Fehmarn Sound Bridge

The Fehmarn Sound Bridge (German: Fehmarnsundbrücke) is a steel network spanning the Sound in the , connecting the German island of to the mainland near Großenbrode in . With a total length of 963.4 meters, including a main span of 248.4 meters flanked by two 120-meter side spans, the bridge features arches rising 43 meters with a clearance height of 23 meters above the water and a deck width of 20.95 meters. It accommodates one (1,435 mm ) and two road lanes, serving as a vital link in the international route between and . Construction of the bridge began on January 4, 1960, and it was officially opened to traffic on April 30, 1963, with rail services commencing on May 14, 1963, replacing a previous service across the sound. The project was designed by engineers G. Fischer, T. Jahnke, and P. Stein of Gutehoffnungshütte Sterkrade AG, with architectural input from Gerd Lohmer, and built entirely by the same firm using an innovative network arch configuration where hangers intersect multiple times to optimize material efficiency. This design, one of the earliest examples of a network arch bridge, was influenced by model tests conducted at TH-Hanover and contributed to the global development of the concept, particularly in following observations by Professor Masao Naruoka in 1960. The bridge holds historical significance beyond its engineering, having been constructed during the Cold War with integrated explosive charges in vaults for potential demolition in case of conflict, and it was designated a protected historic monument in 1999. Despite its enduring role in regional connectivity, the structure faces future replacement due to increasing traffic demands, with plans for a separate new immersed tunnel crossing under the Fehmarn Sound to replace it, related to improved regional connectivity including the Fehmarn Belt Fixed Link; the Sound tunnel remains in planning as of 2025 with approval documents submitted in July 2025 and no completion date set, while the Belt tunnel is under construction and targeted for 2029. Recent maintenance, such as the early 2020s replacement of pot bearings with high-capacity RESTON®SPHERICAL bearings capable of handling 25,000 kN loads, underscores ongoing efforts to preserve its functionality.

Overview

Location and Purpose

The Fehmarn Sound Bridge spans the Fehmarnsund, a narrow in the western that separates the island of , located in the state of , , from the mainland near the town of Großenbrode in the Ostholstein district. This connection integrates the bridge into the regional geography, where the strait forms a critical waterway linking the 's inner waters to broader maritime routes. The bridge's primary purpose is to provide a fixed crossing for both road and rail traffic, enabling seamless transport between and the mainland while eliminating the previous dependence on local services across . Prior to its construction, access to the island relied heavily on ferries operating between Großenbrode and points on , which isolated the region and limited efficient connectivity for residents, , and . By facilitating this link, the structure supports wider travel corridors, including the route from , , to , , enhancing overall regional mobility. Measuring 963 meters in total length, the bridge crosses the Fehmarnsund at its narrowest point, which is approximately 1.3 kilometers wide, allowing for a direct and efficient traversal of the strait. As a , it accommodates vehicular lanes and a single within its 21-meter-wide deck, positioned 23 meters above to permit shipping passage below.

Physical Description

The Fehmarn Sound Bridge is a network characterized by two prominent arches that rise to a total height of 66 meters above , with the arches themselves extending 43 meters above the roadway . The roadway and rail tracks are suspended beneath these arches via a network of inclined hangers and cross-bracing, creating a visually striking "coat hanger" profile that dominates the . The measures 21 meters in width, providing space for two lanes, a railway line, and adjacent sidewalks for pedestrians. The bridge's main components include a central span of 248 meters flanked by two side spans of 120 meters each, supported by eight piers positioned in the water to span the 1,300-meter-wide Sound. The overall structure totals 963 meters in length, incorporating 337 meters of approach ramps in total. This configuration ensures a clear of 23 meters above mean water level and 240 meters in width for maritime traffic. The design emphasizes slender arches to reduce visual and navigational obstruction, allowing the bridge to integrate harmoniously with the surrounding environment while supporting combined and rail traffic. Pedestrian and cycle paths run alongside the roadway, offering accessibility for non-motorized users.

Construction and History

Planning and Building

The planning for the Fehmarnsund Bridge was initiated in the late 1950s as part of post-World War II efforts to enhance transportation infrastructure in northern Germany, driven by increasing road and rail traffic to the island of Fehmarn and the broader development of the Vogelfluglinie connection to Denmark. In 1957, German and Danish governments formed commissions to evaluate the technical and financial feasibility of a fixed crossing, leading to active planning phases in 1957–1958 and a bilateral government agreement in 1958. A design competition was announced in 1959, with construction approved by Schleswig-Holstein authorities and groundbreaking occurring on January 4, 1960. Construction of the bridge took place from 1960 to 1963, managed by a of firms including Gutehoffnungshütte for the arch structure, Grün & for pier foundations, and for auxiliary lifting platforms. The project utilized prefabricated steel elements, which were rolled into place on temporary supports for side spans and assembled using cable cranes and central scaffolding for the main arch over the navigation channel. The total cost for the portion of the bridge and associated infrastructure was approximately 123 million Deutsche Marks, with about 84 million allocated to rail components and 39 million to road elements. Key engineering challenges arose from the shallow waters of the Fehmarnsund, averaging 5–10 meters deep, and strong currents that complicated work; these were addressed through the use of pneumatic caissons (Senkkästen) and temporary lifting islands (Hubinseln) to build the seven piers. Unstable conditions required lightweight abutments and ongoing adjustments to prevent settling of platforms, such as one instance where a lifting island sank by 11.25 meters. The design integrated road and rail traffic on a single structure during the era, incorporating defensive features to allow for potential in case of . Approximately 200 workers were involved in the on-site assembly and tasks over the three-year period.

Inauguration and Early Operations

The Fehmarn Sound Bridge was officially inaugurated on April 30, 1963, by Minister President Helmut Lemke, alongside Federal Transport Minister Hans-Christoph Seebohm and Defense Minister . High-ranking officials arrived by for the ceremony, which highlighted the bridge's role as a modern engineering achievement after more than a century of planning efforts dating back to the . The event symbolized West Germany's post-war and infrastructure expansion, connecting the mainland to as part of the emerging route between and . Due to a severe winter, the bridge had been provisionally opened for road traffic on January 16, 1963, under special permission. Road operations commenced immediately following the inauguration, while rail services began on May 14, 1963, with the opening of the Puttgarden station and the full . A ceremonial passenger train crossed the bridge on April 30. The structure integrated seamlessly into the regional transportation network, serving as a key segment of Bundesstraße 207 for road traffic and accommodating rail services on the line to Fehmarn-Burg, known as the Bird Island Railway. This replaced the prior ferry service across the Fehmarnsund, which had operated since 1905 for the island railway and road access. In its first year, the bridge handled substantial vehicle volumes, reflecting the growing demand for efficient links to amid rising and trade. The bridge's opening reduced overall travel times from to by eliminating waits and crossings, providing a direct link that enhanced accessibility for tourists and . This immediate connectivity boost stimulated the island's by increasing visitor numbers and supporting local through faster goods delivery. During the early years of operation through the 1960s, routine maintenance addressed initial exposure to salt, with minor repairs undertaken by the 1970s to ensure structural integrity amid the harsh marine environment.

Design and Engineering

Structural Features

The Fehmarn Sound Bridge employs a network arch system, featuring two parallel arches spanning 248 meters, from which the main is suspended by inclined hangers that cross each other multiple times to form a web-like pattern. This arrangement enhances load distribution efficiency by reducing bending moments in the arch and tie, allowing for a lighter structure while supporting combined road and rail traffic. The design draws from early innovations, adapted for the bridge's dual-purpose requirements. The superstructure includes an orthotropic steel deck, which provides high strength-to-weight ratio essential for bearing vehicular and rail loads over the 963-meter total length. This deck is elevated on seven reinforced concrete piers, each founded into the seabed to resist tidal forces and ensure long-term stability in the marine environment. As a dual-use structure, the bridge integrates road and rail traffic on a single 20.95-meter-wide deck, with a 6-meter-wide section dedicated to the single railway track and the remaining width for two road lanes and pedestrian paths; this configuration minimizes interference between traffic types through the inherent stiffness of the network arch system. Expansion joints and bearings accommodate thermal movements in the variable Baltic climate, permitting up to 500 mm of displacement to prevent structural stress. For navigation, the main span offers a vertical clearance of 23 meters above and a 240-meter-wide opening, facilitating safe passage for ships while incorporating protective fenders on the piers.

Technical Specifications

The Fehmarn Sound Bridge measures 963.4 meters in total length, comprising a main span of 248.4 meters flanked by side spans of 102 meters each. The deck width is 20.95 meters, accommodating two road lanes and a single with a standard gauge of 1,435 mm. The structure provides a clearance height of 23 meters above mean for , while the overall height from the water to the arch apex reaches approximately 69 meters, including an arch rise of 43 meters above the deck. The bridge's superstructure is primarily constructed from steel, with approximately 3,000 tons used for the main arch, and the substructure relies on reinforced concrete for the piers and abutments. Concrete volumes include 400 cubic meters per abutment (grade B 300) and 230 cubic meters per pier foundation, supporting a total of seven piers across the spans. These materials enable the bridge to function as a combined road and rail crossing in the exposed Baltic environment. The design accommodates axle loads consistent with mid-20th-century standards for such structures. It withstands speeds up to 150 /h without closure for standard and holds a seismic rating appropriate for the low-risk of the . The railway component supports train speeds of up to 160 /h. As of , the bridge handles approximately 15,000 vehicles per day, reflecting increased and regional demands. Rail operations consist of primarily services with limited freight.

Transportation Role

Route Integration

The Fehmarn Sound Bridge serves as an integral component of the , specifically forming part of (B207), which extends from on the mainland to the ferry port at Puttgarden on the eastern tip of Island. This route facilitates direct access for vehicles traveling between and the ferry connections to . The bridge's alignment connects seamlessly to the motorway near Heiligenhafen, approximately 20 kilometers to the west, enabling efficient integration with the national system and supporting regional mobility across . In the rail domain, the bridge carries the Lübeck–Puttgarden railway line, a segment of the historic (Bird Flight Line) that has linked and since the 1960s. This single-track connection, spanning about 88 kilometers from , was designed to allow trains to cross the Fehmarn Sound and reach the Puttgarden ferry terminal for onward transport to Scandinavian destinations. However, rail services on this line have been suspended since August 31, 2022, for construction and upgrades in preparation for the , including double-tracking and electrification. On a broader scale, the bridge plays a pivotal role in the transport corridor, one of Europe's key north-south axes within the (TEN-T). By bridging the Fehmarn Sound, it shortens overall journey times for road users heading toward the Fehmarnbelt ferry service between Puttgarden and Rødbyhavn, , until the completion of the Fehmarnbelt , now delayed beyond 2029 with revised timelines forthcoming. This connectivity enhances cross-border trade and passenger flows but also positions the bridge as a vital interim link in reducing travel durations—approximately 5 hours by road (including ferry crossing) from to as of 2025—while preparations for the tunnel's rail and road alignments proceed. Traffic on the bridge exhibits distinct patterns influenced by its strategic location, with steady volumes supporting daily commuters and freight but notable seasonal peaks driven by to Island's beaches and coastal attractions during summer months. These fluctuations underscore the bridge's importance in accommodating variable demand, including holidaymakers accessing the island's recreational facilities.

Ferry Service Changes

Prior to the construction of the Fehmarn Sound Bridge, access to the island of relied on ferry services across the Fehmarn Sound, primarily operating between Großenbrode on the mainland and auf Fehmarn. These short-distance crossings, which began with motorized ferries in 1903, utilized vessels such as the steam ferry Fehmarn (introduced in 1927) and the motor vessel (from 1949), capable of transporting passengers, vehicles, and rail wagons. The service functioned as both a and , supporting local and regional traffic until its discontinuation. The opening of the Sound Bridge on April 30, 1963, marked a pivotal shift in operations, coinciding with the closure of the local Großenbrode– auf route on the same day. This change eliminated the need for intra-German Sound crossings, while the nearby Großenbrode–Gedser train and car to , operational since 1951 as a temporary link, was also terminated in May 1963. Emphasis subsequently shifted to the longer crossing via the newly established Puttgarden–Rødby route, which became the primary international connection under the (Bird Flight Line). These alterations significantly enhanced efficiency for accessing Fehmarn, as the bridge provided a direct, toll-free road and rail link, rendering the local ferry obsolete and reducing dependency on Sound ferries by 100 percent. Concurrently, the Puttgarden port on was expanded and opened in to accommodate increased traffic volumes on the route. In the long term, ferry services across the have concentrated on international passenger and freight links between and , with the bridge assuming responsibility for all intra-German traffic to and from . This division has streamlined connectivity, prioritizing high-capacity international ferries operated by companies like .

Historical Significance

Monument Designation

The Fehmarnsundbrücke was designated a protected historical in 1999 by the Landesamt für Denkmalpflege , the state office for the preservation of historical monuments based in . This recognition followed the initiation of the protection procedure in autumn 1998, marking the bridge as a key technical-cultural heritage site just 36 years after its completion. The designation was based on the bridge's embodiment of 1960s engineering innovation in post-war West Germany, where it represented a pioneering application of advanced construction techniques to rebuild and connect infrastructure amid economic recovery. As one of Europe's earliest and rare examples of a network arch bridge design—with a main span of 248 meters constructed using innovative hub island methods—it highlighted structural efficiency and aesthetic integration into the Baltic landscape. Its architectural significance lies in facilitating vital Baltic Sea connectivity as part of the Vogelfluglinie route, symbolizing enhanced regional integration between Germany and Scandinavia. Under Schleswig-Holstein's (Monument Protection Law), the status imposes strict restrictions on structural alterations, requiring any modifications or upgrades to prioritize preservation and obtain approval from the state office to maintain the bridge's integrity. This protection ensures that future interventions, such as maintenance or adaptations for reduced traffic loads, incorporate heritage conservation measures, preventing demolition without rigorous justification. Culturally, the bridge serves as an enduring symbol of Fehmarn's modernization in the post-war era, transforming the island from a ferry-dependent into a linked part of the mainland network and boosting local . Known affectionately as the "Brücke des Friedens" for its role in fostering cross-border ties, it draws enthusiasts and tourists who appreciate its landmark status and historical narrative, contributing to public awareness of Schleswig-Holstein's industrial heritage.

Cold War Defensive Features

The Fehmarn Sound Bridge was constructed from 1960 to 1963 amid escalating tensions between member and the . In anticipation of a possible Soviet invasion from the east, German military planners incorporated defensive features into like the bridge to disrupt enemy logistics and movements across the Fehmarn Sound toward and . These measures were part of a broader strategy to create chokepoints along potential invasion routes, ensuring that key crossings could be rapidly disabled if forces advanced. Central to these defenses were six pre-cast concrete explosive shafts embedded below the roadway in the approach embankment on the mainland side near Großenbrode, positioned at strategic points to maximize structural damage. Each shaft served as a chamber capable of housing demolition charges for a controlled explosion that would sever the bridge's connection, creating an impassable gap. The explosives were stored in a fortified concrete bunker, known as the Sperrmittelhaus, located about one kilometer inland in Heinrichsruh; this facility featured reinforced doors, a gas-tight steel entrance, and earthen camouflage for security. The activation mechanism was linked to the Sperrmittelhaus, enabling to initiate swiftly and isolate Fehmarn Island from the mainland, thereby halting an invading force's progress. This setup allowed for the bridge to be rendered unusable in a matter of minutes, buying time for reinforcements. The design reflected standard practices for infrastructure sabotage during the era, prioritizing speed and reliability over permanence. Following the end of the and , the demolition charges were removed from the shafts, which were then sealed with concrete and covered over. Today, the locations of these historical features are marked by six square asphalt patches on the roadway, serving as tangible reminders of the era's preparations and integrated into the bridge's documentation as elements.

Future Developments

Current Challenges

The Fehmarn Sound Bridge, operational since 1963, exhibits significant aging infrastructure challenges stemming from prolonged exposure to saline marine conditions over more than six decades. Assessments have identified in components, such as boxes, necessitating corrosion protection measures. Structural reinforcements are ongoing to address maintenance backlogs and ensure long-term usability. Capacity limitations pose additional operational strains due to the anticipated surge in traffic volume following the completion of the nearby Fehmarnbelt Tunnel. Speed limits of 30 km/h are in place during construction sites until at least 2025. Environmental pressures further compound these issues, with rising sea levels projected to increase by approximately 0.3-0.8 meters in the by 2100 and intensified storm activity accelerating scour around the bridge piers. While seismic risks remain minor in this low-activity zone, they are routinely monitored as part of broader coastal infrastructure oversight. Maintenance demands have escalated accordingly, with the ongoing renovation program—including replacements, repairs, and —estimated at 91 million euros in total costs. These efforts, which began intensifying in 2023, include railway replacements by mid-2025, repairs starting in 2025, and from 2026, involving phased work on both road and rail components to minimize disruptions.

Proposed Replacements

In response to the anticipated surge in cross-border traffic following the opening of the Fehmarnbelt Tunnel, authorities have proposed replacing the aging Fehmarn Sound Bridge with a new tunnel known as the Fehmarn Sound Tunnel. This 1.7 km-long structure, designed to accommodate four road lanes and two railway tracks, was selected as the preferred option in March 2020 after evaluating bridge and tunnel alternatives, aiming to provide a modern, high-capacity crossing while addressing the bridge's structural limitations. Construction of the tunnel has not commenced as of November 2025, primarily due to escalating costs and planning delays, with estimates now reaching €2.3 billion—more than triple the initial €714 million projection—driven by rising material prices and regulatory hurdles. Delays in the broader Fehmarnbelt project, including an 18-month setback confirmed in October 2025 due to issues with immersion vessels and rail integration, have shifted focus to a full replacement in the 2030s to cope with projected traffic volumes exceeding current capacities. This aligns with broader delays pushing the Fehmarnbelt Tunnel's operational readiness beyond the original 2029 target to 2031 or later. The Fehmarnbelt Tunnel's expected opening between 2031 and 2033 is forecasted to boost road traffic across the Fehmarn Sound by at least 50%, as it eliminates the Puttgarden-Rødby route and redirects substantial volumes to the Sound crossing for access to mainland . This shift underscores the need for enhanced to handle increased freight and passenger loads without bottlenecks. To balance preservation with functionality, proposals incorporate the bridge's status as a protected by retaining its iconic arches for pedestrian, cyclist, and limited local road use, while the new tunnel serves as a parallel high-speed corridor for mainline road and rail traffic. This approach ensures the historical structure's legacy endures amid modernization efforts.

References

  1. [1]
    Fehmarnsund Bridge (Großenbrode/Fehmarn, 1963) - Structurae
    Fehmarnsund Bridge is a network arch bridge, road bridge, railroad (railway) bridge and steel bridge that was built from 1960 until 1963.
  2. [2]
    None
    ### Summary of Fehmarn Sound Bridge from the Document
  3. [3]
    Difficult access - Mageba-group
    The Fehmarn Sound Bridge was opened in 1963, carrying road and railway traffic across the first stretch of Baltic Sea water to the island. It has an overall ...
  4. [4]
    The Fehmarnsundbrücke: Everything you need to know
    The most important key data on the Fehmarnsundbrücke: ; Construction time, 3 years, 3 months (1,186 days) ; Costs for the construction, 43 million German marks.Missing: Sound history
  5. [5]
    None
    Nothing is retrieved...<|separator|>
  6. [6]
  7. [7]
    Fehmarn Sound Bridge - TouriSpo
    May 6, 2025 · The bridge is almost one kilometre long and connects the island with the Schleswig-Holstein mainland. On a width of 21 metres the bridge offers ...Missing: length | Show results with:length
  8. [8]
    Fehmarn Sound Bridge - Mageba-group
    The total length of the bridge is 963 meters with 337 meter-long ramps, which carries traffic over the 1,300 meter-wide Fehmarn Sound. The main span of the ...Missing: history construction
  9. [9]
  10. [10]
    [PDF] Deutscher Bundestag Drucksache 186 3. Wahlperiode
    123 Mio DM. Hiervon entfallen auf die Deutsche Bundesbahn rd. 84 Mio DM, auf den Straßenbau rd. 39 Mio DM. In dem Betrag sind die. Page 3. Deutscher Bundestag ...
  11. [11]
    www.Sundfaehre.de – Fehmarnsund Brücke (ab 1963) - Sundfähre
    1960 - 1963 Der Bau der Fehmarnsund Brücke · Der Bau des ersten Brückenpfeilers im September 1960 · Transport der Brückenelemente 1961 · Ein Besuch auf der ...
  12. [12]
    Die Eröffnung der Fehmarnsundbrücke am 30. April 1963
    Rating 4.0 (21) Die sich noch im Bau befindliche Fehmarnsundbrücke. Die Fehmarn Sundbrücke wurde am 30. April 1963, nach über 100 Jähriger Planung, eröffnet.
  13. [13]
    Schwungvoll und elegant - und das Symbol für den Aufschwung
    Feb 23, 2010 · Das Fehmarnsche Tageblatt berichtet im Frühjahr 1963 täglich ausführlich von den Bauarbeiten und dann von der Eröffnung der Fehmarnsundbrücke.Missing: Lemke | Show results with:Lemke
  14. [14]
    Vogelfluglinie - Gesellschaft für Schleswig-Holsteinische Geschichte
    Am 30. April 1963 konnte die 963 Meter Lange Brücke dem Verkehr übergeben werden. Um den knapp 20 Kilometer breiten Fehmarnbelt zu überwinden, wurden Puttgarden ...Missing: Verkehrszahlen | Show results with:Verkehrszahlen
  15. [15]
    Sechs Jahrzehnte im Zeitraffer: Geschichte(n) am Fehmarnsund und ...
    Jan 7, 2021 · Heinrich Lübke (r.) gehen am 14. Mai 1963 im dänischen Hafen Rodbyhavn an Bord des Fährschiffes „Kong Frederik IX“. Hinter ihnen links der ...
  16. [16]
    A Review of the Network Arch Bridge - MDPI
    Narouk saw a test model of the Fehmarn Sound Bridge in Hannover in 1960. He took the idea to Japan, where it flourished. Most of the NABs in Asia are ...
  17. [17]
    Fehmarn Sound Bridge - Mageba-group
    As a dual purpose bridge for road traffic and railway, the Fehmarn Sound Bridge connects the island of Fehmarn in the Baltic Sea with the mainland near ...Missing: physische Beschreibung Höhe Breite Spannweite Pfeiler
  18. [18]
    [PDF] Zeitschrift für Denkmalpflege in Schleswig-Holstein
    Die Fehmarnsundbrücke (Abb. 1 und 2) zwi- schen dem ostholsteinischen ... breite betrug 13,60 m) und in der Achse (der. Achsabstand betrug 11 m) des ...
  19. [19]
    [PDF] Entwurf, Konstruktion und Berechnung einer eingleisigen ... - CORE
    This master's thesis is about the design and dimensioning of a network arch bridge as a steel construction with a span of 110 m for a single-track railway.
  20. [20]
    Bund will zwei neue Brücken über den Fehmarnsund bauen
    Sep 4, 2014 · Derzeit rollen täglich gut 5300 Fahrzeuge über die mehr als 50 Jahre alte Fehmarnsund-Brücke. Die für den Bau des 18 Kilometer langen ...
  21. [21]
    [PDF] 2024-09-20 Bericht RM - Stadt Fehmarn
    Die Fehmarnsundbrücke ist in die Streckenklasse C3 eingeordnet, d.h. es ist ein. Schienenpersonenverkehr und ein geringer Schienengüterverkehr über die Brücke ...Missing: täglicher Fahrzeuge<|control11|><|separator|>
  22. [22]
    The construction site in Puttgarden - Femern
    In addition to the construction of the tunnel portal on Fehmarn, the project also includes connections to the existing road network - main road B207 and ...Missing: Sound integration Bundesstraße Lübeck
  23. [23]
    The Fixed Fehmarnbelt Connection: Getting ahead in 2018
    Sep 29, 2019 · In Germany, route B207 between the end of the A1 motorway at Heiligenhafen to Puttgarden is to be expanded to a four-track motorway. A ...Missing: integration Bundesstraße
  24. [24]
    Rail link for the Fehmarn Belt Fixed Link | DB E&C
    A sub-project on the German side concerns the seaport hinterland connection: the existing single-track Lübeck–Puttgarden line will be doubled up over a distance ...Missing: integration Bundesstraße 207 B207
  25. [25]
    Fehmarn Belt Fixed Link: Faster from Hamburg to Copenhagen
    Jun 14, 2022 · The historic Fehmarn Sound Bridge will remain open for limited ... “The project structure provides an important basis for further design ...
  26. [26]
    [PDF] Feste Fehmarnbeltquerung – Einflüsse auf den Tourismus und ...
    Jan 4, 2017 · Der Tourismus wird im Zuge der Planungen der Festen Fehmarnbeltquerung immer wieder von unterschiedlichen Interessengruppen als ein ...
  27. [27]
    Sundfähren & Brückenbau - Insel Fehmarn
    ... Fehmarnsundbrücke, die im Mai 1963 dem Verkehr übergeben wurde. Die "Fehmarnsund" 1903 (Quelle:exLichtbildstelle BD HH) ,das Trajekt "Fehmarnsund" auf dem ...
  28. [28]
    Still a old Great Belt ferry be bound for India.
    Jan 7, 2011 · ... Gedser-Grossenbrode until to the closing down in 1963, as car- and train ferry. At the 15th of May 1963 opened the new crossing between ...
  29. [29]
    A strong Danish-German collaboration - Scandlines
    In 1963, an additional ferry route between the two countries was established – the so-called Beeline between Puttgarden in Germany and Rødby in Denmark. The ...Missing: closure Großenbrode-
  30. [30]
    Fehmarn Sound Bridge - Mageba-group
    The total length of the bridge is 963 meters with 337 meter-long ramps, which carries traffic over the 1,300 meter-wide Fehmarn Sound. The main span of the ...
  31. [31]
    Ferry operation on the Fehmarn Belt - Scandlines
    Scandlines has been operating ferries between Germany and Denmark since 2007, with a dedication to quick and comfortable transport, and will continue to sail.<|control11|><|separator|>
  32. [32]
    [PDF] Schleswig-Holstein über die Jahre 1998 und 1999
    Mit dem Tätigkeitsbericht des Landesamtes für Denkmalpflege für die Jahre 1998 und 1999 legen die Denkmalpfleger öffentlich Rechenschaft ab über ihre ...
  33. [33]
    Fehmarnsund-Brücke - Kreis Ostholstein
    Im Herbst 1998, 35 Jahre nach ihrer Fertigstellung, ist das Denkmalschutzverfahren durch das Landesamt für Denkmalpflege eingeleitet worden. Wegen der ...
  34. [34]
    [PDF] Runder Tisch Fehmarnsundquerung Gewichtungsmodell „Region“
    Landesamt für Denkmalpflege Schleswig-Holstein (LAD) zur Planung der „Neuen. Fehmarnsundquerung“ geführt. Ein absolutes Rückbauverbot für das Bestandsbauwerk ...<|control11|><|separator|>
  35. [35]
    [PDF] Sachgesamtheit: Fehmarnsundbrücke - schleswig-holstein.de
    Sprengschächte und. Sprengstoffbunker wurden im Kalten Krieg errichtet, um im Ernstfall den. Vormarsch der militärischen Verbände des Warschauer Paktes an ...Missing: Sprengkammern | Show results with:Sprengkammern
  36. [36]
    Sperrmittelhaus - Geocaching
    Jan 5, 2010 · Im landseitigen Anlauf zur Fehmarnsundbrücke befanden sich zur Zeit des Kalten Krieges als vorbereitete Sperren sechs Sprengschächte in der ...
  37. [37]
    Lost Place in Großenbrode: Im Bunker war Sprengstoff für die ...
    Dec 15, 2024 · Ursprünglich lagerte hier Sprengstoff, um im Falle eines Vormarsches der militärischen Verbände des Warschauer Paktes die Fehmarnsundbrücke zu ...Missing: Sprengkammern | Show results with:Sprengkammern
  38. [38]
    Fehmarn: Die Sanierung der Fehmarnsundbrücke dauert noch Jahre
    Jun 26, 2024 · „Wir sehen starke Korrosion. Teilweise ist kein Bewehrungseisen mehr vorhanden“, erklärt Börensen. Besonders zu schaffen macht dem Bauwerk das ...
  39. [39]
    [PDF] Instandhaltung und weitere Nutzung der Fehmarnsundbrücke
    Die DB Netz AG beabsichtigt nun, die Instandhaltung der Fehmarnsundbrücke bis. Ende 2024 abzuschließen. Als letzte Maßnahme ist der Korrosionsschutz vorgesehen.Missing: 2025 | Show results with:2025
  40. [40]
    [PDF] Transport and infrastructure connectivity bottleneck analysis for the ...
    ▫ Fehmarn Sound Bridge: When the Fehmarn Belt Fixed Link will be opened, the current. Fehmarn Sound bridge will not cope with the increased traffic any longer.
  41. [41]
    Fehmarnsundbrücke: Bahn mit Sanierungs-Zeitplan - Tempo 30 in ...
    Nov 12, 2023 · Bis mindestens zur Jahresmitte 2025 wird es für den Straßenverkehr weiterhin nur mit maximal Tempo 30 über den Sund gehen, sagte die DB- ...Missing: Korrosion | Show results with:Korrosion
  42. [42]
    [PDF] FEHMARNBELT FIXED LINK MARINE MAMMAL SERVICES (FEMM)
    Sea level. According to current knowledge it seems likely that the sea level may rise about one metre. An extreme storm surge may result in even higher ...
  43. [43]
    Storm Surges - BSH
    Storm surge: 1.00-1.25 m above mean sea level; medium storm surge: 1.25-1.50 m above mean sea level; severe storm surge: 1.50-2.00 m above mean sea level; very ...
  44. [44]
    Fehmarnsundbrücke: Sanierung wird teurer - ÖPNV-Archiv
    Die Deutsche Bahn geht für die Sanierung der kombinierten Schienen- und Straßenbrücke über den Fehmarnsund inzwischen von Gesamtkosten von 91 Mio Euro aus.
  45. [45]
    Instandhaltung der Fehmarnsundbrücke: Wir haben in 2024 viel ...
    Dec 16, 2024 · Im nächsten Jahr geht es mit Hochdruck weiter: Bis Mitte 2025 sollen alle Seile auch auf Bahnseite ausgetauscht sein. Zudem werden wir mit ...Missing: Zustand | Show results with:Zustand
  46. [46]
    Decision on the New Fehmarn Sound Crossing - tunnel
    The new 1.7 km-long immersed tunnel will have four lanes for road traffic and two railway tracks. It is scheduled to be completed in time for the opening of ...<|separator|>
  47. [47]
    Eliminating bottlenecks: The Fehmarnsound Fixed Link planned as ...
    Apr 3, 2020 · The new Sound Fixed Link is more powerful than the previous one and at the same time it preserves a tourist landmark by maintaining the ...
  48. [48]
    Fehmarnbelt Fixed Link: Tunnel construction - delays and cost ...
    Oct 4, 2025 · The Fehmarnsund tunnel will replace the existing ageing bridge, which has already become a bottleneck for traffic. Commodity prices to blame ...