Getlink

Getlink SE is a Paris-headquartered European public company that manages and operates the Channel Tunnel, the undersea rail link connecting Folkestone in the United Kingdom to Coquelles in France, enabling shuttle services for vehicles and rail paths for passenger and freight trains. Formerly known as Groupe Eurotunnel SE until its rebranding in 2018, the company was established in 1986 to oversee the Channel Tunnel's development and holds a concession to operate the infrastructure until 2086. Getlink's Eurotunnel division runs LeShuttle, transporting approximately 1.5 million vehicles and nearly 10 million passengers annually across the Channel, while its railway network supports Eurostar high-speed services and freight operators, promoting low-carbon alternatives to air and sea travel. Complementing its core operations, Getlink owns ElecLink, a high-voltage direct current electricity interconnector operational since 2021 that enhances energy security between the UK and France, and Europorte, a French rail freight subsidiary handling over 20 million tonnes of goods yearly. The group's diversified activities have driven robust financial performance, with 2024 EBITDA reaching €833 million amid post-pandemic traffic recovery and strategic expansions in sustainable transport infrastructure.

History

Conception and Construction

The modern conception of the Channel Tunnel emerged from renewed Franco-British cooperation in the 1980s, building on earlier 20th-century studies that had faltered due to financing and geopolitical concerns. After evaluating competing proposals for bridges, tunnels, and hybrid links, the governments selected a rail-only tunnel design in 1986, prioritizing a submerged fixed link over surface alternatives for engineering feasibility and minimal environmental disruption. The Treaty of Canterbury, signed on 12 February 1986 by Margaret Thatcher and François Mitterrand, formalized the commitment to construct and operate a Channel Fixed Link under public-private partnership, with no government funding or guarantees. The concession was awarded to Eurotunnel, a consortium established in 1986 by the British Channel Tunnel Group and French France-Manche, tasked with raising private capital, overseeing design-build contracts, and managing 65-year operations from 1986 to 2051. Construction contracts, valued at approximately £2.1 billion initially, were let to Transmanche Link (TML), a of ten major contractors including and , employing design-and-build methods to accelerate progress under fixed-price terms. Tunneling commenced in December 1987 on the side at Shakespeare Cliff near , followed by the French side at Sangatte in February 1988, utilizing 11 massive tunnel boring machines weighing up to 1,000 tonnes each to excavate chalk marl . The project comprised two parallel 7.6-meter-diameter rail tunnels for and freight trains, spaced 600 meters apart, and a central 4.8-meter service tunnel for maintenance and evacuation, totaling 50.5 kilometers in length with 38 kilometers underwater at depths up to 75 meters below sea level. Over 13,000 workers participated across sites, achieving a breakthrough on 1 December 1990 when British and French teams connected the service tunnel headings just 40 centimeters off alignment after excavating over 7 million cubic meters of material. Fit-out and testing proceeded through 1993, with rail installation, ventilation systems, and safety features like cross-passages completed amid delays from geological challenges and labor disputes, pushing total costs to £12 billion (equivalent to about £26 billion in 2023). The first test freight train ran in November 1993, followed by passenger trials, culminating in the official inauguration on 6 May 1994 by Queen Elizabeth II and President Mitterrand, marking the first fixed land connection between England and France since the last Ice Age.

Financial Crises and Restructuring

Following the Channel Tunnel's opening on May 6, 1994, Eurotunnel encountered immediate financial strain due to construction costs exceeding initial estimates by more than double, rising from approximately £5.5 billion to around £10 billion, financed largely through debt comprising 80% of funding. Revenues in the first full year of 1994 fell short, generating losses of over $600 million amid lower-than-projected passenger and freight volumes, exacerbated by delays in services and competition from operators. By the late , annual interest payments alone consumed most operating revenues, with debt levels reaching £9 billion by 1999, pushing the company toward potential but staved off through repeated rights issues and creditor waivers without formal . Debt continued to mount into the , totaling approximately €9 billion (around £6.2 billion) by October 2006, amid disputes with contractors like Transmanche-Link and ongoing revenue pressures from regulatory concessions to competitors. Failed negotiations led to the activation of cross-default clauses, culminating in Groupe Eurotunnel entering a safeguard procedure (procédure de sauvegarde) on August 2, 2006, akin to protection, to facilitate talks. A preliminary agreement was signed on May 23, 2006, with an committee of senior s, followed by a comprehensive plan involving debt-for-equity swaps, bond issuances, and creditor participation. The 2007 Safeguard Plan, approved by creditors and courts in February 2007, reduced net by over half to approximately €3 billion through mechanisms including a €1 billion -to-equity conversion, issuance of €1.2 billion in bonds, and €1.2 billion in participating securities, while diluting existing shareholders' to 13% and introducing new investors such as and . This restructuring, which included a €3.4 billion , enabled early repayments and stabilized operations, with Eurotunnel reporting its first in April 2008 after 20 years of losses. Subsequent in 2017 further optimized the , supporting long-term viability without additional major crises.

Expansion and Rebranding

Following its emergence from financial in , Groupe Eurotunnel diversified beyond operations to stabilize revenues and pursue growth in complementary sectors. In December 2009, the company completed its first major external expansion by acquiring the French rail freight businesses of Cargo for an undisclosed sum, integrating them under the new Europorte to enter the continental freight . This move added approximately 200 employees and a network serving industrial clients, enhancing logistics synergies with tunnel freight services. Subsequent expansions included in freight via Europorte, which by operated across multiple European countries, contributing to Groupe Eurotunnel's strategy of value-creating diversification outside the fixed link, which accounted for about 80% of revenues at the time. These efforts positioned the group as a broader and player, including preparations for projects like the interconnector. On 20 November 2017, Groupe Eurotunnel rebranded to Getlink to signify this evolution, with the name derived from "get link" to evoke , , and adaptability amid post-Brexit uncertainties and non-tunnel assets. The rebrand unified oversight of entities like Le Shuttle, Eurotunnel Freight, and Europorte under a single corporate identity, emphasizing multimodal transport without altering core operations. Further refinements occurred in May 2023, when Eurotunnel Le Shuttle adopted the simplified "" branding to streamline customer-facing identity and support service enhancements, following over 2.1 million annual passenger vehicles. In June 2025, Getlink introduced an updated group visual identity and brand architecture to clarify its ecosystem and reinforce growth ambitions across entities. This included a refreshed Eurotunnel unveiled in July 2025, aligning with ongoing infrastructure and service expansions.

Recent Developments

In 2024, Getlink reported group consolidated revenue of €1.614 billion, a 12% decrease from 2023 at constant exchange rates, primarily due to the suspension of operations amid regulatory and technical issues. The company's EBITDA for the year reached €833 million, meeting its guidance target, supported by growth in Eurotunnel and Europorte segments that offset declines elsewhere. Net profit fell 5% to €317 million, influenced by competitive pressures in cross-channel transport and downtime. Early 2025 saw Getlink announce full-year core profit declines that outperformed market expectations, with Eurotunnel and freight activities providing resilience against broader sector challenges. In March, Getlink signed an exclusive agreement with to install and operate a new fibre-optic network through the , replacing expiring 1998 contracts by 2025 to enhance digital connectivity. For the first half of 2025, Getlink achieved revenue growth in Eurotunnel operations, though contributed less due to suspensions until February 5 and from May 19 to June 2. The period included regulatory progress for to , with the announcing capacity enhancements. Operational innovations advanced, including automated biometric e-gates for Le Shuttle coach passengers to expedite border checks. In June 2025, Getlink launched Club LeShuttle, a loyalty program in partnership with Avios, aimed at boosting repeat customer engagement. September marked the start of an unprecedented solar energy program at Eurotunnel sites to improve sustainability. Le Shuttle Freight traffic in September 2025 totaled 94,503 trucks, down 2% year-over-year, with year-to-date volumes exceeding 870,000. Third-quarter 2025 revenue reached €472 million, reflecting 3% growth in Eurotunnel and 4% in shuttle services amid shifting cross-channel dynamics, including preparations for border controls implemented from October. Getlink reaffirmed its 2025 EBITDA guidance of €780-830 million, emphasizing strategic agility in passenger and freight recovery.

Operations and Infrastructure

Channel Tunnel Engineering

The Channel Tunnel comprises three parallel bored tunnels totaling 50.5 kilometers in length, with 38 kilometers submerged beneath the seabed at a depth of approximately 40 meters below the surface. The two rail tunnels, each with an internal diameter of 7.6 meters, support single-track operations spaced 30 meters apart, while the central service tunnel measures 4.8 meters in diameter and enables maintenance access, ventilation, and emergency evacuation. Cross-passages interconnect the tunnels every 375 meters, facilitating personnel movement and utility distribution. Tunneling exploited the stable geology of the Lower formation, primarily —a homogeneous, low-permeability clay-rich with unconfined compressive strengths of 4 to 7 —selected for its resistance to ingress and suitability for large-diameter boring. Eleven tunnel boring machines (TBMs), including earth pressure balance and double-shield types with diameters up to 8.8 meters for the rail bores, advanced through this medium from portals at , , and Coquelles, , minimizing deformation and water-related delays compared to more fractured overlying layers. Pre-construction investigations, including over 120 marine boreholes and 1,000 kilometers of seismic surveys, mapped fault zones such as the Castle Hill fault to adjust alignments and mitigate risks like localized inflows exceeding 1,000 liters per minute in permeable horizons. Construction of the bored sections began in earnest in following site preparation in 1987, culminating in the service tunnel breakthrough on December 1, 1990, when and teams met 132 feet below the ; rail tunnel connections followed in 1991. Over 13,000 workers contributed across seven years, excavating more than 150 kilometers of aggregate tunnel length using cast-iron segmental linings—1.2 meters wide and 1.6 meters high for rail tunnels—to ensure structural integrity under hydrostatic pressures up to 10 . The project integrated and engineering standards, with teams employing methods for 10-kilometer land approach tunnels in softer soils stabilized by sand layers. Engineering provisions include 200 kilometers of ballasted track in the rail tunnels, supported by 950 kilometers of 25,000-volt wiring for electric traction, alongside 550 kilometers of and service pipes managed by six pumping stations capable of handling inflows. Ventilation relies on 10 axial fans per tunnel for piston-effect relief during shuttle operations, while linings and coatings enhance fire resistance, informed by geological stability analyses confirming long-term below 1 meter over decades. These features enabled the tunnel's operational for mixed freight, , and shuttle services upon inauguration on May 6, 1994.

Le Shuttle Vehicle Services

Le Shuttle provides a rail shuttle service for passenger vehicles traversing the Channel Tunnel between Folkestone, United Kingdom, and Calais, France, enabling drivers and passengers to remain in their vehicles during the 35-minute journey. Launched in 1994 alongside the tunnel's opening, the service accommodates a range of vehicles including cars, motorcycles, vans up to 3.5 tonnes (with exceptions for campervans and coaches up to 25 tonnes), minibuses, caravans, campervans, trailers, high-sided vehicles, bicycles, and adapted mobility vehicles. One ticket per vehicle covers up to nine passengers, with no luggage restrictions or additional fees for excess baggage. The fleet comprises nine passenger shuttles, each approximately 800 meters long and consisting of 24 carriages with dual locomotives—one at each end—for bidirectional operation without turning. Departures operate continuously, with up to four per hour during peak periods and frequencies of every 15 minutes daytime in high demand or every 30 minutes off-peak, available 24 hours a day year-round. Since inception, Le Shuttle has transported over 100 million vehicles, including more than 60 million cars, facilitating low-carbon travel that emits 52 times less CO2 per crossing than equivalent ferry services. In September 2025, it carried 193,880 passenger vehicles, reflecting a 3% decline from the prior year amid broader market fluctuations. Passengers drive onto designated single- or double-deck carriages based on vehicle height (under or over 1.85 ), secure their vehicles, and may access limited onboard facilities if desired, though most remain in place. Border controls occur at the terminals prior to boarding, streamlining the process compared to crossings. The service emphasizes flexibility with options for short-stay, seasonal, and flexible tickets, supporting and personal travel across the Strait.

Freight and Logistics Services

Getlink's freight and services primarily encompass Freight, a dedicated operation transporting commercial vehicles such as lorries and vans through the Channel Tunnel. This service facilitates accompanied freight by loading trucks onto rail shuttles, providing a direct motorway-to-motorway connection with a 35-minute crossing time. Operating 24 hours a day, 365 days a year, it supports up to six departures per hour during peak periods, prioritizing speed, security, and reliability for logistics operators. In 2023, Freight carried more than 1.2 million , solidifying its role as the leading cross-Channel freight shuttle provider and handling approximately 30% of UK-France . volumes remained stable into 2024, with nearly 1.2 million transported over the year, though monthly fluctuations occurred, such as 105,413 in March 2025, marking a 2% increase from the prior year. The service emphasizes , employing 100% electric traction powered by 75% sources as of September 2025, reducing emissions compared to alternatives. Complementing shuttle operations, Getlink enables unaccompanied rail freight by managing the infrastructure and allocating paths to licensed operators for freight services. These include trains and trailer shuttles operated by third parties, such as initiatives involving and new partnerships like the October 2025 service with CAT and . However, cross-Channel rail freight remains underutilized, with a 19% decline in volumes reported for Q3 2024 compared to the previous year, attributed to high access charges and infrastructure constraints on the side. Getlink advocates for expanded rail freight capacity, including W12 intermodal corridors, to double and enhance trade efficiency.

Passenger Rail Operations

Getlink operates the 's rail infrastructure, allocating train paths to licensed operators for high-speed passenger services, primarily , which connects London St Pancras to , , and other European destinations. As concessionaire, Getlink ensures non-discriminatory access in line with regulatory requirements, managing capacity through its Network Statements and annual timetabling processes. The infrastructure comprises two single-track rail tunnels, each 50 km long, equipped for passenger trains operating at up to 160 km/h, linked to in the UK and in . Cross-passages every 375 meters and a parallel service tunnel enable maintenance, safety interventions, and passenger evacuations if required. Getlink's Railway Control Centre coordinates real-time operations, historically accommodating paths for approximately 86% of delayed trains. Capacity exceeds current utilization, with theoretical potential for up to 1,000 trains daily, though passenger paths are used at less than 50% of available slots. To stimulate growth, Getlink launched the ETICA initiative in , offering up to €50 million in time-limited grants to new operators launching cross-Channel services, aiming to challenge Eurostar's position and expand connectivity. Ongoing developments include preparations for increased competition, with regulatory approvals facilitating access for rivals to depots and paths, and exploring double-decker trains to boost capacity through the tunnel. Getlink maintains the tracks, signaling, and power systems tailored for international high-speed operations, contributing to the tunnel's role in low-carbon passenger mobility. ElecLink is a (HVDC) electrical with a capacity of 1,000 megawatts (MW), linking the electricity s of the and through the . Operated by ElecLink Limited, a wholly owned of Getlink SE, the project utilizes two cables routed alongside the existing rail infrastructure within the tunnel, spanning approximately 51 kilometers underground and submarine. Converter stations are located at Sellindge in , , and Les Mandarins near Sangatte in , enabling bidirectional power flow to enhance grid reliability and facilitate integration. Development of ElecLink began as a privately funded initiative, designated a Project of Common Interest by the to support cross-border energy security and low-carbon objectives. Construction involved specialized HVDC cables manufactured by , with completion of major works announced in 2021, followed by regulatory approvals from the UK-France Intergovernmental Commission and national safety authorities in February 2022. The achieved full commissioning and operational start in May 2022, operating at ±320 kilovolts to transfer up to 1 gigawatt (GW) of , equivalent to powering about 1 million homes. Capacity allocation occurs via auctions managed by Joint Allocation Office (JAO), with day-ahead and long-term products available to registered market participants. In its initial years, ElecLink contributed to Getlink's revenue growth, generating €185 million in the first half of 2024 amid high volatility, though volumes later declined due to normalized prices and from other interconnectors like IFA2. A technical fault detected in early 2025 prompted a suspension of operations, with gradual reinstatement approved following inspections, highlighting the project's reliance on infrastructure for access. By mid-2025, first-half sales had fallen over 50% to €92 million, reflecting outage impacts and reduced utilization. The interconnector's minimizes environmental footprint by leveraging existing corridors, avoiding new seabed installations, and supports EU targets for 15% electricity interconnection by 2030.

Ancillary Assets and Facilities

Getlink maintains extensive ancillary facilities at its terminals in , , and Coquelles, , to support the operational integrity of the Channel Tunnel infrastructure and . These include dedicated maintenance workshops, control centers, administration buildings, and inspection equipment, distinct from core passenger and freight handling areas. The Coquelles terminal, spanning 700 hectares, houses the majority of these assets due to its larger scale, incorporating repair and maintenance depots for motive power, , and rail infrastructure. Key maintenance facilities at Coquelles feature the world's longest workshop at 838 meters, designed for comprehensive servicing, alongside a replacement worksite where 222 meters of were installed in 2020. Folkestone, covering 130 hectares, includes a specialized worksite for and points replacement, with 500 meters of upgraded in 2021. These sites enable to minimize disruptions in high-density traffic averaging 4,000 trains per day. Ancillary assets also encompass advanced inspection tools, such as the Wheel Measurement System (WMS) deployed in Coquelles workshops and tunnel lanes to monitor wheel wear and schedule reprofiling, and the Vectoor Measurement Train—a two-wagon unit conducting rail inspections at speeds of 100-140 km/h. Drones equipped with high-definition cameras inspect bridges and ramps without halting traffic. Supporting infrastructure includes upgraded ventilation systems completed in 2021 and power enhancements like new static var compensators () and 25,000-volt cables in the service . Control and administration buildings at both terminals oversee , protocols, and operational coordination, ensuring seamless integration with core and services. These facilities, bolstered by land holdings optimized for expansion, contribute to Getlink's emphasis on reliability and minimal downtime.

Technical and Rolling Stock Details

Tunnel Specifications and Safety Features

The comprises three parallel bores extending 50.5 kilometers in total length, of which 38 kilometers lie beneath the at a depth of approximately 40 meters. It features two tunnels, each 7.6 meters in and separated by 30 meters, accommodating single-track, unidirectional traffic with overhead and integral walkways. A central , 4.8 meters in and positioned 15 meters from each , facilitates maintenance, utilities, and emergency operations. Safety infrastructure includes cross-passages linking the rail tunnels to the service at 375-meter intervals, equipped with 600 operable doors controllable from the Rail Control Centre to enable dispersal and evacuation. The service is maintained under positive air to isolate it from fumes during fires in adjacent rail tunnels, supported by dual systems providing fresh air supply. Fire suppression capabilities encompass four SAFE stations, each 900 meters long and deployed since 2011, utilizing water mist systems activated upon incident detection to suppress fires up to 200 megawatts. These are complemented by fire mains connected to reservoirs, cooling plants at Shakespeare Cliff and Sangatte, and comprehensive detection networks. Emergency evacuation procedures direct passengers via walkways and cross-passages to the service tunnel, where specialized transport vehicles and cars facilitate movement to safe zones or surface access. Continuous monitoring from control centers ensures rapid response, with post-incident enhancements derived from events like the 1996 fire informing iterative improvements in confinement and suppression protocols.

Fleet Composition and Maintenance

Getlink operates a fleet of 57 electric locomotives for its Le Shuttle services, each in configuration with three s and two motorized axles per bogie. Of these, 43 locomotives deliver 7 MW of power, while 14 provide 5.6 MW, enabling each —powered by two locomotives—to achieve 14 MW of traction for the 50 km crossing. These 9 locomotives, built by and Bombardier, support both passenger and freight shuttle operations. The passenger fleet consists of 9 , each comprising 24 carriages and 4 loading/unloading wagons, designed to carry up to 120 or 12 coaches. These shuttles feature single- and double-deck configurations constructed from with 30-minute fire resistance and equipped with smoke and heat detectors for safety. For freight, Getlink maintains 15 shuttles, including 6 third-generation WBN units, 9 Arbel-type shuttles, and 3 Breda-Fiat models (with the latter noted for dismantling in recent updates). Each shuttle includes 2 locomotives, 3 loading/unloading wagons, and 31 or 32 carrier wagons capable of accommodating an equivalent number of 44-tonne heavy goods vehicles, with the newer WBN shuttles boosting overall capacity by 20% to support up to 6 departures per hour per direction. Maintenance of the fleet emphasizes daily inspections to ensure safety, reliability, and availability, conducted at facilities including the world's longest workshop (838 m) in Coquelles, . A mid-life program for the 9 shuttles, launched in 2018 and spanning to 2026 in partnership with (now ), involves full overhauls, with the first renovated shuttle entering service in 2026. Predictive techniques, such as wheel measurement systems, aid in anticipating needs, while ongoing investments address wear from high-frequency operations—up to 4,000 trains daily through the tunnel.

Economic Performance and Impact

Revenue Model and Financial History

Getlink generates revenue primarily through its core Eurotunnel operations, which include Le Shuttle vehicle carriage services for passenger cars, commercial vehicles, and coaches; track access charges from high-speed passenger trains such as ; and freight services encompassing both shuttle transports and rail operations via its Europorte. Additional revenue streams derive from the high-voltage direct current , which transports electricity between the and , and ancillary activities like customs services and . In 2024, Eurotunnel activities accounted for the majority of group , with Europorte contributing €168 million (up 12% year-over-year) and ElecLink €280 million (down 50% due to market normalization and a temporary suspension in the final quarter). The company's financial history is marked by significant early challenges stemming from construction cost overruns and lower-than-expected initial traffic volumes following the Channel Tunnel's opening on May 6, 1994. Initial debt levels exceeded £8 billion, leading to proceedings in 1995 and a first in 1997 that involved a debt-for-equity swap, transferring 45.5% ownership to creditors. A second major crisis culminated in bankruptcy protection on August 2, 2006, after failed negotiations; the subsequent plan, approved in 2007, achieved a 54% debt write-off equivalent to approximately £3.3 billion and extended maturities through issuance of £1.8 billion and €2.2 billion in notes due December 2050 under Channel Link Enterprises Finance (CLEF). Subsequent optimizations reduced the average cost of to 4% by 2017 via operations initiated in 2015, culminating in a final stage in July 2018 that further aligned liabilities with long-term assets. Post-restructuring, Getlink achieved consistent profitability, with group reaching €1.614 billion in 2024 (down 12% from 2023 primarily due to ElecLink's reduced contribution amid stabilization) and EBITDA of €833 million, meeting guidance despite economic headwinds. Earlier annual revenues, adjusted for bases post-restructuring, showed steady growth: €704 million in 2008 ( €431 million, Railways €260 million), rising to €1,018 million by an earlier benchmark year through expanded traffic.

Market Competition and Trade Facilitation

Getlink's Eurotunnel shuttle services encounter primary competition from ferry operators such as and across the Dover Strait, particularly for truck freight and accompanied vehicle transport. The Tunnel's 35-minute crossing time offers a marked efficiency edge over typical 90-minute sailings, allowing Eurotunnel to sustain while 90% of freight users prioritize it for reduced transit duration. Fierce has historically compelled tariff adjustments, contributing to initial challenges post-opening. Recent performance reflects persistent competitive pressures, with truck shuttle volumes declining 1% in 2024 amid subdued economic activity and intensified contestation, alongside occasional allegations of unfair practices by competitors. Eurotunnel's rail freight, though underutilized at around 1,400 in 2023 (averaging five per working day), competes with unaccompanied road haulage alternatives but benefits from lower emissions—eight times below ferries and 99 times below air freight—enhancing its appeal for sustainable . The bolsters UK-EU trade facilitation by enabling efficient, high-frequency transport of , handling over 1.6 million trucks annually and supporting just-in-time supply chains for time-sensitive sectors like fresh produce and automotive parts. In 2016, it underpinned €137.8 billion in —€69 billion in EU exports to the UK and €68.8 billion in UK exports to the EU—equating to 26% of total UK-EU and fostering integrated across 27 countries. This lowers physical barriers through weather-resilient operations and frequent shuttles (up to six per hour), driving export growth in high-value categories such as postal/courier freight (€38.6 billion) and pharmaceuticals. Assessments as recent as 2023 affirm the Tunnel's enduring role, carrying 25% of trade value between the UK and continental Europe, with shuttle flexibility accommodating perishable and oversized loads that alternatives struggle to match efficiently. By minimizing delays and costs relative to sea or air options, Getlink's operations have sustained vital cross-border flows, including £43.6 billion in UK exports to the EU as of 2014 data, while supporting 220,000 jobs tied to facilitated commerce.

Achievements in Cross-Border Connectivity

The Channel Tunnel, operated by Getlink since its inception, represents a landmark achievement in cross-border infrastructure by establishing the world's longest undersea rail connection at 50 kilometers, linking Folkestone in the United Kingdom to Coquelles in France. Opened to freight on May 31, 1994, and to passengers shortly thereafter, it has transported over 518 million people and 106 million vehicles through June 2025, surpassing initial projections and providing a weather-resilient alternative to ferry services. This fixed link has reduced transit dependencies on maritime routes, enabling consistent connectivity even during adverse conditions that historically disrupted Dover Strait crossings. In passenger transport, the tunnel underpins services, slashing London-to-Paris journey times to 2 hours and 15 minutes via trains utilizing Getlink's infrastructure, compared to 5-6 hours by traditional ferry and rail combinations. passenger services, directly managed by Getlink, carried 2.25 million vehicles in , contributing to annual totals exceeding 21 million passengers across shuttle and rail operations. These volumes have fostered enhanced and business exchanges, with the tunnel supporting 4.5 million tourists annually as of recent assessments. Freight connectivity has been revolutionized through unaccompanied truck shuttles and rail wagons, with Freight handling a record 1.45 million trucks in 2022 and maintaining growth into 2025, such as 105,413 trucks in March alone, up 2% year-over-year. This supports efficient just-in-time logistics, achieving door-to-door transit times of 2-3 days across the , and accounts for 25% of UK-EU volume, valued at £91.4 billion in 2014. The facilitates 26% of bilateral France-UK , bolstering supply chains for perishable and manufactured products otherwise vulnerable to sea delays. Getlink's ongoing enhancements, including a €80 million completed in 2024 for EU integration at shuttle terminals, optimize border processing to mitigate post-Brexit frictions and sustain seamless flows. Strategic collaborations, such as the February 2025 partnership with London St. Pancras Highspeed, target doubling direct high-speed connections to the within a decade, further amplifying regional integration. These efforts, combined with spurred investments in connecting rail and road networks, underscore the tunnel's role in driving , with France- trade totaling €67.4 billion in 2016.

Controversies and Criticisms

Debt and Bailout Episodes

Eurotunnel, the predecessor to Getlink, accumulated substantial during the Channel Tunnel's construction from 1987 to 1994, totaling over £10 billion with approximately 80% financed through . Post-opening in 1994, actual revenues fell far short of projections—reaching only about one-fifth of estimates by 1995—exacerbating liquidity strains amid high interest payments and operational costs. This led to the company's first major financial distress, prompting negotiations with banks in 1996 to extend loan maturities, defer payments, and restructure terms, averting immediate without direct . By the mid-2000s, persistent revenue shortfalls from competition with low-cost airlines and ferries intensified the crisis, with Eurotunnel reporting declining revenues to £556 million in 2003 and facing imminent payment defaults. In April 2005, the company sought waivers from creditors, followed by entry into France's safeguard (procédure de sauvegarde) in July 2006 after failing to meet obligations projected at over £6 billion. A Preliminary Agreement (PRA) was signed on May 23, 2006, between Eurotunnel and an creditor committee, proposing a 54% reduction to approximately £2.9 billion through write-offs, debt-for-equity swaps, and maturity extensions. The restructuring culminated in the creation of Groupe Eurotunnel SA as a new holding entity, with the plan approved by a French commercial court on January 15, 2007, and fully implemented by February 2008 after creditor tender offers and shareholder votes. Existing shareholders retained only about 13% of equity post-restructuring, reflecting significant dilution, while junior creditors received minimal recovery. This private creditor-led resolution, costing an estimated £80 million in fees, enabled Eurotunnel to achieve its first profit in 2007 and sustained operations without taxpayer-funded bailouts, though it highlighted risks of overleveraged project finance predicated on optimistic traffic forecasts. Subsequent financial stability under Getlink, rebranded in 2017, has precluded further such episodes.

Security Breaches and Migrant Intrusions

The Channel Tunnel, operated by Getlink (formerly Groupe Eurotunnel), has experienced recurrent security breaches primarily involving unauthorized migrant attempts to enter the French terminal in Coquelles and board shuttle trains or freight vehicles bound for the United Kingdom. These intrusions peaked during the 2015 European migrant crisis, with Eurotunnel reporting 37,000 thwarted attempts from January to July 2015 alone, including coordinated storms by groups of up to 2,000 individuals targeting fences and gates. Such breaches often involved migrants climbing perimeter barriers, evading patrols, or exploiting vulnerabilities like guessed access codes to unlock gates, leading to operational halts and physical confrontations with security forces. A notable escalation occurred on July 28-29, 2015, when approximately 3,500 migrants attempted to breach the site over two nights, prompting Eurotunnel to request urgent Franco-British amid rising and disruptions to freight services. In October 2015, multiple incidents further strained operations: on October 2, over 100 migrants intruded, suspending all trains; the following day, around 200 broke through security near the tunnel entrance, advancing a third of the way before interception, which required clashes with and temporary service closures. Eurotunnel quantified 20,000 prevented breaches in 2016, attributing persistence to the nearby Calais migrant camps, though enhanced fencing, patrols, and bilateral agreements gradually reduced large-scale storms. Post-2016 measures, including reinforced infrastructure and French deployments, stemmed mass intrusions, enabling record freight volumes by early 2016 as reported by Eurotunnel. However, smaller-scale attempts continued, with 5,874 detections of migrants hiding in vehicles at continental ports—including the terminal—in the year ending April 2025, reflecting ongoing vulnerabilities despite improvements. These events have imposed significant operational costs on Getlink, including expenditures and lost revenue from disruptions, while highlighting jurisdictional tensions in border enforcement between and the . Getlink's annual reports note that intrusions became "rare" by 2015's end following these adaptations, prioritizing system integrity amid high traffic levels. The end of the EU-UK transition period on 31 December 2020 marked the full implementation of , requiring new customs declarations, tariff classifications, and sanitary/phytosanitary checks for all freight shuttles through the starting 1 January 2021. These changes disrupted operations initially, as hauliers adapted to mandatory pre-lodging of documentation via the UK's Goods Vehicle Movement Service and France's Delta system, leading to processing delays at and terminals. Lorry drivers reported waits of several hours for border checks in early January 2021, exacerbating bottlenecks amid concurrent restrictions. Pre-implementation testing amplified disruptions, with trials of French border software causing 5-mile queues on the near on 24 November 2020, and sporadic gridlock persisting through December as authorities simulated post-Brexit protocols. Forecasts anticipated 1-2 hour delays for car and freight crossings in January 2021, potentially extending longer during peak summer periods due to heightened scrutiny. Passenger Le Shuttle services faced minimal direct halts but required compliance with updated rules and pet certifications, contributing to administrative hurdles. Getlink mitigated these through €47 million in pre-Brexit investments (2017-2020), including expanded truck parking at (240 spaces), additional pit stops, and the October 2020 launch of the Eurotunnel Border Pass for digitized processing. Post-1 January, the company rolled out Smart Border infrastructure to cut control times by 30%, alongside training for support staff to assist drivers. Freight volumes reflected adaptation challenges: December 2020 saw a pre- stockpiling boosting truck shuttles, but 2021 overall registered declines, such as 7% fewer trucks (122,434) in December versus 2020, amid formalities and Covid recovery lags—though Eurotunnel gained from ferries by offering more reliable crossings. Passenger traffic remained subdued primarily by travel bans rather than Brexit alone. By mid-2021, operations stabilized, with Getlink reporting enhanced competitiveness in unaccompanied freight as operators optimized compliance.

Assessments of Overall Viability

Getlink's operational viability has been affirmed by sustained profitability and robust liquidity in recent years, following decades of financial after overruns and early shortfalls. By , achieved an EBITDA of €833 million, meeting its target despite a 12% decline to €1,614 million, primarily due to lower contributions amid market shifts. In the first half of 2025, Eurotunnel segment results grew, with net from activities rising to €345 million from €292 million in the prior year, supporting €1,355 million in net cash and equivalents. agencies have upgraded assessments, with S&P raising Getlink to '' in citing expected Eurotunnel EBITDA dominance at 80-90% long-term and supportive financial metrics like funds from operations to debt at 12-14%. Fitch similarly revised its outlook to positive in , noting 2023 revenues 17% above 2019 levels through yield improvements despite traffic variability. Long-term structural advantages underpin viability, including the Channel Tunnel's on fixed-link rail connectivity under a concession extending to at least 2086, providing stable, diversified revenues from shuttles, freight, and passenger trains with a competitive against ferries and . Analysts highlight irreplaceable enabling cross-border worth billions annually, with Getlink confirming shareholder returns via a €0.58 per share for 2024 amid confidence in growth prospects. Third-quarter 2025 revenue rose 1% to €472 million, driven by Eurotunnel and Europorte gains, reaffirming full-year EBITDA guidance and demonstrating resilience to fragmented Short demand. However, ex-post economic analyses question broader societal returns, with one evaluation concluding the UK's economy would have benefited more without the Tunnel due to high costs relative to induced and time savings. Persistent risks temper unqualified optimism, including exposure to geopolitical disruptions like customs delays and migrant-related closures, which have eroded below original projections—car shuttles down 4% in early despite 5% growth—and elevated costs. Debt management remains key, with ongoing repayments on long-term loans totaling €526 million, though improved cash flows mitigate default risks historically plaguing the . Independent reviews, such as those from investors, praise operational maturity and yield-focused strategies for enabling profitability exceeding €500 million annually by 2017, yet note failure to fully realize pre-opening forecasts amid external shocks like COVID-19. Overall, Getlink's viability rests on leveraging its unique asset for yield optimization rather than volume growth, with current metrics indicating sustainability absent major escalations in disruptions or competition.

Environmental Considerations

Emissions Reductions vs. Alternatives

The facilitates cross-Channel travel with substantially lower per passenger-kilometer compared to maritime ferries and aviation alternatives, primarily due to its electric rail infrastructure drawing from low-carbon grids in the and . For vehicle shuttle services, Getlink reports that a single crossing emits approximately 52 times less CO₂ than equivalent ferry travel, attributed to the absence of direct emissions during the electrically powered transit versus or used in ships. Independent estimates align, placing ferry emissions at around 147 kg CO₂e per car crossing, while shuttle operations minimize this through efficient electric haulage, though total emissions depend on occupancy and upstream use. Eurostar passenger rail services via the tunnel achieve up to 90% lower CO₂ emissions than short-haul flights for the London-Paris or London-Brussels routes, factoring in well-to-wheel lifecycle analysis including airport processes and from contrails. Rail emissions average 13-17 times less per passenger-kilometer than , with the tunnel's fixed enabling high load factors and avoiding the energy-intensive cycles of . These reductions are enhanced by the predominantly nuclear and renewable-sourced electricity in (over 70% low-carbon as of 2023), contrasting with 's kerosene dependency yielding 150-250 g CO₂e per passenger-kilometer for short-haul flights. For freight, Getlink's rail shuttles and wagon services emit 8 times less CO₂ than equivalent road haulage and 99 times less than air freight, displacing heavier lorries from ferries and enabling modal shift to electrified transport. Overall, the tunnel's operations prevent an estimated 1.4 million tonnes of CO₂ emissions annually across passenger and freight modes versus baseline alternatives, supporting Getlink's trajectory toward 30% direct emission cuts by 2025 relative to 2019 levels. These figures, while company-reported, are consistent with sector benchmarks from transport efficiency studies, though actual savings vary with grid decarbonization and vehicle efficiency improvements.

Construction and Operational Impacts

The construction of the , spanning 1988 to 1994, involved excavating approximately 21 million cubic meters of chalk marl using tunnel boring machines, generating significant spoil that required careful disposal to minimize environmental disruption. In the , nearly 5 million cubic meters of spoil were used to create , a 30-hectare artificial country park built behind a 1.7 km sea wall at Shakespeare Cliff near , transforming former seabed material into a managed that has supported enhancement through replanting and natural . On the French side, over 5 million cubic meters were deposited at the Fond Pignon site near Coquelles, where landscaping and replanting efforts integrated the material into the local terrain. Pre-construction environmental impact assessments addressed potential risks to , habitats, and species, incorporating mitigation measures such as noise barriers, dust suppression, and hydrological monitoring, with no major long-term ecological risks identified post-completion. Temporary construction-phase effects included localized noise, dust, and increased traffic affecting nearby communities in and , though these were managed through and site-specific controls. Operational impacts of the Channel Tunnel, managed by Getlink since its opening in 1994, center on energy-intensive rail shuttle services for passengers and freight, powered primarily by electricity with 75% derived from renewable sources as of 2024. The system's direct greenhouse gas emissions remain low at 44 kilotons of CO2 equivalent in 2023, reflecting efficient electric traction and ventilation systems. Innovations such as a Honeywell cooling system implemented in 2018 have achieved 33% energy savings in the first operational season by optimizing airflow and reducing compressor loads in the undersea sections. Compared to alternatives, LeShuttle freight services emit 12 times fewer greenhouse gases per truck than ferry crossings, contributing to an estimated avoidance of over 2 million tons of CO2 annually through modal shifts from road and sea transport. Getlink reports a 55% reduction in its carbon footprint since 2006, driven by energy efficiency and renewable integration, though ongoing ventilation and maintenance demands necessitate continuous monitoring to offset indirect energy uses.

Sustainability Initiatives and Scrutiny

Getlink has committed to achieving carbon neutrality by 2050, with an intermediate target of reducing its direct (Scope 1 and 2) CO₂ emissions by 30% by 2025 relative to 2019 levels, when emissions totaled 47 kt CO₂e. This strategy aligns with the Paris Agreement's 2°C trajectory and emphasizes transitioning to biofuels for shuttle operations, sourcing 73% renewable in and 75% low-carbon in the , and substituting high-global-warming-potential refrigerants in . In 2023, direct emissions stood at 44 kt CO₂e, reflecting ongoing efficiency measures such as ventilation optimization and recovery in terminal facilities. The company's operations inherently support low-carbon mobility, with Channel Tunnel shuttles emitting up to 20 times less CO₂ per truck than equivalent ferry crossings, averting an estimated 1.4 million tonnes of CO₂ annually when substituting for road and sea alternatives. Getlink's 2025 Environmental Plan includes structural initiatives like adopting eco-friendly fire suppression agents and enhancing energy monitoring, integrated into its broader CSR framework that links to emission reduction milestones. External evaluations affirm these efforts, with Sustainalytics assigning a low ESG risk rating of 10.3 in recent assessments and ISS-ESG maintaining a "B-" score, indicating stable performance in environmental management. Getlink's inclusion in the as of June 2024 reflects third-party validation of its sustainability practices. No substantiated claims of greenwashing or operational environmental non-compliance have emerged in reviews, though historical construction-phase environmental assessments faced for underestimating habitat disruptions and spoil disposal challenges. Current scrutiny focuses on verifying Scope 3 emissions from customer journeys, with Getlink allocation reports under its Green Finance Framework to ensure bond proceeds fund eligible low-carbon projects.

Future Prospects

Planned Service Expansions

In February 2025, Getlink's Eurotunnel division entered a with through a to expand cross-Channel services. The focuses on reducing journey times, improving timetable coordination, increasing frequencies, and developing new routes to destinations in , , and , while boosting passenger capacity to nearly 5,000 per hour. Eurotunnel aims to double the number of direct services through the by 2034, enhancing connectivity from to major European cities including , , , and . This initiative promotes low-carbon mobility by positioning rail as a viable alternative to , with efforts to shorten new service launch timelines from 10 years to 5 years via coordination among regulators, manufacturers, and operators. Supporting these expansions, Getlink invested €45 million in STATCOM technology using converter systems, doubling the tunnel's reactive compensation power to accommodate next-generation high-speed trains. Developed over five years in with GE Grid Solutions and , this upgrade increases overall rail capacity without major infrastructure overhauls. Getlink has targeted 2029 for the introduction of select new services, though firm timelines depend on regulatory approvals and commitments. Broader ambitions include tripling services to France, , and the , alongside initial routes to .

Infrastructure Upgrades and Innovations

In 2022, Eurotunnel initiated a three-year campaign to replace the rails throughout the Channel Tunnel, following a comprehensive overhaul of the ventilation systems to enhance safety and operational reliability. This infrastructure renewal aims to extend the lifespan of the rail network and minimize disruptions by improving track integrity under high-traffic conditions. A significant electrical upgrade occurred in January 2023 with the commissioning of the world's most powerful (STATCOM) using converter (VSC) technology, supplied by GE Vernova. This system stabilizes voltage fluctuations, enabling the simultaneous operation of up to 16 trains and boosting overall transport capacity by 60% without compromising grid reliability. In March 2025, Getlink signed an exclusive agreement with to install and operate a new subsea fibre-optic network through the , enhancing internal telecoms capacity and commercializing high-speed data connectivity across the . This innovation supports increased digital infrastructure resilience and positions the tunnel as a key conduit for transcontinental data transfer. Eurotunnel has also developed an in-house "power to traction" system as part of ongoing efforts, designed to integrate excess directly into train propulsion, though full implementation details remain in progress as of October 2025. These upgrades collectively underscore Getlink's focus on modernizing the infrastructure to handle growing demand while prioritizing efficiency and safety.

References

  1. [1]
    Our Group - Getlink
    Getlink is a key player in mobility infrastructures, international transport and leader in eco-responsible transport.
  2. [2]
    Eurotunnel, a key player in low-carbon transport - Getlink
    As the operator of the Channel Tunnel since its opening in 1994, Eurotunnel carries nearly 10 million passengers a year between France and the UK via its ...
  3. [3]
    The Group's history - Getlink
    A pioneer in the movement to bring people, goods, data and energy closer together, Getlink has been a major player in European history for 30 years.
  4. [4]
    Getlink SE: Shareholders Board Members Managers and Company ...
    Getlink SE manages and operates a railroad tunnel under the English Channel connecting continental Europe and the United Kingdom (the Channel Tunnel).
  5. [5]
    Eurotunnel railway network - Getlink
    Eurotunnel is concessionaire of the cross-Channel Fixed Link and makes paths available to train operators who are licensed to operate cross-channel rail ...
  6. [6]
    2023 annual results: historic Group performance - Newsroom Getlink
    Feb 29, 2024 · In 2023, Getlink achieved unprecedented results thanks to the exceptional performance from ElecLink and the solid results of Eurotunnel and Europorte in ...Missing: key facts achievements
  7. [7]
    Annual results 2024: EBITDA target achieved at €833 million - Getlink
    Jun 3, 2025 · The Group has once again generated high-quality annual results, with EBITDA at the top end of the guidance set in February 2024.Missing: key facts
  8. [8]
    Getlink's core profits drop, outperforms guidance and market ...
    Mar 5, 2025 · Transport and infrastructure operator Getlink reported a better-than-expected drop in its full-year core profit, as growth in its Eurotunnel ...
  9. [9]
    Origins of the Channel Tunnel, 1957-1987 - BNP Paribas
    Feb 25, 2025 · On 29 July 1987, François Mitterrand and Margaret Thatcher signed the treaty between Britain and France that authorised the building of a tunnel underneath the ...
  10. [10]
    Facts About The Channel Tunnel - Eurotunnel LeShuttle™
    Mar 20, 2024 · February 1986 – A treaty to approve the tunnel project is signed by the French and British governments · December 1987 - Excavation starts on the ...
  11. [11]
    The Channel Tunnel - Global Infrastructure Hub
    Nov 30, 2020 · The Channel Tunnel proposal from Eurotunnel was conceived as a combination of financing and construction functions. The design-and-build ...
  12. [12]
    Channel Tunnel handshake of history - TunnelTalk.com
    Twenty years ago this month, on 1 December 1990, England and France were joined under the sea through the central service tunnel headings of the Channel ...Missing: timeline | Show results with:timeline
  13. [13]
    1994–2024 The Channel Tunnel - 30 years of unique history - Getlink
    May 6, 2024 · The Channel Tunnel was inaugurated on 6 May 1994. On that day, the first shuttle with Queen Elizabeth II and the President of the French ...
  14. [14]
    What was the financial loss of the channel tunnel project? - Quora
    Aug 9, 2024 · The financial loss of the Channel Tunnel project was significant, with costs escalating from an estimated £5.5 billion to £9 billion ¹.<|separator|>
  15. [15]
    Channel Tunnel Operator Sees a Financial Collapse If Revenues ...
    Apr 11, 1995 · The operating company of the tunnel under the English Channel said yesterday that it lost more than $600 million in 1994 and that revenues had been so meager ...
  16. [16]
    The Company File | Tunnel vision: the Eurotunnel story - BBC News
    Mar 15, 1999 · Its financial situation soon became untenable and the group was faced with bankruptcy. Eurotunnel owed £9bn and was clocking up staggering ...
  17. [17]
    Deep in debt | Politics | The Guardian
    Apr 6, 2004 · By then, Eurotunnel was a financial basket-case: the cost of building the tunnel had rocketed from £6bn to over £10bn. The problems were ...
  18. [18]
    [PDF] Preliminary Restructuring Agreement - Getlink
    The restructuring of the Eurotunnel group indebtedness concerns approximately £6.2 billion, estimated to be the level of the group's debt as at 31 October 2006 ...
  19. [19]
    Financial restructuring - TNU archives - Getlink
    The financial restructuring included debt negotiations from 2005, the Safeguard Plan approved in 2007, and an Exchange Tender Offer by Groupe Eurotunnel SA.
  20. [20]
    Eurotunnel to Repay Debt Early with Equity Hike - Reuters
    Feb 20, 2008 · 15, 2007 approved a debt restructuring deal which gave banks and financial institutions a major part of an increased share capital. Under that ...
  21. [21]
    Eurotunnel saved by shareholder support | Business - The Guardian
    May 25, 2007 · Under the terms of the restructuring, Eurotunnel's debt will be more than halved to £2.8bn and shareholders will receive a 13% stake in Groupe ...
  22. [22]
  23. [23]
    Debtholders - Getlink
    13 April 2018 – Getlink reoganisation of legal structure · 21 May 2017 – Groupe Eurotunnel announces the complete success of its debt refinancing operation, ...
  24. [24]
    Eurotunnel completes first external expansion in its history ... - Getlink
    Dec 1, 2009 · Eurotunnel completes first external expansion in its history with the acquisition of the French businesses of Veolia Cargo. Getlink · Europorte.
  25. [25]
    [PDF] Groupe Eurotunnel - Getlink
    Over and above the cross-Channel Fixed Link (80% of 2012 revenues), Eurotunnel Group is continuing its expansion in Europe, in markets that complement its core ...
  26. [26]
    A new name for a new challenge: Groupe Eurotunnel becomes Getlink
    Nov 20, 2017 · Groupe Eurotunnel has today changed its name to Getlink. This new name, reflecting the dynamism of connection and exchange, ...Missing: expansion | Show results with:expansion
  27. [27]
    Eurotunnel renamed Getlink in preparation for post-Brexit era
    Nov 20, 2017 · Company says rebrand to 'very Anglo-Saxon' name is needed because it owns businesses beyond the Channel Tunnel.
  28. [28]
    Eurotunnel rebrands as Getlink - International Railway Journal
    Groupe Eurotunnel announced on November 20 that it has changed its name to Getlink, with the new brand intended to “reflect the dynamism of connection and ...Missing: history | Show results with:history<|separator|>
  29. [29]
    Getlink reveals the new brand identity for its rail shuttle service ...
    May 12, 2023 · With this new brand identity, LeShuttle, Getlink introduces a strategic milestone in its growth ambition based on customer focus, service ...Missing: expansion | Show results with:expansion
  30. [30]
    Getlink unveils new Group brand identity and updates visual ...
    Jun 27, 2025 · Paris, 27 June 2025 - Getlink has introduced a refreshed Group brand identity and revealed a new brand architecture for its entities.
  31. [31]
    Eurotunnel branding gets a refresh - Kent Online
    Jul 2, 2025 · Eurotunnel's branding has undergone a refresh with a new logo unveiled. It comes as part of a decision by its owner, Getlink, to revamp the brands of all its ...
  32. [32]
    Getlink SE: 2024 Group Revenue of €1.6 Billion - Yahoo Finance
    Jan 27, 2025 · 2024 financial year: Group's consolidated revenue at €1.614 billion in 2024, down 12% at a constant exchange rate1 compared to 2023 as a ...
  33. [33]
    Getlink's net profit drops by 5% in 2024, impacted by competition ...
    Mar 7, 2025 · Getlink, the operator of the Channel Tunnel, reported a net profit of €317 million for 2024, marking a 5% decrease compared to 2023.<|separator|>
  34. [34]
    Colt and Getlink sign exclusive agreement to install and operate a ...
    Mar 31, 2025 · The contracts for dark fibre installed in the Tunnel in 1998 will progressively expire until 2025, and Colt will take over their operation. The ...<|control11|><|separator|>
  35. [35]
    [PDF] 2025 Half Year Results Presentation - Getlink
    Jul 24, 2025 · The revenue already secured by Eleclink, the consequences for suspension of activity until 5 February and between 19. May and 2 June 2025, ...
  36. [36]
    Getlink SE: 2025 Half-Year Results: Growth in Eurotunnel Results ...
    Jul 23, 2025 · Revenue of €564 million (+4%) through growth in Railway Network and Shuttle activities in a challenging economic environment, particularly in ...<|control11|><|separator|>
  37. [37]
    Innovation and digitalisation - Getlink
    Eurotunnel has introduced automated biometric facial recognition e-gates for coach passengers traveling with Le Shuttle in order to speed up border crossings ...
  38. [38]
    [PDF] & YOU - Getlink
    Oct 1, 2025 · Launched on 3 June 2025, the Club LeShuttle marks a new stage in Eurotunnel's loyalty strategy. Developed in partnership with Avios, one of the ...
  39. [39]
    Shuttle traffic in September 2025 - Newsroom Getlink
    Paris, 7 October 2025 - In September 2025, LeShuttle Freight carried 94,503 trucks, down 2 % compared to September 2024. Since 1 January, more than 870,000 ...
  40. [40]
    Getlink SE: Shuttle Traffic in September 2025 - Morningstar
    Oct 6, 2025 · Regulatory News: In September 2025, LeShuttle Freight carried 94,503 trucks, down 2 % compared to September 2024. Since 1 January, more than ...
  41. [41]
  42. [42]
  43. [43]
    The Channel Tunnel - Eurotunnel - Getlink
    Unique infrastructure in the world, the Fixed Link is the only way to cross the Channel in total safety, 365 days a year, 24 hours a day.
  44. [44]
    The Channel Tunnel - The Robbins Company
    Machine Type EPBM and Double Shield TBM · Number Of Machines Five · Diameters 2 x 8.80 m (29 ft), 2 x 8.36 m (27 ft), 5.6 m (18 ft), 5 m (16 ft) · Tunnel Type Rail ...
  45. [45]
    Channel tunnel | The Geological Society of London
    This Marly Chalk is free from flints, generally has a very low permeability and is usually less fissured than the overlying Chalk strata. The lowest member of ...
  46. [46]
    [PDF] CHANNEL TUNNEL TUNNELS CONSTRUCTION - WordPress.com
    Mar 3, 2015 · - 120 marine boreholes and about 1,000 km of geophysical (seismic reflection), traverse lines,. - adits and short lenght of tunnels excavated ...
  47. [47]
    Chunnel makes breakthrough | December 1, 1990 - History.com
    Shortly after 11 a.m. on December 1, 1990, 132 feet below the English Channel, workers drill an opening the size of a car through a wall of rock.
  48. [48]
    Channel Tunnel Facts & Figures - Eurotunnel LeShuttle™
    The Channel Tunnel is one of the biggest engineering projects ever undertaken in the UK. Taking more than five years to complete, with more than 13,000 workers ...
  49. [49]
    The Channel Tunnel - VINCI Construction Grands Projets
    We were commissioned by Eurotunnel to build three key turnkey tunnels with a total length of 150 kilometres. The tunnels, which run for 10 kilometres ...
  50. [50]
    Take Your Car To France With Eurotunnel LeShuttle™
    LeShuttle is the quickest way to take your car to France, with no luggage fees, no size restrictions, and no excess luggage charge. It takes 35 minutes.Missing: details | Show results with:details
  51. [51]
    Travelling with different vehicles - Eurotunnel LeShuttle™
    LeShuttle allows cars, motorcycles, high vehicles, vans, minibuses, caravans, campervans, trailers, coaches, bicycles, and adapted vehicles. One ticket covers ...
  52. [52]
    Vehicle types and sizes - Eurotunnel LeShuttle™
    Light commercial goods maximum weight: 3.5 tonnes (however the Passenger Shuttle will allow exceptional vehicles such as campervans and coaches up to 25 tonnes ...
  53. [53]
    Rolling stock - Eurotunnel - Getlink
    Each Eurotunnel Shuttle in operation has two locomotives, one at each end of the Shuttle and is about 800m long. Out of the fleet of 57 Brush/Bombardier ...
  54. [54]
    Eurotunnel entrusts the mid-life renovation of its Passenger Shuttles ...
    Mar 20, 2019 · Composed in total of 254 wagons, each 800-meter long shuttle is made up for passengers' vehicles with passengers remaining in their vehicles ...
  55. [55]
    Eurotunnel LeShuttle™: Folkestone To Calais In 35 Minutes. Book ...
    Quickest, easiest, and most eco-friendly way to cross the channel. No luggage restrictions with up to 4 departures an hour. Start your adventure today!The LeShuttle™ Experience · Club LeShuttle account · LeShuttle - Trip detailsMissing: frequency | Show results with:frequency
  56. [56]
    Travelling by Le Shuttle: Timetable, Ticket Prices & What To Expect
    As a general guide, a train will run every 15 minutes each way during daytime in peak and every 30 minutes off peak. You can view the latest live timetable of ...Missing: frequency | Show results with:frequency
  57. [57]
    Eurotunnel LeShuttle Freight - Cross Channel Freight
    Our VanPro service​​ Operating 24 hours a day, 365 days a year, with up to 6 departures per hour, LeShuttle Freight is the fastest, safest and most convenient ...Missing: details | Show results with:details
  58. [58]
    LeShuttle (Eurotunnel) Freight | Freightlink
    LeShuttle (Eurotunnel) Freight operates up to 6 trains per hour at peak times on the freight service. The crossing time is just 35 minutes. Le Shuttle Freight ...
  59. [59]
    [PDF] 2023-traffic-and-revenue-of-getlink.pdf
    Jan 25, 2024 · Truck Shuttle activity: LeShuttle Freight transported more than 1.2 million trucks in 2023, confirming its position as the market leader ...<|control11|><|separator|>
  60. [60]
    Shuttle traffic in December 2024 - Les Echos Comfi
    Jan 9, 2025 · In December 2024, LeShuttle Freight carried 96,223 trucks, up 6% compared to December 2023. In 2024, nearly 1.2 million trucks crossed the ...
  61. [61]
    Shuttle traffic in March 2025 - Newsroom Getlink
    In March 2025, LeShuttle Freight carried 105,413 trucks, up 2% compared to March 2024. Since 1 January, 302,144 trucks have crossed the Channel on board the ...
  62. [62]
    Sustainable Freight Shipping - Eurotunnel LeShuttle Freight
    Sep 23, 2025 · LeShuttle Freight uses 100% electric rail traction · Today, 75% of LeShuttle Freight's electrical consumption comes from renewable sources · A ...
  63. [63]
    video - Getlink
    Oct 15, 2025 · New cross-Channel rail freight service with CAT and Toyota · video · Eurotunnel · Getlink · Rail Freight.Missing: logistics | Show results with:logistics
  64. [64]
    'The Channel Tunnel is largely underused for rail freight ...
    Feb 18, 2025 · Data from parent company Getlink (ex-Eurotunnel Group) for 2024 showed that in Q3 the number of trains fell by 19 per cent compared to the same ...
  65. [65]
    Developing cross-Channel rail freight - doubling the modal share of ...
    In a call to action, Eurotunnel and Getlink urge British rail authorities to redirect some of the HS2 investment to the development of the W12 intermodal ...<|separator|>
  66. [66]
    [PDF] FIXED LINK USAGE ANNUAL STATEMENT - 2026 WORKING ...
    Dec 13, 2024 · Eurotunnel has established, for its function of capacity allocation, an organisation which ensures that train paths are allocated on a fair and ...
  67. [67]
    Maintenance - Eurotunnel - Getlink
    The Passenger Shuttles can transport up to 120 cars and 12 coaches. During the crossing in the Tunnel, these 800-metre long Shuttles run at 120 kph and Eurostar ...
  68. [68]
    [PDF] GROUPE EUROTUNNEL - Getlink
    In this way, thanks to its expertise, Eurotunnel's Railway. Control Centre (RCC) manages to find a path through the Tunnel for 86% of late Eurostar trains.<|separator|>
  69. [69]
    Channel Tunnel capacity - RailUK Forums
    Aug 6, 2025 · Getlink claims up therotically to 1000 trains per day with 16 simultaneous, which lines up with the 42tph over 24h, but that would be only 24tph ...
  70. [70]
    [PDF] Runways to railways: unlocking the potential of the Channel Tunnel
    Of train paths through the Channel. Tunnel. allocated for passenger and freight services, less than 50 per cent of the passenger capacity and ten per cent of ...
  71. [71]
    Eurotunnel operator offers cash to attract new cross-channel services
    Jun 5, 2024 · The operator of the Channel Tunnel, Getlink, has offered €50 million to encourage more companies to launch new cross-Channel rail services to rival Eurostar.
  72. [72]
    Eurostar rivals given 'green signal' for cross-Channel trains
    Apr 2, 2025 · A new report commissioned by the Office of Road and Rail has ruled that Eurostar must provide access to new operators at Temple Mills depot.
  73. [73]
  74. [74]
    Eleclink - Getlink
    ElecLink operates the electricity interconnector between the United Kingdom and France, which includes two direct current cables inside the Channel Tunnel.
  75. [75]
    ElecLink HVDC Interconnector, Eurotunnel, UK and France
    Jan 19, 2021 · The ElecLink is a 320kV high-voltage direct current (HVDC) bi-directional interconnection project being developed to transfer up to 1GW of electricity.<|separator|>
  76. [76]
    ElecLink Interconnector UK - HVDC - aspecto
    ElecLink is an HVDC link between the UK and France through the Channel Tunnel, using a +/- ~320kV DC scheme with 51km DC cable inside the tunnel.Missing: details | Show results with:details
  77. [77]
    [PDF] Project 172 - ElecLink - entso-e
    Project 172 - ElecLink. Eleclink is a new FR – UK interconnection cable with 1000 MW capacity through the channel Tunnel between Sellindge. (UK) and Mandarins ...Missing: details | Show results with:details
  78. [78]
    [PDF] The ElecLink Project - Getlink
    Nov 30, 2019 · The ElecLink project is a direct current electricity interconnection between the UK and France, supporting a low carbon economy, and is the ...
  79. [79]
    Prysmian announces the completion of the Eleclink HVDC ...
    The ElecLink project involves an HVDC cable connection between France and the UK through the Channel Tunnel, to increase energy exchange over a bidirectional ...Missing: details | Show results with:details
  80. [80]
    Getlink: ElecLink: The Inter-Governmental Commission and the ...
    Feb 17, 2022 · Recognised as a Project of Common Interest by the European Commission, ElecLink provides an exchange capacity of 1 GW between France and the ...
  81. [81]
    2023 revenue up 14% to more than €1.8 billion. - Newsroom Getlink
    Jan 25, 2024 · This remarkable performance is driven both by the full-year contribution of ElecLink (commissioned in May 2022) in a still-buoyant electricity ...
  82. [82]
    [PDF] Part 2 ElecLink Day Ahead Allocation Rules - JAO
    Mar 17, 2025 · In particular, the Allocation Rules for Daily Capacity Allocation on ElecLink Interconnector set out the rights and obligations of Registered ...
  83. [83]
    Getlink's core profits drop, dragged down by Eleclink - Reuters
    Jul 23, 2025 · Eleclink's first-half sales fell more than 50% to 92 million euros ($108 million) compared to 185 million euros in the first half of 2024, due ...
  84. [84]
    Getlink SE: Gradual return to service of ElecLink operations
    Feb 5, 2025 · As a reminder, a fault was detected on the ElecLink electricity interconnector between France and the UK, leading to a suspension of activity ...Missing: electrical | Show results with:electrical
  85. [85]
    Eleclink
    Eleclink provides secure and protected interconnector capacity with minimal environmental impact through the interoperability of the Channel Tunnel.Who we are · ElecLink News · Trade With ElecLink · Auctions and Nominations
  86. [86]
    The Channel Tunnel
    In 1957, it seemed the last obstacle to construction of a tunnel had disappeared and by 1973, work had re-started in a blaze of optimism.
  87. [87]
    How The Channel Tunnel Works - Practical Engineering
    Jan 16, 2024 · 2024 marks thirty years since the opening of the channel tunnel, or chunnel, or as they say in Calais, Le tunnel sous la Manche. This ...
  88. [88]
    Safety and security - Getlink
    The four SAFE fire-fighting Stations, conceived by Eurotunnel's experts and deployed in 2011, contributes to guarantee maximum system availability in any ...Missing: ventilation | Show results with:ventilation
  89. [89]
    Fire-safety in the Channel Tunnel
    Not only the train's maximum travelling time to the safe station, but also the complex ventilation conditions resulting from its slipstream, and multiple flow ...The Safe-Station Concept · Water Mist For Safe Stations · Fire Tests Up To 200 MwMissing: Getlink | Show results with:Getlink
  90. [90]
    [PDF] 20250128-getlink-2024-revenues-en.pdf
    Jan 28, 2025 · ➢ Europorte: growth of 12% with revenue of €168 million. ➢ ElecLink: revenue of €280 million down 50% compared to 2023, impacted by the expected ...Missing: sources | Show results with:sources
  91. [91]
    Corporate website - Getlink
    Getlink, a pioneer in low carbon transport. Getlink's origins lie in a pioneering momentum that has left its mark on the history of major infrastructure.Eurotunnel · Eurotunnel railway network · Getlink share · Getlink Customs Services
  92. [92]
    [PDF] 20240326 Case Getlink - FIR-PRI Awards
    Mar 26, 2024 · The group operates its own Shuttle for passenger vehicles and trucks, and leases the tunnel rail infrastructure to other train operators ( ...
  93. [93]
    [PDF] Eurotunnel on track - Getlink
    A complete restructuring plan will be presented to shareholders at the next AGM. The shareholders will be sent all the information in the document which will be ...
  94. [94]
    Channel Link Enterprises Finance | S&P Global Ratings
    Apr 1, 2022 · In 2007, CLEF issued a combination of £1.8 billion and €2.2 billion of notes due December 2050 as part of the financial restructuring and debt ...
  95. [95]
    Groupe Eurotunnel announces the complete success of its debt ...
    May 21, 2017 · Groupe Eurotunnel announces the complete success of its debt refinancing operation, average cost of debt reduced to 4% - Newsroom Getlink.
  96. [96]
    Getlink: Concluding step in debt optimisation
    Jul 2, 2018 · Getlink has initiated the third and last stage of the financial reorganisation which it began in December 2015 with a further step in the ...
  97. [97]
    2024 Group revenue of €1.6 billion - Newsroom Getlink
    Jan 28, 2025 · Group's consolidated revenue at €1.614 billion in 2024, down 12% at a constant exchange rate compared to 2023 as a result of ElecLink's lower ...
  98. [98]
    Getlink: Annual Results 2024: EBITDA Target Achieved at €833 ...
    Mar 6, 2025 · At 31 December 2024, fixed assets mainly include property, plant and equipment, right-of-use and intangible assets amounting to €5,645 ...
  99. [99]
    [PDF] Groupe Eurotunnel SA Annual Report - Getlink
    the Eurotunnel Group's debt levels, and the undertakings made as part of the Term Loan, may affect its ability to obtain additional finance in future and ...
  100. [100]
    [PDF] Economic footprint of the Channel Tunnel fixed link | Getlink
    The shorter crossing times through the Tunnel, compared to the ferry crossing, also reduce costs, allowing services to remain competitive compared to air ...
  101. [101]
    Getlink: Annual Results 2024: EBITDA Target Achieved at €833 ...
    Mar 6, 2025 · Truck traffic down slightly by 1%, in a lacklustre economic environment in the United Kingdom and continuing fierce competition from ferry ...
  102. [102]
    [PDF] Economic Footprint of the Channel Tunnel in the EU - Getlink
    In total the Channel Tunnel facilitated €22.0bn of direct trade between France and the UK in 2016. This is composed of trade in a variety of sectors, with the ...
  103. [103]
    Shuttle traffic in May 2025 - Newsroom Getlink
    Jun 6, 2025 · In May 2025, LeShuttle Freight carried 97,125 trucks, down 4% compared to May 2024. Since 1 January, close to 500,000 trucks have crossed ...Missing: size types
  104. [104]
    The Channel Tunnel: What economic value to European trade?
    Jun 4, 2018 · The Channel Tunnel provides a fast, frequent and reliable route accounting for €138 bn of trade and 21 million passengers each year.
  105. [105]
    How the Channel Tunnel changed Europe forever - CNN
    May 4, 2019 · Some 4.5 million UK tourists use the Channel Tunnel every year, with 1.6 million trucks transporting goods between the UK and the continent, ...
  106. [106]
    Getlink: All-Time High Revenue for the Group at €1.6 Billion
    Jan 26, 2023 · Getlink: All-Time High Revenue for the Group at €1.6 Billion · Nearly 1.45 million trucks crossed the Channel on Le Shuttle Freight in 2022, ...
  107. [107]
    Channel Tunnel shuttle Entry/Exit System preparations completed
    Aug 29, 2024 · Channel Tunnel concessionaire Getlink has completed a €80m three-year programme of changes to its car and lorry shuttle train terminals at Folkestone and ...
  108. [108]
    Eurotunnel and London St. Pancras Highspeed deepen ... - Getlink
    Feb 20, 2025 · London St. Pancras Highspeed and Eurotunnel have today announced a landmark partnership to accelerate the growth of cross-Channel high-speed rail.Missing: achievements | Show results with:achievements
  109. [109]
    Valuing companies in financial trouble - Eurotunnel - ResearchGate
    The Eurotunnel was built during 1987 to 1994 for over £10 billion, of which roughly 80% were financed by debt and 20% by equity.
  110. [110]
    Eurotunnel: When Success Spells Disaster | by Bent Flyvbjerg
    Dec 13, 2021 · Revenues were a fifth of what had been estimated, resulting in the tunnel's first insolvency. When revenues finally materialized, in 1995, they ...
  111. [111]
    History of Eurotunnel Group – FundingUniverse
    A debt restructuring is finalized. Company History: The Eurotunnel Group includes Eurotunnel plc, which, through its Eurotunnel subsidiaries, was ...
  112. [112]
    Eurotunnel in talks to head off cash crisis - The Times
    Feb 8, 2004 · Revenues from the tunnel have fallen by 5% to £556m, as a result of tough competition from low-cost airlines and ferry companies. Eurotunnel ...
  113. [113]
    Fitch Downgrades Unwrapped Tranche of Eurotunnel-Related FLF2
    Jul 13, 2006 · The Ad Hoc Committee signed a binding Preliminary Restructuring Agreement ("PRA") with Eurotunnel on 23 May 2006. On 31 May 2006 a binding ...
  114. [114]
    Court approves Eurotunnel debt reduction plan | Reuters
    Aug 9, 2007 · The court gave Eurotunnel 36 months to implement the restructuring. ... Before reading out the 17 judgements approving the debt restructuring ...
  115. [115]
    Channel Tunnel - Hansard - UK Parliament
    Feb 8, 2007 · Under the new proposal, Eurotunnel's debt would be reduced from more than £6 billion to £2.84 billion, leaving existing shareholders with 13 ...<|separator|>
  116. [116]
    Move to save perks could halt Eurotunnel restructuring - The Guardian
    Apr 9, 2007 · Eurotunnel's complex restructuring, which has taken 18 months and an estimated £80m to engineer, could be blocked by a small group of long- ...Missing: details | Show results with:details
  117. [117]
    First profit for Eurotunnel in 20-year history | Channel Tunnel
    Apr 8, 2008 · The debt crisis, during which Eurotunnel suspended payments, ended last year in a deal between creditors and angry shareholders brokered by ...
  118. [118]
    3,500 migrants try to enter Channel Tunnel in France - CNN
    Jul 30, 2015 · This year alone, Eurotunnel has intercepted 37,000 migrants, the operator said. And the attempted journey has been deadly.Missing: Getlink | Show results with:Getlink<|separator|>
  119. [119]
    Extra riot police drafted in to protect Eurotunnel from 1000s of migrants
    Jul 29, 2015 · More than 2,000 migrants stormed the Tunnel on Tuesday, and 'more intrusions were expected for the foreseeable future', said the police source.
  120. [120]
    Migrants 'breached Eurotunnel security by guessing code'
    Aug 8, 2015 · Migrants are believed to have unlocked a gate into the Eurotunnel complex after guessing the security code, it has been reported.
  121. [121]
    Migrants Have Made 3,500 Attempts to Enter the Channel Tunnel ...
    Jul 29, 2015 · In total more than 37,000 attempts by migrants to reach the UK have been blocked since January 1, according to Eurotunnel, which last week asked ...Missing: breaches incidents
  122. [122]
    Migrant 'Intrusion' Halts Channel Tunnel Trains - Yahoo News UK
    Oct 2, 2015 · Eurotunnel (Paris: FR0010533075 - news) has suspended all train services between Folkestone and Calais due to a "massive intrusion" of over 100 migrants.
  123. [123]
    Migrants break into Channel Tunnel as tension mounts in Calais
    Oct 3, 2015 · About 200 migrants broke into the Channel Tunnel from France while several hundred others held up lorries near Calais port on Saturday in ...
  124. [124]
    Migrants Evade Security to Enter Tunnel in France
    Oct 3, 2015 · Rail services had resumed after almost 200 migrants broke through security near the opening of the Channel Tunnel in France, clashing with ...
  125. [125]
    Eurotunnel migrant breaches 'stopped 20,000 times' - BBC News
    Jan 20, 2017 · More than 20,000 breaches of security by migrants at the Channel Tunnel terminal in France were thwarted in 2016, Eurotunnel has claimed.Missing: intrusions | Show results with:intrusions
  126. [126]
    Eurotunnel Posts Record Truck Tally as Migrant Intrusion Stemmed
    Jan 21, 2016 · Eurotunnel called on the French and British governments to intervene in July as break-in attempts at its Shuttle terminal reached record levels, ...Missing: issues statistics
  127. [127]
    Thousands of attempts by migrants to hide in vehicles at Channel ports
    May 5, 2025 · Figures obtained by BBC South East show there were 5,874 detections at ports on the continent, including Calais, Dunkirk and the Channel Tunnel ...Missing: Getlink | Show results with:Getlink
  128. [128]
    [PDF] GROUPE EUROTUNNEL SE ANNUAL REVIEW ... - Getlink
    The second major component is the Maintenance 2.0 project, which involves implementing a continuous improvement programme to maintain rolling stock over seven ...
  129. [129]
    Border Formalities - Eurotunnel LeShuttle Freight
    Since Brexit came into effect in 2021, formalities for goods transport between the UK and France have been mandatory. Eurotunnel and the French and British ...
  130. [130]
    [PDF] Brexit: The future operation of the Channel Tunnel Fixed Link
    Feb 23, 2021 · 8. The Tunnel operates on the basis of a concession agreement with Eurotunnel (now known as Getlink), the dedicated infrastructure manager.
  131. [131]
    Eurotunnel post-Brexit: what comes next? - Railway Technology
    Dec 8, 2020 · Folkestone's Eurotunnel terminal could be set for more disruption in the coming weeks, with further testing continuing sporadically up to 31 December.
  132. [132]
    Car drivers face two-hour queues at Dover and Folkestone from ...
    Nov 6, 2020 · Car drivers face two-hour queues at Dover and Folkestone from January – and even longer waits in summer · A new report from the National Audit ...
  133. [133]
    What caused the delays at Dover and will they continue? - BBC
    Jul 29, 2022 · ... queues at Dover and Eurotunnel could be one to two hours in January 2021 but become much longer in the summer months, especially at Dover.
  134. [134]
    [PDF] Q3 2021 : Getlink maintains its performance in the third quarter
    Oct 21, 2021 · 1 January 2021 and the introduction of Brexit border controls, a service that reduces frontier control time by 30%. • Eurotunnel wins the SITL ...
  135. [135]
    Eurotunnel beyond Brexit - Getlink
    Since the implementation of Brexit on January 1, 2021, Eurotunnel has been deploying digitized services and infrastructure for its freight and passenger ...Missing: effects | Show results with:effects
  136. [136]
    [PDF] 2020 Annual Results - Operational and financial discipline ... - Getlink
    Feb 25, 2021 · Other non-current assets at 31 December 2020 include the G2 inflation-linked notes held by the Group amounting to. €322 million and a deferred ...<|control11|><|separator|>
  137. [137]
    Shuttle Traffic for December 2021 - Newsroom Getlink
    Dec 17, 2021 · In December 2021, Le Shuttle Freight transported 122,434 trucks, a decrease of 7% compared to 2020, the comparison with 2020 being adversely ...
  138. [138]
    [PDF] 2021 Annual Results: In an extraordinary year, Getlink is controlling ...
    Feb 24, 2022 · Other non-current assets at 31 December 2021 include the G2 inflation-linked notes held by the Group amounting to. €347 million and a deferred ...
  139. [139]
    Eurotunnel turns the page on Covid and Brexit - Africa Supply Chain
    Minus Covid, which has had a greater impact on its "passenger" activity, the implementation of Brexit on 1 January 2021 has strengthened its position in cross- ...Missing: effects | Show results with:effects
  140. [140]
    Getlink SE: 2025 Half-Year Results: Growth in Eurotunnel Results ...
    Jul 24, 2025 · At €266 million in the first half of 2025, operating expenses were up 6% compared to 2024. While lower energy bills offset general inflation, ...
  141. [141]
    [PDF] PRESS RELEASE - Getlink
    Mar 6, 2025 · Other non-current assets at 31 December 2024 include the G2 inflation-linked notes held by the. Group amounting to €361 million and a deferred.
  142. [142]
    Getlink Upgraded To 'BB' On Supportive Financial - S&P Global
    Apr 18, 2024 · This led to Getlink accumulating €1.6 billion of cash on a consolidated basis at the end of 2023, €800 million of which, by our estimate, was at ...
  143. [143]
    Fitch Affirms CLEF and Getlink; Revises Outlook on Getlink's Bond to ...
    Apr 4, 2024 · Despite lower traffic volumes, Eurotunnel's 2023 revenues were 17% higher than 2019, mainly thanks to higher yields due to management's current ...Missing: prospects | Show results with:prospects<|separator|>
  144. [144]
    [PDF] Getlink Channel Tunnel - Magellan Financial Group
    Rail Services: Operating under a long-term contract, Eurostar is the key user, operating high-speed rail services. • ElecLink: A significant addition since ...
  145. [145]
    Dividend - Getlink
    Confident in its long-term prospects, the Group confirms its commitment to shareholder return and distribute a dividend of €0.58 per share for the 2024 ...
  146. [146]
  147. [147]
    The Channel Tunnel - An ex post economic evaluation | Request PDF
    Aug 6, 2025 · The cost benefit appraisal of the Channel Tunnel reveals that overall the British economy would have been better off had the Tunnel never been ...
  148. [148]
    [PDF] 2024 Half-Year Financial Report For The Six Months To 30 june
    Jul 24, 2024 · Other non-current assets. 611. 578. Total non-current assets. 7,258. 7,228. Trade and other receivables. 131. 113. Other current assets *. 140.
  149. [149]
    [PDF] Letter to shareholders - Getlink
    Mar 6, 2025 · Total contractual repayments on the long-term loan amount to €526m. The Group continues to monitor climate change, we clearly believe that we ...Missing: prospects | Show results with:prospects
  150. [150]
    Digging beneath the iron triangle: the Chunnel with 2020 hindsight
    By 2017, Eurotunnel could boast growing profitability above half a billion euros a year on a turnover above one billion and a buoyant share price, despite ...Missing: viability | Show results with:viability
  151. [151]
    Thirty years on: why the Channel Tunnel has failed to reach its ...
    Mar 6, 2024 · Brexit, COVID, government disinterest and tighter security have ramped up the cost of travelling through the Channel Tunnel, which opened almost 30 years ago.
  152. [152]
    The Greener Way To Travel - Eurotunnel LeShuttle™
    Jul 25, 2024 · LeShuttle is a green option, emitting 52 times less CO2 than ferries, using 75% renewable energy, and avoiding 1.7 million tons of CO2e yearly.<|separator|>
  153. [153]
    The real carbon cost of travel to the Alps | Ecoski Stories
    Apr 2, 2022 · According to Eurotunnel, taking the ferry produces 147kg CO2e per car, per crossing, whereas driving your car (filled with passengers) onto a ...
  154. [154]
    CO2 emissions: Train & ferry versus plane - Seat 61
    The conclusion was remarkable: Taking the train instead of flying cuts your CO2 emissions by a staggering 90%. With airport check-ins up to 2 hours even for a 1 ...
  155. [155]
    Can rail reduce British aviation emissions? - ScienceDirect.com
    41 % of passengers could switch to rail, accounting for 14 % of aviation emissions. •. Minority of long-haul flights account for most aviation emissions.
  156. [156]
    [PDF] Getlink S.E. - TCI Fund Management
    Nov 30, 2019 · Carbon emissions generated by rail freight using Getlink's infrastructure are 99 times lower than those of air transport and 8 times lower ...<|control11|><|separator|>
  157. [157]
    Strategy and sustainability - Getlink
    Getlink integrates sustainable development, is a leader in low carbon transport, and prevents 1.4 million tonnes of CO2 emissions per year. They also ...A Responsible Group On The... · Getlink Csr Brochure 2023 · Our Csr Commitments
  158. [158]
    [PDF] For sustainablE mobility - Getlink
    These results were achieved through a number of structural initiatives: substitution of refrigerant fluids and fire extinguishing agents in technical rooms and ...
  159. [159]
    Creation of Samphire Hoe
    Almost 5 millions of cubic metres of spoil extracted from the tunnels were deposited behind the 1,7 km long (just over 1 mile) sea wall, reclaiming some 45 ...
  160. [160]
    EUROTUNNEL preserve biodiversity on both sides of the Channel
    Sep 18, 2019 · Eurotunnel has set up under the cliffs of Dover, Samphire Hoe, an artificial site of 30 hectares where 5 million m3 of blue chalk extracted from ...
  161. [161]
    [PDF] 2011-environment-report-eurotunnel.pdf - Getlink
    This document describes the characteristics, initiatives and key indicators for measuring our proactive contribution to the challenges of Sustainable.
  162. [162]
  163. [163]
    [PDF] A social and environmental impact assessment that examines the ...
    This thesis examines the social and environmental impacts that have resulted from the construction and operation of the Channel Tunnel. Nord-Pas de. Calais, ...
  164. [164]
    World's Longest Undersea Tunnel Stays Cool And Reduces ...
    May 31, 2018 · Eurotunnel released official data demonstrating energy savings of 33 percent after the first season of operating a new cooling system.
  165. [165]
    Eurotunnel Le Shuttle Freight Helps Logistics Industry Reduce ...
    Sep 21, 2022 · With a truck travelling on a Shuttle emitting 12 times less greenhouse gases than travel by ferry, Eurotunnel Le Shuttle Freight is eager to ...
  166. [166]
    [PDF] 2016 Corporate Social Responsibility report - Groupe Eurotunnel SE
    completed a carbon assessment, the Eurotunnel Group has reduced its carbon footprint by 55% since 2006. This ongoing commitment to combat global warming is ...
  167. [167]
    Environmental strategy - Getlink
    Getlink has set itself an ultimate goal of carbon neutrality by 2050, based on medium-term milestones focused on reducing intrinsic emissions.Reducing Our Direct And... · Linking Financial And... · Controlling Waste And...
  168. [168]
    Getlink Sets Out Its 2025 Environmental Plan - Business Wire
    Jun 21, 2021 · A 30% reduction in direct CO21 emissions by 2025, an environmental strategy in line with the Paris Agreement 2°C trajectory, a commitment to ...<|separator|>
  169. [169]
    Corporate Social Responsibility - Getlink
    Getlink sets out its new 2025 action plan to meet environmental challenges: reduce its direct CO2 emissions by 30% and accelerate the development of sustainable ...Strategy: Acting As A... · A Responsible Group, Always... · Getlink's Recent Ratings
  170. [170]
    Eurotunnel to double direct high-speed rail services via Channel ...
    Nov 28, 2024 · Eurotunnel plans to double direct high-speed rail services via the Channel Tunnel by 2034, accelerating low-carbon mobility.
  171. [171]
    St Pancras and Channel tunnel plan rail routes to Germany and ...
    Feb 21, 2025 · Those could include Cologne, Frankfurt, Geneva and Zurich. Getlink has previously said it wanted new services to be up and running by 2029.
  172. [172]
    2025 | The Channel Tunnel prepares for more trains ... - Trip By Trip
    Jul 25, 2025 · These routes would extend Eurostar's reach deep into continental Europe, connecting the British capital directly with two of the most important ...Eurostar Strikes Back · Gemini Trains And The 'uber'... · More On Night Trains And...
  173. [173]
    The Channel Tunnel is at the forefront of rail power technology and ...
    Jan 2, 2023 · Getlink announces that Eurotunnel has commissioned the world's most powerful static compensator (VSC technology) connected to a railway ...
  174. [174]
    Channel Tunnel, the longest undersea tunnel in the world, reaches ...
    GE's STATCOM solution enables the Channel Tunnel to run up to 16 trains simultaneously, increasing capacity by 60% and ensuring voltage stability.
  175. [175]
    The future is now for the Channel Tunnel - Railway Technology
    Apr 15, 2024 · Dan Hughes, infrastructure director at GetLink, talks about the last 30 years of the channel tunnel and what the future might hold.<|separator|>