Chase Line

The Chase Line is a suburban commuter railway in the West Midlands region of England, linking Birmingham New Street station with Rugeley Trent Valley via Walsall and intermediate stops in the Black Country and Cannock Chase area. The approximately 21-mile route serves local passengers with hourly services operated by West Midlands Trains, utilizing diesel multiple units north of Walsall while the southern section from Birmingham to Walsall has been electrified since 1966. Opened in stages beginning with the to segment in 1837 as part of the Grand Junction Railway, the line's northern extension to developed through 19th-century mineral branches serving collieries before passenger services were restored and expanded in the late . A major electrification project for the to section, spanning about 12 miles, is underway to enable electric operation, raise line speeds from 45 mph to 75 mph, and support 730 trains for improved frequency and reliability. The route's development reflects efforts to enhance regional connectivity amid historical freight dominance and periodic service withdrawals.

History

Origins and Construction

The southern section of the Chase Line, extending from to , originated as part of the Grand Junction Railway, one of Britain's earliest intercity trunk lines. Authorised by on 6 May 1833, construction commenced shortly thereafter under the engineering oversight typical of the era's pioneering railways, with the 82-mile route from to Newton Junction (near ) opening to traffic on 4 July 1837. This segment traversed key intermediate points including , , and Bescot, facilitating coal and passenger transport amid the Industrial Revolution's demand for efficient linkages between manufacturing centers and ports. The line's double-track alignment, built to a standard gauge of 4 ft 8½ in with initial haulage, marked a foundational step in connecting the West Midlands to the northwest's emerging rail network. The connection from Bescot to , approximately 2 miles, was developed by the South Staffordshire Railway (), incorporated in 1846 to serve the region's mineral-rich coalfields. The obtained powers in 1847 and completed this short link, opening it on 1 November 1847, which integrated directly into the Grand Junction system and spurred local industrial access. itself entered service around this period, initially handling mixed freight and passengers on a modest two-platform setup. Further northward expansion from toward arose from the 's ambitions to tap Cannock Chase's collieries. In 1854, the SSR secured parliamentary approval for a diverging at Ryecroft , with advancing amid from rival schemes like a proposed Great Western line. The Walsall to Cannock segment, roughly 6 miles, opened on 1 1858, coinciding with Cannock station's debut and initial workings. Extension to followed swiftly, with the additional 5 miles to Rugeley Town and Valley completing in autumn via the Cannock Branch Railway alignment, absorbed by the SSR and later leased to the London and North Western Railway. These northern sections featured single-track branches with passing loops, prioritising traffic over services, reflecting the era's focus on resource extraction infrastructure. By the , the amalgamated route had been rationalised under London and North Western control, setting the stage for its role in regional connectivity.

Mid-20th Century Decline and Partial Closure

In the post-World War II era, British Railways, formed after in , encountered substantial financial deficits amid a national shift toward , with rising car ownership and lorry usage eroding rail's market share for both passengers and freight. Branch lines like the Chase Line, serving the coalfield, saw passenger traffic dwindle as local bus services and private vehicles offered greater flexibility, while freight volumes fluctuated with demand. The 1963 Beeching Report, commissioned to rationalize the loss-making network, scrutinized usage data and deemed the to section of the line uneconomic, recommending withdrawal of services due to low ridership and high maintenance costs relative to revenue. operations between and Trent Valley ceased in 1965 as part of these closures, with intermediate stations including closing to s that year; the route had originated as a mineral line in 1859 but proved unsustainable for regular services under mid-century conditions. Freight traffic persisted on the northern section to support remaining colliery operations, averting immediate full dismantlement despite the cuts.

Revival, Reopening, and Extensions

The section of the Chase Line north of , which had been closed to services since while remaining open for freight traffic, saw the restoration of trains beginning in through a joint initiative by and the West Midlands Passenger Transport Executive. This first phase reopened the route from to , with intermediate stations such as Bloxwich West, , and Landywood brought back into service, alongside the reconstruction of station itself. Initial services required a change at for connections to Birmingham New Street, resulting in journey times of approximately 55 minutes from . Demand for the revived services grew rapidly, prompting further northward extensions. On 2 June 1997, passenger operations extended to the newly rebuilt , adding 2.5 miles of route and improving access to the area. This was followed by the final phase on 25 May 1998, when services reached , integrating the Chase Line with the and enabling through trains toward . These extensions, totaling about 10 miles from , were supported by infrastructure upgrades including platform reconstructions and signaling improvements to accommodate hourly diesel multiple-unit shuttles.

Post-Reopening Developments

In May 2018, revised the Chase Line timetable to reintroduce two trains per hour during daytime between , Cannock, and Birmingham New Street, enhancing capacity and connectivity along the route. This upgrade formed part of broader investments, including the deployment of four-carriage trains that added hundreds of extra seats for passengers. Platform extensions were subsequently undertaken at every station on the line to support the longer , addressing previous overcrowding issues without relying on enhancements. By September 2019, service patterns were further adjusted to prioritize reliability, ending through-running from Rugeley Trent Valley to Euston; trains now terminate at Birmingham New Street, reducing delays propagated from the . This change stemmed from observed performance shortfalls on the Chase Line segment, allowing more consistent local operations. The line's community engagement advanced through the establishment of a dedicated Community Rail Partnership, fostering local initiatives such as station adoption schemes and surveys to repurpose underutilized facilities into community hubs. These efforts aimed to boost ridership and integrate the railway with regional economic and social needs, independent of major infrastructure overhauls.

Route and Infrastructure

Route Description

The Chase Line extends approximately 21 miles (34 km) from Birmingham New Street station in the south to Rugeley Trent Valley station in the north, serving the West Midlands metropolitan area and southern Staffordshire. Named after the nearby Cannock Chase Area of Outstanding Natural Beauty, the route facilitates commuter services between urban centers and rural districts, connecting to the West Coast Main Line at Rugeley Trent Valley for onward travel. Trains typically depart from Birmingham New Street's platforms 4A or 4B, initially sharing infrastructure with the Birmingham Cross-City Line northward to Aston. At Aston, the line diverges northwest from the Cross-City route, heading through the residential and industrial suburbs of Perry Barr and Hamstead before entering Walsall borough. It passes Bescot Stadium and Tame Bridge Parkway stations, crossing the Tame Valley, and reaches Walsall station, a major interchange point with connections to the Wolverhampton line. North of Walsall, the terrain shifts from built-up areas to semi-rural landscapes, with the track running alongside the Wyrley and Essington Canal near Bloxwich West before ascending gently through Landywood and Hednesford, traversing the wooded fringes of Cannock Chase. The final stretch includes Rugeley Town station, serving the town center, and terminates at Rugeley Trent Valley, where platforms align with the electrified Trent Valley Line for seamless transfers. The route features single-track sections in its northern portion, with passing loops at key points like to accommodate bidirectional services, and crosses several roads and waterways, including the motorway near . Historically freight-oriented in parts, it now prioritizes passenger operations amid ongoing electrification from northward, completed in phases to enhance capacity and reliability.

Stations and Key Features

The Chase Line serves 14 operational stations along its 21-mile route from Birmingham New Street to Rugeley Trent Valley, facilitating connections between urban centers in the West Midlands and the rural . The stations, listed from south to north, are Birmingham New Street, , , Hamstead, Tame Bridge Parkway, , , , Bloxwich West, Landywood, Cannock, , Rugeley Town, and Rugeley Trent Valley. Southern stations primarily cater to commuters in Birmingham's industrial and residential suburbs, with providing access to local amenities and serving the eponymous district near major roads. Walsall acts as a key intermediate hub with interchange to other local services, while the northern stretch from Cannock onward accesses communities in , including near former mining areas. Rugeley Trent Valley offers interchange with express services toward London Euston. Key features include car parking availability at multiple stations such as Cannock, , and Rugeley Town to accommodate park-and-ride users, alongside step-free access enhancements at sites like Cannock where platform extensions and lifts were implemented to improve accessibility. The route crosses the Wyrley and Essington Canal between and , highlighting its integration with local canal infrastructure. Stations like are near freight facilities, reflecting the line's proximity to goods yards, though passenger operations prioritize suburban and rural links.

Engineering and Technical Specifications

The Chase Line employs the standard 1,435 mm (4 ft 8½ in) prevalent across the British mainline railway network. The route from Birmingham New Street to Walsall comprises double track, electrified at 25 kV 50 Hz via overhead lines since 1966. North of to Trent Valley, the approximately 15-mile section is mainly single track configured for bidirectional operation, supplemented by passing loops at select stations to facilitate train crossing. of this segment, initiated in 2013, involved installing overhead line equipment spanning 51 single-track kilometers, with structures designed for 25 kV supply; the wires became live in November 2018, enabling electric train operations by May 2019 using Class 350 units. Key engineering interventions for electrification included reconstructing six bridges to achieve required clearance for overhead wires, alongside foundation works, steelwork erection, and contact system , completed under a £100 million investment. The infrastructure lacks tunnels, relying instead on conventional embankments, cuttings, and minor viaducts over roadways and canals, with no reported exceptional gradients or curves limiting capacity beyond standard suburban constraints.

Operations and Services

Service Patterns and Frequencies

Services on the Chase Line consist primarily of shuttle trains operated by West Midlands Railway between Birmingham New Street and Rugeley Trent Valley, calling at all intermediate stations including , , and . This end-to-end pattern avoids integration with the denser services, providing direct connectivity for passengers in the area to central . Weekday frequencies are two trains per hour in each direction during both peak and off-peak periods, a level established following upgrades and timetable revisions in 2018. One hourly service typically originates from to enhance reliability by decoupling from longer-distance operations, while the other runs directly from Birmingham New Street. Evening and late services maintain this interval where demand permits, though minor reductions may occur outside core hours. On Sundays, services operate throughout the day including mornings, marking an improvement from prior gaps in coverage, with frequencies generally at one to two trains per hour depending on the timetable period. All patterns utilize multiple units pending full completion, with journey times averaging 50-60 minutes end-to-end under normal conditions. Timetables are subject to periodic adjustments for engineering works or performance enhancements, as coordinated by .

Operators, Franchise, and Rolling Stock

The Chase Line is operated by West Midlands Trains Limited (WMT), which trades as West Midlands Railway (WMR) for regional services including those on this route. WMT took over operations in December 2017 following the award of the West Midlands franchise, a competitively tendered contract previously held by London Midland. The franchise encompasses commuter and regional services across the West Midlands county, with the Chase Line forming a key suburban corridor linking Walsall and Rugeley Trent Valley to Birmingham New Street. Management of the franchise falls under the West Midlands Rail Executive (WMRE), a body established by Transport for West Midlands to oversee service specifications, performance, and investment. As of October 2025, WMT continues to operate under a directly awarded management contract extended from the original 2017 agreement, which includes commitments to service enhancements and fleet modernization; a transition to public ownership under WMRE is scheduled for February 2026. Rolling stock on the Chase Line consists of Class 730 electric multiple units (EMUs), introduced progressively from late 2023 and entering full service on the route by November 2024. These Aventra-derived three-car trains, with a top speed of 110 mph, replaced older Class 350 EMUs that had operated post- since 2019. Each Class 730/2 unit accommodates 199 standard-class seats, features air-conditioning, plug and USB charging at every seat, and enhanced accessibility with low-floor designs and wider doors. The fleet totals 87 units across the WMR network, leased from rolling stock company , enabling higher capacity and reliability on electrified sections. Diesel or bi-modal units are not used, as the line's full 25 kV AC overhead —completed in 2019—supports pure electric operation throughout.

Signaling and Safety Systems

The Chase Line operates under a mixture of and Absolute Block signalling systems, employing fixed distant signals to manage train movements and ensure safe spacing between services. TCB provides continuous detection of train occupancy within block sections via electrical circuits in the rails, automatically adjusting signals to prevent rear-end collisions, while Absolute Block relies on manual token or block instrument authorization between signal boxes for single-line or low-density sections. This hybrid approach accommodates the line's suburban traffic patterns and historical infrastructure constraints. Re-signalling works completed in enhanced capacity and reliability, including renewals of signalling power supplies and integration with adjacent routes like the area. These upgrades supported increased service frequencies ahead of , reducing block lengths where feasible to minimize headways without compromising safety margins. Safety overlays include the Automatic Warning System (AWS) and Train Protection and Warning System (TPWS), fitted across the route to mitigate risks of signals passed at danger (SPAD) and excessive speeds at junctions or braking curves. AWS provides audible and visual alerts to drivers approaching cautionary aspects, while TPWS enforces automatic brake application if speeds are not reduced sufficiently, aligning with mandatory standards post-2003 for non-high-speed lines. enhancements, such as dedicated fibre-optic routes for distance protection, were incorporated during associated works to enable rapid isolation of equipment faults, minimizing disruption and hazards. Level crossings on the line, where present, integrate with these systems via obstacle detection and to prevent unauthorized vehicle or pedestrian incursions.

Electrification Project

Planning and Rationale

The electrification of the Chase Line, spanning approximately 15 miles from to Rugeley Trent Valley, was planned as part of Network Rail's broader Railway Upgrade Plan to modernize regional infrastructure in the West Midlands. The project originated from assessments of rising passenger demand on the line, which had seen overcrowding during peak hours following its reopening in and subsequent service expansions. Network Rail's investment of around £100 million was justified through evaluations emphasizing the need to upgrade from diesel to electric traction to support increased train frequencies and capacities, with planning commencing in earnest around 2014-2015 to align with regional transport strategies aimed at enhancing connectivity to Birmingham New Street. The primary rationale centered on operational and economic efficiencies, including a projected speed increase from 45 mph to 75 mph, which would reduce journey times between and by several minutes and enable more reliable services less susceptible to failures. Electric trains were expected to offer lower long-term running costs due to reduced expenses and needs, while also minimizing wear compared to heavier units, thereby extending lifespan. enhancements were a key , with allowing for additional seats—potentially hundreds more per hour—and higher frequencies to accommodate forecasted in commuter traffic from and surrounding areas. Environmental considerations formed another pillar of the justification, as would cut carbon emissions from rail operations on the line, aligning with government targets for decarbonizing despite the upfront capital costs. Proponents highlighted quieter operations and improved air quality benefits for local communities, though planning documents acknowledged potential short-term disruptions from construction, such as extended closures at sites like . The business case also factored in with the already-electrified Birmingham-Walsall section, facilitating through electric services and avoiding the inefficiencies of bi-mode or diesel-electric transitions. Overall, the project was positioned as a pragmatic response to empirical demand data rather than speculative expansion, with expected benefits including boosted regional economic activity through better workforce mobility.

Construction Timeline and Challenges

The electrification of the to section of the Chase Line, spanning approximately 15 miles, was initially targeted for completion by December 2017 to enable electric train operations between and . Major construction activities commenced in mid-2016, marked by a ceremonial in highlighting the project's priority for regional connectivity. included the installation of steel support structures for equipment by August 2017, accompanied by a 16-day full line closure to facilitate upgrades. By December , the project faced risks of missing its 2017 deadline due to accumulating delays in sequencing and works. These setbacks aligned with broader challenges in the UK's rail electrification program, including a 2015 pause under the Hendy Review for cost reassessments, though the Chase Line work resumed with adjusted timelines. Final commissioning occurred in December 2018 following extensive testing, allowing electric services to begin in May 2019 using Class 323 units, representing a two-year slippage from the original target. Key challenges included prolonged disruptions to passenger services, such as closures of three level crossings for up to six months to accommodate installations and upgrades between and . Engineering complexities arose from the route's mix of urban and rural terrain, requiring precise geotechnical monitoring to prevent during and wire erection, as well as adaptations for snaking alignments and existing like bridges. Temporary works, including propping systems for , were deployed to mitigate risks during overhead equipment retrofitting, contributing to extended timelines amid coordination with ongoing freight and commuter operations.

Completion and Integration

The electrification of the Chase Line between and was fully completed with the final installation of equipment () and associated infrastructure upgrades by late 2018, following from the original 2017 target due to challenges and escalations to approximately £100 million. conducted extensive testing and commissioning of the 25 kV AC electrification system, including dynamic testing with electric multiple units, which concluded successfully on December 20, 2018, confirming compatibility with the route's signaling and . Handover to operational control occurred in early 2019, enabling (subsequently rebranded as West Midlands Railway) to introduce electric passenger services starting May 20, 2019, replacing diesel Class 153 and units with more efficient Class 350 electric multiple units cascaded from other routes. This transition marked the line's full integration into the electrified West Midlands network, providing end-to-end electric operation from Rugeley Trent Valley to Birmingham New Street via the existing electrified corridor through and , eliminating diesel traction changes and supporting faster acceleration and for improved energy efficiency. Integration extended to enhanced timetable coordination, with the Chase Line now forming part of through services linking commuter flows to Birmingham's urban core and onward connections to the , while adhering to the same TVM930 signaling standards as adjacent electrified sections for unified control. systems and upgrades, including edge enhancements at key stops like and Town, were synchronized with the electric timetable rollout to ensure seamless operations, though initial teething issues with reliability required minor interventions in the months following launch.

Impacts and Performance

Passenger Usage and Economic Contributions

The Chase Line serves as a vital commuter corridor connecting the area in to , with passenger numbers reflecting its evolution from a freight-dominant route to one supporting daily workforce travel and regional links. Estimates of station usage, derived from ticket sales and adjusted for factors like service changes, indicate growth driven by service enhancements. For the year ending March 2024, station—the line's busiest intermediate stop—recorded 314,972 entries and exits, up from lower pre-pandemic levels following a sharp drop to about 20% of normal during 2020-21 restrictions. station handled 125,244 passengers in 2022-23, while Landywood saw 81,850 and 69,134 in the same period. Bloxwich West, near , reported around 102,000 in 2023-24, underscoring localized demand for access to urban centers. Electrification of the line, completed in 2019 with electric trains introduced thereafter, accelerated usage trends by enabling speed increases from 45 mph to 60 mph, doubled off-peak frequencies starting in 2018, and new direct services to London Euston and . This resulted in stronger post-2020 recovery compared to non-electrified routes, as noted in (ORR) adjustments for upgraded infrastructure. Passenger volumes had already surged 161% across the line by 2011 relative to earlier baselines, a trajectory sustained by capacity expansions providing hundreds more seats daily. Economically, the Chase Line bolsters the West Midlands by facilitating labor mobility from semi-rural —home to and sectors—to Birmingham's service and professional job markets, reducing road congestion on parallel routes like the . The electrification initiative is forecasted to yield £113 million in (GVA) through enhanced productivity and induced activity. It supports an estimated 160 new jobs via shortened commute times and reliable services, aligning with broader regional goals to double rail travel volumes by 2050 and underpin economic expansion in areas with limited alternative .

Operational Benefits and Efficiencies

The of the Chase Line, completed in 2019, has enhanced by upgrading line speeds from 45 mph to up to 75 mph, reducing end-to-end journey times between and Trent Valley and allowing for more precise timetabling. Electric multiple units introduced by offer superior acceleration compared to predecessor stock, enabling shorter headways and potential for increased service frequencies without compromising safety margins. Capacity utilization has improved through the deployment of higher-capacity electric trains, which support doubled service frequencies to half-hourly intervals since , accommodating rising demand while minimizing platform occupancy times at intermediate stations. Reliability metrics benefit from reduced mechanical failures inherent in locomotives, with lowering traction-related delays and maintenance downtimes, as electric systems require less frequent overhauls. Operating costs have been curtailed by shifting from to grid , which identifies as a key efficiency gain, alongside decreased emissions and noise that indirectly support smoother integration with urban signaling and operations. This transition facilitates via electrified infrastructure monitoring, optimizing resource allocation for and franchise operators.

Criticisms, Costs, and Challenges

The electrification of the Chase Line incurred costs of approximately £100 million, with reports indicating that expenses had escalated significantly from initial projections by late 2016. This figure encompassed the installation of equipment across the 15-mile route, including 52 support structures and associated upgrades to connect with existing electrified sections. Such overruns mirrored broader challenges in rail electrification programs, where optimistic budgeting often failed to account for site-specific complexities like the line's undulating terrain through . Construction faced delays, placing the project at risk of missing its targeted December 2017 completion, ultimately resulting in electric services commencing in May 2019 after extensive closures, including a 16-day shutdown in August 2017 for intensive works. Engineering hurdles included navigating environmental constraints in the and integrating signaling with adjacent lines, necessitating advanced monitoring like wireless tilt meters to ensure structural stability. Post-electrification, operational criticisms have centered on persistent overcrowding, frequent cancellations, and staffing shortages, with commuters reporting unreliable services terminating short of destinations like . West Midlands Railway has addressed issues like ticketless travel and antisocial behavior through enforcement campaigns, yet passenger satisfaction surveys highlight declining perceived value for money amid rising operational costs and service reductions. Additionally, a proposed £200 million extension for direct services to London Euston was abandoned in 2019 following local objections labeling it a wasteful diversion of funds from core regional needs.

Future Developments

Ongoing and Planned Upgrades

Following the completion of the Chase Line electrification project between and in May 2019, which enabled the operation of electric trains and reduced journey times, ongoing upgrades emphasize operational optimizations and maintenance to sustain reliability and capacity. continues routine track and signaling maintenance, including vegetation management and structure inspections, to minimize disruptions and support consistent service levels amid growing passenger demand. Planned enhancements focus on maximizing the benefits of through service expansions under the West Midlands Rail Executive's investment framework, which identifies the Chase Line for capacity growth to accommodate and with regional networks like the Midlands Rail Hub. Timetable adjustments, such as those implemented in early 2024 to refine frequencies, are expected to continue with the May 2025 change aiming for improved availability and additional peak-hour services via four-carriage trains. These measures prioritize efficient use of existing infrastructure over new major builds, reflecting fiscal constraints and a shift toward service-led improvements rather than extensive capital projects.

Role in Regional Connectivity and Policy

The Chase Line facilitates regional connectivity by providing a direct rail link between Staffordshire's Cannock Chase district and the West Midlands conurbation, serving commuters from Rugeley, Cannock, and Walsall to Birmingham New Street over approximately 21 miles. This corridor supports daily travel for around 1.5 million passengers annually post-electrification, reducing reliance on congested motorways like the M6 Toll and A5. Electrification, completed in 2019, enabled electric multiple-unit trains with journey times reduced by up to 10 minutes between Walsall and Rugeley, enhancing links to employment hubs in Birmingham and facilitating economic integration of semi-rural areas. In transport policy, the line aligns with the West Midlands Combined Authority's emphasis on rail capacity expansion under the 2022-2050 , which prioritizes outcomes to boost passenger numbers and support regional growth. County Council's Rail Strategy identifies post-upgrade potential for diverting long-distance services from to via the Chase Line, improving north-south connectivity and alleviating pressure on the . These developments reflect devolved powers to the West Midlands Rail Executive for franchise management, focusing on frequency increases—such as additional peak-hour services introduced in 2018—to address housing growth in and integrate with bus networks under ' corridor strategies. Policy integration extends to sustainability goals, with electric operations contributing to decarbonization in the region's Local Transport Plan, though challenges like station access persist in less dense areas. Official assessments note the line's role in balancing urban-rural disparities, with upgrades funded via the Department for Transport's £5.4 million re-signaling commitment in the early , underscoring its alignment with evidence-based infrastructure prioritization over less utilized routes.

References

  1. [1]
    Walsall to Rugeley electrification - The Chase Line - Rail Engineer
    Jul 24, 2015 · Electrification. The lines between Birmingham New Street and Walsall were electrified in 1966 as a part of the West Coast main line ...
  2. [2]
    Chase Line - Trains
    Feb 16, 2007 · The Chase Line is the railway line from Birmingham New Street to Walsall and Rugeley. The line from Birmingham to Walsall (sometimes referred to as the Walsall ...
  3. [3]
    The Chase Line - Rugeley Trent Valley To Birmingham New Street
    Mar 27, 2024 · Full Route: The Chase Line Player Route: The Chase Line Route Time: 52 minutes. Route Distance: 20 Miles 17 Stations: Rugeley Trent Valley, ...Chase Line: Rugeley Trent Valley - Wolverhampton & Birmingham Int'lTrain Sim World 3 - Wcml West Midlands + Chase LineMore results from forums.dovetailgames.com<|separator|>
  4. [4]
    Chase Line - EPFL Graph Search
    The Chase Line is a suburban railway line in the West Midlands region of England. It runs from its southern terminus, Birmingham New Street, to Walsall, ...
  5. [5]
    The Chase Line Electrification | Geosense
    The Chase Line (Walsall to Rugeley) Electrification Project in the West Midlands covers a stretch of 10 miles of track with the route snaking through both urban ...
  6. [6]
    Significant improvements for passengers when electric trains are ...
    May 10, 2019 · The Chase Line is a well-used and popular route, which will benefit from the significant uplift in capacity and new direct services that the ...<|separator|>
  7. [7]
    Electrification of the Chase line is well under way
    Aug 21, 2017 · Improvements to the railway between Rugeley Trent Valley and Walsall are progressing as Network Rail engineers continue work to electrify ...
  8. [8]
    Grand Junction Railway
    The Grand Junction Railway opened for business on 4 July 1837, running for 82 miles (132 km) from Birmingham through Wolverhampton (via Perry Barr and Bescot), ...
  9. [9]
    Grand Junction Railway - RAILSCOT
    The line received its act on the 6th of May 1833 and opened in 1837. Today it forms part of the West Coast Main Line routes. In 1845 the company merged with the ...
  10. [10]
    South Staffordshire Railway & its Locomotives - Rail Album
    The first part of the South Staffordshire Railway was opened on the 1 st of November 1847 between Bescot Junction and Walsall.
  11. [11]
    Local history for Walsall and beyond | Page 2 - The Borough Blog
    Jul 25, 2011 · Walsall Station gradually expanded from one set of up 'up and down' lines. The South Staffordshire Railway opened the Cannock line in 1858, ...
  12. [12]
    In 1854, the South Staffordshire Railway obtained powers to build a ...
    May 19, 2025 · In 1854, the South Staffordshire Railway obtained powers to build a branch to Cannock from Ryecroft Junction on its main line near Walsall; ...Missing: origins | Show results with:origins
  13. [13]
    Cannock Station - Disused Stations
    May 24, 2025 · Cannock Station opened 1.2.1858, closed to passengers 18.1.1965. The original platforms were demolished in 1989, with a new station built. A ...
  14. [14]
    Walsall railway station - Culture Wikia - Fandom
    The Grand Junction Railway provided the town with its first rail service, albeit indirectly from 1837. Their Birmingham to Warrington line passed to the south ...
  15. [15]
    Historic England Research Records - Heritage Gateway - Results
    After a bitter battle with the LNWR, the line opened as an LNWR line in 1859. With the opening of the Cannock Branch Railway in 1858, (Linear 1181), which the ...
  16. [16]
    Explore The History of Rural Railways After Dr. Beeching's Axe
    Mar 15, 2023 · The railways were actually losing out to the road and the rise of the motorcar and increased haulage for commercial goods.
  17. [17]
    Did Dr Beeching get it wrong with his railway cuts 50 years ago? - BBC
    Mar 27, 2013 · But Dr Beeching did not cut the rail lines - successive government ministers did, and they would undoubtedly have cut the network anyway, report ...Missing: Chase mid- decline
  18. [18]
    Chase Line re-born - RailwayWorld.net
    Aug 7, 2019 · Services on the Chase Line are curiously unbalanced, with two weekday services an hour from London Euston, making the journey to Rugeley Trent ...
  19. [19]
    Hednesford 1st railway station (site),... © Nigel Thompson - Geograph
    Jan 27, 2019 · Opened in 1859 by the Cannock Mineral Railway as part of the line from Walsall to Rugeley, this station closed in 1965.
  20. [20]
    South Staffordshire Line - beleben
    Passenger services stopped running in the 1960s, and nearly all of the South Staffordshire Line was closed altogether in the 1980s and 1990s. The term 'South ...
  21. [21]
    Chase Line - Wikipedia
    The Chase Line is a suburban railway line in the West Midlands region of England. It runs from its southern terminus, Birmingham New Street, to Walsall
  22. [22]
    [PDF] Hednesford Neighbourhood Plan - Cannock Chase District Council
    ... Rugeley, which had closed in 1965 was re-instated in 1989 as far as Hednesford and then through to Rugeley Trent Valley in 1997. The new station was built ...
  23. [23]
    Chase Line | UK Transport Wiki - Fandom
    The Chase Line is a suburban railway line in the West Midlands region of England. It runs from its southern terminus, Birmingham New Street, to Walsall, and ...Overview · Services · History
  24. [24]
    Extra services on the way for the Chase Line | West Midlands Railway
    May 11, 2018 · The revised timetable from 20 May will see the re-introduction of two trains per hour during the day between Rugeley, Cannock and Birmingham as part of a £200 ...Missing: 2000-2025 | Show results with:2000-2025<|control11|><|separator|>
  25. [25]
    CHASE LINE SERVICE TO BE SPLIT NEXT MAY - Modern Railways
    Sep 26, 2019 · West Midlands Trains is to end the practice of running through trains from Rugeley to London Euston after poor performance on its Chase line service.<|separator|>
  26. [26]
    Community rail - West Midlands Rail Executive
    A second partnership has launched along the Chase line. There will be more partnerships in the future. Driving a revolution in rail services for West Midlanders ...
  27. [27]
    [PDF] Community Rail Strategy 2022/2023 - West Midlands Railway
    Chase Line. Community Hubs. Survey of stations along the line to assess areas for community use. Chase Line Community Station. Partnership. Chase Line.
  28. [28]
    Chase Railway Line - Hansard - UK Parliament
    Nov 1, 2016 · The electrification of the line will mean faster and more frequent trains, increasing the capacity on the line. But I am afraid there are ...Missing: 1998 | Show results with:1998
  29. [29]
    Trains to Cannock Chase Forest - West Midlands Railway
    The nearest train station to Cannock Chase Forest for bike, woodland trails and treetop rope course is Rugeley Town (about a 45-minute walk).
  30. [30]
    Chase line between Bloxwich and Walsall crossing the Wyrley and ...
    Jul 1, 2021 · Chase line between Bloxwich and Walsall crossing the Wyrley and Essington canal. Regions: North West & Central · Download. Chase line between ...
  31. [31]
    UK Train Times | Avanti West Coast
    Sep 24, 2025 · Find UK train times at Avanti West Coast using our handy train times tool. Choose your route and departure time to plan your journey online ...
  32. [32]
    [PDF] 06-Cannock Railway Station Rpt Cab 131218.docx
    Dec 13, 2018 · Platform extension and widening works; installation of step free access. (new lifts and stairs from Lichfield Road to platforms 1 and 2); ...
  33. [33]
    'Stay off the railway' warning as Walsall to Rugeley line is electrified
    Nov 12, 2018 · The overhead power lines on the railway between Walsall and Rugeley Trent Valley are now live as work continues to introduce electric trains on the route.
  34. [34]
    Rail Electrification of the Chase Line - MGF
    MGF assisted with the Rail Electrification of the Chase Line to aid the development of networks in Staffordshire and the West Midlands.<|control11|><|separator|>
  35. [35]
    New rail timetable to create more reliable Chase Line service | West ...
    Dec 2, 2019 · The new timetable comes into operation on Sunday 15 December, bringing with it a number of changes aimed at improving the reliability of services across the ...
  36. [36]
    TAKING IT TO THE NEXT LEVEL - Modern Railways
    Jun 21, 2018 · With linespeed improvements, the May timetable on the Chase line has already seen an increase in frequency to two trains per hour as a result of ...
  37. [37]
    Train timetables and schedules - West Midlands Railway
    Download our train timetables here for easy reference when planning your journey. Providing up-to-date times from 4 weeks in advance.
  38. [38]
    Service contracting - West Midlands Rail Executive
    The West Midlands NRC started in September 2021. It will run for a maximum of 5 years. The contract is held by West Midlands Trains (WMT). WMT operate the ...
  39. [39]
    Operator West Midlands Trains launches its new rail franchise after ...
    Dec 11, 2017 · West Midlands Trains (WMT), a joint venture between Abellio, JR East and Mitsui, have now taken over the franchise from London Midland after winning the ...
  40. [40]
    West Midlands Trains to enter public ownership - Modern Railways
    Jul 30, 2025 · West Midlands Trains, which operates West Midlands Railway and London Northwestern Railway, will transfer to public ownership on 1 February.
  41. [41]
    Class 730 fleet | West Midlands Railway
    Our brand-new Class 730 trains have arrived on our Walsall-Wolverhampton route and the Cross City line. Here's some background on their development.
  42. [42]
    New West Midlands Railway trains welcomed on new route
    Nov 5, 2024 · West Midlands Railway's Class 730 electric trains are now calling at Walsall, with the local council welcoming the new service.
  43. [43]
    Welcome aboard our brand new Class 730s on the chase line! 84 ...
    Nov 7, 2024 · Welcome aboard our brand new Class 730s on the chase line! 84 new trains in the fleet. ⚡Plug & USB sockets at every seat 199 seats ...<|control11|><|separator|>
  44. [44]
    [PDF] LNW Route Specification 2017 - Network Rail
    The LNW route links Greater Manchester and Leeds via Huddersfield, is 36 miles long, and includes regional, inter-urban, and freight services.
  45. [45]
  46. [46]
    Rail Electrification & Power Grid Case Studies - PACE Networks
    Major improvement work was needed on the Chase line services due to the increasing number of passengers. To provide this growth, investment of over £100m has ...
  47. [47]
    Chase Line electrification works to begin - Rail Technology Magazine
    Liam Sumpter, Network Rail area director, said: “Electrification helps us to boost capacity, reduce carbon emissions and cut the cost of running the railway.
  48. [48]
    Chase Line Electrification Ceremony - Cannock Chase District Council
    Jun 1, 2016 · Electrification, when coupled with increased service frequencies and rail journey time reductions, could support the creation of around 1,600 ...Missing: 1998 excluding<|separator|>
  49. [49]
    Chase Line electrification moves forward with steel structure ...
    Aug 22, 2017 · “The electrification of the Chase Line will see faster and more frequent trains which mean there are hundreds more seats, bringing an end to the ...
  50. [50]
    Delays due on Chase line electrification work - Express & Star
    Dec 9, 2016 · Delays due on Chase line electrification work. The electrification of the Chase line is at 'risk' of missing its December 2017 completion date ...
  51. [51]
    Railway electrification in Great Britain - Wikipedia
    Railway electrification in Great Britain began in the late 19th century. A range of voltages has been used, employing both overhead lines and conductor rails.
  52. [52]
    Electric trains to run on Walsall-Rugeley line from May after ...
    Dec 20, 2018 · This paves the way for quieter, faster new electric services for West Midlands Railway customers on the Chase Line from May 2019.Missing: rolling stock
  53. [53]
    Chase Line electrification | Page 2 - RailUK Forums
    Apr 8, 2016 · Three level crossings between Walsall and Rugeley will close for up to six months while Network Rail carries out electrification and upgrade work on the Chase ...Missing: timeline challenges
  54. [54]
    CHASE LINE ELECTRIFICATION - Modern Railways
    Jan 24, 2019 · ELECTRIC SERVICES TO START IN MAY. Wires up: Rugeley Town station on the Chase line. Courtesy Network Rail. IN DECEMBER Network Rail ...
  55. [55]
    Cannock Station - RailStats.co.uk
    Passenger numbers for Cannock peaked during 2023-24 with 314,972 estimated passengers. Passenger Numbers. Usage dropped to 20% during the 2020-21 travel ...
  56. [56]
    ORR unveils station usage data between April 2022 and March 2023
    Dec 14, 2023 · Hednesford - 125,244. Berkswell - 119,180. Hamstead - 111,722. Colehsill Parkway - 110,340. Adderley Park - 96,564. Witton - 94,000ORR Rail station usage - RailUK ForumsORR Station usage statistics 2016-17 - RailUK ForumsMore results from www.railforums.co.uk
  57. [57]
    Bloxwich Station - RailStats.co.uk
    Passenger numbers for Bloxwich peaked during 2023-24 with 102,284 estimated passengers. Passenger Numbers. Usage dropped to 27% during the 2020-21 travel ...
  58. [58]
    [ODF] Table-1410 Passenger entries, exits and interchanges by station
    Nov 24, 2022 · ... Usage adjustments for London stations, "Season"=Season ticket ... Stronger recovery on the Chase Line after electrification upgrades north of ...
  59. [59]
    Numbers soar 161 per cent on Chase train line | Express & Star
    Jun 29, 2011 · The Chase rail line between Rugeley and Birmingham has seen a huge surge in passenger numbers – almost trebling at one station, new figures show ...
  60. [60]
    Chase Line Electrification on target for completion | Cannock Chase ...
    The Chase Line electrification of the 15 mile missing link between Walsall and Rugeley, has been a strategic priority for the Council for many years.
  61. [61]
    [PDF] West Midlands Rail Investment Strategy 2022-2050
    The strategy aims to deliver better rail services, increase travel by two-thirds, improve capacity, and support the region's growth and local connectivity.
  62. [62]
    Chase Line electrification preparations begin
    Liam Sumpter, Network Rail area director said: “Electrification helps us to boost capacity, reduce carbon emissions and cut the cost of running the railway.
  63. [63]
    Significant improvements for passengers when electric trains are ...
    May 10, 2019 · Local passengers will benefit from more seats and new direct services to London and Birmingham Airport.Missing: increase | Show results with:increase<|separator|>
  64. [64]
    Railway Industry publishes new paper outlining many benefits of rail ...
    Mar 31, 2023 · As this new paper outlines, electrification improves the railway in a myriad of other ways, including increased reliability, reduced costs and ...Missing: Chase Line
  65. [65]
    Chase Line electrification - The Railway Magazine
    Sep 27, 2017 · The 15-mile line across Cannock Chase is being electrified at a cost of more than £100million, and was closed for 16 days between August 13 and 28 to allow ...Missing: delays | Show results with:delays
  66. [66]
    [PDF] Infrastructure The Chase Line Electrification, UK - Geosense
    OVERVIEW. The Chase Line (Walsall to Rugeley). Electrification Project in the West. Midlands covers a stretch of 10 miles of track with the route snaking ...Missing: budget | Show results with:budget
  67. [67]
    Chase Line Action Group - Facebook
    Sep 18, 2019 · West Midlands Railway has now added staffing shortages to their ever growing list of failures. Trains still terminating at Hednesford along with ...This current situation is worse than the one a few years ago when ...Everything to Walsall or rugeley appears to be cancelled ... - FacebookMore results from www.facebook.comMissing: overruns | Show results with:overruns
  68. [68]
    West Midlands Railway clamps down on ticketless travel and ...
    Jan 22, 2019 · West Midlands Railway has been clamping down on ticketless travel and antisocial behaviour on the Chase line.Missing: criticisms costs overruns
  69. [69]
    West Midlands bus, rail and metro offer 'less value for money' - BBC
    Jul 31, 2025 · It stated rising costs and reduced services were down to "increased cost pressures for operators and stagnant or reducing revenue". Other ...<|separator|>
  70. [70]
    £200m Chase Line service scrapped over complaints | Express & Star
    Sep 3, 2019 · A £200 million scheme to build a direct route from Staffordshire railway stations to London has been dubbed a waste of money as rail bosses scrap the route ...
  71. [71]
    [PDF] Network Rail Interim Business Performance Report 2019-20
    The first electric train ran between Walsall and. Rugeley following the completion of the. Chase Line electrification project in May 2019. Following a £27 ...
  72. [72]
    Planned works - Network Rail
    Our planned works are carefully planned to minimise disruption to passengers and freight users months in advance.
  73. [73]
    [PDF] West Midlands Rail Investment Strategy 2022-2050
    Oct 25, 2022 · Line extension to Aldridge. 2031-2040. Increased frequency on Chase Line. Sutton Park Line open with new stations. Cross City extended to Burton.<|separator|>
  74. [74]
    Performance Update - West Midlands Railway
    We are continuing to plan changes for the upcoming May 2025 timetable change which will further improve availability; We are engaging with Transport Focus ...
  75. [75]
    [PDF] Staffordshire Rail Strategy April 2016
    A clear example would be the introduction of electric trains to operate on the Chase Line between Rugeley Trent Valley and the. Birmingham area, upon completion ...
  76. [76]
    West Midlands: Transport - Hansard - UK Parliament
    May 8, 2024 · He is right on the Chase line electrification about the growth in passengers and more frequent services in rail. He has pressed me for more ...
  77. [77]
    [PDF] MOVEMENT FOR GROWTH: - Transport for West Midlands
    Rail – passenger Capacity - Need to maximise new rail capacity opportunities from the Chase Line electrification and the new West Midlands Rail Franchise.
  78. [78]
    [PDF] Transport for the West Midlands Local Transport Plan Core Strategy
    No – The plan does not include residential dwellings but may lead to increased recreational pressure upon. Cannock Chase SAC through improved transport links.
  79. [79]
    [PDF] South Staffordshire Integrated Transport Strategy 2013 - 2028 - i54
    5.7 The Chase Line is in line for a large package of upgrades over the next 5 years. Network Rail have committed £5.4m to deliver re-signalling and capacity.