Product backlog

A product backlog is an emergent, ordered list of everything known to be needed to develop and improve a product, serving as the single source of work for the . In the Scrum framework, it represents one of the three core artifacts, alongside the sprint backlog and increment, and is dynamically maintained to reflect evolving requirements and priorities. The product backlog consists of product backlog items (PBIs), which are prioritized descriptions of desired functionality, enhancements, bug fixes, technical tasks, or knowledge-acquiring activities that deliver value to the product. These items are often expressed as user stories in the format "As a [type of user], I want [some goal] so that [some reason]," but they can also include epics, for , or other formats as long as they align with the product's goals. The product owner holds accountability for maximizing the backlog's value by creating, ordering, and refining items to ensure transparency and team understanding. This role involves deciding what to include or exclude based on input, market conditions, and strategic objectives, often rejecting low-value requests to focus on high-impact work. Backlog management emphasizes ongoing refinement, an activity where the Scrum Team collaborates to break down items, add details, estimate effort (typically in story points), and prepare them for future sprints. Refinement aims to maintain a "ready" for items at the top of the backlog, with the entire team participating in discussions to clarify acceptance criteria and reduce uncertainty. occurs through techniques like value vs. effort analysis or (Must-have, Should-have, Could-have, Won't-have), ensuring the highest-value items are addressed first while considering risks, dependencies, and . In practice, the product backlog drives key Scrum events: during sprint planning, the team forecasts and selects a subset of top-ordered items to form the sprint backlog, committing to deliver an increment of potentially shippable product. Feedback from sprint reviews may lead to adjustments, such as adding new items or reordering existing ones, keeping the backlog adaptive to change. This just-in-time approach replaces rigid upfront planning, allowing teams to respond to emerging insights and deliver value iteratively.

Overview

Definition

A product backlog is an emergent, ordered list of everything that is needed to improve the product, encompassing features, enhancements, bug fixes, and other requirements. It serves as the single source of work undertaken by the development team, acting as the foundational artifact that guides what the team will deliver. The backlog is maintained to best achieve the Scrum Team's , which is a clear describing a that the product aims to fulfill. Key attributes of the product backlog include its dynamic and evolving nature, as it continuously changes in response to new insights, , and priorities throughout the . Ownership resides with the product owner, who is accountable for its effective management to maximize the value of the product, while the entire team maintains visibility into its contents to ensure alignment and transparency. In frameworks such as , the product backlog forms the basis for iterative planning and development. For instance, in , a product item might be expressed as a : "As a , I want to log in via so that I can access my account securely." This format helps articulate requirements from the end- perspective, facilitating clear communication within the team.

Purpose and Benefits

The product serves as the primary mechanism for aligning the efforts of the Team with overarching business objectives, ensuring that all work contributes directly to the product's goals. By maintaining an emergent, ordered list of requirements, it facilitates iterative delivery through sprints, where teams select and complete prioritized items to produce incremental value. This structure also enables adaptive planning in environments characterized by uncertainty, as the evolves based on new insights, feedback, and changing priorities without disrupting ongoing development. Key benefits of the product backlog include enhanced , which provides a single, visible source of all planned work, allowing stakeholders to monitor progress and understand the product's direction at any time. It improves communication among team members and stakeholders by serving as a shared reference for discussing trade-offs and requirements, fostering and consensus. Additionally, it reduces by emphasizing prioritization of high-value items over less critical ones, preventing the inclusion of unnecessary features that could dilute focus and resources. The backlog supports continuous value delivery by enabling the Product Owner to order items in a way that maximizes the product's overall worth, promoting efficient across iterations. For instance, in projects, the product backlog helps maximize (ROI) by allowing teams to prioritize features based on customer needs and market demands, such as focusing first on core functionalities that address user pain points before adding enhancements. This approach ensures that development efforts yield the highest possible business impact, for instance, in one telecommunication company's agile transformation, backlog management was part of efforts that led to a 6% increase in .

Historical Development

Origins in Agile Methodologies

The product backlog concept emerged in the early 2000s as a core element of the movement, which sought to address the limitations of traditional, plan-driven methodologies like the . This movement was crystallized in the Agile Manifesto, published in February 2001 by a group of 17 software practitioners, including and , who emphasized values such as "responding to change over following a plan" and "working software over comprehensive documentation." The manifesto's principles promoted adaptive planning through iterative cycles, where requirements evolve based on feedback, laying the groundwork for dynamic artifacts like the product backlog to manage evolving product needs without rigid upfront specification. The conceptual foundations of Scrum, including dynamic requirement management akin to a backlog, were laid in the 1986 article "The New New Product Development Game" by Hirotaka Takeuchi and Ikujiro Nonaka, which drew parallels to rugby for overlapping, iterative development phases. Key influences on the product backlog trace back to Extreme Programming (XP), an Agile precursor developed by Kent Beck and Ward Cunningham in the late 1990s, which introduced user stories as a simple, collaborative format for expressing customer requirements—"As a [type of user], I want [some goal] so that [some reason]."—to facilitate ongoing dialogue over exhaustive documentation. Concurrently, the backlog drew from early Scrum implementations pioneered by Jeff Sutherland at Easel Corporation in 1993, where small, cross-functional teams used prioritized lists of requirements to deliver increments rapidly, and refined through collaboration with Ken Schwaber starting in 1995. These practices integrated XP's lightweight requirement capture with Scrum's emphasis on prioritization and inspection, forming a flexible repository for all known product needs. The first formal description of the backlog (later termed the product backlog) appeared in Ken Schwaber's 1995 paper " Development Process," presented at the conference, where it was defined as "product functionality requirements that are not adequately addressed by the current product release," including items such as bugs, enhancements, and technology upgrades, managed iteratively through sprints and reviews. This concept was further elaborated in the 2001 book Agile Software Development with by Schwaber and Mike Beedle, which positioned the backlog as a dynamic, prioritized list maintained by a product owner to guide development toward maximum value. By integrating these foundational ideas, the product backlog became a central artifact in Agile, enabling teams to balance emerging requirements with delivery focus.

Evolution in Scrum and Beyond

The concept of the product backlog in evolved from an initial emphasis on grooming in the 2010 Scrum Guide, where it was described as an ongoing activity to add details, estimates, and order to items, ensuring they are ready for implementation. This practice, positioned as a tip for Product Owners, laid the groundwork for continuous management to maximize value delivery. By the 2017 update, the terminology shifted from "grooming" to "refinement" to promote a more professional tone, defining it as breaking down and clarifying items to make them transparent, estimable, and implementable within a Sprint. The 2020 Scrum Guide further integrated the as a commitment within the Product , providing a long-term that guides refinement and ensures all items contribute to fulfilling this , thereby enhancing and across the team. Beyond core , the product backlog has adapted to non-software domains, such as , where it manifests as a content backlog—a prioritized list of campaigns, assets, and tasks derived from customer needs and business objectives, enabling agile responses to market changes. In development, the backlog supports iterative prototyping and integration by including enabler stories for design, testing, and manufacturing, allowing teams to manage complexity in physical product cycles while incorporating feedback loops similar to software sprints. These adaptations are prominently influenced by the (SAFe), which scales the backlog into hierarchical structures like Team, Program, and Backlogs to coordinate enterprise-level efforts, including hardware and cyber-physical systems, ensuring alignment with strategic themes. In modern practices, the product backlog integrates with by linking prioritized items to and delivery pipelines, facilitating automated testing and deployment to accelerate and reduce release cycles. has shifted toward data-driven approaches, such as the value versus effort matrix, which scores backlog items on (e.g., impact or user satisfaction) against implementation effort, helping Product Owners select high-impact, low-effort features to optimize . This emphasis on metrics like usage and effort estimates promotes empirical , adapting the backlog to dynamic environments while maintaining its role as a single source of truth for product evolution. In 2025, the Guide Expansion Pack, a non-official supplement authored by Ralph Jocham, , and , expanded on backlog practices by advocating for outcome-oriented PBIs and streamlined structures to enhance flow.

Components and Structure

Backlog Items

Backlog items, also known as product backlog items (PBIs), represent the fundamental units of work in a product backlog, encompassing various types that address different aspects of product development. These include epics, which are large-scale features or themes that can be decomposed into smaller items; user stories, which describe functionality from an end-user perspective; , which capture defects in the existing product; items, which address accumulated shortcuts or inefficiencies in the codebase; and non-functional requirements, such as performance criteria or standards that ensure overall system quality. A common format for backlog items, particularly user stories, follows the template: "As a [type of user], I want [some goal] so that [some reason]," which emphasizes the user's role, desired action, and expected benefit to promote clarity and focus on value delivery. Acceptance criteria accompany these items to define conditions for completion, ensuring they are testable and verifiable, often expressed as a list of explicit requirements like "The system must load within 2 seconds under normal conditions." To maintain effective granularity, backlog items should adhere to the INVEST criteria: Independent (standalone without dependencies), Negotiable (open to discussion), Valuable (delivering clear business or user value), Estimable (possible to size accurately), Small (fit within an ), and Testable (verifiable through criteria). This framework, introduced by Bill Wake in 2003, helps teams create actionable and high-quality items.

Prioritization Techniques

Prioritization techniques in product backlog management aim to order items—such as user stories or features—by assessing their relative importance to deliver maximum value efficiently. These methods balance factors like business impact, customer needs, and operational constraints to guide the product owner in sequencing work. Common approaches range from qualitative categorizations to quantitative formulas, ensuring the backlog remains dynamic and aligned with evolving goals. The is a foundational prioritization technique originating from the (DSDM), used to classify items into four categories based on necessity and feasibility within time constraints. These categories include:
  • Must Have: Essential items required for the product's viability, with no acceptable workarounds, typically allocated up to 60% of effort to form the minimum usable subset.
  • Should Have: Important items that enhance value but can be delivered with temporary workarounds if needed.
  • Could Have: Desirable items that add marginal benefits and serve as contingency options, often limited to about 20% of effort.
  • Won't Have: Items deferred beyond the current timeframe to clarify scope boundaries.
Value versus risk matrices provide a visual for backlog prioritization by plotting items on a two-dimensional grid, where one axis represents potential or and the other assesses technical, market, or implementation . High-, low- items are prioritized first to maximize returns while mitigating uncertainties, a practice commonly applied in agile environments to balance opportunity and exposure. The , developed by and colleagues in , categorizes backlog items based on their impact on through surveys that evaluate functional and dysfunctional responses to features. It distinguishes basic (must-be) requirements that prevent dissatisfaction, performance features that linearly affect satisfaction, and delighters that exceed expectations to drive enthusiasm, enabling prioritization that focuses on delighting users beyond mere functionality. Quantitative approaches like Weighted Shortest Job First (WSJF), integral to the (SAFe), use a formula to score and sequence items for economic efficiency: \text{WSJF} = \frac{\text{User/Business Value} + \text{Time Criticality} + \text{Risk Reduction/Opportunity Enablement}}{\text{Job Size}} Here, the numerator captures the by summing relative scores for value to users or business, urgency due to time sensitivity, and benefits from reducing risks or enabling opportunities, divided by the estimated effort or duration of the item; higher scores indicate higher priority to minimize delay costs. Qualitative factors further refine , incorporating input to align with organizational goals, trends to anticipate external shifts, and dependencies to resolve sequencing constraints among items like epics or stories. Ongoing re- occurs iteratively, driven by from sprint reviews where inspect outcomes and adapt the to incorporate new insights, ensuring to change as mandated in .

Management Practices

Creation and Initial Population

The creation of a product backlog commences with defining the product vision and overarching goals, which serve as the foundational alignment for all subsequent items. This step ensures that the backlog reflects the strategic objectives of the product, such as achieving specific user engagement metrics or targets. The Product Owner, in collaboration with key stakeholders, articulates these elements to guide the elicitation of requirements. Requirements are then elicited through structured activities including stakeholder workshops, one-on-one interviews, and collaborative brainstorming sessions. These methods facilitate the gathering of diverse inputs from customers, business representatives, and internal teams to identify high-level needs and opportunities. For instance, a dedicated meeting with the Team and selected s can generate an initial set of ideas, often captured on index cards or digital tools to encourage rapid ideation without premature judgment. Cross-functional input from developers, designers, and other roles is essential at this stage to ensure the backlog's completeness and feasibility from multiple perspectives. Initial population strategies involve brainstorming high-level epics—broad themes or large bodies of work—that represent major product increments, followed by decomposition into smaller, more manageable items. This process typically aims to provide enough for the first few sprints, with near-term items detailed sufficiently for and farther items outlined at a higher level to accommodate emerging insights. Rough is applied early, often by selecting the top 20-30 items based on value, urgency, and dependencies, using techniques like or thematic grouping to establish an initial order. items are formatted using standard structures such as user stories to promote clarity. Throughout, assumptions about market conditions or technical constraints are documented, along with identified uncertainties, to mitigate risks in the evolving product landscape.

Refinement and Grooming

Product backlog refinement, also known as backlog grooming, is the ongoing activity of adding detail, estimates, and order to items in the product backlog to enhance its and value maximization. This process involves the Team collaboratively reviewing and updating backlog items to ensure they align with current priorities and requirements. Refinement is the ongoing activity that the Team decides how and when to perform. It usually consumes no more than 10% of the Developers' capacity. Key techniques in backlog refinement include splitting large or complex items into smaller, more manageable user stories to facilitate better estimation and implementation. Teams also remove obsolete or irrelevant entries that no longer contribute to the product goals, keeping the backlog focused and current. Additionally, re-estimating effort for existing items is common, often using methods like story points to gauge relative complexity or for consensus-based sizing during team sessions. The primary outcomes of refinement are a backlog where the top items meet a "Definition of Ready" (DoR)—criteria such as clear standards, feasible , and sufficient detail to be completed within one sprint—preparing them effectively for sprint planning. These collaborative sessions, involving the product owner and development team, foster shared understanding and reduce risks in future sprints by ensuring items are well-defined and . During refinement, methods like value-based ranking may be applied to adjust item order, though detailed techniques are covered elsewhere.

Role in Agile Frameworks

Integration with Scrum Processes

The product backlog serves as a foundational artifact in various agile frameworks, particularly in , where it dynamically integrates with the framework's roles and events to guide value delivery. The Product Owner holds primary accountability for its maintenance, ensuring it remains an ordered, transparent list of features, enhancements, and fixes that align with the Product Goal. Developers contribute by providing input on item feasibility and refinement, while the Scrum Master facilitates processes to support effective backlog management without owning the content themselves. This role interplay ensures the backlog evolves responsively to needs and insights. In Scrum ceremonies, the product backlog integrates most directly during Sprint Planning, where the Product Owner presents prioritized items, and the Development Team selects a subset based on capacity and the Definition of Done to form the Sprint Backlog. Daily Scrums allow the team to reference the product backlog indirectly when adapting the Sprint Backlog as needed based on progress toward the Sprint Goal. The Scrum Master plays a key facilitative role in backlog refinement meetings, which occur ongoing throughout the Sprint to add details, estimate effort, and clarify items, preventing overload during planning. These integrations promote empirical progress by keeping the backlog as a living source of work. The flow of items through processes begins with the product backlog as the single source of requirements; selected items transition to the Sprint Backlog for implementation within a time-boxed Sprint, culminating in a potentially shippable Increment that advances the Product Goal. At the Sprint Review, the Scrum Team presents the Increment to stakeholders, gathering feedback that informs adjustments to the product backlog, such as reprioritization or addition of new items. This cyclical movement ensures continuous validation and adaptation, distinguishing the product backlog from the more focused Sprint Backlog, which represents the team's commitment for a single iteration. In other agile frameworks like , the product —often visualized as an upstream column—serves a similar purpose for prioritizing and visualizing work but supports and flow without fixed sprints, allowing teams to pull items based on capacity in real-time. The product serves as a foundational artifact in agile methodologies, particularly , but it is distinct from other related planning tools such as the sprint backlog, product , and release backlog, each of which operates at different levels of granularity, scope, and timeframe. In contrast to the sprint backlog, the product backlog is a long-term, product-wide ordered list of all features, enhancements, bug fixes, and other requirements needed to deliver value to stakeholders over the product's lifecycle. The sprint backlog, however, is a short-term, team-specific derived from the product backlog, consisting of the selected items committed to for a single sprint—typically lasting one to four weeks—along with the developers' plan for completing them to achieve the sprint goal. While the product owner solely owns and manages the product backlog to ensure it reflects evolving priorities, the development team owns the sprint backlog and updates it dynamically during the sprint to adapt to progress and impediments. This distinction emphasizes the product backlog's role in strategic visioning versus the sprint backlog's focus on tactical execution within a bounded . Unlike the product roadmap, which provides a high-level, strategic overview of the product's direction through themes, initiatives, and timelines without delving into specific tasks, the product backlog is tactical and detailed, comprising granular, actionable items like user stories or tasks that operationalize the 's objectives. The roadmap communicates broader goals and priorities to diverse audiences, including executives and customers, often spanning quarters or years, whereas the backlog supports day-to-day development by the product and engineering teams, remaining emergent and refined continuously as needs change. This separation allows the product backlog to serve as the executable bridge between strategic intent and implementation details. The product backlog encompasses the entirety of work across all potential releases, acting as an evolving master list, whereas the release backlog is a targeted of those items specifically scoped and prioritized for delivery within a defined release cycle, often comprising multiple sprints. Release backlogs are planned collaboratively by product managers and engineering teams to align with capacity and release goals, focusing on a cohesive set of features that form a viable product increment, in contrast to the product backlog's comprehensive, ongoing nature that includes deferred or future items. This makes the release backlog a planning horizon for near-term delivery milestones, while the product backlog maintains the full horizon of product evolution.

Tools and Implementation

Common Software Tools

Several popular software tools facilitate the management and visualization of product backlogs in Agile environments, with from , , and standing out for their specialized capabilities. Jira, developed by , offers customizable and boards that allow teams to tailor backlog structures to specific workflows, along with rules to streamline task transitions and notifications. Its robust ecosystem supports large-scale Agile projects through hierarchical issue types like epics and stories, enabling comprehensive backlog organization. , owned by , provides simple Kanban-style lists via boards, cards, and lists, making it ideal for smaller teams or initial backlog ideation with its intuitive, visual interface. Users can create product backlog templates to track roadmaps and sprints, emphasizing ease of use for collaborative prioritization. , from , integrates backlog management within its broader suite, supporting product backlog items (PBIs) and features in a hierarchical view that aligns with / (CI/CD) pipelines. It excels in environments requiring end-to-end workflows, where backlogs feed directly into build and release processes. Common features across these tools include drag-and-drop interfaces for reordering items to reflect priorities, support for attachments such as documents outlining acceptance criteria, and reporting mechanisms like burndown charts to monitor backlog health and sprint progress. For instance, Jira's agile reports visualize , while Trello's Timeline View offers overviews, and Azure Boards provides forecasting based on effort estimates. When selecting a tool, key criteria include scalability to handle team size and backlog volume—such as Jira's support for enterprise teams versus Trello's free plan suitability for small teams up to 10 collaborators, with paid plans supporting larger teams with unlimited collaborators—integration with version control systems like GitHub for seamless development handoffs, and cost structures ranging from free tiers (e.g., Trello's basic plan at $0 for 10 collaborators) to enterprise licensing (e.g., Azure DevOps Basic access starting at stakeholder levels with paid upgrades). Tools like these often reference refinement practices to maintain backlog viability, though implementation varies by platform.

Best Practices and Challenges

Effective management of the product backlog requires adhering to key best practices that ensure clarity, focus, and alignment with organizational goals. One fundamental practice is limiting the backlog size to maintain team focus and prevent overload, often by keeping only the most relevant items visible (e.g., enough for 3-6 sprints) and archiving or removing lower-priority ones as needed. This approach helps teams concentrate on high-value work without being overwhelmed by an expansive list. Additionally, organizing the backlog using themes or tags—such as categorizing items by user personas, business objectives, or technical components—facilitates easier navigation, grouping, and retrieval of related items during planning sessions. Conducting regular stakeholder reviews, often integrated into sprint reviews or dedicated refinement sessions, ensures the backlog reflects evolving priorities and incorporates diverse inputs, fostering buy-in and relevance. Despite these practices, product backlog management presents several challenges, particularly in dynamic agile environments. A common issue is overloading the backlog with low-value items, leading to bloat and diluted focus, which can be addressed through ruthless that emphasizes saying "no" to non-essential requests and regularly culling items based on current strategic needs. Resistance to change, such as reluctance to adopt new methods or remove legacy items, often arises from familiarity with traditional processes and can be mitigated through targeted programs that build understanding and skills in agile backlog techniques. Keeping the backlog up-to-date in fast-paced environments is another hurdle, as shifting market conditions and feedback loops demand frequent adjustments; this requires disciplined, ongoing refinement to avoid obsolescence while balancing the time investment. To gauge the effectiveness of these practices, teams can track specific metrics for success. Backlog age, defined as the average time items remain in the backlog before selection, serves as an indicator of freshness and , with lower ages signaling efficient management. Refinement completion rate measures the proportion of planned refinement activities finished within a sprint, ideally targeting 5-10% of sprint to ensure a ready backlog without overcommitment. Value delivered per sprint quantifies the impact of completed items, often assessed through assigned value points or outcomes achieved, helping validate decisions. Software tools like or can assist in monitoring these metrics through automated dashboards.

References

  1. [1]
    The 2020 Scrum Guide TM
    A Product Owner orders the work for a complex problem into a Product Backlog. The Scrum Team turns a selection of the work into an Increment of value during a ...
  2. [2]
    Scrum Product Backlog - Agile - Mountain Goat Software
    Mar 10, 2023 · The agile product backlog in Scrum is a prioritized features list, containing short descriptions of all functionality desired in the product.
  3. [3]
    What Is a Product Backlog in Scrum?
    A product backlog is an emergent and ordered list of everything that needs to be completed on the road to developing a product.
  4. [4]
    Product Backlog Refinement - Scrum.org
    Most Scrum Teams refine during working sessions in which they have focused discussions about the items in the Product Backlog.
  5. [5]
    User Stories and User Story Examples by Mike Cohn
    Oct 28, 2025 · Every agile user story includes a written sentence or two to describe a product backlog item from a user perspective. And more importantly ...
  6. [6]
  7. [7]
    Large Scale Agile Transformation in Traditional Telecommunication ...
    Every product had its own single Product Backlog. The PBI (Product Backlog Item) was prioritized according to ROI by CPO, APOs and POs. To progress the agile ...
  8. [8]
    Manifesto for Agile Software Development
    The Agile Manifesto values individuals and interactions, working software, customer collaboration, and responding to change over following a plan.Missing: adaptive | Show results with:adaptive
  9. [9]
    [PDF] Embracing change with extreme programming
    Rather than planning, analyzing, and designing for the far-flung future, XP programmers do all of these activities—a little at a time—throughout development.
  10. [10]
    Origins of Scrum
    Jul 5, 2007 · The first Scrum team starting in 1993 rapidly achieved a hyperproductive state by implementing all of the engineering practices now known as XP, ...
  11. [11]
    [PDF] SCRUM Development Process - Object Technology Jeff Sutherland
    The SCRUM approach treats these systems development processes as a controlled black box. Variants of the SCRUM approach for new product development with high ...
  12. [12]
    Scrum Guide Revisions
    The Product Backlog is refined rather than groomed. The refined Product Backlog items are transparent, well enough understood and granular enough to be input ...
  13. [13]
    The Complete Guide to Your Marketing Backlog - Agile Sherpas
    The marketing backlog is simply the team's prioritized list of upcoming work. It's NOT where extra work gets parked.
  14. [14]
    Applying Agile Methodologies to Hardware Product Development
    Jul 6, 2023 · ... features. A prioritized list of engineering and design tasks (i.e., product backlog) is also developed to ensure everyone stays on track.
  15. [15]
    Team Backlog - Scaled Agile Framework
    Feb 24, 2025 · The Team Backlog is a Kanban system that is used to capture and manage the user stories and enablers intended to enhance the solution.
  16. [16]
    Integrating DevOps Practices with Scrum Frameworks
    Sep 4, 2024 · Integrating DevOps practices into Scrum frameworks can maximize the benefits of both. This allows teams to rapidly build, test and release software while ...
  17. [17]
    Six product prioritization frameworks and how to pick the right one
    Value vs. effect. Value vs. effect, or the value vs. effort matrix, prioritizes features based on their probable value and the effort necessary to implement ...
  18. [18]
    Prioritization Techniques for the Product Owner - Scrum.org
    Aug 28, 2023 · The RICE method is a data-driven approach that helps you quantify and compare different feature ideas. This method is particularly useful ...
  19. [19]
    What are Epics and Features? - Scrum.org
    Aug 16, 2022 · The Product Backlog includes a list of new features for development, production bug fixes to resolve, fixes for technical debt for completion, ...
  20. [20]
    What is a Product Backlog? | Agile Alliance
    The product backlog is the single authoritative source for things that a team works on. That means that nothing gets done that isn't on the product backlog.
  21. [21]
    How To Handle Non Functional Requirements (NFRs) - Scrum.org
    Jul 22, 2019 · NFRs can be handled by describing them in the Definition of "Done", as a Product Backlog item, or in the Product Backlog Item's Acceptance ...
  22. [22]
    User Story Template - Agile Alliance
    What is User Story Template? · As a (who wants to accomplish something) · I want to (what they want to accomplish) · So that (why they want to accomplish that ...
  23. [23]
    Acceptance Criteria: Everything You Need to Know Plus Examples
    User story: As an online shopper, I want to be able to remove items from my shopping cart on the checkout page so that I can easily make last-minute adjustments ...
  24. [24]
    INVEST in Good Stories, and SMART Tasks - XP123
    INVEST in Good Stories, and SMART Tasks. Posted on August 17, 2003 by Bill Wake. (French). XP teams have to manage stories and tasks. The INVEST and SMART ...Missing: original source
  25. [25]
    What does INVEST Stand For? - Agile Alliance
    User Story Template. The "role-feature-reason" template is one of the most commonly recommended aids to write user stories: As a ... I want ... So that ...
  26. [26]
    MoSCoW Prioritisation - DSDM Project Framework Handbook
    MoSCoW is a prioritisation technique for helping to understand and manage priorities. The letters stand for: Must Have; Should Have; Could Have; Won't Have this ...Missing: origin official
  27. [27]
    Use a Product Value Matrix to Prioritize Your Roadmap - Reforge
    Turn your feature backlog into an actionable matrix of prioritized initiatives using these three frameworks: Value-complexity matrix; Value-risk matrix ...Missing: authoritative source
  28. [28]
    Kano, N., Seraku, N., Takahashi, F. and Tsuji, S. (1984) Attractive ...
    Using the Kano Model to analyze and classify the requirements of Y Company's consulting project, we recognize the effective factors in improving Y Company's ...
  29. [29]
    WSJF - Scaled Agile Framework
    Oct 9, 2023 · Backlogs are continuously prioritized based on a WSJF algorithm that uses relative user and business value, time criticality, risk reduction and ...Missing: qualitative | Show results with:qualitative
  30. [30]
    Initiating a Scrum Product Backlog: Essential Steps | Resource Library
    Start by breaking your product goal into the problems that need to be solved to achieve the goal. · Categorize your product backlog items by the IMPACT that ...
  31. [31]
    5 Easy Steps to Create a Product Backlog - Scrum.org
    Oct 7, 2021 · Creating a Product Backlog - Task 1 - Call a meeting​​ Invite the Scrum Team(s) involved and some stakeholders. It may be a good idea to split ...Missing: initial population
  32. [32]
    Product backlog: Tips for creation and prioritization - Atlassian
    A product backlog is a prioritized list of work for the development team that is derived from the product roadmap and its requirements.
  33. [33]
    Backlog Refinement Guide - Atlassian
    Backlog refinement focuses on adjusting, estimating, and ranking the issues. Adjustments can be small things like adding descriptions and large edits like ...
  34. [34]
    5 Strategies for Product Backlog Refinement - Scrum.org
    Apr 30, 2021 · The five strategies for product backlog refinement are: gaining insights, ordering, estimating, breaking down, and eliminating dependencies.
  35. [35]
    Planning Poker: An Agile Estimating and Planning Technique
    Sep 4, 2025 · Planning Poker® is a consensus-based estimating technique. Agile teams around the world use Planning Poker to estimate their product backlogs.Missing: removing obsolete
  36. [36]
    Backlog refinement meetings | Atlassian
    This article provides proven strategies for conducting backlog refinement meetings that keep your backlog current, clean, and organized.
  37. [37]
    Product backlog vs. sprint backlog: Top Differences - Atlassian
    Sprint backlogs facilitate focused, short-term goal achievement, while product backlogs guide the long-term project vision.
  38. [38]
    Product roadmap vs product backlog: both essential, better together
    and both should be easily accessed and shared, up-to-date ...
  39. [39]
    A Guide to Product, Sprint, and Release Backlogs
    The concept of a backlog is rooted in agile methodologies. Many teams use adaptive planning techniques to continuously prioritize what to build and when.
  40. [40]
    The difference between product, sprint, and release backlogs
    Jul 13, 2022 · Product backlog is all work for the product, sprint backlog is for the current sprint, and release backlog is for a specific release. Product ...
  41. [41]
    Top 7 Backlog Management Tools for Prioritizing Tasks | Atlassian
    For Agile teams, Jira is the undisputed task-tracking heavyweight. Its robust functionality and seamless integration make it perfect for Agile project ...
  42. [42]
    Effective Tools for Product Backlog Management - Productboard
    Dec 25, 2023 · Product backlog tools include digital boards like Trello and JIRA, and tracking systems like Azure DevOps and Targetprocess.
  43. [43]
    Use backlogs to manage projects - Azure Boards | Microsoft Learn
    Jul 17, 2025 · An Azure Boards backlog is a prioritized list of work items that guides your developments team's effort. A backlog helps manage project scope.
  44. [44]
    Jira Backlog Software for Agile Project Management - Atlassian
    Key features include timelines, agile reports, comment threads, bug tracking, and more. JSW backlog. Discover more about Jira ...A Jira Kanban Board For... · User Story Management · Scrum Vs. Kanban Backlogs
  45. [45]
    Trello For Product Management Teams
    Bring high-quality products to market faster with Trello. See how Trello helps product management teams track product roadmaps, simplify sprints and more.
  46. [46]
    Product Management templates - Trello
    Plan, produce, and reflect with product management templates made by teams you trust, using Trello. Translate business needs into manageable team tasks.
  47. [47]
    Create and manage your product backlog - Azure Boards
    Jul 17, 2025 · Create and prioritize your product backlog in Azure Boards. Add work items, estimate effort, and organize requirements to guide your team's ...
  48. [48]
    Azure DevOps
    Optimize your development process with Azure DevOps Services. Plan smarter, collaborate better, and ship faster using agile tools, CI/CD, agentic AI, ...<|separator|>
  49. [49]
    33 Best Product Backlog Tools To Organize Product Priorities In 2025
    Selection Criteria for Product Backlog Tools. Selecting the right product backlog tool involves a careful examination of each tool's functionality and how ...
  50. [50]
  51. [51]
    How to Manage Large Product Backlogs - 4 Steps to Rein In Your List
    To manage a large backlog, split it, limit items, eliminate irrelevant items, and consolidate similar items.
  52. [52]
    Product Backlog Prioritization Techniques - Scrum.org
    Oct 6, 2025 · When done well, Product Backlog prioritization turns the backlog into a roadmap of value, guiding the team toward delivering meaningful results ...
  53. [53]
    Battling the Bloated Product Backlog - Scrum.org
    Sep 11, 2023 · Ensure the team knows and understands that Product Backlog Items can be deleted. This might include a practice where those items are moved into ...<|control11|><|separator|>
  54. [54]
    Best Practices for Agile Marketing Backlog Refinement
    The Scrum Guide suggests that backlog refinement should take 10% of your total sprint length. For example, a 2-week sprint requires roughly a day of refinement.
  55. [55]
    Resistance to Agile Transformations | Scrum.org
    Sep 11, 2023 · Resistance to agile transformations stems from fears about job security, loss of control, comfort with established practices, and concerns ...
  56. [56]
    Product Backlog Management with Upstream Kanban - Scrum.org
    Mar 3, 2025 · Product Backlog management can often feel overwhelming, with hundreds of items, constant reordering, and shifting priorities. Additionally, your ...
  57. [57]
    4 Key Flow Metrics and How to Use Them in Scrum's Events
    Within Scrum, you assign story points to each product backlog item. So for a sprint, the team plans for 15 stories worth of 45 points. At the end of the sprint, ...Work In Progress (wip) · Cycle Time · Work Item Age
  58. [58]
    Product Backlog Refinement - Mountain Goat Software
    Sep 26, 2023 · A good rule of thumb is that about 5 to 10 percent of the effort in each sprint should be spent on backlog refinement. While the whole team's ...
  59. [59]
    Agile Metrics: Velocity - Scrum.org
    May 17, 2018 · ... Scrum Team may quickly result in this metric being abused ... value delivered per sprint along with velocity is another very useful metric ...