IRT Flushing Line


The IRT Flushing Line is a line of the system, extending from Flushing–Main Street station in to 34th Street–Hudson Yards station in , serving as the route for the 7 local and <7> express trains operated by the . The line spans approximately 9.2 miles with 22 stations, transitioning from elevated structure through much of to underground tunnels in via the historic Steinway Tunnels. Constructed initially by the City of and opened in sections starting April 21, 1917, it reached full length to Flushing by January 21, 1928, and received a western extension to Hudson Yards on September 13, 2015, marking the first new station in the system in over two decades. Notable for employing the subway's only 11-car train consists and for providing service to the and 1964 World's Fairs at dedicated stations now serving and the USTA National Tennis Center, the line facilitates connectivity across ethnically diverse communities, including Flushing's large Asian enclaves and the developing Hudson Yards neighborhood.

Route and Service

Route Description

The IRT Flushing Line extends from its eastern terminus at Flushing–Main Street station in , westward to in , serving primarily Queens neighborhoods and . The route supports both local () and peak-hour express (<7>) service on its three-track configuration, with expresses operating between 74th Street–Broadway and Queensboro Plaza in . In Queens, the line operates as an elevated structure for nearly its entire length east of the East River, traversing Flushing, Corona, Elmhurst, Jackson Heights, Woodside, and Long Island City via steel girder spans and concrete viaducts. Stations along this section include Flushing–Main Street (a three-track, two-island platform terminal), Mets–Willets Point, 103rd Street–Corona Plaza, 82nd Street–Jackson Heights, 74th Street–Broadway (transfer point to Queens Boulevard Line), 61st Street–Woodside, and Queensboro Plaza (junction with the discontinued IRT Astoria Line spur). The elevated alignment facilitates speeds up to 50 mph on open sections, though urban constraints limit average speeds. West of Queensboro Plaza, following the Vernon Boulevard–Jackson Avenue station, the tracks descend into the , a subaqueous bore completed in 1907 that crosses under the to . This underground segment connects to deep-level platforms at Grand Central–42nd Street, then proceeds west along 41st Street to –42nd Street. The western extension, opened in September 2009, continues underground southwest under 11th Avenue to the Hudson Yards terminus, integrating with the neighborhood's redevelopment. The portion remains fully subterranean, with no intermediate stops between major transfer points.

Service Patterns

The IRT Flushing Line operates local via the <7> train designation, running 24 hours daily between in , and 34th Street–Hudson Yards in , with stops at all 22 stations along the route. This full-route local pattern accommodates continuous demand across Queens and western , utilizing the line's two tracks for bidirectional outside periods. Weekday rush-hour express service supplements the local runs under the <7> designation, operating in the peak direction only: inbound toward during morning hours and outbound toward Flushing during evening hours. Express trains utilize the line's four-track section between 74th Street–Broadway and Queensboro Plaza, bypassing intermediate stations at 82nd Street–Jackson Heights, 90th Street–Elmhurst Avenue, and 103rd Street–Corona Plaza to reduce travel time for longer-distance riders. This pattern typically commences around 6:00 a.m. inbound and extends through late afternoon outbound, with frequencies integrated into the overall headways that average 2–5 minutes during peaks. Off-peak, weekends, and late-night service reverts exclusively to local operation, eliminating expresses to simplify operations on the two-track segments at either end of the line. Special event service, such as for games at , may include additional express runs from to Mets–Willets Point station, though these are not part of the standard schedule. As of October 2025, express service faces temporary suspension from October 27 to November 21 due to track replacement work between 33rd Street and Queensboro Plaza, requiring all trains to run local during affected rush hours.

Operational Distinctions

The IRT Flushing Line operates 11-car train consists, the longest by number of cars among all services, a configuration designed to handle peak-hour demand on its corridor from to . This exceeds the typical 10-car maximum on other IRT lines and the 8- or 10-car trains on BMT/IND divisions, though total train length remains shorter than BMT/IND consists due to narrower IRT car dimensions (51 feet per car versus 60 feet). Platforms along the line were extended to accommodate this setup during mid-20th-century upgrades, reflecting its role as a high-volume commuter route. Unlike most IRT lines, which rely on legacy with fixed wayside signals, the Flushing Line has been fully equipped with (CBTC) to permit moving-block operations, closer headways, and enhanced capacity. CBTC installation, proposed in the MTA's 2000-2004 Capital Plan and completed in phases through the , replaced older mechanical interlockings and supports automated functions. In May 2019, the activated (ATO) mode under CBTC, programming trains for optimal acceleration, braking, and cruising speeds to reduce variability in run times and improve on-time performance. This semi-automated system, the first full-line implementation on a non-shuttle NYC route, requires operator oversight but minimizes manual inputs, though early rollout encountered issues such as trains overshooting stations, leading to temporary suspension and adjustments. ATO contributes to more even spacing and potential for future driverless operation, distinguishing the line's controls from manual-heavy operations elsewhere in the IRT division.

Historical Development

Origins and Planning

The origins of the IRT Flushing Line trace back to the project, proposed as early as February 25, 1885, by the East River Tunnel Railroad Company to connect the with the across the . The initiative was reorganized on July 22, 1887, as the New York and Railroad Company, with a route formally proposed on , 1888, and finalized by 1892. Piano manufacturer William Steinway advocated for the tunnel in 1890 to enhance in , , leading to groundbreaking on June 3, 1892, at 50th Avenue between Vernon and Jackson Avenues. Construction stalled around 1893 amid engineering challenges, lawsuits, and financial difficulties, despite the north tube's completion on May 16, 1907, and the south tube on August 7, 1907; the tunnels officially opened on September 24, 1907, but remained largely idle until 1915 due to ongoing legal disputes involving financier , who had taken over the project. The line's integration into the modern subway system occurred through the , a comprehensive expansion agreement negotiated between the City of New York, the (IRT), and the (BRT) from 1910 to 1920. On April 3, 1913, the city purchased the Steinway Tunnels from for $3 million, incorporating them into the framework and assigning their operation to the IRT to form the core of the Flushing Line. This acquisition resolved prior private-sector impasses and aligned the tunnels with broader goals, shifting from initial concepts of rail or streetcar service—such as IRT proposals for Queens streetcars looping into Grand Central—to a dedicated subway extension serving Flushing and Corona in . The contracts specified IRT responsibility for operating the line while the city financed and oversaw much of the elevated and subway construction eastward from Queensboro Plaza. Planning emphasized connectivity to Manhattan's core, with the Flushing Line designated to link Queensboro Plaza (via the repurposed Steinway Tunnels) to Flushing, addressing growing population and industrial demands in western . The ' provisions for the "Flushing-Ely Extension" highlighted its role in providing to underserved areas, with preparatory work including modifications at Grand Central for integration completed ahead of initial service. This phase prioritized empirical engineering feasibility over speculative extensions, setting the stage for construction that balanced cost efficiency—estimated at around $3 million for the tunnel acquisition alone—with long-term urban expansion needs.

Construction Under Dual Contracts

The , executed between the City of New York and the (IRT) on March 19, 1913, authorized extensive subway expansions, including the Flushing Line as the primary IRT route into to link Flushing with [Long Island City](/page/Long Island City) and . This line, designated the Flushing-Ely Extension, incorporated the pre-existing Steinway Tunnels—twin tubes drilled from 1907 to 1910 by August Belmont's New York and Queens Railroad—and required adaptation for standard IRT gauge, third-rail power, and signaling. The city acquired these tunnels on April 3, 1913, for $3 million, integrating them into the project to avoid redundant crossings while extending the line westward under 41st Street to connect with the at . Construction emphasized efficiency, with two-track tunnels featuring steep 3% grades necessitating specialized "Steinway Loop" equipment for early operations, though loops at either end were ultimately abandoned in favor of direct alignments. Bidding and groundwork in commenced immediately after contract awards in , with the city overseeing most physical construction to control costs and standards, while the IRT handled operations. Key segments included underground stations at Vernon Boulevard–Jackson Avenue and Hunters Point Avenue, plus elevated sections toward , built with concrete-lined bores and cut-and-cover methods to navigate Flushing Bay and industrial zones. By mid-1915, modifications to the Steinway Tunnels enabled initial on June 22, 1915, running shuttles from a temporary stub at 41st Street and to Queensboro Plaza, marking the first direct link to . Further progress tripled tracking in bottleneck areas for capacity and added platforms at Court House Square and Queensboro Plaza, addressing anticipated commuter demand from growing residential developments. The core Flushing Line trunk opened on April 21, 1917, extending through-service from Grand Central–42nd Street to 103rd Street–Corona Plaza (then Alburtis Avenue), spanning approximately 8 miles with seven intermediate stations and carrying over 100,000 daily passengers in its first year despite material shortages. This phase completed the foundational build-out to , though eastward extensions to Flushing–Main Street remained pending due to land acquisition delays and funding reallocations, not reaching terminus until January 21, 1928. Engineering challenges, including groundwater incursions during tunneling and alignment with the trolley, were mitigated through reinforced linings and ventilation shafts, ensuring structural integrity under varying soil conditions. Overall, the project exemplified the contracts' scale, delivering 14 miles of new trackage at an estimated cost exceeding $20 million for the Queens segments alone, financed jointly by bonds and IRT contributions.

Initial Opening and Early Expansions

The initial segment of the IRT Flushing Line in opened for on April 21, 1917, extending from Queensboro Plaza to Alburtis Avenue (later renamed 103rd Street–Corona Plaza). This three-station elevated extension, constructed by the City of as part of the agreements, connected to the preexisting under the , enabling through service from Manhattan's Grand Central station. The opening facilitated access to Corona and surrounding areas, with IRT operating the service despite the line's municipal ownership. Queensboro Plaza itself had entered service on November 5, 1916, marking the first operational link from via the tunnel, initially as a terminus before the 1917 extension. Preliminary segments east of the plaza, including to Hunters Point Avenue, opened on February 15, 1916, as part of preparatory construction to support the full line. These openings addressed growing demand in western , where the elevated structure traversed industrial and residential zones along Roosevelt Avenue. Subsequent early expansions focused on eastward progression toward Flushing. On October 13, 1925, the line extended to 111th Street in , adding a key intermediate stop and increasing capacity for local commuters. This was followed by the opening of (now Mets–Willets Point) on May 7, 1927, further bridging the gap to downtown Flushing. The final segment to Flushing– opened on January 21, 1928, completing the core route with an underground terminus designed for high-volume transfer to surface lines. These extensions, totaling approximately 2.5 miles, spurred residential and commercial development in northeastern by providing direct subway access from .

Mid-20th Century Adjustments

In 1949, following the termination of joint operations between the IRT and BMT on the shared Queensboro Line trackage, the Flushing Line was fully assigned to the IRT division, while the adjacent Astoria Line was reconfigured exclusively for BMT service. This adjustment necessitated shaving back the Astoria Line platforms to accommodate the wider BMT , ending through service from Astoria to via Flushing Line tracks and establishing the Flushing Line as a standalone IRT route from to Flushing–. The change, implemented in the fall of that year, streamlined operations under the unified but required coordination to minimize disruptions during the transition. To address growing peak-hour demand, service was introduced on , 1953, with two 9-car "super express" trains operating mornings from Flushing–Main Street to , utilizing the center track between Queensboro Plaza and . This marked the first regular post-war use of express patterns on the line beyond temporary service in 1939, though initial skips at stations like Woodside prompted community protests, leading to resumed stops there within months. The service aimed to boost capacity amid rising Queens commuting, but overall ridership began declining in the due to automobile competition and , prompting further pattern tweaks rather than expansions. Infrastructure modifications included platform extensions completed between 1955 and 1956 at all Flushing Line stations except Queensboro Plaza, lengthening them to support 10-car trains and improving dwell times and safety. These upgrades, part of broader efforts to modernize IRT infrastructure under city control, facilitated the longer consists used in express operations and helped sustain service reliability despite aging equipment like SMEE cars, which persisted on the line until 1964. Post-World War II enhancements, such as a new eastern entrance at Flushing–Main Street, also supported local access amid steady but pressured usage.

Late 20th Century Decline and Rehabilitation

Like the broader system, the IRT Flushing Line experienced significant deterioration during the 1970s and early 1980s due to deferred stemming from the city's 1960s fiscal policies and the 1975 financial crisis, which limited capital investments and led to widespread neglect of infrastructure. This manifested in structural defects, such as a 1973 concrete ceiling collapse in a Flushing Line tunnel that killed one passenger and delayed service for thousands, alongside worn tracks, outdated signaling, and increasing service disruptions from signal failures and track conditions exacerbated by underfunding. The line's elevated sections, particularly in , suffered from and vibration-induced wear, contributing to slower speeds and reliability issues for the roughly 250,000 daily riders. Rehabilitation efforts accelerated with the Metropolitan Transportation Authority's inaugural 1982-1986 capital plan, which allocated funds from state and federal sources to address systemic decay, including targeted work on high-ridership lines like the Flushing. A comprehensive $70 million overhaul of the entire IRT Flushing Line began on May 13, 1985, encompassing track replacement, station structural repairs, platform renovations, and upgrades to electrical and signal systems to restore capacity and safety. This four-and-a-half-year project, part of the MTA's $6.3 billion five-year capital program, required single-tracking during off-peak hours and weekends, reducing frequencies but enabling the renewal of supports and the elimination of speed restrictions. The project concluded on August 21, 1989, with the restoration of express service on the line's three-track portions, improving travel times and reliability after years of constraints. Subsequent capital plans in the late and early extended these gains through station house modernizations and ongoing track maintenance, marking the Flushing Line's transition from crisis-era neglect to stabilized operations amid the MTA's broader $51 billion investment in subway infrastructure since 1982.

21st Century Modernization

The IRT Flushing Line underwent substantial modernization efforts in the , primarily driven by the (MTA) to address capacity constraints, aging infrastructure, and growing ridership in and western . A flagship project was the 1.5-mile extension from its previous terminus at –42nd Street westward along 41st Street and south along Eleventh Avenue to a new underground station at 34th Street–Hudson Yards, which opened to the public on September 13, 2015, following groundbreaking in 2007 and substantial completion of tunneling by 2013. This extension, integrated with the Hudson Yards Redevelopment Project, featured a cavernous station with nine entrances, high ceilings, and provisions for future capacity increases, serving over 30,000 daily passengers by facilitating access to new commercial and residential developments. To support the extension and enable higher train frequencies, the procured and deployed 284 R188 new-technology train cars, manufactured by , with the first entering on the Flushing Line in November 2013. These cars, designed specifically for A Division lines like the Flushing Line, incorporate open-gangway interiors for improved passenger flow, LED lighting, and compatibility with (CBTC) systems, replacing older R68 and R142A models phased out from the route. Signaling modernization shifted the line toward automation via CBTC installation, beginning with pilot testing in 2010 and progressing through the 2010s to replace mechanical block signals with digital train control for closer headways and reduced human error. By the mid-2010s, CBTC enabled automatic train supervision on segments of the line, contributing to a targeted completion of full implementation by 2018, though delays extended aspects into the 2020s due to integration challenges with legacy infrastructure. Station rehabilitation and accessibility upgrades complemented these efforts, with targeted work at high-volume stops such as –42nd Street, 74th Street–, and Flushing– to enhance circulation, add elevators, and extend platform life. Ongoing projects as of 2025 include track rehabilitation, signal enhancements, and escalator replacements between 48th Street and 72nd Street in , aimed at mitigating deterioration and boosting reliability amid peak loads exceeding 500,000 daily riders. These initiatives, funded through capital plans, have prioritized empirical improvements in throughput and safety over expansive new construction, reflecting fiscal constraints and operational data from post-extension usage patterns.

Infrastructure and Technology

Stations and Facilities

The IRT Flushing Line consists of 22 stations, operating primarily on an elevated structure through with underground segments in western (Long Island City) and . The line utilizes a four-track configuration for much of its length, with local and express tracks served by island platforms at most intermediate stops, facilitating overtaking by <7> express trains during rush hours. Stations range from high-volume transfer hubs like –42nd Street to neighborhood-oriented elevated stops in , with varying degrees of accessibility; as of 2023, 12 stations feature full ADA compliance with elevators or ramps, while others rely on stairs or partial mezzanine elevators. In Manhattan, the line begins at the 34th Street–Hudson Yards terminal, a cavernous underground station with a single island platform and three tracks, including tail tracks extending south for train storage; it opened on September 13, 2015, as the sole station of the 7 Subway Extension project to support Hudson Yards development. Adjacent is the Times Square–42nd Street complex, where the Flushing Line platforms interconnect with multiple lines (1/2/3, N/Q/R/W, A/C/E, and S shuttle) via extensive passageways, handling peak loads exceeding 50,000 daily boardings. The next stop, Grand Central–42nd Street, provides transfers to the IRT Lexington Avenue Line (4/5/6) and features an island platform with direct underground connections to Grand Central Terminal's commuter rail and subway concourses. Transitioning to Long Island City, underground stations include Vernon Boulevard–Jackson Avenue and Hunters Point Avenue, both with side platforms on two tracks (no express service here), serving residential and office areas near the ; Court Square–23rd Street offers transfers to the IND Queens Boulevard Line (E/M/) and Crosstown Line ( only during off-peak). Queensboro Plaza marks the transition to elevated territory and includes a crossover for route switching, with island platforms and free out-of-system transfers to the IRT Astoria Line (N/W). In Sunnyside and Woodside, stations such as 46th Street–Bliss Street, 52nd Street, 61st Street–Woodside (with transfers), and others feature compact island platforms typical of early 20th-century IRT design, often with partial renovations for LED lighting and tiling but limited accessibility. Further east in , Elmhurst, and , stations like 74th Street–Broadway (transfer to IND Queens Boulevard Line at Queens Plaza? Wait, no: 74th St transfers to buses mainly, but key for density), 82nd Street–, 90th Street–Elmhurst Avenue, and 103rd Street– Plaza serve densely populated immigrant communities, with elevated island platforms and recent upgrades for fare control and surveillance under MTA's rehabilitation efforts. The line culminates in Flushing with 111th Street, Mets– (adjacent to and National Tennis Center, with seasonal crowds exceeding normal capacity), and the terminal at Flushing–, featuring two island platforms, three tracks, and nine street entrances; it connects to Long Island Rail Road's Flushing station and handles over 20,000 daily riders as the busiest station on the line outside . Key facilities include Corona Yard, the primary storage, inspection, and light maintenance depot for the line's fleet, located south of Mets–Willets Point in ; established in 1928, it accommodates up to 50 trainsets via a connecting to the local tracks between 111th Street and Mets–Willets Point, supporting daily turnarounds and overhauls. Tail tracks at Flushing– provide limited storage for two trains, while extended caverns at 34th Street–Hudson Yards allow staging for up to three additional sets during off-peak. No heavy overhaul facilities are dedicated solely to the Flushing Line; cars are rotated to larger IRT yards like 239th Street for major work.

Rolling Stock

The IRT Flushing Line operates with 11-car consists, longer than standard IRT formations to maximize capacity on its busy corridor. Current comprises R142A and R188 New Technology Trains (NTTs), assigned from the Yard. The R188 cars, manufactured by , feature open-end designs enabling flexible 11-car assemblies without cab cars in intermediate positions and include provisions for (CBTC), implemented progressively on the line since 2018. These 76-foot cars, with bodies and automated announcements, entered starting , 2013, primarily displacing R62A cars previously used. Historically, the line's steep grades in the necessitated modified "Steinway" cars—Gibbs underframes adapted with AB brakes and heavier components for adhesion—introduced around 1916 for reliable operation. Standard IRT "Low-V" (Lo-V) cars, including 50 units built by for the , served elevated sections to Flushing Meadows. Postwar, R12 and R14 cars entered Flushing service in 1948 and the early , respectively, marking the line's designation as the route. In the 1960s, dedicated R33 World’s Fair (WF) and R36 WF cars, built by and Pullman-Standard, were assigned exclusively to the Flushing Line, painted turquoise-and-white to evoke the 1964–1965 New York World's Fair theme; 430 such cars supported increased ridership. These "redbirds" persisted into the 2000s before retirement, with some repainted all-white in 1983 as an anti-graffiti measure across the fleet.

Signaling and Automation

The IRT Flushing Line historically utilized fixed-block signaling with interlockings and multiple signal towers for , a that divided tracks into predefined blocks enforced by and color-light signals. By the mid-20th century, efforts to aspects of signaling began, including a 1954 initiative to install a fully signal aimed at improving and for riders. However, these upgrades retained manual operation dependencies and did not fundamentally alter the fixed-block constraints limiting . Modernization accelerated with the adoption of (CBTC), a radio-based system enabling continuous train positioning and moving-block operation, which replaced traditional fixed blocks to reduce headways and enhance safety through exchange between trains and central control. The Flushing Line received Thales SelTrac CBTC as part of the 2015 Hudson Yards extension project, with full integration across the line achieved by July 2019, allowing automated enforcement of speed limits and collision avoidance. This upgrade involved retrofitting interlockings, installing onboard transponders and antennas, and upgrading power and communications infrastructure to support the system's bidirectional wireless communication. Complementing CBTC, (ATO) was implemented on the Queens portion of the line by May 2019, automating throttle, braking, and speed adjustments to optimize performance based on real-time conditions, thereby improving energy efficiency and ride consistency without eliminating train operators. The combined CBTC-ATO deployment has increased peak-hour frequencies from 25-27 trains per hour to 29, demonstrating measurable capacity gains while maintaining manual oversight for non-standard scenarios. Ongoing pilots, such as a demonstration of advanced signaling technologies on the line, explore further enhancements like ultra-wideband communication for even finer train localization, though full driverless automation remains absent.

Economic and Urban Impact

Development in Queens

The construction and extension of the IRT Flushing Line into , initiated under the 1913 between the City of New York and the , transformed large swaths of farmland and underdeveloped land into residential and commercial hubs, alleviating Manhattan's congestion by enabling outward migration. The line's initial segments, opening from Queensboro Plaza to 103rd Street–Corona Plaza on October 28, 1917, anticipated rapid real estate speculation, with developers subdividing plots along the right-of-way even prior to full service commencement in 1915 for preliminary sections. This infrastructure investment directly catalyzed suburban expansion in areas like and , where proximity to the lowered commuting barriers and boosted land values, fostering middle-class housing tracts designed for access. The 1928 extension to Flushing–Main Street further accelerated growth in northeastern , particularly Flushing, by integrating the area into Manhattan's economic orbit and spurring multi-family construction. A 1929 survey documented 131 houses erected in Flushing, attributing this surge to the subway's completion, which provided reliable 20- to 30-minute connections to Midtown and stimulated demand for denser urban living over scattered rural holdings. Industrial development also proliferated, with factories and warehouses clustering near stations like to leverage freight spurs and worker influx, though residential zoning pressures later shifted emphasis toward . This pattern mirrored broader trends, where subway adjacency correlated with elevated property assessments and speculative building booms in the . Post-World War II demographic shifts amplified the line's role in Queens' , as returning veterans and expanding families settled along the corridor, contributing to a borough-wide increase from 469,042 in 1920 to 1,546,316 by 1950—a net gain of over 1 million residents largely enabled by expansions like the Flushing Line. Neighborhoods such as Flushing evolved into ethnic enclaves, with later 20th-century from accelerating commercial revitalization around terminal stations, though core development patterns originated from the line's early-20th-century openings. By providing fixed, high-capacity links to employment centers, the Flushing Line not only inverted Queens' pre-subway sparsity but also entrenched transit-oriented growth, with sustained ridership underpinning viability despite periodic capacity strains.

Capacity and Usage Statistics

The IRT Flushing Line operates with 11-car consists during peak hours, utilizing R142A and R188 designed for high-volume IRT infrastructure. Each car provides a seated of 70 passengers and a design load of 176 including standing room, yielding a theoretical peak-hour of approximately 41,000 passengers per direction when run at intervals of 2.5 minutes ( per hour). This supports the line's as corridor for commuters from to , though actual throughput is constrained by station dwell times, signal blocks, and platform lengths limited to 11 cars at most stops. Express service on the <7> enhances effective by bypassing intermediate stations, allowing higher speeds and reduced crowding on the outer segments. Average weekday ridership on the 7 and <7> services reached 487,000 passengers in fiscal year 2019, prior to the , making it one of the New York City Subway's busiest lines and accounting for roughly 7% of systemwide trips. Pandemic-related declines reduced this to a low of 112,000 in fiscal year 2021, with partial recovery to 372,000 by fiscal year 2023 amid hybrid work patterns and immigration-driven population growth in . Peak loads occur inbound toward during morning rush (7–9 a.m.), often exceeding 90% of capacity at Flushing–Main Street terminal, where transfer volumes from the amplify demand. Outbound evening peaks similarly strain the line, with utilization rates approaching design limits on express segments between Junction Boulevard and Queensboro Plaza.
Fiscal YearAverage Weekday Ridership (000s)Annual Ridership (millions)Notes
2019487118Pre-pandemic peak; driven by workforce commuting.
202024535Initial COVID shutdown impact.
202111220Lowest post-initial recovery; effects.
202227865Gradual rebound with office returns.
20233729076% of 2019 levels; population influx contributes.
These figures, reported by the , reflect counts and do not include estimated at 10–15% systemwide, potentially understating true usage. Capacity expansions, such as the 2015–2018 (CBTC) implementation on a portion of the line, have aimed to increase throughput by 20–25% through closer headways, though full benefits await systemwide upgrades. Ongoing challenges include overcrowding at key interchanges like Queens Plaza, where transfers to the E, F, M, G, and R lines exceed 50,000 daily, straining platform and vertical circulation.

Challenges and Criticisms

Historical Construction Delays and Costs

The Steinway Tunnels, which form the underwater segment of the IRT Flushing Line under the , encountered severe construction challenges shortly after groundbreaking on June 3, 1892, when work halted on February 2, 1893, due to unexpected water springs and related lawsuits. These issues, compounded by engineering difficulties and financial strains, resulted in extensive delays and cost overruns during the initial private development phase. William Steinway's involvement from provided temporary momentum, but the project stagnated after his death in 1896, leaving the tunnels incomplete for nearly a decade. Construction resumed under in 1905, with the north tube finished on May 16, 1907, and the south tube on August 7, 1907; however, the tunnels remained idle from October 23, 1907, until 1915, primarily due to the lack of an operating franchise from city authorities. The City of acquired the tunnels on April 3, 1913, for $3 million, enabling integration into the public system and the start of subway service on April 21, 1917, from Grand Central to Alburtis Avenue (present-day 103rd Street–Corona Plaza). This acquisition addressed prior private-sector funding shortfalls but underscored the high opportunity costs of prolonged inactivity. The extension from to Flushing faced its own deferrals; although favored in early planning, it was postponed during the 1913 to minimize upfront expenditures. Initial service reached only in 1917, with full extension to –Flushing delayed until January 21, 1928—an 11-year interval attributable to phased funding and construction prioritization under public oversight. The contract for this segment totaled $3,867,138, reflecting elevated costs for elevated and at-grade infrastructure amid post-World War I economic pressures, though specific overrun figures remain undocumented in contemporary records. These delays limited early ridership growth and deferred urban development benefits in eastern .

Operational and Maintenance Issues

The IRT Flushing Line has faced persistent operational challenges, including signal malfunctions and mechanical failures, despite the implementation of (CBTC) signaling to enhance reliability and capacity. The CBTC project, intended to modernize the line's century-old fixed-block system, encountered significant delays and cost overruns, with testing issues contributing to an original $636 million budget escalating beyond projections and full operation lagging years behind schedule. Even after activation, vulnerabilities persisted; for instance, on September 21, 2021, a malfunction in the newly installed signals near Grand Central led to hours-long suspensions and rerouting, underscoring integration challenges with legacy infrastructure. Mechanical problems with have also triggered frequent disruptions, often during peak hours. On July 9, 2025, a activation issue at Vernon Boulevard-Jackson Avenue caused delays in both directions, with service resuming gradually after track inspections. Similar incidents, such as removing trains with mechanical faults at Times Square-42nd Street, have compounded delays, reflecting wear on the R188 fleet amid high daily ridership exceeding 500,000 passengers. Maintenance demands exacerbate these operational strains, as the line's elevated sections in —built primarily between 1917 and 1928—require ongoing interventions for , structural corrosion, and station rehabilitations, frequently necessitating reductions or suspensions. Express was indefinitely halted in late 2025 to accommodate delayed track work between 74th Street-Broadway and Flushing-Main Street, with full restoration not expected until 2026; similarly, rush-hour express operations were paused from October 27 to November 21, 2025, due to overlapping at multiple sites. These efforts, while addressing a systemic inherited from decades of underinvestment, have led to chronic crowding on local tracks and on-time performance variability, even as CBTC has helped sustain averages above 90% in recent years.

Extension Debates and Community Opposition

Proposals to extend the IRT Flushing Line eastward beyond Flushing-Main Street station have recurred since the 1910s, with early debates centering on routes to Bayside or amid growing development. Residents and civic groups opposed elevated structures due to aesthetic, noise, and property value concerns, leading to the abandonment of such plans by the 1920s in favor of service; underground alternatives proved cost-prohibitive. Similar resistance persisted into the mid-20th century, as secondary schemes to repurpose LIRR tracks or build new alignments were shelved amid fiscal constraints and local pushback against disruption. In the 2000s, attention shifted westward, with Mayor reviving a plan in to extend the line from its new 34th Street-Hudson Yards terminus under the to in , positioning it as a lower-cost alternative to the canceled (ARC) tunnel project. A 2013 feasibility study estimated costs at $5.7–7.1 billion, projecting 13,000–18,000 daily riders but highlighting engineering challenges like tunneling through soft silt and integrating with operations. Critics, including transportation analysts, argued the extension's capacity—limited by the line's existing infrastructure—would fail to alleviate trans-Hudson congestion meaningfully, potentially diverting riders from higher-capacity commuter rail while exacerbating overcrowding. Jurisdictional barriers compounded debates, as the charter restricts service to city limits, requiring legislative changes and inter-agency coordination with the and . Community opposition to Secaucus plans was limited but echoed broader sentiments in , where residents cited fears of intensified platform crowding at Flushing and reduced service frequencies. Renewed advocacy in 2023 by New Jersey congressmen urged reconsideration for commuter relief, yet the proposal stalled amid competing priorities like Gateway tunnel expansions. LaGuardia Airport connectivity debates indirectly implicated the Flushing Line, as Willets Point station serves as a potential ; 2015–2023 AirTrain proposals, which would link the airport to the 7 via a $2.4 billion elevated spur, drew fierce Queens opposition from groups like Guardians of Flushing over environmental impacts, wetland disruption, and traffic increases. State Senator and local advocates criticized the federal review process as rushed, favoring direct extensions like the N train over the "backwards" AirTrain routing. The project was canceled in March 2023 after cost overruns and opposition, reverting focus to without resolving extension viability amid persistent Astoria-area resistance to construction disruptions.

Recent Developments (2015–2025)

Western Extension Completion

The western extension of the IRT Flushing Line added 1.5 miles of track and a new terminal station at 34th Street–Hudson Yards, extending 7 train service from Times Square-42nd Street westward to serve the Hudson Yards neighborhood. Construction commenced in late 2007 after project approval by the Hudson Yards Development Corporation in September 2006, with the extension designed as a two-track underground alignment including tail tracks for train storage. The $2.4 billion project incorporated advanced ventilation facilities, signal upgrades, and a deep underground station excavated via cut-and-cover and mined tunneling methods to minimize surface disruption. Completion was marked by the station's opening on September 13, 2015, following resolution of final delays related to installations, functionality, and testing. Initial plans targeted passenger service by December 2013, but phased testing extended the timeline as crews addressed integration with existing infrastructure at , including a new crossover and . The station, spanning over 75 feet deep, features four entrances, high ceilings with installations, and capacity for 24-hour operations to support peak-hour demand from adjacent commercial developments. Post-opening, the extension immediately boosted connectivity, with 7 trains operating full Flushing Line service to the new terminus and ridership data indicating over 5 million annual passengers by , reflecting its role in alleviating congestion on nearby lines. No major structural issues emerged in the initial years, though ongoing maintenance has addressed wear on new escalators and tracks as part of broader Flushing Line rehabilitation efforts. The completion fulfilled a long-standing goal for Manhattan's West Side, funded primarily through city bonds and developer contributions tied to Hudson Yards rezoning.

Station Upgrades and Accessibility Improvements

The has implemented station upgrades along the IRT Flushing Line as part of the Flushing Line Improvements Project, focusing on circulation enhancements and modifications at seven high-volume stations to facilitate safer movement and prolong durability. These efforts include platform renewals, stair rehabilitations, and targeted Americans with Disabilities Act (ADA) features such as compliant boarding zones, particularly at elevated structures where full installations are constrained by challenges. At Flushing–Main Street terminal, renovations completed on November 22, , incorporated expanded areas, new fare control equipment, and improved lighting and signage to alleviate congestion and enhance entry points, though vertical access remains limited without new elevators due to the station's at-grade configuration. In parallel, work at features ADA-compliant platform edges, reoriented stairs for better flow, drainage upgrades to prevent flooding-related disruptions, and partial retrofits to support users via existing ramps and modified barriers. Queensboro Plaza station initiated ADA improvements in recent years, emphasizing barrier-free paths and signal integrations to aid transfers with the IRT Astoria Line, while renewal projects at 82nd Street–Jackson Heights and 111th Street address deteriorated canopies, wind screens, and entry to comply with federal mandates. Design phases for comprehensive rehabilitations at 52nd Street, 69th Street, 103rd Street–Corona Plaza, and additional sites concluded by 2021, incorporating tactile edge warnings, wider gates, and structural reinforcements to incrementally boost ADA compliance amid the line's aging elevated viaducts. These upgrades align with the MTA's $5.5 billion allocation in the 2020–2024 Capital Program for 70 station projects systemwide, prioritizing vertical circulation where structural feasibility allows, though Flushing Line progress lags behind due to higher costs for elevated retrofits estimated at $75–100 million per station. Ongoing efforts through 2025 include phased implementations to minimize service interruptions, with pre-construction at select sites starting as early as September 2022 and emphasizing maintenance of business access during disruptions. Despite these advancements, full ADA remains incomplete at most Flushing Line stations, reflecting broader systemic delays in subway retrofits attributable to budgetary constraints and logistical complexities in historic infrastructure.

Ongoing Rehabilitation Projects

The Flushing Line Improvements Project, initiated by the (), targets rehabilitation of infrastructure along the line between 48th Street in and approximately 72nd Street in , encompassing track replacements, structural reinforcements, and station upgrades to address aging components and enhance reliability. Work includes repairs to track supports and platforms at , where construction began in June 2023 but has faced delays, extending beyond the original mid-2025 target into early 2026; similar delays affect adjacent Jackson Heights–Roosevelt Avenue station (74th Street–Broadway). At 61st Street–Woodside, ongoing efforts involve platform reconstruction, escalator replacements, and structural fixes to mitigate water infiltration and vibration issues, necessitating periodic suspension of express <7> service and single-tracking arrangements. Pre-construction activities for the broader started in September 2022, with full completion projected for 2026 amid supply chain and labor challenges. Separate station renewal at 103rd Street–Corona Plaza, part of a state-of-good-repair initiative across five Flushing Line stations, commenced in 2025 for a 10-month duration, focusing on stair replacements, and enhancements, and safety barriers; the Flushing-bound undergoes a five-month to minimize disruptions. These projects collectively aim to extend asset life and improve , though they have prompted alternatives and weekend closures since 2022.

References

  1. [1]
    IRT Flushing Line - nycsubway.org
    The line, built by the City of New York, began April 21st, 1917 with IRT trains running between 42nd St / Grand Central and Alburtis Avenue (now 103rd St.)
  2. [2]
    7 Train (Flushing Local and Express) Line Map - MTA
    Queens stations ; Flushing-Main St. Main St and Roosevelt Ave, Roosevelt Ave between Main St and Lippmann Plaza. Two island platforms ; Mets-Willets Point.
  3. [3]
    (7) IRT Flushing Line - Secrets of the Subway
    Feb 15, 2022 · Construction on the tunnel began in 1892, but a series of accidents and a stock market crash the following year saw construction stop and the ...
  4. [4]
    Subway Travel from Manhattan to Flushing: The IRT Flushing Line
    On March 1, 1927, the opening of the line was set for March 15, the third time an opening date was set for the line. ... Flushing line's construction if there was ...
  5. [5]
    Improving the 7 Line - MTA
    Improving the 7 Line. From Manhattan to Flushing, we're working to improve the customer experience across the 7 line, including on board trains and in stations.
  6. [6]
    [PDF] 7/7X subway timetable - MTA
    Local trains run between Main St-Flushing and 34th-Hudson Yards at all times. Express trains run weekday mornings to Manhattan and afternoons/evenings to ...
  7. [7]
  8. [8]
    Why do 7 trains have 11 cars? : r/nycrail - Reddit
    Sep 29, 2019 · None of the original platforms on the 7 were 10 cars long. When they were extending them, due to the high usage of the line, they extended them to 11 cars long ...Why does the 7 have an odd number of cars (11) : r/nycrail - RedditWhy didn't the IRT increase train car length/width to compete with ...More results from www.reddit.com
  9. [9]
    No. 7/Flushing Line CBTC Signal Modernization | RailWorks
    RailWorks upgraded two interlockings and installed communication-based train control, power and communications systems on the Flushing Line.
  10. [10]
    Flushing 7 Train Signals Late and Over Budget - Reinvent Albany
    Nov 14, 2018 · Signal modernization with Communication Based Train Control (CBTC) for the Flushing 7 line was first proposed in the MTA's 2000-2004 Capital ...
  11. [11]
    MTA completes 7 line's Automatic Train Operation upgrade in Queens
    May 9, 2019 · The 7 train in Queens is now equipped with a program that automatically sets optimal acceleration, cruising speeds and braking, the MTA ...
  12. [12]
    MTA Flushing Line implements Automatic Train Operation
    May 10, 2019 · “Automatic Train Operation,” a technology intended to enable faster, more reliable service, on the Flushing 7 Line in Queens.
  13. [13]
    7 train automatic trains halted after trains blow past stations NYC MTA
    May 13, 2019 · The MTA's latest technology, computers driving trains at the push of a button, got derailed on the 7 line, days after its full launch last ...
  14. [14]
    CBTC: Upgrading signal technology - MTA
    The computerized automatic train operation (ATO) system that's part of CBTC means there are fewer variations between how train operators run trains.
  15. [15]
    The Dual Contracts - nycsubway.org
    Between 1910 and 1920, the City, along with the IRT and BMT companies, undertook a massive construction project known as the Dual Contracts.
  16. [16]
  17. [17]
    NY Transit Museum on X: "#TodayinHistory: #OnThisDay in 1917 ...
    #TodayinHistory: #OnThisDay in 1917, the IRT Flushing Line opened between Queensboro Plaza and 103rd Street – Corona Plaza. Today, it has been dubbed the ...<|control11|><|separator|>
  18. [18]
    IRT Flushing Line - Metro Wiki - Fandom
    It is now nicknamed the "International Express" because of the diversity of the population of the communities it serves. It is also famous for being the ...Diverse Ridership And... · Extent And Service · History
  19. [19]
    OnThisDay in 1925, an extension of the IRT Flushing line opened ...
    Oct 13, 2024 · 1925, an extension of the IRT Flushing line opened with a new station at 111th Street & Roosevelt Avenue in Corona, Queens. The debut of the IRT ...
  20. [20]
    Route 7 (New York City Subway) | Metro Wiki - Fandom
    On June 13, 1915, the first test train on the IRT Flushing Line ran between Grand Central and Vernon Boulevard–Jackson Avenue, followed by the start of revenue ...
  21. [21]
    [PDF] History Of The Nyc Subway - Tangent Blog
    In the 1950s and 1960s, the rise of the automobile and suburban living contributed to a decline in subway ridership. The city faced budget deficits, and the ...<|separator|>
  22. [22]
    The New York Transit Authority in the 1970s - nycsubway.org
    This line would reduce overcrowding on the IND Queens Blvd line, through the 53rd Street tunnel, on the IRT Flushing Line and through the 60th Street tunnel.
  23. [23]
    Subway Maintenance Is Better Than It Was - The New York Times
    Oct 9, 1973 · The increase in delays caused by signal problems was attributed by subway officials to a rule imposed by Dr. Ronan in 1970 forbidding a train to ...
  24. [24]
    Much ado about Flushing: Regional Rail and Extending the 7 Train
    May 23, 2022 · An eastward 7 train extension dates back to the 1910s when Queens residents were debating about possible routes into Flushing and Bayside. The 7 ...<|control11|><|separator|>
  25. [25]
    The New York Transit Authority in the 1980s - nycsubway.org
    In 1981 through 1982, he was able to secure $8.1 billion in funding for the first capital improvement program. In 1982, the first year of the program, the MTA ...
  26. [26]
    REPAIRS TO SLOW FLUSHING LINE RIDERS - The New York Times
    The $70 million rehabilitation of the IRT Flushing line, which carries about 250,000 passengers a day, is part of the authority's five-year, $6.3 billion ...
  27. [27]
    [PDF] From Rescue to Renaissance: - NYU Wagner
    Dec 1, 2004 · In the 1970s, these projects consumed 45% of the Transit Authority's capital budget and left a decreasing share for upkeep of the existing ...
  28. [28]
    No. 7 Subway Line Extension - WSP
    WSP USA designed a 1.5-mile extension of New York's No. 7 Line Subway from Times Square to a new station at 34th Street in Hudson Yards.
  29. [29]
    No. 7 Subway Extension - Hudson Yards Development Corporation
    The No. 7 subway line, which originally terminated in Times Square, now extends approximately two miles to a new terminus at West 34th Street and 11th Avenue.
  30. [30]
    Hudson Yards Station - Dattner Architects
    The project extends the Number 7 Subway line from its original terminus at Times Square, running along 41st Street and then south along Eleventh Avenue to 34th ...
  31. [31]
    CBTC trials on New York's Flushing Line | News - Railway Gazette
    May 4, 2010 · The R188 is designed for use on Division A of the New York City Transit network, the former IRT lines, and will be assigned to the No 7-Flushing ...
  32. [32]
    [PDF] flushing line - improvements project - MTA
    May 3, 2025 · The project will rehabilitate the Flushing Line between 48th and 72nd Street, including station upgrades, track work, and escalator ...Missing: IRT century
  33. [33]
    MTA NYC Metro 7 Train Stops & Schedule - New York Metro
    1 - Flushing - Main Street Metro Station (IRT Division Flushing Line) · 2 - Mets - Willets Point Metro Station (IRT Division Flushing Line) · 3 - 111th Street ...
  34. [34]
  35. [35]
    R188 Subway Cars - MTA New York City Transit
    Apr 26, 2013 · The R188s are an "A" division car that will be used on the (7) line on the IRT Flushing Line that will displace all the R62As.
  36. [36]
    New York City Subway 7 Flushing Local on the SubwayNut
    Oct 16, 2021 · Since the R142As were originally delivered in 5 car trainsets, a new-built R188 'B' car without operator cabs was installed in half of the ...
  37. [37]
    Meet the Lo-Vs - New York Transit Museum
    There were only 50 World's Fair Lo-V cars. These were built by the St. Louis Car company for service during the 1939 World's Fair on the IRT Flushing Line.
  38. [38]
    Meet the Birds - New York Transit Museum
    This color, officially called Kale Green, was tested by the Transit Authority on 12 R-33 cars on IRT (numbered) lines. The Train of Many Colors, 2018
  39. [39]
    In 1981 the MTA rolled out 7,000 pure white subway cars to ... - 6sqft
    Aug 10, 2018 · By January of 1983, 7,000 cars– the entire IRT Flushing Line fleet–were painted white. Which predictably had about the same effect as trying to ...<|control11|><|separator|>
  40. [40]
    A century of amber lights: the story of New York's subway signals
    Oct 25, 2021 · For instance, the IRT Flushing Line (now the 7) was split between around ten such towers by the 1940s. Those signal towers spoke with each other ...
  41. [41]
    Train Identity Signals To Aid Flushing Riders - The New York Times
    The installation of a completely automatic signal system for the Flushing line of the I. R. T. subway will be started in two weeks.
  42. [42]
    Metropolitan Transportation Authority fully integrates ... - Mass Transit
    Jul 25, 2019 · Metropolitan Transportation Authority fully integrates communications based train control on Flushing Line ... The line has been running on Thales ...
  43. [43]
    NYC Subway's 7 Line: ATO & CBTC Modernization - Railway News
    The combined effect of CBTC and ATO on the Flushing Line has resulted in a notable increase in train frequency, from 25-27 trains per hour to 29. This seemingly ...
  44. [44]
    MTA demonstrates new signaling technology pilot on the Flushing line
    Jan 27, 2020 · The updated signaling system on the 7 and L lines is called Communications Based Train Control (CBTC), and it allows more precise control of the ...
  45. [45]
    How one subway line changed New York forever
    Aug 4, 2017 · The Interborough Rapid Transit (IRT) Flushing line, which publicly became the 7 in 1948, was built to encourage growth in the city's most rural outer borough.<|separator|>
  46. [46]
    7 Train: Minutes to Midtown - Urban Archive
    Did you know that the construction of the IRT Flushing line (known as the Corona Line until 1925) was the catalyst for real estate development that ...Missing: impact | Show results with:impact
  47. [47]
    FLUSHING GROWTH AIDED BY SUBWAY; Survey Discloses That ...
    FLUSHING GROWTH AIDED BY SUBWAY; Survey Discloses That 131 Apartment Houses Have Been Erected There. Credit...The New York Times Archives.
  48. [48]
    QUEENS POPULATION GREW WITH SUBWAY - The New York Times
    In the rapid growth from 1920 to 1950, when its population rose from 469,042 to 1,546,316 for a gain of 1,086,274 persons, Queens increased its dwelling units ...Missing: onward | Show results with:onward
  49. [49]
    Flushing: Transit Connectivity, Immigration, and Development
    Aug 3, 2021 · From how subway spurred urbanization, to Asian immigration starting in the 1980s, and to today's Flushing: a hotbed for luxury development.
  50. [50]
    CORONA TO FLUSHING VIA RAPID TRANSIT - The New York Times
    "This extension was favored at the time the dual system contracts were made, but was postponed in order to cut down the cost of construction. The engineers of ...
  51. [51]
    Straphangers fume after faulty new signals shut down 7 train for ...
    Sep 21, 2021 · 7 trains are rerouted/delayed while our crews troubleshoot a signal malfunction near Grand Central. Some 34 St-bound 7 trains are ending at ...
  52. [52]
    7 train service slowly resumes between Manhattan and Queens - NY1
    Jul 9, 2025 · Service on the 7 train is slowly resuming between Manhattan and Queens after a brake issue partially suspended trains during the Wednesday morning commute.
  53. [53]
    NYCT Subway (@NYCTSubway) / X
    7 trains are running with delays in both directions after we inspected the tracks after a train's brakes activated at Vernon Blvd-Jackson Av.
  54. [54]
    [PDF] FLUSHING LINE - MTA
    Jun 23, 2025 · Flushing Line express service is expected to resume once all track work is completed in 2026. Page 2. The MTA and its project team are making ...Missing: backlog | Show results with:backlog
  55. [55]
    Could The 7 Train Be Extended To New Jersey? - CBS News
    Nov 20, 2010 · Extending the 7 line train under the Hudson into New Jersey isn't actually a new idea according to transportation expert Jeff Zupan of the ...
  56. [56]
    [PDF] No. 7 Secaucus Extension Feasibility Analysis Final Report
    The No. 7 Secaucus Extension would create additional trans-Hudson capacity by extending MTA subway service from Midtown Manhattan and Queens to an expanded ...
  57. [57]
    Why the 7 to Secaucus Won't Work | Pedestrian Observations
    Oct 28, 2011 · I'm baffled that anyone considers the 7 Secaucus extension to be an ARC alternative. ... The 7 train would allow for increased NJ bus service ...
  58. [58]
    Why did they rule out extending the #7 MTA subway line out ... - Quora
    Jun 5, 2024 · It would be more accurate to say such a plan has never been ruled in. The NYC Subway system is chartered to run within the City of New York only.
  59. [59]
    If Money and Community Opposition were not an Issues Where ...
    Jun 26, 2021 · As the title says, let's say that money and community opposition are not issues and let's take into account mostly what parts are underserved. Most of these ...What to do about Flushing: Regional Rail and Extending the 7 Trainr/nycrail - Extremely controversial but it's the honest truth, I'm tired of ...More results from www.reddit.comMissing: debates | Show results with:debates
  60. [60]
    Congressmen Menendez and Pascrell Call on New York to Extend 7 ...
    Sep 29, 2023 · We strongly urge the MTA and New York City to provide additional trans-Hudson rail services to commuters through the expansion of the 7 Train.
  61. [61]
    Real estate group to argue for 7 train to Secaucus - POLITICO
    Jul 17, 2014 · The city anticipates demand for transit between New Jersey and New York to grow 38 percent by 2030, even as existing facilities are at or near ...Missing: debates | Show results with:debates
  62. [62]
    Queens community groups voice opposition to LaGuardia AirTrain ...
    Apr 12, 2021 · Queens community groups and state Senator Jessica Ramos voiced resolute opposition to the proposed LaGuardia AirTrain and criticized the project's review ...<|separator|>
  63. [63]
    Port Authority kills 'backwards' AirTrain to LGA - New York Post
    Mar 13, 2023 · The Port Authority on Monday officially killed its plans to build a “backwards” AirTrain linking LaGuardia Airport to Willets Point.
  64. [64]
    Plans to Build AirTrain to La Guardia Are Officially Scrapped
    Mar 13, 2023 · Gov. Kathy Hochul has abandoned plans to build a light-rail link to La Guardia after a review found that the project's cost had ballooned to $2.4 billion.
  65. [65]
    Trying to understand the NIMBIYISM factor against the N extension ...
    May 26, 2024 · Looking at the proposed maps in the past of the N train using 19th Avenue to potentially go below grade before it hits Grand Central.Extend R to LaGuardia : r/nycrail - RedditNIMBY-friendly N extension to LGA and 7 to College Point - RedditMore results from www.reddit.com
  66. [66]
    Airport/Transit Best Project: Number 7 Subway Line Extention | ENR
    Oct 6, 2016 · The $2.4-billion No. 7 Subway Line Extension Project is a 1.5-mile, two-track underground rail system that extends west and then south from the subway line's ...Missing: timeline | Show results with:timeline
  67. [67]
  68. [68]
    Hudson Yards Subway Extension to Open in September: MTA
    Jul 20, 2015 · 7 line will finally open in September, MTA officials say. The opening of a station at 34th Street and 11th Avenue is now expected to open on ...
  69. [69]
    OP-ED: The Missing Hudson Yards NYC Transit #7 intermediate ...
    Sep 15, 2023 · Construction started in 2007, with a planned completion date of December 2013. The anticipated first day of public service slipped several times ...Missing: IRT | Show results with:IRT
  70. [70]
    MTA Announces Significant Station Upgrades Complet
    Nov 22, 2023 · “The project will improve access, ease overcrowding and provide straphangers with a better and safer experience at the Flushing-Main Street ...Missing: IRT Line
  71. [71]
    The Flushing Line Is Getting A Slew Of Upgrades That Will Improve ...
    Mar 7, 2023 · The MTA had already significantly upgraded the line in recent years by installing CBTC(Communications-Based Train Control) to replace the fixed- ...<|control11|><|separator|>
  72. [72]
    MTA's Plan To Overhaul Six Stations on 7 Line is Moving Forward
    Jul 6, 2021 · The MTA says that it has completed the design work to rehabilitate the 52nd Street, 61st Street, 69th, 82nd, 103rd and 111th Street stations– ...<|control11|><|separator|>
  73. [73]
    Station accessibility projects - MTA
    The MTA is investing more than $5.5 billion in station accessibility improvements in the 2020-2024 Capital Program. This historic investment includes 70 new ...