Fact-checked by Grok 2 weeks ago

Tramway track

A tramway track is the specialized infrastructure designed for guiding trams or vehicles, typically consisting of two parallel rails mounted on crossties or embedded in , with supporting components like fastenings and to ensure and alignment in or environments. These tracks are engineered to accommodate low to medium loads, tight curves as small as 15–18 meters in , and speeds up to 70 km/h, often integrating with road surfaces for shared use by vehicles and pedestrians. Tramway tracks vary by configuration to suit operational needs: ballasted tracks use or to support crossties, providing flexibility for and alignment adjustments in dedicated rights-of-way; direct fixation tracks secure rails to slabs or plinths without , ideal for stable urban alignments; and embedded tracks, common in street-running sections, encase grooved rails in or with flangeways to allow wheel flanges to pass while minimizing hazards to road traffic. designs often incorporate continuous checkrails (keepers) for curve stability and clear boundaries between tram and road lanes, addressing challenges like and in mixed-use settings. Key components include rails, typically tee-section (e.g., 115 RE at 56.7 kg/m) for ballasted applications or grooved rails (e.g., Ri59N or 59R1 per standards) for , with ratings of 300–390 Brinell for against ; fasteners such as clips or direct fixation systems with elastomeric pads to dampen and vibration; and crossties made of timber (e.g., 180 x 230 mm), (e.g., 255 mm wide), or , spaced 0.6–0.76 m apart. Continuous welded (CWR) is preferred over jointed sections to reduce and , while restraining rails (e.g., 33C1 section) prevent on sharp curves. Special trackwork, including switches, frogs, and crossings, uses manganese for high-wear areas and modular panels for accessibility compliance, such as flangeway widths ≤63.5 mm per ADA standards.

Introduction

Definition and purpose

A tramway track is a specialized rail infrastructure designed for trams, which are light rail vehicles that operate predominantly in urban settings on fixed rails integrated into streets or dedicated rights-of-way. It provides stable guidance and support for the vehicles' wheels, enabling efficient movement at speeds typically up to 80 km/h while accommodating the lighter loads and shorter consists characteristic of urban transit. The primary purposes of tramway tracks are to support low-floor tram designs that enhance passenger accessibility without steps at platforms, to permit shared with in mixed-use corridors, and to reduce interference with pedestrians and vehicles through flush or minimally raised alignments that blend into streetscapes. This setup promotes safer coexistence in dense city environments, where tracks often run at grade alongside roadways. At a high level, tramway track comprises rails for guidance, fasteners to secure the rails in place, and a base structure such as slabs for street-embedded installations or ballasted foundations for segregated sections, ensuring durability under frequent stop-start cycles. These tracks facilitate bidirectional operation on single or dual lines, optimizing space in constrained areas and enabling seamless networks that boost connectivity and by carrying higher passenger volumes than buses with lower emissions.

Key characteristics

Tramway tracks are engineered with low-profile rails to minimize hazards for road users in shared spaces, allowing and pedestrians to traverse them safely without significant elevation changes. These rails, often grooved designs such as the 59R1 or 60R2 profiles, feature a narrow flangeway width of 1¼ to 2 inches (32 to 51 mm) that guides tram while permitting automobile tires to pass over without catching. The groove, typically 60 mm wide at the head with a depth of 46-47 mm, ensures precise guidance in street-running environments, reducing the risk of misalignment and enhancing compatibility with mixed traffic. Unlike conventional tracks, tramway alignments accommodate greater flexibility to navigate dense landscapes, supporting tighter curves with minimum radii as low as 36 feet (11 meters) and steeper gradients due to the lighter weight and shorter of tram vehicles, such as 74.8-inch spacing with 28-inch . This adaptability enables to follow geometries closely, with gauge widening of up to ¼ inch on sharp curves to maintain and cant (e.g., 1:30) to mitigate wheel squeal and lateral forces. Such designs contrast with mainline 's broader curves (often exceeding 82 feet or 25 meters) and shallower grades, prioritizing maneuverability over high-speed efficiency. Integration with urban infrastructure is a core feature, with tracks frequently embedded directly into s using concrete slabs, bituminous fillers, or elastomeric seals to create a seamless surface that withstands vehicular loads. Provisions for include transverse drains spaced every 1,000 feet (300 meters) and polyurethane seals to prevent water ingress, while end barrier walls within 5 feet of embedded sections manage runoff and avoid deterioration. Utility crossings incorporate dedicated ductwork and boxes for electrical and signaling systems, with transition slabs at least 20 feet (6.1 meters) long ensuring smooth shifts between embedded and ballasted sections without disrupting adjacent roadways. Safety is enhanced through features like check rails, installed on curves tighter than 82 feet (25 meters) radius, which rise ¼ to ⅜ inch (6 to 10 mm) above the running rail to guide flanges and prevent derailments by maintaining . These rails, with a ¾-inch working face height and approximately 2-inch flangeway depth, provide reliable restraint while minimizing trip hazards. Additional visual and tactile cues, such as textured markings or strips adjacent to tracks, alert motorists to paths, promoting awareness in shared environments.

Historical Development

Origins in early tram systems

The origins of tramway tracks trace back to mid-16th century mining operations in , particularly in , where wooden rails were employed to guide horse-drawn carts through mine galleries. These early systems, documented in Georgius Agricola's (1556), included designs such as Hund carts with unflanged wheels and guide pins, and Reisen setups featuring flanged wheels on narrow wooden planks laid over , enabling the transport of loads up to 10-13 tons per run. Introduced to around 1564 by miners through the Company of Mines Royal, these wagonways marked the foundational concept of guided , prioritizing efficiency in resource extraction over urban mobility. By the late , advancements in materials shifted tramway construction from wooden planks—typically 6 feet long and 5-6 inches thick, pegged to spaced 2 feet apart—to iron plates and rails for improved durability and load-bearing capacity. This transition, beginning around 1767 with cast-iron rails in British collieries like those on the , addressed the rapid wear of wood under repeated use. The first urban horse-drawn tramways emerged in the early , with the and Railroad opening in 1832 as the world's inaugural street railway, running from Prince Street to 14th Street and accommodating about 30 passengers per car pulled by one or two horses. In , horse trams debuted in 1860 along Victoria Street in , initiated by American entrepreneur , and expanded rapidly in the despite initial regulatory hurdles. Initial challenges in these street-running systems centered on track durability amid cobblestone pavements and mixed traffic, where wooden or early iron rails often shifted or deteriorated under the weight of vehicles and environmental exposure. To mitigate derailments on uneven surfaces, innovators adopted flanged wheels—introduced in around 1789 by William Jessop for edge-rails—and simple rail shapes like flat plates or low-profile L-sections, which provided basic guidance while minimizing obstruction to horse-drawn carriages and pedestrians. However, these designs sometimes posed hazards, as deeper grooves intended for flanges could trap wheels of lighter road vehicles, prompting ongoing refinements in rail embedding. A pivotal development occurred in the 1870s with the introduction of steam-powered trams, beginning with experimental runs in in 1873 and the first regular services in shortly thereafter using English engines. The heavier axle loads and higher speeds of these locomotives—often exceeding those of horse-drawn cars—strained existing tracks, necessitating stronger constructions such as solid girder rails weighing 70-80 pounds per yard, rolled in one piece for enhanced vertical stiffness and resistance to deformation. This shift underscored the evolving demands on tramway as transitioned from animal to mechanical power.

Evolution of rail designs and materials

The advent of electric tramways in the late marked a pivotal shift in track design and materials, as the heavier loads and higher speeds of electric vehicles demanded greater durability than the wooden or iron rails used in earlier horse-drawn systems. rails, offering superior strength and resistance to wear, became the standard by the , enabling reliable operation under the stresses of , such as in the first public electric tramway in opened by in 1881. Grooved rails, initially invented by Alphonse Loubat in to embed tracks flush with street surfaces, saw widespread adoption in the 1890s alongside electric trams, facilitating shared use with road vehicles while guiding flanged wheels securely. This design addressed the need for safer integration in urban environments, reducing hazards to pedestrians and horse traffic. By , the transition to all-steel construction was complete, eliminating wood and iron entirely for enhanced longevity and load-bearing capacity. In the , innovations like welded rails emerged as key advancements for smoother rides and reduced maintenance, with adoption in urban rail systems increasing after . Post- reconstruction in and elsewhere accelerated modernization, including the use of prefabricated track sections for rapid installation in damaged urban areas and improved alignment in modernized networks. Material advancements further refined tram track performance, with developments in high-strength pearlitic steel grades from the early to mid-20th century to withstand heavier loads, and the application of corrosion-resistant coatings to combat environmental degradation in street-embedded installations. Electrification's legacy profoundly influenced these changes, as electric trams' increased weight—often double that of horse cars—necessitated reinforced designs to mitigate railhead fatigue and track distortion. In the United States, this evolution culminated in the 1970s and 1980s, when new systems revived in cities like (opened 1981) and (opened 1986), incorporating modern elements such as welded rails and high-strength materials to handle contemporary demands.

Construction and Layout

Embedded and street-running tracks

Embedded and street-running tracks integrate tram rails directly into road surfaces, allowing trams to share space with automobiles, cyclists, and pedestrians while maintaining a level profile to enhance and in dense environments. This approach is prevalent in central business districts where dedicated rights-of-way are impractical. In embedded track design, rails—often grooved types—are set into slabs or pavements with channels that accommodate flanges, ensuring the rail head sits flush or slightly raised (up to 6 mm initially) above the surrounding surface for clearance. Flangeways typically measure 35 to 50 mm wide to permit safe crossing by non-rail traffic without catching tires. Elastomeric pads or resilient mounts are incorporated beneath the rails to isolate vibrations and provide electrical , preventing stray currents in electrified systems. Construction begins with excavation of the street to form a stable , typically 400 to 600 mm deep, followed by installation of secured with anchors or clips on a preliminary pour. Non-conductive fillers like or cement-filled porous encase the rails, and a final surface layer of , , or prefabricated slabs is applied to complete the embedment. A common two-pour involves an initial slab for , rail placement with protective boots, and a secondary pour for the trough fill, with channels spaced every 150 to 200 meters to manage runoff. Materials must meet minimum strengths, such as 27.6 for , to withstand mixed loads. These tracks offer advantages such as seamless urban integration that reduces visual clutter and collision risks from raised elements, alongside effective and reduction—up to 6 to 8 in resilient designs—through elastic compounds like polymer-cork mixtures. In European cities like , embedded systems using Hakorit plastic plates and the Vienneese prefabricated slab method enable quick installation with minimal street disruption and even load distribution for longevity. A 3 km test section of in built in the in 1999 demonstrated superior damping compared to conventional paved-in tramways. Challenges include persistent drainage problems, where poor runoff can cause , intrusion, or spalling, necessitating regular inspections and specialized repairs that disrupt traffic. is labor-intensive, often requiring removal to access rails, and high initial costs arise from precise needs to mitigate electrical hazards. Transition zones to other types can also induce concentrations due to differing moduli. Variations encompass continuous slab tracks with in-situ poured concrete for uniform support and modular systems using prefabricated blocks or twin-block , which simplify repairs by allowing component replacement without full excavation. Resilient embedded designs, such as those with elastomeric isolators, further enhance control in sensitive urban areas, while asphalt-based variants provide flexibility for mixed-use streets.

Ballasted and reserved tracks

Ballasted tracks in tramway systems utilize a layer of or , known as , to support the rails and (also called ties), providing a stable foundation over the . This construction method distributes loads evenly, allows for effective to prevent water accumulation, and enables periodic adjustments to maintain . Typically employed in suburban or routes where space is available away from constraints, ballasted tracks mimic traditional infrastructure but are adapted for lighter loads in tram operations. The construction process begins with subgrade preparation, involving excavation or embankment compaction to achieve a firm, well-drained base capable of withstanding tram axle loads up to 12.5 tonnes. Geotextiles are often layered beneath the sub-ballast to enhance , reduce , and inhibit weed growth by separating the subgrade from finer sub-ballast materials. A sub-ballast layer of 200–300 mm follows, topped by 250–600 mm of , typically crushed or sized 25–65 mm for optimal and . Concrete , spaced 500–600 mm apart, are then placed and fastened to the rails using elastic clips or fasteners to secure and resist lateral movement. This setup supports speeds up to 80 km/h on straight sections, prioritizing safety and ride quality. Reserved track layouts refer to dedicated corridors for trams, separated from road traffic by , medians, kerbs, or to minimize conflicts and enhance . These alignments often incorporate ballasted for their full length, though direct fixation to slabs may be used in segments without embedding into . In such setups, tracks run parallel to roadways or through open areas, with clear zones for access and vegetation control. For instance, Melbourne's tram network features reserved ballasted sections on routes like the 75 and 86 lines, where medians provide isolation from vehicular traffic, allowing smoother high-speed running. Compared to tracks, ballasted tracks offer easier through tamping and renewal, reducing downtime and costs over time, though they require more land and initial earthworks. Their resilience to minor ground shifts provides flexibility in varied terrains, but potential for contamination or necessitates regular inspections. channels alongside the tracks further mitigate flood risks, ensuring longevity in temperate climates.

Rail Profiles and Types

Standard and Vignole rails

Standard and Vignole rails, also known as flat-bottom rails, feature a T-shaped cross-section designed for efficient load distribution in railway and tramway applications. The rail head provides a running surface for wheels, while the flat base allows secure fastening to track components. In tramways, these rails are primarily employed in reserved or segregated sections, such as ballasted or green tracks, where they offer enhanced stability for light rail vehicles. Typical Vignole rail profiles for tramways include weights ranging from 40 to 60 kg/m, such as the 49E1 at 49.39 kg/m, 50E6 at 50.90 kg/m, and 54E1 at 54.77 kg/m, conforming to standards like EN 13674-1. These are manufactured from high-quality , often with head-hardened grades to resist wear from frequent tram operations. Installation involves clipping the rails to or wooden using systems like elastic rail clips, which secure the flat base—typically 150-180 mm wide—for optimal load transfer to the substructure and minimal gauge variation. The adoption of flat-bottom Vignole rails in tramways evolved from earlier bullhead designs in the early , transitioning to provide better and easier on dedicated tracks. However, in street-running environments, these rails are less common due to the need for a separate flangeway, which can trap vehicle tires or wheels, posing hazards to other road users.

Grooved rails

Grooved rails are a specialized type of tramway featuring a central longitudinal groove in the head, designed to accommodate the of tram wheels while providing a smooth running surface for road vehicle tires to cross without interference. This bifurcated head configuration allows the rails to be embedded flush with the street surface, enhancing safety by minimizing the risk of road wheels dropping into the flange way. Typical profiles include the 35G and 41G, denoting their approximate mass per meter in kilograms, which are rolled with an I-shaped cross-section for structural integrity in urban environments. The grooved rail design was invented in 1852 by French engineer Alphonse Loubat to facilitate the integration of tram tracks into city streets, first implemented in early horse-drawn systems in and . Loubat's innovation addressed the limitations of earlier flat rails, which posed hazards to horses and carriages by creating wide slots that could cause accidents; the narrower groove ensured safer shared use of roadways. This development marked a pivotal advancement in street-running tram infrastructure, enabling widespread adoption in urban settings during the late 19th century. Dimensions and standards for grooved rails are governed by the EN 14811, which specifies profiles with groove widths typically ranging from 35 to 42 mm and depths of 45 to 47 mm to precisely guide flanges while permitting passage. For instance, the 35G profile (also known as 55G1) has a groove width of approximately 35.94 mm and depth of 45.9 mm, with a height of 152.5 mm and mass of 55.27 kg/m, while the 41G (such as 55G2) features a wider groove of 40.94 mm at similar depth and height, weighing around 55.37 kg/m. Materials commonly include ferritic-pearlitic steels alloyed with (grades like R200V or R260V) for improved hardness and wear resistance, often incorporating to enhance toughness in high-traffic urban conditions; these alloys achieve surface hardness up to 320 HB, extending service life compared to plain carbon steels. Grooved rails are universally applied in embedded urban tram tracks where street-running is prevalent, providing a durable solution for mixed traffic environments. Notable examples include the system in the UK, which employs the 35G profile for on-street sections to ensure compatibility with road users. In -hauled systems like San Francisco's, grooved rails have been adapted to support the central slot while maintaining safe wheel guidance, as seen in track rebuilds specifying heavy grooved profiles for level integration. These rails may integrate briefly with guard rails at curves to prevent , though such variants are addressed separately.

Guard and block rail variants

Guard and block rail variants represent specialized adaptations of grooved rails, incorporating enclosed or block-like structures to provide enhanced protection from road traffic and facilitate modular construction in constrained urban environments. These designs build on basic grooved rail principles by emphasizing durability and ease of integration with street surfaces, governed by standards such as EN 14811. Girder guard rails enclose the running within a robust , shielding it from impacts by automobiles and other vehicles in mixed-traffic settings. This configuration offers superior resistance to damage in high-traffic zones, as evidenced by its widespread adoption in early 20th-century U.S. systems, where it supplanted T-rails for better longevity amid growing urban congestion. Block rails, by comparison, employ low-profile grooved sections as a compacted variant of guard rails, promoting reduced excavation and straightforward installation for urban applications where vertical clearance is limited. They support loads above 40 tons and are used in modern systems for tight curves as small as 20 m radius. Key design distinctions lie in their structural priorities: rails deliver lateral stability through the enclosing , minimizing risks, whereas block rails emphasize cost-effective construction with reduced and (3–10 lower than conventional grooved rails) due to their embedding. Weights for these variants generally reach up to 58 kg/m, with common profiles such as the 51R1 at 51.37 kg/m and block equivalents like 57K2 or 58K2 at 57–58 kg/m. Contemporary implementations leverage prefabricated girder sections for rapid urban deployment, reducing construction downtime.

Track Gauge and Standards

Common gauges worldwide

The standard gauge of 1,435 mm is the predominant track gauge for modern tramway systems worldwide, especially in and , where it promotes with mainline railway infrastructure and leverages in vehicle manufacturing and maintenance. This gauge accounts for approximately 60% of global usage overall, with tram systems increasingly adopting it to enable shared components and potential dual-mode operations in integrated urban rail networks. Examples include major systems in cities like Berlin, Germany, and , where standard gauge supports efficient expansion and compatibility with freight or lines. The metric gauge of 1,000 mm remains common in legacy and some contemporary tram networks, particularly in and historical systems, as it facilitates tighter curve radii—often down to 15-20 meters—essential for navigating dense street layouts with limited space. In , cities like retain 1,000 mm tracks from early installations, while in , networks like those in used 1,067 mm. This narrower profile reduces land requirements and construction costs in constrained environments but limits vehicle size and speed compared to wider gauges. Other notable gauges include 1,524 mm in , which mirrors the national broad gauge for seamless vehicle transfer between tram and mainline services. Russian systems, such as Moscow's extensive network, utilize this gauge to maintain compatibility across over 200 km of . Usage statistics show that standard gauge dominates new tram constructions, with most post-2000 builds—over two-thirds globally—opting for 1,435 mm to prioritize future-proofing and efficiency. Gauge selection in tramway design is driven by historical precedents, which often dictate legacy ; vehicle compatibility, ensuring access to global suppliers; and urban constraints, where narrower options like 1,000 mm enable sharper turns in city centers without excessive land acquisition. These factors balance operational performance with infrastructural practicality, though they can pose challenges for cross-border or mixed- operations. A common narrow in parts of and is 1,067 mm, used in systems like those in and .

Gauge variations and compatibility issues

Tramway systems in various regions feature narrow gauges that deviate from the of 1,435 , often due to historical development in constrained urban environments. In , the Lisbon tram network operates on a 900 gauge, a choice originally intended to deter horse-drawn competitors from using the tracks and which has persisted since the system's in 1901. Similarly, some older networks employed even narrower gauges, such as 750 , to navigate tight street layouts, though these have largely been phased out in favor of broader compatibility. In contrast, Portugal's broader rail infrastructure, including main lines at 1,668 (), highlights regional variations that affect tram with national networks. Compatibility issues arise when tram gauges differ from adjacent rail systems, necessitating adaptations like dual-gauge tracks to allow seamless transitions for or freight. Dual-gauge configurations involve specialized turnouts where rails for multiple widths run parallel, but they introduce challenges such as increased maintenance complexity and potential lateral forces on wheels during switching, requiring precise engineering tolerances. Wheelset adjustments or exchanges can mitigate mismatches, yet these solutions limit operational speeds and increase downtime in mixed environments. In , several narrow-gauge lines were re-gauged to or broader widths during the late 1980s and early 1990s to align with standards, incurring significant costs for track reconstruction and vehicle modifications, though exact figures for individual projects like those near remain project-specific and often bundled within broader infrastructure budgets. Standards bodies provide guidelines to address these variations, with the (UIC) emphasizing kinematic gauges and loading profiles that accommodate light rail deviations while promoting . In , the American Railway Engineering and Maintenance-of-Way Association (AREMA) recommends aligning gauges with standard 1,435 mm practices to avoid conflicts with freight or maintenance equipment, as outlined in transit-specific design handbooks. Post-2000 developments show a clear trend toward on 1,435 mm for new tram networks, facilitating easier procurement and potential tram-train operations that extend into mainline rail. Gauge mismatches in mixed metro-tram systems often impose operational limits, as seen in feasibility studies for integrated networks where differing widths prevent direct vehicle sharing without costly conversions. For instance, in , , the existing 1,000 mm conflicts with 1,435 mm tracks, restricting joint operations and requiring solutions like gauge-convertible vehicles to avoid service disruptions. Similarly, case studies on joint use in U.S. metropolitan areas, such as those examined by the , reveal that discrepancies between urban trams and regional rails lead to segregated , increasing by up to 20-30% for non-standard adaptations. These examples underscore the economic and logistical barriers to unification, driving modern designs toward consistent gauges for enhanced system resilience.

Power Supply Systems

Overhead electrification

Overhead is the predominant method for powering tramways, utilizing a network of overhead contact wires suspended above the tracks to deliver electrical current to the s via pantographs or trolley poles. The system typically employs a arrangement, consisting of a messenger wire supporting a contact wire at heights ranging from 5.5 to 7 meters to accommodate clearance while minimizing obstruction. Standard voltages for these systems are 600 to 750 volts , with the current return path completed through the running rails, ensuring efficient distribution without additional ground-level conductors. Integration with the track occurs through support structures such as poles positioned between or alongside the rails and bracket arms extending from buildings or curbs, designed to maintain wire and . These fastenings incorporate , often using polymeric materials or discrete insulators, to prevent electrical with the track components and surrounding infrastructure. Poles are typically spaced 20 to 40 meters apart in settings, with brackets used where constraints limit pole installation, ensuring the system aligns precisely with the tram's collector without disrupting rail . This electrification approach offers reliability in all weather conditions, as the elevated wires are less susceptible to ground-level disruptions like flooding or snow accumulation, and it supports operations on reserved sections where trams can achieve higher speeds up to 70 km/h. Historically, overhead systems were adopted in the late 19th century, with , , inaugurating the first electric street tramway in in using this method, marking a pivotal shift from horse-drawn services. Despite these benefits, overhead electrification presents challenges in urban environments, including visual clutter from wires and supports that can detract from street , as well as difficulties in maintenance access due to the elevated infrastructure. To address these issues, modern designs incorporate low-profile systems with streamlined poles and reduced wire profiles, enhancing visual integration in cityscapes while preserving functionality.

Conduit and surface contact systems

The conduit system represents an early form of ground-level electrification for trams, featuring a narrow slotted channel embedded in the street surface between the rails, within which a live conductor rail is housed. Trams collect power via a downward-extending plow or plunger mechanism from the vehicle that enters the slot and maintains contact with the conductor rail. This setup was developed to avoid the visual clutter of overhead wires in urban areas, with the slot typically measuring about half an inch wide and the conduit positioned 38 inches below the street level on insulated cast-iron yokes spaced 13.5 feet apart. Historically, the conduit system was implemented in , starting in 1895 as a response to a ban on overhead wires in the central city, powering streetcars at 600 V DC through parallel positive and negative conductor rails until the system's abandonment in 1962. In , , the system operated from the early 1900s until 1958, serving as the primary power method before the network's temporary closure. Track modifications for conduit systems included precise excavation for the conduit tunnel, installation of waterproof seals around the slot to prevent debris or water ingress, and insulation of the conductor rails to minimize stray currents, though maintenance challenges arose from plow replacements requiring manual intervention in underground pits. Surface contact systems, a variant of , employ raised or flush studs or segmented rails embedded in the track that are energized only as the tram passes overhead, typically using magnetic or positional detection to activate power and enhance safety by avoiding continuously live elements. In historical applications, such systems included the Lorain studs in (operational from 1901 to 1921 over 11.375 miles of single track) and the Dolter system in (1905 to 1921 over 2 miles), where a on the tram triggered magnetic switches to raise conductive studs from the road surface for . These early designs connected to buried cables and operated at voltages around 500-600 V , with track modifications involving insulated housings for studs, waterproof potting compounds, and periodic flushing to clear debris. A prominent modern example is the APS (Alimentation Par le Sol) system in , introduced in 2003 initially across about 12 km of the phase 1 network, and has since expanded to cover 35 km of the current 77 km network as of 2020, utilizing an embedded divided into 11-meter powered segments separated by 3-meter insulated neutral sections, activated via an onboard detecting the tram's position. Power is collected by a retractable under the tram floor at 750 V DC, similar to traditional overhead systems, with track adaptations including flush-mounted power strips in the slab, robust via sealed insulators, and integration with drainage to mitigate moisture issues observed in early operations. Both conduit and surface contact systems offer aesthetic benefits by eliminating overhead wires, preserving urban heritage sites like Bordeaux's UNESCO-listed center, and providing reliable power in constrained city environments with uptime exceeding 99% after refinements. However, they incur higher initial complexity and costs compared to overhead —such as €1.2 billion for Bordeaux's Phase 1 and 2 implementations—due to specialized track embedding and frequent maintenance every 22 meters, alongside limitations to low-speed urban sections vulnerable to weather-related faults like flooding.

Cable haulage mechanisms

Cable haulage mechanisms provide non-electric for trams through an endless of steel cable running continuously in a subsurface conduit parallel to the tracks, driven by stationary engines at powerhouses. Vehicles attach to the moving cable via specialized grips, allowing them to be pulled at a constant speed of approximately 9-10 miles per hour. This system was pioneered in the 1870s by engineer Andrew Smith Hallidie, who drew inspiration from wire-rope technologies to address San Francisco's steep hills; the first successful line opened on Clay Street in 1873, marking the birth of practical urban cable tramways. The track plays a critical role in integrating the cable system, featuring a narrow slot—typically 10-12 inches wide—between the rails that permits the to extend downward and seize the without interfering with street traffic. At line terminals and curves, sheaves (pulleys) redirect the within the conduit, ensuring smooth operation over distances up to several miles per loop. This configuration supports grades as steep as 20%, far exceeding the limits of horse-drawn or early electric trams, making it suitable for undulating terrain in cities like , where inclines reach 21% on lines such as Hyde Street. Historically, cable haulage reached its zenith in the United States and from the to the 1920s, with rapid expansion in over 30 U.S. cities—including , , and —totaling hundreds of miles of track by the early 1890s. In the UK, systems operated in places like and , often on hilly routes. The advent of more flexible and cost-effective electric overhead systems led to widespread conversions by the 1910s and 1920s, reducing operational cable networks to near extinction outside preserved tourist operations. Revivals persist in challenging topographies, such as Lisbon's funiculars (e.g., the Elevador da Glória, operational since 1885), which employ similar cable-haulage principles for urban connectivity in steep neighborhoods. Essential components include the grips—massive, adjustable (weighing over 300 pounds) embedded in the slot and manually operated by a gripman to engage or release the —and emergency , comprising that press against the rails and that directly onto the rails for rapid stopping in case of cable slippage or failure. Sheaves, often dozens per line, require precise alignment to minimize . centers on cable tensioning, achieved via weighted carriages or hydraulic systems at powerhouses to counteract and maintain consistent propulsion, with cables typically replaced every 18-24 months after traveling millions of miles; routine inspections also cover and conduit debris removal to prevent operational disruptions.

Special Track Elements

Switches, crossings, and turnouts

In tramway systems, switches, also known as points, consist of movable rails that enable vehicles to diverge from the main to a , facilitating route changes in constrained environments. These components typically feature compact designs suited to tight radii, such as a 1:6 for low-speed operations up to 25 km/h, where curved switch points provide smoother transitions and reduce wear. In sections common to street-running tramways, tongue switches with a short throw of around 64 mm are often employed, allowing trailable operation to prevent damage from unintended impacts. Electro-hydraulic mechanisms, such as the MCEH61 drive, power these switches for reliable actuation in roadway installations, supporting gauges like 1435 mm while minimizing surface obstruction. Crossings, or frogs, form the diamond-shaped where rails from diverging tracks meet, allowing wheels to pass over without derailing. In tramways, these are designed as flange-bearing types with flangeways approximately 38 mm deep to accommodate narrow treads, often incorporating ramps at a 1:60 angle for gradual elevation changes and improved ride quality. Guard are essential in guarded crossings to prevent climbing, extending along the approach to guide flanges securely; the U69 section is commonly used for these guards in applications. Monoblock crossings machined from solid manganese provide high wear resistance, particularly in high-traffic urban intersections where embedded designs integrate seamlessly with pavement. Turnouts represent complete diverging sections combining switches and crossings, often embedded in urban streets with low-profile grooved rails like 59R1 or 55G1 profiles to blend with surroundings and reduce noise. These assemblies frequently use spring-loaded points for self-restoring alignment after passage, enhancing safety in bidirectional operations, and inserts in the frog area for durability against abrasive wear. In slab track or concrete-supported layouts, monoblock technology ensures precise geometry without cant within 3 m of the switch, adhering to standards like VDV-OR 14 for optimal performance. Networks such as Vienna's, featuring 1,816 switches across its dense urban grid, exemplify the frequent use of these compact turnouts to navigate complex street layouts efficiently.

Track maintenance and inspection

Routine inspections of tramway tracks are essential to ensure safety and , typically involving visual assessments, for internal defects, and measurements using specialized track recording vehicles. Visual inspections, conducted on foot or by hi- vehicles, check for surface irregularities such as wear, joint conditions, and debris accumulation, and are performed weekly on revenue in urban sections. inspections detect cracks and flaws within the , occurring annually for mainline . checks evaluate , , and superelevation using automated vehicles, also on an annual basis for high-traffic areas. These frequencies align with standards set by the (APTA) for systems, which classify into categories with varying inspection intervals to mitigate risks in street-running environments. Maintenance techniques focus on preserving rail profile and track stability, with rail grinding employed to remove corrugations and restore head geometry, particularly effective for short-wave defects exceeding 1/8 inch in depth. For ballasted tracks, tamping compacts the under to maintain and , often performed after adjustments to prevent pumping. Embedded slab tracks, common in urban settings, require repairs involving patching or slab replacement to address cracking from loads and environmental . These methods are prioritized based on defect severity, with immediate actions for critical issues like cracked rails longer than 4 inches, as per APTA guidelines. Urban tramway maintenance faces unique challenges due to shared street spaces and high service demands, necessitating night-time operations to minimize disruptions, often limited to 90-100 minute windows after service ends. Coordination with municipal road repairs is critical to avoid conflicts in mixed-use corridors, where track access is constrained by traffic and utilities. Maintenance costs for , including track work, can constitute approximately 27% of the operating budget, underscoring the need for efficient planning in dense environments. Advancements in technology enhance tramway track monitoring, with AI-driven systems analyzing aerial imagery and sensor data for early defect detection, such as vegetation overgrowth or alignment shifts. Predictive analytics models, based on historical degradation data like track gauge widening at rates of 0.04-0.12 mm per million gross tonnes, forecast maintenance needs to optimize schedules and reduce unplanned outages. These tools, integrated into APTA-compliant practices, support proactive interventions in urban networks, improving longevity and safety.

References

  1. [1]
    [PDF] TCRP Report 57: Track Design Handbook for Light Rail Transit (Part ...
    Track components include rail, fastenings, crossties, and ballast. The 115 RE rail section is primary for light rail, and continuous welded rail (CWR) is ...
  2. [2]
    Standardisation of embedded rail for light-rail systems - Rail Engineer
    Dec 20, 2024 · Light-rail/tramway systems are generally characterised by sections of street running with embedded track and areas of reserved right of way ...
  3. [3]
    Track Design Handbook for Light Rail Transit, Second Edition (2012)
    Chapter 5 of the handbook covers track components and materials for light rail transit.
  4. [4]
    Fact Book Glossary - American Public Transportation Association
    Apr 23, 2019 · Light Rail is a mode of transit service (also called streetcar, tramway, or trolley) operating passenger rail cars singly (or in short, usually ...Employee and Labor Definitions · Financial—Operating Expense...
  5. [5]
    Light rail and tramways | Office of Rail and Road
    ### Summary of Light Rail and Tramways
  6. [6]
    [PDF] What is Light Rail - The PWI
    Transport (UITP) defined light rail in 1979 as: “a rail-borne form of transport, which can be developed in stages from a modern tramway to a form operating ...
  7. [7]
    Track Design Handbook for Light Rail Transit, Second Edition (2012)
    Track Structure Design 4-11 tracking performance when passing through reduced radius curves using groove rail. It is thought that reduction of track gauge ...
  8. [8]
    [PDF] Tramway Vehicle/ Infrastructure Interfaces | The PWI
    Tramway interfaces include challenges in street environments, segregated and on-street track with grooved rails, and unique vehicle profiles and tight curves.
  9. [9]
    Track Design Handbook for Light Rail Transit, Second Edition (2012)
    The use of curves tighter than 82 feet [25 meters] is therefore strongly discouraged. ... Some vehicles may be suitable for operation on somewhat steeper †...
  10. [10]
    [PDF] The First Railway Projects
    Jun 11, 2022 · The concept of wagonways used in this paper focuses on mining, wheeled tubs on wooden rails were used in mines in Germany, Alsace, and Lorraine ...
  11. [11]
    A History of Inland Transport and Communication in England
    Oct 11, 2021 · ​The substitution, from about 1767, of iron rails—even though they were only cast-iron rails—for wooden ones became the great event in the ...
  12. [12]
    The New York and Harlem, the world's first street-railroad, began ...
    Nov 13, 2023 · The New York and Harlem street-railroad began on November 14, 1832, on Fourth Street from Prince St. to the Harlem Bridge at 14th St.
  13. [13]
    Celebrating London's tramways past and present
    Jan 3, 2020 · The first horse trams in London were introduced in the 1860s, operated by private companies. Although banned from operating in the City and West ...Missing: drawn | Show results with:drawn
  14. [14]
    1911 Encyclopædia Britannica/Tramway - Wikisource, the free online library
    ### Summary of Steam-Powered Trams in the 1870s-1880s
  15. [15]
    The History of Tramways and Evolution of Light Rail
    The origin of the tramway can be traced back to the plateways used in mines and quarries to ease the passage of horse-drawn wagons.<|control11|><|separator|>
  16. [16]
    [PDF] From the 1832 Horse pulled Tramway to 21th Century Light Rail ...
    Aug 20, 2019 · Horse-cars on tramlines were an improvement over the horse drawn omnibus, as the low rolling resistance of metal wheels on iron or steel rails ( ...
  17. [17]
    Rails for Trams: Grooved/Girder vs. Block Rail - ArcelorMittal
    Nov 15, 2012 · Grooved Rail was invented in 1852 by Alphonse Loubat as a special rail designed for tramways. The idea behind was to allow integration of other ...Missing: history | Show results with:history
  18. [18]
    LOUBAT, Alphonse (1799 - 1866) - DMG Lib
    He returned to France and developed the grooved rail in 1852, which greatly facilitated street railways and tramlines.
  19. [19]
    1939 Railway Maintenance Cyclopedia Excerpt: Standard Lengths ...
    While the continuous welding or rail has been a standard practice in electric street railways and interurban lines for many years, it was not until 1930 that ...
  20. [20]
    [PDF] Post war reconstruction period 1940–1970: steel and concrete ...
    Prefabricated halls consist of columns, main trusses, girders, purlins and roof slabs, possibly provided with roof-light rows. When the size was limited by the.<|separator|>
  21. [21]
    The potential use of high-strength steel grades
    May 23, 2017 · The best results in track performance today are seen from the high-strength rail steel of the quality R400HT (400 UHC® HSH®), which is ...
  22. [22]
    Rail Station Coatings Tested Against Harsh Coastal Exposure
    Sep 23, 2025 · This relentless environmental assault has resulted in significant corrosion of the structural steel canopies, causing progressive deterioration ...
  23. [23]
    Riding the Rails: A Look at Light Rail Transit | St. Louis Fed
    Between 1984 and 1992, light rail, which is essentially an updated streetcar system, was the fastest-growing segment of railway systems, which also include ...
  24. [24]
    When America Fell in Love With Light Rail - Bloomberg.com
    Jan 17, 2020 · Light rail was seen as the answer to congested highways, growing populations, and civic fantasies of a dozen US cities in the 1980s and early '90s.
  25. [25]
    [PDF] Track Design Handbook for Light Rail Transit (Part B)
    This handbook covers track design for light rail, including track and wheel gauges, track support modulus, ballasted, direct fixation, and embedded track ...Missing: challenges | Show results with:challenges
  26. [26]
    [PDF] TRACK STRUCTURES IN AN URBAN ENVIRONMENT
    In this paper track structures in an urban environment will be discussed. In addition to tracks in the open paved-in structures are treated for tram and ...Missing: challenges | Show results with:challenges
  27. [27]
    Design Calculations for Embedded Rail in Asphalt | Request PDF
    Aug 6, 2025 · In built-up areas, embedded rail structures have more advantages than conventional paved-in tramways. In the Netherlands, embedded rail ...Missing: Amsterdam challenges<|control11|><|separator|>
  28. [28]
    Rail Track Stabilization Systems | Railway Structure Design - Tensar
    Tensar geogrids provide a predictable, cost-effective solution for the stabilization of ballast and sub-ballast layers that includes many advantages.
  29. [29]
    [PDF] Standard - Infrastructure - Tram Track Design
    Jul 7, 2023 · This document is about tram track design for the Melbourne tram network, specifically for Yarra Trams, and is not for other purposes.
  30. [30]
    The Country That Never Tore Up Its Tracks - Create Streets
    Aug 13, 2025 · While Britain and North America tore up their trams after World War II, Germany kept, and modernised, theirs. Today, an unrivalled 60 cities ...
  31. [31]
    Comparison of Ballasted Track and Non-Ballasted Track
    Feb 7, 2017 · Ballasted track is a type of traditional railway tracks. Ballasted track is commonly composed of steel rail, railroad tie, railway fasteners and ballast bed.
  32. [32]
    Flat-Bottom Vignole Rail - British Steel
    Flat bottomed rail for railways including high speed, heavy haul, urban, light rail and tram networks.
  33. [33]
    Tram Rails (grooved, vignole & block rails) - ArcelorMittal
    ArcelorMittal offers grooved, block, and vignole tram rails, with low carbon vanadium grades for grooved rails, and a wide portfolio of railway products.
  34. [34]
    Rails - high-quality steel rails for construction - Constructalia
    ArcelorMittal offers rails for high-speed, heavy haul, urban, public, underground, tram, light, and crane applications, including conductor rails.
  35. [35]
    Fastening systems - Vossloh
    They ensure that the rail is held firmly and precisely in place, that loads are safely transferred to the subgrade and, at the same time, that vibrations and ...<|control11|><|separator|>
  36. [36]
    [PDF] Rail expansion joints on light rail bridges - a planning process ...
    The Vignole rails are used all over the world on open tracks built with sleepers. On tramways the Vignole rail is used on ballast tracks as well as on closed ...
  37. [37]
    [PDF] CHANGEABLE FATE OF COVERED TRAM TRACK APPLICATIONS
    The use of a classic track structure, in which the flat bottomed rails protruded above the level of sleepers, caused considerable problems in the urban traffic.
  38. [38]
    Tram Grooved Rails - ArcelorMittal
    ArcelorMittal manufactures grooved rails per EN 14811, with bar lengths up to 18 meters and chemical composition as per European standards.Missing: design history 35G 41G
  39. [39]
    Grooved rails for trams - Saarstahl Rail
    Grooved rails for trams are used in urban networks, are easily repairable, and come in various grades, including standard and vanadium-alloyed options.Missing: design 35G 41G
  40. [40]
    Grooved Rails - Wirth Rail
    Grooved rails are often referred to as tram, groove, grooved, girder or block rails. This family of rails is noted for two typical designs.
  41. [41]
    Manganese Steel Rails - 911Metallurgist
    Apr 3, 2017 · This test was so satisfactory that manganese-steel rails of heavy section, 100 lb. per yard, varying from 6 to 12 m.<|separator|>
  42. [42]
    [PDF] South Yorkshire Supertram - Transportation Research Board
    35G-TF grooved rail to French Standard NF F52 523 was chosen and, for standard switch construction, grooved rail to. VOF Standard 785 (RI60) was chosen. The ...
  43. [43]
    [PDF] GAStreetcar.pdf - Georgia Department of Transportation
    By the early twentieth century, girder rail had largely replaced T-rail as the preferred streetcar rail type along most city streets in Atlanta (Figure 4.37).<|separator|>
  44. [44]
    Haytor Granite Tramway - Heritage Locations
    The Haytor Granite Tramway, built in 1820, is a unique granite railed tramway using granite blocks as rails to transport granite.
  45. [45]
    Grooved rail 51R1 (Ri52) - ArcelorMittal
    ... supply Grooved Rails. Rail profile 51R1 manufactured according European Standard. Dimensions, profile and mesures of the most common tram rails on the world.<|control11|><|separator|>
  46. [46]
    Block Rails - Wirth Rail
    Grooved rails are often referred to as tram, groove, grooved, girder or block rails. This family of rails is noted for two typical designs.
  47. [47]
    Bordeaux Tram Network – France - SYSTRA UK
    A network of 4 lines, all in correspondence, linking all the activity, employment, residential and tourism hubs.Missing: prefabricated girder
  48. [48]
    Major Gauges of the Global Rail Systems
    Six major gauges dominate global rail systems, with the Standard Gauge (1435 mm) being the most common. North American railways have the same gauge.
  49. [49]
    How Much Do You Know About Railway Track Gauge?
    About 60% of the world's railroad tracks use the standard 1435mm (4 ft 8 1⁄2 in) gauge today. The other 40% use either a narrow gauge or a broad gauge.<|separator|>
  50. [50]
    The 10 largest tram networks in the world - Future Rail | Issue 104
    Sep 21, 2023 · According to UITP data, Europe manages to occupy 58% of the world's total LRT network, with 16,000km of track across the continent, accounting ...
  51. [51]
    List of Tram Track Gauges | Encyclopedia MDPI
    Nov 14, 2022 · 1. Narrow Gauge · 2. Standard Gauge · 3. Broad Gauge ...
  52. [52]
    Light Rail Now! NewsLog - Light Rail Transit News
    Particularly unusual for a newly constructed modern-day system is the meter-gauge track (1000 mm), rather than the more typical standard gauge of 1435 mm (4 ft ...
  53. [53]
    Non standard track gauges that were and currently used in the UK
    Jan 2, 2024 · All railways in the UK use standard gauge (4 ft 8,5 in / 1435 mm) except for Northern Ireland which (along with the Republic or Ireland) uses 5 ft 3 in 1600 mm.
  54. [54]
    Turning trains into trams - Works in Progress Magazine
    Oct 29, 2025 · Over the next four years the line's gauge (the space between the rails) was converted from 1,000 millimeters to 1,435 millimeters, the standard ...
  55. [55]
    Europe and its Russian gauge tracks - Mediarail.be - WordPress.com
    Jun 30, 2022 · The 1,520mm gauge is the official gauge to this day in Russia, while Finland made no such change. In order to move from these countries to the ...Missing: tram | Show results with:tram
  56. [56]
  57. [57]
    Railways in Portugal - sinfin.net
    Although the standard gauge of 1435mm had by then been adopted in several European countries, the new line used a broader gauge of 1664mm (5 Portuguese feet).Missing: 1580mm | Show results with:1580mm<|separator|>
  58. [58]
    Dual Gauge Turnout Design for Mixed Traffic Lines
    Dual gauge turnouts must maintain strict tolerances to ensure that trains do not experience undue lateral forces when switching tracks. Insulation of the common ...
  59. [59]
    Past, present and future of the Portuguese narrow-gauge network
    Nowadays, just one of the lines is in operation; most were closed in the late 1980s and early 1990s, while others were re-gauged or reconverted to tram systems.
  60. [60]
    [PDF] Loading Guidelines-Volume 1-01042025
    Apr 1, 2025 · The load must not exceed the smallest loading gauge over the whole of the route. Compliance with this gauge should be measured from rail level ...
  61. [61]
    [PDF] TRAMS AT THE HEART OF THE 21ST CENTURY METROPOLIS
    Jul 10, 2019 · The trend towards standardisation. Since the end of the 1990s, the construction of tram systems has been based on the following core elements ...
  62. [62]
    A Possible Tram–Train System Covering Bratislava Old Bridge ...
    In most European cities, the gauge of tram lines measures 1435 mm. If a 1435-mm-gauge tram–train system is introduced, the only obstacle to suitable tram and ...
  63. [63]
    [PDF] Joint Operation of Light Rail Transit or Diesel Multiple Unit Vehicles
    The joint-use rail issue is broad in scope and covers a range of joint-use opportunities. Table 1 shows the exten- sive range of the subject and provides a ...<|separator|>
  64. [64]
    Light Rail Power Supplies from A to Z | RECOM
    Sep 30, 2022 · Most light rail or tram systems get their power from overhead catenary systems. Typical voltages range from 600V–750V DC, with more recent installations ...
  65. [65]
    [PDF] TP2-DOC-003519-Tram-System-Overhead-wiring ... - Torrens Connect
    d) The contact wire height in depots should be 5.8m at supports. e) The normal contact wire height at supports should be 5.6m. 11.3. Contact Wire Stagger a ...
  66. [66]
    [PDF] tramway overhead manual
    widened and single centre support poles erected between the tracks to support the overhead wire. Side arm brackets are fitted in pairs, one each side of the ...
  67. [67]
    Overhead Wires - - Electricity History Society
    The first street trams were powered by prime movers in the form of horses or steam tractors, with no need for electric wires or any other external equipment, ...
  68. [68]
    Comparing Overhead and Third Rail Electrification | GEM Cable
    Jan 10, 2024 · Overhead uses a catenary system above tracks, while third rail uses a parallel conductor rail at ground level. Overhead is for high-speed, ...
  69. [69]
    History - 1885 - 1920 - Blackpool trams
    The tramway was operated by the Blackpool Electric Tramway Company and the tramway therefore became the first electric street tramway in Britain.
  70. [70]
    Streetcar Overhead Contact System Design: Cost & Aesthetics
    This paper describes a practical, economical and aesthetically sensible approach to overhead contact system (OCS) design for streetcar systems.Missing: urban | Show results with:urban
  71. [71]
    [PDF] SECTION B | DC Streetcar
    The conduit rail system is not a currently deployed technology. It is described here as an historical reference because it did address a similar challenge in a ...
  72. [72]
    Conduit Current Collection - Electric Vehicles News
    The last conduit line in Paris closed in 1936, while the last Bordeaux conduit car ran in 1953. The conduit systems in Berlin, Vienna and Budapest were very ...
  73. [73]
    [PDF] Washington's Trolley System - WAMU
    Mar 7, 2009 · Peter's book, “Capital Transit, Washington's Street Cars,. The Final Era: 1933 – 1962”, provided the history of the underground conduit system ...
  74. [74]
    Trams without wires - Rail Engineer
    Nov 28, 2012 · It began operation in Bordeaux, a UNESCO world heritage site, in 2003. Up until 1958, Bordeaux's trams used the conduit system, and it had been ...
  75. [75]
    [PDF] 690467.pdf - Open Research Online
    Aug 3, 2015 · However, after lengthy debates, five towns in England opted for the surface-contact system. Of these, Wolverhampton and Hastings are the main.
  76. [76]
    Dolter System (Surface Contact Current Collection) -
    The history of the Dolter system, the surface contact method of tramway current collection.Missing: Nottingham details
  77. [77]
    APS: Service-proven catenary-free tramway operations - Alstom
    APS is a highly reliable power system that reduces the footprint of light rail lines and preserves the aesthetics of urban environments.Missing: modern low- designs
  78. [78]
    [PDF] Innovative Technologies for Light Rail and Tram - POLIS Network
    Safety: Traditional conduit systems were deemed unsafe by government to use in the conditions of. Bordeaux. Solution 'of the times': Innorail (alongside ...
  79. [79]
    Cable Car History - SFMTA
    Cable cars were invented by Andrew Smith Hallidie here in San Francisco in 1873. Hallidie's cable car system was based on early mining conveyance systems.Missing: 1870s | Show results with:1870s
  80. [80]
    [PDF] Historic Context Report for Transit Rail System Development
    In the 1810s and 1820s, American inventors began experimenting with various railway designs in which a “road” made of one or more rails could be built over ...
  81. [81]
    San Francisco Cable Car Museum
    ### Summary of Cable Car System Design and History
  82. [82]
    MCEH61/MTEH61 - Tramway point machine - Vossloh
    Sep 29, 2025 · The MCEH61 and MTEH61 Tramway point machines are robust, electro-hydraulic solutions designed specifically for tramway applications.
  83. [83]
    Tramway Switches & Crossings
    ### Summary of Vossloh Tramway Switches & Crossings
  84. [84]
    [PDF] A full range of turnouts for modern tramways - Vossloh - Topic Lounge
    We produce all types of turnouts using flat bottom rails or grooved rails: connection turnouts, diamond crossings, single or crossed scissors crossovers, double ...
  85. [85]
    Modernisations - Wiener Linien
    In 2024, we are launching a modernisation campaign for our infrastructure: in the coming years, we will be renewing tracks, points, tunnels, bridges, signal ...Missing: turnouts design
  86. [86]
    [PDF] Rail Transit Track Inspection and Maintenance
    Sep 22, 2002 · Specific types of track design and track construction are described in Sections 12 through 14. APTA rail transit safety standards represent an ...
  87. [87]
    Research recommends strategies to optimize overnight ...
    Aug 28, 2024 · Most urban transit systems have a brief window of time in the wee hours of the morning to perform maintenance work without disrupting ...Missing: challenges | Show results with:challenges
  88. [88]
    [PDF] TRANSIT ASSET MANAGEMENT PRACTICES
    approximately 27 percent of a transit agency's operating budget is dedicated to maintenance costs. These can be divided into two categories: scheduled. 1 ...
  89. [89]
    Essential Guide to Railway Track Inspection - FlyPix AI
    Feb 9, 2025 · Inspection Frequency: Owners must inspect tracks at specific intervals, which can vary from once or twice a week to once a month, depending on ...<|control11|><|separator|>
  90. [90]
    [PDF] TRAM TRACK MAINTENANCE-PLANNING BY GAUGE ...
    Abstract. Tram track system management is a complex, costly and interdisciplinary process. It involves construc- tion, monitoring and maintenance of track ...