Fact-checked by Grok 2 weeks ago

Chatham Main Line

The Chatham Main Line is a major railway route in southeast , connecting to the coastal towns of and via the towns and the north coast. Spanning approximately 124 kilometres to , the line passes through key stations including Bromley South, , Chatham, , and , and supports both commuter services to and leisure travel to seaside destinations. Fully electrified with 750 V DC , it is operated by Southeastern and forms a vital part of the route network managed by . Opened in sections during the mid-19th century by the London, Chatham and Dover Railway (LC&DR), the line originated from the East Kent Railway, incorporated in 1853 and renamed LC&DR in 1859 to expand services from London through Kent to Dover for continental traffic. The core Strood to Faversham segment opened in 1858, with extensions to London Victoria in 1860 and full connections to Dover by the 1860s, enabling direct steamer links across the Channel. The LC&DR operated independently until 1923, when it was grouped into the Southern Railway, and the route has since undergone significant upgrades, including electrification in the 1950s and integration with High Speed 1 services since 2009. Today, the Chatham Main Line forms part of Kent's busy network, which carries over 2,600 weekday trains, handling suburban, regional, and freight traffic, including imports via the and Thamesport. Southeastern provides frequent services using Class 375 and Class 465 electric multiple units, with journey times from London Victoria to around 95 minutes (fastest services) and to Dover Priory about 110 minutes. Recent investments, including a £1.35 billion upgrade plan from 2024, focus on capacity enhancements, accessibility improvements, and signalling renewals to support growing demand.

Route Description

Overview

The Chatham Main Line is a major railway route in , linking with and Dover Priory via the towns, including key locations such as Chatham and . Spanning approximately 109 km to , the line serves as a vital corridor for commuter, regional, and coastal passenger traffic across and north . It was originally constructed in the by the London, Chatham and Dover Railway to facilitate trade and travel to the southeast coast. Primary operations on the line are handled by Southeastern, which manages most suburban and mainline services, alongside for cross-London routes. The infrastructure supports a mix of high-speed express trains and stopping local services, accommodating diverse passenger needs from urban commuters to holiday travelers. The line uses standard gauge track of 1,435 mm throughout, consistent with the British railway network. It is fully electrified with a 750 V DC system, enabling efficient operations. Maximum permitted speeds reach 90 (145 /h) on principal sections, balancing capacity and journey times.

Stations

The Chatham Main Line features a series of stations serving , , and coastal destinations, with services operated primarily by Southeastern. The route originates at , a major terminus handling Southeastern trains on platforms 1 to 8 out of the station's total 19 platforms. From there, the line progresses southeast through suburban and rural areas before reaching the branch point at , where paths diverge to either via the north Kent coast or Dover Priory via Canterbury East. Stations along the route offer varying amenities, including platform lengths accommodating up to 12-car trains at key interchanges, car parking for commuters, and connections to local buses and other rail lines. Key stations include Chatham, a significant interchange point with the Medway Valley Line for services to and , featuring multiple platforms and step-free access. , rebuilt in 2015 as part of a £26 million project, now includes three extended platforms capable of handling 12-car trains, enhancing capacity for London-bound services. St Mary Cray provides parking for over 30 vehicles, supporting commuters on faster services toward . Rainham serves as an occasional terminus for services extending from , with facilities including cycle storage and bus links. At the branches, acts as the critical junction where trains split, offering interchanges with high-speed services from St Pancras International. Dover Priory connects directly to the ferry terminals, approximately 1 mile away via shuttle bus or taxi, facilitating travel to . The following table lists all stations in sequential order along the main line from London Victoria to Faversham, followed by the branches; this reflects typical all-stations patterns from Southeastern timetables. Amenities such as platforms and parking vary, with larger stations like Sittingbourne and Canterbury East providing extensive facilities including ticket offices and waiting rooms.
Station NameKey Features and Amenities
London VictoriaMajor terminus; 19 platforms total (Southeastern uses 1-8); full accessibility; integrated with Underground and buses.
Herne Hill4 platforms; step-free access; Thameslink interchange.
Bromley South4 platforms; major commuter hub; parking for 100+ vehicles; bus connections.
St Mary Cray2 platforms; car park (31 spaces); step-free to London-bound platform.
Swanley4 platforms; parking available; local bus links.
Farningham Road2 platforms; rural stop; limited parking.
Longfield2 platforms; commuter parking; cycle facilities.
Meopham2 platforms; largest village station; parking for 50 vehicles.
Sole Street2 platforms; rural; basic amenities.
Rochester3 platforms (rebuilt 2015 for 12-car trains); full accessibility; bus interchange.
Chatham3 platforms; major interchange with Medway Valley Line; parking; step-free.
Gillingham (Kent)3 platforms; shopping precinct nearby; bus and taxi links.
Rainham (Kent)3 platforms; Thameslink services; cycle parking; bus connections.
Newington2 platforms; limited facilities.
Sittingbourne4 platforms; key interchange; parking; integrated with bus station.
Teynham2 platforms; rural stop.
Faversham4 platforms; branch point for Ramsgate/Dover; high-speed connections; parking.
Branch to Ramsgate:
Station NameKey Features and Amenities
3 platforms; coastal access; cycle facilities.
Chestfield & Swalecliffe2 platforms; local stop.
3 platforms; seafront links; parking.
2 platforms; rural coastal.
2 platforms; parking available.
4 platforms; tourist hub; bus to beach.
3 platforms; Dickens connections; step-free.
Dumpton Park2 platforms; local.
5 platforms; Thameslink terminus; parking; bus to port.
Branch to Dover Priory:
Station NameKey Features and Amenities
Selling2 platforms; rural.
2 platforms; rural stop; heritage features.
Canterbury East3 platforms; city center access; bus links.
Bekesbourne2 platforms; limited.
Adisham2 platforms; rural.
Aylesham2 platforms; parking.
Snowdown2 platforms; basic.
Shepherd’s Well2 platforms; local.
Kearsney2 platforms; near river.
Dover Priory3 platforms; ferry port connections (1 mile away); taxi/bus shuttle; parking.
A side branch from serves the Isle of Sheppey: Kemsley (industrial), Swale (halt), Queenborough (2 platforms), and (3 platforms; port links). These stations primarily handle local services, with offering ferry connections across the estuary.

Operations

Passenger Services

The Chatham Main Line is primarily served by Southeastern, which operates the majority of passenger trains from Victoria to destinations in , including the Medway towns, , and Priory. provides additional through services on the southern portion of the line, connecting in to Rainham via Blackfriars and the Thameslink core. These operators deliver a mix of stopping, semi-fast, and fast patterns to cater to commuter, regional, and leisure travel demands. As of December 2024, Southeastern's core off-peak service patterns include two trains per hour (tph) on all-stations routes from Victoria to Gillingham, calling at intermediate stations such as Bromley South, , and . Another one tph operates as semi-fast services to via and East, while one tph runs semi-fast to Dover Priory, typically calling at fewer stations like Longfield, , and . During peak hours, frequencies increase to approximately two tph on the routes to both and Dover Priory to accommodate higher commuter volumes, with some additional services. integrates with the line by running two tph from to Rainham, diverging from the at and using the Chatham route southward to . Typical journey times on Southeastern services are approximately 45-50 minutes from London to Chatham, 90 minutes to Priory on semi-fast trains, and 100 minutes to (as of 2025). journeys from to Rainham take around 2 hours 20 minutes, providing a direct cross-London link without changing at . These times reflect standard semi-fast operations using 375 electric multiple units. Ticketing on the line supports pay-as-you-go options with cards and , valid for Southeastern and services within London Travelcard Zones 1-6, extending to stations up to Rainham. Beyond Rainham, passengers require paper tickets, boundary zone fares, or advance bookings for destinations like Gillingham, , or . Special services on the Chatham Main Line include seasonal enhancements during summer weekends, with additional trains to coastal destinations such as and to support tourism and events along the coast.

Rolling Stock

The rolling stock on the Chatham Main Line has evolved significantly since the line's opening, transitioning from to modern electric multiple units (EMUs) suited to the 750 V DC third-rail electrification system. Southeastern operates the primary fleet, consisting of Class 375 and Class 377 Electrostar EMUs, typically configured in 8- to 12-car formations for mainline services. As of late 2025, Southeastern has introduced 13 additional Class 377/1 units cascaded from other operators, enhancing capacity on Chatham Main Line routes. These units, built by Bombardier, offer seating capacities ranging from 340 to 473 passengers depending on the formation and subclass, with features including air-conditioning, onboard information systems, and accessibility provisions such as dedicated wheelchair spaces and priority seating. contributes to services on sections of the line with Class 700 Desiro City EMUs, also in 8- to 12-car sets, providing a high-capacity option with approximately 1,146 seats in the 8-car variant and enhanced accessibility through low-floor designs and universal toilets. Additionally, Southeastern's Class 465 and Class 466 Networker EMUs, in 8-car formations (with Class 466 units always paired with Class 465), continue to handle shorter suburban routes, though some Class 466 units were withdrawn in 2025; these feature slam-proof doors and capacities suited for commuter traffic. High-speed operations formerly relied more extensively on the Class 395 EMUs, which provided rapid connections from St Pancras International via before linking to the classic Chatham Main Line sections toward destinations; current usage is limited to specific paths and maintenance diversions. Maintenance for these EMUs is primarily handled at Slade Green depot, a key facility for Southeastern's fleet that supports stabling, cleaning, and heavy repairs for Classes 375, 377, 465, and 466. Historically, prior to in the and , the line relied on steam locomotives from the London, Chatham and Dover Railway (LCDR) era, including the M class tender engines designed by William Kirtley for express passenger duties and the R class tanks for suburban and branch services. After the 1899 formation of the (SECR), classes like the L class continued hauling mainline trains until the mid-20th century. The introduction of electric traction brought early EMUs such as the Southern Railway's 1925 SL/E stock (suburban electric units) for initial third-rail operations on the Eastern Section, marking the shift toward electric suburban services. The transition to modern rolling stock accelerated in the 1990s with the introduction of the , which systematically replaced aging slam-door stock like the , improving safety, reliability, and passenger comfort by the early 2000s. This upgrade paved the way for the Electrostar fleet's deployment from 2001, fully phasing out slam-door units by 2005.

Infrastructure

Electrification and Track

The Chatham Main Line features a double-track configuration throughout its length from London Victoria to Dover Priory and , enabling bidirectional traffic with passing loops at select locations such as between Rainham and Newington, creating a four-track section for operational flexibility. Sidings are provided at key points to support freight and activities, including Allington sidings for aggregates handling and Gillingham for freight storage adjacent to the main line. This layout accommodates a mix of passenger and freight services while minimizing capacity constraints in the predominantly suburban and rural sections. Electrification of the line utilizes a 750 V DC third rail system, with no alternating current (AC) sections present. The process occurred in phases under British Railways Southern Region, with suburban sections electrified progressively from the 1930s, including Swanley to Gillingham on 2 July 1939. The Kent Coast electrification Phase 1 extended services to the full route to Ramsgate and Dover Priory, operational by 15 June 1959, replacing steam traction and enabling consistent electric services across the entire line. Power is supplied via traction substations spaced along the route, drawing from the national grid and distributing direct current to the third rail, while rail bonding ensures a low-impedance return path for the current through the running rails, minimizing stray currents and supporting safe operation. Track standards on the line adhere to for freight and W9 for loading, with maximum permitted speeds reaching 90 mph in open sections such as between and to optimize journey times. Permanent speed restrictions apply on sharper curves along the route to maintain stability on the undulating terrain. Maintenance of the infrastructure falls under Network Rail's responsibility, involving regular inspections, renewals, and upgrades; recent enhancements include platform extensions at stations like Rainham and to accommodate 12-car trains, improving capacity for peak services without altering the core double- layout. As part of the £1.35 billion upgrade plan for the route from 2024, ongoing works include step-free access improvements at stations such as Chatham (completed in 2023) and track renewals to support growing demand. Significant structures along the route include the Rochester Bridge over the River , a multi-span iron dating to 1858 that carries the double tracks and has undergone periodic reinforcements for load capacity. The line also passes under the Medway Viaducts, where the railway and motorway cross overhead, requiring clearance coordination for maintenance access below. Tunnels punctuate the route, such as the 428-yard and 297-yard Chatham Tunnel near Chatham station, alongside the 897-yard Gillingham Tunnel east of Gillingham, all designed as double-track bores to handle the line's traffic volume while navigating the chalky geology of .

Signalling and Projects

The Chatham Main Line employs a modern colour-light signalling system controlled from the East Kent Signalling Centre (EKSC) at Gillingham, which oversees operations from Longfield to Dover Priory and via centralized computerized controls. This setup replaced older mechanical systems and integrates absolute block principles to ensure safe train spacing across the route. The East Kent Re-signalling Project, undertaken by , modernized the infrastructure in two main phases to enhance reliability and capacity. Phase 1, completed in early 2012, renewed signalling over 62 miles from to , Faversham to Minster, and related branches, replacing 60-year-old mechanical equipment with a computerized system that abolished several traditional signal boxes. Phase 2, implemented between 2014 and 2016, extended the upgrades across 33 miles from Longfield to , including the Isle of Sheppey branch and connections to and , fully commissioning the EKSC for integrated control. These upgrades have reduced train path conflicts, improved operational reliability, and increased line by allowing more efficient of services. A key component of Phase 2 was the £26 million rebuild of station, completed in December 2015, which relocated the station closer to the town center and extended platforms to accommodate 12-car , facilitating longer and Southeastern services. The line integrates with (HS1) via a connection at Farningham Road, enabling freight and maintenance access though primarily used post-Eurostar operations. As of November 2025, no major new signalling projects or resignalling initiatives have been announced for the Chatham Main Line, though ongoing enhancements include line speed improvements and minor upgrades as part of broader route studies to boost capacity without introducing (ETCS) trials on this corridor.

History

Construction and Early Development

The London, Chatham and Dover Railway (LCDR) was established through an in 1859, which renamed and expanded the ambitions of the earlier East Kent Railway to create a direct route connecting to the ports of Chatham and . This legislative step formalized the company's focus on developing a rival network in southeastern , independent of the established South Eastern Railway (SER). Construction proceeded in distinct phases, beginning with the Metropolitan Extension from Victoria to Redhill between 1858 and 1860, which provided essential access to via running powers over existing lines. From 1861 to 1863, the line advanced eastward to , , and , incorporating challenging engineering works such as the Rochester Bridge, influenced by the designs of prominent engineer Joseph Cubitt. Further extensions in the 1860s reached and , completing the core network with the opening of key sections like on 29 March 1858 (under precursor operations) and full through services to Dover Priory by 22 July 1861, though some infrastructure finalized in 1863. The entire system was built to standard gauge of 4 ft 8½ in (1,435 mm), aligning with prevailing British railway standards. The project faced substantial early challenges, including chronic financial difficulties exacerbated by overambitious expansion and the 1866 collapse of financier Overend, Gurney and Company, leading to the LCDR's and subsequent reorganization. Intense rivalry with the SER further strained resources, as both companies vied for dominance in Kent's transport corridors, resulting in legal disputes and duplicated infrastructure. The rivalry culminated in the amalgamation of the LC&DR and SER into the in 1899. Initial operations relied on steam locomotives, such as the Crampton-type engines suited for the line's gradients and speeds.

Electrification and Modernization

The of the Chatham Main Line began under the Southern Railway in the mid-1920s as part of a broader effort to modernize suburban services on former South Eastern & Chatham Railway routes. On 12 July 1925, third-rail at 660 V DC was extended from Victoria to Bickley, including the Catford Loop and connections to , enabling electric multiple units to replace steam for commuter operations and significantly reducing journey times in southeast . This initial phase covered approximately 20 miles of track and integrated with existing electric networks, boosting capacity on busy inner suburban sections. Further progress came in 1939 with the completion of the Maidstone & Gillingham Electrification scheme, which extended third-rail supplies from and to Gillingham and , marking the end of on the core Chatham route. This 117-mile project, opened on 6 July 1939, allowed full electric operation from to these towns, with services from reaching Gillingham in under an hour for the first time. Post-war, under British Railways, the line saw temporary trials in the , including prototype mainline diesel-electrics tested on Southern Region routes to evaluate alternatives amid electrification delays caused by economic constraints. The Kent Coast Electrification scheme under BR's 1955 Modernisation Plan extended the network beyond Gillingham, with Phase 1 completing third-rail installation to Ramsgate via Faversham and to Dover Priory on 15 June 1959, covering an additional 45 miles and eliminating steam on these coastal extensions. Full electric passenger services, supported by new 4 CEP and 4 BEP units, were introduced progressively, achieving complete operation across the extended line by January 1961 when regular workings to Ramsgate and Dover commenced. This upgrade raised the system voltage to 750 V DC and integrated the Chatham Main Line with broader Southern Region electric operations. In the 1980s and 1990s, modernization continued with the introduction of Class 465 and 466 Networker electric multiple units in 1994, replacing older stock on Chatham services to improve reliability and passenger comfort on routes from to Gillingham, , and . These slam-door EMUs, built by , entered service on the line as part of Network SouthEast's fleet renewal, offering faster acceleration and higher capacity for commuter and coastal trains. Ownership transitioned from British Railways to on 1 April 1994 under the Railways Act 1993, shifting infrastructure management to a private entity responsible for track and signalling maintenance. was replaced by in October 2002 following administration, establishing a not-for-profit company to oversee the network, including the Chatham Main Line's integration with metro-style services such as the to loop via the Catford Loop.

Recent Developments

The South Eastern rail underwent significant changes following the privatization era, with Connex South Eastern's contract terminated by the Strategic Rail Authority in November 2003 due to persistent performance issues and financial mismanagement. This marked the first default termination of a rail since , leading to the immediate handover to South Eastern Trains, a temporary public-sector operator established by the authority to maintain services. The transition improved reliability on the Chatham Main Line, with subsequent award of the to Southeastern (a subsidiary) in 2006, which introduced modernized operations and fleet investments. Eurostar services utilized a section of the Chatham Main Line via the Farningham Road to Cheriton curve from 1994 to 2003, routing international trains from London Waterloo through Kent to join the high-speed line near Folkestone for Channel Tunnel crossings to Paris. This classical route, involving a diversion at Fawkham Junction, accommodated up to 12 daily return services but was discontinued after the opening of High Speed 1's domestic section in 2003, which rerouted Eurostars directly from central London to the tunnel. The curve and associated infrastructure now lie disused for passenger traffic, primarily serving occasional freight. The in the 2010s integrated the Chatham Main Line into an expanded north-south network, enabling through services from Rainham to and beyond starting in 2018. These two-trains-per-hour services via , , and enhanced connectivity for towns, reducing the need for changes at and supporting commuter flows to destinations like Blackfriars and . The East Kent re-signalling project, completed in phases by 2016, facilitated this by upgrading signalling from Longfield to , improving capacity along the line. In the 2020s, the Chatham Main Line has focused on post-COVID recovery, with patronage rebounding to support economic revitalization in amid reduced demand during the . Southeastern's franchise transitioned to public ownership under the for Transport's in October 2021 following a contractual , with the direct award contract extended through multiple short-term renewals and set to align with broader by 2027. No major incidents occurred on the line in 2024 or 2025, though has identified potential for digital signalling upgrades as part of the long-term Digital Railway programme, aiming to boost capacity by the 2030s. Environmentally, Southeastern's all-electric operations on the fully electrified Chatham Main Line produce zero tailpipe emissions, contributing to a decarbonization roadmap targeting 70% reduction in scope 1 and 2 emissions by 2029 and net-zero operations by 2035.

Accidents and Incidents

Major Accidents

On 10 September 1963, a consisting of 25 vehicles, including braked "ferry vans" en route from Marine to Hither Green Continental Depot, between Longfield and Farningham Road stations on the Chatham Main Line in the . The train was traveling at approximately 60 mph on a curved section of track in a where a long, steep falling gradient transitioned to a rising one, within the authorized for the route. The initiated at the second van and propagated to the following 18 vans (the second through twentieth vehicles), with most suffering severe damage as they traveled about 185 yards beyond the point of initiation; the engine and leading van continued for 1¼ miles before stopping after the train parted between them. No fatalities or injuries occurred, but the incident caused significant disruption, obstructing both the lines—160 yards of the Up line and 40 yards of the Down line were damaged, short-circuiting the conductor rails and requiring signals to be placed at danger. Normal services resumed by 13 at 4:50 a.m. following repairs. The official inquiry, conducted by Colonel W. P. Reed of the Ministry of Transport and published on 24 March 1964, attributed the to possible violent oscillation of the vans, exacerbated by excessive lateral play in their suspensions and minor variations in track cant, though no definitive single cause such as a track fracture was identified. Key recommendations included reducing the to 50 mph for similar ferry van trains on that section, modifying brake systems to ensure automatic application after a train parting, and providing guards with clearer instructions on load assessments to prevent uneven loading. These measures contributed to enhanced safety protocols, underscoring the rarity of such major disruptions on the Chatham Main Line, which has otherwise maintained a strong safety record throughout its history.

Other Incidents

The Chatham Main Line has seen a range of minor incidents and disruptions since the , often involving , trespassers, and near-misses with track workers, contributing to occasional service delays but generally maintaining a low overall accident rate. One notable non-fatal disruption occurred on 23 October 2017, when a Southeastern collided with a parcel delivery van at Frognal Farm user-worked near Teynham, causing minor damage to both the train and the crossing barriers but no injuries; the Rail Accident Investigation Branch (RAIB) report identified inadequate user compliance and visibility issues as factors, leading to recommendations for enhanced crossing protections. A similar incident took place on 13 July 2025 at Bax user-worked between and Teynham, where a struck an delivery van, resulting in the driver's death and temporary line closure; RAIB launched an into the user-operated crossing's safety features and operational procedures. Trespasser-related disruptions have also been recurrent, such as on 20 January 2020 at Chatham station, where a person on the tracks prompted the shutdown of 750 V power supplies, halting all approaching trains and causing widespread delays across the route. Other trespasser fatalities include a 2012 incident near Farningham Road where a person was struck by a train, closing the line in both directions for investigation, and a 2006 event at station involving a man falling to his death, suspending services for several hours. Near-miss incidents with workers highlight operational risks, as seen on 3 July 2009 near Grosvenor Bridge south of Victoria, where a examination on the Down Chatham Fast line was nearly struck by an approaching train due to a controller of site safety straying from the ; RAIB's analysis led to updated procedures for on- . A comparable event occurred on 4 April 2017 near Newington, involving workers under lookout on the Down Chatham Fast line who failed to clear the line promptly. RAIB reports up to 2025 demonstrate ongoing improvements following re-signalling projects, such as the East Kent Resignalling Phase 2 (completed by 2018), which centralized signalling to Gillingham Integrated Electronic Control Centre and reduced () risks. Preventive measures include the nationwide rollout of the Train Protection and Warning System (TPWS) in the early 2000s, fitted across the by 2003 to automatically apply brakes at danger signals and overspeed locations, significantly mitigating collision risks. In 2024 and up to November 2025, no major disruptions were reported beyond routine works causing minor delays, such as weekend possessions for track maintenance; the July 2025 Bax incident remains under RAIB review, with no further significant events noted.

References

  1. [1]
    Kent route - Network Rail
    Chatham Mainline from London Victoria to Dover Priory and Ramsgate via Chatham. Network Rail High Speed Ltd. maintains and operates High Speed 1 from St Pancras ...
  2. [2]
    [PDF] Network Specification 2016 - South East Route
    The Chatham Main Line connects towns across south London and north Kent with the London terminals. The principal route runs from. London Victoria to Margate via ...
  3. [3]
    London, Chatham and Dover Railway - Graces Guide
    Jun 13, 2025 · The London, Chatham and Dover Railway (LC&DR) was a railway company that operated in south-eastern England between 1859 and 1923 before grouping into the ...
  4. [4]
    Trains from London Victoria to Ramsgate | Southeastern
    The distance trains travel from London Victoria to Ramsgate is around 68 miles. Are there direct trains from London Victoria to Ramsgate? Yes, there are around ...
  5. [5]
    [PDF] Route Specifications 2016 - South East - Network Rail
    The predominant linespeed is 60mph with some permanent speed restrictions across the route. There are a large and diverse range of services operating on the.<|control11|><|separator|>
  6. [6]
    Cheap trains from London Victoria to Ramsgate - Trainline
    Starting from £13.20It takes an average of 2h 13m to travel from London Victoria to Ramsgate by train, over a distance of around 68 miles (109 km). There are normally 26 trains per ...
  7. [7]
    Why the end of the gauge war didn't standardise Britain's railway
    May 20, 2021 · The battle to establish a standard gauge between the rails across Britain ended 129 years ago. So why do we still have variations in track today?
  8. [8]
    [PDF] London Victoria Station Guide - Network Rail
    We have customer information screens on the central and eastern concourse that provide train information, including train times and platform numbers. We ...
  9. [9]
    Chatham Train Station - Southeastern Railway
    Visit our Chatham station information page for ticket office openings, accessibility & station facilities, car parking and live timetable information.
  10. [10]
    More trains and a new station – Rochester's rail revolution only days ...
    Dec 9, 2015 · Our work will allow 12-car trains to call at Rochester for the first time and our ongoing rebuilding of the railway in the Medway Towns will ...
  11. [11]
    St-Mary-Cray Station Information | Live Departures & Arrivals for St ...
    Station Car Park. Operator Name: APCOA Parking. Spaces: 31. Accessible Spaces ... Top-up only from self-service ticket machine(s). Use Oyster here: Yes. Get ...Missing: high- speed
  12. [12]
    rainham-kent Station Information | Live Departures & Arrivals for ...
    Departures from Rainham (kent)​​ Thameslink services between West Hampstead Thameslink and St Albans City expected until 05:00 Tuesday 11 November. More details ...Missing: terminus | Show results with:terminus
  13. [13]
    Ferry - How To Get Here - Port of Dover
    Dover Priory is the nearest train station to Dover ferry Terminals, just over 1 mile away, with High-Speed 1 (HS1) train services to London in just over one ...
  14. [14]
    [PDF] Train times 2 - Southeastern
    Page 1. Train times 2. London to: Medway Towns, Sittingbourne,. Sheerness-on-Sea, Faversham,. Margate, Ramsgate and Dover Priory. Timetable from Sunday 16 May ...
  15. [15]
  16. [16]
    Train Timetables | Southeastern Railway
    Check your train times before you travel. Download our timetables for updated routes and times along with helpful information for your journey.
  17. [17]
    [PDF] South East Route:Kent Area Route Study | Network Rail
    May 2, 2018 · Not all sidings are the same length so capacity by ixed formation unit is shown as a line ... Chatham Main Line. 1. 1. 59,572. 68,620. Farningham ...
  18. [18]
    Trains Luton to Rainham (Kent) | Compare Times & Cheap Tickets
    Trains from Luton to Rainham (Kent) take an average of 2 hours and 27 minutes, although on the fastest services it can take just 2 hours and 20 minutes. You'll ...
  19. [19]
    London Victoria to Dover Priory Trains from £13.20 - TrainPal
    Starting from £13.20 Rating 4.5 (9,928) First train. 00:25. Last train. 23:40. Departure station. London Victoria. Arrival station. Dover Priory. Journey time. 1h 37m. Distance. 68 miles (109 km).
  20. [20]
    Oyster & Contactless FAQs - Southeastern
    You can use your 60+ Oyster card after 09:30 within London Zones 1-6, for free. On the Southeastern network, it can also be used beyond the Zones to Dartford ...<|separator|>
  21. [21]
    [PDF] Routes and stations where Oyster pay as you go is currently valid
    Oyster cards are NOT valid. National Rail. London Fare Zones. Interchange station. Station in two zones. NOT valid on Heathrow Express and. Southeastern High ...
  22. [22]
    '377s' transferred to Southeastern - Modern Railways
    Nov 28, 2024 · The first pair of Alstom Class 377 Electrostar EMUs has arrived with Southeastern ahead of the December 15 timetable change.
  23. [23]
    [PDF] Rolling stock - Southeastern
    Class 375 (Electrostar). • Conductors on board to provide assistance ... • The Class 466 (Networker) ALWAYS operates with a 465 attached. There is no ...
  24. [24]
    Class 375 | Eversholt Rail Limited
    4 cars (375/9) unit seating capacity: First class: 24, Standard Class: 250 ... Accessible: TSI PRM compliant. CET toilets: 1 x UAT (3 car unit) / 1 x ...Missing: Electrostar | Show results with:Electrostar<|separator|>
  25. [25]
    [PDF] The Class 700 trains - Siemens
    Total capacity: 1,754 passengers (12 carriages);. 1,146 (8 carriages) ... The Class 700 also features more luggage space and improved access. The ...
  26. [26]
    A high-speed experience - Modern Railways
    May 30, 2024 · The Class 395 'Javelins', built by Hitachi, have transformed travel from Kent into London, bringing Ashford, for example, within 40 minutes of the capital.<|control11|><|separator|>
  27. [27]
    A systemwide approach for Southeastern at Slade Green
    Feb 19, 2025 · BR began introducing Class 415 4-EPB EMUs at Slade Green from 1952. These were the first EMUs to use electro-pneumatic brakes. The depot ...
  28. [28]
    [PDF] goods and tank locomotives of the lcdr
    They were known as class " B." The next lot, class "B1," came in 1877 from Neilsons, and were numbered 151 to. 156, (S.E.C.R. Nos. 610 to 615), and looked ...
  29. [29]
    [PDF] Southern Electric Coaching Stock
    The year 1925 also saw the inauguration of electric services on the Eastern Section, a project which had been in hand at the time of the grouping under the ...Missing: SL/ | Show results with:SL/
  30. [30]
    Class 465/466: Kent Link Networker - Kent Rail
    First mooted in 1986 the scheme, also know as the ''Networker Revolution'', aimed to replace slam-door stock on those suburban lines radiating out of the ...
  31. [31]
    From Dingwall to Slade Green - the Networker story
    May 29, 2025 · New look: the Networkers marked a striking change of appearance from slam door stock in London. On 15 March 1996, No 465039 passes ...
  32. [32]
    Restoration project: Mk.1 slam-door EMU | Rail Express
    May 2, 2024 · A slam-door Mk.1 electric multiple unit returned to London Waterloo on January 27, for the first time in 6820 days, for a ceremony marking the ...
  33. [33]
    Electrification dates - Railway Codes
    This list, originally compiled by Martin Baumann, attempts to document all dates when Britain's railways were electrified (and, in some cases, de-electrified ...
  34. [34]
    [PDF] Kent area route study - Technical appendix - Network Rail
    May 2, 2018 · This section includes general and line of route comments and is more detailed than previous Route Studies.
  35. [35]
    Rochester Bridge (River Medway) - Railway Structures
    The first railway bridge across the River Medway at Rochester was built in 1858 for the East Kent Railway to the design of Joseph Cubitt.
  36. [36]
    Medway Viaducts - Wikishire
    Jul 27, 2016 · The Medway Viaducts are three bridges near Rochester, Kent. Two carry the M2 motorway, and one carries the High Speed 1 railway line.
  37. [37]
    Video: Final piece of Rochester railway jigsaw complete as first train ...
    Oct 11, 2016 · East Kent Re-signalling 2 project saw the commissioning of 30 miles of new signalling, from Longfield to Sittingbourne and out onto the Isle ...
  38. [38]
    The East Kent Resignalling Project Phase 2 - Spencer Group
    Apr 3, 2014 · ... 12-car bay platform; New platforms and extensions to existing platforms at Strood to accommodate 12-car trains; The total renewal of life ...
  39. [39]
    East Kent Re-signalling Phase 1 - Network Rail Consulting
    The project renewed 62 miles of railway signaling, replacing old mechanical systems with a modern computerized system, increasing capacity and reliability.
  40. [40]
    Network Rail's east Kent signalling project to complete - BBC News
    Dec 28, 2011 · A two-year project to renew 60-year old signalling on a section of railway in east Kent is nearing completion. By 3 January, Network Rail ...
  41. [41]
    Success in the South - Rail Engineer
    Feb 10, 2012 · Designed to be commissioned in three phases with many intermediate stages, the project centres on the new East Kent Signalling Centre (EKSC) ...
  42. [42]
    HRH The Duke of Kent officially opens Rochester station
    Feb 24, 2016 · The bigger, better, £26m station was completed in December, with more than 250,000 journeys having been made through the new station to date.
  43. [43]
    Rochester Station - Spencer Group
    The Rochester Station works included the construction of three new platforms, each long enough to accommodate the latest 12-car trains ... 2015. Find out more ...
  44. [44]
    [PDF] Gillingham and Rainham; Rochester and Strood
    North Kent Line / Chatham Main. Line - Line Speed. Enhancements. Increased line speeds and signalling upgrades on the. North Kent Line and the Chatham Main Line ...
  45. [45]
    London Chatham & Dover Railway Part I
    Dec 12, 2015 · The Canterbury and Dover Railway Company was floated in October 1845 to provide a connection at Canterbury with the London, Chatham and North ...
  46. [46]
    Chatham
    ### Summary of LCDR Construction Phases and Opening Dates
  47. [47]
    Bitter competition – and its benefits - A Walker's History of the Railways
    ... LCDR then got access to the new Victoria station in 1861. ... The SER countered with its own scheme, the Elham Valley line, which won the day and opened in 1887, ...
  48. [48]
    Chatham - Kent Rail
    Mechanical signalling at Chatham had its swansong on 9th May 1959, when the Saxby & Farmer cabin was decommissioned after over seventy years of service. New ...
  49. [49]
    Bickley - Kent Rail
    Third rail reached Bickley in 1925 during the Southern Railway's scheme of electrifying former SE&CR suburban lines to modernise and speed up commuter services.
  50. [50]
    The Growth of the Southern Electric Network
    Public electric service began on the South London Line on 1 December 1909 after eleven months of trials. Traffic began to recover at once, rising by 50% within ...
  51. [51]
  52. [52]
    British Railways Southern Region history - Key Model World
    Aug 6, 2020 · Although design work started before nationalisation, his main line 1-Co-Co-1 diesel engines appeared in 1949 with a third being built in 1953.
  53. [53]
    Kent Coast Electrification - Southern Electric Group
    In this item the author reviews in detail the major Southern electrification scheme which formed part of the 1955 modernisation plan of British Railways.<|separator|>
  54. [54]
  55. [55]
    NETWORK RAIL FIRST ANNIVERSARY - 'FOCUS ON ...
    Oct 2, 2003 · On 3 October 2002, Network Rail completed its acquisition of Railtrack PLC and assumed responsibility for Britain's rail infrastructure.Missing: formation | Show results with:formation
  56. [56]
    Network Rail - Railway Technology
    Nov 3, 1998 · Established in March 2002, Network Rail (NR) took over ownership and responsibility for the rail infrastructure of England, Scotland and ...Missing: formation | Show results with:formation
  57. [57]
    Incompetence costs Connex its franchise | UK news - The Guardian
    Jun 27, 2003 · In an unprecedented move, the SRA had secretly formed its own company, South Eastern Trains, to take over instantly if Connex refused to comply.
  58. [58]
  59. [59]
    Connex loses second UK franchise - Railway Gazette
    Aug 1, 2003 · For the first time since privatisation in the 1990s, a franchise to operate passenger services in Britain has been terminated through default.<|separator|>
  60. [60]
    Times are changing: more services and journeys in May timetable
    Apr 16, 2018 · ... Thameslink Railway to integrate their new Thameslink services into the timetable. ... Chatham, Gillingham, Rainham and Rochester. 2 trains ...
  61. [61]
    [PDF] Kent Rail Strategy 2021
    The Kent Rail Strategy 2021 aims to influence train service and fleet specifications, meet increasing demand, and align with transport policies.
  62. [62]
    South Eastern Railways 2021 OLR rail services contract - GOV.UK
    The direct award services contract between the Secretary of State for Transport, DfT OLR Holdings Limited and SE Trains Limited dated 16 October 2021.
  63. [63]
    When will my local train operator be nationalised? - Commons Library
    Jan 8, 2025 · The government is bringing most passenger train operators under public ownership. Nationalisation will start in 2025 and is expected to finish in 2027.
  64. [64]
    [PDF] South East Route Control Period 6 Delivery Plan | Network Rail
    Jun 13, 2019 · Around. 5,000 passenger trains run every day over almost 2,000 miles of track to deliver almost 500 million passenger journeys a year. We manage ...
  65. [65]
    Emissions | Environment - Southeastern
    At Southeastern, we're committed to decreasing our carbon footprint. Our electric passenger trains are free from tailpipe emissions.Missing: Chatham Main
  66. [66]
    None
    ### Summary of the Longfield Derailment (10th September 1963)
  67. [67]
    Report 12/2018: Collision at Frognal Farm User Worked Crossing
    Aug 23, 2018 · On 23 October 2017, a passenger train collided with a parcel delivery van at Frognal Farm user worked level crossing, near Teynham, in Kent.
  68. [68]
    Collision between a train and a van at Bax user worked level crossing
    Jul 28, 2025 · At around 12:42 on 13 July 2025, a passenger train struck a delivery van at Bax user worked level crossing, located between Sittingbourne ...
  69. [69]
    DISRUPTION: Power lines in Chatham switched off as trespasser ...
    Jan 20, 2020 · Emergency services are dealing with a trespass incident at Chatham, Kent, which means that all trains approaching the station are at a stand.Missing: derailment RAIB
  70. [70]
    Rail death on Chatham Main Line - News Shopper
    Sep 8, 2012 · At around 11.15 the 09.04 service from Dover Priory to Victoria was carrying around 200 people when it struck a person in the Farningham ...Missing: accidents | Show results with:accidents
  71. [71]
    Man dies in rail station horror - Kent Online
    Feb 27, 2006 · Mr Jarrett said the incident, which happened at about 10.45am, meant train services on the Chatham main line would be suspended for at least two ...
  72. [72]
    [PDF] Rail Accident Report - GOV.UK
    Jul 3, 2009 · Introduction. 5. Summary of the report. 6. Key facts about the accident. 6. Immediate cause, causal and contributory factors, ...<|control11|><|separator|>
  73. [73]
    [PDF] Rail Accident Report - GOV.UK
    Apr 4, 2017 · M13 The group were working under lookout protection applying to trains on the down. Chatham fast line, and the COSS had moved away from that ...
  74. [74]
    TPWS a retrospective - Rail Engineer
    Oct 17, 2024 · It is a basic form of train protection developed initially for Great Britain, that will take control away from the driver by applying the brakes for a minimum ...