Eastern Interconnection

The Eastern Interconnection is one of the two principal (AC) power grids in , comprising a vast synchronous network that delivers across the eastern two-thirds of the , as well as portions of from eastward to coast (excluding ), south to , and west to the base of the (excluding most of ). This interconnection operates as a unified system at a nominal frequency of Hz, electrically linking hundreds of utilities, thousands of generators, millions of kilometers of and lines, and over 145 million customers, making it the largest interconnected in the world. The system's scale and complexity are defined by its extensive infrastructure, including approximately 36 balancing authorities responsible for maintaining real-time supply-demand equilibrium, and a total utility-scale generation capacity of approximately 1,000 GW as of 2023, dominated by (~485 GW on-peak), non-hydro renewables (~117 GW), and (~106 GW). In 2023, it produced approximately 2,800 terawatt-hours of net , with accounting for roughly 41%, 20%, 24%, and renewables (including ) the remainder, supporting peak demands exceeding 500 GW during high-load periods like summer afternoons, with a record of 549 GW in 2024. Transmission assets span hundreds of thousands of miles of high-voltage lines, enabling redundant power flows and enhancing reliability across diverse subregions such as the Midwest, Northeast, and Southeast. Governed primarily by the (NERC), the Eastern Interconnection adheres to mandatory reliability standards to mitigate risks from events like , cyberattacks, and supply disruptions, as evidenced by analyses of incidents such as the 2022 Winter Storm Elliott, which caused over 90 GW of unplanned generation outages. Ongoing challenges include integrating sources, accommodating rising demand from and data centers—with over 1,000 GW in interconnection queues as of —and expanding interregional transmission to optimize resource use, with initiatives like the Eastern Interconnection Collaborative facilitating coordinated long-term planning among stakeholders. The interconnection's design emphasizes thermal limits over stability constraints, allowing robust power transfers but requiring vigilant to prevent cascading failures.

Overview

Definition and Scope

The Eastern Interconnection is one of the two major synchronous alternating-current (AC) power grids in North America, alongside the Western Interconnection, operating at a nominal frequency of 60 Hz across approximately 3.5 million square miles. This grid encompasses the eastern two-thirds of the contiguous United States from the Rocky Mountains eastward, eastern Canada from Manitoba to the Atlantic coast (excluding the separate Quebec Interconnection), and portions of northeastern Mexico. At its core, the Eastern Interconnection enables synchronous operation, in which all generators and loads within the grid maintain precise phase lock to the common 60 Hz frequency, facilitating efficient and reliable power exchange among over 100 utilities without requiring frequency synchronization adjustments. The grid serves more than 70% of the U.S. , corresponding to roughly three-quarters of the U.S. , as well as the needs of eastern Canadian provinces, and supports a total installed generation exceeding 1,187 GW as of 2023.

Significance in North American Systems

The Eastern Interconnection plays a pivotal role in the economic landscape of North American systems by enabling bulk transfers that pool diverse generation resources across vast regions, thereby reducing overall costs through optimized dispatch of lower-cost sources. This resource pooling allows utilities to access surplus generation from areas with abundant renewables or baseload , minimizing the need for redundant local and supporting cost-effective operations for industries in high-demand areas like the densely populated Northeast and the industrial Midwest. For instance, enhanced transmission within the interconnection facilitates economic savings estimated in billions of dollars annually by leveraging variable renewable integration and reducing curtailments. In terms of reliability, the interconnection enhances grid stability by allowing reserve sharing during outages, exemplified by the rapid recovery following the 2003 Northeast blackout, where unaffected regions imported over 2,600 MW into affected areas like northern to restore loads and prevent further cascading failures. This interconnected structure supports the distribution of spinning reserves—synchronized generation available within minutes—across the entire system, enabling a collective of approximately -2,100 MW per 0.1 Hz deviation to arrest imbalances and maintain at 60 Hz. Such mechanisms ensure the grid can withstand major contingencies, with the interconnection handling peak summer demands exceeding 700 GW while coordinating transfers to bolster stability. Furthermore, the Eastern Interconnection bolsters by diversifying supply sources and mitigating risks from regional fuel disruptions, such as natural gas shortages during winter peaks, through inter-regional power flows that draw from , , and resources in less affected areas. Typical inter-regional transfers average 10-20 daily, providing a buffer against localized constraints and ensuring resilient supply for hundreds of millions of people across the eastern U.S. and . This diversification reduces vulnerability to events like Winter Storm Elliott in 2022, where gas supply issues caused approximately 70% of unplanned generator outages, by enabling alternative energy imports to maintain service continuity.

History

Early Development and Regional Grids

The development of electric power systems in the and originated in the late 19th century with isolated hydroelectric and coal-fired generating plants serving local needs. In the eastern U.S., early coal-fired stations like Thomas Edison's in , which began operation in 1882 using (DC), powered urban lighting and small industrial loads, while hydroelectric facilities emerged along rivers such as the Niagara. On the Canadian side, the first commercial hydroelectric plant opened in in 1881, powered by the Chaudière Falls, marking the start of widespread electrification in eastern provinces like and . By the 1910s and 1920s, hundreds of such isolated plants—both and coal-fired—dotted the region, with coal plants proliferating in industrial areas like and hydroelectric sites expanding in and to meet growing demand from manufacturing and urbanization. A pivotal advancement came with the adoption of (AC) transmission, particularly Nikola Tesla's , which enabled efficient delivery over long distances and drove the transition from fragmented municipal systems to interconnected regional networks. This technology was first practically implemented at the hydroelectric plant, which began generating in 1895 under George Westinghouse's contract and achieved the world's first long-distance AC transmission to , on November 15, 1896, spanning 20 miles at 11,000 volts. In eastern Canada, similar AC hydro developments at Niagara's Canadian side and in Quebec's during the 1890s supported early streetcar systems and industrial growth in cities like and . These innovations shifted reliance from short-range DC to scalable AC grids, allowing utilities to link nearby plants for reliability and . Initial regional grids began forming in the early around hydroelectric hubs like Niagara and in , where utilities in , , and interconnected local systems to balance loads and serve expanding and sectors. The 1920s saw the rise of major utility holding companies, such as Associated Gas & Electric (AG&E), incorporated in 1906, which acquired and integrated dozens of independent plants across , , and , supplying electricity and gas to over 44,000 consumers by 1922 through coordinated regional operations. These holding companies exemplified the move toward broader networks, though competition and regulatory fragmentation limited full synchronization. The Rural Electrification Administration (), established by on May 11, 1935, addressed uneven access by providing low-interest loans to rural cooperatives, dramatically expanding grids in the eastern U.S. where private utilities had overlooked farms due to high costs. In its first five years, the REA financed over $227 million in loans (equivalent to $3.6 billion in 2010 dollars) for distribution lines, bringing electricity to previously isolated rural areas and boosting . By 1930, nearly 70% of U.S. homes had electricity, with rates exceeding 90% in eastern urban centers like and , but grids remained a patchwork of regional entities, vulnerable to imbalances until industrial demands accelerated interconnections.

Post-War Expansion and Interconnection Formation

Following , the Eastern Interconnection experienced significant expansion driven by surging electricity demand and technological advancements in generation. Utilities constructed larger plants, particularly coal-fired units, to meet the post-war economic boom, with generating capacity in the eastern U.S. more than doubling between 1945 and 1960 as interconnections allowed for shared resources and . Concurrently, the advent of commercial in the late accelerated this growth; the , the first full-scale nuclear plant in the U.S., began operation in 1957 near , followed by a wave of boiling water and pressurized water reactors in the 1960s that added gigawatts of baseload capacity to the grid, primarily in the Northeast and Midwest regions. These developments were facilitated by voluntary pooling arrangements among utilities, such as the Pennsylvania-New Jersey-Maryland ( formalized in 1956, which enabled coordinated operation and reserve sharing to optimize costs and reliability. A pivotal milestone in the unification of the Eastern Interconnection occurred in 1963, when the electricity industry established the North American Power Systems Interconnection Committee (NAPSIC) to coordinate operations among neighboring power pools, including PJM and the emerging New York systems, addressing vulnerabilities exposed by growing interdependencies. This coordination effort was further spurred by the Northeast blackout of November 9, 1965, which left 30 million people without power across the northeastern U.S. and parts of Ontario, Canada, highlighting the need for stronger reliability measures. These efforts linked multiple regional grids into a cohesive synchronous zone, enhancing emergency response and bulk power transfers across the Northeast. The 1935 Public Utility Holding Company Act (PUHCA), which dismantled oversized holding companies and promoted regionally focused utilities, indirectly spurred such mergers and pooling by encouraging collaboration to recapture lost scale efficiencies without violating federal restrictions on cross-state ownership. Pooling concepts evolved further in the Midwest during the 1950s, with informal arrangements among utilities in states like Illinois and Michigan paving the way for inter-regional ties that distributed generation economically, reducing the need for redundant capacity in each locality. By 1968, these efforts culminated in the formal establishment of the National Electric Reliability Council (NERC, predecessor to the current organization) as a defined synchronous zone for the Eastern Interconnection, encompassing utility councils from the Northeast to the Southeast and coordinating over a dozen regional entities to enforce reliability standards. At this point, the grid spanned from in the south to in the north, integrating diverse generation sources across approximately 1,500 utilities serving much of the eastern population center. Initial experiments with (HVDC) transmission in the began to explore long-distance ties within and beyond the interconnection, such as early studies for asynchronous links to Quebec's hydro resources, complementing the predominantly infrastructure to handle growing remote generation needs.

Geographical Coverage

Included Territories and Jurisdictions

The Eastern Interconnection encompasses 39 states in the United States east of the , forming the core of its U.S. coverage. This region includes the entire Northeastern states such as , , and ; the Southeastern states like , , and the Carolinas; the Midwestern states from and to and ; and extends to the and Gulf Coast areas, encompassing states such as , , , and . These jurisdictions are fully synchronized within the interconnection, supporting a vast network of generation and transmission serving over 200 million people. In , the Eastern Interconnection integrates key eastern provinces and parts of the central region, with five primary balancing authorities overseeing operations. is fully synchronized and central to this coverage. The Maritime provinces—, , , and —are also included, providing coastal connectivity and hydroelectric resources. Additionally, portions of fall under the interconnection via the Midwest Reliability Organization, contributing to cross-border balancing. This Canadian involvement spans eight provinces to varying degrees, enhancing regional reliability. Limited portions of northeastern are tied into the Eastern Interconnection, primarily through asynchronous connections in states like . These ties facilitate limited power transfers with the U.S. grid, particularly near the border, supporting cross-border energy trade under NERC oversight. The core interconnected area excludes isolated systems such as , focusing on the synchronized bulk power system across these populated lands.

Boundaries and Exclusions

The western boundary of the Eastern Interconnection is delineated by the eastern foothills of the , extending from central in southward through the western , eastern , , , and , before reaching the panhandle of . This natural divide, shaped by the physical barrier of the mountain range, separates the Eastern Interconnection from the to the west, limiting synchronous AC power flows across the region due to the challenges of transmission over rugged terrain. Several key areas are excluded from the Eastern Interconnection despite their proximity, operating instead as separate synchronous systems. The state of largely falls outside the grid, managed by the (ERCOT) as an independent interconnection covering about 90% of the state's load. This separation originated in the early when Texas utilities developed intra-state networks to evade federal interstate commerce regulations under the Federal Power Act; the arrangement persisted due to the region's vast size, historical isolation from national grid expansions, and deliberate limited interconnections even after the (PURPA) of 1978 encouraged broader ties while allowing ERCOT to maintain autonomy. Quebec operates the distinct Quebec Interconnection, centered on Hydro-Québec's transmission system, which connects asynchronously to the Eastern Interconnection via high-voltage DC radial ties rather than integrated AC synchronization. This exclusion stems from mid-20th-century historical development, including Quebec's 1944 nationalization of private utilities into to secure provincial and control over its vast hydroelectric resources, alongside regulatory structures prioritizing self-sufficiency over full integration with neighboring grids. Alaska maintains its own isolated Alaska Interconnection, comprising multiple disconnected regional grids due to the state's expansive geography, including remote communities served by diesel microgrids and limited railbelt transmission lines that cannot feasibly link to the continental systems. Physical barriers such as vast wilderness, mountains, and water bodies preclude synchronous ties, resulting in higher costs and reliance on local generation. These boundaries and exclusions, driven by a combination of historical development paths, regulatory frameworks, and geographical constraints like mountain ranges, mean that approximately 20% of North electricity load operates outside the Eastern Interconnection, even in proximate areas such as the western plains and Gulf Coast.

Technical Specifications

Synchronization Standards and

The Eastern Interconnection operates at a nominal of 60 Hz, which is maintained across the entire synchronous grid through (AGC) systems implemented by balancing authorities. AGC functions as secondary control, continuously adjusting generator outputs to match load variations and restore to nominal after primary responses, ensuring stable power exchange among over 145 million customers served by . Synchronization in the Eastern Interconnection relies on precise alignment between generators and the grid, typically maintained within ±180 degrees to prevent during connections or disturbances. This alignment is achieved using turbine governors, which regulate mechanical power input to match speed, and , which control field to synchronize voltage phases. The fundamental dynamics of arise from imbalances in mechanical and electrical power, governed by the in per-unit form: \frac{d\Delta f}{dt} = \frac{P_m - P_e}{2H} where \Delta f is the frequency deviation, P_m is mechanical power input, P_e is electrical power output, and H is the inertia constant representing stored kinetic energy in rotating masses. This equation derives from the rotor dynamics of synchronous machines, where acceleration or deceleration of turbine speeds directly impacts grid frequency, with governors providing primary feedback to minimize deviations. Under normal operating conditions, is regulated to Hz ±0.05 Hz through coordinated AGC actions, preventing cascading effects from minor imbalances. If frequency declines further due to severe contingencies, under-frequency load shedding (UFLS) activates automatically at 59.5 Hz as the first stage, shedding 5-10% of load in steps to arrest decline and preserve system integrity, as mandated by regional reliability standards. The interconnection's stability is bolstered by from over 500 GW of synchronous generating capacity, primarily from , , and gas plants, yielding a total system of approximately 3,200 GW-s (as of base cases) that resists rapid frequency changes during disturbances. This inertial response, inherent to rotating machinery, provides critical seconds for protective measures to engage, with declining synchronous penetration posing ongoing monitoring needs. Asynchronous interties to other North American grids enable limited power transfers without full .

Transmission Infrastructure and Interties

The transmission infrastructure of the Eastern Interconnection comprises hundreds of thousands of miles of high-voltage (AC) lines operating primarily at voltages ranging from 345 to 765 , forming a vast network that spans the eastern two-thirds of the and . These extra-high-voltage lines enable efficient bulk power transfer across diverse terrains, with key corridors such as the Northeast-to-Midwest spine—running through regions like and (MISO)—serving as critical pathways for interconnecting load centers and generation resources. This infrastructure supports the synchronous operation at 60 Hz within the interconnection, facilitating the movement of electricity from generation hubs in the Midwest and Southeast to high-demand areas in the Northeast. Interties to adjacent asynchronous grids provide limited but essential pathways for emergency support, reserve sharing, and economic exchanges, primarily through (HVDC) back-to-back converter stations that decouple the 60 Hz Eastern system from differing frequencies or phases in neighboring networks. The Eastern Interconnection connects to the via six HVDC ties in the United States, totaling approximately 1.32 GW of transfer capacity; notable examples include the Miles City tie in , a 200 MW link commissioned in 1985. To the (ERCOT) Interconnection, two HVDC ties exist: the Oklaunion tie (220 MW) and the Monticello tie (600 MW), enabling controlled flows for reliability during peak events. Connections to the Interconnection include four major HVDC lines, such as the back-to-back station (1,000 MW, commissioned 1984), along with a (VFT) at the Langlois substation for flexible asynchronous power exchange. Collectively, these interties support approximately 6 GW of total bidirectional transfer capacity (as of 2024), enhancing overall North American grid resilience. These asynchronous interties predominantly employ HVDC technology with line-commutated converters (LCC-HVDC) for bulk transfers due to their high and over long distances, though newer installations incorporate voltage-source converters (VSC-HVDC) for greater flexibility in controlling reactive and integrating renewables. Unlike synchronous connections within the Eastern Interconnection, where is governed by P = \frac{V_1 V_2}{X} \sin \delta (with V_1 and V_2 as terminal voltages, X as line , and \delta as the phase difference limited to approximately 30–45 degrees for ), HVDC ties allow constant up to their rated without constraints, limited instead by converter ratings and constraints. This contrast enables HVDC interties to operate at full (e.g., up to 90% of rating for LCC systems) for emergency imports/exports, whereas limits prevent overloads from rotor instability. Recent developments, such as the —a 1,250 MW VSC-HVDC line from to , with construction underway since 2022 and expected energization by 2026—exemplify ongoing expansions to bolster these connections with modern, flexible technology.

Governance and Operations

Reliability Organizations and Oversight

The (NERC) is the primary organization responsible for developing and enforcing reliability standards across the North American bulk electric system, including the Eastern Interconnection. Founded in 1968 by representatives of the electric utility industry, initially as a voluntary council, NERC aimed to promote the reliability and adequacy of bulk power transmission following early grid disturbances. In 2006, NERC was certified by the (FERC) as the Electric Reliability Organization (ERO) pursuant to the , transitioning its standards from voluntary to mandatory enforcement across the . NERC delegates compliance enforcement authority to regional entities that oversee standards implementation and coordination within the Eastern Interconnection, which is divided into subregions such as the Northeast Power Coordinating Council (NPCC) for the and , ReliabilityFirst Corporation (formerly RFC) for the Midwest and Mid-Atlantic areas, and the for the southeastern United States, alongside others including the Midwest Reliability Organization (MRO), Florida Reliability Coordinating Council (FRCC), and Southwest Power Pool Regional Entity (SPP RE). These entities perform regional assessments, monitor compliance, and develop adaptations to NERC standards tailored to local conditions. Separate from regional entities, Reliability Coordinators () provide real-time operational oversight. NERC maintains oversight through more than 100 approved reliability standards categorized into areas like balancing (e.g., BAL-001, requiring entities to maintain real within specified limits) and resource adequacy, with Eastern-specific adaptations developed post-2003 blackout. Compliance is achieved via regular audits, self-certification, and spot checks by NERC and regional entities, with violations subject to civil penalties of up to $1,584,648 per day per violation (as adjusted for in 2025) as authorized by FERC. Following the 2003 Northeast blackout, NERC conducted targeted assessments, including the 2011 Long-Term Reliability Assessment for the Eastern Interconnection, which incorporated stress tests evaluating grid under extreme conditions to prevent cascading failures.

Balancing Authorities and Real-Time Management

Balancing authorities (BAs) in the Eastern Interconnection are the operational entities responsible for maintaining real-time equilibrium between generation and load within their defined areas, ensuring the overall system's frequency remains stable at 60 Hz. There are 36 such authorities, comprising 31 in the United States and 5 in , including prominent examples like the (PJM) and (MISO), which together oversee a substantial portion of the interconnection's activity. These BAs continuously monitor and adjust resources to counteract fluctuations from demand changes, generation outages, or renewable variability, adhering to (NERC) standards for performance. Overseeing multiple BAs for wide-area reliability, there are 8 Reliability Coordinators in the as of 2025. RCs maintain across their areas, calculate and monitor Reliability Operating Limits (IROLs), and direct corrective actions to mitigate risks like cascading outages. A core metric for this balance is the area control error (), which quantifies the deviation in a BA's net interchange and from scheduled values. The standard ACE is: \text{ACE} = (NI_A - NI_S) - 10B (f_A - f_S) where NI_A is the actual net interchange (in MW), NI_S is the scheduled net interchange (in MW), B is the frequency bias setting (in MW/0.1 Hz), f_A is the actual system frequency (in Hz), and f_S is the scheduled frequency (typically 60 Hz). The term $10B (f_A - f_S) represents the frequency bias adjustment, converting frequency deviations into equivalent MW to mimic the system's natural response; the factor of 10 normalizes the bias to per 0.1 Hz units. BAs aim to keep ACE near zero through automated and manual interventions, with performance measured against NERC's Balancing Authority ACE Limit and control standards. Real-time management relies on (AGC), which issues dispatch signals to adjustable s every 2 to 6 seconds to correct and restore balance. These rapid adjustments handle minute-to-minute variations, while BAs also procure reserves—typically online responsive within 5 minutes—to support AGC operations. For larger disturbances, such as trips, BAs deploy reserves, divided into spinning reserves (online, synchronized, and responsive within 10 minutes) and non-spinning reserves (offline but startable within 10 to 30 minutes, depending on regional criteria). The total reserve requirement is set to at least the most severe single (MSSC) in the BA area, defined as the generating unit or transmission element failure causing the greatest impact; in practice, this equates to the greater of the two largest single generating units or approximately 5% of the BA's peak load. Coordination among BAs occurs through seams agreements, which govern operational interfaces at boundaries to ensure reliable power flows and shared responsibilities. These agreements facilitate inter-BA scheduling of energy transfers via platforms, where transmission service reservations are posted and confirmed, enabling electronic tags (e-tags) for tracking hourly interchanges that commonly range from 10 to 15 across major seams. Such mechanisms allow BAs to import or export power efficiently, enhancing overall reliability without compromising individual area control.

Generation and Demand

Primary Energy Sources and Capacity

The Eastern Interconnection relies on a diverse mix of sources to meet its substantial demands, with fossil fuels historically dominant but shifting toward greater renewable contributions. As of 2023, the total installed across the interconnection was approximately 1,200 , supporting annual net of about 2,600 TWh. has emerged as the leading source, accounting for around 45% of at approximately 540 and surpassing -fired generation in overall output around 2016, a trend accelerated by the retirement of older plants and expansions in efficient gas-fired combined-cycle units. Nuclear power provides reliable baseload generation, comprising about 8% of capacity at roughly 100 , with major facilities like Canada's (6.4 ) exemplifying large-scale operations. Coal capacity has declined to around 17% or 200 amid environmental regulations and economic pressures, though it remains significant in certain subregions. Renewable sources, including (~7%, 85 ) and solar photovoltaic (~5%, 60 ), total around 20% of capacity at over 250 (excluding ), reflecting steady growth from policy incentives and technological advancements. Hydroelectric power, at ~11% or 130 , benefits from abundant in and the U.S. Northeast, serving both baseload and peaking needs. Other sources, such as oil (~3%) and miscellaneous (~3%), fill niche roles.
Fuel TypeCapacity (GW)Share (%)
Natural Gas54045
20017
Renewables (excl. )25021
13011
1008
Other807
Total1,300100
This capacity breakdown underscores a fuel diversity that enhances resilience, often evaluated through metrics like the Herfindahl-Hirschman Index to quantify concentration risks across sources. Operational dispatch follows a merit-order system, prioritizing low-marginal-cost resources such as and for baseload, while units—particularly peakers—handle variable demand due to their flexibility and moderate fuel costs. Projections for 2025 indicate modest growth in renewables and continued coal retirements, maintaining dominance amid rising needs. In 2023, net generation was led by (41%, ~1,066 ), (24%, ~624 ), (20%, ~520 ), and renewables including (15%, ~390 ).

Historical and Projected Load Patterns

The Eastern Interconnection's historical load patterns have shown steady growth, with the summer forecasted at 753 in 2007 under normal weather conditions, reflecting a combination of residential, , and usage across the . By 2022, this had increased to approximately 750 , driven in part by early efforts in transportation and heating, which contributed to a reversal of previously flat demand trends observed since the late . Seasonal variations are prominent, with summer peaks primarily resulting from demands in warmer months (June through September) and winter peaks influenced by in colder periods (December through February), particularly in northern subregions. Load patterns within the Eastern Interconnection exhibit distinct diurnal curves, typically featuring a morning as and residential activities commence, followed by a midday plateau and an evening peak associated with higher household electricity use after work hours. Regional differences further shape these patterns: the Northeast experiences more pronounced industrial loads during daytime hours due to and sectors, while the Southeast shows stronger residential-driven peaks tied to in humid climates. Projections indicate continued expansion, with the 2024 NERC Long-Term Reliability Assessment forecasting a roughly 15% increase in over the next decade, reaching about 890 by 2034, fueled by widespread adoption of electric vehicles (EVs), proliferation, and broader of heating and industry. This outlook incorporates efficiency gains from programs and distributed resources, which are expected to moderate growth by 5-10% relative to baseline scenarios without such measures. To illustrate the accuracy of earlier forecasts, the following table compares projected summer peak loads for the U.S. portion of the Eastern Interconnection from the 2008 NERC assessment (adjusted for 3% annual growth) against actuals (~), highlighting how actual demand aligned closely with mid-range projections amid economic and efficiency factors:
Year2008 NERC Projection (GW)2022 Actual (GW)Variance (%)
7007000
This alignment underscores the role of updated modeling in capturing trends like gradual , though recent accelerations from data centers have exceeded prior expectations.

Challenges and Future Developments

Key Operational and Reliability Issues

The Eastern Interconnection has experienced significant reliability challenges, exemplified by major blackout events that underscore vulnerabilities in its operational framework. The 2003 Northeast blackout, triggered by a software bug in the alarm system at FirstEnergy's , led to a affecting approximately 50 million people across eight U.S. states and , , with economic losses estimated at $6 billion. Similarly, the 2021 Winter Storm Uri in , while primarily impacting the isolated ERCOT grid, highlighted intertie risks to the Eastern Interconnection through asynchronous DC links, where attempted power imports strained southeastern balancing authorities and contributed to elevated alert levels in regions like SERC. Aging infrastructure poses a persistent operational , with over 70% of lines in the U.S. exceeding 25 years of age, many approaching or surpassing their 50-year design life, leading to increased maintenance demands and outage risks across the Eastern Interconnection. vulnerabilities further compound these risks, as demonstrated by parallels to the , where attackers remotely manipulated substation controls to cause outages; NERC's Protection standards, updated post-incident, reveal ongoing gaps in the Eastern Interconnection's defenses against similar state-sponsored intrusions targeting systems. Extreme weather events, including hurricanes and ice storms, have intensified these pressures, accounting for nearly 20% of weather-related outages from cold and ice alone, and 18% from tropical storms, with events like in 2012 causing widespread damage in the Northeast. Recent events, such as Hurricane Helene in 2024, which led to widespread outages affecting millions across 10 states, and early 2025 elevating alert levels, underscore these intensifying weather-related vulnerabilities. Reliability is assessed through concepts like the N-1 contingency criterion, which mandates that the grid withstand the loss of any single element (e.g., a transmission line or generator) without cascading failures, yet violations occur due to overloads in high-demand scenarios across the Eastern Interconnection. Key metrics such as SAIDI (System Average Interruption Duration Index) and SAIFI (System Average Interruption Frequency Index) reflect these challenges, with Eastern U.S. regions averaging around 200-300 minutes of annual customer interruption duration (SAIDI) and 1-2 interruptions per customer (SAIFI), influenced by weather and equipment failures. According to the 2024 NERC Long-Term Reliability Assessment, reserve margins in the Eastern Interconnection have eroded by approximately 15% in several subregions due to coal and nuclear retirements outpacing new capacity additions, heightening shortfall risks during peak loads; the 2025 NERC State of Reliability report notes further erosion in reserves and challenges from rapid load growth due to electrification and data centers, emphasizing the need for accelerated transmission builds.

Renewable Integration and Grid Modernization Initiatives

The Eastern Renewable Generation Integration Study (ERGIS), conducted by the (NREL) in 2016, demonstrated that the Eastern Interconnection can reliably integrate up to 30% and photovoltaic (PV) generation by enhancing operational flexibility, such as through increased ramping capabilities and deployment, without major infrastructure overhauls. This study analyzed four scenarios projecting renewable futures through 2030 and beyond, emphasizing the need for coordinated market reforms and transmission planning to achieve these levels. Building on ERGIS, the 2021 North American Renewable Integration Study (NARIS) extended the analysis across the continent, confirming that cross-border coordination in the Eastern Interconnection could support even higher penetrations of variable renewables while maintaining reliability. To support ambitious renewable targets, including the national goal of 100% clean electricity by 2035 where and could comprise 60-80% of generation, initiatives focus on offshore development along coast. The 2024 Atlantic Offshore Wind Transmission Study (AOSWTS) by NREL outlines pathways to integrate 30 GW of offshore by 2030 and up to 85 GW by 2050, utilizing meshed (HVDC) networks to efficiently transmit power inland and reduce congestion in the Eastern Interconnection. These efforts align with regional projects, such as proposed 20 GW Atlantic offshore developments, which aim for 30-50% overall renewable penetration by 2035 through enhanced interties and policy incentives. Grid modernization initiatives incorporate advanced technologies to handle rising renewable shares. Synchrophasors, deployed through the Eastern Interconnection Monitoring System (ESAMS), provide real-time wide-area visibility by measuring voltage, current, and phase angles across , enabling faster detection of oscillations and improved amid variable generation. Complementing this, HVDC expansions are prioritized for importing offshore wind, with studies showing that adding HVDC lines between Eastern and Western interconnections could yield benefit-to-cost ratios exceeding 2:1 by optimizing renewable flows and reducing curtailment. The proliferation of inverter-based resources (IBRs), such as solar PV and turbines, reduces system traditionally provided by synchronous generators, posing risks to during disturbances. To address this, synthetic solutions emulate inertial responses using control strategies like virtual synchronous machines (VSMs), where inverters mimic the and synchronizing of physical rotors through grid-forming controls, as outlined in NERC guidelines for IBR performance. These VSM models, validated in NREL's research , enable IBRs to contribute to primary , supporting low- operations in the Eastern Interconnection. Looking to 2025, goals include ramping up to an average of approximately 70 of new and wind capacity annually through 2035 to support decarbonization pathways, bolstered by the U.S. Department of Energy's () $10.5 billion Resilience and Innovation Partnerships (GRIP) program, which funds transmission upgrades and resilience projects to integrate these resources. This funding catalyzes private investments, targeting enhanced grid flexibility for the Eastern Interconnection's evolving renewable landscape.

References

  1. [1]
    Learn More About Interconnections - Department of Energy
    EASTERN INTERCONNECTION. North America is comprised of two major and three minor alternating current (AC) power grids or “interconnections.
  2. [2]
    U.S. electric system is made up of interconnections and balancing ...
    Jul 20, 2016 · The Eastern Interconnection encompasses the area east of the Rocky Mountains and a portion of northern Texas. The Eastern Interconnection ...Missing: definition | Show results with:definition
  3. [3]
    [PDF] 2. Technical Aspects of Grid Interconnection - the United Nations
    The Eastern interconnection by itself has been called the largest machine in the world, consisting of thousands of generators, millions of kilometers of ...
  4. [4]
    [PDF] Electric Power Annual 2023 - EIA
    Oct 29, 2024 · Capacity by energy source is based on the capacity associated with the energy source reported as the most predominant (primary) one, where ...
  5. [5]
  6. [6]
    [PDF] 2024 State of Reliability
    NERC, as the ERO, works to assure the effective and efficient reduction of reliability and security risks to the North American BPS. Annual and seasonal risk ...
  7. [7]
    Interconnections Seam Study | Energy Systems Analysis - NREL
    Apr 21, 2025 · This study quantifies the costs and benefits of strengthening the connection (or seam) between the Eastern and Western Interconnections.
  8. [8]
    [PDF] Use of Frequency Response Metrics to Assess the Planning and ...
    The Eastern Interconnection covers approximately 3.5 million square miles and includes the provinces of Saskatchewan, Manitoba, Ontario, Quebec and the ...
  9. [9]
    U.S. Grid Regions | US EPA
    The U.S. grid is divided into three major regions: The Eastern Interconnection, which operates in states east of the Rocky Mountains.
  10. [10]
    [PDF] Final Report on the August 14, 2003 Blackout in the United States ...
    Dec 24, 2003 · The report makes clear that this blackout could have been prevented and that immediate actions must be taken in both the United States and ...
  11. [11]
    None
    ### Summary: Spinning Reserves and Stability in the Eastern Interconnection
  12. [12]
    [PDF] Interregional Transfer Capability Study (ITCS)
    NERC assessments11 have identified the need for more transmission capacity to support the energy transformation and the ongoing electrification of the economy, ...
  13. [13]
    NERC sounds alarm over winter gas supplies, potential grid impacts
    Sep 19, 2024 · The joint report on Winter Storm Elliott concluded that gas fuel supply issues accounted for 20% of unplanned generating unit outages, derates, ...
  14. [14]
    Coal timeline - Energy Kids - EIA
    1882. The first practical coal-fired electric generating station, developed by Thomas Edison, went into operation in New York City to supply electricity for ...
  15. [15]
    History of Hydropower - Department of Energy
    The U.S. Army Corps of Engineers is authorized by Congress to build hydroelectric plants in the 1920s. Today, the Corps operates 75 power plants, which makes ...Missing: coal- eastern 1890s-
  16. [16]
    History of Electricity
    The first Canadian made electric generator was built by JJ Wright and supplied to the Eaton department store at Queen and Yonge.
  17. [17]
    1878-1897 – The Early Years | History of Electricity in Québec
    Electric streetcars first appeared in Montréal around 1890, in the cities of Québec and Sherbrooke in 1897, in Lévis in 1902 and in Trois-Rivières in 1915.
  18. [18]
    The War of the Currents: AC vs. DC Power - Department of Energy
    Tesla believed that alternating current (or AC) was the solution to this problem. Alternating current reverses direction a certain number of times per second -- ...Missing: 1900s | Show results with:1900s
  19. [19]
    Nikola Tesla Inventions - Tesla Science Center at Wardenclyffe
    This led to the development of a practical system of AC power, including the AC induction motor (1887) and the polyphase AC system (1888), inventions which made ...
  20. [20]
    Niagara Falls History of Power
    On November 15th 1896, the City of Buffalo joined the power grid being generated from Niagara Falls. It became the first long distance transmission of ...
  21. [21]
    Niagara Falls Hydroelectric Power: History & Facts
    When Niagara Falls' first power plant came online on November 18, 1896, Tesla ushered in a new era for the natural wonder as a leading producer of electricity.
  22. [22]
    History of the Grid and Major Projects - RPA
    Feb 5, 2025 · In 1886, the first transformer was built, allowing voltage to be stepped up or down, revolutionizing the way power was transmitted. Then in 1888 ...
  23. [23]
  24. [24]
    Associated Gas and Electric Company records, 1902-1954 ...
    The Associated Gas and Electric Company (AGEC) was a utility holding company which went bankrupt in the 1930s. It was reorganized under the supervision of the ...
  25. [25]
    Rural Electrification Administration – EH.net
    The R.E.A. was created in 1935 as a government-financing agency providing subsidized loans for rural electrical infrastructure, using a cooperative model.Missing: impact eastern
  26. [26]
    [PDF] The Spatial Impact of the Rural Electrification Administration 1935 ...
    In its first five years of operation, the REA provided over $227 million in loans ($3.6 billion in. 2010 dollars) to survey areas, lay distribution lines, and ...
  27. [27]
    History - America's Electric Cooperatives - NRECA
    On May 11, 1935, Roosevelt signed Executive Order No. 7037 establishing the Rural Electrification Administration (REA).Missing: impact eastern
  28. [28]
    The Birth of the Grid - by Brian Potter - Construction Physics
    May 25, 2023 · By 1930, electricity was available in nearly 70% of US homes, and supplied almost 80% of industrial mechanical power.
  29. [29]
    Electrifying Rural America | Richmond Fed
    The REA was created to finance electricity in rural areas, working with co-ops, and provided loans for wiring and appliances, reducing costs.Missing: eastern | Show results with:eastern
  30. [30]
    [PDF] Electricity Transmission, A Primer - Department of Energy
    The growth continued in the post-World War II era. Electric utilities made technological advances by constructing larger generating plants to capture economies ...
  31. [31]
  32. [32]
    [PDF] FERC Staff Issues Electric Reliability Primer
    The Eastern interconnection includes the eastern two-thirds of the continental. United States and Canada from Saskatchewan east to the Maritime Provinces. In ...
  33. [33]
    Eastern Energy Zones Mapping Tool
    EISPC represents the 39 states, the District of Columbia, the City of New Orleans, and 8 Canadian Provinces located within the Eastern Interconnection electric ...
  34. [34]
    [PDF] Interregional Transfer Capability Study (ITCS)
    One could transfer additional energy between Eastern Texas with the Eastern Interconnection, while the other would connect Western Texas with the Western ...Missing: population | Show results with:population
  35. [35]
    Texplainer: Why does Texas have its own power grid?
    Feb 8, 2011 · Once was during World War II, when special provisions were made to link Texas to other grids, according to Cudahy. Another episode occurred in ...
  36. [36]
  37. [37]
    [PDF] Interconnections
    Western Interconnection. ERCOT. Interconnection. Eastern. Interconnection. Quebec. Interconnection. Interconnections.
  38. [38]
    1945-1959 – Hydro-Québec's First Triumphs | History of Electricity in ...
    May 24, 2025 · Hydro-Québec set about improving the reliability of a transmission and distribution system that had been left in a deteriorated state by ...
  39. [39]
    Alaska Profile Analysis - EIA
    Small diesel-fueled generators also produce electricity in many of the state's isolated communities. Three out of 10 state households rely on fuel oil, kerosene ...<|separator|>
  40. [40]
    [PDF] Balancing And Frequency Control
    May 11, 2021 · Important Concept: Following a large generator trip, frequency response will only stabilize the frequency of an. Interconnection, arresting its ...
  41. [41]
    [PDF] Eastern Frequency Response Study - NREL
    Secondary control actions are usually the result of automatic generation control (AGC) instructions that are issued through a balancing authority's energy ...
  42. [42]
    [PDF] AGC (Chapter 9 of W&W) - Iowa State University
    AGC, or Automatic Generation Control, is a control function that uses frequency to regulate load-generation imbalances. It has two main functions: load- ...
  43. [43]
    [PDF] Practices for Generator Synchronizing Systems - PSRC - IEEE PES
    Apr 20, 2024 · During a synchronization transient, either accelerating or decelerating torque is produced to align the two systems in speed and angle.
  44. [44]
    [PDF] Frequency Control Concerns In The North American Electric Power ...
    Under normal conditions. (the right side of the figure) frequency is maintained near 60 Hz by having the power system collectively balance generation and load.
  45. [45]
    [PDF] Eastern Interconnection Wide-Area Oscillation Assessment and ...
    The 2018 heavy summer (HS) case has a RES penetration level of ~2.2% with a total system inertia of 3188 GW-s and total system load of ~649 GW. In the base-case.
  46. [46]
    [PDF] Operational Analysis of the Eastern Interconnection at Very High ...
    U.S. Eastern Interconnection peak load period ... This scenario assumes 25% of the coal and nuclear generation capacity is must-run, and completely inflexible.
  47. [47]
    Electricity Transmission - IER - The Institute for Energy Research
    Sep 2, 2014 · In the U.S., there are over 200,000 miles of high-voltage transmission ... Eastern Interconnection, which covers the eastern two-thirds of ...
  48. [48]
    [PDF] 2025 State of Reliability - Technical Assessment
    Total Transmission Circuit Miles >100 kV miles. 506,734 508,766 522,433 ... reported), which occurred in the Eastern Interconnection (shown in red in Table 2.6).
  49. [49]
    [PDF] The Value of Increased HVDC Capacity Between Eastern ... - NREL
    Abstract—The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the. Eastern and Western ...
  50. [50]
    Basin Electric takes on maintenance of Stegall DC tie
    Jun 19, 2024 · There are four DC ties located within Basin Electric's service territory at Miles City, Montana; Rapid City, South Dakota; Sidney, Nebraska ...
  51. [51]
    Connecting the Country with HVDC - Department of Energy
    Sep 27, 2023 · HVDC transmission has significant advantages compared to conventional alternating current (AC) lines, including greater efficiency over long distances.Missing: experiments | Show results with:experiments
  52. [52]
    [PDF] The Hydro-Québec Transmission System: Origins and Current Issues
    Mar 31, 2017 · 1980s: growth of interconnections. ○. 1984: Châteauguay, back-to-back unit linked to New-York (1,000 W). ○. 1985: Madawaska, back-to-back unit.
  53. [53]
    [PDF] 2023 NPCC Québec Comprehensive Review of Resource Adequacy
    Dec 5, 2023 · The Québec Area is a separate Interconnection from the Eastern Interconnection, into which the other NPCC Areas are interconnected.
  54. [54]
    Champlain Hudson Power Express
    The fully buried Champlain Hudson Power Express transmission line is ready to power New Yorkers into the future with clean, renewable hydropower.Construction Progress · Project Overview · Route Maps · The Technology
  55. [55]
    Champlain Hudson Power Express (CHPE) - Hitachi Energy
    Using Hitachi Energy's HVDC Light® technology, CHPE will transfer up to 1,250 megawatts of electricity, enough to power 1 million New York households. The link ...
  56. [56]
    [PDF] History of NERC - March 2023
    The electricity industry responded by forming its first electric reliability council. 1967–1968. The Federal Power Commission, predecessor of the Federal Energy ...Missing: synchronous | Show results with:synchronous
  57. [57]
    Who We Are - North American Electric Reliability Corporation
    NERC was founded in 1968 by representatives of the electric utility industry for the purpose of developing and promoting voluntary compliance with rules and ...Leadership · Regulatory · North AmericaMissing: history establishment EEI
  58. [58]
    Federal Register :: North American Electric Reliability Council and ...
    Sep 27, 2006 · Take notice that on September 18, 2006, the North American Electric Reliability Council and its affiliate, North American Electric ...
  59. [59]
    [PDF] 117 FERC ¶61084
    Aug 28, 2006 · SUMMARY: Pursuant to section 215 of the Federal Power Act (FPA), the Commission is proposing to approve 83 of 107 proposed Reliability Standards ...
  60. [60]
    Key Players - North American Electric Reliability Corporation
    NERC has delegated certain authority to its six Regional Entities to conduct activities such as proposing regional Reliability Standards, engaging in ...Missing: Eastern coordinators MRO
  61. [61]
    The NERC Reliability Regions - Versify Solutions
    Jun 13, 2016 · FRCC covers all of Florida and is within the Eastern Interconnection. Midwest Reliability Organization (MRO). MRO covers Saskatchewan and ...
  62. [62]
    [PDF] 2024 Long-Term Reliability Assessment
    Dec 31, 2024 · Interconnection and Eastern Interconnection, block load transfers (BLT), and switchable generation ... peak load. All values in the IRM ...
  63. [63]
    [PDF] North American Electric Reliability Corporation
    Mar 19, 2015 · Electric Reliability Organization; and Procedures for the Establishment, Approval, and. Enforcement of Electric Reliability Standards, Order No.<|separator|>
  64. [64]
    [PDF] 2022 Quarterly State of the Market Report for PJM
    Jun 1, 2022 · PJM implements this contingency reserve requirement using ... reserve requirement is 4.40 percent of the peak load forecast, based on a.
  65. [65]
    Natural gas expected to surpass coal in mix of fuel used for ... - EIA
    Mar 16, 2016 · Natural gas generation first surpassed coal generation on a monthly basis in April 2015, and the generation shares for coal and natural gas were ...
  66. [66]
    [PDF] 2007 SUMMER ASSESSMENT
    uses a historically based range of weather conditions to develop a range of summer peak demand forecasts18. The analysis combines this range of peak demand ...
  67. [67]
    [PDF] The Era of Flat Power Demand is Over - Grid Strategies
    Grid planners forecast peak demand growth of 38 gigawatts (GW) through 2028, requiring rapid planning and construction of new generation and transmission.
  68. [68]
    [PDF] Load Growth Is Here to Stay, but Are Data Centers?
    Jul 9, 2024 · ... morning and evening peaks may be more likely, resembling today's residential load shapes. Figure 5 illustrates these possible load shapes.
  69. [69]
    NERC Long-Term Reliability Assessment (LTRA) 2024 - NAES
    The 2024 LTRA provides a comprehensive roadmap for industry stakeholders, including generator owners, to navigate the complex dynamics of energy demand and ...<|control11|><|separator|>
  70. [70]
    None
    ### Summary of Load Growth Due to Electrification, EVs, and Data Centers in Eastern Interconnection
  71. [71]
  72. [72]
    [PDF] The February 2021 Cold Weather Outages in Texas and the South ...
    Feb 8, 2021 · This report covers the February 2021 cold weather outages in Texas and the South Central US, including a synopsis, key findings, and ...
  73. [73]
    What does it take to modernize the U.S. electric grid?
    Oct 19, 2023 · For example, 70 percent of transmission lines are over 25 years old and approaching the end of their typical 50–80-year lifecycle. This has ...Missing: Eastern Interconnection 40
  74. [74]
    [PDF] EXTREME WEATHER, CLIMATE CHANGE AND POWER OUTAGES
    Nearly 20 percent of weather-related outages were caused by cold weather and ice storms, and another 18 percent were caused by hurricanes and tropical storms.
  75. [75]
    [PDF] Tracking the Reliability of the U.S. Electric Power System
    A greater than two-to-one difference can be seen in average SAIDI, ranging from a low of 118 minutes in the Mountain region to a high of. 498 minutes in East ...
  76. [76]
  77. [77]
    [PDF] offshore wind transmission development in the us atlantic region
    x. Although analysis from the AOSWTS indicates that 30 GW of ofshore wind could be integrated into the grid by 2030 without interregional interlinks or a meshed ...
  78. [78]
    Eastern Interconnection Situational Awareness Monitoring System ...
    ESAMS collects and integrates synchrophasor measurements from throughout the interconnection in real time to produce never-before-seen visibility of the grid ...Missing: modernization | Show results with:modernization
  79. [79]
    [PDF] Inverter-Based Resource Performance Guideline - 2018-08-16
    on synchronous machines; the same concept could be used for inverter-based resources. ... Challenges and Practices for Interconnecting Inverter Based Resources ...
  80. [80]
    [PDF] PLUMMETING SOLAR, WIND, AND BATTERY COSTS CAN ...
    Establishing a target year of 2035, rather than the typical 2050 target, helps align expectations for power-sector decarbonization with climate realities while ...