NuScale Power
NuScale Power Corporation (NYSE: SMR) is an American nuclear technology company that designs, develops, and commercializes small modular reactors (SMRs) based on pressurized light-water reactor technology.[1] Founded in 2007 as a spin-off from research at Oregon State University, the company is headquartered in Portland, Oregon, and its flagship product, the NuScale Power Module™, consists of integral, factory-fabricated units producing up to 77 megawatts electric (MWe) each, with passive safety systems enabling natural circulation cooling without external power or operator action.[2][3] NuScale achieved a regulatory milestone as the first SMR design to receive U.S. Nuclear Regulatory Commission (NRC) design approval in 2020 for a 50 MWe module and final certification in 2023, followed by standard design approval for the uprated 77 MWe version in May 2025.[4][5] Despite these advancements, NuScale encountered significant challenges, including the November 2023 termination of its Carbon Free Power Project—the planned first U.S. SMR deployment in Idaho—after projected costs escalated from $5.3 billion to $9.3 billion for a 462 MWe plant, driven by insufficient power purchase commitments and higher-than-expected capital expenses, underscoring persistent economic hurdles for novel nuclear technologies.[6] The company, which went public via merger in 2022, continues pursuing deployments such as potential partnerships for multi-gigawatt SMR programs while emphasizing scalability for up to 12-module plants delivering 924 MWe.[2][7]
History
Founding and Early Development
NuScale Power originated from nuclear engineering research at Oregon State University (OSU), where scientists developed the foundational concepts for a small modular reactor (SMR) design known as the Multi-Application Small Light Water Reactor (MASLWR).[8] This work emphasized passive safety systems and integral pressurized water reactor architecture, tested using OSU's one-third-scale electrically heated reactor facility constructed around 2003.[9] In 2007, OSU granted exclusive commercialization rights for the SMR technology to the newly formed NuScale Power, LLC, marking the company's formal founding.[2] Co-founded by OSU nuclear engineering professor José N. Reyes, who served as chief technology officer, and Paul G. Lorenzini, the venture aimed to advance the design toward regulatory approval and market deployment.[10] Reyes, an expert in passive safety systems, took a leave of absence from OSU to lead technical development, building on the university's MASLWR prototype.[11] Early efforts focused on refining the NuScale Power Module—a 35-77 megawatt electric (MWe) scalable unit housed in a containment vessel—for factory fabrication and enhanced safety through natural circulation cooling.[12] The company, initially headquartered in Corvallis, Oregon, collaborated closely with OSU, retaining access to its test facilities for validation experiments while pursuing partnerships to support design certification.[9] By leveraging this academic-industrial bridge, NuScale positioned itself as a pioneer in SMR commercialization amid post-Fukushima interest in resilient nuclear technologies.[8]Funding Challenges and Rebound
NuScale Power, established in 2007, initially relied heavily on U.S. Department of Energy (DOE) grants to advance its small modular reactor (SMR) design, receiving selection in December 2013 for up to $226 million in cost-shared funding to support engineering and licensing efforts.[8] This public-private partnership, formalized in May 2014 with up to $217 million from DOE over five years matched by private contributions, underscored the company's dependence on government support amid limited early commercial traction.[13] Fluor Corporation, which held a majority stake by 2014, provided additional backing, but the firm's progress remained tied to these subsidies as private investment alone proved insufficient for scaling without regulatory milestones.[14] A significant funding challenge emerged in November 2023 when the Utah Associated Municipal Power Systems (UAMPS) terminated the Carbon Free Power Project (CFPP), NuScale's flagship demonstration initiative, due to costs escalating from an estimated $5 billion to $9.3 billion for a 462-megawatt plant.[15] This setback, attributed to inflation, supply chain issues, and design complexities, triggered financial strain, including a January 2024 layoff of 154 full-time employees—28% of the workforce—to cut costs.[16] The company's stock price plummeted over 50% in the ensuing months, prompting investor lawsuits alleging misleading projections on project viability and economics.[17] The rebound began with NuScale's May 2, 2022, public listing via a merger with Spring Valley Acquisition Corp., a special purpose acquisition company (SPAC), which raised approximately $380 million in gross proceeds to bolster its balance sheet and fund commercialization.[18] Post-CFPP, renewed investor interest in nuclear energy—driven by data center demands and policy shifts favoring advanced reactors—propelled a stock recovery exceeding 1,000% from late 2023 lows by December 2024.[19] Capital inflows continued, including $227.7 million from warrant exercises in December 2024 and a strengthened cash position of $489.9 million by June 2025, alongside narrowing net losses to $37.61 million in Q2 2025 (a 49.5% reduction year-over-year).[20][21] Strategic deals, such as the September 2025 tri-party agreement with DOE and ENTRA1 Energy's 6-gigawatt SMR commitment with the Tennessee Valley Authority, further stabilized funding prospects by signaling deployment pathways.[22][7]Public Listing and Initial Commercial Push
NuScale Power went public on May 2, 2022, through a merger with Spring Valley Acquisition Corp., a special purpose acquisition company, valuing the combined entity at approximately $1.9 billion.[23][24] The transaction, initially announced on December 14, 2021, raised $380 million in gross proceeds, enabling the company to transition toward commercialization of its small modular reactor technology under the ticker symbol SMR on the New York Stock Exchange.[25][26] Following the merger, NuScale restructured internally to prioritize product delivery over development, establishing a VOYGR Services and Delivery unit aimed at accelerating deployment of its NuScale Power Modules.[27] This shift supported efforts to secure supply chain partnerships, including a collaboration with the U.S. Reactor Forging Consortium to enhance domestic forging capabilities for reactor components.[28] Additionally, NuScale advanced manufacturing agreements, such as with Doosan Enerbility, to initiate production of forging materials for its reactors as early as 2022.[29] A key element of the initial commercial push was the formation of an exclusive global partnership with ENTRA1 Energy in 2022, designating ENTRA1 as the lead for commercialization, distribution, and deployment of NuScale's SMR technology worldwide.[30] This alliance targeted sectors like data centers and heavy industry, laying groundwork for future contracts, though no firm orders were secured immediately post-listing.[31] The company leveraged its NRC-certified design to pursue demonstrations and sales, with ongoing advancement of the Carbon Free Power Project as a flagship initiative, despite later challenges.[32]Project Setbacks and Strategic Pivots
In November 2023, NuScale Power and the Utah Associated Municipal Power Systems (UAMPS) mutually terminated the Carbon Free Power Project (CFPP), a planned deployment of six small modular reactors (SMRs) at the Idaho National Laboratory, marking a significant setback for the company's first commercial endeavor.[33] [34] Initially estimated at $5.3 billion in 2021 for twelve 50 MWe modules, the project scope shifted to six upgraded 77 MWe modules, but total costs escalated to $9.3 billion by mid-2023 due to inflation, supply chain disruptions, extended regulatory timelines, and first-of-a-kind engineering challenges.[35] [6] The U.S. Department of Energy had committed $1.4 billion in cost-sharing support, but rising power prices—projected at $89 per MWh versus competitive alternatives—rendered the off-take agreements uneconomic for participants, leading to insufficient subscriber commitments.[6] [36] The CFPP cancellation highlighted systemic risks in pioneering SMR deployments, including underestimation of construction complexities and macroeconomic pressures, echoing historical nuclear project overruns where costs often exceed budgets by over 100%.[37] [38] NuScale's CEO described the termination as "unfortunate" but emphasized it did not undermine the underlying technology, though the event contributed to workforce reductions and financial strain, with the company reporting ongoing quarterly losses amid delayed revenue.[39] [40] In response, NuScale pivoted toward enhanced commercialization strategies, securing U.S. Nuclear Regulatory Commission design certification for the 77 MWe module in May 2025, enabling factory production of long-lead components and positioning for scaled deployments.[41] The company shifted focus from utility-led first-of-a-kind projects to partnerships with high-demand sectors like data centers and industrial applications, while pursuing DOE-backed initiatives including $575 million in advanced reactor demonstration funding to mitigate future cost risks.[42] [43] A key pivot materialized in September 2025 with ENTRA1 Energy's agreement alongside the Tennessee Valley Authority (TVA) for up to 6 gigawatts of NuScale SMRs, targeting phased deployments starting in the early 2030s to support grid reliability and electrification needs, leveraging TVA's existing infrastructure to address prior siting and financing hurdles.[44] [7] Concurrently, NuScale expanded into non-electricity applications, such as integrated desalination and hydrogen production pilots, to diversify revenue streams and demonstrate modular versatility amid electric market volatility.[45] These adaptations reflect a broader emphasis on risk-sharing models with private partners and government incentives to overcome first-project economics, though analysts note persistent execution uncertainties in achieving cost reductions through learning curves.[46][47]Technology
NuScale Power Module Design
The NuScale Power Module (NPM) is an integral pressurized water reactor (PWR) design that integrates the reactor core, steam generators, pressurizer, and containment vessel within a single, compact unit.[3][48] This configuration eliminates the need for large external piping and reactor coolant pumps, relying instead on natural circulation for coolant flow during normal operation.[49] The module measures approximately 76 feet in height and 15 feet in diameter, fitting within a steel-lined, pressure-retaining containment vessel.[3][50] Each NPM generates 77 megawatts electric (MWe) gross power and 250 megawatts thermal (MWt), an uprated capacity from the original 50 MWe design certified by the U.S. Nuclear Regulatory Commission (NRC) in 2020.[50][51] The reactor operates at a design temperature of 316°C and pressure of 83 bar, using 37 standard PWR fuel assemblies enriched with low-enriched uranium.[50] Modules are factory-fabricated for transport by truck, rail, or barge, then installed in a below-grade pool of water that provides passive emergency cooling.[3][52] The design emphasizes modularity, with up to 12 NPMs deployable in a single plant configuration housed in a common reactor pool, enabling scalable power output from 77 MWe to 924 MWe while maintaining independent operation of each module.[3][53] Core coolant flow is driven by density differences from natural convection, enhancing reliability by reducing mechanical components prone to failure.[49] The integral arrangement minimizes leak paths and supports a capacity factor exceeding 95 percent under full-power conditions.[3]Safety and Operational Features
The NuScale Power Module (NPM) employs a passive safety design philosophy, leveraging natural physical processes such as gravity, natural circulation, and thermal convection to achieve reactor shutdown, core cooling, and containment integrity without reliance on active components like pumps, valves requiring power, or operator intervention.[54] This approach enables indefinite decay heat removal following accidents, supported by the reactor's immersion in a safety-related water pool that serves as the ultimate heat sink.[55] The design's inherent stability stems from its integral pressurized water reactor configuration, where the steam generators, core, and pressurizer are housed within a single vessel, minimizing piping and potential leak points.[56] Core safety functions are fulfilled by redundant passive systems, including the decay heat removal system and emergency core cooling system, which activate automatically in response to events like loss of off-site power or station blackout.[54] The containment vessel, integrated into the module, is engineered to withstand internal pressures up to 600 psia during severe accidents, preventing radionuclide release. These features eliminate the need for engineered safety feature filters or external injection systems, reducing complexity and enhancing reliability against extreme events such as earthquakes or floods.[57] The U.S. Nuclear Regulatory Commission certified the uprated 77 MWe NPM design in May 2025, affirming that its passive safety attributes remain unchanged from the prior 50 MWe version despite power increases.[51] Operationally, the NPM utilizes natural circulation for primary coolant flow during normal conditions, eliminating forced circulation pumps and enabling efficient heat transfer to produce 77 MWe (250 MWt) per module.[3][56] Modules operate independently within a plant configuration of up to 12 units, allowing for incremental capacity addition, load-following flexibility, and continued power generation even if individual modules are offline for maintenance.[58] The design supports grid-independent operation by routing steam directly to auxiliary systems during transmission failures, and its factory-fabricated construction facilitates standardized quality control and reduced on-site assembly risks.[59] Projected operational lifetime is 60 years, with provisions for remote monitoring and simplified control systems that minimize human error potential.[60]Comparisons to Other Nuclear Technologies
NuScale's power module is an integral pressurized water reactor (PWR) producing 77 megawatts electric (MWe) per unit, designed for factory fabrication and scalable deployment up to 12 modules per plant for a total of 924 MWe, contrasting with traditional large reactors like the Westinghouse AP1000 (1,100 MWe) or Areva EPR (1,600 MWe) that require extensive on-site construction and occupy over one square mile compared to NuScale's 0.06 square miles.[61] This modularity enables incremental capacity addition and reduced upfront capital risk, though large reactors benefit from economies of scale in fuel efficiency and potentially lower long-term costs per kilowatt once serial production is achieved.[62] Safety features in NuScale emphasize passive systems, including natural circulation for primary heat removal and the emergency core cooling system, eliminating reliance on active pumps or external power for decay heat rejection, which simulations indicate prevents core meltdown even under extreme events.[54] [56] These align with Generation III+ reactors like the AP1000, which also incorporate passive cooling, but NuScale's smaller core size—reducing fission product inventory by orders of magnitude—enhances inherent safety by facilitating simpler containment and lower radiological release risks during accidents.[63] In comparison, Generation II reactors depend more on active safety systems, contributing to historical vulnerabilities observed in incidents like Three Mile Island.[64] Economically, NuScale's projected costs have escalated, with the canceled Idaho project estimating over $20,000 per kilowatt, comparable to AP1000 overruns at Vogtle (around $10,000/kW) and exceeding initial SMR promises of $4,400/kW through factory efficiencies.[35] [65] Large reactors face first-of-a-kind (FOAK) premiums but achieve lower fuel costs; SMRs like NuScale may incur 15-70% higher fuel expenses due to less efficient burnup in smaller cores.[62] Relative to other small modular reactors (SMRs), such as GE-Hitachi's BWRX-300 (300 MWe boiling water design), NuScale offers finer scalability but trails in per-module output, with BWRX-300 claiming up to 60% capital cost reductions versus traditional reactors through simplified components.[66] NuScale holds a regulatory edge as the first SMR design certified by the U.S. Nuclear Regulatory Commission in 2020, facilitating faster deployment than unproven Generation IV concepts like molten salt or high-temperature gas reactors, which promise higher efficiency but lack commercial maturity.[60]| Technology | Power Output (MWe) | Key Safety Feature | Estimated Cost ($/kW, FOAK) | Status |
|---|---|---|---|---|
| NuScale Module | 77 (scalable to 924) | Passive natural circulation, no AC power needed | ~$20,000 (Idaho estimate) | NRC certified 2020 |
| AP1000 | 1,100 | Passive cooling towers | ~$10,000 (Vogtle) | Deployed (e.g., Vogtle 2023-2024) |
| BWRX-300 | 300 | Simplified boiling water | Claims 60% below traditional | Pre-construction (Ontario 2025) |
| EPR | 1,600 | Active/passive hybrid | ~$6,000-10,000 (varies) | Operational (e.g., Taishan 2018) |
Regulatory Milestones
U.S. Nuclear Regulatory Commission Approvals
In December 2016, NuScale Power submitted its Design Certification Application to the U.S. Nuclear Regulatory Commission (NRC) for the NuScale Power Module, a small modular reactor design rated at 50 megawatts electric (MWe) per module.[4] The NRC completed the final phase of its safety review on July 20, 2020, approving the design's key safety features and marking the first such approval for an SMR under the NRC's pre-application review process.[72] On September 11, 2020, the NRC issued a Standard Design Approval for the reactor design, allowing it to be referenced in future combined license applications without full re-review of the certified elements.[73] The NRC Commission voted to certify the 50 MWe NuScale design on July 29, 2022, making it the first SMR design approved for deployment in the United States.[74] This certification was formalized through a final rule published on January 19, 2023, amending NRC regulations under 10 CFR Part 52 to incorporate the design, effective February 21, 2023; the certification remains valid for 15 years and positions the design as one of only seven reactor technologies cleared by the NRC.[75] The process involved extensive review of safety analyses, probabilistic risk assessments, and passive cooling systems, confirming the design's ability to maintain core cooling without external power or operator action during severe accidents.[76] Building on this foundation, NuScale submitted a Standard Design Approval application on January 1, 2023, for an uprated version increasing output to 77 MWe per module while retaining the core safety architecture.[51] The NRC docketed and accepted the application for review on August 1, 2023, after verifying its completeness.[77] On May 29, 2025, the NRC approved the uprated design, designating it the second SMR variant certified and enabling scalable plants up to 462 MWe (six modules) with enhanced thermal efficiency from 250 megawatts thermal input.[5] This approval expedites future licensing by confirming the uprate's safety margins, including improved fuel utilization and seismic resilience, without requiring site-specific environmental reviews for the reference plant.[78] As of October 2025, NuScale remains the only SMR technology with multiple NRC-approved configurations, facilitating potential deployments by 2030 pending combined license approvals.[5]International and Export Considerations
NuScale Power has pursued international commercialization of its small modular reactor (SMR) technology through strategic partnerships and memoranda of understanding (MoUs) in multiple countries, leveraging its U.S. Nuclear Regulatory Commission (NRC) design approvals to facilitate exports. As of January 2023, the company reported 19 active agreements for SMR deployments across 12 countries, including efforts to adapt its VOYGR plants to local regulatory frameworks. ENTRA1 Energy serves as NuScale's exclusive global strategic partner for commercializing the technology, enabling deployments worldwide while NuScale focuses on design and licensing support.[74][31] In Europe, NuScale signed a teaming agreement with Romania's Nuclearelectrica in 2021 to deploy a VOYGR-6 power plant (six 77 MWe modules) by the end of the decade, supported by a USD 98 million loan commitment from the U.S. Export-Import Bank approved in October 2024 for pre-project services including site assessment and feasibility studies. The project advances under RoPower Nuclear, with NuScale providing engineering and procurement assistance amid Romania's goal to add 1,500 MWe of nuclear capacity by 2030. Separately, a 2022 MoU with Estonia's Fermi Energia targets evaluation of a NuScale SMR plant for deployment by 2031, focusing on Baltic energy security. Poland features among early agreement countries, though specific deployment timelines remain preliminary as of 2023.[79][80][74] Beyond Europe, NuScale has advanced partnerships in Asia and Africa. In March 2023, the U.S. Trade and Development Agency (USTDA) partnered with Indonesia's state utility PLN to conduct a feasibility study for a 462 MWe facility using NuScale SMRs, aiming to support Indonesia's clean energy transition amid growing electricity demand. In Africa, a September 2024 agreement between Nuclear Power Ghana, Regnum Technology Group (a U.S. firm licensing NuScale's design), and U.S. partners targets SMR deployment to bolster Ghana's energy infrastructure during the U.S.-Africa Nuclear Energy Summit. These initiatives highlight NuScale's strategy to export modular components from U.S. supply chains, subject to International Atomic Energy Agency safeguards and host-nation licensing.[81][82] Export considerations for NuScale involve U.S. regulatory compliance under the Atomic Energy Act and export licensing from the NRC and Department of Energy, with its May 2025 NRC approval of the uprated 77 MWe US460 design enhancing credibility for foreign regulators by demonstrating passive safety features and factory-fabrication viability. However, international deployments face host-country hurdles, including site-specific approvals, grid integration, and financing, as seen in ongoing Romanian environmental impact assessments. No operational NuScale SMRs exist outside the U.S. as of October 2025, with timelines contingent on bilateral cooperation and global supply chain maturation.[5][79]Key Projects and Partnerships
Carbon Free Power Project
The Carbon Free Power Project (CFPP) was a collaborative initiative led by the Utah Associated Municipal Power Systems (UAMPS), a consortium of public utilities, to deploy the first commercial small modular reactor (SMR) power plant using NuScale Power's technology at the Idaho National Laboratory (INL) site near Idaho Falls, Idaho.[83] Initially planned as a 12-module facility generating 720 megawatts electric (MWe), the project was scaled back to six modules producing 462 MWe due to insufficient subscriber commitments from UAMPS members seeking carbon-free baseload power.[84] The design leveraged NuScale's VOYGR SMRs, each rated at 77 MWe, with passive safety features enabling underground siting for enhanced security and flood resistance.[85] In 2020, the U.S. Department of Energy (DOE) conditionally approved up to $1.4 billion in funding over 10 years to support the project, contingent on meeting cost-sharing and performance milestones, positioning CFPP as a demonstration of scalable nuclear deployment to replace retiring coal plants and meet clean energy demands.[34] NuScale achieved regulatory progress, including NRC approval of the SMR design in 2020 and pre-application interactions for a combined construction and operating license (COL), with a planned submission in January 2024 for the six-module configuration.[86] By mid-2023, the project management committee approved updated budgets reflecting escalating development costs, estimated at over $9 billion total for the downsized plant, driven by supply chain inflation, regulatory requirements, and first-of-a-kind engineering challenges.[84] The project faced mounting economic pressures, with power prices rising from an initial $58 per megawatt-hour to $89 per MWe-hour by 2023, deterring additional utility participants amid competition from cheaper renewables and gas.[6] On November 8, 2023, UAMPS and NuScale mutually terminated the CFPP agreement, citing inability to secure enough subscribers and unsustainable cost overruns that exceeded available DOE cost-share limits.[87] [88] This cancellation marked a significant setback for U.S. SMR commercialization, highlighting risks in novel nuclear economics despite technological readiness, though NuScale retained design certifications and pursued alternative deployments.[34] Post-termination, the NRC was notified on November 10, 2023, suspending related licensing activities.[86]TVA and ENTRA1 Energy Collaboration
On September 2, 2025, the Tennessee Valley Authority (TVA) and ENTRA1 Energy announced a collaborative agreement to develop up to 6 gigawatts (GW) of new nuclear power capacity using NuScale Power's small modular reactor (SMR) technology, marking the largest such deployment program in U.S. history.[89] Under the terms, ENTRA1 Energy will finance, own, and operate up to six nuclear plants—termed ENTRA1 Energy Plants—while TVA will purchase the generated power through long-term contracts, with deployments targeted at sites across TVA's seven-state service territory.[44] This initiative leverages NuScale's VOYGR SMR design, which has received U.S. Nuclear Regulatory Commission design certification, to provide reliable baseload power amid rising demand from electrification and data centers.[7] ENTRA1 Energy serves as NuScale Power's exclusive global strategic commercialization partner through their 50/50 joint venture, ENTRA1 NuScale LLC, which facilitates the technology's deployment while NuScale provides engineering, licensing, and support services.[89] NuScale publicly endorsed the agreement on September 3, 2025, highlighting its alignment with efforts to deliver clean, scalable energy to meet TVA's needs for powering approximately 4.5 million homes or supporting up to 60 new data centers.[7] The collaboration emphasizes standardized, factory-built SMR modules to reduce construction risks and timelines compared to traditional large-scale reactors, though specific site selections and timelines remain subject to regulatory approvals and further planning.[90]Other Deployment Efforts
In Romania, NuScale Power has pursued deployment through a partnership with RoPower Nuclear, a joint venture involving state-owned entities Nuclearelectrica and Nova Invest. A 2021 teaming agreement targeted the construction of a six-module VOYGR-6 plant, delivering 462 MWe, at the former coal site in Doicesti, with operations planned by the end of the 2020s.[91] In July 2024, the parties advanced to a Phase 2 front-end engineering and design (FEED) contract to support site-specific preparations and regulatory processes for a potential 2029 startup.[92] This effort aligns with Romania's national energy strategy to phase out coal and integrate advanced nuclear capacity, though progress depends on securing financing and final government approvals.[93] In Poland, NuScale entered a landmark agreement with KGHM Polska Miedź, a state-owned mining company, in October 2022 to explore SMR implementation for industrial power needs, focusing on a VOYGR plant to supply clean energy to copper mining operations this decade.[94] The collaboration includes feasibility studies and technology transfer, building on Poland's interest in SMRs for energy security amid coal dependency.[95] Romania and Poland have coordinated efforts since 2022, sharing insights on NuScale's six-module VOYGR designs to accelerate mutual deployments.[96] NuScale has also engaged in preliminary discussions and memoranda of understanding for SMR applications in other regions, including potential desalination and hydrogen production integrations, as outlined in 2025 research announcements. However, as of October 2025, these remain exploratory without firm deployment timelines, contrasting with the more advanced Romanian and Polish initiatives.[97] Overall, international efforts emphasize export of the NRC-certified design, with 19 active agreements across 12 countries reported in early 2023, though actual construction hinges on local regulatory alignment and economic viability.[74]Economic and Financial Aspects
Cost Structures and Viability Analysis
NuScale Power's small modular reactor (SMR) designs, particularly the VOYGR series, feature a cost structure emphasizing factory-fabricated modules to minimize on-site construction labor and time, with capital costs dominated by nuclear island components, balance-of-plant systems, and licensing expenses. Overnight capital costs for a first-of-a-kind (FOAK) 12-module VOYGR-12 plant (924 MWe net capacity) were initially projected at around $5,000–$6,000 per kWe in early analyses, but real-world estimates from the Carbon Free Power Project (CFPP) escalated significantly due to immature supply chains and limited vendor competition for specialized nuclear-grade components.[35] The CFPP, intended as a six-module (462 MWe) demonstration in Idaho, saw total project costs rise from $5.3 billion in 2021 to $9.3 billion by mid-2023, equating to approximately $20,000 per kW—comparable to large-scale light-water reactors like Vogtle despite the modular promise of economies through replication.[35][6] Key drivers included post-2020 inflation in commodities (e.g., steel and concrete), higher interest rates elevating financing costs, and design refinements to uprate module output from 50 MWe to 77 MWe, which increased engineering and regulatory validation expenses without proportional cost offsets in early stages.[98][99] Operational and maintenance (O&M) costs are estimated at $10–$15 per MWh for nth-of-a-kind (NOAK) deployments, lower than traditional nuclear due to passive safety reducing staffing needs, though fuel fabrication and waste management remain comparable at 10–20% of levelized costs. Levelized cost of electricity (LCOE) projections for NuScale SMRs vary by deployment stage and assumptions: FOAK estimates reached $89/MWh for CFPP before its November 2023 cancellation, up from $58/MWh targets, while NOAK models from independent assessments suggest $51–$64/MWh under favorable conditions like low discount rates (<5%) and serial production.[84] Viability hinges on achieving learning curve reductions—potentially halving unit costs after 10–20 modules via standardized manufacturing—but historical nuclear projects indicate persistent overruns from regulatory delays and supply bottlenecks, rendering SMRs currently uncompetitive with gas combined-cycle plants ($40–$60/MWh) absent subsidies or carbon pricing.[100][101] Despite CFPP's failure, NuScale's economic prospects improved in 2024–2025 through partnerships like the Tennessee Valley Authority collaboration and U.S. Department of Energy cost-sharing grants totaling up to $900 million, enabling progress toward NOAK cost targets amid rising demand for dispatchable low-carbon power.[102] Critics, including analyses from the Institute for Energy Economics and Financial Analysis, argue that without rapid scaling, SMRs face structural risks from high upfront capital (70–80% of LCOE) and sensitivity to macroeconomic shocks, questioning broad commercial viability until multiple deployments validate cost declines.[35][103] Proponents counter that policy supports, such as the ADVANCE Act streamlining approvals, position NuScale for competitiveness in high-utilization grids where intermittency alternatives falter.[102]Revenue, Stock Performance, and Investor Relations
NuScale Power Corporation reported revenue of $37.0 million for the full year 2024, marking an increase from $22.8 million in 2023, primarily driven by engineering and licensing fees related to projects such as the RoPower initiative in Romania.[20] In the second quarter of 2025, quarterly revenue rose to $8.1 million, up $7.1 million from $1.0 million in the same period of 2024, reflecting expanded services in support of international deployments.[21] Trailing twelve-month revenue as of mid-2025 stood at approximately $56.1 million, with year-over-year growth exceeding 300% in recent quarters, though the company continues to operate at a net loss, reporting $348.4 million for 2024 amid high research, development, and administrative costs associated with commercialization efforts.[104]| Year | Revenue (millions USD) | Year-over-Year Growth |
|---|---|---|
| 2023 | 22.8 | - |
| 2024 | 37.0 | 62.3% |