Bay-class landing ship

The Bay-class landing ships are a group of auxiliary dock landing ships (LSD(A)) developed for amphibious support roles within the Royal Fleet Auxiliary (RFA), emphasizing the transport and deployment of troops, armored vehicles, and landing craft via a floodable stern dock. Originally comprising four vessels constructed in the early 2000s based on the Dutch Royal Schelde Enforcer design, the class entered RFA service between 2006 and 2007 to replace older logistic landing ships. Each ship displaces approximately 16,160 tonnes, measures 176.6 meters in length with a beam of 26.4 meters, attains speeds of 18 knots, and offers a range of 8,000 nautical miles at 15 knots, enabling sustained operations in expeditionary scenarios. Capable of embarking 356 troops under normal conditions (up to 700 in overload), accommodating 1,200 linear meters of vehicles such as 24 main battle tanks or 150 trucks, and operating four landing craft alongside helicopter facilities, the vessels provide versatile littoral maneuver and sealift capabilities. Three remain in RFA service—RFA Mounts Bay, Cardigan Bay, and Lyme Bay—while the fourth, former RFA Largs Bay, was sold to Australia in 2011 and recommissioned as HMAS Choules.

Design and Development

Origins and Requirements

The Alternative Landing Ship Logistic (ALSL) project, which led to the Bay-class vessels, was established in 1997 by the UK Ministry of Defence to address the obsolescence of the fleet, beginning with the replacement of RFA Sir Geraint and RFA Sir Percivale. These 1960s-era ships, originally six in number and completed between 1967 and 1968, had provided bow-ramp beaching capability for vehicle and troop delivery but lacked modern features such as stern docks for operations or integrated aviation support, limiting their effectiveness in expeditionary scenarios. By the early , only five remained operational, prompting a broader modernization to sustain the UK's amid post-Cold War commitments like interventions in the and potential Gulf operations. Key requirements for the ALSL centered on enhancing amphibious lift and logistical sustainment, including a floodable stern dock to embark and deploy LCUs or Mexeflote pontoons for over-the-horizon transfers, capacity for up to 350 troops, 24 main battle tanks or equivalent vehicles, and facilities for two or helicopters plus smaller aircraft. The vessels were specified to operate independently as auxiliary oilers or supply ships, supporting deployed naval task groups with fuel, ammunition, and stores while enabling autonomous amphibious insertions without reliance on dedicated assault ships like the Albion class. This design shift from the Round Table class's beach-dependent model aimed to provide greater operational flexibility in contested littorals, drawing on lessons from 1990s exercises and the need for rapid force deployment in line with the UK's Strategic Defence Review of 1998, which emphasized versatile expeditionary capabilities. In April 2000, the issued an for two ALSL ships within a £150 million budget, with options for two or three additional units to fully replace the LSL fleet and augment overall . The procurement prioritized adaptation of proven designs, ultimately selecting a variant of the Schelde Enforcer platform for its balance of cost, capacity, and multi-role utility, including aviation decks and vehicle garages exceeding prior LSL limits. These specifications reflected a causal emphasis on integrating logistical sustainment with assault enablers, ensuring the could support joint operations by and Army units in diverse theaters without excessive vulnerability during beach assaults.

Construction Process

The construction of the four Bay-class landing ships was initiated under a £300 million contract awarded by the Ministry of Defence in late 2000, with two vessels assigned to at its Wallsend yard on the River Tyne and two to at the Govan shipyard in . Work began in early 2002, starting with the for RFA Largs Bay at on 28 January, followed by RFA at BAE Govan on 25 August. The design incorporated modular construction elements adapted from the Spanish 7000 class, allowing for prefabricated sections to be assembled into the hulls, though the process emphasized traditional shipbuilding methods suited to the yards' capabilities. Swan Hunter's portion encountered severe challenges, including mismanagement, quality issues, and escalating costs that exceeded initial estimates by tens of millions of pounds. By mid-2006, after RFA Largs Bay had been launched on 18 July 2003 but delayed in completion, the terminated Swan Hunter's involvement due to persistent failures in meeting milestones. The incomplete , launched at Swan Hunter on 3 September 2005, was towed approximately 150 miles to BAE Govan for final outfitting, marking a significant intervention to salvage the program. This transfer added further delays but ensured continuity, with BAE also handling alongside the transferred vessel. BAE Systems progressed more steadily at Govan, launching on 9 April 2004 after integrating systems and internal fit-outs in a phased approach that prioritized floodable dock integration and facilities. The yard's experience with complex naval facilitated corrections to early design adaptations, such as enhanced stern ramp mechanisms for vehicle offloading. Overall program delays totaled up to 28 months for some ships, pushing full operational capability into 2007, with commissioning first in July 2006, followed by RFA Largs Bay in December 2006, and the BAE-completed pair in 2007.
Ship NamePrimary YardKeel LaidLaunchedEntered Service
RFA Largs BaySwan Hunter (Wallsend)28 Jan 200218 Jul 200317 Dec 2006
RFA Mounts BayBAE Systems (Govan)25 Aug 20029 Apr 2004Jul 2006
RFA Lyme BaySwan Hunter/BAE GovanUnspecified3 Sep 2005Late 2007
RFA Cardigan BayBAE Systems (Govan)UnspecifiedUnspecified2007

Procurement Challenges

The procurement of the Bay-class landing ships, initiated with contracts awarded to and around 2000, encountered substantial hurdles primarily at the latter's shipyard, which was responsible for RFA Largs Bay (L3005) and RFA Lyme Bay (L3007). While BAE's facility progressed with RFA Mounts Bay (L3004) and RFA Cardigan Bay (L3006) without comparable disruptions, Swan Hunter's efforts were plagued by persistent delays and escalating costs from the outset of construction in 2002. By December 2005, these issues had intensified to the point where the (MoD) extended an £84 million bailout to to address overspends and schedule slippages on Largs Bay and , amid concerns over the yard's and project viability. Despite this intervention, problems persisted, particularly with Lyme Bay, where costs reached "unacceptable" levels and completion lagged far behind targets; in July 2006, the MoD terminated 's contract, deeming it no longer value for money, and arranged for the partially built vessel—launched in September 2005 but unfinished—to be towed approximately 150 miles to BAE's yard on the Clyde for final assembly and fitting out. This transfer underscored systemic challenges in yard management and coordination, contributing to the yard's eventual collapse later that year. The overall programme suffered protracted delivery timelines and budget overruns, with the four ships ultimately costing around £600 million—substantially above initial projections—exacerbated by thousands of mid-project modifications demanded by the and , which deviated from the vessels' established Spanish-derived design and amplified complexity at the troubled site. These setbacks highlighted broader vulnerabilities in defence , including over-reliance on domestic yards prone to financial distress and the risks of alterations without adequate contingency planning.

Technical Specifications

Hull and Dimensions

The Bay-class landing ships feature a hull derived from the Dutch Royal Schelde's Enforcer design, adapted as a landing ship dock (auxiliary) with a prominent floodable stern docking well capable of accommodating one LCU Mk 10 landing craft utility or equivalent. The structure supports amphibious operations by enabling the embarkation and offloading of vehicles and troops via Mexeflotes secured on each side of the hull. Key dimensions include a of 176.6 meters, a of 26.4 meters, and a draught of 5.8 meters. The full load is 16,160 tonnes.
ParameterValue
176.6 m
26.4 m
Draught5.8 m
(full load)16,160 tonnes

Propulsion and Performance

The Bay-class landing ships utilize a diesel-electric system powered by four generators: two 8L26 units, each rated at 2,240 kW (totaling 4,480 kW or approximately 6,000 hp), and two 12V26 units, each rated at 3,360 kW (totaling 6,720 kW or approximately 9,000 hp). This drives two azimuthing pods, which provide both forward and directional control by rotating to steer the vessel, eliminating the need for traditional rudders and enhancing low-speed handling in confined waters such as harbors or during landing operations. A single bow supplements the system for improved maneuverability, particularly when or positioning the floodable stern dock for deployment. Performance specifications include a maximum speed of 18 knots (33 km/h; 21 mph), suitable for amphibious support roles rather than high-speed transit. The vessels attain a range of 8,000 nautical miles (14,800 km) at an economical speed of 15 knots (28 km/h), supporting sustained operations in expeditionary scenarios with minimal logistical dependency. These attributes prioritize endurance and versatility over sprint capability, aligning with the class's role in troop and vehicle transport across littoral environments.

Capacity and Facilities

The Bay-class landing ships feature dedicated troop accommodation for 356 fully equipped combat personnel under standard operating conditions, with provisions for expansion to 500 using camp beds in auxiliary spaces. In overload configurations, this capacity can increase to approximately 700 personnel, though such arrangements prioritize surge requirements over comfort. Vehicle storage is provided on a large internal spanning 1,150 linear metres, accessible via and starboard Ro-Ro ramps, enabling the transport of up to 24 main battle tanks or 150 light trucks. The also supports general , including 200 tons of or the equivalent of 24 twenty-foot TEU containers. A floodable stern well dock facilitates amphibious operations, accommodating either two Landing Craft Vehicle and Personnel (LCVP) or one larger Landing Craft Utility (LCU), supplemented by two transom-stowed Mexeflote pontoons for modular pier construction. Aviation facilities include a through-deck flight deck rated for simultaneous operations of medium-lift helicopters such as the Merlin, with a hangar capable of housing two such aircraft and supporting vertical replenishment. The core crew complement consists of around 60 Royal Fleet Auxiliary personnel, augmented by up to 29 Royal Navy staff for specialist roles.

Armament and Sensors

The Bay-class landing ships are fitted with modest self-defense armament suited to their auxiliary role, primarily comprising two Mk 15 close-in weapon systems (CIWS) for engaging incoming missiles and low-flying . These are supplemented by two manually operated DS30B 30 mm cannons for surface threat engagement. Additional close-range protection is provided by four M134 7.62 mm miniguns and other small arms. Provisions exist for decoy launchers capable of deploying and infrared flares to counter systems. The exact configuration varies across individual ships, reflecting operational priorities and upgrades. Sensors and electronics emphasize navigation and over combat detection, with an integrated system handling automated , power distribution, and for precise maneuvering during amphibious operations. No dedicated air-search or fire- radars are fitted, limiting the class to reliance on external vessels for threat detection in contested environments. Communication systems support coordination with naval task groups, but specifics remain aligned with commercial maritime standards rather than military-grade battle networks.

Operational History

Early Commissioning and Exercises

RFA Mounts Bay became the lead ship of the Bay class when dedicated into service with the Royal Fleet Auxiliary on 13 July 2006, marking the initial operational entry of the vessels designed to replace the older Round Table-class landing ships. RFA Largs Bay followed, completing sea trials on 9 November 2006 ahead of its dedication later that month. RFA Cardigan Bay was commissioned on 6 March 2007 at Portland Harbour, with local Sea Cadets participating in the ceremony. The final vessel, RFA Lyme Bay, entered service on 26 November 2007 after completion by BAE Systems following delays at Swan Hunter. These commissionings occurred amid procurement challenges, including builder transitions that delayed the program but enabled the ships to fulfill amphibious support roles promptly. Post-commissioning, the Bay-class ships validated their capabilities through key early exercises. RFA Mounts Bay undertook its inaugural operational deployment in Operation Vela from 11 September to 22 November 2006, a significant amphibious demonstration off under Commander UK Amphibious Group, involving around 3,000 personnel, eleven Royal Navy ships, and exercises with local forces in , , and to showcase and —the largest UK amphibious effort since 2001. This deployment tested the ship's ability to embark Royal Marines from , landing craft operations, and logistical support in austere environments. In October 2008, RFA Mounts Bay participated in Exercise Joint Warrior 08-2, a biennial multinational training event off the Scottish coast at Faslane, integrating with HMS Bulwark as amphibious flagship, carrier group, and allied forces to practice maneuvers, including troop and vehicle offloads via pontoons and . These activities honed the class's role in enabling rapid deployment of ground forces, with subsequent ships like joining similar drills to build fleet readiness for global commitments.

Combat and Security Deployments

RFA Cardigan Bay undertook multiple extended deployments to the , serving as a forward-operating base for and allied mine countermeasures vessels engaged in securing maritime routes against threats including mines and smuggling. From 2007 to , she supported coalition operations, returning to the on 7 after three years of continuous service. A subsequent four-year deployment beginning around 2017 ended in June 2021, during which she provided logistical support to and minehunters operating under Combined 152 for against terrorism, , and narcotics trafficking. RFA Lyme Bay contributed to counter-piracy efforts off the as part of EU Naval Force operations, completing her mission on 21 November 2013 after conducting patrols and regional capacity-building to enhance local . She later deployed to the 5th Fleet area in for operations ensuring stability in the , including replenishment at sea with allied vessels. In 2024, Lyme Bay participated in Exercise Grand African Nemo in the , simulating smuggling and piracy scenarios to train West African navies in countering criminal maritime activity. RFA Mounts Bay enforced arms embargo measures in the Mediterranean following the , resuming patrols on 13 October 2016 to interdict illegal weapons shipments destined for terrorist groups. In August 2016, she facilitated the extraction of chemical weapons precursors from under UN auspices, preventing their potential use by extremists such as Daesh. Additionally, Mounts Bay supported counter-narcotics missions in the and Western Atlantic from late 2017, hosting unmanned mine countermeasures systems and providing a platform for regional security experiments. The class has also provided security support for high-profile events, with serving as an accommodation and small-boat base during the 2012 London Olympics sailing venue protection in Portland. RFA Cardigan Bay offered similar forward presence during the 2022 FIFA World Cup in Qatar after her Gulf duties. These deployments underscore the vessels' role in enabling persistent without direct combat engagement, as auxiliaries focused on and force projection in contested areas.

Humanitarian and Training Missions

RFA conducted humanitarian disaster relief operations in following on September 5, 2019, delivering essential aid including water, food, and shelter materials while embarking a dedicated relief team and specialist equipment for . The ship also performed a successful and mission in the on the same date, supporting regional response efforts. During its three-year deployment ending in March 2020, was prepositioned annually for under Atlantic Patrol Task (North), providing standby humanitarian support to . RFA Lyme Bay delivered 87 tonnes of humanitarian aid supplies to on January 2, 2024, as part of a broader 13-month deployment supporting regional operations, though not ultimately required for initial conflict escalation tasks. supported international aid efforts to starting May 1, 2024, by providing offshore accommodation for military personnel constructing a temporary for aid delivery. HMAS Choules, formerly RFA Largs Bay, participated in Operation Vanuatu Assist in 2017, delivering aid to approximately 11,600 residents affected by a volcanic eruption. During Operation Bushfire Assist starting December 31, 2019, the ship supported evacuations and humanitarian relief along Australia's fire-impacted and coasts. As RFA Largs Bay prior to its 2011 transfer to Australia, it contributed to the international response to the in January 2010, offloading humanitarian supplies. Bay-class ships have supported training missions emphasizing amphibious operations and disaster preparedness. HMAS Choules conducted a humanitarian and disaster relief (HADR) training exercise in July 2024, simulating crisis response to demonstrate readiness for domestic and international crises. Prior to its transfer, RFA Largs Bay engaged in a month-long amphibious warfare training exercise with the Australian Army in 2011, focusing on landing craft operations and troop deployment. RFA Lyme Bay routinely participates in international exercises integrating combat, humanitarian aid, and fleet preparation scenarios.

Criticisms and Limitations

Cost and Delay Issues

The of the Bay-class landing ships encountered significant delays and cost escalations, primarily stemming from challenges at the Swan Hunter shipyard on , which was contracted alongside Surface Ships to construct the vessels. commenced in early following a 2001 contract award, with an initial tender for the first two ships valued at approximately £150 million and options for two additional units, but the program as a whole faced protracted timelines that pushed deliveries well beyond original schedules. Swan Hunter's difficulties, including production inefficiencies and financial strain, led to severe setbacks, particularly for , the last vessel under their responsibility; by mid-2006, the () terminated the contract due to persistent delays and spiralling costs, reaching a mutual settlement to transfer incomplete work to ' Govan yard in . As the lead yard for initial hull sections shared across the class, Swan Hunter's issues rippled through the program, exacerbating delays for and and contributing to overall budget overruns estimated to have inflated the per-unit construction costs beyond initial projections of around £100-150 million. The first ship, , was not commissioned until March 2006—over three years later than anticipated—while Lyme Bay's handover and completion extended into 2007, highlighting systemic vulnerabilities in shipbuilding capacity and contractor management during the early . These overruns were not isolated but reflective of broader procurement patterns, where optimistic bidding and inadequate often led to taxpayer-funded bailouts, though the Bay class ultimately delivered capable vessels despite the fiscal strain.

Maintenance and Reliability Problems

The Bay-class landing ships have experienced notable reliability issues, primarily related to , electrical systems, and , which have periodically reduced availability despite their overall operational utility. Early in the class's , RFA Largs Bay suffered an engine room fire on 3 March 2007 while en route to Devonport, leading to a complete loss of power and steering approximately five miles west of the ; the vessel drifted and required towing to for repairs, highlighting vulnerabilities in the diesel-electric shortly after commissioning in 2006. Following its 2011 transfer to the Royal Australian Navy as HMAS Choules, the ship encountered further propulsion failures, including a fault in June 2012 that forced an early return to harbor just one day after departing for Exercise Hamel in . Premature ageing of key components emerged around the same period, with all transformers exhibiting accelerated degradation necessitating full replacement to restore electrical reliability. By 2023, after 12 years of service, had severely affected the mild-steel water feed pipes in the wet exhaust systems, contributing to broader sustainment challenges addressed during an extended maintenance period that included sea trials upon completion. For the Royal Fleet Auxiliary vessels, maintenance demands have intensified with age, as evidenced by RFA Lyme Bay's refit commencing in June 2025 at Tyne—its original construction site under the defunct yard—which temporarily reduced the UK's active amphibious capacity to a single ship. Similar docking occurred for RFA Mounts Bay in Falmouth in 2023, focusing on pods and underwater hull refurbishment to mitigate wear from high operational tempo. These recurring interventions underscore causal factors such as initial build quality variations—two ships completed by after Swan Hunter's 2006 collapse—and cumulative saltwater exposure accelerating material fatigue in the Wärtsilä-powered diesel-electric plants, though no class-wide grounding defects have been reported.

Capability Shortcomings

The Bay-class landing ships, designed primarily as auxiliary vessels for logistical support rather than primary amphibious assault platforms, exhibit inherent limitations in facilities compared to dedicated landing platform docks (LPDs) like the Albion class. Each ship features a capable of handling one heavy-lift such as the , but lacks a permanent enclosed for storage, maintenance, or protection from weather, restricting sustained rotary-wing operations and necessitating reliance on temporary tented structures for any extended aviation support. Self-defense capabilities are minimal, with armament consisting of two 30mm remote stations and general-purpose machine guns, providing only basic protection against small surface threats or low-level air attacks but offering no integrated systems, close-in systems (CIWS), or robust anti-air warfare suites, thereby requiring constant by warships in contested environments to mitigate vulnerability to submarines, aircraft, or s. The class's maximum speed of 18 knots (33 km/h) hampers tactical flexibility, preventing integration with faster carrier strike groups or rapid response to dynamic threats, and exposes the ships to prolonged risk during transits or when operating independently. As auxiliary landing ship docks (LSD(A)), the Bay class lacks the command-and-control infrastructure, enhanced troop berthing for sustained operations, and integrated hangars found in purpose-built amphibious ships, rendering them inadequate substitutes for full-scale littoral maneuvers without complementary vessels like the Albion class. This design prioritizes vehicle and cargo delivery—up to 1,150 linear meters for 24 tanks—over versatile expeditionary roles, limiting their effectiveness in scenarios demanding organic air support or independent command.

Fleet Composition and Status

List of Ships

The Bay-class landing ships comprise four vessels constructed for the Royal Fleet Auxiliary () in the during the early to mid-2000s, with three remaining in active RFA service as of 2025 and one transferred to the Royal Australian Navy (RAN).
Ship NameBuilderLaunch DateCommissioning Date (RFA unless noted)Status
RFA Largs BayL30062006November 2006Transferred to RAN as HMAS Choules (L100) in 2011; commissioned into RAN on 13 December 2011; active.
RFA Lyme BayL3007 (completed by )200726 November 2007Active in RFA service.
RFA Mounts BayL30082006July 2006Active in RFA service.
RFA Cardigan BayL3009April 2005March 2007Active in RFA service.

Transfers and Decommissionings

In December 2010, the UK Ministry of Defence announced the decommissioning of one Bay-class vessel as part of the Strategic Defence and Security Review, identifying RFA Largs Bay (L3006) for withdrawal from service. The ship was decommissioned in April 2011 after entering service in 2006, primarily due to budget constraints aimed at restructuring naval capabilities. Following decommissioning, RFA Largs Bay was sold to the Royal Australian Navy for approximately £65 million (equivalent to A$100 million at the time) to replace the aging HMAS Tobruk. The vessel was transferred under its original name initially, then renamed (L100) in honor of , Australia's last veteran. It arrived in in December 2011 and was commissioned into RAN service on 13 December 2011, retaining its Bay-class design for amphibious operations including troop transport, vehicle landing, and humanitarian missions. No other Bay-class ships have been decommissioned or transferred as of October 2025. The remaining vessels—RFA , RFA , and RFA —continue active service with the Royal Fleet Auxiliary, providing logistical support for and allied operations amid ongoing fleet modernization plans.

Future Replacement Prospects

The United Kingdom's Ministry of Defence plans to replace the Royal Fleet Auxiliary's three Bay-class landing ships—RFA Lyme Bay, RFA Mounts Bay, and RFA Cardigan Bay—with up to six Multi-Role Support Ships (MRSS) as part of a broader modernization of amphibious capabilities. Announced in May 2024, the MRSS program aims to consolidate roles previously filled by the decommissioned Albion-class landing platform docks, the Bay-class vessels, and the aviation training ship RFA Argus, providing enhanced support for Royal Marines operations including troop transport, vehicle deployment, and unmanned systems integration. The vessels are expected to enter service no earlier than 2033, with the Bay-class maintaining interim amphibious support following the retirement of HMS Albion and HMS Bulwark by March 2025. Final requirements for the MRSS design are slated for refinement by mid-2025, emphasizing modularity for strike, logistics, and humanitarian roles amid fiscal constraints on procurement timelines. In , the Royal Australian Navy's sole Bay-class vessel, HMAS Choules (formerly RFA Largs Bay), faces through the acquisition of two Australian-built multi-role sealift and replenishment vessels under evolving fleet sustainment programs. Initial plans outlined in 2022 target these ships to handle amphibious lift, replenishment-at-sea, and support, addressing Choules' aging infrastructure despite recent upgrades such as CEAFAR arrays fitted in 2024. No firm delivery dates have been confirmed as of late 2024, with the tied to broader surface fleet reviews prioritizing integrated amphibious and sealift capabilities alongside Canberra-class landing helicopter docks. HMAS Choules remains operational for training, humanitarian missions, and regional deployments, sustaining Australia's interim heavy lift needs until the new vessels materialize.

References

  1. [1]
    Bay Class - Royal Navy
    Comprising of three ships (RFA Lyme Bay, Mounts Bay and Cardigan Bay), the role of the Bay Class vessels is to offload embarked troops and armoured vehicles ...
  2. [2]
    Bay class Landing Ship Dock Amphibious Royal Fleet Auxilary
    The Bay class is a class of four dock landing ships for the British RFA, based on the Royal Schelde Enforcer design, with no helicopter hangar.
  3. [3]
    Bay Class LSD(A) Alternative Landing Ship Logistic (ALSL)
    Aug 27, 2003 · The Bay Class will support an embarked military force (EMF) of 350 fully equipped troops and up to 700 fully equipped troops in overload ...
  4. [4]
    HMAS Choules | Royal Australian Navy
    Commissioned in December 2011, HMAS Choules is an amphibious Bay Class landing ship dock (LSD) ship based on the Royal Schelde Enforcer design.
  5. [5]
    In focus: The highly versatile Bay class auxiliaries - Navy Lookout
    Jul 16, 2018 · The Bay class are replacements for the 6 Round Table class LSLs (Landing Ship Logistic) originally completed between 1967-68 HNMLS Rotterdam.
  6. [6]
    Bay Class Large Amphibious Landing Ships ... - GlobalSecurity.org
    May 20, 2012 · As well as transporting troops, they can carry about 1200 lane metres of vehicles and carry 12 x 40 TEU or 24 x 24 TEU containers. The flight ...
  7. [7]
    Bay Class Large Amphibious Landing Ships Alternative Landing ...
    Jul 17, 2005 · The Royal Fleet Auxiliary's Alternative Landing Ship Logistic project was set up in 1997, to replace RFA SIR GERAINT and RFA SIR PERCIVALE.
  8. [8]
    Overworked, Over-egged and Over There? The Overburdened Bay ...
    Nov 19, 2021 · The Bays were originally built to replace the six Landing Ships Logistic (LSL) of the Round Table class. By the early 2000s only five of these venerable old ...
  9. [9]
    RFA Mounts Bay
    Oct 26, 2008 · In April 2000 an Invitation to Tender was issued for the design and build of two Alternative Landing Ships Logistics to replace RFA's SIR ...Missing: development | Show results with:development
  10. [10]
    RFA Largs Bay - Historical RFA
    Oct 25, 2008 · Builder: Swan Hunter, Wallsend on Tyne. Launched: 18 July 2003. Into Service: 17 December 2006. Out of service: 19 October 2011. Fate: Sold to ...
  11. [11]
    L 3007 RFA Lyme Bay Dock Landing Ship Royal Navy Auxilary
    The ship was launched on 3 September 2005. The Bay class construction project saw major delays and cost overruns, particularly in the Swan Hunter half of the ...
  12. [12]
    House of Commons - Defence - Written Evidence - Parliament UK
    The prime contractor and design authority is Swan Hunter (Tyneside), responsible for the build of RFA Largs Bay and RFA Lyme Bay at its Wallsend shipyard.
  13. [13]
    Bleak future for Swans as contracts go to other yards
    Dec 15, 2005 · Swan Hunter has faced the embarrassment of an £84m MoD bail-out after delays and overspend on the building of two landing ships, Largs and Lyme ...
  14. [14]
    More on the demise of Swan Hunter | Ships Nostalgia
    Jul 14, 2006 · The MoD said the contract with Swans no longer represented value for money after costs and delays on the Lyme Bay reached an "unacceptable" ...Missing: bankruptcy | Show results with:bankruptcy
  15. [15]
    Fears for Swan Hunter as ship is towed to Govan for completion
    Jul 14, 2006 · A nearly finished landing ship is expected to be towed from Swan Hunter's Wallsend yard to a rival one on Monday for completion in a move ...Missing: class bankruptcy
  16. [16]
    Historic shipbuilder loses MoD's warship contract - The Times
    Jul 14, 2006 · Now, after a history of management and financial problems, the four ships are going to cost £600 million. The final one, RFA Lyme Bay, is about ...Missing: issues | Show results with:issues<|control11|><|separator|>
  17. [17]
    Is the Royal Navy at breaking point or a turning point? - Navy Lookout
    Aug 11, 2025 · The current condition of the RN is alarming, with almost every aspect of its capabilities understrength or overstretched.
  18. [18]
    Bay Class Landing Ship Dock (LSD (A)) (RFA) - Page 13
    Jul 3, 2019 · The reality is the high end escort fleet is type 26 and type 45. ... Bay do not have CMS, Bay do not carry good radar, it is a fact.Bay Class Landing Ship Dock (LSD (A)) (RFA) - Page 8RFA Fort Victoria - Page 6 - UK Defence ForumMore results from ukdefenceforum.net
  19. [19]
    RFA Mounts Bay will receive freedom of Falmouth
    Apr 11, 2007 · RFA Mount's Bay's first operational task was for Exercise Vela to West Africa embarking troops and equipment from 40 Commando Royal Marine.<|separator|>
  20. [20]
    Bay-class landing ship completes testing - ResearchGate
    First of class, HMS Albion, was commissioned in June 2003 and declared operational in April 2004. Both were built by BAE Systems at Barrow, in northwestern ...
  21. [21]
    RFA Cardigan Bay (L3009) - Ships
    Jun 30, 2010 · The ship was commissioned on 6 March 2007 in Portland Harbour. Local Sea Cadets assisted, whilst some more from Kent provided an honour guard.
  22. [22]
    Bay-class landing ship — Shipshub
    In April 2000, the MoD issued an Invitation to Tender for two ships within a budget of £150 million, with the option to procure three additional ships.
  23. [23]
    2006 Operation Vela - Historical RFA
    Jul 25, 2012 · The Naval Task Group for Operation VELA, a three month deployment to West Africa in 2006, was under the command of Commander UK Amphibious Group ...
  24. [24]
    L 3008 RFA Mounts Bay Dock Landing Ship Royal Navy Auxilary
    12/22. Type, class: Dock Landing Ship - LSD / Bay class. Builder: BAE Systems Naval Ships, Govan, Glasgow, Scotland, UK STATUS: Awarded: November 19, 2001
  25. [25]
    RFA Cardigan Bay returns from three-year deployment - GOV.UK
    Jan 7, 2011 · Royal Fleet Auxiliary vessel Cardigan Bay returned to Portsmouth today after a three-year deployment to the Gulf in support of coalition
  26. [26]
    Support ship Cardigan Bay completes mammoth four-year Gulf ...
    Jun 18, 2021 · “After four years as a forward presence, supporting defence outputs in the Gulf, RFA Cardigan Bay returns to the UK for a major refit and ...
  27. [27]
    US, UK Conduct Mine Countermeasures Training in the Arabian Gulf
    Jun 25, 2019 · U.S. and United Kingdom naval forces conducted routine bilateral mine countermeasures training in the Arabian Gulf, June 10-20.
  28. [28]
    UK Ship RFA Lyme Bay Heads For Home Having Completed ...
    Nov 21, 2013 · After a short period of integration training, RFA Lyme Bay commenced EU counter piracy operations in the Gulf of Aden on 16 October. During her ...Missing: early | Show results with:early
  29. [29]
    RFA Lyme Bay Replenishment at Sea [Image 3 of 4] - DVIDS
    Mar 13, 2022 · Lyme Bay is deployed to the U.S. 5th Fleet area of operations in support of naval operations to ensure maritime security and stability in ...
  30. [30]
    Royal Navy helps African navies enhance security skills during ...
    Nov 12, 2024 · Royal Marines and their support ship RFA Lyme Bay played the bad guys in one of West Africa's biggest naval exercises.
  31. [31]
    RFA Lyme Bay plays the bad guy in one of West Africa's biggest ...
    Nov 13, 2024 · The exercise is designed to combat criminal activity in the Gulf of Guinea and enhance security in maritime areas suffering from piracy and ...
  32. [32]
    RFA Mounts Bay resumes arms trafficking patrol - GOV.UK
    Oct 13, 2016 · RFA Mounts Bay has resumed duties patrolling the Mediterranean to counter illegal arms trafficking.
  33. [33]
    RFA Mounts Bay supports removal of potential chemical weapon ...
    Aug 31, 2016 · RFA Mounts Bay has assisted in the removal of the last batch of known materials which could be used in the manufacture of chemical weapons from Libya.
  34. [34]
    VIDEO: Navy Brings Mine Countermeasures Triad Together for ...
    Apr 1, 2019 · The Falmouth, U.K.-based RFA Mounts Bay is a year and a half into a two-year deployment to the Caribbean and Western Atlantic to conduct ...
  35. [35]
    RFA Cardigan Bay to house hundreds of US sailors and soldiers ...
    Apr 26, 2024 · The Royal Fleet Auxiliary vessel will let the US take part in the aid effort - but without putting boots on the ground.<|separator|>
  36. [36]
    RFA Mounts Bay: What Is She And What Can She Do? - Forces News
    Sep 20, 2017 · RFA Mounts Bay can deliver worldwide support to the Royal Navy in various tasks including warfighting, counter-piracy, counter-narcotics operations and ...
  37. [37]
    RFA Mounts Bay delivers aid to the Bahamas after Hurricane Dorian
    Sep 5, 2019 · Royal Fleet Auxiliary ship RFA Mounts Bay has started delivering essential aid to people in the Bahamas after the country was hit by a ...<|separator|>
  38. [38]
    RFA Mounts Bay delivers aid to The Bahamas - ReliefWeb
    Sep 4, 2019 · RFA Mounts Bay has embarked a dedicated Humanitarian and Disaster Relief team, and is carrying vital aid and specialist equipment, such as ...Missing: operations | Show results with:operations
  39. [39]
    RFA Mounts Bay conducts successful casualty evacuation ... - GOV.UK
    Sep 5, 2019 · RFA Mounts Bay has embarked a dedicated Humanitarian and Disaster Relief team, and is carrying vital aid and specialist equipment. It also ...Missing: operations | Show results with:operations
  40. [40]
    RFA Mounts Bay returns from Caribbean deployment - Royal Navy
    Mar 17, 2020 · RFA Mounts Bay has returned to the UK after her successful three-year Caribbean deployment. The ship received a warm welcome as she arrived in Portland, Dorset.
  41. [41]
    Naval News – RFA LYME BAY L 3007 delivers humanitarian aid to ...
    Jan 2, 2024 · A Significant Milestone done by the Bay Class Landing Ship RFA LYME BAY L 3007 was done after she delivered 87 tonnes of humanitarian aid supplies.<|separator|>
  42. [42]
    Praise for RFA ship Lyme Bay as she completes epic 13-month ...
    Nov 28, 2024 · The ship left the UK on October 9 2023 as one half of the Littoral Response Group, acting as command ship, alongside RFA Argus. And 414 days ...Missing: early | Show results with:early
  43. [43]
    Royal Navy landing ship RFA Cardigan Bay to support international ...
    May 1, 2024 · RFA Cardigan Bay will support the US military personnel by providing temporary offshore accommodation as they build a new temporary pier to deliver aid ...
  44. [44]
    HMAS Choules training for humanitarian aid and disaster relief ...
    Jul 30, 2024 · Choules also supported Operation Vanuatu Assist in 2017, providing aid to 11,600 residents after a volcanic eruption devastated the small island ...
  45. [45]
    Operation Bushfire Assist - Royal Australian Navy
    Operation Bushfire Assist began Dec 31, 2019, with the ADF supporting civilians. The Navy provided humanitarian relief, including evacuations, with ships like  ...
  46. [46]
    Australian navy ship prepares to evacuate residents from bushfire ...
    Jan 1, 2020 · The navy ship HMAS Choules, which is designed to deal with humanitarian crises, leaves Sydney for the fire-devastated coast of Victoria and NSW.<|separator|>
  47. [47]
    Training for when disaster strikes - Defence
    Jul 29, 2024 · A recent humanitarian and disaster relief (HADR) training exercise demonstrated HMAS Choules' readiness to respond to crises at home and abroad.
  48. [48]
    L 3006 RFA Largs Bay Dock Landing Ship Amphibious Royal Navy
    The vessel was built by Swan Hunter in Wallsend, Tyne and Wear. She was named after Largs Bay in Ayrshire, Scotland, and entered service in November 2006.
  49. [49]
    RFA Lyme Bay | Royal Navy
    From combat operations and international exercises to humanitarian aid missions, RFA Lyme Bay and her crew help make sure the Fleet is prepared for anything.Missing: early | Show results with:early
  50. [50]
    Bay Class Landing Ship Dock (LSD (A)) (RFA) - UK Defence Forum
    May 5, 2015 · In mid-2006, Swan Hunter was stripped of work, and the incomplete second ship was towed to BAE's shipyard for completion. All four ships, Largs ...<|separator|>
  51. [51]
    Ministry of Defence: Swan Hunter Contract - Hansard - UK Parliament
    Jul 12, 2006 · The Ministry of Defence has reached a full and final settlement for the closure, by mutual agreement, of its contract with Swan Hunter (Tyneside) ...Missing: bankruptcy | Show results with:bankruptcy
  52. [52]
    Departure of Lyme Bay left Wallsend yard high and dry
    Dec 28, 2006 · The Ministry of Defence (MoD) pulled out of its contract with Swans because of delays and spiralling costs. ... A £3M price tag was put on Swan ...
  53. [53]
    RFA Largs Bay limps in - Falmouth Packet
    Mar 14, 2007 · The multi-million pound vessel, which entered service less than four months ago, lost engine power and steering after an engine room fire ...
  54. [54]
    Navy's new ship back in port with mechanical problem - ABC News
    Jun 18, 2012 · A Defence spokesman says a day after it left Sydney, the ship developed a fault in its propulsion system, forcing it to return to Sydney for ...
  55. [55]
    Signs of premature ageing found on HMAS Choules
    Sep 24, 2012 · As ADM has reported HMAS Choules suffered a defect while on her way to Queensland to support Exercise Hamel causing her to return to Sydney.
  56. [56]
    Technical Presentation: HMAS Choules – Capability Assurance ...
    Jul 5, 2023 · The installed wet exhausts inherit issues, with the water feed pipes being thick-walled mild steel and having corrosion problems after 12 years ...
  57. [57]
    Australia's HMAS Choules undergoes trials following maintenance
    Mar 27, 2023 · The oyal Australian Navy (RAN) is carrying out trials of the Bay-class landing ship HMAS Choules, following an extended maintenance period.Missing: problems | Show results with:problems
  58. [58]
    RFA Lyme Bay begins refit, leaving the UK with just one active ...
    Jun 27, 2025 · It was in january 1862, the Frenchies wanted to build modern cruise ships, but they lack technology, so they called John Scott, one of the best ...
  59. [59]
    RFA Mounts Bay gets some TLC - UK Defence Journal
    Apr 12, 2023 · RFA Mounts Bay is undergoing maintenance and refurbishment in Falmouth. With a unique view from below the waterline, the ship's azimuth pods and ...
  60. [60]
    Bay-class landing ship - Wikipedia
    The Bay class is a ship class of four dock landing ships built for the British Royal Fleet Auxiliary (RFA) during the 2000s.RFA Lyme Bay · RFA Cardigan Bay · RFA Mounts Bay · Multi-role strike ship
  61. [61]
    Development of Royal Navy amphibious vessels - Parliament UK
    Feb 1, 2018 · 120 The Bay class are Royal Fleet Auxiliary ships, rather than warships of the Royal Navy, and are largely crewed by civilian RFA personnel. As ...
  62. [62]
    Royal Australian Navy commissions HMAS Choules - defenceWeb
    Dec 14, 2011 · The Royal Australian Navy has officially commissioned the HMAS Choules Landing Ship Dock (LSD), which was originally commissioned into ...
  63. [63]
    HMAS Choules - Large Strategic Sealift - GlobalSecurity.org
    May 20, 2012 · On 17 March 2011 Reuters News Agency reported that Australia had purchased RFA Largs Bay from the UK as a replacement for HMAS Tobruk.
  64. [64]
    HMAS Choules | Sea Power Centre - Royal Australian Navy
    ADFS Choules arrived in Western Australia in December 2011, and was commissioned as HMAS Choules on 13 December 2011. The ship is named after the late Chief ...
  65. [65]
    The Albion class are gone, let's move on - UK Defence Journal
    Dec 5, 2024 · The three Bay-class Landing Ship Dock vessels and RFA Argus will continue to provide critical support, ensuring the Royal Marines can ...
  66. [66]
  67. [67]
    Six new amphibious warships to be built for Royal Marines operations
    May 14, 2024 · The new Multi Role Support Ships (MRSS) will replace HMS Albion and HMS Bulwark, the Royal Navy's current amphibious flagships which will remain ...
  68. [68]
    Royal Navy will iron out MRSS concept by mid-2025
    Jan 9, 2025 · “The Multi-Role Support Ship design will need to incorporate the twin needs of enabling an initial amphibious landing and supporting an extant ...
  69. [69]
    Royal Navy to get six replacement amphibious ships - Baird Maritime
    May 20, 2024 · The Royal Navy has unveiled plans to acquire six examples of a new type of amphibious ship to support Royal Marines Commando operations.
  70. [70]
    Royal Navy's Multi-Role Strike Ship not due until 2033 at the earliest
    Dec 6, 2024 · Until then, the Royal Fleet Auxiliary's three Bay-class landing ship docks will fulfill the role of amphibious support vessels, although ...
  71. [71]
  72. [72]
    New Details Emerge on Australia's Future Joint Support Ship
    May 13, 2022 · – Design, development and acquisition of two Australian-built multi-role sealift and replenishment vessels to replace HMAS Choules. This will ...
  73. [73]
    With the surface fleet review locked in, what about the rest of the ...
    Feb 27, 2024 · Moving to the other arm of Australia's amphibious warfare/sealift capability, the HMAS Choules is scheduled to be replaced by two sealift ships ...
  74. [74]
    Navy landing ship dock HMAS Choules fitted with Canberra firm's ...
    Mar 26, 2024 · The Royal Australian Navy's landing ship dock (LSD) amphibious support vessel HMAS Choules has been fitted with CEA Technologies' CEAFAR radar arrays.
  75. [75]
    Team effort to keep ship running smoothly - Defence
    Nov 11, 2024 · Petty Officer Benjamin Ayliffe monitors vessel power health on board HMAS Choules. Able Seaman Max Conder conducts his routine checks on board ...