turntables ...
  10. [10]
    OPENING OF THE BRUNSWICK AND COBURG RAILWAY. - Trove
    The railway line from Spencer-street station to Brunswick and Coburg was formally opened for traffic yesterday by His Excellency the Governor, ...
  11. [11]
    Upfield - VICSIG - Infrastructure
    History ; Tue, 8 Oct 1889, Opened as North Campbelfield ; Tue, 8 Oct 1889, Opened with line as North Campbellfield. (Victorian Railways Chronological Index) ; 1890 ...
  12. [12]
    [PDF] THE VICTORIAN RAILWAYS: A THEMATIC HISTORY
    Feb 9, 2024 · The Victorian Railways: A Thematic History has been prepared to document and illustrate how the railways have shaped the Victorian ...
  13. [13]
    Infrastructure - Line Data Upfield line - VICSIG
    Jul 27, 2023 · The line is double track between North Melbourne and Gowrie, with an extensive single-track section from there to Upfield. From Upfield, a ...
  14. [14]
    Infrastructure - Line Data Upfield line - VICSIG
    Jul 27, 2023 · The Upfield line is a suburban electrified railway line which branches from the Craigieburn, Werribee and Sydenham lines at North Melbourne Junction.Missing: route | Show results with:route
  15. [15]
    Ford Sidings - VICSIG - Infrastructure
    Sep 19, 2022 · Sun, 19 Jul 1959, Ford's Sidings open for traffic at 14M 51C 76L via Somerton, approximately at down end of Upfield.Missing: reason Broadmeadows
  16. [16]
    Melbourne By Rail: Along the Upfield Line
    It was opened on 8 October 1889 as North Campbellfield when the railway line from Coburg was extended to Somerton. It closed on 13 July 1903, reopened on 5 ...
  17. [17]
    Upfield Line - Victorian Railway Stations
    The Upfield Line was originally built as the line to Coburg with a later extension to Somerton where a connection was provided to the main line to Wodonga.
  18. [18]
    Not the end of the line: How people power saved the Upfield rail line
    Jun 2, 2016 · The hand-operated gates have been preserved because they are part of the most intact example in Melbourne of what a 19th century railway looked ...
  19. [19]
    Upfield | Victorian Places
    The State Government announced its intention to construct a railway station (Upfield), and the line was electrified in 1959.Missing: link Broadmeadows<|separator|>
  20. [20]
    The importance of the Upfield line
    Apr 28, 1993 · The Upfield railway line runs through Melbourne's northern working class suburbs of Brunswick, Coburg and Gowrie and ends at the Ford factory at ...
  21. [21]
    Upfield railway line - Infogalactic: the planetary knowledge core
    In December 1920 the line was electrified, then in March 1928, the section from Fawkner to Somerton reopened with passenger services provided by an AEC ...
  22. [22]
    [PDF] Network Development Plan –Metropolitan Rail - Transport Victoria
    Dec 18, 2012 · to the Upfield line. • Frequency improvements will encourage more people to use the Upfield line and provide a better balance of passengers ...
  23. [23]
    [PDF] VERIFIED TRANSCRIPT - Public Transport - Parliament of Victoria
    Sep 21, 2025 · To date they are replacing two in every five sleepers. That gives you a sense of the condition. Approximately 1000 new sleepers are being ...
  24. [24]
    [PDF] Report on the 2008-09 Budget Estimates - Parliament of Victoria
    May 16, 2008 · ... new sleepers are being installed each day as part of that project ... Upfield line, which means they are more likely to cancel an ...<|control11|><|separator|>
  25. [25]
    [PDF] Melbourne Metro Rail Project - Victoria's Big Build
    Apr 20, 2016 · Craigieburn line, Upfield line, Sunbury line and ... North Melbourne Station is a premium station, staffed from the first to last train.
  26. [26]
    Level Crossing Removal Project - Victoria's Big Build
    We're removing 110 dangerous and congested level crossings across Melbourne by 2030, the largest project of its kind in Victoria's history.Brunswick Road · Explore projects · Melton level crossing removals · Contact
  27. [27]
    [PDF] Service changes from Monday 26 October - Public Transport Victoria
    On the Upfield Line, we've nearly finished removing four level crossings. From Monday 26 October to Sunday 1 November, buses replace trains between North ...
  28. [28]
    Brunswick level crossing removals - Victoria's Big Build
    Dec 23, 2024 · We're removing 8 level crossings on the Upfield Line to improve safety, reduce congestion and to pave the way for future upgrades including extra train ...
  29. [29]
    Eight level crossings to be removed in Melbourne's north - The Age
    Sep 19, 2022 · Another eight level crossings will be removed in Melbourne's inner north along the Upfield train line.
  30. [30]
    Brunswick and Parkville level crossing removals - Engage Victoria
    We're removing 8 more dangerous and congested level crossings on the Upfield Line. We'll build modern stations in new locations in Brunswick's north and south.
  31. [31]
    Brunswick elevated rail | Conversations Merri-bek
    The level crossings had previously been scheduled to be removed by 2027. Council will continue to advocate to the State Government about what you told us was ...
  32. [32]
    Upfield train line duplication: $246million upgrade of line ... - The Age
    Sep 11, 2025 · Upfield train line duplication: $246million upgrade of line would dramatically improve services.Missing: modernizations 2000-2020<|separator|>
  33. [33]
    If govt is serious about optimising the Upfield line, they must duplicate
    Sep 22, 2024 · The Public Transport Users Association (PTUA) has called for the State Government to duplicate the Upfield line during the forthcoming Brunswick level crossing ...
  34. [34]
    [PDF] Policy costing - Parliamentary Budget Office
    Duplicating this section of track and building an additional platform at Upfield Station would allow more train services to operate on the line. Costing ...
  35. [35]
    Council welcomes $2 million investment to boost Upfield Rail ...
    Mar 27, 2025 · The City of Whittlesea welcomes the Federal Coalition's announcement of $2 million in funding to advance critical improvements to the Upfield rail line.
  36. [36]
    Demands for Upfield Line track duplication and line extension to ...
    Sep 25, 2023 · The 2019 Rail Futures study called for Upfield Line Track Duplication and extension to Craigieburn by 2024, and double track extension and electrification to ...
  37. [37]
    Council welcomes funding commitment for Upfield line duplication ...
    Mar 20, 2025 · Extending and electrifying the Upfield line to Wallan, with new stations planned at Beveridge and Cloverton to support the region's expanding ...
  38. [38]
    NCA Newsletter - NCA 2024 - Northern Councils Alliance
    NCA advocacy for the duplication, extension and electrification of the Upfield Line to Wallan has resulted in both parties prioritising funding for this ...
  39. [39]
    Melbourne Transportation Plans: Upfield Line and Tram Extensions
    Mar 3, 2025 · It lists extending the Upfield line and a new station at Campbellfield as a future project in the 2030s. Also extending electrified rail to Kalkallo.Missing: Connex 2000s
  40. [40]
    Promises, promises to upgrade Upfield line during the 2025 Federal ...
    May 7, 2025 · $7 million by Federal Labor for upgrade planning of Upfield and Craigieburn lines; $600 million by the Greens to build the Upfield line upgrade ...Missing: premium | Show results with:premium
  41. [41]
    Train service upgrades applauded
    May 12, 2025 · Craigieburn and Upfield upgraded from every 30-40 minutes to every 20 minutes evenings and Sunday mornings; Gippsland line upgraded from every ...
  42. [42]
    Upfield Line Service Improvements and Capacity Increase - Facebook
    May 11, 2025 · Money allocated to increase services late at night and weekends on the Craigieburn and Upfield Lines to at least a 20 minute service.Melbourne Transportation Plans: Upfield Line and Tram ExtensionsUpfield Line Upgrade and Potential Service Increase - FacebookMore results from www.facebook.comMissing: 2000-2020 | Show results with:2000-2020
  43. [43]
    UPFIELD Line - Flinders Street Via City Loop (Updated) - Moovit
    The UPFIELD train (Flinders Street Via City Loop) has 18 stations departing from Upfield and ending at Flinders Street.
  44. [44]
    Guide to navigating the City Loop - Public Transport Users Association
    The City Loop is confusing at the best of times, with trains running in different directions at different times, some direct, some via the Loop.
  45. [45]
    North Melbourne | Metro Trains
    Station Facilities. Connecting Bus Service(s); No Connecting Tram Service(s); Toilet Facilities; Customer Service; No Bicycle Facilities; Parking Available ...
  46. [46]
    North Melbourne Station - Transport Victoria
    Departure information for North Melbourne Station.
  47. [47]
    Melbourne Airport Rail benefits - Victoria's Big Build
    Mar 6, 2025 · a new premium station at Melbourne Airport with services every 10 minutes ... Upfield Line – Upfield Line passengers will be able to change to ...
  48. [48]
    Night works between North Melbourne and Upfield - Metro Trains
    To improve the safety and efficiency of Melbourne's metropolitan rail network, critical safety works will be undertaken along the Upfield Line.
  49. [49]
    Which has more trains? The Upfield line or the Geelong line?
    May 9, 2018 · The Upfield line has more services each week: 749 vs 714. But the Geelong line has more on weekdays (122 vs 108), and has a lot more services during peak.<|separator|>
  50. [50]
    A video where I talk about the Upfield line for 38 minutes! - YouTube
    Apr 27, 2024 · The Upfield line is a 19km electrified broad gauge suburban railway line running north from Melbourne's CBD. This video takes a look at the ...<|separator|>
  51. [51]
    Schedules, Stops & Maps - Upfield Via City Loop (Updated) - Moovit
    The first stop of the UPFIELD train route is Flinders Street Railway Station and the last stop is Upfield Railway Station. UPFIELD (Upfield Via City Loop) is ...
  52. [52]
    At last, more services - Daniel Bowen
    May 15, 2025 · The biggest changes are for the Sandringham, Craigieburn and Upfield lines. Here's a summary of their frequencies, and the changes.
  53. [53]
    Metro Trains Melbourne
    Welcome to Metro Trains Melbourne. Lines - Select a line to browse station specific train times and status information.Timetable Search · Planned Works · Line & Station Information · Careers
  54. [54]
    Authorised Officers - Victorian Government
    Nov 15, 2023 · They're employed by public transport operators to check tickets, provide passenger information, improve safety and help during special events and disruptions.Missing: Upfield | Show results with:Upfield
  55. [55]
    Operations | Metro Trains
    Metro's Operations team delivers the rail network, ensuring reliable services. Roles include train drivers, signallers, and controllers, in a fast-paced ...
  56. [56]
    Career Profile: Authorised Officer | Rail Academy
    Primarily authorised officer carry out public transport checks, report ticketing offences and submit accurate and detailed reports. They may be present on ...Missing: Upfield | Show results with:Upfield
  57. [57]
    [PDF] Metro Trains Melbourne Rail Operations EA 2023 - RTBU Victoria
    Feb 13, 2024 · Officer of this requirement at the commencement of duty or at an earlier time ... Authorised Officer under the Transport Act (may include ...<|separator|>
  58. [58]
    Upfield passengers get short straw - Herald Sun
    Sep 11, 2018 · The instances of “short shunting” on the Upfield train line is reducing according to figures from Metro Trains, but passenger anger remains.
  59. [59]
    Upfield Line Track Duplication and extension to Craigieburn by ...
    Sep 17, 2019 · 520 trains have been short-shunted on the Upfield Line in 2019 (PTV monthly report August 2019) and 345 trains cancelled. With peak ...
  60. [60]
    Metro Train Careers
    Metro is a diverse, inclusive, and safety-focused organization with a focus on work/life balance, and is a global leader in its field.Why Join Metro? · View all jobs · Who we are · Train Operations
  61. [61]
    Upfield Line - No Way For Freight | PDF | Rail Transport - Scribd
    The mayor of Moreland expresses shock that the Linking Melbourne Authority is considering allowing freight trains on the Upfield Line, which passes through ...
  62. [62]
    [PDF] Growing Our Rail Network 2018-2025 | Victorian Government
    The Hurstbridge Line upgrade is duplicating the section of track between Heidelberg and. Rosanna, to improve the frequency and reliability of services in ...
  63. [63]
    Upfield and Craigieburn lines shafted in Metro tunnel budget cuts
    Jan 2, 2025 · These upgrades would allow increasing the frequency of service on the Upfield line to a true 10 minute service. ... Upfield line during the 2025 ...
  64. [64]
    upfield line disruption : r/MelbourneTrains - Reddit
    Jul 21, 2025 · There was a fatality at the level crossing at Gowrie so trains were terminating at Batman during the morning peak.Am I naive or am I missing the point? : r/MelbourneTrainsThe push to unclog Melbourne's most infuriating train lineMore results from www.reddit.com
  65. [65]
    Delivering Better Transport Connections For Brunswick | Premier
    Sep 19, 2024 · The two new accessible stations will be located between 200 and 450 metres from the current stations and will feature entrances at both ends of ...<|separator|>
  66. [66]
    Station to be axed under skyrail revamp - Brunswick Voice
    Sep 19, 2024 · The state government has released new plans for the locations of two stations as part of the project to remove eight level crossings along a 2.1 ...Station To Be Axed Under... · Proposed Locations Of... · Vote On The Plan For Two...
  67. [67]
    Accessible stations? Moreland Leader: Commuter Anger Ramps Up
    Jul 23, 2019 · Accessibility of the elevated stations is a serious concern with the design of the new elevated stations for Moreland and Coburg.
  68. [68]
    Access Guide - Metro Trains
    Please take all necessary precautions to ensure your safety on trains and at stations. We encourage you to seek the assistance of Metro staff if you require ...Missing: systems | Show results with:systems
  69. [69]
    Victoria to buy updated X'Trapolis EMUs | News - Railway Gazette
    May 19, 2021 · They will be deployed by Metro Trains Melbourne on the Craigieburn, Upfield and Frankston lines, which serve some of Melbourne's fastest-growing ...
  70. [70]
    Progress on Melbourne's new X'Trapolis 2.0 trains
    Apr 8, 2025 · 25 X'Trapolis 2.0 trains to be built by Alstom at their Ballarat facility, and intended to enter service on the Craigieburn, Upfield and Frankston lines.Missing: deployment | Show results with:deployment
  71. [71]
    X'Trapolis 2.0 - modern trains for a modern Melbourne | vic.gov.au
    Dec 3, 2024 · This project will significantly boost to Victoria's local rolling stock manufacturing industry, supporting up to 750 local rolling stock ...
  72. [72]
    New $1 billion Metro train fleet to run through Melbourne's Upfield ...
    May 17, 2021 · Victoria will build 25 new trains worth nearly $1 billion dollars. Thursday's state budget will feature $986 million for the X'Trapolis 2.0 trains.
  73. [73]
    Case study: The new X'Trapolis 2.0 trains | vic.gov.au
    Oct 2, 2024 · Victorians can expect to see the first X'Trapolis 2.0 trains testing on the network from 2025. These trains will be gradually introduced on the ...
  74. [74]
    Updated annual Melbourne train patronage graphs - Reddit
    May 6, 2024 · In 2018-19 FY the Belgrave/Lilydale line was the busiest line with 25.9 million and the Upfield line had 5.1 million.
  75. [75]
    Upfield line | Metro Trains
    North Melbourne to Upfield Royal Park. Exit Royal park station on to Poplar Road and turn left. Walk approx 500m and take the first exit of the roundabout onto ...
  76. [76]
    Trends in public transport patronage
    Updated July 2025 with monthly data up to April-June 2025 (varies by region), and annual data up to 2023-24 (including per-capita metrics).
  77. [77]
    Railway station patronage for Melbourne and Victoria 2008 – 2024
    Oct 14, 2024 · You can now see patronage data by station going back to 2008 for metropolitan stations and 2013 for regional stations in these two spreadsheets below.<|separator|>
  78. [78]
    Transport Patronage - Victorian Government
    Dec 5, 2024 · Total and daily average patronage (station entries) for Melbourne metropolitan train stations, including average patronage by time band, allows ...
  79. [79]
    Annual metropolitan train station patronage (station entries) - Dataset
    Jul 29, 2025 · Total and daily average patronage (station entries) for Melbourne metropolitan train stations, including average patronage by time band.
  80. [80]
    Which were the least and most used stations in Victoria in 2023-24?
    Nov 6, 2024 · In its first full year of patronage statistics (2015-16) it recorded 713,250 passengers. It now has nearly double that just eight years later.
  81. [81]
    [PDF] Melbourne Metro Business Case - Victoria's Big Build
    Melbourne Metro also provides the backbone for further improvements to the network in the future, by incorporating features such as longer platforms and high ...
  82. [82]
    [PDF] Victorian transport services quarterly performance bulletin
    Passenger compensation is not payable for reliability on any line as performance was above the applicable threshold (96.0 per cent). Punctuality and reliability ...
  83. [83]
    The push to unclog Melbourne's Upfield train line - The Age
    Aug 7, 2024 · Melbourne's least reliable train line shows no signs of improving under the $12.6 billion Metro Tunnel project, due to the continued refusal ...
  84. [84]
    The need for Track Duplication between Gowrie and Upfield
    Dec 13, 2017 · The benefit to public transport users will only come with adding dual track from Gowrie to Upfield, which would allow for an increase in service ...<|control11|><|separator|>
  85. [85]
    [PDF] Brunswick Elevated Rail - AWS
    The Upfield line (from North Melbourne to Coburg) opened in 1884 and for almost 140 years trains have serviced the line . An elevated train line, with new train ...
  86. [86]
    Level-crossing removals: a case study in why major projects must ...
    Jan 22, 2021 · Our research aims to quantify the health impacts of major infrastructure, using level-crossing removals on the Upfield line as a case study.<|separator|>
  87. [87]
    Delivering our world-class transport network | Victorian Budget 25/26
    May 16, 2025 · $46 million to deliver additional train services on the Sandringham, Craigieburn, Upfield and Werribee lines – made possible by the extra ...Missing: subsidies | Show results with:subsidies
  88. [88]
    Greens announce $600m to duplicate Upfield line - Samantha Ratnam
    Apr 15, 2025 · The costs of duplicating the Upfield line are estimated to be around $600 million. Without a commitment to funding the duplication, other ...
  89. [89]
    Upfield Train (@UpfieldTrain) / X
    Line Suspended - Upfield line between North Melbourne and Coburg (train fault at Flemington Bridge). Bus replacement on order, major delays.
  90. [90]
    Detailed Metro train stats revealed - Daniel Bowen
    Mar 25, 2015 · ... punctuality statistics. Metro may need to be pulled into line in the ... Peak hour service on the Upfield line is a twenty minute service.
  91. [91]
    PT users give 60% approval rating to Melbourne PT system -
    Passengers on the Upfield train line are the least content, awarding the route only 53.7 out of 100. Lilydale passengers are the least crotchety, awarding the ...
  92. [92]
    Upgrade Upfield Line – Upfield Transport Alliance community ...
    Upgrade Upfield Line – Upfield Transport Alliance community campaign to duplicate, upgrade and extend the Upfield rail line in Melbourne's northern suburbs.Missing: 2000-2020 | Show results with:2000-2020
  93. [93]
    Angry Upfield Line! | Facebook
    They discuss train delays, cancellations, and short shunts, as well as express their anger and disappointment with the public transport system. The group also ...
  94. [94]
    Melbourne level crossing works cause sleepless nights, families claim
    Aug 21, 2020 · Families and frontline healthcare workers living beside a 24-hour construction site say they've struggled through 25 “sleepless” nights.Missing: opposition | Show results with:opposition
  95. [95]
    As months of 24/7 Upfield line works loom, residents still want answers
    May 21, 2020 · This follows a bruising fight between many locals and the Level Crossing Removal Project, with residents saying they were kept in the dark about ...
  96. [96]
    Petition · Upfield Train Line Community Seeks Fair Living Conditions ...
    Feb 20, 2019 · Please sign and help support the hundreds of Upfield Train Line Community residents whose living conditions are under threat due to the ...
  97. [97]
    [PDF] brn-submission-mcc-lxrp-issues-and-opportunities-paper-march ...
    Given the narrowness of parts of the Upfield line, many residents are concerned that LXRP will skimp on the infrastructure required to quickly and safely access ...
  98. [98]
    Victorian government urged to prepare 'exit strategy' for Suburban ...
    Mar 21, 2025 · Infrastructure Australia criticises project's business case and backs concerns over cost blowouts.
  99. [99]
    Calls for Upfield upgrade to cope with increased housing
    Feb 28, 2025 · “The Upfield train line has the poorest service levels of all lines in Melbourne and the status quo of one train every 15-20 minutes in peak ...
  100. [100]
    Upfield train line duplication - The Sydney Morning Herald
    Sep 11, 2025 · Duplicating Melbourne's least-frequent rail line would make a big difference to many people at a modest cost, a new report shows.
  101. [101]
    news - Upgrade Upfield Line
    Upfield line has increased off-peak services, but no 10-minute service. Track duplication is needed, and some upgrades were dropped. Level crossing removal is ...
  102. [102]
    Dutton says Coalition would scrap funding for 'hoax' Suburban Rail ...
    Mar 31, 2025 · Peter Dutton says the Coalition will cancel more than $2 billion in federal funding for Victoria's Suburban Rail Loop (SRL) if it wins government.
  103. [103]
    [PDF] Policy costing - Parliamentary Budget Office
    When costing this policy, we: ▫ investigated the configuration and infrastructure of the Upfield rail line. ▫ estimated the cost of building the train turnback ...
  104. [104]
    Victoria's Suburban Rail Loop back on the chopping block as Peter ...
    Apr 1, 2025 · Mr Dutton described the Suburban Rail Loop as a “cruel hoax” and criticised the government for funding a project “that everyone knows would ...