Fact-checked by Grok 2 weeks ago

Length overall

Length overall (LOA) is the maximum length of a vessel's , measured parallel to the from the extreme forward end to the extreme end. In some regulatory or operational contexts, such as for certain fishing vessels, non-essential protrusions like bowsprits, rudders, or brackets may be excluded. In , LOA is a key principal dimension used to describe a ship's , often measured in feet or meters. LOA plays a critical role in various practical applications, including and berthing, where it provides a more relevant figure than other length metrics like for determining space requirements at ports. It is also essential for regulatory purposes, such as in international maritime identification schemes by the (), which apply to with an LOA of 12 meters or more authorized to operate beyond national waters. Additionally, LOA serves as a fundamental parameter for ship classification, stability assessments, and operational planning, influencing factors like marina berthing costs and identification at sea.

Overview

Definition

Length overall (LOA), also denoted as o/a or , is the maximum length of a vessel's measured parallel to the from the foremost fixed point, such as the , to the aftermost fixed point, such as the . This measurement includes fixed protrusions like bowsprits and rudders that form integral parts of the hull structure, but excludes removable or non-structural fittings such as flagpoles, outboard motors, or dinghies. It represents the total extreme fore-to-aft dimension along the centerline, capturing the vessel's full spatial extent for practical purposes in design and operation. The measurement is typically taken with reference to the designed load waterline, which corresponds to the vessel's under normal operating conditions, unless otherwise specified for particular assessments. This ensures consistency in evaluating the vessel's proportions relative to its intended load and performance. In international contexts, LOA is expressed in meters following ISO standards for small craft and maritime conventions, while imperial units like feet are used in U.S. customary practices.

Importance in naval architecture

In naval architecture, the length overall (LOA) plays a pivotal role in defining the hull form, directly influencing hydrodynamic efficiency and wave resistance. A longer LOA enables a more slender hull shape, which reduces the wave-making resistance by allowing the vessel to generate longer, less disruptive waves relative to its speed, as quantified by the Froude number (Fn = V / √(g × L)), where longer lengths lower Fn for a given velocity, minimizing energy loss to wave formation. For instance, in computational models of cargo ships, extending LOA from 55 m to 75 m while maintaining beam and draft reduced the resistance coefficient from 0.0236 to 0.0120, underscoring LOA's primacy in optimizing hull forms for reduced drag in calm waters. The impact of LOA on is significant, particularly through its interaction with and (). Longer LOA generally permits greater and overall for a given , which can enhance transverse by increasing the of the waterplane; however, the effect on varies across loading conditions due to redistributed , as observed in simulations. In full-load conditions, increased slightly from 2.507 m at 55 m LOA to 2.513 m at 75 m LOA. Conversely, in or states, longer LOA boosts (e.g., from 7.655 m to 7.763 m), improving initial against rolling motions. This dual effect highlights LOA's role in balancing across loading conditions, where excessive length without proportional adjustments could compromise righting moments in waves. In design considerations, LOA serves as a foundational parameter for sizing capacity, accommodations, and requirements. It directly scales volumetric , with rising linearly—e.g., from 2,426 tons at 55 m LOA to 3,308 tons at 75 m LOA—allowing for larger holds or compartments while influencing the layout of quarters amidships for and . power needs are also tied to LOA, as longer hulls exhibit lower resistance per unit , reducing required effective power (e.g., from 386 kW at shorter lengths to 366 kW at extended LOA for equivalent speeds), though this must account for increased structural weight. Compared to other dimensions, LOA represents the primary "headline" metric for a vessel's overall , contrasting with , which governs width-related and form drag via the length-to- (L/B) ratio—higher L/B ratios (e.g., >7 for ships) reduce but may necessitate wider beams for adequate . , meanwhile, addresses vertical immersion and , but LOA integrates these by setting the longitudinal framework for total volume and hydrodynamic profile, ensuring holistic design coherence.

Measurement methods

Length overall (LOA)

Length overall (LOA) is defined as the maximum length of a vessel's , measured as the between the forward-most point, typically the head, and the after-most point, such as the post or , parallel to the . This captures the total external extent of the in a straight line, ensuring it reflects the vessel's full structural footprint for practical applications like . The procedure involves identifying the extreme points on the and measuring the between them, parallel to the , independent of load or variations. Inclusions in LOA encompass fixed structural elements that define the hull's extremities, such as skegs. For sailing vessels, an integral bowsprit may be included if it forms part of the hull structure. These elements are incorporated because they contribute to the vessel's overall operational profile and cannot be detached without altering the hull structure. Exclusions include bowsprits, rudders, outboard motors, motor brackets, handles, and other fittings or extensions, as well as removable or non-structural items such as dinghies, booms, and antennas, particularly for recreational vessels. Measurement standards vary by jurisdiction and vessel type; for example, recreational vessels under USCG guidelines exclude bowsprits and rudders, while commercial ships per IMO include fixed hull extremities. Common tools for measuring LOA include tape measures for smaller vessels, laser rangefinders for precision over distances, and CAD software during or verification phases, with accuracy typically maintained to within 0.1% for large commercial ships to ensure . Physical measurements are often cross-verified against design plans using equipment to account for any protrusions. Unlike length at (LWL), which fluctuates based on and load, LOA provides a constant metric unaffected by operational changes. Variations in LOA measurement occur by vessel type; for designs like catamarans, the is determined by the longest individual hull to represent the primary structural extent. For ships featuring overhangs at the bow or , such as bulbous bows or extended transoms, these are fully included in the total to capture the complete horizontal span.

Length at waterline (LWL)

The length at waterline (LWL) is defined as the length of a 's measured along the under designed load conditions, specifically from the points where the hull intersects the waterline at the bow and . This measurement is taken parallel to the designed summer load waterline, representing the immersed portion of the hull when the vessel is at its specified maximum draft. LWL is the length of the along the designed summer load , measured as the from the forwardmost point where the hull intersects the waterline at the bow to the aftmost point at the . This geometric measurement accounts for the hull's molded surface and excludes any external fittings or protrusions above the water. In practice, LWL is often shorter than the length overall (LOA) because it does not include bow flares, stern overhangs, or other extensions beyond the waterline intersections. Note that LWL differs from (LBP), which is the straight distance between defined forward and after perpendiculars. The actual LWL varies with changes in draft, trim, and heel as the vessel loads or unloads, altering the position of the waterline relative to the . For instance, increased raises the waterline, potentially lengthening the effective LWL, while variations in trim can shift the measurement forward or . In design, a fixed LWL value is established at the summer load waterline for predicting hydrodynamic performance, , and , providing a standardized despite operational variability. This fixed LWL serves as the basis for estimating a displacement hull's theoretical maximum speed, known as , approximated by the formula: V \approx 1.34 \sqrt{\text{LWL (in feet)}} where V is in knots; this empirical relation highlights LWL's role in limits.

Length between perpendiculars (LBP)

The (LBP), also denoted as LPP, is defined as the horizontal distance measured along the summer load between the forward perpendicular and the after perpendicular. This measurement provides a consistent structural benchmark in , focusing on the primary extent at the vessel's design load condition. The forward perpendicular is established as the vertical line intersecting the forward side of the stem with the summer load waterline, marking the bow's reference point. The after perpendicular is the vertical line through the after side of the rudder post or, if no rudder post exists, through the centerline of the rudder stock. These perpendiculars ensure precise placement for engineering calculations, emphasizing the load-bearing frame rather than external protrusions. LBP functions as a key standard for tonnage calculations, stability assessments, and comparing vessels of similar design, enabling engineers to evaluate hydrodynamic performance and structural integrity without variability from appendages. It is typically 2-5% shorter than the length overall (LOA), excluding bow and stern overhangs that extend beyond the perpendiculars. Additionally, LBP informs load line regulations by serving as the basis for determining the assigned length in international conventions. This convention originated from 19th-century practices, where perpendiculars were adopted to standardize framing, ensure uniform load distribution, and provide a reliable indicator of a 's by focusing on the usable length.

Length on deck (LOD)

on deck () refers to the length of a measured along the from the bow to the , excluding removable spars such as bowsprits, overhanging rudders, or other non-structural appendages. This measurement focuses on the primary surface, providing a practical of the usable onboard space without accounting for extensions that do not contribute to the core structure. In yacht design, is particularly valued for its emphasis on the enclosed and functional areas of the . The measurement of is taken from the inside face of the at the forward end of the deck to the edge of the transom at the end, following a line parallel to the . This approach ensures by aligning with the deck's centerline and avoiding distortions from curved or overhanging elements. For classic and small vessels, such as wooden or traditional designs, this method standardizes comparisons by disregarding temporary or removable features that could inflate overall dimensions. LOD differs from length overall (LOA) by excluding protrusions beyond the deck edges, resulting in a shorter figure that better reflects the vessel's intrinsic size; for instance, in a gaff-rigged sloop, it omits the extending end of the boom. This distinction is especially relevant in sailing yachts, where appendages like bowsprits can significantly extend LOA but do not affect deck usability. In the context of small craft, LOD often aligns closely with the Length of Hull (LH) specified in ISO 8666, which applies to recreational boats up to 24 meters and excludes removable parts for standardized principal dimensions.

Applications and regulations

Docking and maneuvering

In port operations, the length overall (LOA) of a is a critical parameter for determining berth length requirements, as it directly influences the space needed for safe . Typically, berth designs incorporate a minimum clearance of 10% of the vessel's LOA to allow for proper alignment and securing, ensuring that the infrastructure can accommodate the ship's full extent without overhang risks. For larger vessels, such as those exceeding 370 meters in LOA, additional from adjacent berths may be required to prevent operational disruptions. LOA also dictates the dimensions of turning basins and locks essential for maneuvering into position. Turning basins are sized to provide a minimum of at least 1.2 times the design ship's LOA, enabling safe rotation without grounding or collision. Similarly, lock chambers are engineered based on maximum LOA to fit the vessel's , with the overall length serving as the primary constraint for transit through inland waterways or canals. During maneuvering, the LOA affects the location of the ship's pivot point, which typically lies approximately 25-33% of the LOA forward from the bow when the is . This positioning influences the ship's response to external forces, such as those from tugs or bow thrusters, requiring pilots to adjust tactics for effective turning and approach. Regulations emphasize margins beyond the LOA to account for fenders and lines, often mandating 10-20% additional space along the berth to absorb impacts and secure lines without straining infrastructure. For instance, supertankers with LOA over 300 meters, such as ultra large crude carriers (ULCCs) reaching up to 380 meters, necessitate specialized terminals like those in the , which feature extended berths and enhanced fender systems to handle their scale. Longer LOA vessels face heightened environmental challenges during berthing, as their increased windage area—proportional to the ship's and —amplifies vulnerability to crosswinds and currents, potentially causing drift or misalignment. This susceptibility demands precise coordination with tugs and consideration of load line-related for in variable conditions.

Classification and load lines

Classification societies, such as , incorporate length overall (LOA) into their classification processes to determine the applicability of rules and assign appropriate notations. For instance, the society's rules for special service craft, including yachts, apply to vessels with an LOA of 24 meters or greater, influencing notations related to design, construction, and operational standards. LOA also factors into survey intervals, as larger vessels based on this dimension typically require more frequent or comprehensive inspections to maintain . Under the International Convention on Load Lines 1966 and the Safety of Life at Sea (SOLAS) Convention, vessels with an LOA exceeding 24 meters—constructed on or after 21 July 1968—are subject to mandatory load line requirements for international voyages. These conventions mandate the assignment and marking of load lines to ensure adequate freeboard, with freeboard calculations primarily based on length between perpendiculars (LBP) but cross-verified against LOA to confirm overall dimensional compliance and prevent overloading. SOLAS Chapter II-1 integrates these load line provisions to align with broader stability and subdivision standards. In tonnage measurement, LOA contributes to the (GT) formula under the 1969 International Convention on Tonnage Measurement of Ships, where GT = × V and V represents the total moulded volume of enclosed spaces derived from the vessel's principal moulded dimensions, including those informed by LOA. This ensures that LOA-related overall dimensions accurately reflect the ship's volumetric for regulatory purposes like port dues and certification. Regional regulations further emphasize LOA in vessel certification. The U.S. employs LOA in stability assessments for small passenger vessels under 46 CFR Subchapter T, such as in simplified stability proof tests that use LOA to evaluate , , and operational for vessels under 100 gross tons. In the , Directive 2013/53/EU on recreational craft ties LOA—measured as hull length—to CE marking categories (A through D), applying to craft between 2.5 and 24 meters and determining , buoyancy, and seaworthiness requirements based on length-specific criteria. Post-1980s amendments to the Convention for the Prevention of Pollution from Ships ( have extended mandatory protections to tankers of 5,000 deadweight tons (DWT) and above, through requirements for and phase-out schedules for single-hull designs based on age and DWT.

Historical development

Early measurements

The measurement of ship lengths in ancient times relied on rudimentary units and approximations, often tied to human-scale references or functional elements rather than precise engineering. In , vessels were commonly assessed using the , a standard unit approximately 52.3 cm long derived from measurements, with larger ships described in texts as spanning 120 cubits (about 62.8 meters) in . Similarly, warships like the were estimated by oar counts, with 170 oars indicating a hull of roughly 35-37 meters, as inferred from naval inventories and archaeological evidence of slips. These methods provided rough approximations of overall for and operation but lacked uniformity, serving primarily for trade, warfare, and ritual purposes. During the age of sail in the 17th and 18th centuries, European shifted toward more structured metrics centered on the , which formed the ship's structural backbone. length was typically measured from the rabbet line at the to the after rabbet of the post, excluding ornamental extensions like the or taffrail, and served as a foundational for calculations and design. This approach, documented in treatises such as those by W. Sutherland in 1717, emphasized proportional relationships between length and for , acting as a precursor to later perpendicular-based measurements while prioritizing the submerged over total extent. Such practices facilitated consistent scaling for and vessels but often understated overall length due to varying bow and stern configurations. In the 19th century, the advent of ironclads prompted the British Royal Navy to adopt length overall (LOA) as a key metric to account for extended hull forms and propulsion changes, marking a departure from keel-centric traditions. For instance, HMS Warrior, launched in 1860 as the Navy's first seagoing ironclad, was recorded with an LOA of 128 meters, reflecting the full span from stem to sternpost to better evaluate speed and armament placement. This shift aligned with broader naval documentation emphasizing extreme dimensions for comparative analysis amid rapid technological evolution. Concurrently, the Merchant Shipping Act of 1876, driven by Samuel Plimsoll's advocacy, formalized load lines linked to vessel dimensions including length, mandating marks at midship to ensure freeboard of at least 3 inches per foot of hold depth, thereby tying safe loading directly to overall size assessments. Plimsoll, a Member of Parliament and author of Our Seamen (1873), highlighted overloading risks through public campaigns and parliamentary testimony, exposing "coffin ships" where excessive cargo compromised stability based on inaccurate length and capacity evaluations. These early methods, however, bred inconsistencies that fueled disputes in international trade and insurance. Tonnage formulas varying by port—such as London's rule of (length × breadth × depth)/94—often incentivized owners to under-report dimensions to minimize tonnage-based fees and taxes, leading to legal challenges and higher premiums when discrepancies emerged during claims. For example, 18th- and 19th-century records show systematic variations across British and colonial sources, exacerbating fraud in marine policies where underwriters contested vessel values tied to inaccurate dimensions. Plimsoll's reforms addressed these by standardizing load assessments, paving the way for later international agreements.

Modern standardization

The (IMO) has established key conventions for standardizing length overall (LOA) measurements in modern maritime regulations, particularly for larger vessels. The International Convention for the Safety of Life at Sea (SOLAS), 1974, specifies minimum standards for ship construction and operation, incorporating length definitions that align with LOA for vessels exceeding 24 meters in length to ensure safety and stability compliance. Complementing this, the 1988 Protocol to the , 1966, refines measurement protocols by defining the regulatory length as 96 percent of the total length on the at 85 percent of the least molded depth from the , providing a standardized basis derived from LOA for load line assignments on ships over 24 meters. These conventions integrate with the International Towing Tank Conference (ITTC) recommended procedures for hydrodynamic model testing, where LOA serves as a reference dimension in scaling models for performance predictions in and maneuvering assessments. For smaller vessels under 24 meters, the (ISO) standard 8666:2020 outlines principal data for small craft, explicitly defining LOA as the maximum horizontal length of the excluding appendages like pulpits, bowsprits, and swim platforms, while distinguishing it from length of (LOH) and length (LOD) to support design, certification, and performance evaluations in recreational and light commercial applications. In the United States, Title 46 of the (46 CFR) adopts LOA as the horizontal distance between the foremost and aftermost points on the for vessel , calculations, and inspected vessel requirements. The U.S. further adapts this for load line purposes by using 96 percent of the at 85 percent molded depth, ensuring alignment with international norms while accounting for operational safety in domestic and foreign voyages. Technological advancements since the 1990s have enhanced the precision of LOA verification in shipyards and surveys. The adoption of (GPS) technology, combined with early 3D systems developed in the mid-1990s, allows for non-contact, high-accuracy measurements of vessel dimensions during construction and retrofitting, reducing errors associated with manual taping and improving compliance with regulatory standards. To promote global consistency for , the Conference on Trade and Development (UNCTAD) and issue guidelines through annual Reviews of Maritime Transport, emphasizing harmonized length measurements; updates in the , including the 2021 regulatory scoping exercise for Maritime Autonomous Surface Ships (MASS), incorporate LOA considerations to adapt conventions for emerging autonomous technologies without altering core definitions.

References

  1. [1]
    [PDF] Length Overall Regulatory Impact Review
    Length overall (LOA) of a vessel means the horizontal distance, rounded to the nearest foot, between the foremost part of the stem and aftermost part of the ...Missing: architecture | Show results with:architecture
  2. [2]
    Boats for Beginners - Navy Ships - Military Analysis Network
    Jun 7, 2000 · A ship�s Length Overall [LOA] is measured in feet and inches from the extreme forward end of the bow to the extreme aft end of the stern.
  3. [3]
    IMO Identification Number Schemes
    ... length overall (LOA) authorized to operate outside waters under the national jurisdiction of the flag State, with the exception of the following: ships ...
  4. [4]
  5. [5]
    [PDF] INTERNATIONAL STANDARD ISO 8666
    Jul 1, 2016 · This length includes all structural and integral parts of the craft, such as stems or sterns, bulwarks, and hull/deck joints. This length ...
  6. [6]
    Length Overall (L.O.A.) Of a Vessel Definition - Law Insider
    Length Overall (LOA) Of a Vessel means the extreme fore-to-aft measurement in feet and inches in a straight line along the centerline.
  7. [7]
    Ship Construction - General Cargo Vessel - The Nautical Site
    The length between perpendiculars and the length overall difference is mostly due to the rake forward. ... Length on the designed load waterline. This is ...
  8. [8]
    [PDF] Basic principles of ship propulsion
    This paper will explain the most elementary terms used regarding ship types, dimensions and hull forms, and clarify some of the parameters pertaining.
  9. [9]
    (PDF) Design Optimization in Shipbuilding: A Computational ...
    Aug 26, 2025 · Using Maxsurf software, this study examines the impact of incremental changes in ship length on stability and speed by collecting data from ...
  10. [10]
    3 Hydrodynamics in Ship Design - The National Academies Press
    The discussion will address five important areas: wave pattern, wave resistance, wake/local flow, viscous resistance and propeller/hull interaction. 3.1 Wave ...
  11. [11]
    Understanding The Beam Of A Ship - Marine Insight
    Nov 17, 2022 · For instance, length can be further segregated as Length Overall (LOA), Length Between Perpendiculars (LBP), and Length of Waterline (LWL).Missing: precise | Show results with:precise
  12. [12]
    [PDF] THE DESIGN RATIOS | Eric Sponberg
    The dimensions of the box are the Beam at the Waterline at the largest section, Bwl, and the Draft at that section, Do. The largest section area may not be at ...
  13. [13]
  14. [14]
    [PDF] Ship-Construction-7th-Edition.pdf
    Length Overall (LOA): Length of vessel taken over all extremities. Lloyd's Length: Used for obtaining scantlings if the vessel is classed with Lloyd's Register.
  15. [15]
    [PDF] Principles of Ship Performance Course Notes - Naval Academy
    The length between perpendiculars has the symbol “LPP.” Engineers typically use the LPP for calculations. There is also an overall ship length “LOA” that.
  16. [16]
    Measuring Length Overall - Boat Ed
    Length overall is measured from the tip of the bow in a straight line to the stern of the vessel.
  17. [17]
    Different Types of Measuring Tools and Gauges Used on Ships
    Feb 22, 2019 · Different precision measuring tools are present in ship such as vernier callipers, Micrometer, feeler gauges, american wire gauge,awg, ...
  18. [18]
    Clarifying “hull length” measurement as per the Fishing Vessel ...
    Nov 3, 2022 · Additionally, for a multihull vessel, measure the length of each hull individually, then use the longest individual measurement for the hull ...<|control11|><|separator|>
  19. [19]
    [PDF] Definitions, principal dimensions - Elsevier
    Naval Architecture is that branch of engineering which embraces all aspects of design, research, developments, construction, trials. Page 2. 2 Ship Hydrostatics ...<|control11|><|separator|>
  20. [20]
    Length Water Line Definition and Examples - PredictWind
    Feb 27, 2025 · The Length Water Line (LWL) is a crucial measurement in the maritime and sailing world, referring to the length of a vessel at the waterline. ...
  21. [21]
    Ship Dimensions Guide: Principal Measurements & Design
    ▻ Length Overall (LOA) represents maximum horizontal stem-to-stern distance ▻ Length on Waterline (LWL) spans waterline intersection points at summer load
  22. [22]
    Design Waterline - an overview | ScienceDirect Topics
    • The length on the waterline (LWL or LWL) is the length on the waterline, at which the ship happens to be floating between the intersections of the bow and ...Missing: variability | Show results with:variability
  23. [23]
  24. [24]
    46 CFR Part 170 -- Stability Requirements for All Inspected Vessels
    (2) Length overall (LOA) means the horizontal distance between the forward-most and after-most points on the hull. (3) Length on the waterline (LWL) means ...
  25. [25]
    [PDF] Principles of Ship Performance Course Notes - Naval Academy
    Length Between Perpendiculars (LPP or LBP) and Length Overall (LOA) c. Keel ... L = length of ship or model (ft) (LPP, LBP, or LWL). Another common ...
  26. [26]
  27. [27]
    Passenger Weight and Inspected Vessel Stability Requirements
    Mar 25, 2011 · (1) Length between perpendiculars (LBP) means the horizontal distance measured between perpendiculars taken at the forward-most and after-most ...
  28. [28]
    The Project Gutenberg eBook of Two Centuries of Shipbuilding by ...
    The nineteenth century brought every incentive to the development of shipbuilding. ... In 1816 the firm built the Shannon, of a length between perpendiculars of ...
  29. [29]
    Essential Yacht Design Calculations and Data - Kasten Marine Design
    LENGTH: When referring to a boat's length, it is the "Length on Deck" that is of interest, since that defines the length of the enclosed and presumed to be ...
  30. [30]
    How to choose a boat - yacht measurements explained
    LOA is the overall designed length of the hull and excludes things like ... This is the length of the yacht at the waterline, measured along the centreline.
  31. [31]
    Yacht Design - Ted Brewer
    Length On Deck (LOD) is the true length, omitting rail overhangs, and is the honest way to describe the length of a boat. More usually, you will see it as ...Missing: naval architecture
  32. [32]
    Length - M.B. Marsh Marine Design |
    Length overall (LOA). The length from the forward tip of the stem to the aftmost point on the hull. · Length waterline (LWL) · Length between perpendiculars (LPP).
  33. [33]
    The long and short of boat length - Classic Boat Magazine
    May 3, 2017 · The old definition, and the one used by Lloyd's is length overall EXCLUDING protruding spars. The new definition is more literal (the modern ...<|control11|><|separator|>
  34. [34]
    Yacht Types And Sizes - YachtOwner.co
    Length of Deck (LOD): deck length excluding bow sprits and other projections. Makes particular sense for sailing boats, since their Length Overall can ...
  35. [35]
    Chapter 7.5 – Cruise Terminal Design and Equipment
    The berth area length required for safe mooring and securing the vessel allows for a minimum clearance of 10% of the vessel's overall length (LOA). Where ...
  36. [36]
    [PDF] The Complete Berthing Guidelines for Port of Hong Kong
    For vessels of LOA>370m, 35 metres are required. 2. Berthing of ships with LOA exceeding berth length requires an extra length of quay front from adjacent berth ...
  37. [37]
    [PDF] Hydraulic Design of Deep-Draft Navigation Projects
    May 31, 2006 · Size. (1) The size of the turning basin should provide a minimum turning diameter of at least. 1.2 times the length of the design ship where ...
  38. [38]
    [PDF] DESIGN MANUAL | Port Technology
    LBP. Length of ship between perpendiculars m. LS. Overall length of smallest ship using the berth m. LWL. Length of ship hull at waterline at laden draft m. MB.<|control11|><|separator|>
  39. [39]
    What Is The Pivot Point Of A Vessel? - Marine Insight
    Mar 12, 2024 · When the vessel moves ahead (V/L >0): The pivot point shifts forwards and is roughly located around 1/3rd or 1/4th distance from the bow, as ...Missing: percentage | Show results with:percentage
  40. [40]
    [PDF] The Impact of Mega-Ships - International Transport Forum (ITF)
    The overall length. (LOA) of the largest container ship is 400 metres, this is longer than the maximum length of current tankers (380 m), bulk carriers (362 m) ...
  41. [41]
    Advances in Navigability and Mooring - MDPI
    Sep 10, 2024 · The size of these vessels means they have a larger windage area, making them more susceptible to wind forces [4]. Additionally, tidal currents ...Missing: LOA | Show results with:LOA
  42. [42]
    Classification of Special Service Craft | LR - Lloyd's Register
    Jul 1, 2025 · Yachts of overall length, LOA, 24 metres or greater. Craft with a draught-to-depth ratio less than or equal to 0,55. In addition, the ...
  43. [43]
    [PDF] msn-073-load-lines-convention.pdf - Isle of Man Ship Registry
    Dec 18, 2020 · if constructed on or after 21 July 1968, is 24 metres or more in length; or. • if constructed before 21 July 1968, is 150gt or more. The ...
  44. [44]
    International Convention on Load Lines
    The main purpose of these measures is to ensure the watertight integrity of ships' hulls below the freeboard deck. All assigned load lines must be marked ...
  45. [45]
    International Convention on Tonnage Measurement of Ships
    The gross tonnage is a function of the moulded volume of all enclosed spaces of the ship. The net tonnage is produced by a formula which is a function of the ...
  46. [46]
    L_2013354EN.01009001.xml - EUR-Lex - European Union
    Originally, Directive 94/25/EC covered only recreational craft of a minimum hull length of 2,5 m and a maximum length of 24 m.Missing: LOA | Show results with:LOA
  47. [47]
    Construction Requirements for Oil Tankers - Double Hulls
    In 1992 MARPOL was amended to make it mandatory for tankers of 5,000 dwt and more ordered after 6 July 1993 to be fitted with double hulls, ...
  48. [48]
    [PDF] Ancient Egyptian Materials And Technology
    Nov 4, 2024 · # Surveying and Measurement - Egyptians developed a cubit rod, approximately 52.3 cm in length, as a standard unit of measurement. - Use of ...
  49. [49]
    [PDF] The Boat Beneath the Pyramid - Harvard University
    The marks apparently include references to measurements in cubits (the ancient Egyptian cubit was the equivalent of 52.3 cm), as well as the royal cartouche ...
  50. [50]
    [PDF] The archaeology of ships of war in the ancient Mediterranean
    The trireme is the most extensively studied class of ship from the ancient world ... of the Greek fleet at Salamis): each trireme fitted with 170 oars, and extras ...Missing: measurements | Show results with:measurements
  51. [51]
    (PDF) Ancient Greek Warship, 500-322 BC - Academia.edu
    ... of a trireme is known from the Naval Inventories to be 31. With a Doric cubit equivalent to 49cm (19in.), the length of the rowing area of the ship was ...
  52. [52]
    [PDF] THE STRUCTURES OF ENGLISH WOODEN SHIPS
    Once the keel stem, sternpost and associated structures were set square and well-shored, the shipwright began to lay the floors across the keel (see Figure 5).
  53. [53]
    [PDF] ILLUSTRAIED GLOSSARY OF SHIP AND BOAT TERMS
    The aftermost piece of a rudder. Back rabbet (Fig. G-4c). The upper surface of a keel rabbet or the nesting surface of ...
  54. [54]
    17th Century Ship Design and the Sovereign of the Seas (1637)
    Jun 20, 2024 · The Treatise tells us that the length of the keel should be 25/9 of the breadth, so it would have the Sovereign's keel be approximately 128 feet ...Samuel 1650 – a Dutch mid-17th century trader | Page 3English ship design ca. 1600 – Mediterranean legacy | Page 2More results from shipsofscale.com
  55. [55]
    Royal Navy - Ironclads 1861 - Naval-History.net
    Sep 16, 2015 · In June 1861, the Navy List records the names of four frigates then fitting out for service which became the first sea-going ironclad ...
  56. [56]
    Warrior class Ironclad (1860) - Naval Encyclopedia
    Oct 19, 2024 · HMS Warrior and Black Prince were the world's first all-iron built capital ships, and sea-going broadside Ironclad built 1859-62.<|separator|>
  57. [57]
  58. [58]
    The Plimsoll Line | Learn & Explore - Heritage & Education Centre
    In 1876 the Merchant Shipping Act made load lines compulsory on all British vessels and on foreign vessels using British ports. However, the act was flawed ...Missing: length sources
  59. [59]
    Samuel Plimsoll and ship safety | Royal Museums Greenwich
    The Merchant Shipping Act of 1876 made load lines compulsory, but it wasn't until 1894 that the position of the line was fixed by law. In 1906, foreign ships ...
  60. [60]
    Samuel Plimsoll's Merchant Shipping Act (1876) - The Victorian Web
    Aug 13, 2002 · The Act required a series of 'lines' to be painted on the ship to show the maximum loading point. Unfortunately, the Act allowed the shipowners ...Missing: length sources
  61. [61]
    Rules for the Calculation of Tonnage and Their History | Proceedings
    It is termed “ A rule to know the burden of a ship: length of keel, 120 feet, breadth in beam, 40 feet; depths in hold, 20 feet; 40x20x 120=96,000 and 96,000÷ ...Missing: 18th | Show results with:18th
  62. [62]
    Tons and Tonnages: Ship Measurement and Shipping Statistics, c ...
    Technical loopholes in tonnage measurement have led to significant discrepancies in reported shipping capacities. ... The Troubled History of the Moorsom ...Missing: insurance | Show results with:insurance
  63. [63]
    Tons, Tonneaux, Toneladas, Lasts - OpenEdition Journals
    Eighteenth-century ship tonnages were imprecise and unstandardized. Comparisons across British sources show considerable variation, both systematic and ...Missing: inconsistencies | Show results with:inconsistencies
  64. [64]
  65. [65]
  66. [66]
    46 CFR 170.055 -- Definitions concerning a vessel.
    ### Definition of Length Overall (LOA)
  67. [67]
    The Early Days of 3D Scanning, Part 3: Cyra Unleashed - xyHt
    Aug 6, 2020 · Geoff Jacobs' oral history of the development of surveyors' 3D scanning technologies, covering Cyra between 1996 and 1997: a crucial place ...
  68. [68]
    Review of Maritime Transport 2020 - UNCTAD
    The Review of Maritime Transport 2020 provides an update on the latest trends in maritime trade, supply, markets, key performance indicators, and legal and ...
  69. [69]
    Autonomous shipping - International Maritime Organization
    In 2021 IMO conducted a regulatory scoping exercise on Maritime Autonomous Surface Ships that was designed to assess existing IMO instruments to see how they ...