Shuttle Landing Facility

The Shuttle Landing Facility (SLF), located at NASA's in , is a specialized airfield featuring one of the world's longest runways at 15,000 feet (4,572 meters) in length and 300 feet (91 meters) wide, originally constructed to support the horizontal landings of the fleet from 1984 to 2011. Construction of the SLF began on April 1, 1974, following NASA's selection of as the primary landing site on April 14, 1972, with a $21.8 million awarded to Morrison-Knudsen Company for the and supporting , including a 1,000-foot overrun on each end and a central 8,500-foot section of 16-inch-thick, high-friction grooved for water drainage. The facility was completed and certified for operations in 1976, enabling the first landing there on February 11, 1984, during mission with , and ultimately hosting 78 orbiter touchdowns over the program's duration, including the final one on July 21, 2011, for with . Key features of the SLF include an FAA-standard tower, (PAPI) lights, GPS-based navigational aids, and (ARFF) services classified as Category D, all designed to accommodate high-performance and spacecraft with restricted airspace access over the adjacent launch complexes. Post-Shuttle program, the facility—now often called the Launch and Landing Facility (LLF)—transitioned to under a 30-year agreement with Space Florida starting in June 2013, with full operational transfer from in June 2015, enabling its use for horizontal space launches, suborbital , zero-gravity parabolic flights, and R&D by tenants such as , , and . In recent years, the SLF has supported diverse missions, including over 400 landings and departures in 2023 for Crew rotations and cargo resupplies, while ongoing investments exceeding $63 million through Florida's Improvement Program have enhanced utilities, rail access, and land availability for hangars and satellite processing facilities used by companies like and .

Overview

Location and Management

The Shuttle Landing Facility (SLF) is situated on Merritt Island in , as part of the Space Center (KSC), a key component of the Spaceport. Its precise coordinates are 28°36′53.6″N 80°41′39.7″W, placing it approximately 4.8 kilometers (3 miles) northwest of the KSC's . The facility encompasses approximately 4,432 acres of NASA-owned land, providing extensive space for and activities within a coastal environment that supports diverse operational needs. Prior to 2015, the SLF was directly operated and managed by the National Aeronautics and Space Administration (NASA) as an integral part of its KSC infrastructure. In June 2015, NASA entered into a 30-year property agreement with Space Florida, the state's aerospace economic development authority, transferring operational control to facilitate broader commercial space utilization while preserving NASA's access. This lease arrangement, effective from the agreement's signing, aimed to transform the site into a multi-user spaceport without altering NASA's property ownership. Under the agreement, Space Florida assumes primary responsibilities for the facility's day-to-day management, including maintenance of infrastructure, security protocols, and promotion of the site to attract non-NASA users such as private companies and government partners. retains overarching oversight, particularly for federal missions, ensuring compliance with safety standards and continued availability for its programs, while Space Florida holds an FAA Launch and Reentry Site Operator License to support licensed commercial activities. This dual governance model balances public and private interests, fostering economic growth in 's .

Purpose and Design

The Shuttle Landing Facility (SLF) at NASA's was constructed specifically as the primary site for both routine and emergency landings of the , enabling direct returns to the launch site and avoiding the need for costly ferry flights from alternative locations such as . This design choice supported the program's operational efficiency, accommodating the orbiter's unpowered glide reentry and precise touchdown requirements without the option for a . The facility's was engineered to handle the orbiter's landing weight of approximately 200,000 pounds at speeds up to 226 miles per hour, ensuring safe deceleration for the delta-winged vehicle. Key design principles focused on precision and durability to match the orbiter's steep 19-degree glide and high-friction landing dynamics, far exceeding those of conventional . The runway features a 16-inch-thick high-friction surface in its central 8,500-foot section, grooved for effective water dispersion during wet conditions and to mitigate tire wear from the orbiter's heavy main gear loads. Additional engineering includes cross-grooves at the ends to reduce initial friction upon and a 24-inch for , allowing the facility to support heavy-load beyond the shuttle's requirements. Unique capabilities of the SLF were tailored for mission-critical scenarios, including transatlantic aborts and return-to-launch-site (RTLS) operations, with rapid post-landing support such as towing and safing within hours. The (ILS) incorporates TACAN for range and bearing guidance up to 145,000 feet and a Microwave Scanning Beam Landing System for automated approaches down to 18,000 feet, enabling all-weather operations. Night landings are facilitated by (PAPI) lights and 16 high-intensity xenon runway end lights, each providing one billion for visibility during low-light conditions.

Facilities

Runway Specifications

The Shuttle Landing Facility features a single runway designated 15/33, oriented approximately 150°/330° magnetic azimuth to align with prevailing winds in the region. The runway measures 15,000 feet in length and 300 feet in width, with 1,000-foot paved overruns at each end to accommodate deceleration margins for high-speed landings. This layout supports precision approaches from either direction, with the southeast threshold (Runway 15) positioned to facilitate overwater final approaches over the Atlantic Ocean. Constructed primarily of high-strength , the incorporates a 16-inch-thick slab at the centerline to withstand extreme loads, with the central 8,500 feet featuring a diamond-grooved surface for optimal traction. The grooving, achieved using diamond blades, creates transverse channels spaced to channel rainwater away from the tire contact patch, minimizing hydroplaning risks during Florida's frequent heavy rains. In response to observed tire on space main gear during early operations, the surface was refined in the through abrasion to a smoother while preserving braking , balancing reduction with a target suitable for unpowered glider landings. Performance-wise, the runway's weight-bearing capacity supports with landing weights up to 800,000 pounds under dual double tandem gear configurations as of October 2025, enabling operations for heavy-lift and experimental vehicles beyond original shuttle parameters. It includes 16 taxiways connecting to a central , facilitating efficient ground movements for multiple . approach aids, such as ALSF-2 approach lighting with sequenced flashers, PAPI visual glide slope indicators, and published GPS RNAV procedures, ensure Category II/III minima compatibility for low-visibility conditions.

Support Infrastructure

The Shuttle Landing Facility (SLF) features several key structures essential for operational support, including an tower constructed to standards, which provides ground-to-air communications and manages airfield traffic. Adjacent facilitate orbiter and aircraft processing; a 50,000-square-foot , built in 2000, supports maintenance and staging activities. Emergency response capabilities are bolstered by Fire Station #2, a 20,000-square-foot facility completed in 2008 that houses (ARFF) Class D equipment and personnel to handle aviation incidents. Support systems at the SLF include navigational aids and lighting for safe operations, such as Precision Approach Path Indicators (PAPI) and distance-to-go markers along the runway, enabling GPS-based approaches for runways 15 and 33. Fuel storage for support aircraft is provided through a dedicated established in to accommodate increased commercial and military traffic, with provisions for on-site temporary storage via refueling trucks as needed. Bird hazard mitigation employs devices like propane cannons and to deter wildlife from the runway area, complementing traditional methods to reduce strike risks during landings.

History

Construction and Development

The development of the Shuttle Landing Facility (SLF) formed a key component of NASA's , with initial planning for shuttle infrastructure underway by 1970 as the agency refined vehicle and support requirements following Phase A and B studies. Specific and for the SLF, intended as the primary East Coast landing site adjacent to (KSC), advanced in the early 1970s, with NASA announcing construction plans on April 14, 1972. Bids for the project were requested on December 10, 1973, leading to a award on March 18, 1974, to the Morrison-Knudsen Company for $21,812,737. Groundbreaking occurred on April 1, 1974, and the facility was completed and opened in 1976, receiving FAA certification as airport X-68, marking the end of a two-year build phase that aligned with the shuttle program's timeline for operational readiness. Engineering challenges centered on adapting the sandy, low-bearing terrain to support a high-performance capable of handling the orbiter's demanding landing profile, including high descent rates and weights up to 230,000 pounds. efforts involved excavating and using fill material from adjacent KSC areas, as initial plans for river borrow sources proved unfeasible due to environmental and logistical constraints. The core feature, a 15,000-foot-long by 300-foot-wide with 1,000-foot overruns at each end, featured high-friction paving—16 inches thick at the center tapering to 15 inches on the sides—to maximize braking , with approximately 8,000 miles of grooves incorporated for drainage and traction. with KSC's existing was achieved through a 9,150-foot tow-way connecting the SLF directly to the , enabling efficient orbiter transport for post-landing processing and refurbishment. Upon completion, the SLF's design viability was confirmed through NASA's (ALT) conducted in at , , where the prototype orbiter was released from a modified (SCA) for a series of captive, active, and free-flight trials, including five unpowered landings that validated the shuttle's low-speed handling and runway performance characteristics. These tests, spanning to , demonstrated the orbiter's ability to execute precise approaches and touchdowns on dry lakebed and concrete surfaces engineered to replicate the SLF's specifications, paving the way for operational shuttle missions. The SLF itself underwent initial ground-based validations in 1976, ensuring compatibility with shuttle recovery procedures before its first operational use in 1984.

Space Shuttle Operations

The Shuttle Landing Facility (SLF) at NASA's served as the primary landing site for the , accommodating a majority of the orbiter's post-mission touchdowns during its 30-year operational history from to 2011. Designed specifically to handle the unique demands of unpowered glider-like reentries, the SLF enabled efficient turnaround times between landings and subsequent launches, supporting the program's concept. Its 15,000-foot provided the necessary length and surface characteristics for safe deceleration of the approximately 100-ton orbiter at speeds up to 214 . Between 1984 and 2011, the SLF hosted 78 landings out of the program's total 135 missions, representing approximately 58% of all shuttle flights. The facility's role extended to contingency planning for Return to Launch Site (RTLS) aborts, where the orbiter would circle back to after an early ascent anomaly; although no actual RTLS landings occurred, the SLF was perpetually readied for such scenarios to ensure rapid response capabilities. The first shuttle landing at the SLF took place on February 11, 1984, when concluded the mission after eight days in orbit, marking the facility's debut in operational use. This event validated the SLF's design following initial test flights that had primarily utilized in . The final landing occurred on July 21, 2011, as touched down at 5:57 a.m. EDT to complete , the 133rd shuttle flight and the program's concluding mission. To address wear issues encountered during early operations, the SLF's underwent targeted modifications focused on reducing to the orbiter's s and . In 1988, following observations of excessive tire abrasion from the 's grooved surface, resurfaced sections at each end of the and ground and re-grooved the full length to enhance traction while minimizing wear. Further refinements came in 1994, when the entire surface was abraded to a smoother , significantly lowering tire degradation rates and improving overall safety. These adaptations were critical, as s—made of specialized heat-resistant rubber—frequently sustained from the high-speed rollout, sometimes requiring after just one use. The SLF also supported night s, with 20 such operations conducted there, including Atlantis's final pre-dawn . The facility's operational significance was underscored by its role in emergency preparedness and post-accident safety enhancements. For instance, during in 1985, which experienced a main engine shutdown leading to an Abort to Orbit, the SLF was part of broader contingency planning alongside transatlantic abort sites, ensuring coordinated global readiness for potential diversions. The on January 28, 1986, which destroyed the orbiter shortly after launch, prompted a 32-month program hiatus and sweeping reforms upon return to flight with in 1988; these included upgraded landing gear braking systems, improved drag chute deployment, and enhanced facility inspection protocols at sites like the SLF to mitigate ascent and descent risks. Similarly, the accident on February 1, 2003, which resulted from thermal protection system damage during reentry, led to another suspension and the implementation of rigorous pre-landing inspections, reinforced structural modifications, and better integration of ground support at the SLF for the 2005 return-to-flight mission STS-114. These reviews elevated the SLF's status from a mere to a key component of the shuttle's layered architecture, emphasizing and rapid anomaly response.

Post-Shuttle Usage

Military and Experimental Programs

Following the retirement of the Space Shuttle program in 2011, the Shuttle Landing Facility (SLF) at NASA's Kennedy Space Center became a key site for military and experimental aerospace testing, particularly for autonomous and vertical landing technologies critical to next-generation spacecraft. The U.S. Air Force's Boeing X-37B Orbital Test Vehicle (OTV) program utilized the SLF for multiple de-orbit and landing operations through OTV-6, leveraging the runway's length and precision approach capabilities to validate reusable spaceplane technologies. The X-37B, an unmanned, autonomous spacecraft designed for long-duration orbital missions, first landed at the SLF on May 7, 2017, at the conclusion of OTV-4 after 718 days in orbit, marking the vehicle's inaugural touchdown on Runway 15 and demonstrating autopilot precision landing systems originally developed for the Space Shuttle. Subsequent X-37B missions employed the SLF for recovery through OTV-6, including OTV-5 on October 27, 2019, after 780 days aloft, and on November 12, 2022, following a record 908-day mission that tested generation and experiments. , launched December 28, 2023, concluded with a landing at on March 7, 2025, after 434 days, including tests of advanced orbital maneuvers. These landings, often on Runway 33 at the SLF, highlighted the facility's role in supporting classified military objectives, such as radiation effects on materials and novel concepts, with the X-37B's autonomous guidance enabling high-fidelity approaches comparable to those used in shuttle-era operations. The program's ongoing includes the OTV-8 mission (USSF-36), launched on August 21, 2025, via from , which incorporates experiments in laser communications and quantum ; its landing site remains undetermined as of November 2025. NASA's , an experimental program for lunar and planetary landers, conducted extensive testing at the SLF from 2012 to 2014 to develop green propellant technologies and hazard avoidance systems. A significant early setback occurred on August 9, 2012, during a tethered hover test when the 1.5A prototype experienced an failure, causing it to tip over, crash, and explode due to ignition, though no injuries resulted and lessons informed vehicle redesign. Subsequent free-flight tests, including successful hovers and translations in February, April, and December 2014, validated the SLF's expansive landing zone for operations, achieving altitudes over 800 feet and durations up to 97 seconds while integrating the Autonomous Landing and Hazard Avoidance Technology sensor suite for safe touchdown on unprepared surfaces. The SLF has also supported planning for other advanced programs, including the Defense Advanced Research Projects Agency's (DARPA) XS-1 experimental spaceplane, selected for development by in 2017 with intended basing at for vertical launches and horizontal landings on the SLF to demonstrate rapid reusability for deployment. Although the XS-1 program did not advance to , the facility's infrastructure, including agreements for use of adjacent Orbiter Processing Facilities starting in 2014, enabled processing and integration support for classified initiatives, underscoring the SLF's adaptability for hypersonic and cryogenic-compatible experimentation in the post-shuttle era.

Commercial Applications

The Shuttle Landing Facility has emerged as a key asset for and -related activities, leveraging its expansive 15,000-foot and secure to support high-performance testing and innovative flights. Managed by Space Florida under a long-term from , the facility attracts commercial operators seeking a controlled for record attempts and experiential tourism, distinct from its original governmental purposes. In the realm of records, the has hosted several landmark speed and endurance achievements. In January 2021, conducted runs with its hypercar at the Shuttle Landing Facility, achieving a verified two-way speed of 282.9 (455.3 km/h), which briefly claimed the title of the world's fastest production car. Earlier, in October 2012, Performance Power Racing's modified 2006 set a standing-mile record of 283.232 on the same , demonstrating the facility's suitability for automotive high-speed validation. Additionally, in 2019, a Gulfstream G650ER completed a pole-to-pole of , departing and landing at the facility after 46 hours, 39 minutes, and 38 seconds, shattering the prior record for any aircraft by over an hour. The facility also plays a pivotal role in commercial space tourism and related operations, providing infrastructure for parabolic flights and specialized landings. Since 2004, Zero Gravity Corporation has utilized the Shuttle Landing Facility for takeoff and landing of its modified aircraft, conducting parabolic arcs to simulate microgravity for paying passengers and researchers, with agreements allowing up to 280 flights annually. In February 2006, adventurer piloted the from the facility on a record-breaking nonstop, non-refueled solo flight around the world, covering 25,766 miles in 67 hours before returning to the same runway. The site has further supported motorsport testing, as seen in 2010 when employed the runway for vehicle development and straight-line performance evaluations. More recently, in September 2024, the European Space Agency's spacecraft was transported via to the Shuttle Landing Facility ahead of its October launch on a , underscoring the venue's ongoing utility for commercial space logistics. Through Space Florida's leasing model, the facility has fostered significant economic contributions to Florida's sector, enabling a diverse array of private operations that generate revenue via rentals, services, and testing fees. This commercialization has supported over 100 annual activities by 2025, including aviation trials and preparations, bolstering the state's $6.8 billion project pipeline in commerce as of late 2024.

Environmental and Future Considerations

Wildlife and Safety Management

The Shuttle Landing Facility (SLF), located at the in , faces significant wildlife challenges due to its proximity to wetlands and the . The runway is locally nicknamed the "gator tanning facility" because alligators frequently bask on the warm concrete surface, with personnel historically tasked with clearing them to prevent hazards during operations. Bird activity poses the primary aviation risk, with species such as tree swallows, cattle egrets, and vultures drawn to the area; between 1983 and 1992, the SLF recorded an average of 6.4 bird strikes per year during aircraft operations. To mitigate these threats, the facility implements a comprehensive Wildlife Hazard Management Plan, including runway inspections and patrols to detect and disperse . strikes are addressed through non-lethal methods such as , including strategically placed cannons that emit loud blasts to deter flocks, a practice in use since the facility's early operations in the 1970s. was evaluated as a potential supplementary technique in the mid-1990s, involving trained raptors like peregrine falcons to scare away target species, but was not implemented due to operational costs. management around the , such as , further reduces attractants for . As an FAA-certified with the ICAO identifier KTTS, the SLF maintains rigorous safety protocols, including continuous and surveillance to monitor for both and intrusions. Emergency response capabilities feature on-site fire and rescue teams from , capable of addressing runway incursions or post-landing incidents within minutes. The facility also incorporates vehicle arrestor systems at runway ends to halt overruns safely, enhancing ground operations security. Wildlife incidents at the SLF have been rare but influential in evolution; for instance, bird strikes during 1990s approaches, including potential ingestions into orbiter systems, prompted intensified deterrence measures like expanded pyrotechnic deployment and regular staff on identification and response. Annual programs for facility personnel emphasize proactive , ensuring compliance with federal aviation standards and minimizing risks for ongoing commercial and experimental activities.

Environmental Issues and Prospects

The Shuttle Landing Facility (SLF) has faced environmental challenges related to (PFAS) contamination, primarily identified in Solid Waste Management Unit (SWMU) Group 114. A 2025 NASA site assessment progress report detailed PFAS presence in soil, groundwater, and around key areas, including #2 and former plants adjacent to the SLF . These contaminants, historically linked to firefighting foams and industrial activities at , exceed screening levels in several samples, prompting action to mitigate risks to local ecosystems and . Remediation planning for SWMU Group 114 was initiated in 2024 following the assessment, with a path forward presented to the KSC Remediation Team in August 2024. The initiative includes quarterly sampling at monitoring wells installed during the 2022–2024 investigation period, with initial treatment applications such as in-situ planned for high-impact zones near the former sewage sites. These measures align with broader protocols under the , aiming to prevent migration into nearby wetlands while ensuring compliance with Department of Environmental Protection standards. In parallel, and Space Florida have advanced sustainability initiatives to promote eco-friendly operations at the SLF, emphasizing reduced use of hazardous chemicals in since 2020. Space Florida's management of the facility under the 2015 lease agreement further supports these goals by prioritizing low-impact upgrades, such as water-efficient for surrounding vegetation to minimize runoff. Looking ahead, the SLF holds prospects for expanded roles in commercial space activities, particularly through potential integration with SpaceX's program for landing operations at . The Federal Aviation Administration's environmental review process, including the Draft released on August 4, 2025, and public meetings, evaluates up to 44 annual Starship landings, with public comments closing on September 29, 2025, and a final Record of Decision expected later in 2025 to assess impacts on air quality, noise, and habitat. This builds on the 2015 NASA-Space Florida lease, which enables facility enhancements for reusable , positioning the SLF as a key asset for sustainable, high-volume commercial recoveries while incorporating adaptive environmental safeguards.

References

  1. [1]
    Shuttle Landing Facility - KSC Partnerships - NASA
    Kennedy Space Center's historic Shuttle Landing Facility (SLF), the site of one of the longest runways in the world, is available for use by external customers.
  2. [2]
    Shuttle Landing Facility History | Federal Aviation Administration
    Dec 14, 2023 · The Shuttle Landing Facility ( SLF ) encompasses approximately 4,432 acres of National Aeronautics and Space Administration ( NASA ) Kennedy ...
  3. [3]
    None
    ### Summary of the History of the Shuttle Landing Facility (SLF) at Kennedy Space Center
  4. [4]
    [PDF] Landing the Space Shuttle Orbiter - As the processing and launch ...
    But landing the orbiter at KSC's Shuttle Landing Facility is preferred because it saves about five days of processing time for its next mission. A KSC landing ...
  5. [5]
    Launch and Landing Facility (LLF) - Space Florida
    Space Florida's LLF boasts one of the longest runways in the world at 15,000 feet. Under a 30-year agreement with NASA, Space Florida manages this facility, ...
  6. [6]
    Shuttle Landing Facility | Federal Aviation Administration
    Jan 15, 2021 · In June 2015, Kennedy Space Center transferred the management, development, and operation of the SLF to Space Florida. Space Florida is the ...Missing: lease | Show results with:lease
  7. [7]
    KTTS - Space Florida Launch and Landing Facility Airport - AirNav
    Location ; Lat/Long: 28-36-53.6030N 080-41-39.7280W · 28-36.893383N 080-41.662133W · 28.6148897,-80.6943689 (estimated) ; Elevation: 8.5 ft. / 2.6 m (surveyed).Missing: coordinates | Show results with:coordinates
  8. [8]
    NASA Signs Agreement with Space Florida to Operate Historic ...
    A 30-year property agreement for the operations and management of the facility, located at Kennedy, has been signed by NASA and Space Florida, ...
  9. [9]
    [PDF] LANDING THE SPACE SHUTTLE ORBITER AT KSC - NASA.gov
    KSC's Shuttle Landing Facility (SLF), first opened for flights in 1976, was specially designed for returning Space. Shuttle orbiters. The SLF is located ...
  10. [10]
    History of the Shuttle Landing Facility at Kennedy Space Center
    When NASA built a new revolutionary spacecraft, the design chosen was a delta-winged orbiter that would liftoff from existing launch pads and land like an ...
  11. [11]
    [PDF] Texture Modification of the Shuttle Landing Facility Runway at ...
    The 20-knot crosswind specification was to provide the STS program with the flexibility to launch and land without frequent weather delays. The unique. Orbiter ...
  12. [12]
    [PDF] KENNEDY SPACE CENTER – APOLLO TO MULTI-USER ...
    Oct 19, 2017 · The SLF is operated as a full airport with an air traffic control tower and support buildings on-site, including a fire station, and a 50,000- ...
  13. [13]
    [PDF] Delta ready for Dawn launch at Cape - NASA.gov
    Aug 22, 2025 · DRYDEN IS the only center, other than Kennedy, permanently equipped to support many shuttle landing operations. ... weigh 6.1 million pounds ...Missing: 1000000 | Show results with:1000000
  14. [14]
    Fuel farm coming to Kennedy Space Center's former shuttle runway
    Mar 15, 2018 · A $500,000 fuel farm aims to drive more air traffic to Kennedy Space Center's former space shuttle runway, now managed by the state.Missing: storage | Show results with:storage
  15. [15]
    [PDF] Request for Proposals For Shuttle Landing Facility Commercial ...
    Jul 10, 2025 · In addition, fuel supplier must have the capability to provide temporary on-site fuel storage via re-fueling trucks from time-to-time as ...
  16. [16]
    [PDF] A Review of Falconry as a Bird Control Technique with ...
    Falconry has been proposed as a method of reducing the bird/aircraft strike hazard, in addition to current bird control techniques, at the Shuttle Landing ...
  17. [17]
    Space Shuttle Approach and Landing Tests (ALT) - NASA
    Feb 7, 2013 · During the nearly one-year-long series of tests, Enterprise was taken aloft on the SCA to study the aerodynamics of the mated vehicles and, in a ...
  18. [18]
    Space Shuttle Enterprise Makes its First Cross-Country Trip - NASA
    Mar 9, 2023 · The Approach and Landing Test (ALT) program conducted in 1977 at NASA's Dryden (now Armstrong) Flight Research Center at Edwards Air Force Base ...
  19. [19]
    [PDF] Space Shuttle Era Facts - NASA
    55 – 747 Shuttle Carrier Aircraft ferry flights to Kennedy's Shuttle. Landing Facility (SLF). 77 – Shuttle landings at the SLF. 81 – Launches from Kennedy's ...
  20. [20]
    The Space Shuttle - NASA
    Unlike earlier expendable rockets, the Shuttle was designed to be launched over and over again and would serve as a system for ferrying payloads and personnel ...
  21. [21]
    First Shuttle Landing at Kennedy - NASA
    May 27, 2022 · The historic first landing at Kennedy brought to a conclusion the eight-day STS 41-B mission. Shortly after sunrise, space shuttle Challenger ...
  22. [22]
    10 Years Ago: STS-135, the Space Shuttle's Grand Finale - NASA
    Jul 8, 2021 · Ferguson brought Atlantis to a smooth night landing at KSC, ending the 12-day 18-hour 28-minute STS-135 mission and closing out the 30-year ...
  23. [23]
    Atlantis arrives home to Kennedy - An emotional finale for Shuttle
    Jul 21, 2011 · Marking the 78th Kennedy Space Center landing, Atlantis landed in the pre-dawn hours to conduct the 25th night landing of the Shuttle Program.
  24. [24]
    Spaceflight mission report: STS-51F - Spacefacts
    Jun 23, 2023 · - Trans-Atlantic abort landing (TAL) - loss of two main engines midway through powered flight, forcing a landing at an airport in Europe or ...
  25. [25]
    [PDF] Changes in Shuttle Post Challenger and Columbia
    Orbiter implemented 76 major redesigns, including robust improvements in Landing Gear Braking system, Drag Chute,. Crew Escape Pole, and 17 Inch Disconnect ...
  26. [26]
    X-37B spaceplane returns to Earth and makes autopilot landing in ...
    May 7, 2017 · But today marked the first X-37B landing at the Kennedy Space Center and used the same Shuttle Landing Facility runway as NASA's manned orbiters ...
  27. [27]
    X-37B breaks record, lands after 780 days in orbit - AF.mil
    Mission 4 landed after 718 days in orbit.Missing: Boeing | Show results with:Boeing
  28. [28]
    X-37B orbital test vehicle concludes sixth successful mission
    Nov 12, 2022 · The X-37B Orbital Test Vehicle-6 (OTV-6), the US Space Force's unmanned, reusable spaceplane, successfully deorbited and landed at NASA's Kennedy Space Center ...Missing: Boeing | Show results with:Boeing
  29. [29]
    X-37B launches USSF-36 mission aboard Falcon 9
    Aug 21, 2025 · Vehicle 1, the first X-37B to fly, launched atop a SpaceX Falcon 9 from the Kennedy Space Center's Launch Complex 39A on Thursday, Aug. 21, at ...
  30. [30]
    SpaceX launches Space Force's X-37B spaceplane to demo laser ...
    Aug 22, 2025 · A SpaceX Falcon 9 rocket streaks away from Launch Complex 39A at NASA's Kennedy Space Center to begin the USSF-36 mission with the X-37B ...
  31. [31]
    NASA's Morpheus Lander Prototype Crashes and Explodes - Space
    An experimental, "green" NASA lander crashed during its first free-flight test today (Aug. 9), erupting in a ball of flame when it hit the ground.
  32. [32]
    Project Morpheus successfully conducts free flight 7
    Feb 10, 2014 · Project Morpheus – an experimental lander project – has enjoyed a successful free flight at its test range at the end of the Shuttle Landing ...
  33. [33]
    Morpheus Completes Free Flight Test - YouTube
    Apr 24, 2014 · A free-flight test of the Morpheus prototype lander was conducted April 24 at the Shuttle Landing Facility at NASA's Kennedy Space Center in ...
  34. [34]
    Boeing, DARPA to base XS-1 spaceplane at Cape Canaveral
    Jun 13, 2017 · The spacecraft booster would return to land at one of two runways on Florida's Space Coast: Kennedy Space Center's Shuttle Landing Facility, a ...
  35. [35]
    NASA Partners with X-37B Program for Use of Former Space Shuttle ...
    Oct 8, 2014 · NASA's Kennedy Space Center in Florida has entered into an agreement with the US Air Force's X-37B Program for use of the center's Orbiter Processing Facility ...
  36. [36]
    SSC Tuatara Hits 282.9 MPH In New Top Speed Run To Prove ...
    Jan 27, 2021 · To qualify for a record-breaking attempt, the Tuatara did two runs in opposite directions. It managed to reach 279.7 mph (450.1 km/h) northbound ...<|separator|>
  37. [37]
    Performance Power Racing Ford GT Sets 283 MPH Standing Mile ...
    Oct 29, 2012 · Bohmer launched his Ford GT into the history books, achieving a standing mile speed of 283.232 miles per hour.
  38. [38]
    Qatar Executive Breaks the World Circumnavigation Speed Record ...
    Jul 11, 2019 · The QE Gulfstream G650ER departed Cape Canaveral, the home of NASA, on Tuesday 9 July at 9.32am to begin its pole to pole mission. The One More ...
  39. [39]
    Competition Coming for Zero Gravity Corp. - SpaceNews
    Mar 14, 2014 · Since 2004, Zero Gravity has been operating a Boeing 727 that flies parabolic arcs to simulate weightlessness, similar to NASA's now-retired KC- ...Missing: Corporation | Show results with:Corporation
  40. [40]
    NASA Facility Serves as Launch Site for Record-Setting Flight
    Dec 17, 2005 · 6, 2006. “We're thrilled that Steve Fossett and Virgin Atlantic selected the Shuttle Landing Facility as the take-off point for this world ...
  41. [41]
    Runway to Racetrack - NASA Hosts NASCAR Team - YouTube
    Jul 9, 2010 · NASCAR's Joe Gibbs Racing team used the Shuttle Landing Facility at NASA's Kennedy Space Center as a testing ground to try out designs for ...
  42. [42]
    Antonov Airlines transports ESA's 'Hera' spacecraft to the US
    |5 Nov 2024 5:36 AM. Antonov Airlines ... has been safely delivered to NASA's shuttle launch and landing facility. Earlier this month the spacecraft was ...
  43. [43]
    Florida Setting the Standard for Aerospace Commerce in 2024 and ...
    Space Florida, the state's aerospace finance and development authority, closes out 2024 with a 187-project pipeline valued at $6.8 billion.
  44. [44]
    FRIDAY FLYING VIDEO: Shuttle Runway - Australian Flying
    Feb 8, 2018 · Despite the last Space Shuttle landing happening in 2011, the Shuttle Landing Facility ... SLF is nick-named the Gator Tanning Facility because ...
  45. [45]
    NASA tries to keep the hogs and 'gators off the shuttle's runway
    Oct 12, 1983 · Its windshield is triple strength, and unlike jet engines, the orbiter's rocket engines have no air intakes into which hapless birds might stray ...Missing: strikes | Show results with:strikes
  46. [46]
    [PDF] Programmatic Environmental Assessment for the Shuttle Landing ...
    Jan 12, 2021 · Management measures include inspecting runways for birds/wildlife, managing habitat near launch areas to discourage use by wildlife, use of air ...
  47. [47]
    What measures were taken to clear wildlife from the Shuttle Landing ...
    Sep 14, 2019 · For birds, NASA deployed its heavy weaponry - propane cannons. A series of 25 liquid propane cannons, placed in strategic locations along ...Missing: hazard | Show results with:hazard
  48. [48]
    [PDF] Ecological Impacts of the Space Shuttle Program at John F ...
    This report documents ecological effects of the Space Shuttle Program on regional ecosystems, including launch effects and concerns identified in NEPA.
  49. [49]
    Shuttle Landing Facility Area SWMU Group 114 PFAS Site ...
    Mar 28, 2025 · Fire Station #2 was constructed in 2008 and is currently active, housing fire station personnel and equipment, including aqueous film forming ...
  50. [50]
    Kennedy Space Center Sustainability - NASA
    May 20, 2024 · NASA's sustainability policy is to execute the agency's mission without compromising our planet's resources so that future generations can meet their needs.<|separator|>
  51. [51]
    SpaceX Starship-Super Heavy Project at Kennedy Space Center ...
    The FAA held two in-person public meetings on August 26, 2025, at Kennedy ... The in-person public meetings were held on June 12, 2024 and June 13,2024.
  52. [52]
    SpaceX plan for Starship launches from Florida sparks debate ...
    Sep 5, 2025 · A final "Record of Decision" is expected in Winter 2025, which will determine whether SpaceX receives the license to begin Starship launches ...