Fact-checked by Grok 2 weeks ago

IC4

The IC4 is a class of (DMU) trainsets operated by Danske Statsbaner (DSB), Denmark's national railway operator, primarily for domestic long-distance services including routes across the Fixed Link. Each trainset comprises four cars—two powered motor cars (), a central intermediate car (FG), and a low-floor car (FH)—designed with tilting technology to navigate Denmark's curved tracks at higher speeds. Capable of reaching 180 km/h, the IC4 was intended to replace aging fleets and enhance capacity on key corridors. Ordered in the early from manufacturer AnsaldoBreda, the IC4 project aimed to modernize DSB's with features like wheelchair-accessible spaces, bistro areas, and efficient propulsion. However, the fleet became emblematic of procurement failure due to protracted delivery delays exceeding a decade, with initial units arriving in 2007 but full certification stalled until 2010 amid persistent defects. Technical shortcomings, including wheel and axlebox failures, braking system malfunctions, coupling incompatibilities preventing multi-set operation, and manifold cracks, resulted in availability rates far below targets—often under 60%—incurring billions in Danish kroner for repairs, leasing alternatives, and legal claims against the supplier. These issues escalated into a national political controversy, fueling debates on public procurement oversight and vendor accountability, with DSB pursuing damages negotiations and independent expert assessments highlighting systemic design and quality flaws. Despite upgrades and partial fleet utilization, the IC4's operational inefficiencies persisted, prompting evaluations of its long-term viability and contributing to DSB's fleet strategy shifts toward more reliable alternatives. One anomalous unit was repurposed as a gift to Libyan leader , underscoring the excess production from the oversized order.

Development and Procurement

Initial Order and Specifications

In December 2000, Danish State Railways (DSB) awarded AnsaldoBreda a contract for 83 IC4 diesel multiple-unit trainsets at a cost of approximately 5 billion Danish kroner. The procurement aimed to modernize DSB's intercity fleet for non-electrified lines, with deliveries initially scheduled to begin in 2003. These four-car articulated units were specified for operation at maximum speeds of 200 km/h, featuring a modular design to facilitate maintenance and fleet expansion. The IC4 configuration includes two end motor cars (MG) equipped with diesel engines, an intermediate car (FG), and a low-floor central car (FH) for enhanced accessibility. Constructed with lightweight aluminum alloy bodies, each trainset weighs around 160 tonnes and is powered by four Iveco V8 diesel engines delivering a combined 2,240 kW. Specifications required an annual mileage of 350,000 km per unit, with braking capabilities supporting operations up to 200 km/h, including provisions for multiple-unit formations of up to four trainsets. The tender emphasized reliability targets, passenger capacity exceeding 250 seats, and features such as wheelchair-accessible spaces and onboard bistros to meet intercity service demands.

Production Delays and Contract Negotiations

The for the IC4 fleet was awarded to Italian manufacturer AnsaldoBreda in December 2000, encompassing 83 four-car diesel multiple units intended for delivery starting in 2003 to replace aging trains on Danish State Railways (DSB) services. Production encountered immediate setbacks, including technical integration challenges with subsystems from multiple suppliers and AnsaldoBreda's internal deficiencies, resulting in no operational deliveries by the initial target and only prototype testing by 2007. These delays escalated costs for DSB, which incurred penalties under performance clauses and alternative leasing expenses exceeding hundreds of millions of Danish kroner annually. Amid mounting disputes, DSB initiated formal negotiations with AnsaldoBreda in , seeking termination of the contract or substantial compensation for breaches, with damage claims potentially reaching billions of Danish kroner due to lost operational efficiencies and remediation needs. AnsaldoBreda countered with offers to accelerate partial deliveries in an incomplete configuration, bypassing full certification of non-essential features to mitigate further slippage. On May 20, 2009, the parties reached a restructuring the agreement: AnsaldoBreda committed to delivering the remaining units by 2012 while paying DSB 2.25 billion Danish kroner (approximately $412 million USD at the time) in , avoiding protracted litigation but requiring DSB to assume additional completion and testing responsibilities post-handover. The accord, while enabling staggered introductions from 2010, drew criticism from Danish oversight bodies for conceding leverage to the supplier and exposing taxpayers to elevated lifecycle costs, as evidenced by subsequent audits revealing incomplete subsystem validations at . Negotiations highlighted systemic risks in fixed-price contracts with foreign vendors lacking proven track records in complex diesel-electric integrations, contributing to the project's transformation into a national political flashpoint over . Despite the settlement, residual disputes persisted into 2012, with final costs surpassing the original 7.2 billion Danish kroner budget by at least 1 billion kroner due to delay-induced modifications and interim fleet sustainment.

Design and Technical Features

Mechanical and Electrical Systems

The IC4 utilizes a arrangement, featuring four power packs mounted under the end coaches, with two packs per end. Each power pack integrates an 560 kW connected to a that drives two traction motors, providing the primary mechanical drive through the bogies. This configuration enables a maximum speed of 180 km/h under optimal conditions, though operational limits have often been lower due to reliability issues. Mechanically, the trainsets incorporate articulated designs with shared Jacobs bogies between intermediate cars, reducing the total number of bogies and enhancing stability on curves. The suspension system relies on standard vehicle components, including axlebox bearings specified in DSB technical documents for durability under loads. Braking is achieved via a combination of air brakes, dynamic ( from the traction motors, and brakes for enhanced , particularly challenged in low-adhesion scenarios. Electrically, the power packs include alternators for generating three-phase power to the traction system, alongside control electronics for engine management and communication via the IEC 61375 Wire Train Bus (WTB) protocol, facilitating multi-unit operation up to four sets. Auxiliary systems, such as HVAC units, draw from the generated power, with compressors and cooling integrated into the power packs for self-contained operation. These elements support the design for flexible deployment on Denmark's mixed-electrification network, relying solely on onboard diesel generation.

Interior and Passenger Amenities

The IC4 interior employs natural materials reflective of principles, emphasizing functionality and comfort. Passenger seating primarily consists of second-class arrangements in enclosed compartments seating up to 32 individuals and open-plan areas, with each four-car unit offering around 208 seats in total. Electronic seat reservation displays and advanced audio-visual information systems support passenger navigation and announcements. A dedicated section in the intermediate cars serves hot and cold refreshments, with counter service and limited seating to accommodate standing passengers during peak times. The layout includes dedicated luggage racks at the ends of motor cars ( units) for stowing baggage securely during travel. Accessibility features are incorporated in the low-floor central car (FH), providing dedicated spaces for wheelchairs measuring up to standard dimensions and an adapted compartment with support rails and wider doors. These elements enable step-free where platforms permit, aligning with DSB's broader services policy requiring advance reservations for assisted boarding. HVAC systems ensure consistent climate control across compartments, visible in overhead units for maintenance .

Operational Deployment

Introduction to Danish Rail Network

The IC4 multiple units were procured by Danske Statsbaner (DSB) to enhance services across Denmark's rail network, which spans non-electrified lines primarily in and parts of , connecting major cities like , , , and . Ordered in December 2000 as 83 four-car sets from AnsaldoBreda, the fleet aimed to replace aging trains on trans-Great Belt and other long-distance routes requiring traction amid incomplete . Initial testing commenced in 2007, with the first unit entering limited passenger service on June 25, 2007, though widespread deployment was hampered by persistent technical faults including software glitches, coupling failures, and braking issues. Deployment progressed incrementally, with DSB securing permanent operational approval from Trafikstyrelsen on August 30, 2013, subject to speed restrictions during low-adhesion periods to mitigate wheel-slide risks. By 2016, amid ongoing reliability concerns, DSB repositioned IC4 units toward regional services on routes such as Aarhus to Aalborg, supplementing intercity operations where feasible, while planning full phase-out by 2024 to coincide with network electrification and introduction of electric IC5 trains. As of 2024, approximately 74 units remained in active use for these duties, with maintenance challenges persisting into 2025, including deferred engine overhauls due to supplier issues. The IC4's integration into DSB's operations underscored the network's transition toward , with Banedanmark overseeing upgrades to support higher speeds and capacity. Despite delivering up to 264 seats per unit in flexible configurations, the trains' dispatch reliability rarely exceeded 70% in early years, prompting compensatory measures like continued usage and eventual fleet renewal contracts for 103 IC5 sets starting deliveries in September 2025. This shift aligns with Denmark's broader rail strategy to electrify over 90% of DSB lines by the late , reducing diesel dependency and emissions.

Performance in Service

The IC4 fleet entered in but faced persistent reliability challenges, resulting in frequent withdrawals and limited deployment. By 2014, availability remained low, with only 12 of 32 targeted trainsets in passenger operation daily, far below contractual expectations. Operational incidents, including failures in 2014 affecting 75% of units and braking system flaws leading to a 2020 withdrawal of 35 sets, underscored early service deficiencies. Reliability metrics improved gradually, though failing to meet the 20,000 km mean distance between failures (MDBF) target. In , baseline MDBF stood at 5,949 km; by 2020, it peaked near 12,000 km before declining. Recent data shows MDBF at 6.6 thousand km for 2024, a 10% rise from 6.0 thousand km in 2023, with first-half 2024 reaching 8.5 thousand km, up 25% year-over-year. Utilization increased to 6,177 thousand km traveled in 2024 using 60 sets, 7% more than 2023. Punctuality for long-distance and regional services, where IC4 operates, reached 76.6% in , improving from 71.7% in 2023, though specific IC4 contributions are not isolated. Ongoing issues include spare parts shortages causing defects, train shortenings, and cancellations in . The fleet's diesel inefficiency prompted phase-out plans starting 2027, with full replacement by electric IC5 units by 2030.

Reliability and Technical Challenges

Major Faults and Incidents

The IC4 fleet has been plagued by recurrent technical faults, particularly in braking systems, axle assemblies, and power components, contributing to elevated downtime and operational restrictions. In June 2020, Danish State Railways (DSB) sidelined 35 IC4 diesel multiple units after detecting a flaw in refurbished drive-brake controls, following two instances of brake failure that risked compromised stopping performance. Earlier braking concerns, stemming from inadequate adhesion and emergency brake activation thresholds, led to a reduction in the permissible braked weight percentage from 170% to 130% in late 2011, limiting train speeds and configurations to mitigate overrun risks. A notable incident occurred on November 7, 2011, when L47 overran a stop signal at Marslev station by 651 meters during low-adhesion conditions, halting 2,800 meters later after automatic emergency braking engaged; no collision ensued, but the event exposed vulnerabilities in the train's traction control and braking integration, prompting fleet-wide inspections and speed curbs. Axle-related defects have also persisted, with cracks detected in lower wheelset-bearing housings and associated castings, where primary dampers attach, risking structural integrity without causing derailments or injuries to date. Additional faults include fractures allowing hot gases to escape and erode nearby parts, alongside integration failures such as bolt breakages. These issues, documented in DSB's 2014 expert assessment, have collectively driven maintenance costs exceeding expectations and accelerated phase-out decisions, with no fatalities directly linked to IC4-specific malfunctions. In a separate event on January 2, 2019, two coupled IC4 sets on the were struck by wind-displaced freight debris, resulting in eight passenger deaths and 16 injuries; investigations attributed the collision to external weather and cargo securing lapses, not inherent IC4 defects.

Maintenance and Refurbishment Efforts

DSB implemented targeted maintenance programs to mitigate the IC4 fleet's persistent reliability problems, focusing on component overhauls and in-house repairs to sustain operations until replacement by newer models. Between 2014 and 2016, DSB coordinated efforts to finalize assembly and testing of incomplete units delivered by AnsaldoBreda, though the Danish Audit Office (Rigsrevisionen) criticized the process for inadequate planning and oversight, noting failures in implementing key activities despite achieving basic completion targets. By 2020, Rigsrevisionen deemed subsequent completion work satisfactory, closing the audit after verifying improved execution. Component-level refurbishments addressed wear from and flaws, including routine powerpack renovations classified by DSB as standard for aging units rather than responses to systemic faults identified in prior investigations. In a notable initiative, DSB opted to internally dismantle and rebuild 14 particularly troublesome sets using partial new components, bypassing external contractors to control costs and timelines amid ongoing disputes with the original manufacturer. system upgrades, however, encountered setbacks; in 2020, flaws in refurbished controls prompted the temporary withdrawal of 35 units for inspection and rectification, underscoring challenges in verifying post-maintenance integrity. To support these activities, DSB expanded workshop capacity by 30% through additional staffing and facilities, aiming to maximize the operational fleet's availability into the mid-2020s despite . These measures, while extending incrementally, did not fully resolve underlying issues, as evidenced by recurrent inspections and partial fleet groundings, contributing to the decision for phased withdrawal starting in 2024.

Controversies and Political Fallout

Economic Costs and Procurement Failures

The IC4 procurement , signed by Danish State Railways (DSB) with AnsaldoBreda in 2000 and supplemented in 2002, covered 83 trainsets at a fixed price of DKK 5.3 billion, with initial deliveries anticipated from 2003 onward to replace aging stock on non-electrified lines. Deliveries faced protracted delays due to design customization and manufacturing defects, with the first operational units emerging only in 2008 and the final sets certified in October 2013, extending the timeline by approximately 10 years. In May 2009, DSB negotiated a settlement under which AnsaldoBreda paid DKK 2.25 billion in compensation—roughly half the original value—in exchange for DSB assuming full responsibility for train completion, upgrades, and any further remedial work. Completion efforts, particularly intensified from 2014 to 2016, adhered to a parliamentary-approved budget of DKK 6.2 billion (in 2015 prices) but yielded suboptimal results, including DKK 85 million in write-downs for decommissioning five underreliable sets by mid-2016. Additional per-unit remedial costs for critical components like power packs, axle boxes, and brakes reached DKK 1.5 million each, contributing to a program expenditure exceeding DKK 111 million to deploy 74 sets by 2019, though only 67 were ultimately approved for service amid ongoing faults. These overruns, partially offset by the 2009 compensation, imposed unrecovered expenses on DSB for uncompensated legacy train upgrades (e.g., 14 NT sets) and punctuality enhancements, totaling around DKK 500 million from settlement funds. Procurement shortcomings stemmed from DSB's inadequate of AnsaldoBreda's for the diesel-electric , lax initial allowing without proportional penalties, and post-settlement underestimation of completion complexities, such as integrating modifications during . The Danish National Audit Office (Rigsrevisionen) highlighted deficiencies in risk , shortages for fault , and of operations over systematic upgrades, which perpetuated inefficiencies and elevated long-term burdens. As a state-owned entity, DSB's absorption of these costs—net of compensations—translated to liabilities, forgoing potential reallocations to or alternative procurements, while AnsaldoBreda's history of similar project failures (e.g., Dutch HSL) underscored supplier selection risks.

Disputes with AnsaldoBreda

The disputes between Danish State Railways (DSB) and AnsaldoBreda arose primarily from chronic delays, technical deficiencies, and failure to meet contractual specifications in the delivery of IC4 diesel multiple units, originally ordered under a 2000 framework agreement for 83 sets. Initial deliveries began in 2007, but persistent issues with coupling systems, engine reliability, and overall performance prevented widespread service entry until 2010, far exceeding the anticipated timeline. In June 2008, DSB issued an to AnsaldoBreda, demanding the and approval of at least 14 fully operational IC4 sets by May 2009 for single-unit service, threatening contract termination otherwise. This followed years of stalled progress, including only limited testing of prototypes. Negotiations ensued, culminating in a May 2009 settlement where AnsaldoBreda agreed to pay DSB 2.25 billion Danish kroner (approximately 411 million USD at the time) in compensation for and defects, while halting further development work on and other systems after acceptance of a test unit. Under the terms, DSB assumed responsibility for completing upgrades to enable multiple-unit operation, with AnsaldoBreda shifting to serial production of remaining units and providing spare parts. Of this amount, 1.5 billion kroner was paid by mid-2012. Disputes persisted into 2012 amid ongoing delivery shortfalls—AnsaldoBreda was 15 IC4 sets behind schedule—and quality lapses below contract standards, prompting DSB to withhold payments. A December 2012 agreement resolved these by committing AnsaldoBreda to deliver the outstanding units, supply additional spare parts including bogies, and provide 550 million kroner in further compensation. DSB retained oversight of final commissioning, marking the effective end of major contractual conflicts, though AnsaldoBreda had already disbursed around 2 billion kroner in total penalties by 2015, with DSB funding subsequent modifications. These settlements reflected AnsaldoBreda's acknowledgment of liability for production shortcomings, as detailed in independent audits, without resorting to full litigation.

Government and DSB Accountability

The procurement of the IC4 fleet was managed by DSB, Denmark's state-owned railway , which signed the with AnsaldoBreda in December 2001 for 83 trainsets at an initial cost of approximately 5.3 billion DKK, following a process initiated in 2000. A 2011 by Rigsrevisionen, Denmark's National Audit Office, identified significant shortcomings in DSB's procurement process, including insufficient evaluation of technical risks, inadequate safeguards against delays, and over-reliance on the supplier's assurances regarding and systems, which contributed to persistent delivery failures and escalated costs exceeding 1 billion DKK beyond the original by 2012. DSB assumed primary responsibility for finalizing and commissioning the trains after a May 2009 settlement agreement with AnsaldoBreda, which granted DSB a 2.25 billion DKK price reduction in exchange for DSB taking over engineering completion, maintenance liabilities, and operational testing—a decision criticized in the for shifting undue risk to the without sufficient . The Danish Ministry of Transport, responsible for strategic oversight of DSB, commissioned independent reviews such as the 2011 Atkins assessment to evaluate deployment viability amid escalating technical faults, but Rigsrevisionen noted limited proactive intervention in mitigating risks prior to the agreement. A 2017 Rigsrevisionen follow-up on DSB's completion efforts from 2014 to 2016 highlighted ongoing inefficiencies in and reliability testing, with only partial fleet utilization achieved despite 800 million DKK in additional expenditures, underscoring DSB's operational under -mandated obligations. No formal sanctions or leadership dismissals at DSB were directly imposed by the for IC4-specific failures, though parliamentary intensified, with the Folketing's Transport Committee in 2012 demanding from DSB's executive board over unrealistic deployment timelines that risked further taxpayer burdens. Politically, the IC4 project fueled cross-party criticism of state railway governance, with opposition figures attributing delays and unreliability to lax contract enforcement under successive administrations, though the center-left in power during the 2001 tender faced retrospective blame for inadequate supplier vetting. In response, Transport Minister Hans Christian Schmidt announced plans in May 2016 to accelerate IC4 phase-out by 2024, aligning with goals and citing persistent faults as justification, effectively acknowledging systemic lapses without assigning personal culpability. DSB's board and CEO Jesper Lok faced mounting pressure but retained positions, with accountability largely internalized through operational reforms rather than external penalties, reflecting the challenges of holding state enterprises liable in a subsidized where annual government funding exceeded 4 billion DKK by the mid-2010s.

International and Special Uses

Libyan VIP Variant

The Libyan VIP variant refers to a single IC4 trainset, originally manufactured by AnsaldoBreda as part of the Danish order but repurposed as a diplomatic from to . In 2009, the unit—designated for high-speed intercity service with a top speed of 200 km/h—was shipped to ahead of Libya's 40th anniversary of the 1969 revolution, with final handover facilitated by Italian Prime Minister in 2010 as a gesture strengthening bilateral ties. AnsaldoBreda hastily refurbished the interior by removing portions of the standard Danish configuration to install a luxury VIP lounge for and his entourage, while applying a custom exterior paint scheme. Despite its capabilities, including modular four-car formation and diesel-hydraulic propulsion suited for non-electrified lines, the train never operated in due to the country's limited rail network, which lacked compatible high-speed . Danish and operator manuals remained intact post-conversion, underscoring the rushed modifications by AnsaldoBreda. Following Gaddafi's ouster in the 2011 Libyan Civil War, the unit was abandoned at a storage siding in , where it has deteriorated without maintenance or operational use as of .

Current Status and Legacy

Fleet Disposition as of 2025

As of October 2025, DSB continues to operate approximately IC4 four-car diesel multiple-unit sets on and regional services, primarily on non-electrified lines such as Aarhus-Copenhagen and routes to , despite chronic reliability challenges and prior announcements of phase-out starting in 2024. Originally, 83 units were built by AnsaldoBreda (now ) and delivered between 2007 and 2013, but nine were either not accepted or withdrawn early due to defects, leaving in the active fleet. Ongoing maintenance efforts, including a mandatory overhaul program initiated in 2024 costing nearly 500 million DKK, have extended service life amid delays to replacement fleets; the Stream electric multiple units, ordered to supplant IC4 and sets, are now slated for entry into service in 2027 rather than 2025. In June 2022, DSB agreed to sell the entire remaining IC4 fleet to an undisclosed international buyer, with initial deliveries of 14 units commencing shortly thereafter, though the majority remain in Danish operation to bridge the gap until and new trains are fully deployed. No units have been fully retired from by late 2025, though availability hovers below 80% due to frequent breakdowns, with mean distance between technical failures reported at around 6,000 km in recent years; this contrasts with DSB's ambitions for a fully electric network by 2030, underscoring the IC4's role as a stopgap amid delays.

Replacement by IC5 and Lessons Learned

The IC5 electric multiple units, based on Alstom's Coradia Stream platform, were ordered by Danish State Railways (DSB) in April 2021 under a framework agreement valued at €2.6 billion for an initial 100 five-car sets, with an option for 53 more that was partially exercised in July 2025 for 50 additional units, bringing the total to 153 trainsets. These units, each accommodating 300 passengers with modular low-floor designs for accessibility and maintenance efficiency, are intended to phase out the IC4 alongside the older IC3, IR4, and Øresund fleets starting in 2027, following delays from initial 2024 targets due to global supply chain disruptions. The first IC5 prototype arrived in Denmark on September 21, 2025, for infrastructure testing and certification, with revenue service projected for late 2027 after rigorous validation to ensure operational readiness across intercity and regional routes up to 200 km/h. As of October 2025, DSB has begun disposing of IC4 units, with 37 sets sold to operator Carpatic for refurbishment and redeployment on domestic services, reflecting the IC4's unsuitability for continued high-intensity Danish operations due to persistent mechanical failures exceeding 20% availability rates in peak years. The IC5 rollout aligns with Denmark's goals, aiming to retire all IC4s by the early 2030s, supplemented by interim measures like refurbished extensions, to restore above 90% on core lines where IC4 disruptions contributed to systemic delays. Lessons from the IC4 program, which suffered from a 2007 fixed-price contract with AnsaldoBreda leading to decade-long delivery shortfalls, quality defects in bogies and HVAC systems, and costs ballooning beyond DKK 15 billion including modifications, underscore the risks of pioneering unproven tilt technology without adequate prototyping. DSB's subsequent expert assessments revealed inadequate risk allocation and testing protocols, prompting reforms favoring established platforms like Alstom's Coradia, which boasts over 1,000 units in service across with proven reliability. The IC5 contract incorporates phased milestones, supplier penalties for , and early-scale mock-ups unveiled in May 2023 for stakeholder validation, mitigating the IC4's siloed development flaws. These adjustments reflect causal priorities in causal realism—prioritizing verifiable supplier track records and modular scalability over ambitious specifications—to avert recurrence of fleet-wide cascading failures that eroded and incurred annual maintenance outlays exceeding DKK 500 million.

References

  1. [1]
    IC4 | TrainsDepot.org
    Dec 25, 2024 · Each unit consists of four car bodies: two motor cars (MG), a center car (FG) and a low-floor central car (FH). In 2010, DSB faces operational ...
  2. [2]
    DSB Vehicles - Mod Requests - Transport Fever Community
    Oct 22, 2019 · Technical data: Maximum speed, 180 km/h. Empty weight, 110 t. Loading ... (Wiki Page with raw data) https://da.wikipedia.org/wiki/IC4 2 ...Missing: specifications | Show results with:specifications
  3. [3]
    The cost of failure - Rail Engineer
    Feb 10, 2015 · The IC4 sets can't work in tandem to provide the required train capacity, because the coupling system doesn't work properly. · The brake blending ...
  4. [4]
    Negotiations about claims for billions of Danish kroner in damages ...
    As is generally known, the delivery of the new IC4 trains to the Danish railways was that much delayed that DSB wanted to terminate the agreement with the ...
  5. [5]
    [PDF] EXPERT ASSESSMENT REPORT IC4/2 - DSB
    Oct 31, 2014 · Technical including categorisation of wheel defects. 207. IC4 DSB Technical Specifications Journal Box Assembly. LPC - AA01JL2. 2. 31.07.2002.
  6. [6]
    DSB removes 35 IC4 DMUs from service following braking issues
    Jun 25, 2020 · Danish State Railways (DSB) has removed 35 of its troubled IC4 DMUs from service, after a potential flaw in some refurbished brake controls was identified.
  7. [7]
    DSB to study whether troubled IC4 fleet has a future
    Jun 24, 2014 · "Most recently, poor communication between the sets, problems with the axleboxes, and manifold cracks have added to the list of challenges," ...<|control11|><|separator|>
  8. [8]
    This Was Gaddafi's Personal Italian High-Speed Train - Oryx
    Feb 1, 2021 · The trainset given to Gaddafi was never owned by Italy. The trainset was actually part of a Danish order of 83 trains for the Danske Statsbaner (DSB), Denmark' ...
  9. [9]
    Late deliveries justify compensation | News - Railway Gazette
    Jan 1, 2006 · DANISH State Railways ordered a fleet of 83 IC4 diesel multiple-units from AnsaldoBreda in December 2000 at a cost of DKr5bn.<|control11|><|separator|>
  10. [10]
    Danish State Railways MG “IC4” - loco-info.com
    Power. Power source, diesel-mechanic. Top speed, 124 mph. Engine, Iveco FVQE 28. Engine type, 4x V8 diesel. Engine output, 3,004 hp (2,240 kW) ...Missing: specifications | Show results with:specifications
  11. [11]
    AnsaldoBreda Problems Aren't in Los Angeles Alone
    Mar 26, 2009 · Minor correction about Denmark's IC4: The trains were ordered in 2000, not 2003. But they still are not delivered. Also, the three sets that are ...
  12. [12]
    [PDF] Report on DSB's procurement and completion of IC4 and IC2 trains
    This report examines how DSB (Denmark's national railway operator) has procured and completed IC4 and IC2 trains. The study has been performed at the ...
  13. [13]
    DSB reaches IC4 settlement with AnsaldoBreda - Railway Gazette
    May 21, 2009 · On May 20 state railway DSB announced an agreement to restructure the troubled procurement contract. The delivery timescale for the 83 IC4 trainsets and 23 IC2 ...
  14. [14]
    DSB: AnsaldoBreda offers $412 mln for late delivery | Reuters
    May 20, 2009 · ... AnsaldoBreda had offered to pay it 2.25 billion Danish crowns ($412 million) in compensation for delayed train deliveries. AnsaldoBreda, a ...
  15. [15]
    DSB's Italian train debacle deepens - The Copenhagen Post
    Jun 1, 2012 · The trains have been an ongoing headache for DSB, which purchased the 83 train sets from Italian company Ansaldobreda in 2000 for 5.3 billion ...Missing: contract | Show results with:contract
  16. [16]
    Railway and Truck Communication - Max-i Fieldbus
    Many trains like the Danish IC4 and IC2 use the IEC 61375 Wire Train Bus (WTB) as a backbone to connect different vehicles or trainsets and Multifunction ...
  17. [17]
    ic4 danimarca - VD | Vernacchia Design
    The interior design features are based on natural materials consistent with Scandinavia's tradition. Advanced audio/video information system, seat reservation ...
  18. [18]
    IC4 - Trainspo
    IC4 - dmu ... 208 seats. Formation: 4 cars. Gauge: 1435 mm. Car length: 86 m. Weight: 160 t. Power output: 2240 kW. Source: en.wikipedia.org. Career. flag, DSB MG ...
  19. [19]
    Interior of DSB (Danish Railways) AnsaldoBreda-built IC4 class MG ...
    Download this stock image: Interior of DSB (Danish Railways) AnsaldoBreda-built IC4 class MG Inter City train ... Get great features with your free account.
  20. [20]
    Travelling on Danish IC trains - ShowMeTheJourney
    This guide to travelling on an IC (Denmark) train includes insights into the journey experience and essential info including seat reservations.
  21. [21]
    Disability services - DSB
    Theseat reservation for your wheelchair is free. Is only valid for the selected day and time, and for the seat indicated on the reservation. You cannot travel ...
  22. [22]
    IC4 har fået permanent tilladelse til kørsel – dog pålægges ... - DSB
    Aug 30, 2013 · Trafikstyrelsen har i dag meddelt DSB, at IC4-togene har fået en permanent ibrugtagningstilladelse, dog med hastighedsreduktioner i ...
  23. [23]
    Planen for IC4-togenes fremtid offentliggjort - DSB
    Dec 15, 2016 · IC4-togenes fremtid bliver primært som regionaltog, indtil DSB begynder indfasningen af nye elektriske togsæt i 2024, hvorefter IC4-togene ...
  24. [24]
    [PDF] DSB Trading update third quarter 2024 - Årsrapport 2023
    Nov 14, 2024 · In addition, maintenance primarily of IC4 en- gines have been postponed due to challenges on the supplier side. DSB is therefore upgrading its ...<|separator|>
  25. [25]
    [PDF] Annual Report - Årsrapport 2024 - DSB
    Feb 6, 2025 · phased out as we take delivery of our electric. IC5 train sets. When the IC5 trainsets are deliv- ered, we will first phase out the IC4 ...
  26. [26]
    DSB's first IC5 trainset arrives in Denmark - Railway Gazette
    Sep 18, 2025 · A further 50 were ordered in June 2025. DSB was seeking a proven design following its experience with the troubled AnsaldoBreda IC2 and IC4 DMU ...
  27. [27]
    DSB finds another IC4 train with axle issues - The Copenhagen Post
    Apr 8, 2014 · “During one of our continual inspections today, we discovered a crack on a IC4 train, which was then pulled from the rails,” Lars Nordahl ...<|separator|>
  28. [28]
    [PDF] DSB Half Year Report 2024 - Årsrapport 2023
    Aug 22, 2024 · Seat kilometres are calculated as the number of seats contained in ... IC4 and IC3 train sets as well as IR4 and S- electric train sets ...
  29. [29]
    DSB releases independent report on IC4
    Jan 8, 2015 · DANISH State Railways (DSB) released the latest independent assessment of its AnsaldoBreda IC4 DMUs on December 5, detailing the current status ...
  30. [30]
    [PDF] IC4 train set passed signal at danger at Marslev - jonroma.net
    Nov 7, 2011 · On Monday 7 November 2011, L 47 passed an AM signal (automatic block signal) at danger at Marslev by. 651 metres. The train which was a ...
  31. [31]
    [PDF] Railway Accident at Great Belt Bridge January 2th 2019 - GOV.UK
    Nov 13, 2019 · Because of a storm the Great Belt bridge was closed for road traffic. • 07:26:35 Lyn 210 departure from Nyborg Station eastbound. (2 IC4 ...
  32. [32]
    [PDF] Report on DSB's effort to complete the IC4 trains - Rigsrevisionen
    In 2000 and 2002, DSB entered contracts with the train manu- facturer AnsaldoBreda concern- ing delivery of the IC2 and IC4 trains that were intended to im-.
  33. [33]
    Report on DSB's efforts to complete the IC4 trains - Eurosai
    It is Rigsrevisionen's assessment that DSB's effort to complete the IC4 trains has not been satisfactory; DSB has failed to implement a number of the activities ...
  34. [34]
    Rigsrevision: DSB's indsats med at færdigbygge IC4 er tilfredsstillende
    Aug 12, 2020 · Rigsrevisionen er tilfreds med DSB's arbejde med at færdigbygge de skandaleramte IC4-toge og har derfor besluttet at afslutte sagen. Det er ...
  35. [35]
    DSB: Renovering af IC4-motorer er naturligt vedligehold | Ingeniøren
    DSB's planlagte renovering af IC4-togenes powerpacks skyldes togenes alder og ikke de fejl, som ekspertundersøgelsen af IC4 afdækkede sidste år.
  36. [36]
    DSB skal selv reparere 14 IC4-tog - Folketidende
    Det bliver DSB selv, der skal stå for, at 14 særligt problemfyldte IC4-togsæt bliver skilt ad og bygget op, delvist med nye komponenter.Missing: vedligeholdelse | Show results with:vedligeholdelse
  37. [37]
    DSB to withdraw troubled IC4 fleet - International Railway Journal
    Dec 16, 2016 · Danish State Railways (DSB) announced on December 15 that it will phase out the fleet of AnsaldoBreda IC4 trains in 2024 as electrification enables the ...
  38. [38]
    DSB sets IC4 withdrawal date to close an 'unhappy chapter' | News
    Dec 16, 2016 · DSB's trouble-plagued fleet of IC4 diesel multiple-units must be kept going for the time being, but will be phased out from 2024.<|separator|>
  39. [39]
  40. [40]
    DSB issues IC4 ultimatum | News | Railway Gazette International
    Jul 2, 2008 · Another chapter in the painful saga of DSB's 200 km/h IC4 inter-city DMUs opened in June, when the state-owned operator issued an ultimatum to AnsaldoBreda.
  41. [41]
    DSB wins $US 411 million compensation for late trains
    DANISH State Railways (DSB) is to receive DKr 2.25 billion ($US 411 million) compensation from Ansaldobreda, Italy, for late delivery of 83 IC4 dmus.
  42. [42]
    DSB and AnsaldoBreda reach agreement on IC4 delivery - update
    Dec 19, 2012 · Danish State Railways (DSB) and AnsaldoBreda have agreed a final delivery schedule for the troubled IC2 and IC4 inter-city dmu fleets.
  43. [43]
    [PDF] IC4-IC2 Review - Background Report Iss 1 191011
    Jul 31, 2011 · The trainsets were to be designed to meet DSB's technical requirements and were intended to replace DSB's IC3 trainsets on long-distance traffic ...
  44. [44]
  45. [45]
    Government looking to phase out IC4 trains - The Copenhagen Post
    May 9, 2016 · Government looking to phase out IC4 trains. Transport minister and DSB don't see a future for the notorious trains. Christian Wenande.
  46. [46]
    [PDF] The Case 2015
    However, as DSB and BaneDanmark have different success criteria, their goals are not always aligned, and this has in the past created some conflicts of interest ...
  47. [47]
    Last IC4 train finally arrives - The Copenhagen Post
    Oct 1, 2013 · 82 trains to Denmark, one to Libya When the trains were ordered in 2000, the IC4 was seen as the train of the future for the Danish railways.Missing: VIP variant<|separator|>
  48. [48]
    DSB has sold all 74 Ansaldobreda IC4 to an unknown buyer
    Jun 4, 2022 · Despite more than fifteen years' trouble-shooting, they achieved a kilométrage between failures less than one third of that of the IC3, their ...
  49. [49]
    DSB tvunget til svinedyr IC4-reparation: »Ingen havde regnet med ...
    Sep 2, 2024 · For næsten en halv milliard kroner bliver der gennemført et såkaldt serviceeftersyn. Det er en obligatorisk reparation af motorerne. PLUS- ...
  50. [50]
    DSB's new Alstom EMU fleet delayed to 2027
    Dec 1, 2023 · DSB announced a six-month delay to the €1.4bn order, which includes 15 years maintenance, in May 2022. Under the revised plans, the first ...
  51. [51]
    [DK / Expert] DSB sells its IC4 fleet to an unknown client
    Jun 22, 2022 · DSB sells its IC4 fleet to an unknown client. Written by Konstantin Planinski on 22.06.2022 in Hitachi Rail IT, Hitachi Rail IT.
  52. [52]
    [PDF] DSB Annual Report 2023
    Dec 31, 2023 · services ran at a customer punctuality rate of 96 percent in 2023. Alongside this, we have implemented local growth initiatives, where we ...
  53. [53]
    [FREE] Litra ES – Alstom and DSB officially present first IC5 train in ...
    Sep 21, 2025 · They will replace DSB's older generation fleets (IC3, IC4, IR4) which the operator is currently using for intercity and regional services.
  54. [54]
    Alstom and Danish State Railways unveil a 1:1 scale model carriage ...
    May 11, 2023 · The IC5 trains will replace the IC3, IC4, IR4 and Øresund trains. These will be continuously phased out, and will operate as both high-speed, ...
  55. [55]
    DSB adds 50 more IC5 trains to order from Alstom - RAILMARKET.com
    Jul 1, 2025 · The first IC5 trainsets are scheduled to arrive in Denmark during 2025. These will undergo testing on Danish rail infrastructure. Once the ...
  56. [56]
    DSB orders further IC5 Coradia Stream trains - Railway PRO
    Jul 2, 2025 · The first trainsets will arrive in Denmark during 2025, where they will undergo test runs on Danish railway lines. Following quality checks and ...
  57. [57]
    Alstom's first IC5 train arrives in Denmark | ROLLINGSTOCK
    Sep 24, 2025 · In summer, the Danish national operator DSB exercised an option for another 50 IC5 EMUs, extending the procurement to a total of 153 trainsets.