Mobile launcher platform

A mobile launcher platform (MLP), also referred to as a mobile launcher (ML), is a massive, wheeled structure designed to support the assembly, transportation, testing, and launch of large multistage space vehicles from facilities like NASA's in . These platforms, typically measuring around 400 feet (122 meters) in height, weighing approximately 11.5 million pounds (5.2 million kilograms), and featuring a base about 165 feet (50 meters) long by 135 feet (41 meters) wide elevated 22 feet (6.7 meters) above the ground, serve as the foundational interface between the rocket and the launch infrastructure, including umbilical connections for power, fuel, communications, and crew access. They are transported slowly—up to 1 mile per hour—over distances of several miles to the via specialized crawler-transporters, enabling of the vehicle within the before rollout. The concept of the mobile launcher platform originated in the early 1960s as part of NASA's Apollo program, where three such structures were constructed to handle the Saturn V and Saturn IB rockets for lunar missions, allowing for efficient stacking and mobility across Launch Complex 39. These original platforms were later adapted for the Space Shuttle program from 1981 to 2011, renamed mobile launch platforms, and modified by removing umbilical towers and fixing them semi-permanently to pads 39A and 39B to support 135 shuttle missions, demonstrating their versatility in accommodating different vehicle configurations. For modern deep-space exploration under the Artemis program, NASA has developed new generations of mobile launchers—such as Mobile Launcher 1 (ML-1), completed in 2018 and first used for the uncrewed Artemis I mission in 2022, and Mobile Launcher 2 (ML-2), whose construction began in 2019 with tower completion in 2025 and full delivery expected in 2026—to support the larger Space Launch System (SLS) rocket and Orion spacecraft, as the legacy platforms proved incompatible with SLS's scale and requirements. Key features of contemporary MLPs include a two-story base with a flame trench for exhaust deflection during liftoff, multiple vehicle support posts, tail service masts for umbilical connections, and a towering structure equipped with cranes, walkways, and systems for cryogenic fueling, sound suppression, and emergency egress, ensuring safe operations for crewed and uncrewed launches aimed at the , Mars, and beyond. These platforms not only represent a of U.S. but also highlight ongoing innovations in ground support systems to enable sustainable .

Overview and History

Definition and Purpose

A mobile launcher platform (MLP) is a large, movable designed to support the assembly, processing, and transport of multistage space vehicles from high-bay assembly facilities to launch pads. It serves as the foundational base for vertically stacking stages and integrating payloads, while enabling safe horizontal movement across the launch complex. The primary purposes of an MLP include providing during vehicle buildup, facilitating via specialized crawler-transporters that maintain level over uneven , and supporting launch operations through integrated interfaces for fueling, electrical connections, and personnel access. This setup allows for efficient workflow in large-scale programs, minimizing the need for fixed launch . Key advantages of the MLP concept encompass its reusability for multiple missions, which reduces costs and logistical demands; the incorporation of ground support systems like detachable umbilical towers for vehicle servicing; and inherent protective features that the from environmental hazards during transit. These attributes have made MLPs essential for handling massive launch vehicles since their inception. In the Apollo and Space Shuttle eras, typical MLPs measured 160 feet long by 135 feet wide and stood 25 feet tall, with an empty weight of about 8.23 million pounds. This design originated from requirements for transporting rockets.

Historical Development

The concept of mobile launcher platforms originated in the early as part of the U.S. Air Force's Titan III program, but adapted it for the Apollo program's rocket to enable , transport, and launch from a single structure. Three mobile launchers were constructed by Ingalls Iron Works between and to support this integrate-transfer-launch approach at Kennedy Space Center's Launch Complex 39. The first, Mobile Launcher-1, was completed in 1964 and rolled out with the for on August 26, 1967, marking the initial operational use; this was followed by its role in the historic launch on July 16, 1969. Sound suppression features, including water deluge systems connected via large pipes, were later incorporated post-Apollo to mitigate acoustic energy during launches. During the Space Shuttle era from the 1970s to the 1980s, the Apollo-era mobile launchers underwent significant modifications to accommodate the stack, including the removal of the launch umbilical towers and swing arms, resurfacing of the platforms to support the solid rocket boosters and external tank, and reconfiguration for horizontal orbiter mating in the . These changes, completed primarily between 1977 and 1980, transformed the structures into mobile launcher platforms (MLPs) capable of handling the 's unique configuration, enabling 135 successful missions from 1981 to 2011. The platforms supported all flights from pads 39A and 39B, with MLP-2 used for the final mission, , in July 2011. Following the Shuttle program's retirement, NASA developed a new Mobile Launcher for the Constellation program in the mid-2000s to support the Ares I crew launch vehicle and planned Ares V cargo launcher. Although Constellation was canceled in 2010, this Mobile Launcher-1 was modified with a new tower to support the Space Launch System (SLS), with the modified Mobile Launcher-1 integrated for the Artemis program's inaugural flight, Artemis I, on November 16, 2022. Design work for a second dedicated launcher, Mobile Launcher-2, began in 2014 under initial studies for SLS Block 1B accommodations before evolving into a full new build contract awarded in 2019. Key challenges in the platforms' evolution included structural wear from repeated launches and environmental factors, prompting ongoing redesigns for durability, such as reinforced interfaces following Shuttle-era debris incidents that highlighted vulnerabilities in launch infrastructure. As of November 2025, after the final tower module was added in July 2025, Mobile Launcher-2's integration and testing continue at to support targeted for no earlier than September 2028, though independent audits project potential delays to spring 2029 due to cost overruns and technical hurdles.

Design and Components

Structural Features

The core structure of a mobile launcher platform consists of an open beam and truss framework constructed from welded steel beams, providing robust support for the assembly, transport, and launch of large rockets. This steel framework is divided into multiple compartments and levels tailored to accommodate rocket stages, such as access platforms at approximately 33-foot and 39-foot heights for integrating components of the . The overall design includes a two-story base measuring about 165 feet long by 135 feet wide and 25 feet high, topped by a tower roughly 355 to 370 feet tall with floor levels spaced every 20 feet for operational access. Mobility is enabled by a system of four leveling legs equipped with hydraulic jacks, which allow precise alignment and stabilization during transport and positioning. These features ensure compatibility with NASA's crawler-transporters, which move the fully loaded platform at speeds up to 1 mile per hour. The base integrates a flame bucket for sound suppression, channeling exhaust during launch while maintaining structural integrity. Support elements include built-in platforms and walkways throughout the tower for worker access during integration, along with integrated wiring raceways that route umbilicals for , , , and communications to the rocket. Hold-down posts, such as the eight vehicle support posts (four per ) on SLS platforms, secure the rocket to the deck and transfer loads during static testing and liftoff. The entire structure weighs approximately 10.5 million pounds when complete. Engineering specifications emphasize extreme durability, with a load-bearing capacity supporting up to 18 million pounds when fully loaded with the and . When jacked up at the , the platform resists winds up to 110 miles per hour, equivalent to hurricane-force conditions. Variations across programs reflect evolving designs: Apollo-era platforms integrated a fixed within the launch umbilical tower for crew access, while platforms incorporated additional tail service masts for engine servicing. platforms feature a taller, integrated tower for enhanced umbilical and stabilization support, built on modified bases with stiffer structural elements to handle heavier loads; Mobile Launcher 2, under construction as of 2025 with its tower completed in July 2025, is projected for delivery in 2027.

Sound Suppression System

The sound suppression system on mobile launcher platforms safeguards the , platform, and pad structures from the intense acoustic energy produced by engines during ignition and liftoff, with unsuppressed levels potentially reaching 180–200 that could cause vibrational damage or structural failure. This protection is achieved through a water-based deluge system integrated with the flame trench beneath the platform, where high-volume water flows flood the exhaust path to absorb and dissipate shock waves generated by the plume. For the Space Launch System (SLS), the system releases approximately 450,000 gallons of water across the blast deck and deflector in about 30 seconds, achieving a peak flow rate exceeding 1 million gallons per minute to create a vapor barrier that scatters acoustic reflections. The water in the flame trench and quiescence areas further dampens pressure waves by converting kinetic energy into steam and turbulence, preventing resonance buildup that could harm the vehicle. Key components include arrays of spray nozzles, or "rainbirds," positioned on the platform base and below the solid rocket motor nozzles to direct water upward into the exhaust plume; these are fed by elevated water towers—such as the 300,000-gallon tank at Pad 39B—drawing from reservoirs via large-diameter piping. The system operates automatically, initiating water flow about 6–7 seconds before liftoff in coordination with engine ignition to ensure full coverage during the critical hold-down . The system's design evolved from the Apollo era's rudimentary water deluge, which primarily served fire suppression during Saturn V launches using basic overhead sprays totaling around 100,000–200,000 gallons without dedicated acoustic focus. It was significantly enhanced for the Space Shuttle program to counter the solid rocket boosters' noise, incorporating 350,000 gallons total and peak flows up to 900,000 gallons per minute for better plume quenching. For SLS, upgrades accommodate the higher 8.8 million pounds of thrust, including refined nozzle geometries and increased piping capacity on Mobile Launcher 2, under construction as of 2025, to optimize spray patterns and reduce overpressure. In terms of effectiveness, the deluge system typically attenuates acoustic levels by 3–5 dB—equivalent to a 50–60% reduction in sound pressure—across the platform and vehicle, as validated through scale model acoustic tests showing substantial mitigation of far-field noise and prevention of damage observed in unsuppressed early rocket firings. This performance ensures the structural integrity of components like the mobile launcher's steel deck, which withstood full-scale water flow tests without erosion.

Usage at Kennedy Space Center

Mobile Launcher Platform-1

The Mobile Launcher Platform-1 (MLP-1), originally designated as Mobile Launcher-3 (ML-3) during the Apollo era, was constructed by Ingalls Iron Works in , with fabrication beginning in 1963 and completion in 1965. This massive steel structure, measuring 135 feet long by 114 feet wide and weighing approximately 8.2 million pounds when unloaded, served as the transportable base and umbilical tower for the rocket. It was first rolled out to Launch Complex 39A in 1967 for testing and made its debut operational use supporting the mission on July 16, 1969, carrying the that launched the first crewed lunar landing. Following the conclusion of the , MLP-1 underwent significant modifications in the mid-1970s to accommodate the , including the removal of its original 320-foot Launch Umbilical Tower (LUT) and reconfiguration of the base to interface with the new (RSS) at the , which provided protected access to the orbiter and . These changes enabled of the Shuttle stack in the before transport to the pad. Designated as MLP-1 for the Shuttle era, it supported 82 missions from in April 1981 through in July 2011, including notable flights like () and (, the final Shuttle mission). During this period, the platform endured key maintenance events, such as rollbacks to the for inspections and repairs related to external tank foam shedding issues following the accident in 2003 and subsequent debris events during in 2005, which prompted enhanced cryogenic systems and structural reinforcements to mitigate insulation risks. In preparation for the Space Launch System (SLS), MLP-1 was selected in the 2010s for upgrades to support the Block 1 configuration, involving retooling of the hold-down posts and umbilical connections to accommodate the taller 39-foot SLS core stage, as well as integration of new ground support equipment for propellant loading and crew safety. After successfully supporting the uncrewed Artemis I mission in November 2022, additional modifications were implemented, including the installation of a crew access arm on the tower to provide a walkway for astronauts boarding the Orion spacecraft and an emergency egress slidewire system for rapid evacuation. The platform was rolled back to the Vehicle Assembly Building on October 3, 2024, for final preparations ahead of the Artemis II crewed mission. As of November 2025, following the completion of SLS rocket and Orion spacecraft stacking in October, MLP-1 supports final processing and integration for the Artemis II launch campaign at Kennedy Space Center's Launch Complex 39B, with a planned rollout to the pad in early 2026. This hybrid structure exemplifies the iterative evolution of launch infrastructure, briefly sharing design elements like extensible column supports with other MLPs for pad stability during liftoff.

Mobile Launcher Platform-2

The Mobile Launcher Platform-2 (MLP-2) is a specialized ground support structure developed by to accommodate the (SLS) Block 1B configuration, enabling more capable missions under the beginning with . In June 2019, awarded a valued at $383 million to Bechtel National, Inc., to design, fabricate, assemble, test, and commission the MLP-2 at the Kennedy Space Center's (). Construction of the platform's modular components commenced in August 2023, following delays in the design phase, with the total project cost escalating to an estimated $960 million by early 2022 due to scope changes and performance issues. The MLP-2 is engineered for of the taller SLS Block 1B rocket, which incorporates the to boost payload capacity to approximately 105 metric tons to , compared to 95 metric tons for the Block 1 variant. Structurally, the MLP-2 features a two-story base measuring 133 feet wide by 158 feet long by 25 feet tall, supporting a tower that reaches about 355 feet in height, resulting in a total stack height of around 380 feet when mated with the Block 1B. The design includes nine operational levels within the tower to facilitate access and integration for the , along with 43 steel super-assemblies in the base for enhanced rigidity to withstand extreme launch conditions, including temperatures up to 2,200°F, pressures exceeding 130 , and liftoff thrust of nearly 8.9 million pounds. It incorporates stronger hold-down clamps capable of securing the against the increased structural loads from the Block 1B's higher thrust profile at liftoff, which exceeds that of the Block 1 by accommodating the additional 105 metric tons of payload mass implications on dynamic forces. An enhanced crew emergency egress system features a slidewire setup at the 317-foot level, with four baskets each accommodating up to five personnel for rapid evacuation during ground operations. Construction progress accelerated in 2025, with tower module stacking initiating in early 2025; Module 4 was lifted onto the tower chair on , followed by additional 40-foot modules in , culminating in the full assembly of the 377-foot tower by July 2 with the placement of Module 10. Concurrently, modifications to the VAB's high bays are underway to support MLP-2 operations for , targeted for no earlier than 2028, including expanded space for the Block 1B. The platform includes upgraded sound suppression features to handle the Block 1B's elevated acoustic and overpressure loads during ignition, as detailed in the broader design. Development of the MLP-2 faced significant challenges, including delays attributed to the pandemic's impact on and workforce availability, as well as Bechtel's initial noncompliance with systems and incomplete design reviews, pushing the original March 2023 delivery to November 2026 as of July 2025. disruptions further compounded issues, with procurement costs surpassing $660 million from over 300 suppliers, yet the 2025 milestone of completing the full tower assembly marked a key step toward operational readiness despite these overruns.

Integration with Space Launch System

The integration of mobile launcher platforms (MLPs) with the enables the vertical assembly, processing, and transport of the rocket within NASA's Integrate-Transfer-Launch paradigm at . The SLS stack, including the core stage, solid rocket boosters, and Interim Cryogenic Propulsion Stage (ICPS), is assembled atop the MLP inside High Bay 3 of the , where components such as the horizontally shipped core stage are erected and mated vertically using overhead cranes. Once stacking is complete, the fully integrated vehicle on the MLP is transported via to Launch Complex 39B for final processing and launch; for Artemis I in 2022, this rollout occurred on March 17, spanning approximately 12 hours to cover the 4-mile distance along the Crawlerway, followed by multi-day pad operations including wet dress rehearsals. MLPs for SLS incorporate specialized adaptations to handle the rocket's cryogenic propellants and structural demands, including tail service mast umbilicals (TSMUs) that connect from the platform's zero-level deck to the core stage for (LOX) and (LH2) fueling, each approximately 33 feet tall and designed to retract cleanly during liftoff to avoid interference. These systems support launch commit criteria that verify precise alignment and stability of the MLP under the SLS, ensuring safe propellant loading and ignition sequencing. In operation, the MLP interfaces with the SLS core stage post its hot-fire testing at in early 2021, facilitating integration with the solid rocket boosters and ICPS during VAB stacking; Mobile Launcher-2 (ML-2) is specifically configured for future Block 1B SLS variants, including the (EUS) for onward, to accommodate the taller configuration and additional payload mass. As of 2025, Mobile Launcher-1 (ML-1) has undergone modifications to support crewed missions, including enhancements to the emergency egress system with platforms and baskets for rapid evacuation, as well as interfaces for the spacecraft's launch abort system to enable safe abort scenarios during countdown and ascent. These updates prepare ML-1 for Artemis II in 2026, integrating crew safety protocols with the platform's structural and umbilical systems. During Artemis I in 2022, the MLP successfully withstood the 's total liftoff of 8.8 million pounds from the core stage engines and boosters, providing data that has informed structural reinforcements and subsystem upgrades for ML-2 to handle evolving SLS Block configurations.

Usage at Cape Canaveral

Historical Use with Titan III and Titan IV

The mobile launcher platforms (MLPs) at Cape Canaveral were initially introduced as part of the Integrate-Transfer-Launch (ITL) concept developed by the United States Air Force in the early 1960s to support the Titan III rocket family, with the first operational use occurring during the inaugural Titan IIIC launch from Space Launch Complex 40 on June 18, 1965. This approach allowed for vertical integration of the launch vehicle in a dedicated assembly building before transferring the fully stacked rocket on the MLP to one of the two dedicated pads (SLC-40 or SLC-41), enabling higher launch rates compared to fixed-pad systems derived from earlier Titan II intercontinental ballistic missile facilities. The design emphasized modularity to handle the Titan III's configuration, including a 10-foot-diameter liquid-fueled core derived from the Titan II, paired with large strap-on solid rocket motors for added thrust. To accommodate the Titan III's dimensions and architecture, the MLPs featured a reduced height relative to later platforms and incorporated specialized supports for positioning and securing the 250-ton solid rocket motors during assembly and . These platforms facilitated the integration of upper stages, such as for deep-space missions, by providing umbilical connections for fueling, power, and data links while the vehicle remained vertical. Operations involved rail or crawler from the Vertical Integration Building to the pad, where the MLP was secured in place for final and launch, prioritizing efficiency for and payloads over the more extensive mobility seen in other programs. Over their service life, the MLPs supported 36 Titan IIIC launches from 1965 to 1982, along with additional missions using Titan III variants like the and , contributing to a total of approximately 55 Titan III-family flights through 1989 that delivered satellites, reconnaissance assets, and scientific probes including the Viking Mars landers and Voyager spacecraft via upper stage pairings. The platforms were subsequently adapted for the upgraded , which conducted 27 launches from between 1989 and 2005, primarily for heavy national security payloads. A brief reference to sound suppression highlights the platforms' integration with water deluge systems tailored to the Titan's acoustic profile during liftoff. Following the final mission from SLC-40 on April 29, 2005, the MLPs were retired from active use as the program concluded, with associated infrastructure at SLC-40 and SLC-41 dismantled or modified starting in 2006 to support newer launch vehicles, completing the transition by 2010.

Use with

In the early 2000s, as part of the Evolved Expendable Launch Vehicle (EELV) program, the mobile launcher platform (MLP) at Space Launch Complex 41 (SLC-41) was adapted from the site's infrastructure to support the rocket, enabling a single reusable platform for vertical stacking and launch operations. Key adaptations include an adjustable deck designed to interface with the RD-180 first-stage engine and the Centaur upper stage, providing stable support during integration and ignition. The platform, which draws from the foundational design of earlier Titan launch structures at the site, facilitates precise alignment for the rocket's 12.5-foot-diameter common core booster. Since the inaugural Atlas V launch from SLC-41 in March 2006, the MLP has enabled more than 100 successful missions, encompassing scientific endeavors like the July 2020 launch of NASA's Perseverance rover to Mars and numerous national security payloads for the U.S. Space Force, such as GPS satellites and missile warning systems. Operations involve stacking the stages atop the MLP within the adjacent Vertical Integration Facility before a short, rail-guided rollout of approximately 1,800 feet to the launch position, eliminating the need for long-distance transport seen in other programs. As of November 2025, the platform remains active for remaining flights, including deployments of Amazon's internet satellites, with the historic first crewed mission having occurred in June 2024. Infrastructure upgrades have reinforced the MLP to withstand up to 1.6 million pounds of thrust from the engine combined with solid rocket boosters in configurations like the 421 or 551 variants, while incorporating automated systems for fueling and to enhance safety and efficiency.

Planned Use with

(ULA) is transitioning from the to the rocket at Space Launch Complex 41 (SLC-41) on , with modifications to the mobile launcher platform (MLP) beginning in August 2019 to accommodate the new vehicle. The Vulcan-specific MLP, distinct from the existing platform, was fabricated in eight sections and first rolled to the pad in January 2021 for ground testing at the Vertical Integration Facility (VIF). The inaugural launch, Certification Flight 1 (Cert-1), occurred successfully on January 8, 2024, from SLC-41, marking the start of operational transitions. The Vulcan MLP features design adaptations tailored to the rocket's 5.4-meter (17.7-foot) diameter and use of liquid natural gas (LNG) propellant, including integrated command and data cabling, propellant plumbing, and hardware for vertical stacking at the VIF before transport to the pad. Standing 56 meters (183 feet) tall, the platform rolls on rail bogies at approximately 4.8 kilometers per hour (3 miles per hour) to support the 61.5-meter (202-foot)-tall Vulcan Centaur configuration. Reinforcements and upgrades to the SLC-41 infrastructure, including the launch mount, were implemented to handle the thrust from the first stage's two Blue Engine 4 (BE-4) engines, each delivering 550,000 pounds-force (2.45 meganewtons) for a combined 1.1 million pounds-force (4.9 meganewtons). These changes build on the Atlas V MLP as a baseline while enabling dual-vehicle compatibility at the shared pad. A second certification flight took place in early 2025, leading to full NSSL certification in March 2025. completed two additional launches in the first half of 2025, followed by its first operational (NSSL) mission on August 12, 2025, from SLC-41. As of November 2025, the platform supports ongoing missions, including a planned GPS III-8 satellite launch later in the month. The Vulcan MLP at SLC-41 will underpin launches for Amazon's constellation, with ULA contracted for multiple missions to deploy broadband satellites starting post-certification, alongside national security payloads under the U.S. Space Force's (NSSL) program through the . The platform's role extends to supporting up to 38 Kuiper flights on , enabling high-cadence operations as retires. Ongoing pad enhancements in 2025, including further infrastructure optimizations, aim to sustain this cadence amid the fleet transition. Development challenges for the Vulcan MLP and overall system stemmed primarily from delays in Blue Origin's BE-4 engine maturation, which pushed the first launch from 2021 to 2024. These setbacks, including and issues, limited early flight rates, but full operational capability is projected for with an annual launch cadence of 20 to 25 missions from SLC-41 and Vandenberg. To mitigate acoustic impacts from the increased thrust, the SLC-41 was expanded to a 300,000-gallon capacity, delivering water via an upgraded network during liftoff.

Other Applications

International and Commercial Uses

Japan's H3 rocket, first launched in 2023 (though the debut flight failed) and operational since its successful launch in 2024 from the Tanegashima Space Center, utilizes a Movable Launcher platform for final assembly and transport to the launch site, drawing inspiration from traditional mobile launcher designs to enhance flexibility and efficiency in heavy-lift operations. This system supports the H3's configuration for payloads up to 6.5 metric tons to geostationary transfer orbit, with successful missions in 2024 and 2025 demonstrating its reliability for national satellite deployments. In Europe, the launcher, which debuted in July 2024 from the in , , incorporates a semi-mobile service tower that rolls away from the to allow liftoff, enabling safer integration and countdown procedures for this heavy-lift vehicle capable of delivering over 20 metric tons to . The design facilitates horizontal assembly in a nearby building before vertical positioning on the pad, optimizing workflow for ArianeGroup's production of up to 11 launches annually. India's Mark III (GSLV Mk III), first tested in 2014 and operational since 2017, employs a mobile launch pedestal for stacking and transport within the , allowing the 640-metric-ton vehicle to be moved from the Vehicle Assembly Building to the pad for missions placing up to 4 metric tons into . This approach has supported key launches, including GSAT-19, underscoring its role in India's independent heavy-lift capabilities. China's , a heavy-lift launching from the since 2016, relies on vertical transporter-erector platforms to move fully assembled vehicles from integration facilities to the pad, accommodating payloads exceeding 25 metric tons to for missions like the lunar program. These platforms enable efficient handling of the rocket's 57-meter height and 870-metric-ton mass, with recent successes in 2024 and 2025 advancing China's deep-space ambitions. In the commercial sector, SpaceX's Starship system at Boca Chica, Texas, uses fixed orbital launch mounts for stacking and ignition, with ongoing tests in 2025 preparing for orbital flights of this fully reusable vehicle designed for over 100 metric tons to low Earth orbit, though not fully mobile to prioritize rapid turnaround. Blue Origin's New Glenn, which conducted its first operational launch on November 13, 2025, from Cape Canaveral's Launch Complex 36, integrates a fixed launch platform with reusable booster recovery capabilities—as demonstrated by the successful first-stage landing—and supports up to 45 metric tons to low Earth orbit for commercial and NASA missions like ESCAPADE. Rocket Lab's Neutron rocket, in development with a planned debut in mid-2026 from Launch Complex 3 in , incorporates smaller-scale mobile integration elements to enable cost-effective reuse for medium-lift payloads up to 13 metric tons to , targeting constellations and interplanetary cargo. This design emphasizes modularity and rapid processing, reducing infrastructure needs compared to larger systems while aligning with commercial demands for frequent, affordable access to space.

Adaptations for Other Launch Vehicles

The United Launch Alliance (ULA) adapted mobile launcher platform concepts for the Delta IV rocket at Space Launch Complex 37B (SLC-37B) on Cape Canaveral Space Force Station, incorporating a fixed mobile launcher with integrated hydrogen vent towers to manage cryogenic propellants during stacking and fueling. This setup supported 35 Delta IV missions from 2002 to 2024, enabling vertical integration of the vehicle's common booster core and solid rocket motors on-site before transport to the pad. The platform's design emphasized safety for liquid hydrogen handling, with vent towers directing gaseous hydrogen away from the stack during pre-launch operations, a feature refined over the program's lifespan to accommodate the rocket's high-thrust RS-68 engines. Following the final Delta IV Heavy launch on April 9, 2024, carrying the NROL-70 payload, the infrastructure was decommissioned, marking the retirement of this MLP variant after more than two decades of service. SpaceX implemented a semi-mobile Transporter Erector Launcher (TEL) for Falcon 9 and Falcon Heavy rockets at SLC-40 and LC-39A on Cape Canaveral, introduced in the 2010s to streamline payload integration and vertical erection. The 212-foot-tall structure, mounted on rails, allows horizontal transport of the assembled vehicle from a hangar to the pad, where it is raised into launch position, reducing exposure to weather and enabling rapid turnaround for reusable boosters. This adaptation has facilitated over 300 Falcon 9/Heavy launches by November 2025, primarily from Cape Canaveral sites, supporting missions like Starlink deployments and national security payloads with enhanced efficiency compared to fixed gantries. Northrop Grumman employs fixed launch platforms for its family of rockets at the on , , adapting MLP principles into stationary structures optimized for solid-propellant vehicles since the . Launch Pad 0-B, for instance, features a reinforced fixed platform that supports vertical stacking of stages without mobility, relying on for components to minimize costs for missions. This design has enabled multiple launches, such as NROL-129 in 2020, emphasizing simplicity and rapid setup for expendable systems derived from decommissioned ICBMs. Firefly Aerospace debuted its Alpha rocket in 2021 using a transportable launch cart system at SLC-2 on , adapting mobile concepts for small-lift vehicles to allow flexible positioning and quick integration. The carts facilitate horizontal assembly in a nearby facility before rolling the vehicle to the pad for erection, supporting the rocket's debut flight on September 2, 2021, which achieved liftoff but encountered an anomaly during ascent. This approach prioritizes affordability for commercial payloads, with subsequent successful missions demonstrating the system's reliability for frequent launches. Innovations in MLP adaptations include SpaceX's hybrid launch tower for at , featuring reusable "chopstick" catch arms that eliminate the need for traditional mobile platforms by enabling in-tower booster recovery during 2025 orbital tests. In Flight 8 on March 6, 2025, the Super Heavy booster was successfully caught mid-air by these arms after separation, reducing ground handling infrastructure and paving the way for rapid reusability. Similar tests in January 2025 further validated the concept, shifting from full MLPs to integrated towers that support both launch and landing operations. Overall trends in U.S. adaptations reflect a move toward vertical on-site integration and reusable elements to accelerate commercial launch cadences, with MLPs evolving into multifunctional towers that minimize transport and maximize throughput in the . This shift supports the growing demand for frequent, low-cost access to space, as seen in upgrades at existing pads for hybrid reusability.

References

  1. [1]
    [PDF] Mobile Launcher 1 | NASA
    The mobile launcher 1 (ML1) is the ground structure used to assemble, process, and launch NASA's Space. Launch System (SLS) rocket (Block 1 configuration) ...
  2. [2]
    [PDF] Mobile Launcher | NASA
    The mobile launcher (ML) is the ground platform structure that will launch NASA's Space Launch. System (SLS) rocket and Orion spacecraft on Arte-.
  3. [3]
    Preserving Launch Infrastructure | National Air and Space Museum
    Jul 5, 2023 · Three Mobile Launchers (ML) were constructed for the Apollo program. The massive Saturn V rocket and the Launch Umbilical Tower were both ...
  4. [4]
    [PDF] Mobile Launcher - NASA facts
    The mobile launcher consists of a two-story base that is the platform for the rocket and a tower that will be equipped with a number of connection lines, called.
  5. [5]
    NASA Mobile Launcher - Hensel Phelps
    The NASA Mobile Launcher supports the next generation of manned space exploration and the program's rocket and ground support equipment.
  6. [6]
    Mobile Launcher 1 - NASA
    Feb 27, 2018 · Mobile launcher 1 is the ground structure that is used to assemble, process, and launch NASA's Space Launch System (SLS) rocket and Orion spacecraft.
  7. [7]
    [PDF] Crawler-Transporters Fact Sheet - NASA
    Able to raise and lower its sides and corners inde- pendently, the crawlers are designed to roll under- neath a mobile launcher (ML), pick it up and steadily.
  8. [8]
    [PDF] Crawler-Transporter - NASA
    131 feet long,114 feet wide. The mobile launcher platform contacts the crawler at four points, arranged in a 90-foot square (same as the base line on a profes-.Missing: dimensions | Show results with:dimensions
  9. [9]
    Have a Rocket to Launch? NASA Platforms on Sale
    Aug 23, 2013 · The platforms stand 25 feet tall and measure 160 by 135 feet, with an unladen weight of 8,230,000 pounds. Add on an unfueled Shuttle, and it ...
  10. [10]
    Mobile Launcher Platform | Encyclopedia MDPI
    Nov 11, 2022 · From 1967 to 2011, three platforms were used at the LC-39 to support NASA's launch vehicles, and will be used for commercial launch vehicles.
  11. [11]
    Out of space, NASA is demolishing Apollo and space shuttle launch ...
    Jan 20, 2021 · Between 1963 and 1965, Ingalls Iron Works built three mobile launchers to transport and support the launch of NASA's Saturn V and Saturn IB ...
  12. [12]
    Apollo 4, the First Flight Saturn V, Rolls Out to the Launch Pad - NASA
    Aug 25, 2022 · On Aug. 26, 1967, the first flight-qualified Saturn V Moon rocket, SA-501, made the slow 3.5-mile ride from the Vehicle Assembly Building (VAB) to Launch Pad ...
  13. [13]
    The Space Shuttle - NASA
    The Space Shuttle was the world's first reusable spacecraft, and the first spacecraft in history that can carry large satellites both to and from orbit.
  14. [14]
    [PDF] Adapting New Space System Designs Into Existing Ground ...
    Mobile Launcher Evolution—The first Mobile Launcher (ML-1) was redesigned to accommodate the crew launch vehicle for the Skylab program: the older, smaller ...
  15. [15]
    First Saturn V Rollout Began an Era of Exploration - NASA
    Aug 20, 2012 · The Saturn V rocket for the uncrewed Apollo 4 mission was the first flight vehicle stacked in the Vehicle Assembly Building, or VAB, and the first to lift off ...
  16. [16]
    [PDF] IG-24-016 - NASA's Management of the Mobile Launcher 2 Project
    Aug 27, 2024 · NASA initially planned to accommodate the larger SLS Block 1B by modifying the ML-1 and conducted studies and preliminary design work as part of ...
  17. [17]
    NASA says it's fixed shuttle foam problem - NBC News
    Aug 26, 2004 · NASA's redesigned space shuttle fuel tanks should no longer shed dangerous pieces of foam when launches resume next spring, officials said Thursday.
  18. [18]
    Final ML-2 tower module added as Artemis and SLS Block 1B ...
    Jul 17, 2025 · ML-2 construction was started in 2020, with an initial completion date of 2023. However, the COVID-19 pandemic and other issues led to several ...
  19. [19]
    [PDF] Space Launch System Mobile Launcher Modal Pretest Analysis
    The Mobile Launcher (ML) is a very large and very heavy open beam/truss steel structure designed to support SLS during its buildup and integration in the ...
  20. [20]
    Mobile Launcher Returns to Launch Pad 39B - NASA
    Sep 10, 2019 · The nearly 400-foot-tall structure, which is rated to withstand 110 mph winds, was taken to the VAB for safekeeping on Aug. 30. The storm passed ...Missing: Platform resistance
  21. [21]
    [PDF] Saturn V Step-by-Step | NASA
    Jan 5, 2025 · When the Saturn V and the mobile launcher sat on the launch pad, the launch ... Designation. S-IC. Manufacturer. Boeing Company. Dimensions. 33 ft ...
  22. [22]
    [PDF] Mobile Launcher 2 | NASA
    The ML2 base is 133 feet wide x 158 feet long x 25 feet tall, and it is supported by six 25-foot-tall pedestals (mount mecha- nisms) located at each site – the ...Missing: definition | Show results with:definition
  23. [23]
    NASA Ramps Up Space Launch System Sound Suppression Testing
    Jan 28, 2014 · During launch, a peak flow rate of 450,000 gallons of water per minute will be released from five rainbirds just seconds before booster ignition ...
  24. [24]
    Plume-generated near-field acoustics during liftoff of Artemis I
    Oct 15, 2025 · This Letter presents an analysis of near-field acoustic data collected on Space Launch System's Mobile Launcher tower during the Artemis I
  25. [25]
    Pad 39B Water Flow Test Comes Through Loud and Clear - NASA
    Sep 16, 2019 · The system reached a peak flow rate of more than 1 million gallons per minute. ... by the flow will curb that sound by knocking it down a few ...Missing: Shuttle | Show results with:Shuttle<|separator|>
  26. [26]
  27. [27]
    [PDF] Analysis and Validation of Multiphase CFD Predictions of SLS ...
    To reduce the magnitude of these pressure waves on the SLS vehicle, the ML is equipped with an ignition overpressure/sound suppression (IOP/SS) water system ...
  28. [28]
    [PDF] Launch Pad 39B - NASA
    The tower that holds 300,000 gallons of water to dump on the pad for sound suppression was sandblasted and repainted so ... The mobile launcher (ML) stands at ...
  29. [29]
    SLS Mobile Launcher Rolls Out for Testing - AmericaSpace
    Aug 22, 2023 · They will familiarize themselves with the Mobile Launcher, the slidewire baskets, and the Crew Access Arm which they will use to board Orion.<|control11|><|separator|>
  30. [30]
    NASA to Release 350,000 Gallonw of Water During Sound ...
    Apr 29, 2004 · For the fourth time in Space Shuttle Program history, 350,000 gallons of water will be released on a Mobile Launcher Platform (MLP) at ...Missing: rate | Show results with:rate
  31. [31]
    Shhhh! Suppressing Sound Waves From Rocket and Space Shuttle ...
    Dec 10, 2017 · Sound suppression uses "deluge systems" with high water flow to break up acoustic waves, protecting the flight vehicle from damage.<|separator|>
  32. [32]
    [PDF] NASA's Artemis Mobile Launchers
    A p p rox. 390 ft. NASA's mobile launchers are designed to send the Space Launch System rocket, Orion spacecraft, astronauts, and large payloads to the Moon in ...
  33. [33]
    [PDF] From Sputnik to SpaceX®: 60 Years of Rocket Launch Acoustics
    Dec 12, 2018 · Water-based acoustic suppression systems are commonly used on launch pads (see Figure 3), where they offer typical noise reductions of 3-5 dB ( ...
  34. [34]
    [PDF] SLS Scale Model Acoustic Test Liftoff Results and Comparisons
    The SMAT tested a 5% scale SLS model to verify liftoff acoustic environments and noise reduction with water suppression systems, using 17 hot fires.
  35. [35]
    Apollo 11 Mission Overview - NASA
    Apr 17, 2015 · Launch July 16, 1969; 9:32 a.m. EDT Launch Pad 39A Saturn-V AS-506. High Bay 1. Mobile Launcher Platform-1. Firing Room 1. Orbit Altitude ...
  36. [36]
    Repairs and upgrades await SLS mobile launcher before crewed ...
    Dec 9, 2022 · One of the most signifiant upgrades will be the addition of an egress system that would whisk astronauts away from the launch pad in pre-launch ...
  37. [37]
    SLS preparations underway for Artemis II and future missions
    Oct 26, 2024 · The Mobile Launcher 1 (ML1) rolled back from Pad 39B to the Vehicle Assembly Building (VAB) on Oct. 3 and was placed inside High Bay 3 the ...
  38. [38]
    NASA's Mobile Launcher Back at Vehicle Assembly Building
    Oct 4, 2024 · The mobile launcher will be used to assemble, process, and launch NASA's SLS (Space Launch Systems) and Orion spacecraft to the Moon and beyond.
  39. [39]
    Mobile Launchers Then and Now: Parallels Between 1969 and 2019
    Jul 17, 2019 · RS&H began design of a new mobile launcher in 2006, when it was conceived for a different program. Paula Endicott, who now serves as ...
  40. [40]
    [PDF] IG-22-012 - NASA's Management of the Mobile Launcher 2 Contract
    Jun 9, 2022 · The launchers consist of a two-story base structure—the platform to support the SLS—and a tower equipped with ... See Figure 2 for a comparison of ...Missing: differences | Show results with:differences
  41. [41]
    SLS (Space Launch System) Block 1B - NASA
    Jul 3, 2024 · The exploration upper stage and universal stage adapter will provide both mass and volume upgrades for Block 1B. They will also provide Artemis ...Missing: MLP- | Show results with:MLP-
  42. [42]
    Mobile Launcher 2 - Bechtel
    Bechtel is building a Mobile Launcher for NASA that will help send humans to the Moon and Mars, unlocking a new chapter in space exploration.
  43. [43]
  44. [44]
    NASA, Boeing Optimizing Vehicle Assembly Building High Bay for ...
    Aug 28, 2024 · Teams are currently outfitting the assembly building's High Bay 2 for future vertical assembly of the rocket stage that will help power NASA's ...Missing: MLP- modifications 2028
  45. [45]
    Artemis - NASA
    Artemis IV. Artemis IV debuts humanity's first lunar space station, a larger, more powerful version of the SLS rocket, and new mobile launcher.Artemis II · Artemis III · Artemis I mission · Artemis Partners
  46. [46]
    [PDF] NASA's Nuclear Thermal Propulsion Project
    NTP is an in-space propulsion system/stage using fission as the energy source to heat propellant (hydrogen) and expand it though a nozzle to create thrust. The ...
  47. [47]
    Space Launch System - NASA
    SLS Block 2 will be designed to lift up to 46 t (101,000 lbs.) to deep space. An evolvable design provides the nation with a rocket able to pioneer new human ...Missing: nuclear | Show results with:nuclear
  48. [48]
    [PDF] NASA ARTEMIS MISSIONS Exploration Ground Systems ... - GAO
    Oct 17, 2024 · Artemis II and III launches (planned for September 2025 and 2026, respectively): EGS is making progress refurbishing the Mobile Launcher 1—the ...
  49. [49]
    Space Launch System (SLS) - NASA
    SLS is the only rocket that can send Orion, astronauts, and cargo directly to the Moon in a single launch.Fact Sheets · SLS: The People · SLS Highlights · SLS Latest NewsMissing: specifications | Show results with:specifications
  50. [50]
    Vehicle Assembly Building Launch Vehicle Processing Facility - RS&H
    Our design enables the stacking, processing, and testing of the SLS rocket and Orion spacecraft atop Mobile Launcher I (ML 1) and eventually ML 2.
  51. [51]
    NASA prepares to roll Artemis 2 core stage to the Vehicle Assembly ...
    Jul 24, 2024 · At that point they will begin assembling the SLS rocket, which will begin with the pair of solid rocket boosters that attach to either side of ...
  52. [52]
    Artemis 1 Rolls Out - AmericaSpace
    Mar 18, 2022 · According to Artemis Launch Director Charlie Blackwell-Thompson, once roll-out from the VAB starts, two weeks of work begin.
  53. [53]
    Artemis I rollout completed ahead of SLS debut launch
    Aug 17, 2022 · Then begins the slow and methodical 10-hour rollout to LC-39B along the iconic Crawlerway, a path of Tennessee river rocks explicitly designed ...
  54. [54]
    [PDF] Mobile Launcher Tower Umbilicals and Accessories - NASA
    Two tail service mast umbilicals connect from the zero-level deck on the mobile launcher to the SLS rocket core stage aft section. These umbilicals are about 33 ...Missing: MLP adaptations
  55. [55]
    NASA talks Mobile Launcher refurbishment, modifications needed ...
    Dec 8, 2022 · The ML now needs to be repaired from damage sustained during SLS's debut launch as well as undergo a series of modifications to prepare it for its role on ...
  56. [56]
    [PDF] NASA's Readiness for the Artemis II Crewed Mission to Lunar Orbit
    May 1, 2024 · The Emergency Egress System will include three platforms on the ML-1 and four baskets. Each of the baskets will have the capability of ...
  57. [57]
    NASA's Orion Spacecraft Secures Critical Abort System Hardware ...
    Sep 19, 2025 · Teams are finishing integration of the Orion spacecraft for the Artemis II test flight with its launch abort system on Sept. 17 inside the ...
  58. [58]
    NASA: Artemis I
    Launch date: Nov. 16, 2022 · Mission duration: 25 days, 10 hours, 53 minutes · Total distance traveled: 1.4 miIlion miles · Re-entry speed: 24,581 mph (Mach 32) ...
  59. [59]
    Artemis 1 success makes SLS most powerful rocket ever to fly - Space
    Nov 16, 2022 · The SLS core stage and its two solid rocket boosters (SRBs) generated a total of 8.8 million pounds of thrust during Wednesday morning's launch, ...
  60. [60]
    LAUNCH COMPLEX 41 (ATLAS V) FACT SHEET - Spaceline
    Launch Complex 41 has been renovated from its Titan roots to vehicle specific hardware for the Atlas V program. Launch Complex 41 now acts as a stand-alone ...
  61. [61]
    Launch Complex 41 (Active) - Cape Canaveral Space Force Museum
    24 November 1962 – Construction started for Titan IIIC launches · April 1965 – Construction completed · 21 December 1965 to 23 May 1969 – Total of 10 Titan IIIC ...Missing: IV | Show results with:IV
  62. [62]
    Atlas V | Space Stats
    United Launch Alliance. Number of orbital launches, 104. First launch, 2002-08-21. Last launch, 2025-09-25. Atlas V source. Launches by year: Latest launches: ...
  63. [63]
    Atlas 5 rocket rolls launch pad at Cape Canaveral with two SES ...
    Oct 3, 2022 · The launcher rode a mobile platform pushed by trackmobile locomotives, covering about 1,800 feet (550 meters) before arriving over the flame ...Missing: SLC- weight adaptations
  64. [64]
    Atlas V Kuiper 3 - United Launch Alliance
    Amazon is partnering with ULA to launch a majority of the Kuiper constellation using a total of eight Atlas V and 38 Vulcan rockets under the largest commercial ...Missing: November | Show results with:November
  65. [65]
    OFT: Atlas V stacked to receive Starliner capsule
    4 when the first stage was hoisted aboard the Mobile Launch Platform. The ... The main engine and solids generate 1.6 million pounds of thrust to power ...
  66. [66]
    Vulcan: Launch platform rolls to pad for first time
    Jan 29, 2021 · The newly assembled launch platform for our next-generation rocket made its first trek to the launch pad today to undergo ground system testing.
  67. [67]
    [PDF] VULCAN CENTAUR - United Launch Alliance
    Vulcan Centaur booster propulsion is provided by a pair of BE-4 engines, each producing 550,000 lbs of thrust. The Vulcan Centaur vehicle is controlled by ...
  68. [68]
  69. [69]
  70. [70]
    United Launch Alliance and Amazon Launch the Future of Global ...
    Jun 23, 2025 · There are six remaining Kuiper missions on the Atlas V rocket, building up to 38 high-cadence, rapid fire launches on the next-generation Vulcan ...Missing: Centaur MLP modifications 2023
  71. [71]
  72. [72]
    ULA has an ambitious plan to 'reuse' Vulcan rocket: keep it in space
    Apr 18, 2024 · Challenges with developing the Blue Origin engine, BE-4, have contributed to delays with Vulcan's original launch date. Blue Origin is ...Missing: capability | Show results with:capability
  73. [73]
  74. [74]
    Major Mods To Space Launch Complex-41 + Facilities Completed ...
    Feb 2, 2021 · These modifications will enable the VIF to handle the 12-foot-diameter Atlas V with up to five Solid Rocket Boosters (SRBs) and the 18-foot- ...
  75. [75]
    H3 Launch Vehicle - JAXA
    The Movable Launcher (commonly known by ML) is the platform used to assemble a rocket at the final stage at the Tanegashima Space Center. On the day of launch, ...<|separator|>
  76. [76]
    H3 Launch Vehicle - JAXA
    The H3 Launch Vehicle is Japan's new mainstay launch vehicle. Our goal is to provide “easy-to-use rockets” that offer flexibility, high reliability, ...
  77. [77]
    ESA - Ariane 6 overview - European Space Agency
    Ariane 6 will be launched from Europe's Spaceport in French Guiana from a new launch site 4 km west of the Ariane 5 launch pad. The main structures include the ...
  78. [78]
    Ariane 6 - Centre Spatial Guyanais - CNES
    Ariane 6 lifted off for the first time, and with flying colours, from Europe's Spaceport on 9 July 2024. With its 6th-generation flagship launch-vehicle ...
  79. [79]
    GSLV Mk-III - ISRO
    Sep 20, 2023 · The first experimental flight (GSLV Mk-III X/CARE) of India's next generation launch vehicle GSLV Mk-III was successfully conducted today (December 18, 2014) ...
  80. [80]
    GLSV Mark III rocket conducts 'all-up' launch with GSAT-19 satellite
    Jun 5, 2017 · In preparation for Monday's launch the rocket, designated GSLV Mk.III D1, was stacked atop a mobile launch pedestal in the complex's Vehicle ...
  81. [81]
    China's largest carrier rocket Long March-5 makes new flight - Xinhua
    Dec 27, 2019 · 27 (Xinhua) -- China launched the third Long March-5, the largest carrier rocket of the country, from Wenchang Space Launch Center in south ...
  82. [82]
    China launches new Long March-5B rocket for space station program
    The white large rocket blasted off from the Wenchang Space Launch Center on the coast of southern China's island province of Hainan at 6 p.m. (Beijing Time).
  83. [83]
    Starbase Pad 2: Design Advancements from Pad 1
    Aug 19, 2025 · The top surface of the Pad 2 launch mount incorporates a radically new design: a water-cooled steel plate, similar to the one implemented under ...<|separator|>
  84. [84]
    New Glenn | Blue Origin
    The New Glenn Launch Complex​​ Launch Complex 36 (LC-36) is located at Cape Canaveral Space Force Station just nine miles (14 km) away from the rocket factory. ...
  85. [85]
    Neutron | Rocket Lab
    Reliable and cost-effective launch services for constellation deployment, cargo resupply, interplanetary missions.Rocket Lab Reveals Neutron... · Rocket Lab’s Neutron Rocket...Missing: mobile | Show results with:mobile
  86. [86]
    Rocket Lab reaffirms 2025 first launch of Neutron - SpaceNews
    Feb 28, 2025 · Rocket Lab says the first launch of its Neutron rocket remains planned for 2025 after a recent research report concluded it could slip to as late as 2027.
  87. [87]
    [PDF] MISSION OVERVIEW SLC-37 - United Launch Alliance
    Delta IV booster propulsion is provided by the RS-68 engine system. The RS-68 burns cryogenic liquid hydrogen and liquid oxygen, and delivers 663,000 lb of ...
  88. [88]
    Delta IV Heavy launches on final mission - NASASpaceFlight.com
    Apr 9, 2024 · Thirty-five of Delta IV's 45 missions have taken place from SLC-37B, with Vandenberg Space Force Base's Space Launch Complex 6 (SLC-6) serving ...
  89. [89]
    The Boeing Company – Delta IV Launch Complex 37 Modifications
    More than 65 projects have been completed for Launch Complex 37, ranging from modifications to the Mobile Service Tower to enhanced filtration for the swing ...
  90. [90]
    Marking the End of an Era, United Launch Alliance Successfully ...
    Apr 9, 2024 · The Delta program, spanning 60 years, came to a close with the launch of the final Delta IV Heavy rocket by United Launch Alliance (ULA) on April 9.
  91. [91]
    Launches > launch-nrol-69 - National Reconnaissance Office
    A total of 55 Titan III and Titan IV missions were launched between 1963 and 2005. In 2007, SLC-40 was leased to SpaceX and was refurbished to accommodate the ...<|separator|>
  92. [92]
    How does SpaceX transport the Falcon 9? - Primal Nebula
    Feb 6, 2023 · Falcon 9 parts are transported by semi-trucks, custom cradles, and 44-wheeled trailers, wrapped in black fabric, from California to Florida.
  93. [93]
    [PDF] Falcon Payload User's Guide - SpaceX
    Established in 2002 by Elon Musk, SpaceX has developed and flown the Falcon 1 light-lift launch vehicle, the Falcon 9 medium-lift launch vehicle, the Falcon ...
  94. [94]
    Minotaur rocket successfully deploys four NRO satellites in orbit
    Jul 15, 2020 · A Minotaur 4 rocket fires into a mostly sunny sky Wednesday from the Mid-Atlantic Regional Spaceport at Wallops Island, Virginia.
  95. [95]
    Minotaur NROL-111 Mission - Northrop Grumman
    The Minotaur I rocket successfully launched NROL111 national security space payload for the National Reconnaissance Office from NASA's Wallops Flight Facility.Nrol-111 Mission News · Northrop Grumman's Minotaur... · 3 National Security...Missing: fixed | Show results with:fixed
  96. [96]
    Launches > launch-nrol-129 - National Reconnaissance Office
    The NROL-129 mission carried four payloads designed, built and operated by the agency and launched aboard a Northrop Grumman Minotaur IV rocket NET July 15, ...Missing: platform platforms
  97. [97]
    Firefly Aerospace Conducts First Test Launch of Alpha Launch Vehicle
    Sep 10, 2021 · The test began with a nominal countdown and lift off at 6:59 PM PDT and achieved a successful first stage ignition, liftoff from the pad, and ...Missing: mobile carts
  98. [98]
    Firefly succeeds on second Alpha flight - NASASpaceFlight.com
    Oct 1, 2022 · Alpha is a two-stage small-lift launch vehicle built and developed by Firefly Aerospace. With an eventual goal of being able to place 1,170 kg ...
  99. [99]
    SpaceX loses spacecraft after catching rocket booster during test flight
    While the Starship is lost, the mission's first-stage booster successfully returned to the launch tower, where it was caught by the tower's robotic arms.
  100. [100]
    SpaceX loses Starship rocket stage again, but catches giant Super ...
    Mar 6, 2025 · SpaceX managed to catch the Super Heavy booster on Starship's eighth test flight today (March 6), but the vehicle's upper stage was lost ...
  101. [101]
    SpaceX executes 'chopsticks' booster catch but Starship spacecraft ...
    Jan 17, 2025 · SpaceX was able to duplicate its prior feat of catching a booster that returned to Earth. But 8.5 minutes into flight, the Starship spacecraft itself was lost.
  102. [102]
    mobile launcher Archives - NASASpaceFlight.com
    Numerous upgrades have been observed during NSF's recent flyover, as efforts continue to bring upgraded systems online for commercial launchers, ...
  103. [103]
    NASA's Mobile Launcher 2 Continues to Grow
    Apr 24, 2025 · The tower of NASA's mobile launcher 2 continues to rise with the addition of two new 40-foot-tall modules on April 22 at NASA's Kennedy Space Center in Florida.