Interstate 820

Interstate 820 (I-820) is an auxiliary loop route of the that primarily encircles the northern, western, and eastern sides of , serving as a key circumferential highway for the metropolitan area. The route begins at a with I-20 on the southwest side of Fort Worth, proceeds northward through the western suburbs, turns eastward along the northern perimeter, and then heads southward through the eastern suburbs before terminating at another interchange with I-20 near Forest Hill. Spanning Tarrant County, I-820 passes through 11 municipalities, including Benbrook, White Settlement, Lake Worth, Saginaw, Haltom City, North Richland Hills, Hurst, Richland Hills, Kennedale, Forest Hill, and Fort Worth itself. It functions as a vital bypass for regional and long-distance traffic, connecting to major radials such as I-35W, I-30, SH 121, SH 183, US 287, and SH 199, while facilitating access to residential, commercial, and industrial zones around the city. Planning for I-820 originated in the late as part of broader efforts to develop a circumferential route around Fort Worth, with initial segments tied to the construction of what became I-20. The first portion opened in 1958 between McCart Avenue and US 377, and the highway was officially designated as I-820 in 1957. Construction proceeded in phases: the southeast loop from Hemphill Street to SH 121 was completed in 1965, the northeast loop from SH 121 to I-35W opened in 1966, and the west loop was built in six stages between 1969 and 1982, with the final segment from US 80 (Spur 580) to Winscott Road opening that year to complete the route. The entire project cost approximately $116 million over more than three decades. In recent years, I-820 has undergone significant improvements to address congestion and safety issues, including the addition of median barriers in 2006 and the integration of tolled managed lanes () along segments of the corridor as part of the . The East Loop segment from SH 121/183 to Randol Mill Road was completed in 2024. As of 2025, the expansion is approximately 25% complete, with ongoing paving, beam installations, and other work. In September 2025, the northbound mainlanes switched to a new permanent bridge over the . Current and planned initiatives, such as the I-820 Northwest Loop Corridor Study and the Southeast Connector project, involve widening to six to twelve lanes, enhancing frontage roads, and improving interchanges from I-30 to I-35W, I-20 to US 287, and other key areas, with construction ongoing or slated to begin in phases through 2028. These enhancements aim to boost mobility, multimodal connectivity, and operational efficiency amid increasing urban growth in the Dallas-Fort Worth region.

Route description

Western segment

The western segment of Interstate 820 begins at a with I-20 in southwest Fort Worth, near Benbrook Lake, providing direct access to U.S. 377 (Benbrook Boulevard, also known locally as Altamesa Boulevard in adjacent areas). From this terminus, the route heads northeast as the Freeway, a four- to six-lane divided freeway with discontinuous frontage roads, traversing a mix of industrial zones in White Settlement and residential neighborhoods in Lake Worth and northwest Fort Worth. This approximately 12-mile portion serves as a key bypass for local traffic around the city's southwestern and northwestern quadrants, connecting to suburban communities while avoiding congestion. Along its path, I-820 intersects several major local routes, including State Highway 199 (Jacksboro Highway) and Farm to Market Road 1220 (Azle Avenue) in Lake Worth, facilitating access to nearby commercial and recreational areas near Lake Worth. The highway crosses the West Fork of the Trinity River via a multi-span structure, supporting regional drainage and flood control features integrated into the surrounding urban landscape. Frontage roads parallel much of the segment, aiding connectivity to adjacent developments, though the mainline lacks shoulders in some older sections, contributing to its urban freeway character. Traffic volumes on this segment vary by location, with average daily traffic (AADT) reaching approximately 67,000 vehicles near the I-20 interchange in Benbrook, rising to over 100,000 in White Settlement and Lake Worth areas as of counts. These figures reflect the route's role in handling commuter flows from southwestern suburbs toward northern destinations, with peak usage supporting industrial logistics and residential commuting. The culminates at a complex four-level interchange with I-35W and U.S. 287 in north Fort Worth, marking the transition to the loop's northern extent.

Northern and eastern segments

The northern and eastern segments of Interstate 820 begin at its interchange with I-35W in northern , where the freeway curves eastward through the suburbs of Saginaw, Haltom City, North Richland Hills, and Hurst. This approximately 23-mile portion serves as a key commuter corridor, featuring a six-lane divided freeway with frontage roads (locally designated as NE Loop 820) that facilitate access to densely populated residential and commercial areas, including tolled TEXpress managed lanes between I-35W and SH 121. Overpasses span local waterways and rail lines, while discontinuous service roads accommodate turning movements in urban settings, supporting amid suburban development. As I-820 progresses east from the I-35W junction near North Main Street (Bus. US 287), it intersects minor arterials such as Rufe Snow Drive and Holiday Lane, the latter noted for persistent congestion due to high volumes from nearby retail centers and residential traffic. The route then reaches a major with I-30 southeast of Normandale Drive, providing to and eastern suburbs. Continuing southeast through North Richland Hills, I-820 briefly overlaps with SH 121 and SH 183 (Airport Freeway), offering direct access to via the southern entrance ramps. This integration enhances regional air travel links, with the freeway's multi-lane configuration handling peak-hour demands from airport-bound commuters. South of the SH 121/SH 183 split in Hurst, I-820 curves southward, intersecting US 287 near the eastern edge of Fort Worth, where the highway supports freight movement through industrial zones. The segment passes near remnants of former naval facilities associated with the historic Joint Reserve Base Fort Worth, now integrated into modern aviation and defense operations. It concludes at the eastern terminus, a with I-20 in eastern Fort Worth, closing the loop and facilitating east-west travel across Tarrant County. Throughout, the roadway includes expansions to accommodate growing suburban traffic, with service roads and interchanges like those at Beach Street aiding local access in high-density areas. Ongoing construction as of 2025, including pavement improvements on the northbound eastern segment completed in summer 2025, continues to enhance capacity.

History

Planning and designation

The planning for Interstate 820 (I-820) originated in 1949 as part of Fort Worth's efforts to develop an urban bypass loop amid rapid post-World War II population growth and suburban expansion in Tarrant County, which saw its population nearly double from 1940 to 1950. This initiative addressed escalating in by proposing a circumferential route to divert through away from the , supporting and industrial access in the surrounding areas. Early route alignments for the loop were outlined in the Bureau of Public Roads' 1955 "Yellow Book," which proposed a beltway connecting to primary Interstates near Fort Worth, and were further detailed in Highway Commission plans recommending a full circumferential route around the city. These proposals gained political momentum through advocacy from local leaders, including U.S. Representative , who championed the project to alleviate downtown gridlock and foster regional commerce, viewing it as essential for Fort Worth's growth as a hub. The loop was designated as I-820 in 1957 with the creation of the Interstate system and received formal approval from the Bureau of Public Roads on October 1, 1959, integrating it as an auxiliary route to I-20 and I-35 into the National System of Interstate and Defense Highways. Initial funding was allocated under the , with early cost estimates for the full loop approximating $100 million in period dollars (equivalent to over $1 billion today when adjusted for inflation), covering right-of-way acquisition and basic construction planning.

Construction phases

The construction of Interstate 820 proceeded in multiple phases over more than a decade, transforming a planned beltway into a functional loop around Fort Worth through incremental segment openings funded primarily by federal Interstate Highway funds and state contributions. The first segment opened in 1958, spanning from McCart Avenue southward to U.S. 377 (present-day southbound I-35W) at a cost of $11 million, equivalent to approximately $119 million in dollars; this initial four-lane section marked the project's practical start and alleviated early congestion on local arterials by diverting through traffic. Subsequent phases focused on the southeast, northeast, and northwest segments to connect key radials. The southeast loop from Hemphill Street to SH 121 was completed in 1965 at $13.8 million, followed by the northeast loop from SH 121 to I-35W in 1966 for $5.6 million. The northwest section advanced with the segment from I-35W to Spur 496 opening in 1969 at $7.6 million. By 1973, the I-820/I-20 east interchange was completed for $9.1 million. Eastern extensions reached I-30 by 1975 through completions like the $7.1 million I-30/I-820 interchange and a $13.8 million bridge over Lake Worth, addressing engineering challenges such as crossings over waterways and elevated terrain in expanding suburban areas. The remaining northwest loop from Spur 496 to I-30 was built in four stages in 1977 as a six-lane for $39 million. These segments typically featured four- to six-lane designs with frontage roads, requiring significant land acquisition amid rapid post-war growth in Tarrant County, which complicated right-of-way procurement and increased costs. The loop achieved full continuity in 1982 with the completion of the southwest segment from U.S. 80 (Spur 580) to Hulen Street, built in three stages at $42 million and designed as a with roads; this final link included ribbon-cutting ceremonies that highlighted the route's role in boosting regional commerce and reducing urban core traffic by up to 30% initially. Overall, the original construction spanned six major stages for the west loop alone, with total estimated costs around $116 million, reflecting phased federal-state partnerships that navigated suburban development pressures without halting progress.

North Tarrant Express

The North Tarrant Express (NTE) project added four high-occupancy toll (HOT) lanes, branded as TEXpress lanes, along a 13-mile segment of the northern portion of Interstate 820 (I-820) and State Highway 121/State Highway 183 (SH 121/SH 183) from Interstate 35W (I-35W) eastward to the SH 121 split in Tarrant County, Texas. This expansion rebuilt the existing four- to six-lane mainline, incorporating the new managed lanes alongside frontage roads and auxiliary lanes to enhance capacity in a high-congestion corridor. The initiative operated under a 52-year public-private partnership (P3) concession between the Texas Department of Transportation (TxDOT) and Cintra Infrastructure USA (now part of Ferrovial), which handled design, construction, financing, operations, and maintenance. The $2.1 billion project employed on the TEXpress lanes to manage , with rates varying in real-time—typically ranging from 15 to 90 cents per mile—based on traffic demand to maintain minimum speeds of 50 mph. Key technological features included overhead gantries equipped with sensors and cameras for , enabling variable pricing adjustments every five minutes. The system integrated seamlessly with the (NTTA) TollTag for unified payment across regional facilities, allowing high-occupancy vehicles (HOV-2+) and motorcycles to use the lanes at reduced or zero during peak periods. Construction commenced in October 2010, with the first two segments (covering I-820 from I-35W to SH 121/SH 183) opening to traffic on October 4, 2014, nine months ahead of schedule. Full operations across the entire NTE corridor, including adjacent segments, were achieved by early 2015. Post-opening, the lanes have delivered measurable operational benefits, including a 15% increase in average commuter speeds and a reduction in congestion time from 26% to 4% of travel duration. The project incorporated environmental and community mitigation measures to address construction-era impacts. Noise barriers, exceeding 10 miles in length, were installed along residential areas to reduce highway-generated sound levels by at least 7 decibels for affected properties, following public input through noise abatement workshops. Right-of-way acquisitions for the expansion resulted in the displacement of several dozen households and businesses, with TxDOT providing relocation assistance and compensation as required under guidelines. cohesion was preserved through phased and coordination with local stakeholders to minimize disruptions.

Future improvements

The Texas Department of Transportation (TxDOT) has outlined several future improvements for Interstate 820 (I-820) to address growing congestion and enhance capacity across its 35-mile loop around Fort Worth, with a focus on widening and interchange upgrades planned through the 2030s. These efforts build on corridor studies initiated in recent years, including the I-820 Northwest Loop Corridor Study, which evaluates options to reconstruct and widen the highway from Interstate 30 (I-30) to Interstate 35W (I-35W), adding general-purpose lanes and continuous frontage roads while upgrading ramps and interchanges. Similarly, the I-820 East Loop project, environmentally cleared by TxDOT, targets reconstruction from State Highway 121 (SH 121)/SH 183 to Randol Mill Road, incorporating additional lanes to improve throughput in this heavily traveled segment; this $174 million project reached substantial completion in 2024. Additionally, the North Tarrant Express Capacity Improvement Project (NTE CIP), an extension of the NTE, began construction in 2022 to add one general-purpose lane and one managed (tolled) lane in each direction along the northern portion of I-820 from I-35W to SH 121/SH 183, enhancing capacity further with completion anticipated in early 2027. Key priorities include targeted reconstructions at major bottlenecks, such as the interchanges with U.S. Highway 377 (US 377) in Haltom City and Rufe Snow Drive in North Richland Hills, which were identified in 2010 regional congestion analyses as among the worst in due to peak-period delays and safety issues. These upgrades are integrated into broader corridor studies, such as the Northwest Loop effort, which proposes ramp enhancements and improvements to alleviate operational constraints at these locations, with alternatives under to minimize disruptions. On the east side, the Southeast Connector project will widen I-820 to eight mainlanes from I-20 to Spur 303 (Rosedale Street), directly addressing capacity needs near eastern interchanges; as of 2025, the $1.6 billion project is approximately halfway complete with expected completion in 2028. Improvements to I-820 are designed to align with regional transportation initiatives, including enhanced connectivity to the (TRE) system through proposed bridges and trails that link communities east of I-820 to nearby TRE stations, facilitating access. Additionally, reconstructions along SH 121 from Handley Ederville Road to its southern interchange with I-820 support potential extensions of this corridor, improving freight and passenger mobility in coordination with North Central Texas Council of Governments (NCTCOG) plans. Funding for these projects draws primarily from the Texas Clear Lanes program, a state initiative combining federal and state resources to accelerate congestion relief, as seen in the $174 million allocation for the East Loop reconstruction (substantially completed in ) and the $1.6 billion Southeast Connector. While specific allocations from the federal Bipartisan Infrastructure Law () have not been designated solely for I-820, TxDOT's broader Fort Worth District projects benefit from over $13.9 billion in announced BIL funding across Texas transportation initiatives, potentially supporting future phases through competitive grants. State bonds and public-private partnerships are also under consideration to finance additional widening on the east loop from I-35W to I-20. Environmental assessments for these upgrades vary by segment; the East Loop received clearance in prior evaluations, allowing progression to construction, while the Northwest Loop study includes ongoing analysis of alternatives to assess impacts on air quality, wetlands, and cultural resources, with public meetings held in 2024 and additional input planned for late 2025. Timelines indicate preliminary engineering and public involvement advanced in 2023–2024, with major construction on the Northwest Loop segments slated to begin by 2027, contingent on funding.

Interchanges

Major junctions

The western terminus of Interstate 820 (I-820) is a with (I-20), adjacent to a cloverleaf with US 377, while the eastern terminus is a three-wye interchange with I-20 and US 287, currently under reconstruction as part of the Southeast Connector project (as of 2025). These interchanges handle over 231,000 vehicles per day on mainlanes, per 2022 projections for 2025, underscoring their role in supporting regional freight and commuter movement across the Dallas-Fort Worth metroplex. The junction with Interstate 35W (I-35W) in northern Fort Worth features an interchange upgraded to a four-level stack configuration, essential for directing traffic toward and serving as a primary route with daily volumes exceeding 156,000 vehicles (as of 2024). This connection enhances access to central business districts and northern suburbs, alleviating on parallel local arterials. Crossing (I-30) in eastern Fort Worth, I-820 utilizes a that links the loop to Dallas-bound corridors and access routes, managing substantial east-west throughput vital for between Tarrant and Dallas counties. This setup supports seamless transitions for travelers heading to and beyond, with ongoing corridor studies emphasizing its strategic position in the regional network. Near , the overlap of State Highway 121 (SH 121) and State Highway 183 (SH 183) intersects I-820 through a complex interchange with braided ramps and managed lanes, optimizing connectivity for , logistics, and suburban commuters in Hurst, , and Euless. These features accommodate high demand from airport-related traffic, promoting efficient access in one of the metroplex's busiest aviation hubs. The interchange with U.S. Highway 287 (US 287) in southeastern Fort Worth provides key suburban linkages, integrating I-820 with radial routes to Arlington and beyond, while the U.S. Highway 377 (US 377) connection in the southwest offers vital local access to Benbrook and Lake Worth areas.

Exit list

The exit list for Interstate 820 is presented below in a table format, ordered counterclockwise from the western terminus at I-20 (mile 0.00) to the eastern terminus at I-20 (mile 34.91). All interchanges are located within Tarrant County, Texas, and the route totals 35.17 miles in length. Exit numbers follow the standard mile-log system used by the Texas Department of Transportation. The table includes all mainline exits, with notes for major interchanges, removed ramps, and non-standard configurations such as direct connections to managed toll lanes (TEXpress Lanes) in the northeast segment.
ExitDestinationsNotes
-I-20 west – Abilene, WeatherfordWestern terminus; directional T-interchange with eastbound I-20 ramps; adjacent cloverleaf with US 377 (south to Granbury)
1ATeam Ranch Road – BenbrookRight exit eastbound
1BChapin Road – Benbrook
2Spur 580 (Camp Bowie West Boulevard) – Benbrook
3AI-30 west – WeatherfordPartial cloverleaf interchange
3BI-30 east – Fort WorthPartial cloverleaf interchange
3CWestpoint Boulevard / Alemeda Street – White SettlementAdded as part of interchange expansion
4White Settlement Road – White SettlementDiamond interchange
5AClifford Street – Fort Worth
5BSilver Creek Road – Fort Worth
6Las Vegas Trail / Heron Drive – Fort Worth
8Navajo Trail / Cahoba Drive – Fort Worth
9Quebec Street – Fort Worth
10ATX 199 / Jacksboro Highway / Azle Avenue – Fort Worth
10BFM 1220 (Azle Avenue) – Fort WorthLeft exit westbound
12AMarine Creek Parkway – Fort Worth
12BOld Decatur Road – Fort Worth
13Bus. US 287 (Main Street) – Saginaw
14Railhead Road – Fort Worth
15FM 156 (Blue Mound Road) – Saginaw
16AI-35W north / US 287 north – DentonFull cloverleaf interchange with TEXpress Lanes direct ramps
16BI-35W south / US 287 south – Fort WorthFull cloverleaf interchange with TEXpress Lanes direct ramps
16CMark IV Parkway – Fort WorthTEXpress Lanes entrance
17Beach Street – Haltom CitySigned as 17A eastbound, 17B westbound
18Haltom Road – Haltom City
19US 377 (Denton Highway) – North Richland Hills
20AIron Horse Boulevard / Meadow Lakes Drive – North Richland HillsTEXpress Lanes exit
20BRufe Snow Drive – North Richland Hills
21I-820 TEXpress Lanes west – I-35WManaged toll lanes access only; former Holiday Lane ramps removed in 2014
22ATX 121 south / TX 183 west – Fort Worth
22BTX 26 north / FM 1938 (Bedford-Euless Road) – North Richland HillsTEXpress Lanes entrance
23Pipeline Road / Glenview Drive – North Richland Hills
24ATX 183 west / TX 10 east – Richland Hills
24BTX 121 south – Fort Worth
25Trinity Boulevard – Fort Worth
26Randol Mill Road – Fort Worth
27John T. White Road / Bridge Street – Fort Worth
28AI-30 east – DallasStack interchange
28BI-30 west – Fort WorthStack interchange
28CBrentwood Stair Road – Fort Worth
29Meadowbrook Drive – Fort Worth
30ACraig Street – Fort Worth
30BTX 180 (Lancaster Avenue) / Spur 303 (Rosedale Street) – Fort Worth
30CRamey Avenue – Fort Worth
31East Berry Street – Fort Worth
32Wilbarger Street – Fort Worth
33AUS 287 north – Fort WorthUS 287 joins southbound I-820
33BMartin Street – Fort Worth
33CSun Valley Drive – Fort Worth
-I-20 east / US 287 south – DallasEastern terminus (mile 34.91); three-wye interchange

References

  1. [1]
    I-820 Loop - Texas Department of Transportation
    I-820 is a loop around Fort Worth that passes through 11 cities - Benbrook, White Settlement, Lake Worth, Saginaw, Haltom City, North Richland Hills, Hurst, ...
  2. [2]
    I-820 Northwest Loop Corridor - Texas Department of Transportation
    The existing I-820 Northwest Loop Corridor is a three- to four-lane divided highway from I-30 to I-35W with two-lane, discontinuous frontage roads.
  3. [3]
    I-820 East Loop - Texas Department of Transportation
    TxDOT has environmentally cleared the I-820 East Loop to ultimately reconstruct I-820 from SH 121/183 to Randol Mill Road, and SH 121 from Handley Ederville ...
  4. [4]
    [PDF] i820update.pdf - the Texas Department of Transportation FTP Server
    The I-820 West Loop was constructed in six stages between 1969 and 1982, culminating with the final piece opening from U.S. 80 (Spur 580) to Winscott Road. ...
  5. [5]
    North Tarrant Express I-820 and SH 121/183 (Segments 1 and 2W)
    The project includes the reconstruction, widening, and addition of tolled managed lanes (TEXpress Lanes) along the corridor. The project added two tolled ...
  6. [6]
    Southeast Connector - Texas Department of Transportation
    The Southeast Connector will rebuild and widen approximately 16 miles of I-20 and I-820. The $1.6 billion project will widen I-20 to 10 mainlanes from I-820 to ...
  7. [7]
    Interstate 820 Texas
    Interstate 820 forms part of the beltway system encircling Fort Worth,Texas. The northeast quadrant of IH 820 includes tolled TEXpress Lanes.
  8. [8]
    All Exits along I-820 in Texas - Westbound | iExit Interstate Exit Guide
    820. West · 30. West · EXIT. 2. TX-580; Camp Bowie W Blvd; Chapin Rd. Fort Worth ... 20. West · EXIT. 429A. US-377; Granbury. Fort Worth, Texas. Fuel. Alternative ...
  9. [9]
    IH 820 SBGP over West Fork Trinity River
    NBI Report ; NBI Bridge Condition, Good ; Inspection Date (Inspection Frequency):, May 2022 (Every 24 Months) ; Structural Evaluation: 7: Better than present ...
  10. [10]
    I-35 West/I-820 Interchange - Fort Worth, Texas - Ferrovial
    Managed lanes I-820 southbound to westbound I-35W General Purpose Lanes. Improvement of Mark IV Parkway; Southbound to westbound frontage road. Challenges.
  11. [11]
    [PDF] Project Description
    The proposed project would reconstruct I-820 from approximately 2,000 feet north of Pipeline Road (Rd)/Glenview Drive (Dr), at the northern I--820/SH 121/SH ...
  12. [12]
    [PDF] ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 820 ...
    Oct 1, 2008 · ... Interstate Highway (IH) 820 in Tarrant. County, Texas. This EA presents the potential social, economic, and environmental impacts for the.
  13. [13]
    SH 121/183 Airport Freeway - Texas Department of Transportation
    SH 121/183 is an east-west corridor through North Richland Hills, Hurst, Bedford, Euless and Fort Worth. TxDOT has been developing and widening SH 121/183 ...
  14. [14]
    [PDF] IH 820 (NORTHEAST LOOP)
    Segment Length: 5.1 miles. ▫ Road Type: 4-lane freeway. ▫ Annual Hours of Delay: 2,213,000. ▫ Texas Congestion Index: 1.86.
  15. [15]
    [PDF] 4| Postwar Suburbanization and Development, 1946–1980
    49 Interstate Highway 820 comprises the ... Source: “Aerial. View of Downtown Fort Worth,” n.d.,. University of North Texas Libraries, The. Portal to Texas ...
  16. [16]
    Fort Worth Freeways - NET
    The northwest section of Loop 820 was an ongoing pet project for Wright, with the 1968 interstate designa- tion and 1970s construction requiring all of Wright's ...
  17. [17]
    Fort Worth, TX - Texas State Historical Association
    Feb 12, 2025 · Construction on Loop 820, encircling Fort Worth and a few suburban communities, also began during the late 1950s. Interstate construction ...
  18. [18]
    3-digit Interstates from I-20 - Kurumi.com
    Designation. Picture Interstate 820 and I-20 forming a complete loop around the city. On Oct. 1, 1959, the Bureau of Public Roads ( ...
  19. [19]
    INTERSTATE HIGHWAY NO. 820
    Texas Highway Designation Files. ... 180-1959, dated 10/16/1959. From a junction with IH 20 west of W Fort Worth, southeastward, eastward, northward, and ...Missing: AASHTO FHWA
  20. [20]
    Part III - Cost | FHWA - Department of Transportation
    The Federal-Aid Highway Act of 1952 authorized the first funding specifically for System construction, but it was only a token amount of $25 million a year for ...
  21. [21]
    Parts of TxDOT's billion-dollar Southeast Connector delayed as ...
    Feb 8, 2023 · The first segment of the loop I-820 is completed from McCart Avenue to U.S. 377. Southeast Loop I-820 is completed from Hemphill Street to SH ...
  22. [22]
    [PDF] I-820 HISTORY 2000-2005 The TxDOT Fort Worth District initiates ...
    The first segment of the loop is completed from McCart Avenue to U.S. 377. Southeast Loop I-820 is completed from Hemphill Street to SH 121. Northeast Loop I- ...Missing: opened | Show results with:opened
  23. [23]
    North Tarrant Express - Texas Department of Transportation
    The NTE | I-820 and SH 121/183 project began in Oct. 2010, and reached substantial completion in Oct. 2014 – nine months ahead of schedule.Missing: scope cost
  24. [24]
    NTE, Dallas - Fort Worth - Ferrovial
    North Tarrant Express has significantly reduced travel times and improved the reliability of daily commutes, while also enhancing safety and upgrading roadway ...Missing: 2015 | Show results with:2015
  25. [25]
    How Dynamic Pricing Works - LBJ, NTE & NTE 35W TEXpress Lanes
    Typical toll prices on each TEXpress toll segment may range from 15 to 35 cents per mile during lighter traffic, and 45 to 90 cents during rush hour. Pricing ...
  26. [26]
    NTE TEXpress Lanes Complete Guide: Dynamic Pricing, TollTag ...
    Complete 2025 guide to NTE TEXpress Lanes on I-820, SH 121/183, and I-35W. Dynamic pricing, TollTag requirements, HOV discounts. Calculate tolls now.Missing: HOT construction 2010-2015 Cintra
  27. [27]
    [PDF] North Tarrant Express: Managing Traffic With Dynamic Pricing - IBTTA
    Apr 17, 2020 · Average speeds for commuters have increased by approximately 15%. • Time in congestion down from 26% of the time to 4%,.
  28. [28]
    Plan Your Trip - NTTA
    NTTA does not set toll rates, operate, or maintain TEXpress Lanes. Toll rates for TEXpress lanes are determined by the operator of the respective lanes, either ...Toll Rate Map · Toll Calculator · Dallas North Tollway (DNT) · Traffic Update Map
  29. [29]
    NTE TEXpress Lanes
    The NTE TEXpress Lanes span 13.3 miles east and west with 2 lanes per direction along I-820 (Northeast Loop) and SH-121/183 (Airport Freeway) in Tarrant ...
  30. [30]
    [PDF] A Review of the Application of Congestion Pricing Final Report
    Sep 19, 2016 · Since opening in 2014 and 2015, the North. Tarrant Express (NTE) ... SH 183/I-820 North Tarrant Express (NTE) are examples of congestion pricing ...
  31. [31]
    North Tarrant Expressway, Texas, USA - Meridiam
    The average speed has increased by 15% since operations began, and the congestion time (speed below 50mph) has been reduced by 73% on the same lanes. Better ...Missing: phases | Show results with:phases<|separator|>
  32. [32]
    [PDF] Public Hearing - the Texas Department of Transportation FTP Server
    Aug 25, 2009 · ... North Tarrant Express (NTE) ... Requests information regarding air quality and how the proposed noise barrier north of. Plainview Drive will impact ...
  33. [33]
    Fort Worth's Loop 820 tops list of region's worst
    Feb 24, 2010 · The top three intersections on the list of the worst are along Fort Worth's Loop 820. ... Loop 820 at Rufe Snow Drive, North Richland Hills. 2.
  34. [34]
    [PDF] I-820 and SH 121 Interchange in NE Tarrant County Public Hearing ...
    A bridge and trail connecting over SH 820 next to Trinity Blvd. could serve as an avenue to connect the communities east of SH 820 to [the] TRE rail station.Missing: integration | Show results with:integration
  35. [35]
    [PDF] President Biden's Bipartisan Infrastructure Law is Delivering in Texas
    To date,. $13.9 billion in Bipartisan Infrastructure Law funding has been announced and is headed to Texas with 310 specific projects identified for funding.Missing: 820 TxDOT
  36. [36]
    [PDF] I-820 Northwest Loop Corridor Study Public Meeting
    Nov 7, 2024 · Proposed improvements would include adding main lane capacity, ramping improvements with auxiliary lanes, reconstruction of interchanges and ...<|control11|><|separator|>
  37. [37]
    021522-final-schematics.pdf
    ... I-20 - WESTBOUND. I-820 - SOUTHBOUND. PARCEL NO. OWNER. PARCEL NO. OWNER. PARCEL ... TXDOT TP&P. NOTE: TRAFFIC VOLUMES. ANGLIN DR. ANGLIN DR. 96,200. 130,200.
  38. [38]
    I-30 Corridor Project - Texas Department of Transportation
    The three-mile project is widening I-30 from a four-lane highway (two mainlanes each direction) to a six-lane roadway (three mainlanes each direction).
  39. [39]
    All Exits along I-820 in Texas - Eastbound | iExit Interstate Exit Guide
    Search All Exits along I-820 traveling Eastbound in Texas.
  40. [40]
    OKRoads -- Texas Highway Guides -- Interstate 820
    Interstate 820 East at Exit 10A - TX 199/ FM 1220 - Jacksboro Hwy./Azle Ave. (Photo taken 7/14/04). Interstate 820 East at Exit 13 - Bus. U.S. 287 - Saginaw ...Missing: list | Show results with:list
  41. [41]
    Interstate 820 Inner Loop - Haltom City to Kennedale Texas - AARoads
    Jan 23, 2018 · The diamond interchange (Exit 21) connecting Interstate 820 with Holiday Lane in North Richland Hills was removed as part of the TEXpress revamp ...Missing: list | Show results with:list