Fact-checked by Grok 2 weeks ago

Oxted line

The Oxted line is a suburban railway line in , branching from the south of station and extending approximately 10 miles (16 km) southeast through to , where it splits at Hurst Green Junction into two branches: one to (electrified since 1987) and the other to (diesel-operated). Opened in sections by the London, Brighton and South Coast Railway (LB&SCR) between 1884 and 1888 as a with the South Eastern Railway to serve the rural and compete with rival routes, the line initially connected to broader networks including Tunbridge Wells and . The core South Croydon to section and the East Grinstead branch both opened on 10 March 1884, and the Uckfield extension via Edenbridge reached Groombridge on 1 October 1888. Post-nationalization under British Railways, the line survived the 1960s , though the Uckfield to section closed in 1969, and the Groombridge to Tunbridge Wells West leg ended passenger services in 1985 (now partly a ). Today, the line is operated mainly by Southern (a brand), with peak-hour services to the branch, providing frequent commuter trains to (journey time 35–50 minutes from ) and some to . Passenger numbers have grown significantly, with around 1 million journeys annually on the branch by the mid-2010s, supported by modern Class 377 electric multiple units on the electrified sections and Class 171 diesel units to . Notable features include the Viaduct (a 19th-century structure carrying the line over the town, refurbished in 2022), and ongoing infrastructure upgrades like platform extensions at for longer trains. Proposals to electrify the branch and potentially reopen the line to persist, though economic viability remains debated.

Route

Overview

The Oxted line is a suburban and rural railway route in , extending from its junction with the at in southward through to Hurst Green Junction, where it branches into two lines: one continuing to in and the other to in . The overall route spans , , Kent, , and , traversing urban commuter areas in the north and more rural landscapes in the south. The total length of the line is 69.2 km, with the branching occurring at Hurst Green Junction. Ownership of the infrastructure resides with , which has managed Britain's rail network since its in 2002. Primary passenger services are operated by Southern, a subsidiary of , with additional peak-hour services provided by . Electrification covers the 29.5 km double-track section from to using the 750 V third-rail system, enabling electric multiple-unit operation. In contrast, the 39.7 km branch from Hurst Green Junction to remains unelectrified and consists of single , requiring multiple units for services. The line serves 18 stations in total, four of which fall within London's fare zones: in Zone 5, and , Riddlesdown, and Upper in Zone 6. commuter numbers have recovered to exceed pre-pandemic levels as of July 2025.

South Croydon to East Grinstead

The to section forms the core electrified portion of the Oxted line, spanning approximately 29.5 km of double track and serving commuter and regional passenger needs in and . This branch diverges southward from the just beyond station, where the Oxted line separates via a flat junction to avoid conflicting with main line traffic. The route climbs steadily through suburban and rural landscapes, featuring gradients reaching 1 in 100 near key engineering features like the Oxted Viaduct, before reaching the Hurst Green Junction split. Starting at station, a busy interchange in Zone 5 with four platforms shared between the Oxted and lines, services accelerate onto dedicated tracks. The next stop is , 2 km south, a Zone 6 station with two platforms catering to local residential areas; it opened in as part of the line's initial extension. Riddlesdown follows 1 km further, another Zone 6 halt with basic facilities, known for its proximity to and serving around 270,000 passengers annually (2023/24). , 3 km from Sanderstead, marks the transition to more elevated terrain in Zone 6, with two platforms and step-free access via ramp; it primarily serves the nearby town of . The line then passes the divergence for the unelectrified branch (no intermediate station at the junction, and no through passenger services to on this route), continuing double track to Woldingham station, 2.5 km beyond Upper Warlingham. This Zone 6 stop, elevated on an embankment, offers views of the and handles peak-hour commuter flows with partial step-free access. Approaching , 5 km further, the route crosses the Oxted Viaduct—a Grade II-listed wrought-iron structure built in 1881 with three 95 ft spans over the A25 and River Eden, standing 60 ft high. The viaduct underwent a £10.5 million strengthening and refurbishment project from 2020 to 2022, including replacement of roller bearings, brickwork repairs, and repainting with 12,000 litres of anti-corrosive coating to ensure structural integrity for ongoing 100 mph line speeds. station itself features four platforms, a major interchange, and facilities like lifts for full accessibility. From , the double-track alignment proceeds 3 km to Hurst Green, the key junction where the diesel-operated branch diverges eastward on single track, while the electrified continuation veers west. Hurst Green has two platforms for services and a third for the branches, supporting local villages with hourly connections. The final 14 km to remains double track through wooded countryside, stopping at Lingfield (5 km from Hurst Green), a two-platform near the racecourse serving events; then Dormans, 3 km on, a with heritage signal box; terminating at , a two-platform with for heritage links and full accessibility upgrades completed in 2010. This section accommodates up to four trains per hour in peaks, emphasizing reliable suburban connectivity.

Hurst Green Junction to Uckfield

The eastern branch of the Oxted line diverges at Hurst Green Junction, heading east/southeast through rural landscapes of the and to terminate at . This unelectrified section, spanning approximately 25 miles (40 km), primarily consists of single track designed for local passenger services, with passing loops at key points including Cowden, a two-mile double-track section near Ashurst, and to facilitate train crossings. From Hurst Green Junction, the route first reaches Edenbridge Town station, followed by Hever, Cowden, Ashurst, Eridge, , Buxted, and finally . These stations serve small towns and villages amid wooded hills and agricultural land, reflecting the branch's role as a rural connector rather than a high-capacity commuter artery. A notable feature is the connection at Eridge station, where the Oxted line adjoins the preserved Spa Valley Railway, allowing interchange to heritage services running to Tunbridge Wells West. The infrastructure emphasizes simplicity and maintenance of the scenic environment, with diesel operations supporting hourly services along this isolated extension.

History

Construction and early operations (1860s–1880s)

The origins of the Oxted line stemmed from the London, Brighton and South Coast Railway's (LBSCR) strategic efforts in the mid-1860s to expand its network and counter the competitive advances of the South Eastern Railway (SER) in and . In 1865, Parliament authorised the and Junction Railway, an independent company backed by the LBSCR, to build a line from the LBSCR's at southward through to and onward toward Tunbridge Wells, utilising a route that would provide direct access to emerging commuter and goods traffic in the region. The LBSCR amalgamated the and Junction Railway in 1869 under the London Brighton and South Coast and and Junction Railway Companies' , consolidating control over the proposed route amid financial challenges that delayed construction. This authorisation reflected broader LBSCR ambitions to secure influence over southern England's rail corridors following the standardisation of across the network. Construction progressed slowly due to economic pressures and rival interests, but gained momentum with the passage of the London, Brighton and South Coast Railway (Croydon, Oxted and East Grinstead Railways) Act in 1878, which empowered the LBSCR to develop the core route. The first section, from —where it diverged from the —to , opened to passengers on 10 March 1884, following inspection by Hutchinson; this 7-mile segment featured double track to accommodate anticipated mixed traffic. The extension from to followed immediately on the same date, completing a 14-mile double-track main line engineered to standard gauge (4 ft 8½ in) with earthworks navigating the ' contours, including cuttings and embankments suited to projected passenger and coal freight volumes. Stations along this stretch, such as those at , Riddlesdown, and , were equipped with basic facilities including platforms and goods sidings, reflecting the era's emphasis on economical rural infrastructure. Parallel developments addressed connectivity to the area, where the LBSCR had already established a foothold. The Oxted and Groombridge Railway Act of 1881 authorised a branch from Hurst Green Junction—created just south of —to Groombridge via Edenbridge, intended to link with the LBSCR's existing line (opened from Eridge to in August 1868) and extend reach into . This 15-mile single-track extension, built to standard gauge with decisions on track configuration driven by lower expected traffic compared to the main line, opened in stages: Hurst Green to Edenbridge on 2 January 1888, and Edenbridge to Groombridge (enabling through services to ) on 1 October 1888, complete with intermediate halts at Hever and Cowden. The branch's engineering prioritised cost efficiency, incorporating level crossings and minimal viaducts over the upper valley. Early operations on the Oxted line relied on LBSCR , primarily tank and tender classes like the and for local passenger duties, hauling mixed trains of up to six coaches at speeds of 40-50 mph on the double-track sections. Signalling employed the electric tablet or staff-and-ticket systems on single-track portions, with manual levers at key junctions like Hurst Green to manage conflicting movements from the branch. Services integrated seamlessly at , allowing through running to Victoria or via the , fostering commuter growth from suburbs while handling modest freight such as timber and agricultural goods from the . Passenger timetables initially offered four daily return trips to , expanding slightly by the late 1880s as traffic built.

Expansion, closures, and decline (1890s–1960s)

In the late 1880s, the saw significant expansion through the construction of the Oxted and Groombridge Railway, which connected Hurst Green Junction southwards to Groombridge via Edenbridge Town, opening on 1 October 1888 to provide a new route for passenger and freight traffic linking to the . This extension facilitated additional connections to Tunbridge Wells and enhanced the line's role in regional transport, including minor sidings added at key points like for goods handling by the early 1900s. During the First and Second World Wars, the Oxted line contributed to Britain's strategic rail efforts, serving as part of the for troop movements and supply transport, with sidings and junctions adapted for amid heightened demand for efficient inland routing. The line's southern branches, including connections via , supported diversionary paths for military trains when main lines faced congestion or disruption. Post-war decline accelerated due to rising road competition, which eroded freight volumes on rural branches like the Oxted line, where traffic in goods such as and agricultural products fell sharply by the as lorries offered more flexible service. The 1955 Modernisation Plan aimed to revitalise operations through dieselisation and infrastructure upgrades, but on the Oxted line, persisted until 1964, delaying full implementation and exacerbating financial strains amid ongoing freight losses. Closures began in the late 1950s as part of broader rationalisation under British Railways. The Low Level to Culver Junction line, linking to the Three Bridges route, shut in March 1958, severing a key connection and redirecting remaining services to the low-level platforms. Passenger and freight services on the to section ended on 6 May 1969, isolating the branch and reflecting Beeching-era cuts to unprofitable rural routes. By the 1930s under the Southern Railway, passenger patterns shifted from all-stations stops to include semi-fast services during peaks, improving journey times on the core to route while maintaining local calls on branches to accommodate commuter growth.

and nationalisation (1970s–1996)

Under British Railways, which had nationalised the UK's rail network in 1948, the line experienced renewed investment in the 1970s and 1980s as part of efforts to modernise suburban services under the brand. This period marked a shift from post-Beeching decline toward infrastructure upgrades, though resources were limited by economic constraints. The line's diesel operations, established since the mid-1960s, continued to rely on ageing multiple units, but initiatives targeted the more populous branch to improve efficiency and capacity. The key development was the electrification of the to section, completed in October 1987 using the standard 750 V DC third-rail system. This 18-mile double-track route received equipment and extensions to accommodate longer trains, enabling the introduction of electric multiple units and the withdrawal of diesel-hauled services. The project, costing around £6 million, formed part of broader Southern Region enhancements and eliminated steam remnants while boosting reliability for commuter flows to . In contrast, the branch remained unelectrified and diesel-operated, with 1980s studies proposing third-rail extension but rejecting it due to estimated costs exceeding £20 million amid competing priorities. Operational changes emphasised diesel-electric multiple units (DEMUs) for cost-effective services, with Class 207 "Thumpers" (three-car sets built in the late 1960s) dominating the 1970s and early 1980s on both branches. These units, transferred from other Southern lines, handled peak and off-peak duties, supporting a gradual increase in frequency to hourly services by the mid-1980s, particularly on the route. Post-1987 electrification, Class 207s were phased out on the eastern section, replaced by electric units, while the line retained diesel traction with similar DEMU types until the 1990s. The era closed with the 15 October 1994 Cowden rail crash on the Uckfield branch, where a passed a signal at danger in fog, colliding head-on with an oncoming train and killing five people. The official inquiry highlighted signalling deficiencies, including inoperative (AWS) and poor visibility, prompting to initiate immediate reviews of single-line token systems and fog-working procedures across rural branches. These changes, including enhanced driver training and signal maintenance protocols, preceded the network's privatisation in 1996.

Privatisation and modernisation (1997–present)

The Oxted line's operations transitioned to private franchise holders following the in the mid-1990s. commenced operations on the line as part of its on 26 May 1996, managing passenger services until performance issues led to its early termination. In August 2001, took over the remaining portion of the , initially operating as South Central before to Southern in 2004. The Southern brand continued under until 2015, when the was integrated into (GTR), with Southern operating as a sub-brand alongside , Great Northern, and services. Under private ownership, significant infrastructure upgrades have enhanced accessibility and reliability on the Oxted line. In 2020, Network Rail completed a £1.8 million replacement of the footbridge at Eridge station, providing step-free access between platforms and improving safety for passengers. This was followed by similar projects at East Grinstead in September 2022, where a new footbridge with integrated lifts was installed to replace the outdated structure, enabling full step-free access. At Crowborough station, a £4.7 million footbridge and lifts opened in February 2023, marking the completion of the Access for All programme on this section and benefiting thousands of annual users. Additionally, the Oxted Viaduct underwent a comprehensive £10.5 million refurbishment in 2022, involving repairs to brickwork, steel treatment, and repainting to ensure structural integrity for the 140-year-old structure carrying the line over the town. The severely disrupted services on the Oxted line, with Southern implementing reduced timetables from March 2020 due to sharp declines in and absences. Frequencies were cut by up to 50% on key routes during 2020–2022, reflecting broader trends where journeys fell to under 25% of pre-pandemic levels at the height of restrictions. Recovery efforts, supported by government funding and timetable adjustments, saw numbers rebound progressively; by March 2025, journeys reached 91% of pre-COVID volumes, with Southern services on the Oxted line returning to full pre-pandemic frequencies. As of 2025, the Oxted line remains fully integrated into the GTR network, with peak-hour services extending to using Class 700 units, providing seamless connectivity to and enhancing capacity during high-demand periods.

Operations

Passenger services

Passenger services on the Oxted line are operated by Southern and as part of the franchise. Southern provides the majority of services, including off-peak half-hourly trains from Victoria to and hourly services from to . During peak hours, some Southern trains extend onto routes, linking to destinations such as London Blackfriars, Farringdon, and International. Thameslink operates peak-hour services to from London Blackfriars and , supplementing Southern's offerings. Off-peak frequencies stand at 2 trains per hour on the East Grinstead branch and 1 train per hour on the branch, with peak frequencies increasing to up to 4 trains per hour on both branches combined. Journey times average 55 minutes from London Victoria to and 60 minutes from to . The May 2025 timetable, valid until December 2025, maintains these service patterns. Ticketing for these services supports cards, which are valid for pay-as-you-go travel up to Zone 6, covering the line as far as Oxted station. options, enabling seamless pay-as-you-go, were extended to the Oxted line in 2025 as part of the ongoing national rollout to additional South East stations.

Freight services

Freight services on the Oxted line are limited in scope and frequency, primarily involving the transportation of aggregates and from the area on the unelectrified branch south of Hurst Green Junction. These operations are constrained by the predominantly single-track configuration, which restricts capacity and prioritizes passenger services. As of , up to one per day was scheduled on this branch for aggregates traffic, utilizing diesel locomotives due to the lack of . Freight paths remain sparse, focused on supporting local outputs rather than broader network . Operators such as handle these low-volume flows, with occasional departmental trains operated for maintenance activities, including distribution. No regular container or intermodal services operate, as the infrastructure limitations—particularly the single and tight pathing—prevent higher-frequency or heavier freight movements. Historically, freight usage on parts of the line, including sections of the Uckfield , saw significant decline and closures in the 1970s amid broader rationalization efforts under , with many sidings and connections lifted. However, limited revival occurred post-2000 to serve aggregates from reactivated quarries in the vicinity, restoring a modest role for rail in bulk materials transport.

Infrastructure and rolling stock

Stations and facilities

The Oxted line comprises 18 stations served by Southern Railway services, spanning the main route from to Hurst Green junction and the two southern branches to and . These stations range from busy urban interchanges to quiet rural halts, with facilities including ticket offices, waiting shelters, and cycle storage at most locations. Parking is available at most stations, particularly those in suburban and rural areas to support commuter and leisure travel. As of 2025, 12 stations provide full step-free access from street to platform, enhancing inclusivity for passengers with mobility needs; notable recent upgrades include lifts and a new at in February 2023 costing £4.7 million, and a £1.8 million at Eridge opened in October 2020. Passenger usage varies significantly, with being the busiest at 1,227,832 entries and exits in 2023/2024. Stations are grouped below by route segment, with descriptions focusing on amenities, , and unique features. All stations offer basic facilities such as help points and lighting, while larger ones include retail outlets and public toilets.

Main line stations (South Croydon to Hurst Green)

StationBranch/PositionKey Facilities and AmenitiesUnique Features
Main line start (interchange with )Ticket office, waiting rooms, cycle storage (20 spaces), bus interchange; car park (80 spaces, operated by APCOA).Step-free to all platforms via ramps and lifts.Major transport hub connecting to London Victoria, London Bridge, and services; 948,230 entries and exits in 2023/2024.
Main line (1 mile south of )Ticket machines, shelters, limited cycle parking; small car park (15 spaces).Partial step-free access to one platform; stairs to the other.Quiet suburban stop serving local residents; proximity to Addington Hills for walkers.
RiddlesdownMain line (2 miles south)Basic shelters, no ticket office; car park (50 spaces).No step-free access; stairs only.Rural feel with views over Riddlesdown chalk quarry; popular for countryside access.
Upper WarlinghamMain line (3 miles south)Ticket machines, waiting shelter; car park (100 spaces).Step-free to platforms via footbridge with stairs.Elevated position offering scenic views; serves community.
Main line (5 miles south)Shelters, cycle storage; car park (120 spaces).No step-free access.Gateway to ; appeals to hikers with links to local paths.
Main line (7 miles south)Full ticket office, cafe, toilets, cycle storage (50 spaces); large car park (385 spaces, including 4 accessible).Full step-free access via lifts and ramps.Busiest station on the line with 1.23 million passengers annually; key interchange for both branches.
Hurst GreenMain line end/junction (8 miles south)Ticket machines, shelters; car park (80 spaces).Step-free to all platforms.Branch point for and lines; serves Limpsfield and nearby villages.

Uckfield branch stations (Hurst Green to Uckfield)

StationBranch/PositionKey Facilities and AmenitiesAccessibilityUnique Features
Edenbridge TownUckfield branch (3 miles south of Hurst Green)Ticket office, waiting rooms, cycle storage; car park (150 spaces).Step-free via footbridge.Serves market town with connections to Sevenoaks; near River Eden.
HeverUckfield branch (5 miles south)Basic shelters, no ticket office; limited parking (10 spaces).Partial step-free to one platform.Heritage site adjacent to Hever Castle, childhood home of Anne Boleyn, featuring the historic Anne Boleyn's Gatehouse; popular for tourists.
CowdenUckfield branch (8 miles south)Shelters, cycle parking; car park (40 spaces).No step-free access.Rural halt in Wealden countryside; supports local agriculture and cycling routes.
Ashurst (Kent)Uckfield branch (10 miles south)Ticket machines, basic facilities; car park (30 spaces).Step-free to platforms.Border location in Kent; near Ashurst village with walking trails.
EridgeUckfield branch (12 miles south)Waiting shelter, cycle storage; small car park (20 spaces).Full step-free via 2020 footbridge and ramps.Interchange with Spa Valley Railway heritage line; surrounded by High Weald forests.
CrowboroughUckfield branch (15 miles south)Ticket machines, shelters; car park (100 spaces).Full step-free since 2023 lifts and footbridge installation.Serves largest town on branch; enhanced access improves connectivity for 20,000 residents.
BuxtedUckfield branch (18 miles south)Basic facilities, cycle parking; car park (50 spaces).Step-free to all platforms.Historic village stop; near Buxted Park with countryside views.
UckfieldUckfield terminus (20 miles south)Ticket office, toilets, waiting rooms, cycle storage; small car park (8 spaces).Full step-free access.Branch terminus with integrated bus links to Tunbridge Wells, Brighton, and Eastbourne via routes 29 and 54.

East Grinstead branch stations (Hurst Green to East Grinstead)

StationBranch/PositionKey Facilities and AmenitiesAccessibilityUnique Features
LingfieldEast Grinstead branch (2 miles southwest of Hurst Green)Shelters, ticket machines; car park (60 spaces).Partial step-free.Serves racing village; near Lingfield Park Racecourse.
DormanslandEast Grinstead branch (4 miles southwest)Basic shelters; car park (40 spaces).No step-free access.Quiet rural station in countryside; community-focused halt.
East GrinsteadEast Grinstead terminus (6 miles southwest)Ticket office, cafe, toilets, cycle storage (30 spaces); car park (200 spaces).Full step-free via lifts.Electrified branch end; connections to services at nearby Three Bridges; town centre location.

Electrification, signalling, and maintenance

The East Grinstead branch of the Oxted line is electrified with the 750 V third rail system, enabling operations from to , while the Uckfield branch remains unelectrified and relies on diesel traction for services beyond Hurst Green Junction. This split configuration reflects historical priorities in the Southern region, with power supplied through the regional network. Signalling on the Oxted line is managed primarily from Oxted Signal Box, which oversees operations from Upper Warlingham to the branches at Hurst Green, though control is transitioning to the Three Bridges as part of broader modernisation efforts. The double-track section to Hurst Green employs to ensure safe train spacing, while the predominantly single-track Uckfield branch uses a token-based system to authorise movements and prevent collisions on the shared . These arrangements support current service patterns but constrain capacity due to the single-track bottlenecks south of Hurst Green. Maintenance activities on the Oxted line focus on structural integrity and geotechnical stability, particularly given the route's location in the with its clay soils prone to movement. A major refurbishment of the 140-year-old Oxted Viaduct, costing £10.5 million, was completed in July 2022, involving replacement of the timber deck with durable materials and strengthening of the brick arches to extend its lifespan and ensure safe passage over the River Eden and A25 road. Regular inspections and interventions follow such works to monitor performance. In response to landslips, engineers addressed a significant 10-metre slip near Lingfield in early 2023 by installing 44 steel sheet piles forming a and using 50,000 tonnes of for stabilisation, restoring services after a closure between Hurst Green and . The single-track nature of much of the Uckfield branch imposes capacity limits, with a maximum line speed of 70 mph north of , restricting the frequency and efficiency of services compared to the double-track branch. These constraints, combined with periodic speed restrictions for maintenance, underscore ongoing efforts to balance operational reliability with infrastructure demands.

Passenger rolling stock

The East Grinstead branch of the Oxted line is served by Class 377 Electrostar electric multiple units (EMUs) in 4-car formations, operating on 750 V DC electrification supplied by Southern services. During weekday peak periods, operates select services to using Class 700 Desiro City EMUs configured as 8-car or 12-car sets, providing higher capacity for commuter flows. On the unelectrified Uckfield branch, Southern deploys Class 171 Turbostar diesel multiple units (DMUs) in 2-car or 3-car configurations to handle all passenger services. As of 2025, no bi-mode units have entered regular service on this branch, though conducted feasibility reviews and trials of bi-mode and technologies in 2024 to assess decarbonisation options for diesel routes like . The passenger fleet on the Oxted line has evolved significantly, with older units such as the Class 455 EMUs withdrawn by Southern in May 2022, following the earlier transfer of Class 456 units to South Western Railway in 2019. Approximately 50 units are allocated across Southern and Thameslink operations for the line's services, drawn from broader Govia Thameslink Railway fleets that underwent a £100 million upgrade programme completed in 2025, enhancing reliability and passenger facilities. Key features of the current include dedicated spaces and priority seating for , with portable ramps available at stations for step-free where platforms require them. Newer Class 377 units provide free connectivity, while the overall fleet's average age stands at around 15 years in 2025, reflecting recent cascades of refurbished EMUs to Southern routes.

Future developments

Electrification proposals

The of the branch of the Oxted line, the remaining unelectrified section spanning approximately 25 miles from Hurst Green to , has been identified as a priority by in its 2022 Southern Region planning. This proposal favors third-rail at 750 V DC, aligning with the existing system on the core Oxted line, over alternatives like overhead lines or battery operation, to facilitate integration with the broader Southern network. A 2017 assessment, informed by expert advice to , estimated the cost of this third-rail project at £75–95 million, covering the full route length while addressing safety requirements such as power isolation in stations. More recent indicative figures from County Council's rail strategy place the capital cost in the range of £130–150 million, reflecting potential updates for inflation, detailed scoping, and associated infrastructure like substation enhancements. The initiative draws inspiration from cost-reduction strategies employed in the , where has achieved efficiencies in delivery to make similar rural projects more viable. Key benefits include enabling the deployment of bi-mode variants of existing , such as modified Class 717 or Class 379 units, to serve the branch without diesel reliance, thereby supporting Govia Thameslink Railway's (GTR) decarbonization roadmap aiming to phase out diesel trains across its network. This would significantly reduce emissions on the diesel-only Uckfield services, aligning with GTR's 2024 commitment to explore long-term diesel elimination and broader net-zero goals by 2050. As of 2025, the project remains in development following a Strategic Outline Business Case submitted to the in December 2021, with ongoing work toward an Outline Business Case and a feasibility assessment in 2024 evaluating engineering and operational viability. is being pursued through the East Sussex Rail Strategy, originally published in 2013 and updated in subsequent local transport plans, involving partnerships with , Transport for the South East, and local authorities. Challenges include navigating the rural Wealden terrain, which complicates and requires environmental mitigations, as well as upgrading sections of single track to support reliable electric operations and potential capacity increases. The Office of Rail and Road's approval for third-rail safety measures on the branch is still pending, adding uncertainty to timelines.

Reopening and enhancement plans

Proposals to restore the closed section of the Wealden Line between and , spanning approximately 12 km, have been discussed for decades to improve connectivity between and the national network. The 2017 and South Coast Rail Corridor Study, commissioned by the , concluded there was a poor case for reopening the due to insufficient demand and high costs relative to benefits. However, the 2023 Rail Strategy revived the discussion by identifying the reopening as a key investment priority to enhance capacity and provide alternative routes to the south coast. for the South East's Strategic Investment Plan further classified it as a medium-priority project, with ongoing feasibility studies but no committed funding as of 2025. Other enhancement plans focus on integrating heritage lines and improving accessibility along the existing route. The section between Eridge and Groombridge, operational since 2011 as part of the preserved Spa Valley Railway, has prompted calls for mainline reinstatement to link it with the and extend services toward Tunbridge Wells. The Rail Strategy supports this through proposals for modern operations on the Spa Valley Line, including infrastructure upgrades at Eridge such as lifts and renovated facilities to facilitate potential integration. Accessibility improvements under Network Rail's Access for All programme continue at Oxted Line stations, with full step-free access already achieved at sites like and recent additions at , while partial access persists at others such as Lingfield. Broader plans emphasize aligned with the UK's rail target by 2050, as outlined in Network Rail's Environmental Sustainability Strategy, which includes environmental assessments for reopening projects to minimize carbon impacts and support . Indirect benefits could arise from enhanced connectivity in , potentially complementing 2's southern extensions, though no direct integration is proposed. Advocacy groups, including the East Sussex Rail Alliance and Railfuture, have led campaigns for these reopenings and enhancements, highlighting and housing support, but no major funding has been allocated as of November 2025.

Accidents and incidents

Major crashes

The Cowden rail crash occurred on 15 October 1994 on the branch of the line, near Cowden station in , . At approximately 08:27, two three-car Class 119 diesel multiple units collided head-on on a single-track section in dense fog: the 08:00 service from to and the 08:04 service from to . The collision resulted in five fatalities—Up train driver Brian Barton, guard Jonathan Brett-Andrews, Down train driver David Rees, and passengers Mr. Raymond and Mrs. Maura Pointer—and 13 injuries, with none requiring hospital detention beyond initial treatment. The line was blocked until 18:40 on 18 October for recovery and investigation. The primary cause was a (SPAD) by the Up train at signal OD58, approximately 1,100 yards south of Cowden station. Inquiry findings attributed this to driver error by Barton, likely exacerbated by distraction from guard Brett-Andrews entering the cab shortly before the signal, combined with reduced visibility (20-50 meters) due to . No evidence of equipment failure was found; the Automatic Warning System (AWS) was operational, and signal OD58's was degraded to 13.6% from but met minimum standards. Visibility challenges and the single-track layout amplified the risk, though the signalling arrangement complied with contemporary standards. The official inquiry, conducted by Her Majesty's Railway Inspectorate and published on 31 October 1995, held driver Barton wholly responsible for the SPAD while deeming the incident preventable with enhanced protections. Recommendations included mandatory Automatic Train Protection (ATP) on high-speed lines and major resignallings, risk assessments for vulnerable layouts, improved cab communications via Cab Secure Radio, on-train monitoring recorders (OTMRs), and vehicle upgrades. This crash, alongside others like Purley (1989), prompted to initiate a three-year development program for the Train Protection and Warning System (TPWS), which automatically applies brakes on SPADs; TPWS was rolled out network-wide to over 12,000 signals and all passenger trains by 2003, significantly reducing collision risks. As the deadliest incident in the line's , it underscored the vulnerabilities of non-electrified, single-track branches reliant on manual signalling.

Other disruptions and safety events

The Oxted line has experienced several trespass incidents leading to temporary line closures and service disruptions. On November 6, 2025, a at station prompted the closure of all lines, with services between East Croydon and affected until recovery efforts were completed later that day. These incidents highlight ongoing safety concerns related to unauthorized access, which reports as a frequent cause of delays on the network, with up to a dozen such events daily contributing to broader disruptions. Weather-related landslips have repeatedly disrupted operations on the line, particularly in its rural and hilly sections. A significant landslip occurred on January 17, 2023, between and near Lingfield, closing the line and requiring extensive repairs by engineers to stabilize a 10-meter section of embankment. Another event on February 10, 2014, involved a between East Croydon and , leading to the cancellation of all trains on that stretch until further notice. These events underscore the vulnerability of the line's infrastructure to heavy rainfall and soil instability in the and countryside. Other safety and operational disruptions include animal strikes and structural impacts. In December 2017, a train struck a cow between and Hurst Green, causing cancellations and delays until at least 9:00 PM while services responded. On May 14, 2025, a lorry colliding with a railway bridge between and closed the line, halting trains and requiring structural assessments. Technical faults have also played a role, such as a power supply failure on August 1, 2025, which disrupted services across the Uckfield branch for the entire day until resolved. Additionally, a signaling system fault on October 23, 2025, between and East Croydon ended by evening but initially caused widespread delays. These incidents reflect a mix of environmental, human, and mechanical factors impacting safety and reliability on the route.

References

  1. [1]
    A Study In Sussex Part 11: Diverted to the Oxted Lines
    The Oxted line diverges from the Brighton Main Line, going to Oxted and Hurst Green, then to East Grinstead or Uckfield, remnants of former routes to Lewes.<|control11|><|separator|>
  2. [2]
    A miraculous survivor - A Walker's History of the Railways
    One last LBSCR line, opened in 1888, went south from Oxted (or more precisely Hurst Green) to Edenbridge Town, Hever, Cowden, Ashurst, Groombridge and Tunbridge ...
  3. [3]
    Selsdon - Disused Stations
    Notes: Although the South Croydon - Oxted line opened on 10th March 1884 there was no station at Selsdon until the Woodside & South Croydon line opened on 10th ...
  4. [4]
    Oxted Station - Disused Stations
    May 22, 2017 · The line opened to Edenbridge on 2.1.1888 and to Groombridge on 1.10.1888 with intermediate stations at Edenbridge Town, Hever, Cowden and ...
  5. [5]
    oxted Station Information | Live Departures & Arrivals for oxted
    Step Free Access. This is a Category A station: This station has step-free access to all platforms. FULL. Address. Oxted Station Station Road West Oxted
  6. [6]
    [PDF] South East Route Strategic Plan | Network Rail
    Feb 9, 2018 · Oxted Viaduct is in a poor condition and without intervention in CP6 there ... Line, West London Line and. North Kent), and provision of ...
  7. [7]
    [PDF] Network Specification 2016 - South East Route
    The outer suburban network provides services (usually at a lower frequency) between London Victoria/London Bridge and branches to East Grinstead, Tattenham ...
  8. [8]
    oxted Station Information | Live Departures & Arrivals for oxted
    Southern (Mainline), Gatwick Express and Thameslink services (south of London). NUckfield, East Grinstead and Oxted to Croydon and London · OThree Bridges ...
  9. [9]
    Third rail or batteries could replace Southern diesel trains
    Mar 5, 2024 · Network Rail has recommended the development of a DC third rail electrification scheme for the Hurst Green to Uckfield line as soon as ...
  10. [10]
    WIRES THROUGH THE WEALD - Modern Railways
    Aug 24, 2017 · Services today comprise an hourly working to London Bridge, increasing to half-hourly at peak periods, although on Sundays services are confined ...
  11. [11]
    Number of city rail commuters in England and Wales passes pre ...
    Jul 17, 2025 · Two million passengers took weekday trains into cities last autumn, the highest number since records began.Missing: Oxted annual<|control11|><|separator|>
  12. [12]
    Network Rail's £10.5m refurbishment of iconic 140-year-old Oxted ...
    Jul 15, 2022 · Friday 15 Jul 2022. Network Rail's £10.5m refurbishment of iconic 140-year-old Oxted Viaduct is complete. Region & Route: Southern: | Southern ...
  13. [13]
    [PDF] Route Specifications 2016 - South East - Network Rail
    The Victoria Lines Strategic Route comprises of the lines between. London Victoria and Bickley Junction via Herne Hill and via the. Catford Loop. It also ...
  14. [14]
    Uckfield & East Grinstead Lines - Scenic Rail Britain
    Stations on this line: Uckfield; Buxted; Crowborough; Eridge; Ashurst (Kent); Cowden (Kent); Hever; Edenbridge Town; Hurst Green; Oxted; Lingfield; Dormans ...
  15. [15]
    Eridge Station - Spa Valley Railway
    For those travelling from London or Surrey, Eridge is easily reached via Southern's Uckfield Line with direct trains from London Bridge, East Croydon, Oxted, ...
  16. [16]
    [PDF] Abandoned Lines of the LBSCR - Southern Railway E-mail Group's
    This line was opened in 1888; that from Croydon through Oxted to East Grinstead had been opened in March, 1884. The construction of these lines over the route ...
  17. [17]
    Laws about Brighton and Hove: Transport
    Nov 17, 2024 · An Act for the amalgamation of the Surrey and Sussex Junction Railway Company with the London, Brighton, and South Coast Railway Company ...
  18. [18]
    Railways South East - SteamIndex
    Feb 21, 2007 · In May 1950 five different classes of LBSCR locomotive, 2 SECR, 2 SR and one LMS could be seen. The Oxted Line. Alan A. Jackson. See page 62.
  19. [19]
    Plan of London, Brighton and South Coast Railway, Croydon, Oxted ...
    Description: (1) Railway (already in part authorised by the Surrey and Sussex Junction Railway Acts of 1865, 1867 & 1869) from a junction with the LBSCR, ...Missing: 1860 | Show results with:1860<|control11|><|separator|>
  20. [20]
    Edenbridge Town - Kent Rail
    The line was opened in two stages: between Hurst Green Junction and Edenbridge on 2nd January 1888, and between Edenbridge and Ashurst Junction on 1st ...
  21. [21]
    Edenbridge Town Station - Disused Stations
    May 18, 2017 · The line opened to Edenbridge on 2.1.1888 and to Groombridge on 1.10.1888 with intermediate stations at Edenbridge Town, Hever, Cowden and ...
  22. [22]
    History of the Uckfield line - Wealden Line Campaign
    The Uckfield line was authorized in 1844, opened in 1858, closed in 1969, and Isfield station was re-opened in 1984 as a preservation line.
  23. [23]
    Groombridge Station - Disused Stations
    Jul 24, 2023 · By 1899 the levels of traffic generated from the Oxted Line prompted the LBSCR to invest in extending the island platform and re-aligning the ...
  24. [24]
    WWI and the railway - Network Rail
    Nov 1, 2018 · The railway played a vital role during WWI. When Britain declared war on Germany in 1914, trains efficiently moved huge numbers of troops and equipment between ...
  25. [25]
    Rail freight in Britain: shaped by Beeching, despite his reputation
    Mar 17, 2013 · Beeching the visionary, who dramatically modernised the service and, they say, championed freight traffic as all-important to the future of the railways as a ...
  26. [26]
    [PDF] Journal - The Railway & Canal Historical Society
    Nov 3, 1984 · 97. Connecting lines at Lewes. 7/8m. Oxted & Groombridge R. Co. dissolved and vested in LB&SC. MID.
  27. [27]
    Disused Stations: East Grinstead High Level Station
    Oct 10, 2023 · Perhaps, therefore, the occasion was the final closure of the East Grinstead Low Level - Culver Junction line in March 1958. ... Oxted line from ...
  28. [28]
    Dismantled railway line (set of 2 images) :: Geograph Britain and ...
    Lewes to Uckfield closed in 1969, Tunbridge Wells to Eridge closed in 1985. Eridge to Uckfield remains open as part of the Oxted line Link . The Spa Valley ...
  29. [29]
    None
    No readable text found in the HTML.<|separator|>
  30. [30]
    Southern Railway semi-fast units
    They were for the semi-fast and stopping services between London and Brighton, Worthing, and also to Reigate. Three coaches - i.e. the two driving motor third ...
  31. [31]
    3D East Sussex units - BloodandCustard
    When introduced there were insufficient units to cover all services on the 'Oxted' lines and the units were concentrated on the London to Tunbridge Wells ...
  32. [32]
    Railway Accident at Cowden: A Report of the Inquiry into the ...
    The report into the Cowden accident, which occurred when a train passed a signal at danger and collided with a train on a single line section.
  33. [33]
    The lasting influence of the Cowden collision - Right Track, Issue 49 ...
    RSSB's Senior Rail Operations Specialist, Tom Waghorn, considers the continuing relevance of the Cowden accident of 1994.Read on.
  34. [34]
    Railnews Business
    Connex South Central. Connex Rail Ltd/Compagnie ... start date 26 May 1996 end date 26 August 2001 ... Franchise of 7 years awarded to London & South ...
  35. [35]
    Company information | Southern Railway
    ... Connex South Central franchise. In 2003 our parent company, Govia, was awarded the franchise from 2003 to 2009. In 2004 South Central became Southern. In ...
  36. [36]
    The Thameslink, Southern and Great Northern rail franchise
    Jan 10, 2018 · Since Govia Thameslink Railway Ltd started operating the full franchise in July 2015, around 146,000 services (7.7% of planned services) ...
  37. [37]
    New £1.8m footbridge opens at Eridge station in East Sussex
    Oct 28, 2020 · Passengers will now benefit from improved access at Eridge station in East Sussex after the opening of a new £1.8m footbridge.
  38. [38]
    Celebration as new lifts and footbridge at East Grinstead station in ...
    Sep 5, 2022 · The opening of a new footbridge and lifts on Friday (2 September), improving accessibility for passengers at their local station.
  39. [39]
    Step-free access now available at Crowborough station in East ...
    Feb 10, 2023 · Friday 10 Feb 2023. Step-free access now available at Crowborough station in East Sussex after lifts and new footbridge opens for passengers.
  40. [40]
    Covid Causes disruptions to Southern Rail Services
    Southern, the rail operator, has said that their timetable has been revised due to “the ongoing effect of coronavirus isolation and sickness”.
  41. [41]
    New tracks ahead: Rail recovery through innovation - PA Consulting
    Apr 24, 2025 · Passenger volumes fell to less than a quarter of their norm, though freight volumes only declined by ten per cent and recovered more quickly.
  42. [42]
    Passenger figures continue recovery since pandemic - Railnews
    Mar 21, 2025 · Meanwhile, the Department for Transport said passenger journeys in the week ending Sunday 2 March 2025 were 91 per cent of those observed in the ...Missing: Southern | Show results with:Southern
  43. [43]
    [PDF] N: Uckfield, East Grinstead and Oxted to Croydon and London
    N: London and Croydon to Oxted, East Grinstead and Uckfield. This table is valid from Monday 19 May 2025 until Friday 12 December 2025. Operator. Facilities.
  44. [44]
    Using an Oyster card - Southern Railway
    These extensions allow you to use either a contactless card, mobile device or an Oyster card to pay for travel. As Oyster PAYG is based on single fares ...Missing: 2023 | Show results with:2023
  45. [45]
    53 train stations to benefit from tap-in tap-out rollout - GOV.UK
    Jul 4, 2023 · Passengers across the South East of England will benefit from 'Pay As You Go' technology by the end of December 2023.
  46. [46]
    GB Railfreight - GBRf
    GB Railfreight (GBRf) provides intermodal transport, energy movement, and infrastructure services, moving 22% of Britain's rail freight with 99% reliability.GB Railfreight agrees... · GB Railfreight comment... · GB Railfreight Announce...
  47. [47]
    South Croydon Train Station
    View up to two hours of live departures and arrivals status information for South Croydon station. Check train times for any future services.
  48. [48]
    RailwayData | Oxted Station - The Railway Data Centre
    In 2023/2024, Oxted had 1,227,832 entries and exits, making it the 413rd most used, out of 2,581 stations in Great Britain. 413/2581. It ranked 451st busiest ( ...Missing: numbers | Show results with:numbers
  49. [49]
    Oxted Station | National Rail
    Discover Oxted railway station. Getting to & from, buying & collecting train tickets, staffing, facilities, accessibility, & mobility access.Missing: line | Show results with:line
  50. [50]
    Hever Castle & Gardens | Visit Hever Castle located in Kent
    Set in 125 acres of glorious grounds, Hever Castle was once the childhood home of Anne Boleyn. During your visit you will discover award-winning gardens.
  51. [51]
    Step-free access now available at Crowborough station in East ...
    Feb 13, 2023 · The installation of the lifts and the covered footbridge have removed the barriers to travel for all members of the local community. No more ...
  52. [52]
    Uckfield Station (opp) - Live Departures - Brighton & Hove Buses
    Uckfield Station opp · Service - Regency 29. Destination - Tun. · Service - 29A. Destination - Heathfield. · Service - 29A. Destination - Brighton. · Service - ...
  53. [53]
    Engineers begin repairs to 10-metre Lingfield landslip, which closed ...
    Jan 19, 2023 · Repairs to this site will see a wall of sheet piles (flat steel beams) driven deep into the ground at the top of the slip site to stop it moving ...Missing: 2022 | Show results with:2022
  54. [54]
    Engineers repaired 10-metre Lingfield landslip | RailBusinessDaily
    Jan 24, 2023 · Engineers installed a steel wall, made of 44, 10-metre-long steel piles, which will stabilise and support the embankment, using 50,000 tonnes of ...Missing: Oxted 2022 viaduct 2020<|separator|>
  55. [55]
    [PDF] Lewes - Uckfield Railway Line Reinstatement Study - Parliament
    The line south of. Hever to Uckfield was singled with two double track sections retained at. Ashurst and Crowborough to permit a half hourly service. 1.2.4 In ...
  56. [56]
    FINAL CLASS 700 COMPLETED - Modern Railways
    Mar 22, 2018 · The full fleet will support a peak service of 24 trains per hour on this stretch, due to be introduced in December 2019. Siemens is also ...
  57. [57]
    Southern to run special Farewell train for Class 455s - RailAdvent
    The charity charter will operate on Saturday 14th May, which is the last day of operation of the class. All profits from the tour will be donated to good causes ...
  58. [58]
    £100m reliability and onboard upgrade on South East's biggest train ...
    Oct 16, 2025 · £100m reliability and onboard upgrade on South East's biggest train fleet completed. 1,222 Southern, Gatwick Express, Great Northern and ...
  59. [59]
    FIRST REFURBISHED ELECTROSTAR - Modern Railways
    Feb 23, 2021 · The oldest Class 377s are 18 years old. The passenger counting ... Counts are relayed in real time over the on-train Wi-Fi to Three ...
  60. [60]
    Uckfield third rail is NR priority - Modern Railways
    Mar 24, 2022 · This is in preference to the plan involving overhead electrification and use of dual-voltage units put forward by then-Network Rail director ...<|control11|><|separator|>
  61. [61]
    [PDF] Southern Strategic Plan | Network Rail
    The closure of the line between Edenbridge and Redhill due to an earthwork failure, has been used to undertake considerable additional maintenance works to ...
  62. [62]
    Appendix A. Strategic Priority Schemes - East Sussex County Council
    Hurst Green (Oxted) - Uckfield electrification. Scheme description. A9 Electrification of the existing railway from Uckfield to Hurst Green via Edenbridge.
  63. [63]
    Powering success: electrification and building the future
    Dec 20, 2024 · The Uckfield line and west of England routes were cited as worthy candidates to gain fixed electrification.
  64. [64]
    Battery Electrostars And The Uckfield Branch
    Sep 30, 2019 · ... bi-mode Electrostars! Network Rail's Plan For The Uckfield Branch ... The Class 379 trains are surely a possibility, as Greater Anglia ...
  65. [65]
    Govia Thameslink Railway eyes diesel elimination - Rail Magazine
    Jan 30, 2024 · Govia Thameslink Railway (GTR) is seeking long-term solutions to replace its diesel fleet, according to its new Decarbonisation Roadmap.Missing: goal | Show results with:goal
  66. [66]
    East Sussex Rail Development Strategy
    Electrification and dual tracking of the line between Uckfield and Hurst Green. This will improve links from the centre of the county into London.Missing: 2023 | Show results with:2023
  67. [67]
    Stumped by 7 miles - BusAndTrainUser
    Sep 7, 2023 · Thursday 7th September 2023 End of the line: Uckfield We must keep investing in our railway infrastructure to stand a chance of meeting net ...
  68. [68]
    Lewes and Uckfield Railway - Graces Guide
    Apr 30, 2017 · ... line covering the 7.5 miles to Uckfield from a point 1.5 miles (2.4 km) north of Lewes, to be known as Uckfield Junction, on the London ...
  69. [69]
    [PDF] London and South Coast Rail Corridor Study - GOV.UK
    The corridor connecting London and the south coast is a critical transport link for supporting the region's daily life and economy.
  70. [70]
    4. Investment priorities - East Sussex County Council
    4.12 The Covid pandemic and reduced passenger numbers have ... The section of the line from Uckfield to Eridge remains open as part of the Oxted Line.
  71. [71]
    Spa Valley Railway extension to Eridge | RailUK Forums
    Mar 12, 2011 · The Spa Valley Railway is isolated from Network Rail at Eridge. The tracks will be adjacent to the Oxted- Uckfield line but there are no plans ...
  72. [72]
    ACCESS FOR ALL AT OXTED STATION - Network Rail media centre
    May 22, 2009 · Railway passengers in Oxted will benefit from full step-free access to the station following the installation of a new lift, ...
  73. [73]
    Oxted line - Wikipedia
    The Oxted line is a railway line in southern England. It runs from the Brighton Main Line at South Croydon in Greater London to Hurst Green Junction in SurreyRoute · History · Passenger rolling stock · Freight services
  74. [74]
    [PDF] Environmental sustainability strategy 2020-2050 - Network Rail
    We will achieve net zero carbon emissions by 2050 (and 2045 in Scotland) and deliver continual improvements to air quality so that our passengers, neighbours,.Missing: Oxted | Show results with:Oxted
  75. [75]
    Route - Crossrail 2
    Crossrail 2 would serve stations across London, linking Surrey in the south with Hertfordshire in the north by an underground tunnel.Missing: Oxted | Show results with:Oxted
  76. [76]
    [PDF] East Sussex Rail Alliance - ORR
    ABOUT East Sussex Rail Alliance. ESRA is an umbrella voluntary rail action stakeholder group comprising the five main rail user groups in East Sussex.
  77. [77]
    Uckfield Lewes - Railfuture
    ... track railway with dynamic passing loops is required. This would involve: Diversion of Station Road in Uckfield over a bridge to the Tesco roundabout to ...Missing: configuration | Show results with:configuration
  78. [78]
    None
    Summary of each segment:
  79. [79]
    The Train Protection and Warning System - APM
    Fatal accidents at Purley in 1989, Cowden in 1994, Southall in 1997 and ... The end product, known as TPWS, was then rolled out to all trains on the ...
  80. [80]
  81. [81]
    Disruption between East Croydon and Oxted expected until 20:00
    A trespass incident on the railway between East Croydon and Oxted means all lines are currently closed. As a result, trains may be cancelled, delayed by up ...Missing: safety level crossing
  82. [82]
    Network Rail is warning "inherently dangerous" trespassers to stay ...
    Oct 28, 2025 · Network Rail is warning "inherently dangerous" trespassers to stay off the tracks, saying "up to a dozen incidents" each day cause rail delays ...Missing: Oxted level
  83. [83]
    Landslide causes train disruption between East Croydon and Oxted
    Feb 10, 2014 · All trains running between East Croydon and Oxted have been cancelled until further notice due to a landslide.
  84. [84]
    Disruption is still ongoing after a landslip on the railway line. 'Due to ...
    Jan 29, 2025 · A landslip at Crowborough is resulting in disruption to trains between Oxted and Uckfield. Trains may be delayed by up to 10 minutes or ...<|control11|><|separator|>
  85. [85]
    Oxted line trains are being cancelled or delayed after a cow was hit ...
    Dec 20, 2017 · Oxted line trains are being cancelled or delayed after a cow was hit by a train. Passengers have been told to expect delays until at least 9pm.
  86. [86]
    Southern Railway disruption as lorry hits railway bridge - BBC
    May 14, 2025 · Disruption after lorry hits ... It said the railway line between Oxted and East Grinstead was closed and that trains were at a standstill.
  87. [87]
    Uckfield to Oxted train disruption after power supply fault - BBC
    Aug 1, 2025 · Rail services in East Sussex and Surrey were disrupted throughout Friday due to a suspected power supply fault, but have since returned to ...Missing: safety incidents trespass
  88. [88]
    Disruption between Oxted and East Croydon - National Rail
    Oct 23, 2025 · Description. Disruption caused by a fault with the signalling system between Oxted and East Croydon has now ended.