Fact-checked by Grok 2 weeks ago

Frecciarossa

The Frecciarossa (Italian for "red arrow") is a high-speed passenger rail service operated by , the primary train operator of Italy's national railway company (FS Group), connecting major cities across the country at operational speeds of up to 300 km/h. High-speed passenger rail services on the route were launched by in June 2007 under the Italia brand, evolving from earlier services. The Frecciarossa branding was introduced in 2008, becoming part of the flagship premium services launched in February 2009, emphasizing speed and reliability amid the expansion of Italy's high-speed network completed in December 2009. The service utilizes advanced electric multiple units, including the ETR 500 (capable of 360 km/h), ETR 600 (up to 280 km/h) and ETR 700 (up to 250 km/h), and the flagship or Frecciarossa 1000 (designed for 400 km/h maximum speed), which entered service in 2015 and features enhanced comfort, safety systems like ERTMS/ETCS, free , power outlets, and environmental certifications for low CO2 emissions. In December 2011, Frecciarossa introduced four classes of service—, , , and —to compete with private operators like Italo, offering amenities such as welcome drinks, meals, spacious leather seating, and business facilities on select trains. Key routes span the high-speed lines from to , including stops in , , , , and , with extensions to , , and international links to via since 2021 and to since June 2025, carrying over 60 million passengers annually as of 2024 and contributing to Italy's and . In 2025, unveiled a next-generation Frecciarossa fleet, which entered service in September 2025, further improving efficiency and expanding services.

Introduction and History

Overview

Frecciarossa is the flagship service of , operating as part of the broader brand of premium trains. Launched in 2008, it replaced the previous Italia branding to unify Trenitalia's high-speed offerings under a new identity focused on speed and efficiency. The service's name, translating to "Red Arrow," reflects its distinctive red livery, symbolizing rapid travel, while bookings and real-time updates are seamlessly integrated via the official Trenitalia app. The core purpose of Frecciarossa is to provide fast connections across , linking major urban centers and reducing travel times by arriving directly in city hearts at speeds up to 300 km/h on standard operations. Recent advancements with the model have enabled certifications for up to 360 km/h, with design capabilities reaching 400 km/h on select high-speed lines, enhancing efficiency on key corridors such as Turin-Milan-Rome-Naples. It operates over 200 daily trains, serving millions of passengers annually and prioritizing comfort through modern amenities. In Italy's competitive market, Frecciarossa serves as the primary offering from state-owned , facing rivalry from the private operator Italo. As of 2024, holds approximately 65% of the market, transporting over 42 million passengers on its high-speed services amid a total sector ridership of around 65 million.

Launch and Early Development

Italy's system, managed by (RFI), saw significant investments starting in the 1990s as part of a national strategy to upgrade aging infrastructure and compete with air and road travel. This period marked a shift toward dedicated high-speed lines designed for speeds up to 300 km/h, building on the pioneering Direttissima line between and , which opened in 1977 as Europe's first purpose-built high-speed route allowing operations at 250 km/h. The Frecciarossa service evolved directly from 's Italia brand, launched in 1997 to operate premium high-speed trains on upgraded and newly constructed lines. In 2008, rebranded its high-speed offerings under the umbrella, with Frecciarossa designated for the flagship red-liveried trains on the longest and fastest domestic routes. The official launch of Frecciarossa services took place in December 2008, coinciding with the completion of the Milan-Bologna high-speed line on December 13, which enabled the inaugural end-to-end run from to to . These initial operations utilized the ETR.500 series trains, originally introduced in 1993 and capable of 300 km/h on dedicated tracks, marking a key step in deploying Italy's growing high-speed network. Early Frecciarossa deployments focused on the Milan-Rome axis, leveraging the upgraded Direttissima infrastructure alongside the new northern lines built by RFI since the Turin-Milan segment opened in 2006. However, the incomplete network posed challenges, requiring integration with legacy conventional lines for southern extensions, which limited overall speeds and efficiency until subsequent openings like Bologna-Florence in . Ridership responded positively to these developments, with passenger-kilometres rising from 8.9 million in 2008 to 10.8 million in 2009, signaling rapid adoption amid competitive pricing and improved travel times. By 2012, annual passengers on Trenitalia's high-speed services exceeded 28 million, demonstrating sustained growth in the foundational years. These advancements were underpinned by policy drivers, including substantial funding through the (TEN-T) corridors, which provided up to 40% co-financing for high-speed projects as part of the EU's core network priorities. The Italian government further incentivized the initiative to foster a modal shift from air and , aiming to alleviate urban congestion, reduce environmental impact, and enhance connectivity along major north-south axes.

Expansion and Milestones

Following the initial rollout of Frecciarossa services, significant expansions began in 2015 with the introduction of the ETR 1000 (Frecciarossa 1000) high-speed train, which entered commercial operation in June and achieved a national speed record of 389 km/h during testing in November, enabling operations at up to 300 km/h on key routes. This upgrade supported network growth, with the fleet expansion contributing to annual ridership surpassing 35 million passengers for Frecciarossa and related Frecce services by 2019, marking a decade of high-speed rail that connected over 80 cities. International expansion accelerated in 2021 with the launch of direct -Paris Frecciarossa service on December 18, operating daily via at speeds up to 300 km/h and reducing travel time to 6-7 hours, enhancing cross-border connectivity under interoperability standards. In 2023, plans for a route were announced, with services set to begin in 2026, linking and to over approximately 600-900 km at high speeds as part of broader European rail integration. Infrastructure milestones included the progressive implementation of ERTMS Level 2 digital signaling on the main Turin-Salerno high-speed axis, which improved safety and capacity for higher speeds while aligning with EU Technical Specifications for Interoperability (TSI). The Turin-Lyon high-speed link advanced with ongoing construction of the , a key EU-funded project expected to fully operationalize by 2033, facilitating seamless crossings. In 2023, sourced 42% of its electricity from renewable sources (with Guarantees of Origin), supporting broader FS Group goals for eco-friendly rail under EU standards. Plans for extending Frecciarossa to progressed in 2025 with approval of the design, incorporating double-track and targeting completion by 2032-2033 to connect the island to the mainland network. In September 2025, introduced a next-generation fleet, certified for 360 km/h and designed for enhanced efficiency and international services, including expansions to . Post-COVID recovery was robust, with high-speed services carrying 45 million passengers in 2023—approaching 95% of pre-pandemic capacity—and full integration into frameworks, enabling efficient cross-border operations.

Operations and Services

Domestic Route Network

The Frecciarossa domestic route network primarily operates along Italy's dedicated high-speed corridors, connecting major urban centers from the northwest to the south. Core routes include the Turin-Milan segment, which covers approximately 140 km and takes about 1 hour at speeds up to 300 km/h. This is followed by the Milan- link, spanning 215 km in roughly 1 hour, utilizing the Milan-Bologna high-speed line operational since 2008. Further south, the -- corridor, totaling approximately 333 km, achieves end-to-end travel in about 2 hours, with to taking 37 minutes and to 1 hour 22 minutes on the Direttissima line. The - route, 205 km long, is completed in 1 hour 10 minutes via the dedicated high-speed track. Extensions from reach in about 4 hours 15 minutes and in up to 6 hours during peak periods, blending high-speed sections with conventional lines. Seasonal services to via and operate year-round but see increased frequencies in summer, linking to the Adriatic coast. The network spans over 1,400 km of dedicated Alta Velocità/Alta Capacità (AV/AC) high-speed lines, serving 12 major domestic routes and integrating with regional feeders for broader coverage. These lines, developed since the early , enable Frecciarossa trains to maintain high speeds while connecting key nodes such as Milano Centrale in the north and Roma Termini in the center, with Roma Tiburtina serving as a secondary for southern extensions. The supports seamless transfers and prioritizes capacity on the Turin-Salerno axis, the backbone of the system. Services feature high frequencies to accommodate demand, with over 200 daily Frecciarossa trains across the network. The flagship Milan-Rome route offers hourly departures, completing the 570 km journey in 3 hours, while peak hours on busy segments like Milan-Bologna see trains every 15-30 minutes. Rome-Naples runs up to every 15 minutes during rush periods, ensuring dense coverage. Seasonal adjustments enhance connectivity to tourist areas, with summer schedules boosting southern routes to , , and by adding up to five daily direct services from and . Venice routes also receive extra trains in peak season to support Adriatic travel, integrated with regional connections for comprehensive national access. In 2025, unveiled a next-generation Frecciarossa fleet, improving operational efficiency, capacity, and service expansions on domestic routes.

International Routes

Frecciarossa operates international services including the Milan-Paris route, connecting Milano Centrale to via , the , and , with a journey time of approximately seven hours. Launched on December 18, 2021, by , the service was temporarily suspended in August 2023 due to a near but resumed on April 1, 2025, with intermediate stops at Part-Dieu, Chambéry-Challes-les-Eaux, , , and Torino . The route utilizes high-speed tracks in and but incorporates conventional lines through the , requiring coordination with for border operations and track access. Currently, four daily Frecciarossa departures operate on this line, including two direct services, with each train accommodating up to 462 passengers across four classes. Since June 15, 2025, a Paris-Marseille route has been added, with four daily trips covering the approximately 850 km journey in about 6 hours 30 minutes via and , using similar infrastructure and stops in . A second international route from to via is planned for launch in December 2026, in partnership with and , covering about 600 km in roughly 6.5 hours with stops at , , , and . This service will extend to , adding an 8.5-hour journey option, and is expected to run with one daily round-trip initially, using adapted ETR1000 trains on mixed high-speed and conventional infrastructure across , , and . Operational challenges on these cross-border routes include navigating voltage transitions—such as from Italy's 25 kV 50 Hz AC on high-speed lines to France's 25 kV 50 Hz AC and Germany's 15 kV 16.7 Hz AC on conventional sections—and managing the standard 1,435 mm gauge without differences, though initiatives like the Single European Railway Area promote harmonization of signaling and certification to facilitate smoother . Border procedures involve joint timetabling and maintenance agreements with and to ensure seamless passenger transfers and compliance with national regulations. Looking ahead, Frecciarossa plans potential extensions to cities like as part of its broader European strategy under the 2025-2029 .

Passenger Classes and Amenities

Frecciarossa trains offer four levels of designed to cater to a range of needs, with comprising approximately 70% of seating capacity as the entry-level option featuring ergonomic eco-leather seats arranged in rows of four, often in a vis-à-vis for flexibility. provides enhanced comfort with leather-upholstered seats in rows of four that recline up to 109 degrees, including a welcome of beverages, snacks, and newspapers on select routes. emphasizes productivity and relaxation with wide leather armchairs in a 2+1 layout, privacy dividers, and complimentary welcome drinks alongside light catering using Italian products. At the top tier, class limits occupancy to just 10 passengers per trainset, offering 74 cm-wide armchairs with 1.5 m legroom, 180-degree rotation, personalized on-seat gourmet catering, and access to exclusive lounges at major stations. Onboard amenities enhance the travel experience across classes, including free connectivity available throughout the train, power outlets and USB ports at every seat, and the FRECCIAPlay entertainment portal for streaming content. Dining options feature on-seat delivery of via the Easy Gourmet or FrecciaBistro services, with menus highlighting regional products and chef-curated selections like Club Sandwiches in Premium. Dedicated quiet zones, known as Area Silenzio, are available in on all Frecciarossa trains and in Standard class on models to minimize disturbances, while family areas include baby changing tables and adjacent seating for companions with young children. Accessibility features ensure inclusivity for all passengers, with every Frecciarossa train equipped with dedicated spaces, wide corridors for easy movement, and audio-visual announcements in , English, , , and . Assistance services, including boarding support, are available upon request at least 24 hours in advance. Pet policies permit small animals in carriers up to 70x30x50 cm to travel free in all classes except restaurant cars, while larger dogs require a half-fare ticket, muzzle, and leash, with guide dogs traveling free without restrictions. Sustainability is integrated into the passenger experience through eco-friendly materials, such as the 94% recyclable components in trains, and significantly lower emissions compared to —up to 90% less CO2 per passenger-kilometer on routes like to . Passengers can view journey-specific CO2 savings via 's integration of the Ecopassenger calculator during booking. Booking and enhancements are streamlined through the app and website, allowing seat selection from interactive maps at purchase, with CartaFRECCIA members earning points on every journey redeemable for class upgrades, lounge access, or free travel.

Rolling Stock and Technology

Fleet Composition

The Frecciarossa fleet primarily comprises four active models of high-speed electric multiple units operated by , designed for efficient passenger transport on Italy's rail network. The ETR.500, a legacy high-speed model, includes 30 first-generation units, each configured with 11 coaches offering 574 seats in a mix of classes. Complementing these are the ETR.600, with tilting technology to handle curved routes and 28 units providing 430 seats across seven coaches. The ETR.700 consists of 19 bi-current units (17 active) capable of operating on both 25 kV AC and 3 kV DC lines, each with 546 seats in eight coaches. The ETR.1000, with approximately 116 units in service as of 2025, accommodates 457 seats in eight coaches and is designed for operational speeds exceeding 360 km/h. Overall, the active fleet totals approximately 250 trainsets. These trains are manufactured by AnsaldoBreda (now part of ), with ongoing procurement including orders for 36 additional new-generation ETR.1000 units, with deliveries from 2026 to 2029 to support fleet expansion and renewal. In 2025, the first new-generation ETR.1000 entered service, featuring enhanced sustainability, updated interiors, and improved multi-system capabilities for international routes. Earlier models such as the ETR.450 and ETR.460, introduced in the late and early for initial high-speed tilting services, were phased out between 2015 (ETR.450) and 2024 (ETR.460). Configurations across the fleet emphasize passenger comfort and accessibility, with typical class ratios allocating about 20-25% of seats to premium categories (, , and ) and the remainder to class, alongside dedicated spaces for bicycles and wheelchairs in select coaches.

Technical Specifications and Innovations

The Frecciarossa high-speed trains primarily operate on 25 AC 50 Hz overhead for dedicated high-speed lines, enabling efficient power delivery for sustained high-velocity travel. Advanced models like the ETR 1000 feature distributed traction systems with 16 asynchronous motors across the trainset, delivering a total power output of up to 9.8 MW under 25 AC, which supports rapid acceleration and energy recovery through . For operations, these trains incorporate multi-voltage capabilities, including 15 AC 16.7 Hz, 3 kV DC, and 1.5 kV DC, allowing seamless transitions across European networks without reconfiguration. Operational speeds reach a maximum of 300 km/h on Italy's high-speed infrastructure for models such as the ETR 500, ETR 600, and ETR 1000, optimizing travel times on routes like to . The ETR 1000 has undergone testing at 360 km/h, demonstrating potential for future enhancements while maintaining stability through advanced suspension and aerodynamic profiling. Certain variants, including the ETR 600, employ active tilting technology up to 8 degrees to navigate curved sections of conventional lines at higher speeds, reducing journey times by compensating for lateral forces without compromising passenger comfort. Safety systems on Frecciarossa trains integrate the (ETCS) Level 2, which uses continuous radio-based communication for precise speed supervision and automatic braking to prevent signal passed-at-danger incidents. This is complemented by Italy's Sistema Controllo Marcia Treno (SCMT), an automatic train protection mechanism that enforces speed limits and provides fallback oversight on mixed high-speed and conventional routes. Structural integrity adheres to EN 15227 standards, incorporating energy-absorbing front-end designs and deformation zones to mitigate collision impacts and protect occupants. Key innovations include aerodynamic shaping that reduces drag by optimizing the and underbody streamlining, contributing to up to 30% lower compared to earlier generations. leveraging data analytics has enabled to reduce maintenance costs by 8-10% across its fleet through forecasting component failures. Maintenance operations are supported by centralized facilities, such as the major depot in for comprehensive overhauls and the Bologna facility for routine servicing along key high-speed corridors. These trains are engineered for a service lifecycle of up to 30 years, with modular components facilitating cost-effective upgrades and extended operational reliability.

Safety and Incidents

Safety Measures and Standards

Frecciarossa operations adhere to the European Union's Technical Specifications for Interoperability (TSI), which establish essential safety requirements for subsystems including , , and operations to ensure and risk mitigation across member states. Compliance with these standards is verified through certification processes, while national oversight by (RFI) enforces additional infrastructure-specific protocols, such as regular maintenance and signaling integrity. RFI conducts annual safety reports and audits in line with Italian National Agency for the Safety of Railway Transport and Infrastructure (ANSF) guidelines, evaluating system performance and implementing corrective actions to maintain compliance. Onboard safety systems incorporate redundant braking mechanisms, combining electropneumatic and to provide during high-speed travel and optimize while ensuring rapid deceleration. , including water mist and gaseous extinguishing agents, are integrated into carriages to detect and contain potential fires, meeting TSI criteria for passenger . Emergency evacuation designs facilitate passenger egress within minutes, supported by wide doors, clear signage, and crew training protocols aligned with TSI requirements for and rapid response. Operational protocols emphasize rigorous driver , utilizing full-motion simulators to replicate high-speed scenarios, with programs exceeding 200 hours of practical and theoretical to build proficiency in emergency handling. Trackside monitoring relies on extensive networks managed by RFI, including diagnostic trains equipped with systems for real-time detection of , wheel-rail interaction, and infrastructure anomalies to preempt failures. Fatigue management rules for drivers follow ANSF directives, incorporating shift limits, rest periods, and risk assessments via indices to prevent impairment, as evidenced in post-incident analyses showing compliance with these measures. Frecciarossa services maintained zero fatalities in regular operations prior to , underscoring the efficacy of these protocols, with overall punctuality rates supporting , reliable performance—recent analyses indicate over 70% on-time arrivals on key routes, contributing to consistent outcomes. Following the Livraga incident, enhancements focused on derailing prevention, including upgraded switch maintenance, automated speed supervision on curved sections, and reinforced signaling to limit velocities and detect anomalies earlier.

Notable Accidents and Investigations

The most significant incident in Frecciarossa history occurred on February 6, 2020, near Livraga in the Ospedaletto Lodigiano area of , when a derailed during pre-commercial testing. Traveling at around 300 km/h, the train's leading struck a track maintenance cart left unsecured on the line by workers, causing the front car to and subsequent cars to partially leave the tracks. This resulted in two fatalities—both railway maintenance workers—and 31 injuries, primarily minor, among the test crew and passengers on board. The official investigation by Italy's of Infrastructure and Sustainable Mobility attributed the to during operations, specifically the failure to remove and report the cart's position, compounded by inadequate communication protocols. No mechanical failure in the train was identified, though the incident exposed vulnerabilities in transitional sections of the Milan-Bologna line not yet fully equipped with the (ERTMS). In response, authorities accelerated ERTMS rollout across the network, enhanced verification procedures, and initiated against involved personnel, including executives from RFI. The affected trainset was repaired after extensive inspections, and the line reopened within days, minimizing long-term disruptions. Another notable event took place on December 10, 2023, when a Frecciarossa train from to collided head-on with a regional near station in . The low-speed impact, occurring at about 30 km/h, stemmed from the regional train passing a red stop signal due to driver error, with the Frecciarossa unable to halt in time despite emergency braking. The accident caused 17 minor injuries among the approximately 400 passengers and crew but no deaths or serious harm. Prosecutors' probe confirmed human factors, including lapses in signal acknowledgment and coordination between dispatchers and drivers, leading to immediate suspension of the involved operators and implementation of stricter certification and simulation training for high-speed and regional crews under ANSFISA guidelines. provided medical support and compensation to the injured, while the Bologna-Rimini line resumed full operations within hours after debris clearance. On November 13, 2025, a Frecciarossa from to struck and killed a man on the tracks near in around 8:00 AM local time. The incident suspended rail traffic on the Sapri-Paola line for several hours, causing delays of up to eight hours and cancellations on routes including , with no reported injuries to passengers or crew. Investigations by authorities are ongoing to determine the circumstances, which may involve a or intentional act. Over its more than 17 years of operation, Frecciarossa has recorded a limited number of serious incidents, reflecting a strong profile overseen by ANSFISA, Italy's safety authority. Minor events, such as occasional defects and track-related near-misses, have been managed without casualties through routine inspections and rapid response protocols. Post-incident measures have consistently included fleet-wide checks, victim compensation via policies, and no passenger service interruptions exceeding 24 hours.

References

  1. [1]
    Frecciarossa - Trenitalia
    FRECCIAROSSA trains travel throughout Italy, reaching a maximum speed of 300 km/h; they run straight into the heart of the most important cities, shortening ...Frecce · Catering service · Frecciargento
  2. [2]
    [PDF] A Short History of High-Speed Rail Development in Italy - FS Italiane
    Jul 9, 2024 · ❖ High-Speed rail produced positive impacts on several sectors such as accessibility, tourism, economic integration and output, external costs, ...
  3. [3]
    Frecciarossa 1000 - Trenitalia
    Frecciarossa 1000 is the new high-speed train of Trenitalia, comfortable, safe and environmentally friendly, designed to meet the most advanced techniques.
  4. [4]
    Trenitalia's Frecciarossa high-speed train | Tickets from €19.90
    This is Trenitalia's flagship train, introduced in 2015 and operating at up to 300 km/h (186 mph) with all 4 classes. They operate the most important services ...
  5. [5]
    Next-Generation Frecciarossa 1000 enters service - Railway PRO
    Oct 3, 2025 · Trenitalia, part of the FS Group, has unveiled its new-generation Frecciarossa ... launch on Sunday, 28 September.
  6. [6]
    Paris to Madrid: New high-speed train will slash travelling time ...
    Dec 15, 2022 · The name 'Freccia rossa' translates to 'Red arrow'. Prior to 2008, it was known as Eurostar Italia. The modern, high-speed trains can reach ...
  7. [7]
    Frecciarossa 1000 - FS Italiane
    Designed with a top speed of 400 km/h and a commercial speed of 360 km/h, the Frecciarossa 1000 is currently certified for 300 km/h.Missing: expansions | Show results with:expansions
  8. [8]
    Frecciarossa train | Buy Trenitalia Frecciarossa tickets - Trainline
    Frecciarossa is Trenitalia's high-speed train, reaching 300 km/h, with 200 daily connections across Italy, and a modern design.
  9. [9]
    High speed: 400 kilometres of new lines and the challenge of Sncf
    Apr 29, 2025 · Today, passengers carried by high-speed trains in a year are estimated at around 65 million: around 23 million are from Italo (35%) and over 42 ...
  10. [10]
    A planning history of high-speed rail in Italy - ScienceDirect.com
    The paper examines the planning history of the Italian high-speed rail (HSR) network through three main perspectives.
  11. [11]
    Italy's high-speed train celebrates its 30th anniversary - Mediarail.be
    Jun 4, 2022 · The 'direttissima' can, however, be considered the first high-speed line to be opened in Europe when the first half of it was put into service ...
  12. [12]
    [PDF] High Speed Rail Competition in Italy - International Transport Forum
    Moreover, network deployment was accompanied by substantial investment in railway stations and urban hubs, an area in which Italy is a world leader, not least ...
  13. [13]
    On the modal shift from motorway to high-speed rail: evidence from ...
    The aim of this study is to analyse whether the HSR expansion in Italy has led to a modal shift from motorway to HSR.
  14. [14]
    Frecciarossa 1000 – high-speed comfort and safety
    Sep 15, 2015 · The Frecciarossa 1000 is the new high-speed train from Gruppo FS Italiane subsidiary Trenitalia which began operating on 14 June 2015.Missing: introduction | Show results with:introduction
  15. [15]
    ETR 1000 sets new Italian rail speed record
    Nov 26, 2015 · The Frecciarossa 1000 (ETR 1000) set a new Italian rail speed record on November 26, when one of the eight-car sets reached 389km/h during nocturnal testing.Missing: introduction | Show results with:introduction
  16. [16]
    FS Italiane Group: ten years of Italian High Speed
    Dec 5, 2019 · Three hundred and fifty million passengers in 10 years, 380 million kilometres travelled and over 80 cities connected, in 2019, with a fleet of 144 Frecce.
  17. [17]
    Italy Launched High Speed Milan-Paris Train - InTrieste
    Dec 28, 2021 · Trenitalia launched a high-speed Frecciarossa train service between Milan and Paris on 18 December, offering a journey time of between six and seven hours.
  18. [18]
    Frecciarossa 1000 Very High-Speed Train - Railway Technology
    May 20, 2015 · The new high-speed train made its inaugural journey from Milan to Rome on 25 April 2015. The trains are expected to start commercial service on ...Missing: introduction | Show results with:introduction
  19. [19]
    New rail links between Italy and Germany set for 2026
    Feb 24, 2023 · While the rail links to Munich will be launched in 2026, FS Group said there is a possibility to extend the routes up to Berlin. The new service ...
  20. [20]
    [PDF] TM: NEW ERTMS FACTSHEETS updated 2025 - ERTMS.net
    Italy, as an early investor in ERTMS, distinguishes itself by the use of ERTMS Level 2 on the main national axis, from Turin to Salerno.
  21. [21]
    Turin-Lyon to cost 2,5 billion euros more, opening set back one year
    Jul 31, 2024 · Moreover, the completion of the project shifted from 2032 to 2033. The not-so-positive news was included in a cost update presented to the board ...
  22. [22]
    Sustainability in maintenance plants - Trenitalia
    Trenitalia uses renewable energy, increases energy efficiency, and reuses water in maintenance plants. 100% of electricity is from renewable sources.
  23. [23]
    Italy Revives Planned $15.7B Messina Crossing
    Aug 7, 2025 · Italy approved the €13.5-billion ($15.7-billion) project on Aug. 6; Webuild aims to start major construction in 2026 and open the crossing by ...
  24. [24]
    Italy Approves Plan for Bridge Linking Sicily to Mainland - AFAR
    Oct 10, 2025 · Projected to be completed between 2032 and 2033, the Strait of Messina Bridge would become the world's longest single-span suspension bridge. As ...
  25. [25]
    [PDF] 2023 Sustainability Report - FS Group - FS Italiane
    Nov 3, 2023 · The year 2023 was marked by strong geopolitical instability, with the continuing conflict in Ukraine and the violent deflagration of the ...
  26. [26]
    ETR1000 – Frecciarossa - The Railway Dictionary of Mediarail.be
    Summary: The history of this train began as the V300ZEFIRO trainset, which was a trainset built in Italy by Bombardier Transport in partnership with ...
  27. [27]
    Milan to Bologna by Train from $12.03 | Buy High-Speed Tickets
    Starting from $12.03It's easy to travel from Milan to Bologna Centrale by train. The train takes just 59m on the fastest services, travelling along the Milan-Bologna high-speed ...
  28. [28]
    Train from Rome to Naples - ItaliaRail
    The distance from Rome to Naples is 140 miles and many high-speed trains make the trip in just 1 hour and 10 minutes.
  29. [29]
    Rome to Bari Centrale by Train | Buy Tickets from $24.01 - Trainline
    Starting from $24.01What's the fastest journey time between Rome and Bari Centrale by train? The fastest journey time by train from Rome to Bari Centrale is 4 hours and 14 minutes.
  30. [30]
    High-Speed Trains In Italy | Italy Bullet Train Guide - Trainline
    High-speed trains in Italy can reach speeds of up to 400 km/h (248 mph). The fastest Italian high-speed train reaching that speed is the modern Frecciarossa ...Missing: frequencies | Show results with:frequencies
  31. [31]
    Frecciarossa train tickets, routes, timetables | Rail Europe
    Frecciarossa is a high-speed train operated by Trenitalia, reaching up to 300 km/h, connecting major Italian cities, and is part of the "Frecce" family.
  32. [32]
    Frecciarossa Trains | ItaliaRail
    Frecciarossa high-speed trains, operated by Trenitalia, reach speeds of 250 miles per hour (400 km/h) and offer maximum comfort.
  33. [33]
    Summer travels to the toe of Italy - Europe by Rail
    Jul 2, 2023 · This summer Trenitalia are running five daily Frecciarossa services from Rome and Naples to Reggio di Calabria. And, as a mark of their ...
  34. [34]
    FS Italiane, the Milan-Paris Frecciarossa connection to be resumed ...
    Jan 21, 2025 · The Paris-Lyon link also continues to gain travellers, with a 40% increase between 2023 and 2024. Paris-Milan link, to resume its operation ...
  35. [35]
    Frecciarossa tickets for Paris-Milan route now on sale
    Dec 13, 2021 · The twice-daily Frecciarossa 1000 service launches on December 18. The Paris (Lyon) – Milan (Centrale) service has departures in both ...
  36. [36]
    Big travel news! The direct Paris–Milan train is officially back!
    Jan 23, 2025 · The first scheduled Frecciarossa service will depart on 1 April, with tickets available for travel until 30 June 2025. Onboard experience.
  37. [37]
    [PDF] 2025-07-18-trenitalia-france-response-further-information ... - ORR
    Jul 18, 2025 · In October 2024, Trenitalia received special recognition for its. Frecciarossa service, being named "Best Rail Operator" in the Ground.<|control11|><|separator|>
  38. [38]
    FS Group: new Frecciarossa connections between Italy, Germany ...
    May 21, 2025 · By 2026, the new high-speed cross-border connections Milan - Munich and Rome - Munich will be activated. Then, from December 2028, the services ...Missing: launch | Show results with:launch
  39. [39]
    DB, ÖBB and Trenitalia agree on new direct train services
    May 22, 2025 · Starting in late 2026, Italy's Frecciarossa high-speed trains will take European travellers along a 600 km route from Munich to Milan, and around 900 km from ...
  40. [40]
    Trenitalia Now Launches Frecciarossa One Thousand High-Speed ...
    Oct 12, 2025 · The launch of the Frecciarossa 1000 will enhance Trenitalia's existing high-speed network, particularly in terms of international connections.
  41. [41]
    Frecciarossa 1000 high speed train launched as FS Group ramps up ...
    Oct 10, 2025 · Renewing the train fleet is one of the key objectives of FS Group's 2025-29 strategic plan. 'The new-generation Frecciarossa 1000 was created to ...
  42. [42]
    Standard - Trenitalia
    For Standard customers, the EasyFood service on seat gives the opportunity to comfortably consume a FOOD & BEVERAGE combo, with 23 alternative menus, and a ...
  43. [43]
    Premium - Trenitalia
    Premium offers leather seats with reclining backrests, welcome drink, snacks, and a new catering service with Italian products. Coach 4 is reserved for Premium.
  44. [44]
    Business - Trenitalia
    Business class offers wide leather armchairs, privacy dividers, luggage space, a welcome drink, and a catering service with Italian products.
  45. [45]
    Executive - Trenitalia
    The Executive class offers comfort and exclusivity for 10 passengers with 74cm wide armchairs, 1.5m spacing, 180° rotation, and on-seat catering with Italian ...
  46. [46]
    Trenitalia First Class vs Second Class - Trainline
    Both classes include free WiFi, power outlets, toilets, access to the FRECCIAPlay entertainment portal, air conditioning and reserved wheelchair spaces.
  47. [47]
    How to check what facilities are available on your train
    Jul 9, 2025 · Quiet zones (also referred to as Area Silenzio) are available on Business (all Frecciarossa trains) and Standard class (Frecciarossa 1000 only).Missing: family amenities
  48. [48]
    Accessibility - FS Italiane
    100% of Freccia trains have equipped areas for transporting people with reduced mobility or wheelchairs. The Frecciarossa1000 lets wheelchair users move ...
  49. [49]
    Passengers with disabilities or reduced mobility - Trenitalia
    Details on the trains with facilities for persons with reduced mobility · Frecciarossa, Frecciargento and Frecciabianca · FrecciaLink buses · Intercity trains ...
  50. [50]
    Travelling with your pet - Trenitalia
    Dogs, cats and other small pets can travel free of charge on our trains in a pet carrier with a maximum size of 70 x 30 x 50 cm.
  51. [51]
    The train: a sustainable choice - Trenitalia
    Trenitalia is the first European railway company to report the CO 2 emissions of its journeys through the UIC's official “Ecopassenger” calculator.Missing: eco- friendly materials
  52. [52]
    [PDF] Download the Sustainability Document - Trenitalia
    Accessibility of services, protection of the environment, adapting travel behaviours and energy efficiency are the key challenges for creating more sustainable ...
  53. [53]
    Online Ticket - Trenitalia
    1. If you have indicated you want to select the seat, you can change the coach you will travel in · 2. Select the seat from those still available · 3. Click on “ ...
  54. [54]
    [PDF] “CartaFRECCIA” Rewards Programme Regulations (Art ... - Trenitalia
    CartaFRECCIA is a points-based rewards program for cardholders, where points are earned through ticket purchases and partner agreements. The program is valid ...
  55. [55]
    Frecciarossa group - Trenitalia
    Frecciarossa 1000 is a high-speed train reaching 400km/h, with four service levels: Executive, Business, Premium, and Standard.
  56. [56]
    ETR1000 – Frecciarossa | Hitachi Rail
    Each train has a total length of around 200 metres and capacity for around 460 passengers, who can benefit from many features enhancing their travel experience, ...
  57. [57]
    FS Group, first trip on the new-generation Frecciarossa 1000
    Sep 26, 2025 · With an investment of over EUR 1.3 billion, 36 convoys are expected to be delivered between now and 2029, with ten trains per year on average, ...Missing: composition | Show results with:composition
  58. [58]
    ETR.450 - TrainsDepot.org
    Jan 19, 2025 · The ETR.450 is a high-speed tilting electric train produced by Fiat Ferroviaria, entering service on the Rome-Milan route of the Italian railway networkMissing: retired | Show results with:retired
  59. [59]
    Frecciarossa 1000 - Trainspo
    Weight: 500 t ; Axle load: 17 t ; Electric systems: 15 kV AC 16.7 Hz 25 kV AC 50 Hz 1.5 kV DC 3 kV DC ; Power output: 9800 kW ; Tractive effort: 370 kN.
  60. [60]
    [PDF] frecciargento trains - ACP Rail
    ... ETR 610 (104 seats + 2 for disabled passengers). ✓5 carriages - 2nd class ETR 600 (328 seats + 2 for disabled passengers). ✓ 4 carriages -2° class ETR 610(304 ...
  61. [61]
    High speed train in Italy - The Railway dictionary of Mediarail.be
    The new Firenze-Roma line called 'direttissima' line, which literally means 'direct railway line', was the first new line project that focuses on high speed.
  62. [62]
    [PDF] Crashworthiness design of a train based on European Standard ...
    The new MLA platform belongs to category C-II as defined by the. EN15227 standard, which requires that the crash behavior of the train be verified during the ...Missing: Frecciarossa | Show results with:Frecciarossa
  63. [63]
    The fleet - Trenitalia
    Trenitalia's fleet includes Frecciarossa 1000, new hybrid intercity, new regional, double-decker, single-decker electric, and single-decker hybrid trains.
  64. [64]
    Industry 4.0 and predictive technologies for asset maintenance
    May 9, 2017 · Overall, Trenitalia was able to decrease downtime by 5–8 percent and reduce its annual maintenance spend of $1.3 billion by an estimated 8–10 ...
  65. [65]
    HS2: Setting the high-speed standard - Modern Railways
    Jul 23, 2020 · Hitachi Rail and Bombardier have a full service contract to maintain the fleet from a depot in Naples, with overnight servicing also carried out ...
  66. [66]
    Trenitalia signs fleet support contract for its ETR500 very high-speed ...
    Apr 30, 2020 · The base order is for six years with an option to extend for a further six years. This is an important step in the ETR500 fleet's lifecycle as ...
  67. [67]
    Technical Specifications for Interoperability (TSIs)
    The Technical Specifications for Interoperability (TSIs) define the technical and operational standards which must be met by each subsystem or part of subsystem ...Infrastructure TSI · Control Command and... · Rolling Stock - Locomotives...Missing: Frecciarossa | Show results with:Frecciarossa
  68. [68]
    [PDF] Rete Ferroviaria Italiana S.p.A. 2024 ANNUAL REPORT - RFI
    Annual Safety Report – 2024. In May 2024, the Annual Safety Report for 2023 was prepared and submitted, in accordance with ANSF Guidelines no. 5841/2016 of ...
  69. [69]
    Trenitalia Frecciarossa - Ingea
    FIRE-FIGHTING SYSTEM. Trenitalia Frecciarossa. Construction design service 3d fire-fighting system water mist for train carriages Frecciarossa trains.Missing: suppression | Show results with:suppression
  70. [70]
  71. [71]
    HENSOLDT train simulator delivered to Trenitalia
    Jul 24, 2020 · The Simsphere Train Full-Motion-Simulator provides a true-to-scale replica of the train driver's cabin with a comprehensive motion simulation.Missing: Frecciarossa | Show results with:Frecciarossa
  72. [72]
    [PDF] Ministry of Sustainable Infrastructure and Mobility
    This document describes in detail the procedures for the acquisition of the authorisations (and relative professional qualifications) also for the Safety and ...
  73. [73]
    FS Group, new diagnostic train in service: RFI expands its fleet
    Oct 21, 2025 · On-board sensors and multi-sector systems constantly monitor track geometry and wear, contact line, running dynamics and wheel-rail and ...
  74. [74]
    Frecciarossa 1000 derails at high speed | News - Railway Gazette
    Feb 10, 2020 · The high speed derailment of a Trenitalia Frecciarossa 1000 trainset at Livraga, south of Lodi, on February 6. This was only the second fatal accident to occur ...
  75. [75]
    High-speed train derails in Italy, killing two and injuring dozens | CNN
    Feb 6, 2020 · Two people died and dozens were injured after a high-speed train derailed in Italy's Lodi province early on Thursday morning, Italian authorities said.
  76. [76]
    Italy train crash: Two dead in high-speed derailment - BBC
    Feb 6, 2020 · Two people have been killed after a high-speed train derailed early on Thursday near the northern Italian city of Lodi, emergency services say.Missing: 2015 | Show results with:2015
  77. [77]
    Train crash in northern Italy injures 17 passengers - The Local Italy
    Dec 11, 2023 · Two trains crashed into each other at low speed in northern Italy late on Sunday, injuring at least 17 people, none seriously, firefighters and ...
  78. [78]
    Collision between two trains in Faenza, 17 injured. High speed ...
    The collision occurred around 8.20pm between a regional vehicle and an Freccia. Probably something went wrong in the communications and the following train hit ...