Fact-checked by Grok 2 weeks ago

Mount Hope Bridge

The Mount Hope Bridge is a two-lane spanning Mount Hope Bay in , connecting the town of on the mainland to on while carrying Rhode Island Route 114. Designed by the firm Robinson and Steinman and constructed from 1927 to 1929 as a private toll facility, it features a main span of 1,200 feet (366 m) between 285-foot (87 m)-tall Gothic-arched towers, with 135 feet (41 m) of vertical clearance over high water and a total length of approximately 6,130 feet (1,870 m). Notable for its innovative stiffening and the rapid thirteen-day erection of the suspended steel spans, the bridge earned design awards and recognition as a masterpiece of engineer . Listed on the in 1976 due to its significance, it has undergone extensive renovations, including over $15 million in work from 1998 to 2004 to maintain structural integrity amid ongoing maintenance by the Rhode Island Turnpike and Bridge Authority.

Location and Geography

Physical Description and Route

The Mount Hope Bridge is a crossing Mount Hope Bay, a northern arm of in . It consists of a central main span measuring 1,200 feet (366 m) suspended between two towers that rise 285 feet (87 m) above the water surface. The structure provides 135 feet (41 m) of vertical clearance above mean high water, accommodating maritime traffic in the bay, while the total length of the bridge, including approaches, spans 6,130 feet (1,870 m). The towers feature a cross-braced with Gothic arches at their tops, drawing stylistic influence from earlier suspension bridges like the . Main cables, each 11 inches in diameter, support the deck via vertical , and the stiffening enhances stability against wind and traffic loads. Foundations for the piers reach depths of up to 54 feet below to anchor into . The roadway is configured for two lanes of vehicular traffic in each direction, with sidewalks on both sides. The bridge's route follows Rhode Island Route 114, originating in the town of on the eastern mainland shore of and terminating in the town of on . This alignment provides the shortest fixed crossing between the mainland and the island, bypassing longer ferry routes and facilitating direct access to northern communities and connections southward toward via the Claiborne Pell Bridge.

Regional Connections and Accessibility

The Mount Hope Bridge carries Route 114 across Mount Hope Bay, linking on to on the mainland and serving as the primary roadway connection between these areas. Route 114 extends southward from the bridge to intersect with Route 138 in Middletown and northward through , Warren, Barrington, and East Providence to connect with Interstate 195, providing access to broader regional networks including and . As a two-lane suspension bridge, it functions as a critical freight corridor for trucks and commercial vehicles, though access for certain oversized loads like RVs and empty trailers is restricted during high winds exceeding specific thresholds. Maintenance activities, such as lane restrictions and periodic full closures for resurfacing, can temporarily impact accessibility, with detours routing traffic via the Sakonnet River Bridge on Route 24 as an alternative path between and the mainland. Public transportation relies on regional bus services that may traverse the bridge, but dedicated or accommodations are absent, limiting non-motorized accessibility; proposals for a Mount Hope Bikeway seek to address this gap by enhancing connections to the mainland. Commuters, including those accessing , depend heavily on the bridge, with RIPTA routes providing supplementary options amid occasional disruptions from weather or construction.

Design and Engineering

Structural Design Principles

The Mount Hope Bridge is a gravity-anchored , employing the core engineering principle of transferring vertical loads from the roadway deck to the main cables through , with the cables themselves placed in and supported by towers in while anchored against horizontal by massive gravity anchors. This configuration enables efficient spanning of the 1,200-foot main span across Mount Hope Bay, minimizing material usage for long-distance crossings compared to rigid arch or designs prevalent at the time. The three-span layout—comprising the central suspension span flanked by two shorter side spans—distributes forces more evenly, enhancing overall structural equilibrium under dead loads, live traffic, and environmental stresses. To counteract deflections and induced by and dynamic loads, the bridge incorporates a deck stiffening system, which rigidifies the suspended roadway and improves load distribution across the and cables, a critical measure for in early 20th-century designs before advanced aerodynamic modeling. The main cables, composed of cold-drawn galvanized wires arranged in parallel strands, provide high tensile strength and flexibility, with Steinman's insistence on this proven material over experimental heat-treated alternatives averting premature failure during . Towers, rising approximately 285 feet, are engineered primarily for axial from cable drape, with gothic-inspired detailing that integrates aesthetic form without compromising load paths. Innovations in the design by of Robinson & Steinman included cable bents featuring straight backstays at the side span ends, which optimized anchorage efficiency and reduced construction costs by simplifying force resolution at the piers. Additionally, the adoption of 150-foot continuous steel girders in the approaches marked an early application of extended prefabricated elements, facilitating smoother integration with the suspension system and minimizing joints prone to stress concentrations. These principles collectively prioritized both structural integrity and economy, reflecting Steinman's emphasis on empirical validation of material performance amid the era's rapid advancements in bridge engineering.

Key Technical Specifications

The Mount Hope Bridge is a suspension bridge with a main span measuring 1,200 feet (366 meters), flanked by side spans that contribute to its three-span configuration. Its towers, constructed in a gothic style with cross-bracing, rise 285 feet (87 meters) above the water surface. The structure provides 135 feet (41 meters) of vertical clearance above mean high water. The total length of the bridge, including approaches, spans 6,130 feet (1,869 ), supported by nine piers in the and anchored by massive blocks. Main cables, each 11 inches in , carry the load to stiffening trusses on the deck, which was designed for a uniform loading of 6,800 pounds per , including a maximum live load equivalent to three lanes of 20-ton trucks. Foundations for the towers and piers extend to a maximum depth of 54 feet below to ensure stability in the bay's conditions.

Innovations and Engineering Challenges

The Mount Hope Bridge incorporated innovative suspension bridge design elements under the direction of engineer of the firm Robinson and Steinman, including the novel use of cable bents with straight backstays at the ends of the side spans. This configuration reduced the required size of the anchorages and allowed them to be positioned further inland, achieving cost savings of approximately $850,000 compared to traditional designs. Steinman also introduced aesthetic and functional advancements, such as applying a light greenish tint to the components for visual with the and installing artistic to accentuate the structure's form after dark—the first such application on one of his bridges. The towers, rising 285 feet above the water, featured a cross-braced framework with Gothic arches above the roadway deck, contributing to both structural efficiency and ornamental appeal. Key structural specifications included 11-inch-diameter main s, each comprising 2,450 galvanized wires engineered for a design wind load of 6,800 pounds per , supplemented by stiffening trusses riveted to the for enhanced rigidity against dynamic forces. faced major setbacks when fractures developed in wire strands seated in the cable strand shoes, linked to the properties of heat-treated wire used in the cables. These failures prompted the partial disassembly and reconstruction of affected sections, adding $1,000,000 to the project costs and postponing the bridge's opening from its initial target to October 24, 1929. Foundations posed additional hurdles, with caissons sunk to depths of up to 54 feet below amid the tidal flows of Mount Hope Bay to support the 135-foot clearance over high water.

History

Planning and Early Proposals

The Mount Hope Bridge was first proposed in 1920 as a means to connect and , across the Mount Hope River, addressing the limitations of ferry services that hindered regional travel and commerce. Early state-level efforts for a public bridge faced defeat in legislative proposals, prompting a shift to private development to bypass governmental delays and opposition from authorities, who exhibited resistance and procrastination over the subsequent years. Wealthy industrialist emerged as a key proponent, leveraging his influence to advance the project amid these setbacks. In 1926, bridge engineer learned of the initiative and expressed interest, recognizing its engineering potential; he later collaborated with Robinson on the design in 1927, with an estimated construction cost of $6,000,000. The Mount Hope Bridge Company (initially referenced in some contexts as the New Hope Bridge Company) was incorporated in 1927 to oversee the private venture, culminating in authorization on December 16, 1927.

Construction Timeline

Construction of the Mount Hope Bridge commenced on December 1, 1927, based on a design by the engineering firm Robinson & Steinman, which aimed to replace ferry services connecting and . Significant structural defects emerged during the build, culminating in the condemnation of the main cables on February 22, 1929—about four months before the projected completion—due to inadequate quality in wire fabrication and assembly. This issue, linked to the contractor's methods, required partial disassembly of the cables and towers for removal of faulty strands, replacement with new wire, and re-spinning, extending the timeline beyond initial estimates. The repairs addressed causal weaknesses in material integrity and construction tolerances, averting potential collapse risks inherent to dynamics under load. Financial pressures from delays nearly led to project collapse, but state intervention and engineering oversight enabled continuation. The bridge reached completion after these interventions and opened to vehicular traffic on October 24, 1929, approximately five months behind the revised schedule, marking it as New England's longest suspension span at the time with a 1,200-foot main span.

Opening and Initial Operations

The Mount Hope Bridge was completed and opened to traffic on October 24, 1929, after construction delays that pushed the project four months behind schedule. Spanning Mount Hope Bay and connecting to , the $5 million replaced unreliable services that had previously linked the areas, providing the first fixed crossing and establishing it as the longest in at the time. The opening occurred amid fanfare, including a commemorative struck to honor the event, though just days before the Wall Street Crash of October 29, which immediately influenced its financial outlook. Operated initially as a private toll facility by the Mount Hope Bridge Company, the bridge implemented toll collection to fund its maintenance and debt repayment, with an inaugural rate of 60 cents for a one-way crossing and $1 for a round trip. Bridge tokens were issued to facilitate payments, reflecting standard practices for early 20th-century toll roads and bridges. Daily operations involved manual toll booths at the Bristol approach, with the two-lane roadway accommodating automobile traffic that surged as the bridge shortened travel times across the bay compared to ferries. The onset of the severely hampered initial revenue projections, as economic contraction reduced vehicle usage and toll collections fell short of the self-sustaining model anticipated by investors. Despite this, the bridge quickly integrated into regional transportation networks, enhancing connectivity between and the mainland while serving as a vital artery for local commerce and commuters in its early years. No major operational disruptions were reported immediately post-opening, though the financial strain foreshadowed later state intervention.

Operations and Incidents

Toll System and Bridge Tokens

The Mount Hope Bridge opened on October 24, 1929, as a privately financed toll facility operated by the Mount Hope Bridge Company, with initial toll rates set at five cents for bicycles, ten cents for passenger cars, motorcycles, and horse-drawn carriages, and 15 to 20 cents for trucks based on size. These tolls funded the bridge's construction and maintenance under private ownership. Pedestrians were charged a five-cent walker's fee from the bridge's early years until its discontinuation in 1960. Bridge , issued by the Mt. Hope Bridge Division in , served as a discounted option for tolls, typically valued at ten cents per compared to higher cash fares. Constructed of and measuring approximately 20 in diameter, these tokens facilitated efficient collection and were used primarily by regular commuters. By the mid-20th century, following the state's purchase of the bridge in 1954 and its transfer to the Rhode Island Turnpike and Bridge Authority, tolls for passenger cars stood at 30 cents cash or ten cents with tokens from onward. Tolls were eliminated in May 1998 after the Turnpike and Bridge Authority voted to cease collection, citing operational cost savings and low revenue relative to maintenance expenses; the decision followed a 3-2 board vote earlier that year to halt tolling. The bridge has since operated toll-free, though feasibility studies in 2010 explored reinstatement options, including EZ-Pass integration and rates aligned with nearby bridges, but no changes were implemented.

Notable Incidents and Accidents

On July 16, 1975, the tanker MV Kurdistan collided with the during heavy fog while en route to , severely damaging the structure but avoiding rupture of its cargo tanks only by chance. The bridge has been the site of multiple fatal vehicle crashes. On December 1, 2012, a multi-vehicle collision killed one person and injured five others, with the incident occurring on the span connecting and . On August 5, 2023, a motorcyclist from Warren was fatally struck by a that veered , an event witnesses described as accidental rather than intentional. Numerous non-fatal crashes have caused temporary closures, such as a two-vehicle incident on November 29, 2023, that shut down both directions until cleared by authorities, and a multi-car pileup on November 19, 2024, which snarled traffic across the narrow span. The bridge has also seen a pattern of suicides, with 12 deaths recorded between January 1, 2010, and November 20, 2018, contributing to broader concerns over barriers on Rhode Island spans. Additional incidents include five suicides from 2021 to May 2023, prompting debates on feasibility of preventive measures amid high costs and engineering challenges.

Daily Operations and Usage Patterns

The Mount Hope Bridge is operated and maintained by the Turnpike and Bridge Authority (RITBA), which oversees continuous vehicular access across its two lanes spanning Mount Hope Bay along Route 114. Daily operations involve standard monitoring for structural integrity, weather-related advisories, and enforcement of speed limits and load restrictions to ensure safe passage for automobiles, trucks, and emergency vehicles, with no pedestrian or bicycle accommodations provided. The bridge remains open 24 hours per day under normal conditions, facilitating local connectivity between and without toll collection, following the discontinuation of fares in the mid-20th century. Average annual daily traffic (AADT) on the bridge averages approximately 15,000 vehicles, reflecting its role in serving regional commuters, commercial deliveries, and seasonal visitors to rather than high-volume interstate travel. Usage patterns exhibit typical diurnal peaks during morning and evening rush hours, driven by residential-workforce flows between the mainland and island communities, though specific hourly breakdowns are not publicly detailed in routine reports. Freight , including heavier loads compliant with posted limits, contributes to wear but remains a minor fraction of total , as the bridge's design accommodates standard vehicles without dedicated or oversized load lanes. Periodic disruptions to daily patterns occur due to mandated inspections and resurfacing, such as single-lane closures from 9:00 a.m. to 3:00 p.m. during routine structural checks or full closures for pavement work, as implemented in August 2025 when the bridge was shuttered for four days to mill and repave the deck. These interventions, while infrequent, can reduce capacity by up to 50% during affected hours, prompting alternate routing via longer ferries or detours, though RITBA coordinates with state to minimize congestion spillover onto approach roads like Route 114. Overall, the bridge's operational reliability supports consistent usage for essential mobility, with traffic volumes stable over recent decades absent major economic shifts.

Maintenance and Preservation

Historical Maintenance Efforts

The Rhode Island Turnpike and Bridge Authority (RITBA), which assumed responsibility for the Mount Hope Bridge following state acquisition in the mid-20th century, initiated systematic inspections revealing progressive deterioration in the main suspension cables, with 744 broken wires documented out of approximately 2,450 total wires between 1960 and 2000. These findings underscored the need for targeted interventions to address and in the aging structure, originally engineered with galvanized wires susceptible to environmental in the coastal Mount Hope Bay environment. A pivotal early effort occurred in 1976, when emergency repairs were performed on the northwest tower leg to stabilize a critical structural vulnerability identified during routine assessments. This was followed by mechanical and electrical rehabilitations in 1981, enhancing operational reliability amid increasing traffic demands. Deck replacement in 1986 represented a major undertaking, necessitating a nine-month closure of the bridge to replace the deteriorated roadway surface and underlying components, thereby restoring load-bearing capacity and preventing further spalling from . Subsequent projects included reconstruction of piers 16 and 17 in 1993 to remedy , and anchorage rehabilitation in 1995, which involved reinforcing attachment points to mitigate stress concentrations and wire strand failures. From 1998 to 2001, comprehensive main rehabilitation addressed accumulated wire breaks and through wire splicing, wrapping, and protective coatings, extending the lifespan of the primary load-bearing elements without full cable replacement. These efforts, combined with ancillary works such as walk repairs and new approach railings in 2001, reflected a shift toward proactive preservation, prioritizing empirical data over cosmetic fixes to ensure long-term causal integrity against tidal winds and de-icing salts.

Recent Inspections and Structural Concerns

In the fall of 2024, the Rhode Island Turnpike and Bridge Authority (RITBA) conducted an inspection of the Mount Hope Bridge, rating its overall condition as "fair." RITBA officials have stated that the bridge remains structurally safe despite its age, with no urgent issues identified that would necessitate immediate closure beyond routine maintenance. However, RITBA has refused multiple requests from media outlets, lawmakers, and residents to publicly release the full 2024 inspection report, citing homeland security concerns related to potential vulnerabilities in infrastructure details. Structural assessments have highlighted ongoing in the bridge's main cables, a common issue in aging spans exposed to coastal environments. RITBA has initiated dehumidification efforts within the cables to mitigate ingress and wire , including access points for and , as outlined in project specifications from June 2025. Independent analyses, such as those referenced in public commentary, have raised alarms about rusting and potentially broken wires reducing the cables' safety factor below standard thresholds like 2.15, though RITBA maintains that current interventions preserve adequate integrity. The bridge underwent a full resurfacing project in mid-August 2025, involving lane closures and detours, aimed at addressing wear but described by officials as cosmetic rather than addressing deeper structural elements. By early September 2025, patchwork repairs were already required on sections of the newly resurfaced , prompting skepticism about the durability of these fixes amid the bridge's 96-year age and high traffic volume. RITBA has scheduled periodic inspections, including lane restrictions from late October to mid-November in prior years, to monitor these evolving conditions, but the lack of transparent reporting continues to fuel concerns over long-term viability without major rehabilitation.

Ongoing and Future Projects

In August 2025, the Turnpike and Bridge Authority (RITBA) completed a resurfacing project on the Mount Hope Bridge, involving a full closure from August 14 at 7 p.m. to August 18 at 5 a.m., with the bridge reopening ahead of schedule. The new road surface is projected to endure until approximately 2030, after which RITBA anticipates a comprehensive re-decking initiative. Follow-up repairs addressed minor imperfections, including discoloration and dust, covering a few square yards of the deck in September 2025. RITBA issued a request for proposals (RFP) on March 10, 2025, seeking engineering services for the , , and phases of the Mount Hope Bridge or potential . This project targets the bridge's aging , originally constructed in 1929, to address structural longevity amid ongoing wear from traffic and environmental factors. In July 2025, RITBA secured a $17 million federal grant to install a dehumidification system aimed at mitigating in the bridge's main cables and anchorages by reducing exposure to the wire strands. RITBA officials described the system as critical for halting wire deterioration, with implementation planned to extend the lifespan of these load-bearing components. This funding builds on prior federal support advocated by U.S. Senators Jack Reed and since at least 2024.

Significance and Impact

Transportation and Economic Role

The Mount Hope Bridge serves as a vital link in 's transportation network, carrying Rhode Island Route 114 across Mount Hope Bay between on the mainland and on . As the only direct roadway connection from the area to , it provides essential access for approximately 19,000 vehicles daily, including commuters, students, and commercial traffic, thereby alleviating dependence on the more distant or Sakonnet River Bridge for eastern coastal travel. This two-lane suspension span functions as a key freight corridor, facilitating the movement of goods between coastal , , and major hubs like , supporting regional supply chains without tolls since its acquisition by the state in 1954. Economically, the bridge underpins the vitality of Bristol and Portsmouth by enabling efficient connectivity to Aquidneck Island's economic anchors, such as Newport's tourism sector, Naval Station Newport, and commercial activities, which collectively drive employment and revenue in the region. Its role in sustaining daily cross-bay mobility prevents disruptions that could isolate East Bay communities, as evidenced by federal investments prioritizing its resilience to safeguard millions of annual users and associated commerce. Without reliable operation, alternatives like detours via the Pell Bridge would impose significant time and cost burdens on freight and personal travel, potentially hampering local business operations and workforce access to island-based jobs.

Cultural and Historical Importance

The Mount Hope Bridge holds historical significance as a pre-Depression era infrastructure project that symbolized regional progress and connectivity in Rhode Island. Construction began on December 1, 1927, under the design of engineers David B. Steinman and Robinson Bayley, culminating in its opening to traffic on October 24, 1929, after overcoming delays from challenging bay conditions and a collapsed cofferdam. The $5 million structure replaced longstanding ferry services, such as the Conanicut and Bristol lines, which had linked Bristol to Portsmouth since the 17th century, thereby integrating the East Bay communities more efficiently. Its dedication featured a radio-linked ceremony with Vice President Charles Curtis signaling the opening from Washington, D.C., and an address by Alfred G. Vanderbilt, highlighting national attention to the event just five days before the Wall Street Crash. Architecturally, the bridge's 1,200-foot main span, gothic towers, and stiffening marked it as an and aesthetic , earning the 1929 Artistic Bridge Award from the American Institute of Steel Construction for the most beautiful long-span bridge constructed that year. Steinman's design emphasized both functionality and visual appeal, with the structure's towers rising prominently over Mount Hope Bay, contributing to its recognition as one of his masterpieces. This blend of utility and artistry led to its listing on the in 1976, affirming its enduring value as a testament to early 20th-century innovation. Culturally, the bridge embodies Rhode Island's colonial and industrial heritage by physically linking the Providence Plantations—settled by in 1636—with , fostering a tangible connection between historical settlements. Artifacts like the commemorative and bridge tokens reflect its role in local commemoration and toll operations, while its silhouette has become an iconic feature in the landscape, serving as a backdrop for educational institutions such as and symbolizing the state's maritime and infrastructural legacy.

References

  1. [1]
    Mount Hope Bridge (Portsmouth/Bristol, 1929) | Structurae
    Mount Hope Bridge is a three-span suspension bridge, motorway bridge / freeway bridge and steel bridge that was built from 1927 until 1929.Missing: facts | Show results with:facts
  2. [2]
    Mount Hope Bridge - HistoricBridges.org
    This bridge is one of the masterpiece bridges of famous engineer David Steinman. It is noted for its attractive stiffening truss, and stunning gothic towers.
  3. [3]
    [PDF] NATIONAL REGISTER OF HISTORIC PLACES INVENTORY
    The Mount Elope Bridge, designed in 1927 by Robinson and -. Steinman, and built under their supervision in the following two years, is a prize-winning.
  4. [4]
    [PDF] Underwater Inspection and Evaluation of the Mount Hope Bridge ...
    It is a two-lane bridge with a center span of 1,200 feet and a vertical clearance of 135 feet. With a total length of 6,130 feet, it has 9 piers that are in the ...
  5. [5]
    Mount Hope Bridge, Substructure Repairs
    Its towers are 285 feet tall, the length of the main span is 1,200 feet and it offers 135 feet of clearance over high water. The total length of the bridge is ...Missing: specifications | Show results with:specifications
  6. [6]
    History - Rhode Island Turnpike and Bridge Authority
    Its towers are 285 feet (87 m) tall; the length of the main span is 1,200 feet (366 m); and the road sits 135 feet (41 m) over high water.
  7. [7]
    Mount Hope Bridge negatives - Rhode Island State Archives - RI.gov
    Built in 1749 by the Pearce family, it was sold to Captain William H. West during the Civil War. The structure is not standing today. The General Contractor for ...
  8. [8]
    Mount Hope Bridge (RI 114) - Boston Roads
    The design of the 285-foot-tall towers borrowed from the cross-braced design of the Benjamin Franklin Bridge, except that there was a Gothic arch above the ...
  9. [9]
    Rhode Island State Route 114 - Mount Hope Bridge
    RI 114 starts at RI 138 in Middletown, crosses the Mount Hope Bridge, and ends at Social Street (RI 126) in Woonsocket. It is a major north/south route.
  10. [10]
    Route 114 Rhode Island - AARoads
    Aug 15, 2012 · Route 114 constitutes a surface route from Mt. Hope Bridge northward through Bristol, Warren, Barrington and East Providence to Interstate 195 ...
  11. [11]
    Reed & Whitehouse Continue Years-Long Effort to Upgrade Mt ...
    Apr 12, 2024 · The two-lane suspension bridge serves as a critical freight corridor connecting coastal Rhode Island to southeastern Massachusetts, Boston, and ...
  12. [12]
    2-16-24 9:35 AM TRAVEL ALERT: VEHICLE ACCESS ...
    Feb 16, 2024 · Due to high winds, access is restricted to the Mount Hope Bridge for house trailers/RVs and empty enclosed trailers.Missing: regional | Show results with:regional
  13. [13]
    Lane Restrictions Scheduled for Bristol approach to Mount Hope ...
    Jul 25, 2025 · Traffic Alert issued concerning lane restrictions scheduled next week on the Bristol approach to the Mount Hope Bridge.
  14. [14]
    R.I.'s Mount Hope Bridge to close until Monday for road resurfacing
    Aug 14, 2025 · The historic 1929 bridge connecting Bristol to Aquidneck Island will shut down to traffic at 7 p.m. Thursday until 5 a.m. Monday so workers ...
  15. [15]
    Bike Newport's Comments on the LRTP
    Jul 11, 2025 · The connection to the mainland over the Mount Hope Bridge, however, must be addressed. Regarding the Mount Hope Bikeway / Two Bridges Trail ...Missing: access | Show results with:access
  16. [16]
    Naval Station Newport, Rhode Island - Facebook
    Jul 28, 2025 · For commuters who travel to and from the installation using the Mount Hope Bridge, which connects Bristol and Portsmouth, R.I., ...Missing: regional connections accessibility
  17. [17]
    [PDF] Suspension Bridges of New England​
    Oct 14, 2024 · Steinman, a well-known structur- al engineer, was put to the task of designing the Mount Hope Bridge in 1927.7 He designed over 400 bridges in ...
  18. [18]
    Then and Now - Mount Hope Bridge | EastBayRI.com
    Nov 26, 2014 · The final suspension version, designed by Dr. David Steinman, came ... For its design and beauty, the Mount Hope Bridge received the 1929 Artistic ...
  19. [19]
    Bridge Construction - The Historical Marker Database
    In 1927, Dr. David B Steinman, the noted New York bridge engineer, produced the design for a graceful suspension bridge. His firm, Robinson and Steinman, ...
  20. [20]
    Mount Hope Bridge - Alexandersmap
    Feb 21, 2018 · The Mount Hope Bridge was proposed in 1920, supported by the wealthy and influential William Henry Vanderbilt III and finally completed four ...Missing: planning | Show results with:planning
  21. [21]
    Old Town Hall Exhibits: Mt Hope Bridge Lights
    Jun 24, 2020 · The bridge was designed by David Steinmen. Its total cost was about $4,250.000. Authorized on December 16, 1927 it was completed Oct. 24, 1929.
  22. [22]
    [PDF] History of the Mount Hope Bridge 1929-2009
    Nov 30, 2017 · Mount Hope Bridge designed by Robinson & Steinman. • Construction began December 1, 1927. • Opened October 24, 1929.
  23. [23]
    Opinion/Coyne: Planning for the Mount Hope Bridge's future
    Jan 3, 2021 · When discussions arise regarding when and how to replace the Mount Hope Bridge, public and P3 options should be discussed. P3 options should ...Missing: alternatives | Show results with:alternatives
  24. [24]
    Remember the tolls? Mount Hope Bridge has a storied past
    Jul 17, 2023 · In June of 1929, part of the bridge had to be reconstructed before it opened due to significant issues within its structure. What about Mount ...Missing: engineering challenges
  25. [25]
    Tokens from the Rhode Island, "Mount Hope Bridge ... - Facebook
    Jan 10, 2025 · Early in the bridge's history, pedestrians paid a $0.05 walker's fee; this fee ended in 1960. The tolls for motorists ended on May 2, 2003. The ...Mt Hope Bridge opens in Rhode IslandMt Hope Bridge Opening and History in Rhode IslandMore results from www.facebook.com
  26. [26]
    Islanders call for 'shared sacrifice' between Pell, Mt. Hope bridge users
    Oct 20, 2011 · Tolling ended in May 1998. For the 38 years from 1964 to 1998, tolls were 30 cents for passenger cars and 10 cents for token users. In 1998 ...
  27. [27]
    1 Fare - Mt. Hope Bridge Division (Bristol, Rhode Island) - Numista
    Features ; Type, Transportation tokens › Toll road tokens ; Composition, Brass ; Weight, 3.3 g ; Diameter, 20 mm ; Thickness, 1 mm.
  28. [28]
    Mount Hope Bridge toll eliminated - SouthCoast Today
    Jan 22, 1998 · The Turnpike and Bridge Authority voted 3-2 yesterday to stop collecting the payment on the bridge linking Bristol and Portsmouth.Missing: ended 2003
  29. [29]
    [PDF] Mt. Hope Bridge Toll Feasibility Study
    Jan 8, 2010 · We expect that the first year of operations will be covered under warranty, and that maintenance will commence in year two. Estimates of ...
  30. [30]
    Rhode Island Toll Roads Complete Guide: E-ZPass, Rates &amp
    Newport Pell Bridge - Detailed bridge information and current tolls; Mount Hope Bridge - Bristol-Portsmouth connection (toll-free); Jamestown Verrazzano ...
  31. [31]
    Could a large ship cause a Baltimore-like bridge collapse in RI?
    Mar 27, 2024 · On a foggy night in 1975, a gasoline tanker plowed into the Mount Hope Bridge. State regulations require most large vessels – such as car ...Missing: notable | Show results with:notable
  32. [32]
    The Historical Record | Ship Collisions with Bridges: The Nature of ...
    HOPE BRIDGE, Mount Hope Bay (Narragansett Bay), Rhode -Island. Opening year ... Vessel: Tug Sea Wolf and gasoline barge. Environment: Night (4:30 a.m.) ...
  33. [33]
    Mt. Hope Bridge crash victim identified - ABC6
    Dec 2, 2012 · BRISTOL, R.I. – Police have identified the man who died in a Saturday evening crash on the Mount Hope Bridge, which also injured five others.
  34. [34]
    Accident on the mt hope bridge Saturday 8/5/2023 8pm - Reddit
    Aug 8, 2023 · There was a guy from Warren on that motorcycle, and he was killed by the truck that drove off. He did not commit suicide. His bike was hit by ...Missing: notable | Show results with:notable
  35. [35]
    Mt. Hope Bridge reopens after 2-car crash - WPRI.com
    An investigation is underway after a two-car crash Wednesday morning temporarily shut down the Mt. Hope Bridge.Missing: notable | Show results with:notable
  36. [36]
    Traffic alert: multi-car crash on the Mt. Hope bridge : r/RhodeIsland
    Nov 19, 2024 · Traffic alert: multi-car crash on the Mt. Hope bridge. Discussion. Just as the title says. Literally my nightmare. That thing is ready to fall ...
  37. [37]
    Since 2010, there have been more than two dozen suicide deaths ...
    Nov 25, 2019 · From Jan. 1, 2010 through Nov. 20, 2018, there were 12 suicide deaths on the Mount Hope Bridge, nine on the Pell Bridge and six on the Jamestown Bridge.
  38. [38]
    RI bridge suicide barriers too costly, not feasible, RITBA study says
    Jun 7, 2024 · Between 2021 and May 23, 2023, five people died by jumping from Mount Hope. “At this point, we all need to look at the human element of this. Do ...Missing: statistics | Show results with:statistics
  39. [39]
    Rhode Island Turnpike and Bridge Authority: Home
    The Rhode Island Turnpike and Bridge Authority operates and maintains the Newport Pell, Mount Hope, Jamestown Verrazzano and Sakonnet River Bridges along with ...Lane/Construction Restrictions · Contact Us · Bill By Mail · Travel Alerts
  40. [40]
    Lane/Construction Restrictions - Rhode Island Turnpike and Bridge ...
    The Rhode Island Turnpike and Bridge Authority operates and maintains the Newport Pell, Mount Hope, Jamestown Verrazzano and Sakonnet River Bridges.
  41. [41]
    [PDF] Rhode Island Strategically Targeted Affordable Roadway Solutions
    The Mount Hope Bridge/Bristol Ferry Road intersection improvement project is a ... Pell Bridge Ramps Access Improvements – 30% design to start in 2013.
  42. [42]
    [PDF] Rhode Island Congestion Management Process: 2023 Annual Report
    A Congestion Management Process (CMP) is a systematic process for identifying congestion and its causes, developing monitoring processes to.
  43. [43]
    Bridge inspection to cause delays on Mount Hope Bridge
    Nov 8, 2024 · The inspection will take place daily from 9 am to 3 pm between November 13-15. One lane of the bridge will be closed during the inspection hours, with traffic ...
  44. [44]
    Mount Hope Bridge resurfacing scheduled to begin Aug. 14 - ABC6
    Jul 9, 2025 · The Mount Hope Bridge will be shut down for four days in August while workers resurface the bridge's pavement, according to the Rhode Island Turnpike and ...
  45. [45]
    Mount Hope Bridge Inspection – 10/28/24 to 11/11/24
    The Rhode Island Turnpike and Bridge Authority operates and maintains the Newport Pell, Mount Hope, Jamestown Verrazzano and Sakonnet River Bridges along with ...
  46. [46]
    Mt. Hope Bridge true condition and safety. Release the 2024 ...
    Apr 13, 2025 · Our roads are no better. According to the U.S. Department of Transportation, Rhode Island also has the worst road conditions of any state ...
  47. [47]
    BRISTOL, RI — The Mount Hope Bridge, which opened ... - Facebook
    Jul 23, 2025 · Speeds are restricted to 45 mph. Many key elements of the bridge have reached the end of their design life and require extensive maintenance to ...
  48. [48]
    RITBA won't release Mt. Hope Bridge inspection report, citing security
    Jun 24, 2025 · RI Turnpike and Bridge Authority officials say a recent inspection of the Mt. Hope Bridge found the nearly century-old span to be in “fair” condition.Missing: alternatives | Show results with:alternatives
  49. [49]
    Crews to Resurface Mount Hope Bridge, Prompting Mid-August ...
    Jul 14, 2025 · Cromwell said the Mount Hope Bridge was rated “fair” in the fall 2024 inspection report. “If the inspection had revealed any urgent issues ...
  50. [50]
    RITBA must release Mount Hope Bridge inspection report: Letter
    Oct 3, 2025 · RITBA has refused multiple requests from the media, state and local government officials and residents to release last year's inspection. RITBA ...
  51. [51]
    [PDF] Mount Hope Bridge Main Cable Dehumidification Bristol
    Jun 19, 2025 · Work to be performed includes drilling new extensometer holes or cleaning existing holes in the existing cable band bolts, measuring and ...Missing: integrity 2020-2025
  52. [52]
    BRISTOL, R.I. — The recently resurfaced Mount Hope Bridge is ...
    Sep 14, 2025 · Roads of this construction type can pose us several challenges since the two types of materials behave very differently when they heat up ...
  53. [53]
    Mount Hope Bridge needs repairs less than a month after resurfacing
    While officials insist the bridge remains safe, they have declined to release the most recent inspection report, raising concerns among residents and commuters ...
  54. [54]
    Mount Hope Bridge reopens ahead of schedule after weekend ...
    Aug 18, 2025 · RITBA expects the new surfacing to last until 2030. RITBA also said more bridge work is in the future, as they plan for a “re-decking” project, ...
  55. [55]
    Mount Hope Bridge gets additional repairs after recent repaving
    Sep 11, 2025 · Rhode Island Turnpike and Bridge Authority said its made repairs to few square yards of the Mount Hope Bridge surface on Wednesday.
  56. [56]
    Planning, Design, and Construction Phase Services Mount Hope ...
    Mar 10, 2025 · The Rhode Island Turnpike and Bridge Authority has issued an RFP for Contract No. 25-02: Planning, Design, and Construction Phase Services Mount Hope Bridge ...Missing: ongoing | Show results with:ongoing
  57. [57]
    Federal government releases $17M to upgrade Mount Hope Bridge ...
    Jul 25, 2025 · Mount Hope Bridge secures $17 million federal grant to reduce corrosion on the 96-year-old bridge's cables.
  58. [58]
    Mount Hope Bridge to receive $17M in upgrades
    Jul 24, 2025 · BRISTOL – The Mount Hope Bridge will receive a $17 million update to expand its longevity, the Rhode Island Turnpike & Bridge Authority ...
  59. [59]
    RITBA confirms $17M funding for Mount Hope Bridge dehumidification
    Jul 24, 2025 · "Dehumidifying the Mount Hope Bridge cables and anchorages is essential to arresting the corrosion of the individual wires in the cables and we ...
  60. [60]
    RI getting $27 million for Mount Hope Bridge rehabilitation - WPRI.com
    May 30, 2024 · Opened in 1929. It is a vital connection to Aquidneck Island and it's used daily by 19,000 motorists, including commuters, students and families ...
  61. [61]
    [PDF] Support Letters - Rhode Island Turnpike and Bridge Authority
    The local economies of Bristol and Portsmouth are dependent upon the viability of the Mount Hope Bridge. Specifically, under this climate resiliency and safety ...
  62. [62]
    Amo, Reed, Whitehouse, McKee Highlight $27 Million in Federal ...
    May 30, 2024 · ... maintenance, particularly on the Mount Hope Bridge. This federal funding will help harden our bridge infrastructure and make the Mount Hope ...
  63. [63]
    How safe is the Mount Hope Bridge? - The Boston Globe
    Mar 15, 2024 · It is one of only three connections from the mainland to Aquidneck Island, and the sole connection from the East Bay.
  64. [64]
    RHODE ISLAND OPENS MOUNT HOPE BRIDGE; National, State ...
    Vice President Curtis, in Washington, touched a button at noon that gave the signal for the official opening. It was announced by the firing of a salute on the ...