Approach and Landing Tests
The Approach and Landing Tests (ALT) were a critical series of 16 taxi and flight trials conducted in 1977 at NASA's Dryden Flight Research Center (now Armstrong Flight Research Center) in Edwards, California, using the Space Shuttle prototype orbiter Enterprise (OV-101) to verify its unpowered approach, glide, and landing capabilities under conditions simulating the final phases of orbital missions.[1] These tests, part of the early Space Shuttle program, demonstrated the orbiter's aerodynamic stability, flight control systems, and handling qualities without engines, providing essential data for subsequent orbital flights.[2] Managed by NASA's Johnson Space Center with support from the Dryden facility's test range and Rogers Dry Lake bed, the ALT program built crew experience and validated the integration of the orbiter with the modified Boeing 747 Shuttle Carrier Aircraft (SCA), NASA 905.[3] The ALT program unfolded in three distinct phases over approximately nine months, from February to October 1977. The initial taxi tests on February 15 involved three ground runs of Enterprise atop the SCA at speeds up to 137 knots to assess structural loads, airworthiness, and ground handling.[2] This was followed by captive flights, comprising five inert (unpowered and unmanned) and three active (manned) missions between February 18 and July 26, where the mated SCA-orbiter combination reached altitudes up to 25,000 feet and speeds of 250 knots to evaluate aerodynamics, separation dynamics, and systems performance.[2] The culminating free-flight phase consisted of five unpowered glide tests from August 12 to October 26, with Enterprise released from the SCA at altitudes of 17,000 to 24,100 feet and speeds of 245 to 270 knots equivalent airspeed (KEAS), testing landing gear deployment, braking, and runway performance—four on the lakebed and one on concrete.[2] Two crews alternated for the manned flights: astronauts Fred W. Haise Jr. and C. Gordon Fullerton handled the first and third free flights, while Joe H. Engle and Richard H. Truly managed the second and fourth.[2] The SCA was piloted by Fitzhugh L. Fulton Jr. and Thomas C. McMurtry, with additional flight engineers. Notable outcomes included confirmation of the orbiter's stable subsonic handling and energy management, though the final free flight on October 26 revealed a pilot-induced oscillation (PIO) issue during landing due to control system limitations, which was resolved through subsequent simulations and software modifications using the F-8 Digital Fly-By-Wire aircraft and Total In-Flight Simulator (TIFS).[2] Overall, the ALT program's success provided foundational validation for the Space Shuttle's design, enabling the safe execution of the first orbital mission, STS-1, in April 1981, and influencing landing procedures across the program's 135 missions.[1]Background and Development
Origins in the Space Shuttle Program
The Space Shuttle program emerged from concepts developed in the 1960s amid the Apollo lunar program's success, as NASA sought cost-effective reusable vehicles to support future endeavors like space stations and satellite operations. Drawing from experimental programs such as the X-15 hypersonic research and lifting-body tests, which demonstrated unpowered glider reentries, early proposals emphasized fully reusable systems to lower launch expenses compared to expendable rockets. In 1969, the presidential Space Task Group endorsed a shuttle as the primary post-Apollo initiative for human spaceflight, prioritizing logistics for orbital activities. On January 5, 1972, President Richard Nixon approved the program, directing NASA to develop a reusable space transportation system capable of routine missions at reduced costs.[4][5][6][7] Throughout the early 1970s, orbiter design decisions focused on a glider-like configuration to enable precise unpowered landings after reentry, balancing reusability with aerodynamic stability. By October 1970, NASA analyses confirmed the feasibility of unpowered glides using data from prior lifting-body flights, eliminating the need for onboard propulsion during descent. In 1971, the design adopted a delta-wing shape to achieve 1,100 nautical miles of crossrange capability for flexible reentry paths, accommodating Air Force requirements for military payloads while preserving subsonic handling traits. These choices, refined through Phase B studies, positioned the shuttle as a winged spacecraft that would glide to runways like an aircraft, enhancing operational efficiency.[5][5][5] The Approach and Landing Tests (ALT) formed a foundational phase to confirm the orbiter's subsonic aerodynamics and landing performance prior to orbital flights with Columbia, mitigating risks in the unpowered return profile. By simulating final descent phases, ALT evaluated flight control systems and pilot handling in real atmospheric conditions, validating predictions from wind-tunnel and simulator data. Planned as part of initial Phase A testing at Dryden Flight Research Center, preparations including component deliveries for the prototype orbiter began in 1975, leading to execution in 1977.[2][2][8]Construction and Naming of Enterprise
The construction of the first Space Shuttle orbiter, designated OV-101, began under a contract awarded by NASA to North American Rockwell Corporation on July 26, 1972. Manufacturing of the initial components commenced on June 4, 1974, at the company's facility in Downey, California, with final assembly taking place at the Palmdale, California plant from 1974 to 1976. This orbiter, intended exclusively for the Approach and Landing Tests (ALT), incorporated structural elements derived from the program's Structural Test Articles (STAs), which were originally designed to validate the airframe's integrity under launch and reentry stresses. Assembly was completed on March 12, 1976, marking a significant milestone in the development of the reusable spacecraft concept.[9] Unlike subsequent orbiters, OV-101 was built without main engines, a functional thermal protection system, or other subsystems required for orbital flight, focusing instead on verifying the airframe's aerodynamic and handling characteristics during atmospheric tests. This design choice allowed for cost savings and accelerated the timeline for ground and flight evaluations, as the vehicle did not require the complex integration of propulsion or heat shield components. The orbiter's structure emphasized durability for mated vehicle testing with the Shuttle Carrier Aircraft (SCA), a modified Boeing 747.[10] Originally slated to be named Constitution in honor of Constitution Day, the orbiter's designation was changed to Enterprise following an extensive letter-writing campaign by fans of the Star Trek television series, who advocated for the name of the fictional starship USS Enterprise. The campaign, which generated hundreds of thousands of letters to the White House, prompted President Gerald R. Ford to approve the renaming on September 8, 1976. The public rollout and naming ceremony occurred on September 17, 1976, at Rockwell's Palmdale facility, attended by over 600 guests, including Star Trek cast members such as William Shatner, Leonard Nimoy, DeForest Kelley, and George Takei, as well as ALT crew astronauts Fred Haise and Gordon Fullerton. The event featured the U.S. Air Force Band performing the Star Trek theme, underscoring the cultural influence on the program's public image.[9] Following the rollout, Enterprise underwent preparations for integration with the SCA. On January 31, 1977, the orbiter was transported overland 36 miles from Palmdale to NASA's Dryden Flight Research Center (now Armstrong Flight Research Center) at Edwards Air Force Base, California, in a 10-hour journey to enable initial ground fit checks. These checks, conducted in early February, verified structural compatibility and handling prior to mating; workers lifted Enterprise using the Mate-Demate Device and secured it atop the SCA on February 7–8, 1977, confirming the mated vehicle's stability for subsequent taxi and flight tests.[11][12]Program Planning and Preparation
Test Objectives and Scope
The Approach and Landing Tests (ALT) program aimed to validate the Space Shuttle orbiter's low-speed handling qualities, aerodynamic stability, and landing gear performance in a configuration independent of the full Shuttle stack, thereby establishing a proof-of-concept for unpowered glide approaches and landings that simulated the terminal phase of orbital missions.[2] Specific objectives included verifying pilot-guided approach and landing capabilities, demonstrating subsonic automated terminal area energy management (TAEM) and autoland functions, and assessing the orbiter's subsonic airworthiness along with integrated systems operations to ensure readiness for subsequent orbital flight tests.[13] These goals focused on evaluating the vehicle's stability and control from altitudes around 25,000 feet through rollout, without the complexities of powered reentry or ascent phases.[14] The scope of the ALT encompassed 16 tests conducted between February 15, 1977, and October 26, 1977, at NASA's Dryden Flight Research Center (now Armstrong) in Edwards, California, divided into taxi tests, captive flights, and free-flight glides.[2] This included three taxi tests to assess ground handling, eight captive flights—five inert (unmanned orbiter) and three active (crewed orbiter)—to verify compatibility with the carrier aircraft and separation dynamics, and five free-flight tests to demonstrate independent glide and landing performance.[2] The program prioritized atmospheric entry simulations through unpowered descents, with four free flights landing on the Rogers Dry Lake bed and one on a concrete runway, providing essential data on handling across varied center-of-gravity configurations.[14] Methodologically, the tests utilized a modified Boeing 747 as the Shuttle Carrier Aircraft (SCA) to airlift the orbiter to release altitudes of 17,000 to 30,000 feet, followed by explosive bolt separation for captive-active and free-flight phases, enabling evaluation within a subsonic flight envelope up to approximately 500 miles per hour.[2] This approach allowed for the demonstration of safe approach and landing under conditions mimicking post-reentry unpowered glides from about 26,000 feet, with speeds ranging from 245 to 270 knots equivalent airspeed during key maneuvers, while confirming the orbiter's ability to maintain stability without propulsion.[2]Vehicle Modifications and Configurations
To enable the Approach and Landing Tests (ALT), NASA modified a Boeing 747-100 airliner, designated as the primary Shuttle Carrier Aircraft (SCA) with tail number N905NA, to serve as the launch platform for the Enterprise orbiter. A second Boeing 747 was also acquired and prepared as a backup SCA, though the primary aircraft handled all ALT operations. Key adaptations included extensive structural reinforcements to the fuselage to bear the orbiter's weight of approximately 150,000 pounds, installation of three external support struts—two aft and one forward—protruding from the top of the fuselage to act as mounting pylons for the orbiter, and addition of 20-foot-10-inch tip fins to each end of the horizontal stabilizers to enhance directional stability and yaw control during low-speed flight with the added mass.[15][2] These modifications addressed aerodynamic challenges posed by the mated vehicle configuration, including shifts in center of gravity (CG) and reduced pitch authority due to the orbiter's interference with airflow over the SCA's tail. Weight distribution adjustments, achieved through internal ballast in the Enterprise, ensured the mated vehicle's CG remained balanced for stable flight; for example, configurations targeted CG locations at 63.8% and 65.8% of the orbiter's mean aerodynamic chord during early tests, progressing to 66.25% for later phases to mimic operational shuttle conditions. The tip fins and reinforced structure also supported improved pitch control by compensating for the orbiter's drag and lift effects. Additionally, an emergency crew escape system was integrated, featuring a slideway tunnel from the flight deck to a ventral hatch with pyrotechnic deployment capabilities.[2][15] Prior to mating with Enterprise in February 1977, the primary SCA underwent airworthiness certification flights in January 1977 at NASA's Dryden Flight Research Center (now Armstrong), including multiple takeoffs and landings to validate structural integrity, stability, and handling at speeds up to 160 knots without the orbiter attached. These tests confirmed the aircraft's readiness for the added load and set the stage for subsequent taxi and captive flight trials.[16][2] The Enterprise orbiter itself received targeted modifications for ALT compatibility, prioritizing aerodynamic and control testing over full operational readiness. In the ALT-1 configuration, used for captive-inert flights, all major systems except basic avionics were inert, the aerodynamic tailcone was installed to fair the engine bay and simulate drag, and no thermal protection system (TPS) tiles were applied; instead, the fuselage was coated with polyurethane foam and fiberglass cloth for weight savings and environmental protection during ground handling. For free-flight tests, the tailcone was retained for the first three flights, while the final two used the ALT-2 configuration with the tailcone removed to expose the dummy main engines (non-functional replicas for weight and shape simulation) and evaluate operational aerodynamics. Flight control systems were activated for manned free flights, and no reaction control system thrusters were fitted, as orbital maneuvering was outside ALT scope. These setups allowed progressive evaluation of the orbiter's unpowered glide characteristics while minimizing development costs.[2][12]Crews and Training
Orbiter Crew Assignments
NASA selected two two-man crews to pilot the Enterprise orbiter during the Approach and Landing Tests (ALT), drawing from experienced astronauts to evaluate the vehicle's low-speed flight characteristics and handling qualities. The first crew consisted of Commander Fred W. Haise Jr., a veteran of the Apollo 13 mission where he served as lunar module pilot, and Pilot C. Gordon Fullerton, an Air Force test pilot with extensive experience in experimental aircraft research.[17][18] This crew flew the first captive-active flight on June 18, 1977, and the third on July 26, 1977, providing early feedback on mated flight dynamics and systems integration. They also handled the first, third, and fifth free flights.[2][19] The second crew comprised Commander Joe H. Engle, who had prior experience as an X-15 pilot with 16 flights in the hypersonic research aircraft, reaching speeds exceeding Mach 5, and Pilot Richard H. Truly, a naval aviator and test pilot with over 7,500 flight hours including carrier operations.[20][21] This team conducted the second captive-active flight on June 28, 1977, focusing on separation profiles, stability in tailcone-off configurations, and manual landing techniques. They also managed the second and fourth free flights.[2][19] By alternating crews across the three captive-active and five free-flight tests, NASA gathered diverse pilot perspectives on the orbiter's aerodynamic control and subsonic performance, enhancing data reliability for subsequent orbital missions.[2] Preparation for these flights involved intensive simulator training to replicate the unique challenges of mated and separated flight. Astronauts conducted sessions in the Orbiter Aeroflight Simulator at Rockwell International's facilities in Palmdale, California, and at NASA's Dryden Flight Research Center (now Armstrong), emphasizing integrated vehicle dynamics, approach profiles, and emergency procedures.[2] For added safety during the crewed ALT phases, the Enterprise was equipped with zero-zero ejection seats manufactured by Lockheed, capable of deployment from ground level up to the test altitudes, which were removed following the program's completion as the vehicle transitioned to non-flight structural testing.[2]Shuttle Carrier Aircraft Crew and Support Personnel
The Shuttle Carrier Aircraft (SCA) crew for the Approach and Landing Tests (ALT) consisted of experienced NASA test pilots and engineers tasked with operating the modified Boeing 747 to transport and release the Enterprise orbiter. The primary flight crew included Captain Fitzhugh L. Fulton Jr. as aircraft commander and Thomas C. McMurtry as co-pilot, both selected for their extensive backgrounds in high-performance aircraft testing.[2] Supporting them were four flight engineers—Victor W. Horton, Louis E. Guidry Jr., William R. Young, and Vincent A. Alvarez—responsible for monitoring systems, managing data acquisition, and ensuring structural integrity during mated flights.[2][22] Fulton, a veteran NASA Dryden Flight Research Center pilot, brought qualifications from over 15,000 flight hours, including command of B-52B Stratofortress missions for X-15 rocket plane drops and early certification flights of the Boeing 747 SCA itself, which ensured precise control during the orbiter's airborne carriage and release maneuvers.[23] McMurtry, who joined NASA in 1967 after U.S. Navy service and graduation from the Naval Test Pilot School, had logged more than 11,000 hours in aircraft such as the F-8 Crusader, U-2, and the 747 SCA, providing expertise in handling modified heavy-lift configurations critical for ALT stability.[24] The flight engineers, drawn from NASA and contractor pools with prior experience on large transport and research aircraft, focused on real-time instrumentation to track aerodynamic loads and vibrations from the 70,000 lb orbiter.[25] These qualifications, rooted in B-52 drop tests and 747 development programs, were essential for safely managing the mated vehicle's unique center-of-gravity shifts and pogo oscillations.[2] Support personnel formed a collaborative network between NASA and industry partners to oversee SCA operations and data flow during ALT. At NASA Dryden (now Armstrong) Flight Research Center, test directors coordinated mission control from Edwards Air Force Base, directing real-time telemetry analysis and abort procedures for all captive and free-flight phases.[25] Rockwell International engineers, as the orbiter's prime contractor, provided on-site expertise for monitoring structural interfaces and systems integration, ensuring the SCA's modifications—such as the external pylon and balance weights—performed under load without compromising flight safety.[2] Additionally, chase aircraft pilots, flying T-38 Talons and other support planes, offered visual confirmation of separation dynamics and orbiter trajectory, relaying observations to ground teams for immediate adjustments.[2] This integrated support structure, managed under the ALT Site Manager at Dryden, emphasized redundancy in communications and emergency response to handle the SCA's operations with the inert or active orbiter.[25] Crew training emphasized simulations to prepare for the challenges of mated vehicle handling, with a particular focus on maintaining SCA stability under the 70,000 lb orbiter load. Joint sessions at NASA facilities replicated captive flight profiles, including takeoff, cruise, and release sequences, using analog cockpits and motion-based simulators to train on aerodynamic interactions like tailcone-induced drag and longitudinal stability.[2] These exercises, conducted prior to ALT's February 1977 start, incorporated data from wind tunnel tests to simulate pylon loads and potential oscillations, allowing the crew to practice coordinated inputs for precise altitude holds and gentle separation maneuvers.[25] Training also covered emergency scenarios, such as asymmetric release or system failures, drawing on the pilots' prior 747 and B-52 experience to build confidence in the SCA's modified handling characteristics without the orbiter crew's direct involvement.[2]Execution of ALT
Taxi and Ground Tests
The Taxi and Ground Tests marked the initial phase of the Approach and Landing Tests (ALT) program for the Space Shuttle orbiter Enterprise (OV-101), conducted at NASA's Dryden Flight Research Center (now Armstrong Flight Research Center) on Edwards Air Force Base, California. These uncrewed trials focused on validating the basic mobility, handling characteristics, and structural integrity of the Enterprise mated to the modified Boeing 747 Shuttle Carrier Aircraft (SCA), designated NASA 905, prior to any airborne operations. Performed on the lakebed runway, the tests ensured the compatibility of the mated vehicle configuration under ground conditions simulating taxiing and high-speed maneuvers.[12][2] Three taxi tests were carried out on February 15, 1977, with the Enterprise secured atop the SCA and the tailcone installed to simulate aerodynamic loads. The first test reached a maximum speed of 89 mph (78 knots), the second 140 mph (122 knots), and the third 157 mph (137 knots), allowing evaluation of the vehicle's performance across increasing velocities on the dry lakebed surface. These runs were self-powered by the SCA's engines, as the Enterprise remained uncrewed and without active propulsion.[12][26][2] The primary objectives were to verify nose wheel steering responsiveness, brake effectiveness, and tire performance under load, while assessing overall ground handling and control of the mated stack. Strain gauges were affixed to critical components, such as the landing gear and airframe, to measure structural loads, complemented by telemetry systems capturing data on vibrations, directional stability, and high-speed turns. This instrumentation provided real-time insights into potential stress points, confirming the integrity of the landing gear during the full-speed third run without significant anomalies. Minor adjustments to the steering hydraulics were implemented post-tests to optimize control precision based on observed handling characteristics.[26][2][12] Overall, the tests demonstrated satisfactory performance of the Enterprise-SCA combination, with no major structural concerns identified, paving the way for the subsequent captive flight phase on February 18, 1977. The data collected underscored the robustness of the design for ground operations, informing refinements to systems like the anti-skid brakes and steering mechanisms that proved vital for later flight evaluations.[26][2]Captive Flights
The captive flights phase of the Approach and Landing Tests (ALT) consisted of eight mated test flights conducted between February and July 1977, during which the Space Shuttle orbiter Enterprise remained attached to the modified Boeing 747 Shuttle Carrier Aircraft (SCA) to evaluate the combined vehicle's aerodynamic stability, structural integrity, and handling characteristics in a real flight environment.[2] These tests built on the prior ground-based taxi evaluations by progressing to airborne operations, focusing on verifying the SCA's performance while carrying the orbiter without risking separation.[2] No crew occupied the Enterprise during the initial flights, with all piloting handled by the SCA crew, allowing engineers to assess mated dynamics under increasing speeds and altitudes.[2] The first five captive-inert flights, performed from February 18 to March 2, 1977, involved an inert Enterprise with non-operational systems to prioritize structural and aerodynamic data collection.[2] These unmanned tests progressively expanded the flight envelope, starting at conservative parameters and culminating in the maximum planned conditions to confirm the mated configuration's stability and load distribution.[2] For instance, the initial flight on February 18 reached a maximum speed of 287 mph and altitude of 16,000 feet over a 2-hour, 5-minute duration, while subsequent flights increased these limits to validate predictions from wind tunnel models.[27] The series verified the SCA's ability to maintain control and structural margins, with no significant aeroelastic issues observed.[2]| Flight | Date | Duration | Max Speed (mph) | Max Altitude (ft) |
|---|---|---|---|---|
| Captive-Inert #1 | February 18, 1977 | 2h 5m | 287 | 16,000 |
| Captive-Inert #2 | February 22, 1977 | 1h 40m | 328 | 22,600 |
| Captive-Inert #3 | February 25, 1977 | 2h 28m | 425 | 26,600 |
| Captive-Inert #4 | February 28, 1977 | 2h 11m | 425 | 28,565 |
| Captive-Inert #5 | March 2, 1977 | 1h 39m | 474 | 30,000 |
| Flight | Date | Duration | Max Speed (mph) | Max Altitude (ft) | Crew |
|---|---|---|---|---|---|
| Captive-Active #1 | June 18, 1977 | 55m 46s | 208 | 14,970 | Haise, Fullerton |
| Captive-Active #2 | June 28, 1977 | 1h 2m | 310 | 22,030 | Engle, Truly |
| Captive-Active #3 | July 26, 1977 | 59m 53s | 311 | 30,292 | Haise, Fullerton |
Free-Flight Tests
The free-flight tests phase of the Approach and Landing Tests (ALT) program consisted of five independent unpowered glide flights conducted between August and October 1977 at Edwards Air Force Base, California, during which the Space Shuttle orbiter Enterprise separated from the [Shuttle Carrier Aircraft](/page/Shuttle Carrier Aircraft) (SCA) to evaluate its low-speed aerodynamic handling, approach, and landing characteristics.[30] These tests built on the prior captive flight envelope by allowing pilots to assess the orbiter's solo performance in a realistic descent profile.[30] Releases occurred at altitudes ranging from 19,000 to 26,000 feet and speeds of approximately 245–270 knots equivalent airspeed (KEAS), with flight durations varying from 2 to 5.5 minutes as the orbiter glided to a landing on dry lakebed or concrete runways.[30] The tests alternated between two crews: Crew 1, commanded by Fred W. Haise Jr. with pilot C. Gordon Fullerton, and Crew 2, commanded by Joe H. Engle with pilot Richard H. Truly.[30] Flights 1–3 (August 12, September 13, and September 23, 1977) used a tailcone-on configuration with center-of-gravity (CG) positions at 63.8% or 65.8% of the reference body length to simulate attached flight conditions, incorporating maneuvers such as windup turns with bank angles up to 60 degrees and initial speedbrake deployments at 30–50%.[30] Flights 4–5 (October 12 and October 26, 1977) removed the tailcone and installed dummy main engines to mimic orbital return aerodynamics, shifting the CG to 66.25% and focusing on shallower bank angles up to 20 degrees, angle-of-attack sweeps, and higher speedbrake settings up to 80%.[30] All flights achieved successful separations and landings, with touchdown points within 1,000 feet of the aim point and rollout distances of 5,700–11,800 feet.[30] Key events included the first use of extended speedbrake modulation during the turn to final approach in Flight 1, autoland guidance testing for 50 seconds in Flight 3, and the introduction of tailcone-off handling in Flight 4, which confirmed effective lift/drag modulation without significant buffet increases.[30] Flight 5 marked the first landing on a concrete runway (Runway 04) and revealed pilot-induced oscillations (PIO) in pitch during the final approach due to elevon rate limiting, resulting in a brief skip on touchdown.[30] Performance metrics demonstrated sink rates of 300–400 feet per minute (5–7 feet per second) and touchdown speeds around 180–189 knots, validating handling qualities rated 1.5–2 on the Cooper-Harper scale across configurations.[2]| Flight | Date | Crew | Release Altitude (ft) / Speed (KEAS) | Duration (min:sec) | Configuration | Key Maneuvers | Landing Notes |
|---|---|---|---|---|---|---|---|
| 1 | Aug 12, 1977 | Haise / Fullerton | 25,080 / 268.3 | 5:22 | Tailcone on, CG 63.8% | 20° banks, speedbrake 30–50% | Lakebed Runway 17; 5,444 ft past aim, rollout 11,845 ft |
| 2 | Sep 13, 1977 | Engle / Truly | 25,320 / 269.2 | 5:31 | Tailcone on, CG 63.8% | 60° banks, 1.8g turn | Lakebed Runway 15; 679 ft past aim, rollout 10,037 ft; brake chatter |
| 3 | Sep 23, 1977 | Haise / Fullerton | 26,040 / 252.7 | 5:35 | Tailcone on, CG 65.8% | 59° banks, 50s autoland | Lakebed Runway 17; 786 ft past aim, rollout 9,184 ft; brake chatter |
| 4 | Oct 12, 1977 | Engle / Truly | 21,460 / 247.7 | 2:35 | Tailcone off, CG 66.25% | 10° banks, AoA sweep | Lakebed Runway 17; 510 ft past aim, rollout 5,725 ft; brake damage |
| 5 | Oct 26, 1977 | Haise / Fullerton | 19,000 / 250.7 | 2:06 | Tailcone off, CG 66.25% | 20° bank, manual approach | Concrete Runway 04; 994 ft past aim (first touchdown), rollout 7,930 ft; PIO and skip |