Fact-checked by Grok 2 weeks ago

Interstate 27

Interstate 27 (I-27) is an intrastate Interstate Highway in spanning 124 miles (200 km) from Lubbock northward to Amarillo. The route connects two principal cities in the and Panhandle regions, facilitating transportation of agricultural goods such as and . It overlays U.S. Route for its entirety, providing a divided, controlled-access alternative to the previous two-lane highway and reducing travel time between endpoints by 50 percent. Designated by the Texas Highway Commission on January 21, 1969, I-27 follows the path of U.S. 87 from its interchange with U.S. 62 in Lubbock to in Amarillo. The highway's construction addressed the need for improved connectivity in rural , where the economy relies heavily on farming and ranching. In September 2024, a 4.2-mile extension south of Lubbock along U.S. 87 was federally approved, marking the first addition to the route and supporting broader corridor development. As part of the Ports-to-Plains Trade Corridor, I-27 is designated for potential expansion southward toward via Laredo and northward, enhancing freight movement from ports to the Canadian border over 963 miles in alone. This initiative, authorized under recent federal legislation, aims to upgrade existing roadways to Interstate standards, though full implementation depends on funding and planning. The highway passes through smaller communities like Abernathy, Hale Center, and Tulia, with key interchanges including Loop 289 in Lubbock.

Route Description

Current Alignment and Length

Interstate 27 (I-27) is a north–south Interstate Highway spanning approximately 128 miles (206 km) entirely within , connecting its northern terminus at a with (I-40) on the eastern side of Amarillo in Potter County to its southern terminus at the end of along U.S. Highway 87 (US 87), approximately 0.1 mile (0.16 km) north of County Road 7500 in Lubbock County. The route's length incorporates an original designated segment of about 124 miles extending to State Loop 289 (SL 289) on Lubbock's southern edge, plus a 4.2-mile (6.8 km) southern extension approved by the in September 2024 and officially signed in April 2025. The alignment parallels the US 87 corridor southward through the flat plains of the , traversing Potter, Randall, Swisher, Hale, and Lubbock counties. From Amarillo, I-27 proceeds south across level terrain with negligible elevation variations, characteristic of the , linking rural agricultural areas with key urban centers while maintaining a predominantly controlled-access divided profile. This path supports efficient north–south travel in a dominated by expansive, open landscapes and minimal topographic relief.

Major Interchanges and Features

The northern terminus of Interstate 27 connects to via an interchange in Amarillo that originally lacked a direct ramp from I-40 eastbound to I-27 southbound but has since been configured to support full access. This junction serves as a critical link for north-south traffic integrating with the east-west I-40 corridor. In Lubbock, I-27 overlaps with through the city, featuring major interchanges such as the one with and 114 at 19th Street, as well as the southern terminus interchange with Loop 289. These interchanges accommodate high local and regional traffic volumes in the urban core. Rest areas are provided along the route, including the Hale County Safety Rest Area at mile marker 29, accessible for both northbound and southbound travelers, offering facilities compliant with standards for driver safety and amenities. The highway maintains interstate design standards as a fully divided, controlled-access freeway, generally with four lanes in rural sections and expanding to six lanes through urban areas like Lubbock and Amarillo to handle denser traffic. Post-designation improvements include the addition of passing lanes in rural segments to enhance overtaking opportunities and traffic flow, as part of ongoing corridor upgrades. Overpasses and bridges, such as those recently replaced in Lubbock including the Yucca Lane structure raised to current standards, support the route's structural integrity and navigation efficiency.

Traffic and Usage Patterns

Interstate 27 experiences higher traffic volumes near urban commercial centers like Lubbock and Amarillo, where average annual daily traffic (AADT) reaches 90,000 to 100,000 vehicles in segments through Lubbock, reflecting concentrations of , , and population-driven activity. In contrast, rural stretches south of Lubbock and between Amarillo and smaller towns like Happy record AADTs of 8,000 to 11,000 vehicles, underscoring the highway's role as a connector rather than a primary urban artery outside these hubs. Overall system-wide AADT averages approximately 30,000 vehicles across its 124-mile length between the cities. Freight transport dominates usage, particularly in rural segments where trucks comprise elevated percentages of total volume due to the corridor's facilitation of agricultural commodities such as , , and from the , alongside energy sector hauls from regional and gas operations. Truck traffic spikes notably near Lubbock, tied to industrial and distribution activities, while northern segments beyond Amarillo show consistent heavy commercial flows linked to broader trade corridors. Seasonal fluctuations occur, with peak volumes during agricultural harvest periods in late summer and fall, when increased trucking of crops and equipment elevates rural traffic, compounded by variability from oil and gas extraction intensities in the Panhandle region. These patterns reflect the highway's operational reliance on regional cycles rather than steady commuter flows.

History

Pre-Designation Development

U.S. Route 87, the primary predecessor to Interstate 27, was extended southward into Texas in 1935 during a revision of the U.S. Highway system, supplanting portions of U.S. Route 385 and aligning with existing state and local roads through the Texas Panhandle from the New Mexico border near Texline southward through Amarillo and beyond. This extension built upon early 20th-century roadways developed to link isolated ranching districts to rail hubs, such as those served by the Atchison, Topeka and Santa Fe Railway, facilitating the transport of cattle and agricultural goods by wagon and emerging motor vehicles. The Panhandle region, with its vast open-range operations producing beef for national markets, drove demand for improved north-south connectivity independent of federal interstate initiatives, as local boosters advocated for highways to reduce reliance on seasonal trails and enhance economic viability amid rising automobile adoption in the 1920s. State-led enhancements in the focused on paving previously unpaved or segments of 87 in the Panhandle, where as late as most of the route remained unsurfaced, hindering reliable travel for freight and passengers. By the , the Texas Highway Department had prioritized asphalt overlays and realignments along key corridors, including the Amarillo-Lubbock stretch, to support heavier loads from gins, feedlots, and field equipment as ranching diversified into commercial . These upgrades, funded through state bonds and gasoline taxes rather than later federal aid, reflected causal pressures from the region's land-extensive economy, where efficient road access to railheads like Amarillo—handling thousands of shipments annually—directly correlated with profitability for operations spanning millions of acres. By the mid-1950s, sections of 87 had evolved into four-lane divided highways, accommodating surging truck traffic without yet invoking interstate standards.

Federal Designation and Initial Planning

Interstate 27 received federal authorization for inclusion in the in December 1968, through the U.S. Bureau of Public Roads (predecessor to the ), under the Federal-Aid Highway Act of 1968. This legislation enabled the addition of qualifying routes that met Interstate design standards and linked existing system segments, reflecting ongoing expansions beyond the original 41,000-mile network established in 1956 to address evolving national transportation demands. The numbering as I-27 adhered to the system's convention of odd numbers for primarily north-south routes, positioned to avoid conflicts with primary corridors like I-25 and I-35 while accommodating potential future branches. Planning emphasized alignment with existing infrastructure to optimize federal and state resources, selecting the corridor paralleling U.S. Route 87 from Amarillo to Lubbock for its established pavement, reduced need for new right-of-way acquisition, and lower construction costs compared to alternatives. state officials, through the Texas Highway Department (predecessor to TxDOT), provided critical input during the approval process, coordinating with federal agencies to ensure the route supported regional connectivity while aligning with broader Interstate goals of facilitating commerce and defense mobility. U.S. Representative George Mahon of advocated for the designation, highlighting its role in linking key Panhandle economic centers to the national grid without extensive disruption. The initial federal-state agreement prioritized logistical feasibility, with the route's 298-mile length defined from the intersection with in Lubbock northward to in Amarillo, formalized in by the Texas Highway Commission's minute order on January 21, 1969. This phase focused on policy approvals and route validation rather than physical development, setting the framework for subsequent allocations under the Interstate program's 90% federal cost-sharing model.

Construction Milestones and Completion

Construction of Interstate 27 primarily involved upgrading and widening existing segments of US Highway 87 to interstate standards, with new alignments in select areas, beginning in the late . Four-laning of US 87 from Canyon to Lubbock was largely completed by the late , establishing the foundational freeway corridor that would become I-27. In the Amarillo area, early upgrades to US 87 facilitated initial interstate connectivity, with portions opening to freeway traffic around 1970. New interstate-standard construction commenced in the mid-1970s, funded through the federal derived from gasoline excise taxes established under the and subsequent authorizations. The Texas Department of Transportation's Lubbock District initiated building from Lubbock northward to in 1975, marking the start of dedicated I-27 segments. Rural land acquisition posed logistical challenges, requiring proceedings over fragmented farmland holdings, though Texas's relatively low population density minimized urban relocation disputes compared to denser corridors. By the , progress accelerated in the northern sections; the Amarillo District's portion, a 23.6-mile stretch from 13 miles south of Amarillo to the city's core, opened on December 5, 1986, achieving full interstate compliance north of Lubbock by 1988. The final phase encompassed urban traversal through Lubbock within Loop 289, with the segment from 19th Street to 54th Street opening on September 3, 1992, marking overall completion of the original 124-mile route. This timeline reflected phased federal-state funding allocations, prioritizing high-traffic alignments amid fluctuating gasoline tax revenues that supported 90% of interstate costs.

Expansions and Future Plans

Southern Extensions

On September 26, 2024, the Texas Transportation Commission approved the extension of Interstate 27 by 4.2 miles southward from its previous terminus in Lubbock, Texas, concurrent with U.S. Highway 87 to 0.1 mile north of County Road 7500. This segment incorporates upgraded access control limits along US 87, marking the initial phase of southern expansion efforts. The extension forms part of the Ports-to-Plains Corridor initiative, aimed at designating and upgrading routes from the U.S.-Mexico border near Laredo northward through west Texas to connect with international trade networks. Proposals envision further southward progression along US 87 toward Interstate 20 near Lamesa and ultimately to Laredo, facilitating freight movement from Mexican ports to northern markets. Implementation follows a phased strategy outlined in TxDOT's 2024 statewide plan, which includes environmental assessments, funding allocations, and prioritization of trade corridor enhancements to support economic connectivity without immediate full construction. This approach leverages federal designations under the I-27 Numbering Act to integrate existing highways into the Interstate system incrementally.

Northern and Corridor-Wide Upgrades

The (TxDOT) initiated a in late summer 2024 to evaluate upgrading U.S. 87/U.S. 287 from Amarillo northward to Dumas to 27 standards. This approximately 25-mile segment analysis assesses current and projected transportation needs, safety enhancements, mobility improvements, costs, and logistical challenges associated with interstate compliance, such as widened lanes, shoulders, and interchange modifications. Public input meetings, including a virtual session on December 4, 2024, presented preliminary findings, with the study slated for completion in July 2025. This northern extension forms a critical component of the broader Ports-to-Plains Corridor, designated as a future interstate system encompassing a 963-mile route across 26 counties from Laredo to the border. Corridor-wide upgrades under the I-27 System in Texas initiative prioritize incremental improvements to achieve full interstate standards, including pavement rehabilitation, bridge replacements or widenings, and capacity expansions such as adding lanes to six in high-volume areas south of Amarillo. These enhancements aim to integrate existing U.S. and state highways with interstates like I-20, I-27, I-35, and I-40, while addressing drainage systems and loop connections for better freight mobility. TxDOT's implementation strategy, outlined in the I-27 System in plan, establishes multi-year timelines for these upgrades, with follow-up meetings in April 2025 providing updates on northern study progress, proposed alignments, and phased integrations such as drainage improvements and auxiliary lane additions near urban loops. The effort represents a decades-long , focusing on verifiable needs rather than accelerated timelines, with environmental and right-of-way evaluations guiding prioritization.

Recent Projects and Implementation Timeline

In March 2022, the U.S. designated the Ports-to-Plains Corridor as a future extension of the Interstate 27 system through legislation included in the federal appropriations act, qualifying it for enhanced federal funding to support infrastructure upgrades along the route. TxDOT finalized a comprehensive statewide implementation strategy for the I-27 system in 2024, establishing a phased, multi-decade framework for incremental enhancements focused on improving features, conditions, and capacity through targeted and widening initiatives. Ongoing construction as of mid-2025 includes multiple improvement contracts involving overlays, median barrier installations, illumination upgrades, and shared-use path developments, with crews actively advancing these elements to mitigate hazards and enhance reliability. In 2024, the Texas Transportation Commission approved a 4.2-mile extension of the existing highway, marking progress in corridor expansion. Active widening projects to six lanes, including ramp improvements, drainage enhancements, and upgrades, continue in key segments, with certain phases projected for completion by 2028 alongside related drainage and bridge work scheduled for early 2027. TxDOT has initiated preliminary development for additional corridor segments under this , integrating these into broader safety and capacity goals.

Numbering and System Integration

Route Number Assignment

The route number for Interstate 27 was assigned in accordance with the Interstate Highway System's established numbering conventions, which reserve odd numbers for primarily north-south alignments, with sequences increasing progressively from west to east across the nation. This system, formalized by the and administered through state applications to the American Association of State Highway and Transportation Officials (AASHTO), selected 27 as an available designation for a north-south corridor west of I-35, positioned logically between I-25 (serving the Rocky Mountain region) and I-35 ( to ). The choice avoided duplication with existing routes—such as in the eastern U.S.—and incorporated spacing in the low-20s series to allow for potential future spurs or extensions without necessitating renumbering. Designation as I-27 followed the addition of the route to the Interstate System beyond the original 1957 plan, with the Texas Department of Transportation submitting the proposal aligned with U.S. Highway 87 between Lubbock and Amarillo. The Federal Highway Administration approved the numbering and inclusion on December 12, 1968, after which the Texas State Highway Commission concurred on February 1, 1969, enabling signage and mapping integration. This late-1960s assignment reflected strategic planning for enhanced connectivity in the Texas Panhandle's sparse infrastructure, prioritizing efficient numbering to support anticipated regional development without preempting expansions. The designation first appeared publicly in the 1970 Rand McNally North American Road Atlas, solidifying its place in the national grid. Subsequent growth in traffic and economy along the corridor has not prompted renumbering discussions, as the original 27 adheres to AASHTO's emphasis on and minimal disruption in the established system. This continuity facilitates navigation consistency, with the number's retention underscoring the system's design for long-term adaptability through extensions rather than reassignments.

Relation to Ports-to-Plains Corridor

The Ports-to-Plains Corridor, designated as a High Priority Corridor 38 under the Transportation Equity Act for the in , serves as a key north-south connecting Gulf and Mexican ports at , to the northern through western and . This corridor facilitates the movement of freight and integrates regional transportation networks, with U.S. Highway 87 forming its primary backbone from the Mexican border northward. The existing Interstate 27 segment, spanning approximately 124 miles from Lubbock to Amarillo along US 87, represents a critical developed portion of this corridor, enabling efficient connectivity for goods transport across the . I-27's alignment within the Ports-to-Plains Corridor positions it strategically to link southern entry points like Laredo to northern extensions toward , supporting a continuous pathway for interstate commerce without reliance on congested east-west routes. The corridor's design leverages US 87 as the core alignment, with I-27's controlled-access standards providing the foundational infrastructure for upgrades to full interstate specifications northward from , and southward toward Lamesa and beyond. This integration enhances the corridor's role in the National Highway System by bridging port access to inland distribution hubs. Congressional legislation has advanced the corridor's interstate status, including the Infrastructure Investment and Jobs Act of 2021, which designated segments in and as future interstates, and the I-27 Numbering Act of 2023 (S. 992), signed into law on March 8, 2024, officially assigning the I-27 designation to the route from Laredo to Raton. These measures extend the I-27 numbering southward from its current terminus near Lubbock along US 87 to Sterling City and integrate northern upgrades, solidifying the corridor's alignment in federal planning for national trade connectivity.

Economic and Strategic Importance

Regional Trade and Commerce Role

Interstate 27 functions as the principal north-south artery linking the economic hubs of Amarillo and Lubbock in the , enabling efficient truck-based movement of goods across a dominated by and energy production. As of 2018, truck traffic constituted up to 73.4% of total vehicles on adjacent segments like US 287, reflecting its heavy reliance for freight hauling. This corridor supports the transport of key commodities, including from the High Plains area around Lubbock—where ranks first nationally in production—and and gas products tied to Permian Basin operations accessible via regional connections. Wind energy components and related equipment from Panhandle installations, contributing to 's leading position in wind capacity, also traverse the route, bolstering exports through integrated highway-rail networks like BNSF and Union Pacific lines. The highway underpins regional freight viability by channeling approximately 41.9 million tons of goods within the encompassing 56-county area in 2018, with high originating and terminating volumes in Potter (Amarillo) and Lubbock counties. Agricultural shipments, such as (98.7% of production), hogs, and routed via I-27, exemplify its causal role in sustaining Panhandle output, which feeds into broader ag exports valued in billions annually. freight, including products from the Permian Basin's $129 billion GDP contribution in 2022, leverages the corridor to bypass eastern bottlenecks. By offering a less congested alternative to I-35, I-27 diverts north-south truck flows, mitigating overload on the state's primary east-west trade spine and enhancing delivery reliability for time-sensitive loads like perishable and energy materials. This integration with I-40 at Amarillo further streamlines access to national markets, underscoring the route's foundational support for Panhandle commerce without dependence on distant gateways.

Projected Job Creation and GDP Impacts

The Ports-to-Plains Corridor Interstate , conducted by the (TxDOT) in collaboration with the Ports-to-Plains Alliance, projects that designating and upgrading the corridor—including extensions of Interstate 27—would generate significant statewide economic benefits through enhanced freight mobility and reduced congestion. During the phase, the project is forecasted to create 178,600 job-years, primarily in but extending via multiplier effects to supporting industries such as and , with a cumulative (GDP) increase of $17.2 billion. These temporary impacts stem from direct investment, which TxDOT modeling attributes to improved efficiency for Texas's export-oriented sectors. Post-construction, the upgraded corridor is expected to support 17,000 permanent jobs through sustained operational efficiencies, including annual travel cost savings of $3.4 billion from shorter transit times and lower fuel consumption for commercial trucking. These projections emphasize causal linkages to rural economies, where enhancements yield higher multipliers—estimated at 1.5 to 2.0 times rates—due to untapped in energy extraction (e.g., and gas from the Permian Basin) and (e.g., faster and shipments to Gulf ports). Unlike urban-focused subsidies, which often redistribute existing jobs, these rural gains arise from expanded , reducing bottlenecks that currently inflate costs by up to 20% for high-plains producers. Sensitivity analyses in the feasibility study indicate that these outcomes depend on full implementation of four-lane minimum standards and intermodal connections, with energy sector spillovers potentially amplifying GDP effects by 15-25% through reliable export routes to Mexico and beyond. Independent validations, such as those from regional economic development analyses, corroborate the job permanence tied to trade volume growth, projecting an additional $2.2 billion in annual corridor-wide GDP from commerce facilitation.

Infrastructure Benefits for Energy and Agriculture Sectors

Interstate 27, as a key segment of the Ports-to-Plains Corridor, enhances the transport of resources and equipment in the and connected regions, including oil and from local fields and the nearby Permian Basin via overlapping routes like US 87. Upgrades to the corridor, including I-27, strengthen pavements and safety features tailored to heavy-haul traffic, reducing wear from oversized loads such as rigs and pipelines. This infrastructure supports 's position as the leading producer of crude oil (42% of national output) and (27%), with the Panhandle contributing through active fields and processing facilities. For , which Texas dominates with over 40 gigawatts installed capacity, I-27 facilitates hauling of blades and towers—often exceeding standard dimensions—from manufacturing hubs to Panhandle wind farms, minimizing delays in assembly and deployment. In agriculture, I-27 serves as a vital artery for the Texas Panhandle's 14 million acres of farmland, enabling efficient movement of cattle, hogs, and crops like wheat, cotton, sorghum, and peanuts to markets and processing centers. The existing I-27 system already handles 98.7% of Texas beef sales, 96.3% of hog sales, and 95.2% of peanut sales by volume, underscoring its role in livestock logistics where timely delivery prevents weight loss and quality degradation in feedlot-to-slaughter routes. Corridor-wide upgrades, incorporating I-27 enhancements, are projected to cut end-to-end travel times by up to 89 minutes, lowering fuel and operational costs for producers and correlating with expanded market access radii that boost farmgate prices through faster spoilage-resistant crop transport. These improvements yield direct margin gains for Panhandle operators, as reduced logistics friction—estimated at savings in vehicle operation and reliability—allows reinvestment in production amid the region's dominance in beef and grain outputs.

Safety and Maintenance

From 2014 to 2021, the Interstate 27 (I-27) corridor in , as analyzed through the Texas Department of Transportation's (TxDOT) Crash Records (CRIS), recorded 29,724 total crashes, with 66% occurring in urban segments and 34% in rural areas, reflecting higher crash densities near centers such as Lubbock and Amarillo. Fatal crashes numbered 383 during this period, disproportionately involving commercial motor vehicles (CMVs) at 16% of total crashes—more than double the TxDOT statewide average of 6.5%—with 84% of CMV-related fatalities in rural stretches, often linked to higher speeds and volumes. Urban approaches exhibited crash hotspots due to factors including merging, , and transitions from divided standards to interchanges, as identified in spatial density analyses. Crash rates along I-27, when normalized by (AADT)—which averaged around 10,600 s per day system-wide in 2018—remained below TxDOT statewide averages for comparable roadways, attributable to interstate design standards such as full , shoulders for emergency stops, and that reduce intersection-related incidents common on non-interstate routes. Nationally, rural interstates exhibit fatality rates of approximately 0.4 to 0.6 per 100 million vehicle miles traveled (VMT), lower than the 1.2 overall U.S. rate in recent years, with only 12% of rural crash deaths occurring on such facilities compared to higher proportions on undivided highways. Freight-related incidents, while prominent due to I-27's role in transporting agricultural and energy goods, showed mitigation patterns tied to continuous shoulders and passing lanes, which facilitate safer CMV operations in rural Panhandle segments.
MetricI-27 System (2014-2021)TxDOT Statewide Comparison
Total Crashes29,724Higher baseline for non-interstates
Fatal Crashes383CMV involvement 16% vs. 6.5% average
Urban Crash Share66%Elevated due to density
Rural CMV Fatal Share84%Linked to speed/freight volume
AADT (2018 avg.)~10,600 vpdRates below state non-interstate norms

Upgrade Initiatives for Safety Enhancements

The (TxDOT) has implemented a series of data-driven projects along Interstate 27 (I-27) as part of the Ports-to-Plains Corridor initiative, focusing on interventions to mitigate crash risks identified through and historical incident patterns. Among the 27 ongoing projects in the corridor, key enhancements include the addition of passing lanes to reduce head-on collisions and improve sight distances on two-lane segments, widening to provide recovery space for errant vehicles, and upgrades to enhance traction and stability. These measures prioritize high-incident locations, such as rural stretches prone to lane departures, without mandating broader regulatory changes. Bridge replacements form a critical component of these upgrades, addressing structural vulnerabilities that contribute to secondary accidents. For instance, TxDOT is rebuilding a damaged southbound bridge between Kress and Tulia in Swisher County, removed after structural failure, with reconstruction emphasizing reinforced designs and improved approach alignments to minimize debris-related hazards. Shoulder rumble strips have been installed in multiple I-27 safety improvement segments, particularly in the Amarillo area, to alert drivers of edge-line deviations and reduce run-off-road incidents by up to 30% based on TxDOT's Highway Safety Improvement Program evaluations. Wider lane configurations, including conversions from four to six mainlanes in freight-heavy corridors like Randall County, incorporate safety features such as enhanced separations and ramp improvements to curb rear-end collisions at interchanges. These initiatives, funded through TxDOT's targeted allocation for corridor upgrades, emphasize measurable reductions in fatality rates over expansive infrastructure overhauls, with completion timelines extending through 2028 for major widening efforts.

Community Impacts and Controversies

Urban Division Effects in Lubbock

The alignment of Interstate 27 through central Lubbock, with construction phases spanning the late to the , bisected established neighborhoods and reinforced historical patterns on the city's east side, where a ordinance had confined residents. This division has limited east-side access to and western areas, surrounding majority and neighborhoods with industrial zoning, factories, and emissions sources, as documented in local disparity analyses identifying I-27 as a boundary akin to historic . U.S. Census data analyzed in 2024 reveals a 24% rate in East Lubbock, exceeding the citywide 19%, correlating with the highway's isolating effects and reduced development incentives east of the corridor. Residents and community advocates contend that the configuration constrains north-south and east-west mobility for east-side households, exacerbating socioeconomic isolation amid westward city expansion. In July 2023, Black and residents filed a federal civil rights complaint alleging discriminatory zoning updates that perpetuate inequities in North and East Lubbock, including barriers tied to I-27's path. A Texas Transportation Institute study on Lubbock's I-27 examined over 250 adjacent properties, finding that at-grade freeway sections influenced land values and uses more negatively than elevated ones, with proximity contributing to lowered residential desirability through , , and visual barriers. Local master plans similarly note increased and near the diminishing property values and developability in bisected areas. While planners acknowledge these local disruptions, resident viewpoints emphasize persistent access constraints over aggregate connectivity benefits, prompting 2024 calls for reconfiguration to reconnect divided communities.

Broader Local Economic and Social Outcomes

The development of Interstate 27 from 1962 to 1971 catalyzed commercial expansion along the corridor by enhancing freight mobility for and sectors, attracting and retail facilities proximate to interchanges. In Plainview, the highway facilitated the establishment of a 1 million square foot Wal-Mart in 1986, alongside processors for and pallets, contributing to localized growth. Lubbock saw the Interport Center, including a plant in 2003 and a $6-8 million in 1999, shifting economic activity northward and supporting hubs at its southern terminus. Amarillo benefited from the 1982 opening of Westgate Mall and a 1999 Bell plant near the northern terminus, bolstering retail and employment tied to I-27's linkage with I-40. These developments correlated with employment gains across corridor counties from 1992 to 2002, with Potter County (Amarillo) recording the highest annual growth rate of 2.0%, aided by sales taxes ranging from 0.125% to 1% allocated for and incentives in Amarillo and Hale County. Business attractions included Excel Beef Packers relocating to Plainview in 1971 and Azteca Milling in 1990, leveraging I-27 for efficient cattle and transport in a region historically reliant on rural commodities. from such ventures funded further public investments, though precise attribution to the highway alone is confounded by concurrent national economic trends. Socially, I-27 reduced geographic isolation in rural by enabling daily commutes, with Hale County workers traveling to Lubbock rising from 660 in 1980 to 1,334 in 2000, fostering labor pool integration and modest increases—0.9% annually in Lubbock and 1.5% in Randall County post-1992. Residential subdivisions emerged, such as Abernathy's first in 30 years by 2004, drawn by proximity. However, bypass configurations disrupted some communities; Tulia experienced commercial stagnation on its U.S. west end after I-27 routing favored eastern accesses, including a 1988 and mid-1990s that drew traffic away from the original business district. Critics highlight localized disruptions like potential noise from rising traffic—average annual daily traffic reached 57,000 vehicles near Amarillo by —but empirical patterns underscore the highway's causal role in averting broader stagnation, as evidenced by sustained and commuting gains outweighing bypass-specific declines in a low-density rural otherwise vulnerable to market inaccessibility. Proponents emphasize net positives in job access and trade efficiency, with corridor-wide development metrics indicating connectivity as a prerequisite for viability in agriculture-dependent areas, despite eminent domain's inherent displacements during initial , which lacked quantified post-build social cost data.

Auxiliary Routes

Business Loops and Spurs

Interstate 27 features business loops as auxiliary routes that branch from the mainline to serve central business districts, enabling the parent highway to bypass urban cores while preserving local access for commercial activity. These loops, designated along pre-existing alignments of concurrent U.S. Route 87, adhere to criteria approved by the American Association of State Highway and Transportation Officials (AASHTO) in , which permit such connections to link interstates directly to bypassed areas without compromising the high-speed efficiency of the primary corridor. Configured as full loops with both ends reconnecting to Interstate 27, these routes differ from spurs, which terminate at one end; no spurs exist for I-27. Signage follows Interstate business loop standards outlined in the Manual on Uniform Traffic Control Devices (MUTCD), including green shields marked "" to distinguish them from the mainline. By channeling local and short-haul traffic away from the freeway mainline, the business loops support sustained economic function in small Panhandle communities, mitigating the disruptive effects of construction on legacy commercial zones historically reliant on U.S. 87 traffic volumes.

Specific Configurations in Key Cities

In Hale Center, Business Loop I-27-T follows a concise 1.168-mile along , linking exits 36 and 38 of the parent Interstate 27 and paralleling the bypassed segment of U.S. Highway 87. Designated by the on April 5, 2002, this short loop maintains connectivity to the city's central commercial strip and surrounding farmland, minimizing detour length for local traffic while preserving the mainline's straight trajectory northeastward. The configuration reflects the town's modest scale and agricultural orientation, with interchanges positioned to facilitate efficient access via 1914 without necessitating extensive urban realignment. Plainview's Business Loop I-27-U spans 9.282 miles along Columbia Street (also designated as U.S. Highway 70 in its central portion), connecting exits 45 and 53 and tracing the pre-freeway path of U.S. 87 through the Hale . Established following the 1970s completion of I-27's western bypass—which shifted through-traffic away from the city's core to enhance regional flow and reduce congestion—the loop integrates an overlap with U.S. 70 to serve downtown businesses and institutions like . This setup addresses urban traversal needs by providing a divided, signalized route with support, distinct from the parent route's rural freeway geometry. In the Canyon area south of Amarillo, I-27's configuration transitions into a more integrated urban-rural hybrid, overlapping U.S. 60 from near exit 110 northward, where frontage roads adopt one-way pairings to manage higher volumes approaching the Potter County line. This alignment, lacking a dedicated business loop but utilizing local streets like 34th Street for access, supports connectivity to Canyon High School and agricultural outlets while prioritizing the mainline's elevation over the Canadian River valley for flood resilience and sight lines. The design rationale emphasizes seamless integration with Amarillo's approaching grid, avoiding standalone spurs in favor of concurrent routing to streamline freight and commuter movement.

Exit List

Potter and Randall Counties

Interstate 27 in Potter and Randall Counties features interchanges primarily serving the , including access to industrial zones along US 87 and connections to I-40 at the northern terminus. The segment overlaps with US 60 and US 87 from near Canyon northward, with one-way frontage roads in urban sections.
ExitMileDestinationsNotes
106106.0TX 217 – Canyon, State ParkRandall ; diamond interchange
109109.0Buffalo Stadium RoadRandall ; serves local access near Canyon
110110.0US 60 west / US 87 south – Canyon, Randall ; beginning of US 60/US 87 overlap with I-27
111111.0Rockwell RoadRandall ; local access in Canyon area
112112.0FM 2590Randall ; rural access north of Canyon
114114.0FM 2219Randall/Potter ; south Amarillo access
115115.0Sundown Lane (FM 2586)Potter ; commercial area
116116.0Canyon DrivePotter ; serves Amarillo businesses
117117.0Hollywood RoadPotter ; local traffic
118118.0Spur 279 (McCormick Road)Potter ; connects to Amarillo industrial zones
119119.0 StreetPotter ; urban access
120120.045th Avenue, I-40 frontage roadPotter ; partial cloverleaf
121121Hawthorne Drive, Austin StreetPotter ; serves downtown Amarillo vicinity
122122FM 1541 (Washington Street)Potter ; eastern Amarillo access
123123.0I-40 / US 287 – Albuquerque, Potter ; northern terminus; trumpet interchange
Mileposts and exit numbers correspond to distance from the southern terminus in Lubbock. Recent TxDOT projects include widening and safety upgrades in this segment to handle increased traffic from Ports-to-Plains corridor designation.

Swisher and Hale Counties

Interstate 27 passes through Hale and Swisher Counties in a predominantly rural corridor characterized by flat High Plains , with exits primarily serving agricultural operations, grain storage facilities, and small communities dependent on farming and ranching. From approximately mile marker 24 to 92, the highway features sparse interchanges—typically diamond configurations—designed for low-volume traffic, reflecting the region's focus on , , and production rather than high-density urban access. (AADT) in these segments generally ranges from 5,000 to 10,000 vehicles, lower than urban areas due to the agricultural economy and limited commuter patterns. In Hale County, I-27 connects to key farm-to-market roads and U.S. routes facilitating access and local transport. The segment north from the Lubbock County line includes interchanges near Abernathy and Hale Center before reaching Plainview, where U.S. 70 provides east-west linkage for crop shipments to markets in Floydada and beyond. Swisher County continues this pattern north of Plainview, with exits linking to FM routes that support irrigation-dependent farming and small towns like Tulia and Happy, emphasizing the highway's role in regional movement over passenger volume. The following table enumerates principal exits in these counties, sequenced northbound, highlighting connections to agricultural infrastructure:
ExitMile Marker (approx.)DestinationsNotes
2424East Service Road; AbernathyLocal access to farms and elevators south of Hale Center.
2727County Road S; Hale CenterServes rural residences and field roads.
36-3836-38Business I-27; Hale CenterLoop for town center, near .
45-5345-53Business I-27; PlainviewBypasses city core; connects to processing facilities.
4949U.S. 70; PlainviewMajor east-west route for haulage to ports.
5656FM 788; Kress areaEntry to Swisher; farm access roads.
65-70~65-70FM roads; Tulia vicinityLocal FM links to dairies and crop fields.
8383FM 2698; HappyServes community elevators and ranches.
88-9088-90FM 1881, FM 1075; HappySparse rural interchanges for field access.
9292Haley Road; Happy northTransition to Randall County farms.
These exits underscore the highway's utility in linking isolated grain elevators—such as those operated by local co-ops in Plainview and Tulia—to broader distribution networks, with roads enabling heavy truck traffic for harvest seasons without frequent urban congestion. The design prioritizes straight alignments and minimal grading to accommodate oversized ag equipment, though visibility of distant farm structures from the roadway highlights the open, low-population density.

Lubbock County

Interstate 27 in Lubbock County primarily traverses the southern and central urban expanse of Lubbock, functioning as a six-lane depressed freeway that interfaces with dense commercial corridors, residential zones, and key arterial routes. The highway's southern terminus occurs at a complex with Loop 289 and , approximately at the 82nd Street area, where southbound lanes transition directly onto the multiplexed U.S. Routes 87 and 84 for continued access southward beyond the Interstate designation. This terminus supports high-volume urban traffic, with interchanges designed for efficient entry and exit amid surrounding retail centers, industrial parks, and housing developments. The segment features elevated traffic demands due to Lubbock's role as a regional , with interchanges facilitating connectivity to local businesses and neighborhoods while minimizing surface disruptions through its below-grade alignment south of . In September 2024, the Texas Department of Transportation approved a 4.2-mile southward extension along U.S. 87 from the existing terminus to just north of the FM 300 intersection, aimed at integrating future Ports-to-Plains corridor enhancements and improving freight access, though construction remains in early stages as of 2025. Key southern exits into Lubbock, listed from south to north, emphasize urban access points:
  • Exit 1A: Loop 289 westbound – Direct southern access ramp for west-side circulation around Lubbock.
  • Exit 1B: U.S. 84 eastbound / Loop 289 roads – Serves east-west transit and local for commercial entry near the .
  • Exit 2: 82nd Street / U.S. 87 south – Connects to residential and retail areas immediately south of the core urban zone, marking the effective end for southbound Interstate travel.
  • Exit 3–5: Local urban roads (e.g., 50th Street vicinity) – Provide granular access to high-density commercial strips and neighborhoods, supporting daily commuter and service vehicle flows.
These interchanges handle substantial local volumes, with ongoing maintenance addressing urban wear, such as bridge reconstructions noted in late 2024 near Loop 289 accesses.

References

  1. [1]
    Project: Interstate 27 - View Case Study | AASHTO
    I-27 is a 124-mile Interstate highway between the Texas cities of Amarillo and Lubbock. It replaced a winding, two-lane route, reducing travel time by 50%.Missing: endpoints | Show results with:endpoints<|separator|>
  2. [2]
    [PDF] Economic Development History of Interstate 27 in Texas[1]
    Jul 13, 2004 · Interstate 27 is a north-south highway, which traverses the northern. Panhandle and High Plains of Texas. The economy is based on cattle, cotton ...
  3. [3]
    I-27 extension to Hwy. 87 officially approved - KCBD
    Sep 26, 2024 · The first I-27 expansion, to add a 4.2-mile segment from the existing terminus in Lubbock, Texas, to the new limits of US Highway 87 (US 87) access control.
  4. [4]
    I-27 System in Texas - Texas Department of Transportation
    The 963-mile corridor connects west and south Texas with Mexico through the strategic trade gateways of Laredo, Eagle Pass and Del Rio and north to Canada.Missing: length endpoints
  5. [5]
    S.992 - I-27 Numbering Act of 2023 118th Congress (2023-2024)
    In Texas, from Sterling City to Lamesa, U.S. Route 87 is designated as Interstate Route I–27E and Texas Routes 158 and 349 via I–20 are designated as Interstate ...
  6. [6]
    Interstate 27
    It was designated as a high priority corridor in 1998 by the U.S. Congress. The Ports to Plains Alliance sought a new feasibility study for extending ...
  7. [7]
    Safety rest area list - Texas Department of Transportation
    Each of the state's 76 safety rest areas feature restrooms that are open 24 hours daily. Most rest areas have attendants on duty 24 hours a day.
  8. [8]
    [PDF] Initial Assessment Report - Ports-to-Plains Corridor (I-27)
    The Ports-to-Plains Trade Corridor is a 2,300-plus mile highway system stretching from Mexico to the US border at Laredo, Eagle. Pass and Del Rio through west.Missing: endpoints | Show results with:endpoints
  9. [9]
    TxDOT ready to begin I-27 bridge replacement project - KCBD
    Feb 4, 2024 · “The project will rebuild three I-27 bridges, including the Yucca Lane bridge, which will be raised to meet the revised TxDOT standards for ...Missing: features | Show results with:features
  10. [10]
    [PDF] 4. Existing and Future Conditions - City of Lubbock
    I-27 Mainline. Regis Street (FM 2641). 100,000. I-27 Mainline. US 84. 90,000. 130th Street (FM 1585). Slide Road (FM 1730). 35,000. University Avenue. Broadway ...
  11. [11]
    [PDF] I-27 System in Texas Implementation Plan
    Apr 22, 2024 · It is a planning tool for decision makers on how to logically plan, design, fund, and construct new highways or upgrade existing roadways to ...
  12. [12]
    Lubbock Personal Injury Lawyer - West Texas Attorneys
    I-27 corridor truck accident risks: Agricultural product transport (cotton, grain, livestock); Oversized farm equipment transport; Heavy seasonal traffic during ...
  13. [13]
    Pre-Interstate Highway Routes History - The Texas Highway Man
    Aug 28, 2024 · ... US 87 was extended south from Wyoming into Texas and supplanted US 385. ... route to Fredericksburg used a new road that is today's US 87.
  14. [14]
    Panhandle - Texas State Historical Association
    Aug 25, 2023 · ... 1920s the Panhandle led Texas in the development of highways, including the legendary Route 66. Farm-to-market transportation flourished ...
  15. [15]
    [PDF] EARLY TEXAS ROADS AND TRAILS: CA
    Nov 14, 2011 · 1047 By 1939, the Texas Highway Commission designated US. 87 along the route from north of Amarillo to Henrietta. (See Figure 213.) Figure 212.
  16. [16]
    [PDF] Historic Road Infrastructure of Texas, 1866-1965
    87 “The International Meridian Highway – U.S. Highway No. ... 88 Text derived from Richard Weingroff, “U.S. Route 80 The Dixie Overland Highway,” FHWA Highway ...
  17. [17]
    Part I - Engineering Data - Interstate System - Highway History
    Eisenhower System of Interstate and Defense Highways, commonly called "The Interstate System," began in the late 1930's. The Federal-Aid Highway Act of 1938 ...<|separator|>
  18. [18]
    Part VII - Engineering Data - Interstate System - Highway History
    Major Interstate routes are designated by one- or two-digit numbers. Routes with odd numbers run north and south, while even numbered run east and west.
  19. [19]
    When did the Federal Government begin collecting the gas tax?
    The tax remained 4 cents a gallon until the Surface Transportation Assistance Act of 1982, which President Ronald Reagan approved on January 6, 1983. The Act ...Missing: challenges | Show results with:challenges
  20. [20]
    [PDF] The Status of the Highway Trust Fund: 2023 Update
    Oct 18, 2023 · Historically, most federal spending for highways has been paid for by revenues—largely from excise taxes on gasoline, diesel, and other motor ...Missing: acquisition | Show results with:acquisition
  21. [21]
    New milestone for interstate expansion in West Texas
    Oct 2, 2024 · It marks the first step for I-27 to expand from its current Lubbock-to-Amarillo route southward to the Mexican border at Laredo, through the ...
  22. [22]
    [PDF] First New Segment of I-27 Approved - Ports to Plains
    Sep 26, 2024 · The new 4.2-mile segment of I-27 will run concurrently with U.S. Highway 87 from the current I-27 terminus in. Lubbock to 0.1 mile north of ...Missing: cosigned | Show results with:cosigned
  23. [23]
    Ports-to-Plains Corridor - Texas Department of Transportation
    The Corridor provides the efficient transportation of goods and people from Mexico, through west Texas, Oklahoma, New Mexico, Colorado and ultimately Canada ...
  24. [24]
    Future Interstate Highway - Ports to Plains
    The route numbering, based on current bills moving through Congress, would be I-27 between Laredo and Sterling City and between Lamesa through Lubbock to Dumas ...Missing: length endpoints
  25. [25]
    I-27 Feasibility Study from Amarillo to Dumas
    The purpose of this study is to evaluate the feasibility, costs, and logistics related to updating the corridor to interstate standards.
  26. [26]
    I-27 Feasibility Study from Amarillo to Dumas
    The study evaluates upgrading US 87/US 287 to I-27 from Amarillo to Dumas, analyzing transportation, safety, and mobility needs. Public input is invited.Missing: Lubbock | Show results with:Lubbock
  27. [27]
    I-27 study to be discussed at TxDOT meetings in Dumas, Amarillo
    Dec 3, 2024 · The I-27 Feasibility Study from Amarillo to Dumas began in late summer 2024 and is expected to be completed in July 2025. Following the study ...
  28. [28]
    [PDF] The Ports-to-Plains Corridor Future Interstate Would Improve Freight ...
    The Ports-to-Plains Corridor was designated as a future interstate in ... The 963-mile corridor spans 26 Texas counties and includes portions of I-20 ...
  29. [29]
    August 2023 Vol 21 Issue 8 - Ports to Plains
    The Ports-to-Plains System in Texas is expected to be a 963-mile corridor that will connect four interstates, 24 state highways and 17 U.S. highways to enhance ...
  30. [30]
    December 2024 Vol 22 Issue 12 - Ports to Plains
    View/Download Complete I-27 System in Texas Implementation Plan. TxDOT Initiates IH-27 Feasibility Study from Amarillo to Dumas. The Texas Department of ...
  31. [31]
    Texas Ports-to-Plains Corridor Wins “Interstate 27” Designation
    Apr 4, 2022 · The highway would stretch out 963 miles in west and south Texas ... The TxDOT feasibility study determined that the extension of I-27 would ...
  32. [32]
    US Designates Future Interstate 27 To Go Thru NM
    Mar 15, 2022 · The designation recognizes the Ports-to-Plains Corridor from Laredo, Texas to Raton, New Mexico as an addition to the Interstate Highway System.
  33. [33]
    Safety improvement projects on I-27, I-40, and State Loop (SL) 335 ...
    Jun 23, 2025 · The safety improvements include the construction of shared-use paths, illumination, median barriers, and pavement overlay. Crews are currently ...
  34. [34]
    Building an Interstate in West Texas - American Society of Civil ...
    January 2025 ... On September 26, 2024, the Texas Transportation Commission adopted a minute order that extended the existing Interstate Highway 27 by 4.2 miles ...Missing: terminus | Show results with:terminus<|separator|>
  35. [35]
    I-27, Randall County, from north of Western Street in Amarillo to ...
    The project is approximately 8.8 miles in length. Project purpose. The purpose of the proposed project is to reduce congestion and improve mobility and ...
  36. [36]
    TxDOT updates community on I-27 and loop construction timeline
    Mar 27, 2025 · The Texas Department of Transportation gave updates on the Loop construction project and safety tips to the Canyon ISD Business and Community Leaders luncheon.
  37. [37]
    Initial work on I-27 along SH 349 Corridor to begin
    Sep 22, 2025 · TxDOT is about to launch preliminary development of the first phase of Interstate 276 along SH 349 corridor.
  38. [38]
    Interstate System - Design - Federal Highway Administration
    Sep 19, 2023 · Routes with odd numbers run north and south, while even numbered run east and west. For north-south routes, the lowest numbers begin in the ...
  39. [39]
    AASHTO Special Committee on U.S. Route Numbering - Home
    Special Committee on U.S. Road numbering and marking system facilitates travel on the main interstate lines, over the shortest routes and the best roads.Missing: 27 | Show results with:27
  40. [40]
    [PDF] Ports-to-Plains Corridor (I-27)
    ▫ 83% of total highway system mileage with over 66,000 centerline miles ... ▫ One exception is I-27 in the Texas Panhandle. – Provides an important ...
  41. [41]
    S.992 - I-27 Numbering Act of 2023 118th Congress (2023-2024)
    Shown Here: Introduced in Senate (03/28/2023). I–27 Numbering Act of 2023. This bill designates the future interstate highway ...Missing: authorization | Show results with:authorization
  42. [42]
    I-27 Numbering Act of 2023 becomes law, names Ports-to-Plains ...
    Mar 8, 2024 · The I-27 Numbering Act of 2023 was signed into law, naming the Ports-to-Plains Corridor between Laredo, Texas and Raton, NM as the future Interstate 27.
  43. [43]
    Sens. Cruz, Lujan, Cornyn, Heinrich Celebrate Unanimous Senate ...
    Aug 3, 2024 · Cruz, Lujan, Cornyn, Heinrich Celebrate Unanimous Senate Passage of Bill to Designate Ports-to-Plains Corridor as the Future 'Interstate 27'.
  44. [44]
    Lawmakers approve path forward to extend Interstate 27, connect ...
    Jun 13, 2019 · Texas State Sen. Charles Perry (R-Lubbock), said the I-27 extension project would help to alleviate congestion on I-35.
  45. [45]
    [PDF] PORTS-TO-PLAINS CORRIDOR INTERSTATE FEASIBILITY STUDY
    Jun 30, 2020 · The total volume of freight to and from Segment #1 reaches 77 million tons in 2050, the highest of the three segments. In Segment #1, much of ...
  46. [46]
    [PDF] The Ports-to-Plains Corridor Future Interstate Would Impact the ...
    Dec 20, 2023 · Statewide connectivity supports Texas' key economic sectors highlighted in the map, including agriculture, energy, and international trade along ...
  47. [47]
    [PDF] US Designates Future Interstate 27 Part of the Interstate Highway ...
    Mar 15, 2022 · The I-27 expansion will grow the Texas GDP by $17.2 billion and create 178,000 construction jobs. It will also add 17,000 long-term employment.Missing: projected | Show results with:projected
  48. [48]
    Newly Designated I-27 Segment Marks Major Milestone for Ports-to ...
    A major step forward for Texas infrastructure and economic growth was celebrated with the official designation of a 4.2-mile segment of US 87 as part of ...
  49. [49]
    [PDF] Ports-to-Plains Corridor Interstate Feasibility Study (HB 1079)
    Aug 20, 2020 · ▫ Total Corridor and Segment Economic Impacts. ▫ Rest-of-State Economic Impacts. ▫ Energy Impacts by Industry (Energy; Food and. Agriculture ...
  50. [50]
    Good for Texas - Energy - Texas Comptroller
    Texas is the top oil and gas state in the U.S., producing 42 percent of crude oil and 27 percent of marketed natural gas. Texas has 32 petroleum ...
  51. [51]
    Texas is the Top State for Oil and Gas Production and for Wind ...
    Feb 6, 2025 · From oil and gas to wind-powered generation, Texas leads in energy innovation and drives economic prosperity.
  52. [52]
    U.S. Reps introduce Ports-to-Plains Highway Act to expand I-27 in ...
    Jun 18, 2020 · Highway expansion is projected to increase Texas GDP $55.6 billion in the first 20 years.Missing: creation | Show results with:creation<|control11|><|separator|>
  53. [53]
    [PDF] TOP INDUSTRIES - of Amarillo & the Texas Panhandle - HubSpot
    Amarillo alone boasts 14 million acres (57,000 km2) of agricultural land. Primary crops produced include corn, wheat, cotton, sorghum, silage, hay and soybeans.
  54. [54]
    Traffic count maps - Texas Department of Transportation
    Traffic data that is collected by the TxDOT Statewide Traffic Monitoring Program is available for viewing and download at the links on this page.Missing: 27 | Show results with:27
  55. [55]
    Fatality Facts 2023: Urban/rural comparison - IIHS
    Compared with urban areas, crash deaths in rural areas in 2023 were less likely to occur on interstates and freeways (12% versus 19%) and on other arterial ...
  56. [56]
    Crash data analysis and statistics
    TxDOT is responsible for the collection and analysis of crash data submitted by Texas law enforcement officers on the Texas Peace Officer's Crash Report form.
  57. [57]
    TxDOT in process of rebuilding bridge on I-27 between Kress and ...
    Aug 4, 2025 · Momentum is building toward rebuilding the bridge on southbound I-27 between Kress and Tulia that was damaged, and subsequently removed, ...Missing: shoulder widening<|control11|><|separator|>
  58. [58]
    [PDF] Highway Safety Improvement Program Guidelines
    Dec 15, 2023 · The Texas HSIP provides funding for construction and operational safety improvements for locations both on and off the state highway system.
  59. [59]
    $$312 MILLION IH-27 WIDENING PROJECT SET TO BEGIN ...
    Jul 11, 2024 · The project is designed to increase safety and mobility on IH-27 by widening it from four to six lanes. The work is expected to be completed in December 2028.
  60. [60]
    Interstate 27 has divided Lubbock for decades. North and east side ...
    the same concerns people in East Lubbock have described for ...
  61. [61]
    [PDF] Lubbock Disparity Report
    The City of Lubbock Community Development Department is responsible for submitting a Consolidated Plan ... is often east of I-27, Lubbock's historic redline, in ...
  62. [62]
    Black and Hispanic Lubbock residents want federal intervention in ...
    Jul 26, 2023 · Now, as the city updates its zoning laws, residents in East and North Lubbock have filed a civil rights complaint and are asking federal ...
  63. [63]
    [PDF] Land Value and Land Use Effects of Elevated, Depressed ... - ROSA P
    Lubbock l-27 Mean Values (Land Value/Sq. Meter in $1994) ... This research examined more than 250 properties along 1-27 and 272 properties adjacent to ...
  64. [64]
    [PDF] 2004 North & East Lubbock Master Development Plan
    Increased traffic, lowered property values, and increased noise and light pollution are a few examples of negative impact. FIGURE 2-J: SITE DEVELOPABILITY ...
  65. [65]
    Business Route Guide - Interstate-Guide
    Jan 26, 2024 · Interstate business connections (loops and spurs) were approved by AASHTO in 1964 as a method to provide access from the Interstate superhighway ...
  66. [66]
    Business Route 27 - Interstate-Guide - AARoads
    Aug 24, 2023 · The two Business Loops for Interstate 27 in the Texas Panhandle follow bypassed portions of U.S. 87 through Plainview and Hale Center.
  67. [67]
    Business Loop I-27 - Hale Center Texas - AARoads
    Feb 27, 2023 · Business Loop I-27 (BI 27T) at the city of Hale Center, Texas runs between Exit 36 and 38 along Main Street / old U.S. 87.
  68. [68]
    Business Route 27 - Interstate-Guide
    Aug 24, 2023 · Business Loop 27T was designated on April 5, 2002 as a 1.168 mile route along Main Street through the city of Hale Center. The route follows old ...Missing: 70 history
  69. [69]
    Interstate 27 North - Hale Center to Plainview Texas - AARoads
    Business Loop IH 27T leaves for Hale Center in one half mile. Bl 27T follows Main Street for 1.168 miles, returning to IH 27 beyond FM 1914 (Exit 37). 04/24 ...
  70. [70]
    Business Loop I-27 - Plainview Texas - AARoads
    Feb 27, 2023 · Business Loop I-27 at the West Texas city of Plainview connects IH 27/U.S. 87 with the Hale County seat along the former route of U.S. 87.
  71. [71]
    Interstate 27 - AARoads Wiki
    Jan 4, 2025 · Business Interstate 27-T (Bus. I-27-T) is a 1.168-mile-long (1.880 km) business loop in Hale Center between exits 36 and 38 of I-27. It was ...
  72. [72]
    Interstate 27 South - Amarillo to Canyon Texas - AARoads
    Feb 27, 2023 · 2021 traffic counts drop to 11,655 vehicles per day (vpd) along IH 27 south beyond the split with U.S. 60/87. 04/24/17.
  73. [73]
    All Exits along I-27 in Texas - Northbound | iExit Interstate Exit Guide
    Search All Exits along I-27 traveling Northbound in Texas. ... Amarillo, Texas. Fuel. Food. Parks. Attractions / Entertainment. Automotive. Other.
  74. [74]
    All Exits along I-27 in Texas - Southbound | iExit Interstate Exit Guide
    EXIT. 122B. Farm to Market Rd 1541; Wasington St. Amarillo, Texas. Fuel. Food. Attractions / Entertainment. Shopping. EXIT. 121B. Hawthorne Dr; Austin St.
  75. [75]
    Interstate Exits for I-27 Southbound in Texas - TravelCoupons.com
    4420 Canyon Dr, Amarillo, TX 79109. 1-806-367-0613. - 0.3 miles. Call Direct. Amarillo Motel. 4051 Canyon Dr, Amarillo, TX 79110. 1-806-353-9193. Left - 0.38 ...Missing: mileposts | Show results with:mileposts
  76. [76]
    Love's Travel Stop #261 | I-27 Exit 116 - Truck Stops and Services
    I-27. Exit: 116. Street Address: 8615 CANYON DR. City: AMARILLO. State: TX. Postal Code: 79110. Phone: 806-352-9501 (TRAVEL CENTER). Phone 2: 806-352-9501 ( ...
  77. [77]
    TxDOT working to renumber I-27 mile markers before Ports-to-Plains ...
    Jul 30, 2025 · The Texas Department of Transportation is working to renumber the exits along I-27 in preparation for the expansion of I-27 as part of Ports-to- ...Missing: interchanges features
  78. [78]
    Exit 27/County Rd/S, I-27, Hale Center, TX 79041, US - MapQuest
    Get more information for Exit 27/County Rd/S in Hale Center, TX. See reviews, map, get the address, and find directions.
  79. [79]
    Interstate 27 South - Happy to Kress Texas - AARoads
    Feb 27, 2023 · IH 27 is a lightly traveled freeway through southern Randall County. 11,270 vpd was recorded by TxDOT on this stretch in 2021.<|control11|><|separator|>
  80. [80]
    Exit 83/FM-2698/N, Interstate 27, Happy, TX 79042, US - MapQuest
    Exit 83/FM-2698/N is a transportation company located in the heart of Happy Texas. Known for its reliable services the company provides efficient logistics ...
  81. [81]
    Exit 92/Haley Rd/S, I-27, Happy, TX 79042, US - MapQuest
    Exit 92/Haley Rd/S is a transportation company located in Happy TX known for its efficient logistics and reliable services.
  82. [82]
    Highways | Interstate 27 - Larry's Phat Page
    124 miles (200 km). Major cities along route: Lubbock, TX; Amarillo, TX. Junctions with non-related Interstates: Interstate 40: Exit 123 in Amarillo, TX.Missing: interchanges | Show results with:interchanges
  83. [83]
    Crews rebuild southbound I-27 bridge, closures expected, TxDOT said
    Nov 22, 2024 · The southbound I-27 Exit, 6B, will also be closed at that time. Traffic needing access to Loop 289 will be directed to use Exit 7. Lubbock ISD ...<|separator|>