Mate-Demate Device

The Mate-Demate Device (MDD) is a specialized engineered for NASA's with a lifting capacity of up to 240,000 pounds to hoist orbiter spacecraft onto and off the backs of modified (SCAs) during transportation, post-flight servicing, and mating operations. Designed as a robust structure resembling a large , the MDD features two 100-foot towers supporting a horizontal arm at an 80-foot that extends 70 feet outward, enabling precise positioning over the SCA's . It incorporates three primary hoists, each with a 100,000-pound for a total lifting capability of 240,000 pounds, along with auxiliary service platforms and smaller 10,000-pound equipment hoists to facilitate maintenance tasks such as inspections, repairs, and payload bay access while the orbiter is elevated. These devices were critical for the program's , allowing orbiters to be ferried between landing sites, launch facilities, and modification centers without ground transport. Two primary MDDs were constructed to support operations across the . The first, located at NASA's (formerly Dryden) at in , was built in 1976 by the Company at a cost of $1.7 million and saw its initial use in 1977 during with the prototype orbiter . This facility handled post-landing processing for 54 missions that touched down at Edwards between 1981 and 2009, enabling efficient return flights to in . The second MDD, erected in 1978 at in , stood 105 feet tall and was first tested that October using a mockup named Pathfinder; it supported orbiter transport for launches, returns from Edwards, and final ferry flights after the program's retirement in 2011, with its last operation occurring on September 14, 2012, for Endeavour. Following the Space Shuttle program's conclusion, both MDDs were decommissioned and demolished in 2014: the Edwards structure from August to October using similar methods to its counterpart, while the facility was dismantled between October and November, yielding over 844,700 pounds of recyclable materials including steel beams severed by torches and toppled via . Throughout their service, these devices exemplified the engineering ingenuity required for the era, underscoring 's emphasis on modular transport and rapid turnaround for orbital missions.

Overview

Purpose and Function

The Mate-Demate Device (MDD) is a specialized designed exclusively for lifting Space Shuttle orbiters, with a capacity of up to 230,000 pounds, onto and off modified Boeing 747 Shuttle Carrier Aircraft (SCA). This equipment enabled the safe and precise handling of the orbiter during ground operations, ensuring structural integrity and accessibility for technicians. The primary functions of the MDD encompass post-landing servicing at remote sites away from the primary processing facilities, the orbiter to the for ferry flights between centers, and demating it to allow for ground processing and refurbishment prior to subsequent missions. These operations were essential for maintaining the shuttle program's efficiency, as the MDD provided the necessary stabilization and lifting mechanism to support the orbiter's weight without relying on conventional methods like rail or road, which were infeasible due to the vehicle's dimensions and mass. The MDD's role proved critical for orbiter mobility, particularly in supporting the 54 out of 135 missions that landed at , where weather or other factors precluded returns to . While initially employed during the non-orbital 1977 with the prototype , the device was used exclusively for operational flights beginning with in 1981, facilitating the recovery and transport of flight-qualified orbiters. This capability underpinned the SCA ferry flights that returned orbiters to launch sites for turnaround.

Historical Development

The Mate-Demate Device (MDD) was conceptualized in the mid-1970s as a critical component of the program's ground infrastructure, specifically to enable the mating and demating of orbiter vehicles with the modified (SCA) for ferry operations between landing sites and processing facilities. This development aligned with the program's early planning phases, including a 1974 between centers that outlined support for orbiter handling and transportation needs. Construction of the first MDD began at NASA's Dryden Flight Research Center (now ) at , , with design by Connell Associates Inc. of , and fabrication by the George A. Fuller Company of , . Completed in late 1976 at a cost of $1.7 million, it was operational in time for initial testing. A second MDD was erected at (KSC) in , with the contract awarded in the first quarter of 1977 and completion in June 1978. The Armstrong MDD saw its first use in 1977 during the Approach and Landing Tests with the prototype orbiter Enterprise, facilitating multiple hoist and SCA mating operations. At KSC, the device underwent its inaugural fit-check on October 19, 1978, using the Pathfinder mockup to verify compatibility with orbiter processing workflows. Full operational deployment occurred from 1981 through 2011, supporting all 135 Space Shuttle missions, including 54 post-landing dematings at Edwards. Following the program's retirement, both MDDs were demolished—the Edwards MDD beginning in August 2014 and completing in February 2015, and the KSC MDD from late October to early December 2014—to repurpose the sites. Significant adaptations arose after the 1986 Challenger disaster, which led to the cancellation of planned polar-orbit launches from Vandenberg Air Force Base and the abandonment of a proposed third MDD there, redirecting resources to existing facilities.

Design and Components

Structural Features

The Mate-Demate Device (MDD) features a robust steel gantry-like framework consisting of two 100-foot towers connected by a horizontal beam at the 80-foot level, which cantilevers 70 feet over the Shuttle Carrier Aircraft (SCA) to facilitate orbiter handling. This core structure provides the necessary stability to support loads up to 240,000 pounds, with the framework constructed from ASTM A36 steel for wide flange sections and ASTM A500 Grade B steel for tubular members, enabling it to withstand outdoor exposure at airfields, including hurricane-force winds up to 125 miles per hour and seismic conditions in Zone 4. Access platforms are integrated at multiple levels on each tower—20, 40, 60, and 80 feet—to support technician work during operations. The platforms at the 60-foot level are particularly versatile, featuring two power-operated access/service units per side that lower via telescoping steel tubes for precise positioning approximately 16 feet above ground, with vertical adjustment speeds of 5 feet per minute and tilt capabilities from -5° to +10° to accommodate servicing needs. Each tower is equipped with two auxiliary equipment hoists, each rated at 10,000 pounds capacity and capable of reaching up to the 60-foot level, for transporting tools and parts during maintenance. These hoists complement the primary lifting systems without overlapping their operational roles. While the overall design remains consistent across installations, minor variations exist in load capacities due to site-specific requirements; for instance, the MDD supports 230,000 pounds, slightly less than the 240,000-pound rating at the .

Lifting Systems

The lifting systems of the Mate-Demate Device (MDD) primarily consist of three electric hoists, each rated at pounds (50 tons) capacity, providing a total lifting capability of 240,000 pounds. These hoists are mounted on the 80-foot horizontal structure spanning the MDD towers, with hoist machines located at the base and deflector sheaves positioned at 80 feet and 100 feet to facilitate vertical movement up to 90 feet. The system uses 1-1/8-inch with a 56.5-ton breaking strength, operating at low speeds of 1 foot per minute or 3 feet per minute to minimize sway during lifts. The hoists connect to custom fore and aft lifting slings that attach to designated lift points on the orbiter, cradling the fuselage and supporting the wings for balanced elevation and stability. These slings, often featuring a distinctive yellow configuration, ensure even load distribution across the orbiter's structure during hoisting. For precise positioning, hydraulic Hydra-Set units with 50-ton capacity enable adjustments in 0.001-inch increments, allowing alignment with the Shuttle Carrier Aircraft (SCA) fuselage while integrating with the fixed structural architecture for guided motion. Safety redundancies in the lifting systems include spring-set brakes on each hoist, supplemented by at least two brakes per system, along with emergency stop buttons at two observer control stations that trip circuit breakers. Load positioning is monitored via the Hydra-Set units, and operations incorporate a wind restraint system limiting lifts to winds up to 12 knots (approximately 14 mph), with the structure secured via tie-downs for gusts up to 40 knots. The overall capacity is engineered with margins to accommodate the orbiter's dry weight of around 172,000 pounds plus contingencies for equipment and minor fuel loads, ensuring reliable performance without exceeding design limits.

Installations and Locations

Kennedy Space Center

The Mate-Demate Device (MDD) at was constructed at the in to facilitate East Coast orbiter processing and mating operations with the (SCA). The contract for its construction was awarded in the first quarter of 1977 and the structure was completed in June 1978. Equipped with a lift capacity of 230,000 pounds, the MDD featured two 100-foot towers connected by a horizontal structure that guided a lift beam for raising and lowering the orbiter. Its design supported most ferry flights associated with missions launched from , enabling efficient transfer of orbiters arriving via . The facility's first operational test occurred on October 19, 1978, when the orbiter mockup was attached to an SCA for fit-checks and ground crew training. Throughout the , the MDD handled demating and mating for incoming and outgoing ferry operations, including post-landing transfers from other sites and orbiter relocations. Its location at the northeast corner of the ramp, in close proximity to the , facilitated seamless integration into overall processing workflows at the center. Following the Space Shuttle program's retirement in 2011, the MDD was dismantled starting in October 2014 and completed on , 2014, to repurpose the site for emerging space activities. This demolition was part of broader efforts to reconfigure infrastructure for new launch providers and payloads.

Armstrong Flight Research Center

The Mate-Demate Device (MDD) at , located at in , was constructed to support operations following landings on the dry lake beds of the base. Completed in late 1976 at a cost of $1.7 million (equivalent to approximately $9.39 million in 2024 dollars), the facility was designed by Connell Associates Inc. and built by the . The MDD featured a gantry-like steel structure with two 100-foot towers supporting a horizontal beam at the 80-foot level, capable of lifting up to 240,000 pounds using three primary hoists, each rated at 100,000 pounds. It included access platforms at multiple levels (20, 40, 60, and 80 feet) and auxiliary hoists for equipment up to 10,000 pounds per tower. Integrated adjacent to the MDD was a 25,000-square-foot hangar, completed in early 1976 at a cost of $3.7 million and constructed by Engineers Inc., which provided enclosed storage and servicing space for the orbiter during mate-demate operations. Operationally, the MDD saw its first use in 1977 during with the prototype orbiter , hoisting it onto the for ferry flights. Over its service life, it supported post-landing de-servicing for 54 missions that touched down at Edwards between 1981 and 2009, including mating the orbiters to the for return transport to . The facility's design accommodated the arid desert environment of Edwards, with robust steel construction to withstand dust, temperature extremes, and wind, enabling efficient processing after landings on the expansive beds. In 2014, following the end of the , the MDD was dismantled by Pantano Demolition of , under a $178,700 contract (equivalent to approximately $236,424 in 2024 dollars) to clear the site for future aeronautics research and testing facilities. The demolition process, which spanned nearly three months from to , removed for , marking the end of its role in shuttle recovery operations.

Vandenberg Air Force Base Variant

The Vandenberg Air Force Base variant of the Mate-Demate Device (MDD) was developed as part of the U.S. Air Force's extension of the to support launches from Space Launch Complex 6 (SLC-6) at Vandenberg, . Intended to enable efficient processing and integration of the orbiter with its external tank and solid rocket boosters, as well as mating and demating with the for ferry operations, the facility addressed the unique logistical needs of West Coast launches, including extended tow routes across rugged terrain and integration with existing airfield infrastructure. Construction of the MDD began in January 1979, with the core mate/demate facility—a steel-frame measuring 203 feet by 348 feet by 101 feet high—targeted for completion by February 1982 at an estimated cost of $11.8 million as of 1983. A key feature of the Vandenberg MDD was its redesigned Orbiter Lifting Frame, an updated hoisting mechanism optimized for cost reduction while maintaining a 250,000-pound lift capacity, similar to the and units but adapted for the site's environmental constraints, such as crossing seasonal streambeds and archaeological sites via existing bridges and minimal grading. The facility included specialized support areas, such as a 204-foot by 160-foot by 18-foot annex for orbiter maintenance, and was positioned near the main runway to facilitate towing to SLC-6 over a dedicated route that avoided most sensitive habitats. Additional infrastructure, like the External Tank landing pier at Point Arguello (involving dredging and a 100-foot by 100-foot rip-rap structure at $8.8 million), complemented the MDD by enabling sea-based tank delivery and transport along a 6,000-foot tow path with cliff cuts for access. These elements minimized environmental impacts, affecting only about 10 acres of wetlands (0.2% of Vandenberg's total) through mitigation measures like archaeological . In November 1984, was ferried to Vandenberg atop 905 for a fit-check and operational testing of the MDD, marking the only full-scale orbiter use of the facility and validating its compatibility with shuttle ferry procedures. The skeletal gantry structure successfully demonstrated the lifting process, confirming the site's readiness for SCA operations despite ongoing program preparations. However, following on January 28, 1986, the halted construction and placed the site in standby mode; the shuttle program at Vandenberg was officially terminated on December 26, 1989, after approximately $4 billion in investments, with the MDD and related facilities never supporting an operational launch. The infrastructure was later repurposed for unmanned rockets, including and planned missions.

Operations and Usage

Mating and Demating Procedures

The mating procedure begins with preparation of the orbiter, which is towed into position beneath the Mate-Demate Device (MDD) using a ground tug and aligned precisely for lifting. Technicians then attach fore and aft lifting slings to the orbiter's designated hardpoints, retract the and doors, and connect necessary ground support lines such as hydraulic, cooling, and electrical systems. A tail cone is installed over the orbiter's base at eight points to protect it during transport, a process that typically requires 2-3 shifts. Once prepared, the lifting sequence commences with three synchronized hoists—two at the aft section and one forward—raising the orbiter to the 80-foot mate-ready position at a controlled speed of 1 to 3 feet per minute. The (SCA) is then towed and aligned beneath the elevated orbiter. Technicians lower the orbiter using the hoists with Hydra-Set precision controls allowing adjustments in 0.001-inch increments, enabling secure attachment to the SCA's dorsal mount at two aft and one forward points using pins and struts, similar to external tank mating interfaces. The slings are removed after connection, completing the mating, which typically takes about 12 hours overall. Demating follows a reverse sequence, starting with the mated orbiter-SCA combination towed into the MDD after a or flight. Technicians disconnect the attachment points, reattach the slings to the hardpoints, and raise the orbiter slightly to clear the SCA before lowering it to the ground or an orbiter lifting fixture at the same controlled speed. The tail cone is removed post-lowering, and the orbiter is prepared for further processing or transport; this process typically requires about 16 hours. Safety protocols are integral throughout, including pre-operation structural inspections of the MDD, orbiter, and , as well as weather assessments to ensure winds remain below operational limits. The MDD's wind restraint system maintains alignment within ±6 inches during lifting in winds up to 12 knots (approximately 14 mph), while a safety tie-down system using 8.5-ton springs and 28-ton ratchets secures the orbiter in gusts up to 40 knots (approximately 46 mph). Dual observer control stations with emergency stop buttons and personnel hoists for SCAPE-suited workers ensure coordinated, fail-safe operations. Demating operations following an orbiter landing are generally expedited compared to mating for ferry flights, as they omit tail cone installation and focus on rapid post-flight servicing.

Notable Missions and Events

The Mate-Demate Device (MDD) at NASA's (formerly Dryden) was first employed in 1977 during the (ALT) program for the prototype orbiter , where it facilitated multiple mate-demate operations with the to support captive and free-flight tests. Similarly, the MDD at underwent its inaugural use on October 19, 1978, when the Pathfinder mock-up orbiter was attached to the for fit-checks, ground crew training, and post-landing simulations to validate processing facilities. A notable early operational highlight occurred during in 1982, when , the only orbiter to land at due to adverse weather at primary sites, was subsequently mated to a using a mobile sling variant of the MDD system for ferry back to . The MDD at Armstrong supported processing for 54 shuttle missions that touched down at across the program, including classified missions such as aboard in 1990, where post-landing demating enabled safe return of the orbiter via ferry flight. Following the 1986 Challenger accident and the program's 32-month hiatus, MDD usage intensified for ferries during the 1988 return-to-flight phase, with increased operations to transport orbiters between facilities for modifications and relaunches; for instance, underwent MDD in 1991 prior to a ferry flight as part of post-return preparations. In the retirement era, the MDD performed its final operational demates in 2011 as the shuttle program concluded with STS-135, after which the devices supported museum transports, including the 2012 mating of Discovery at Kennedy Space Center for its flight to the Smithsonian National Air and Space Museum and Endeavour's subsequent ferry to the California Science Center using combined MDD and mobile sling configurations. Rare events included the MDD's role in Enterprise's 1980s display relocations, where the mobile sling variant enabled multiple transports to air shows and expositions without full SCA mating.

Orbiter Lifting Fixture

The Orbiter Lifting Fixture (OLF), also referred to as the orbiter , is a specialized cradle-like lifting apparatus designed for handling orbiters during ground-based assembly and intra-facility transport at 's (KSC). It serves as a key component in the vertical positioning and mating processes within the (VAB), enabling safe elevation and rotation of the orbiter without the need for full gantry structures. Unlike more complex systems, the OLF is portable or semi-fixed, attaching directly to the orbiter to distribute loads evenly during lifts conducted by the VAB's overhead cranes. The OLF consists of a robust framework engineered to support the orbiter's structure, including attachment points on the forward and carry-through areas to ensure balanced lifting. Integrated with the VAB's 250-ton and 175-ton bridge cranes, it has a load of approximately 150,000 to 200,000 pounds, sufficient for the orbiter's dry mass while providing margin for operational safety. This design emphasizes simplicity and precision, with features like strain monitoring systems—such as laser-based tools developed by KSC's —to detect shear forces in real time and prevent structural stress during operations. The fixture's lighter profile compared to dedicated systems allows for efficient setup in the VAB's transfer aisle. In primary applications at KSC, the OLF facilitates the rollover of the orbiter from the (OPF) to the on a 76-wheel transporter, followed by attachment of the and elevation to a vertical using the overhead cranes. Once vertical, the orbiter is hoisted several hundred feet and maneuvered over the pre-stacked (ET) and Solid Rocket Boosters (SRBs) on the (MLP) for precise mating in High Bays 1 or 3. It also supports horizontal transport within processing facilities, such as repositioning during pre-mating inspections, but is not utilized for (SCA) integration. These operations typically occur over several days, with the sling remaining attached until hard mate to the stack is complete. Developed in the 1970s as part of modifications to support the , the OLF was introduced around 1976 alongside upgrades to the building's infrastructure, including the installation of extensible workstands by the Frank Briscoe Company in 1977. It was first employed in operational stacking sequences by 1981, as seen in the processing of orbiter , and remained in use through the program's final mission in 2011. Following the 's retirement, surplus OLF components and related lifting equipment were repurposed for NASA's (SLS) assembly operations or decommissioned as part of facility transitions. Distinct from the Mate-Demate Device (MDD), the OLF operates solely at ground level within enclosed facilities like the , relying on existing overhead cranes rather than integrated high-elevation hoists or access platforms. While the MDD focuses on aircraft integration and elevated servicing for SCA mating at the , the OLF prioritizes precise assembly tasks, such as orbiter-to-stack alignment, without provisions for prolonged worker access during lifts. A variant of the OLF was briefly tested at Vandenberg Air Force Base in 1983 but relocated for other uses.

Mobile Sling

The Mobile Sling is a lightweight, transportable lifting system designed specifically for hoisting orbiters in locations lacking fixed Mate-Demate Devices (MDD), utilizing a combination of and cables, harnesses, and hoists compatible with standard cranes. This setup allows for temporary, ad-hoc operations outside dedicated facilities, with harness points secured to the orbiter's wings and for balanced support during lifts. While often associated with fixed MDD installations, a mobile variant was developed as a measure to the primary MDD , enabling rapid deployment for emergency recoveries or remote transports, though its use required precise coordination to mitigate risks associated with improvised setups. With a lifting capacity of up to 240,000 pounds—provided by three independent hoists each rated at 100,000 pounds—the Mobile Sling was engineered for the orbiter's approximate empty weight of around 230,000 pounds, ensuring safe elevation without permanent fixtures. The system's steel-framed components and synthetic cables were selected for durability and flexibility, allowing disassembly and transport via truck for quick assembly at sites like remote landing strips. Post-Shuttle program, the equipment has been preserved in storage at , reflecting its critical role in the fleet's logistics. Historically, the Mobile Sling originated in the late 1970s as a backup to fixed MDDs, with initial testing during the Enterprise Approach and Landing Tests at Dryden Flight Research Center, though full operational development occurred in the early 1980s to support preparations at Vandenberg Base. It was used extensively for post-landing processing at Dryden for 54 missions (1981-2009) and other ferry operations, though mobile deployments outside fixed facilities were less common and occurred in non-standard scenarios where orbiter relocation demanded on-site improvisation. One notable use was during in March 1982, when , diverted to land at due to weather, was recovered using Army-provided cranes to elevate and position it for mating to the for ferry back to . These operations underscored the system's versatility but also highlighted operational challenges, as assembly and load balancing often extended timelines by hours compared to MDD procedures. While effective for mobility in austere environments, the Mobile Sling carried higher risks of misalignment or wind-induced sway, necessitating specialized training and weather constraints not required at fixed sites.

References

  1. [1]
    [PDF] Space Shuttle Mate-Demate Device (MDD) | NASA
    The MDD is a large gantry-like structure used to hoist space shuttles during post-landing servicing and mating/de-mating with the 747. It has two 100-foot ...
  2. [2]
    NASA gantry used to lift space shuttles off jumbo jets demolished in ...
    Feb 5, 2015 · The Mate-Demate Device, which for 35 years was used at NASA's Kennedy Space Center to mount and remove the space shuttles from the back of their ...
  3. [3]
    [PDF] Landing the Space Shuttle Orbiter - As the processing and launch ...
    Kennedy Space Center (KSC) is the primary landing site, with Edwards Air Force Base (EAFB) as an alternate. KSC is preferred for saving processing time.
  4. [4]
    [PDF] THE ORBITER MATE/DEMATE DEVICE Arthur J. Miller, P.E. and ...
    The purpose of this paper is to describe the numerous components and systems of the Orbiter Mate/. Demate Device (MDD), with special emphasis on mechanisms.
  5. [5]
    NASA Armstrong Fact Sheet: Shuttle Carrier Aircraft
    Sep 24, 2014 · The orbiters were placed atop the SCAs by Mate-Demate Devices, large gantry-like structures that hoisted the orbiters off the ground for post- ...Missing: function | Show results with:function
  6. [6]
    [PDF] Space Shuttle Era Facts - NASA.gov
    54 – Shuttle landings at Edwards Air Force Base. 55 – 747 Shuttle Carrier Aircraft ferry flights to Kennedy's Shuttle. Landing Facility (SLF). 78 – Shuttle ...
  7. [7]
    [PDF] Supporting Shuttle | NASA
    Dryden the orbiters were lifted by the Mate Demate Device (MDD) and mounted atop the 747 Shuttle Carrier Aircraft ... The Mate/De-mate Device (MDD) was a large ...
  8. [8]
  9. [9]
    Edwards, NASA say goodbye to historic landmark > Air Force > News
    Aug 28, 2014 · Constructed in 1976 at a cost of $1.7 million, the MDD was first used in 1977 for the prototype shuttle orbiter Enterprise's approach and ...
  10. [10]
    Symbol of NASA's space shuttle program torn down - Florida Today
    Jan 19, 2015 · The Mate-Demate Device, or MDD, was a gantry-like structure designed to lift 100-ton shuttle orbiters on and off modified 747 jumbo jets that ...
  11. [11]
    Vandenberg and the space shuttle (part 2) - The Space Review
    Oct 28, 2024 · After the January 1986 Challenger accident, plans to use Vandenberg for the shuttle were canceled. ... mate/demate device for lifting the ...
  12. [12]
    [PDF] Information Summaries Countdown! - NASA.gov
    The mate/demate device can lift up to 230,000 pounds (104,328 kilograms) and withstand winds of up to 125 miles (201 kilometers) per hour. A diesel-driven ...
  13. [13]
    Historic Mate-Demate Tower Used to Lift Space Shuttles Being ...
    Aug 26, 2014 · The historic steel tower that for 30 years was used to mount NASA space shuttles atop jumbo jets to fly them cross-country after they landed ...
  14. [14]
    Space shuttle Discovery is lifted into the mate demate device by a ...
    Title: Space shuttle Discovery is lifted into the mate demate device by a crane hooked to the yellow sling. ; Location: Kennedy Space Center, FL ; Owner: KSC ...<|control11|><|separator|>
  15. [15]
    [PDF] NASA JOHNSON SPACE CENTER ORAL HISTORY PROJECT
    Everything's over. So you cannot do that. WRIGHT: Let's talk about the use of the crane with the mate/demate device. Can you share what those steps are?Missing: restrictions | Show results with:restrictions
  16. [16]
    Mate-Demate demolition: Tower used to lift space shuttles being ...
    Aug 25, 2014 · Construction of the $1.7 million Mate-Demate Device was completed in 1976 in support of the approach and landing tests by the prototype shuttle ...
  17. [17]
    Shuttle Landing Facility History | Federal Aviation Administration
    Dec 14, 2023 · Between 1984 and 2011, NASA and the Department of Defense conducted a total of 78 Space Shuttle orbiter landings at the SLF located at NASA 's ...
  18. [18]
    CPI Inflation Calculator - Bureau of Labor Statistics
    No information is available for this page. · Learn why
  19. [19]
    Shuttle Hangar in Edwards AFB, CA (Google Maps)
    It was built by Santa Fe Engineers Inc., Lancaster, Calif., at a cost of $3.7 million. Construction was completed in early 1976. A concrete tow-way, 60 feet ...
  20. [20]
    NASA, Edwards say goodbye to historic landmark
    Aug 27, 2014 · The 110-foot tall, gantry-like MDD structure was used for de-servicing the space shuttles after they landed at Edwards Air Force Base and for ...Missing: 135 | Show results with:135<|separator|>
  21. [21]
    Space Shuttle MDD Demolition Time-lapse Video - NASA
    Feb 19, 2015 · Time lapse video shows three-month demolition of Armstrong's Mate-Demate Device, which prepared the space shuttles that landed at Edwards AFB ...Missing: construction | Show results with:construction<|control11|><|separator|>
  22. [22]
    RIP Giant Machine That Put Space Shuttles on Top of 747s - Gizmodo
    Feb 5, 2015 · Now it's scrap metal. NASA just announced the demolition of this 35-year-old structure. The job took nearly two months and yielded 844,700 ...Missing: Armstrong 2014 cost
  23. [23]
    None
    ### Summary of Mate/Demate Facility at Vandenberg Air Force Base (Space Shuttle)
  24. [24]
    [PDF] Environmental Impact Statement Space Shuttle Program ... - DTIC
    No new facilities are proposed for the Orbiter sequence of operations. The Mate/Demate Facility has been redesigned to include a new lifting device, an Orbiter ...
  25. [25]
    File:Space Shuttle Discovery and SCA over Vandenberg AFB SLC-6
    File:Space Shuttle Discovery and SCA over Vandenberg AFB SLC-6 - DF-. Size ... Discovery is at Vandenberg for testing of the Mate-Demate Device, which ...
  26. [26]
    [PDF] the SOFIA Program wanted the engines as spares, so the SCAs ...
    These three attach locations were the same as those used when the orbiter was mated to the ET. The mate process typically took about twelve hours. 49. The SCA ...Missing: steps | Show results with:steps
  27. [27]
    40 Years Ago: STS-3, Columbia's Third Mission to Space - NASA
    Mar 22, 2022 · ” Although Fullerton kidded that his only function involved lowering the shuttle's ... space shuttle Columbia in the Mate Demate Device (MDD).
  28. [28]
    STS-36 Flies a Dedicated Department of Defense Mission - NASA
    Mar 3, 2025 · On Feb. 28, 1990, space shuttle Atlantis took off from NASA's Kennedy Space Center in Florida on STS-36, the sixth shuttle mission dedicated to the Department ...
  29. [29]
    35 Years Ago: STS-26 Returns the Space Shuttle to Flight - NASA
    Sep 27, 2023 · The STS-26 mission returned American astronauts to space after a 32-month hiatus following the January 1986 Challenger accident that took the lives of seven ...
  30. [30]
    Sling Attached To Discovery (KSC-2012-2128) - DVIDS
    Oct 15, 2012 · ... sling to space shuttle Discovery to enable the mate-demate device to lift it onto a Shuttle Carrier Aircraft. The device, known as the MDD ...
  31. [31]
    Endeavour Mated to SCA Time-Lapse - YouTube
    Sep 18, 2012 · At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, space shuttle Endeavour is mounted atop NASA's Shuttle Carrier ...
  32. [32]
    Space Shuttle Enterprise - The Orbiter that started it all
    Apr 27, 2012 · Towed the newly-built Mate-Demate Device (MDD), Enterprise was connected to a hoisting sling, lifted off the ground, her landing gear ...
  33. [33]
    Vandenberg and the space shuttle (part 1) - The Space Review
    Oct 28, 2024 · But after the January 1986 Challenger accident, plans to launch shuttle from the West Coast were halted, then canceled completely. The decision ...
  34. [34]
    [PDF] An Example from the Space Shuttle Launch Program at KSC
    Figure 6 shows the Orbiter sling, a large construct that is attached to the Orbiter allowing it to be lifted with a crane (the sling, attached to an Orbiter, is ...
  35. [35]
    None
    Below is a merged response that consolidates all the information from the provided summaries into a single, comprehensive overview of the Orbiter Lifting Fixture (OLF) and Orbiter Sling used in the Vehicle Assembly Building (VAB) and Mate-Demate Device (MDD) at NASA Kennedy Space Center (KSC). To maximize detail and clarity, I’ve organized the information into a table in CSV format, followed by a narrative summary that ties it all together. This approach ensures all details are retained while making the information dense and accessible.
  36. [36]
    [PDF] The Vehicle Assembly Building, or VAB, is a national - NASA
    A transfer aisle down the center of the VAB connects the bays, allowing massive components and equipment to be rolled into the building, lifted and assembled on.<|control11|><|separator|>
  37. [37]
    40 Years Ago: Space Shuttle Discovery Makes its Public Debut - NASA
    Oct 16, 2023 · In the Mate-Demate Device (MMD), workers placed Discovery atop the Shuttle Carrier Aircraft (SCA), a modified Boeing 747, to begin the ferry ...<|control11|><|separator|>