Fact-checked by Grok 2 weeks ago
References
-
[1]
[PDF] Uranus Orbiter and Probe (UOP) | NASA ScienceThe Uranus Orbiter and Probe mission will deliver an in situ probe into Uranus's atmosphere, then complete a multi-year orbital tour of all aspects of the ...
-
[2]
Uranus Orbiter and Probe | Origins, Worlds, and LifeUOP will conduct a multi-year orbital tour addressing (1) the planet's origin, interior, and atmosphere; (2) its magnetic field and magnetosphere; and (3) its ...
-
[3]
Aerocapture: An Enabling Technology for Flagship-Class Uranus ...Jun 8, 2024 · The Uranus Orbiter and Probe (UOP) study, which the survey identified as the flagship mission of this decade, proposes a 2031 launch to take ...
-
[4]
A Mission to Uranus Requires a Community-Building Effort on EarthJul 23, 2024 · The Uranus Orbiter and Probe concept would investigate all aspects of the Uranus system. Different elements of the system, including the ...
-
[5]
How to aerobrake a mission to Uranus on the cheap - Phys.orgMay 16, 2025 · A proposed Uranus Orbiter and Probe (UOP) mission could utilize the same aerocapture technology that Curiosity used to dramatically improve both the speed and ...<|control11|><|separator|>
-
[6]
Voyager 2 - NASA ScienceIn 1974, mission planners proposed a mission in which, if the first Voyager was successful, the second one could be redirected to Uranus and then Neptune ...
-
[7]
[PDF] Uranus Orbiter and Probe | NASA ScienceThe objective of this study was to update the prior Uranus Orbiter and Probe concepts, including a project start between 2023–2030, with refined science goals ...
-
[8]
[PDF] Ice Giants Pre-Decadal Study Final ReportThree key points highlight the importance of sending a mission to our ice giants,. Uranus and Neptune. First, they represent a class of planet that is not ...
-
[9]
Plutonium availability constrains plans for future planetary missionsMay 3, 2023 · NASA may not have enough plutonium available to power a mission to Uranus recommended by the latest decadal survey until the latter half of the 2030s.
-
[10]
U.S. Department of Energy Completes Major Shipment of Plutonium ...Jul 18, 2023 · Delivery of 0.5 kilograms is the largest shipment of new heat source plutonium oxide in more than a decade.
-
[11]
Decadal Survey: After Europa and Mars Sample Return — UranusApr 19, 2022 · But they are worried about potential cost growth above their $5.3 billion estimate ... “No new technologies” are required for the Uranus Orbiter ...
-
[12]
Design Considerations for Aerocapture Delivery of Uranus Orbiter ...Jan 3, 2025 · This paper presents an aerocapture system design for delivering the Uranus Orbiter and Probe (UOP) subsystems to their science orbit using the Mars Science ...
-
[13]
[PDF] Uranus Orbiter and Probe 2023-2032 Planetary Mission Concept ...The Uranus Orbiter and Probe mission enables broad multi- and cross-disciplinary science across nearly all Decadal thematic questions. Thematic. Question.
-
[14]
Mining Old Data From NASA's Voyager 2 Solves Several Uranus ...Nov 11, 2024 · “The spacecraft saw Uranus in conditions that only occur about 4% of the time.” Never Miss a Discovery. Subscribe to the JPL Newsletter.Missing: atmosphere limitations
-
[15]
Uranus: Facts - NASA ScienceMagnetic fields are typically in alignment with a planet's rotation, but Uranus' magnetic field is tipped over: the magnetic axis is tilted nearly 60 ...
-
[16]
SwRI-led Webb Telescope survey discovers new moon orbiting ...Aug 19, 2025 · A SwRI-led survey discovered a new, small moon (S/2025 U 1) around 6 miles in diameter, bringing Uranus' total to 29. It's located at the edge ...
-
[17]
Uranus Orbiter and Probe - WikipediaThe Uranus Orbiter and Probe is an orbiter mission concept to study Uranus and its moons. The orbiter would also deploy an atmospheric probe to characterize ...Background · Key science questions · Mission details · Orbiter instruments
-
[18]
(PDF) Trajectory Options for a Uranus Orbiter and ProbeNov 25, 2024 · There are a variety of trajectory options that enable a Uranus Orbiter and Probe flagship mission. To help search through these options, ...
-
[19]
[PDF] Uranus Flagship-class Orbiter and Probe Using AerocaptureThis mission which was based on a launch date of 2031 or 2032, used a fully-propulsive orbit insertion maneuver at Uranus. (requiring 60-70% of total mass for ...
-
[20]
[PDF] Aerocapture Solutions for Flagship-class Uranus Orbiter and ProbeJan 10, 2025 · ➢ Baseline Uranus mission from the Decadal Survey is a fully-propulsive orbit insertion concept called Uranus Orbiter and Probe. It takes ...
-
[21]
[PDF] Design Considerations for Aerocapture Delivery of Uranus Orbiter ...1. The Uranus Orbiter and Probe design achieves mission science objectives with a 60 kg instrument payload and 233 kg/1.25 meter diameter atmospheric probe.Missing: details | Show results with:details
-
[22]
[PDF] Uranus Cruise and Tour Design Impacts on Science Return, Cost ...Jun 12, 2024 · • Mass of orbiter (sans probe) at end of tour. • Total ∆V ... • 350-kg probe allocation (MPV). • Probe released post-UOI. • Launch ...
-
[23]
[PDF] Uranus Probe Entry and Descent Trajectory DesignAug 31, 2022 · The Uranus Orbiter and Probe (UOP) is a mission concept to deliver an in-situ atmospheric probe and conduct orbital tour to study Uranus and ...Missing: profile | Show results with:profile
-
[24]
Mass Spectrometer Experiment for a Uranus ProbeAug 22, 2024 · One invaluable instrument on a Uranus probe is a mass spectrometer experiment that analyzes the planet's chemical composition in situ in real-time.