PATCO Speedline

The PATCO Speedline is a 14.2-mile rail line operated by the , a subsidiary of the , connecting , , with Lindenwold in , and crossing the via the . It serves 14 stations—five in and nine in —and operates nearly 24 hours a day on weekends and until midnight on weekdays, providing seamless connections to and systems, with a temporary suspension of weekday overnight service (12:00 a.m. to 4:30 a.m.) starting September 1, 2025, for maintenance. In 2024, the line carried approximately 5.6 million passengers annually, supporting regional commuting and tourism with fares collected through an automated system featuring magnetic stripe tickets and Freedom Cards. Opened on February 15, 1969, after an initial investment of $96 million, the Speedline represented a pioneering effort in mid-20th-century public transit, utilizing existing railroad rights-of-way from the and the 1936 Bridge Line subway while introducing computer-controlled —the first such system in the United States, implemented upon opening in 1969. This innovation enhanced efficiency, safety, and capacity, with the full end-to-end trip taking about 30 minutes and park-and-ride facilities at seven stations offering over 12,500 parking spaces to accommodate suburban commuters. The line's development stemmed from the 1952 formation of the to integrate cross-river rail services, addressing the decline of earlier commuter railroads amid rising automobile use, and it quickly achieved initial daily ridership of 21,000 passengers, growing to around 38,000 by the early 2000s. As a vital link in the , the PATCO Speedline continues to evolve, with recent projects including the rehabilitation and reopening of the in on April 3, 2025, to boost accessibility and ridership recovery post-pandemic. Its automated operations and regional integration have made it a model for efficient cross-state , though it faces ongoing challenges like and adapting to shifts in travel patterns.

History

Early Development and Crossing the Delaware

The origins of the PATCO Speedline trace back to early 20th-century efforts to bridge the , driven by growing transportation needs between , , and . Proposals for a permanent crossing dated to 1818, but momentum built in the amid rising automobile and passenger traffic, with ferries handling a high volume of crossings annually by the late . In 1919, the legislatures of and passed uniform acts establishing the Delaware River Bridge Joint Commission, a bipartisan body tasked with planning, funding, and constructing a public bridge; each state agreed to cover half the costs, estimated at around $20 million initially. An in 1921 authorized the project near South Street in , marking a collaborative interstate initiative to replace unreliable ferries with a fixed link. Construction of the Bridge—later renamed the —began on January 6, 1922, on the side, under the direction of chief engineer , who applied Leon Moisseiff's deflection theory to optimize the suspension design for wind and load forces. The structure featured two 385-foot steel towers, massive anchorages, and twin 30-inch-diameter main cables composed of 25,100 miles of wire, spanning a total length of 9,573 feet with a 1,750-foot main span that was the world's longest for a upon completion. Built by contractors including the for the deck and for the towers, the project cost $24.6 million and was completed ahead of Philadelphia's Sesqui-Centennial Exposition, opening to pedestrian traffic on July 1, 1926, followed by vehicular access days later. The bridge's 128-foot width accommodated sidewalks, roadways, and dedicated transit infrastructure from the outset. A core element of the bridge's design was the inclusion of lower-level tracks for passenger service, comprising two inner tracks for trolleys and two outer tracks for , integrated into the deck trusses to enable seamless cross-river movement without interfering with road traffic. The anchorages incorporated built-in stations to serve these lines, reflecting early visions for integrated urban transit. reports from the 1920s highlighted proposals for subway extensions from central (via the Market Street Elevated) and Camden's streetcar networks to link directly to the bridge's rails, aiming to support local commuter flows while accommodating potential long-distance services; these plans emphasized the bridge as a foundational hub for future connectivity, though economic analyses initially deemed full uneconomical without further traffic growth.

Bridge Line Era

The Bridge Line rapid transit service launched on June 7, 1936, under the operation of the Rapid Transit Company (PRT), connecting 8th and Market Streets in to Broadway in , via the lower deck of the . The initial fleet consisted of 26 Brill "Wedgyside" cars adapted from PRT's existing subway stock, providing frequent service across the to accommodate commuters and shoppers between the two cities. Construction of the rail infrastructure had begun in 1932, enabling this cross-river link as part of broader efforts to integrate regional transit. Service patterns evolved in the late 1930s with minor adjustments to routing and capacity to meet growing demand, including connections to Philadelphia's Broad Street Subway for extended reach into the . Ridership surged during due to wartime employment in defense industries, gasoline rationing, and limited automobile availability that funneled workers onto public transit, making the line a vital artery for cross-river mobility amid national mobilization efforts. Operational challenges mounted as the PRT faced financial strain, leading to its reorganization into the Philadelphia Transportation Company (PTC) in 1940, which assumed control of the Bridge Line and integrated it into the broader PTC network. Labor tensions escalated, culminating in the 1944 transit strike, where white PTC workers protested the promotion of African American operators, halting all service—including the Bridge Line—for a week and requiring federal intervention to restore operations. The broader decline of surface trolley networks across and further strained resources, as buses increasingly supplanted streetcars and shifted ridership patterns. Postwar years brought a sharp ridership drop on the Bridge Line as , expansion, and rising car ownership drew passengers away from rail transit. This downturn, coupled with aging infrastructure, prompted planning for underground extensions in to revitalize service, setting the stage for later integrations.

Locust Street Subway Construction

The Locust Street Subway was conceived as part of Philadelphia's comprehensive plans in the early , including the 1912 Bureau of City Transit master plan, which envisioned an underground line through Center City to alleviate surface congestion. began in 1917 under city direction, employing the cut-and-cover method that involved excavating trenches along Locust Street while maintaining sidewalk access for pedestrians amid significant traffic disruptions. Work progressed intermittently, with tunnels from 3rd Street to 18th Street largely completed by 1931, though the project stalled due to the and , leaving the infrastructure unused for over two decades. In the late , the Transportation Company (PTC), which had assumed operations of the city's transit system in , revived planning to connect the dormant subway to the existing Bridge Line across the , aiming to create a seamless corridor from to Center City. Groundbreaking for the final phase occurred in 1953, focusing on track installation, a new portal near 18th Street, and a short extension to 15th-16th Street to integrate with PTC's network; this completed approximately 1.5 miles of twin-tube subway featuring modern electrical and signaling systems. Engineering challenges included coordinating the subway's 20-foot diameter tunnels with the elevated bridge approach at 3rd Street, using for station structures at key points like 8th & Locust (an station with cast-iron entrances) and Locust/Walnut (designed for high-volume transfers near ). The project, with an excavation cost alone of about $6 million by 1933, faced ongoing debates over route alignment during the initial 1920s phase, including a court ruling requiring competitive bidding on the $40 million contract amid concerns of favoritism toward the Company, and persistent worries about long-term impacts on Center City traffic from prolonged street closures. Despite these hurdles, the 1953 completion enabled Bridge Line trains to resume full underground service through on February 15, 1953, boosting cross-river ridership.

Conversion and Opening as PATCO Speedline

The Delaware River Port Authority (DRPA) was established on July 17, 1951, through interstate compact between Pennsylvania and New Jersey to manage transportation infrastructure across the Delaware River, including the development of unified rail operations connecting Philadelphia and southern New Jersey. In September 1967, the DRPA formed the Port Authority Transit Corporation (PATCO) as its subsidiary specifically to oversee and operate the high-speed rail line, integrating existing rail segments under a single modern system. The conversion from the older Bridge Line and Locust Street Subway entailed significant technological upgrades, including the installation of automated control () and computer-based signaling systems, positioning PATCO as one of the earliest U.S. networks to employ such for efficient, conductorless operation. These advancements allowed for precise spacing and via centralized computers, a departure from traditional manual controls. The project also incorporated air-conditioned cars and to enhance passenger experience and streamline boarding. Service commenced partially on January 4, 1969, with the first trains running between Lindenwold and , utilizing the newly electrified and automated extension. Full operations extended to on February 15, 1969, marking the official launch of the PATCO Speedline as a 14.2-mile bidirectional route. The initial rolling stock comprised 76 railcars built by in 1968, consisting of 25 single-end units (numbered 101–125) and 25 married pairs (201–250), designed for high-speed performance up to 100 mph on open sections. Ridership surged rapidly post-opening, reaching approximately 21,000 daily passengers within the first year, driven by suburban commuters and coordinated bus feeder services at park-and-ride lots. However, the system faced early financial strains from the $96 million construction investment and ongoing operational deficits, exacerbated by the , which raised electricity and maintenance costs amid broader economic pressures on public transit. Despite these hurdles, the automated design proved resilient, supporting steady growth and establishing PATCO as a model for bi-state integration.

Post-Opening Expansions and Modernization

Following its opening in 1969, the PATCO Speedline underwent significant infrastructure rehabilitations in the 1980s and 1990s to maintain reliability and safety. In the mid-1980s, a major project rehabilitated the tracks on the , addressing wear from heavy usage and improving structural integrity. By the 1990s, enhancements included the installation of reverse signaling to allow bidirectional operations, track replacements on the bridge, and pole line rehabilitations to support overhead power systems. These upgrades, combined with early ADA improvements at select stations, ensured the system's longevity amid growing ridership. Fare collection evolved in the mid-2000s with the introduction of the in 2007, a system that replaced outdated magnetic stripe tickets and simplified payments through automated vending machines and autoload options. This innovation enhanced convenience for commuters, integrating fare payments with features like parking deductions and marking a shift toward modern, electronic ticketing. A notable reopening occurred at , which had closed in 1979 due to low ridership. In 2015, the announced a $30 million redevelopment project to revive the station near 7th and Race Streets in , incorporating modern amenities such as elevators, escalators, and energy-efficient lighting. Construction began in 2022, focusing on full ADA compliance and structural upgrades, leading to its reopening on April 3, 2025, after 46 years of inactivity. The station now serves as a key access point to the growing Fashion District and historic sites, boosting connectivity. The system marked its 50th anniversary on February 15, 2019, with events including "flashback fares" charging 1969 prices—such as 40 cents for a one-way adult ticket—during morning rush hours to honor its founding. Commemorative activities at all stations highlighted the line's role in regional transit, drawing crowds and underscoring its enduring impact on Philadelphia-New Jersey . In 2025, PATCO implemented temporary service adjustments for maintenance, suspending overnight weekday service (midnight to 4:30 a.m., through ) starting September 1 for six months to enable deep cleaning, enhanced station maintenance, and infrastructure inspections. This phased change, announced in June 2025, aims to improve overall safety and cleanliness without affecting weekend or daytime operations. Ongoing projects emphasize , with a $32 million initiative completed in the late 2010s installing eight elevators at six stations—including Haddonfield, Collingswood, and Westmont—to achieve full ADA compliance across the network. Additional enhancements, such as extended concourses and modified ramps, continue at select sites to support riders with disabilities. While potential extensions to areas like Gloucester County or University City in have been discussed in documents since the 2000s, none have advanced to implementation due to funding and environmental challenges.

Route and Infrastructure

Route Description

The PATCO Speedline operates over a total distance of 14.2 miles, linking the suburban terminus at Lindenwold in , with , . The line serves nine stations in and five in , facilitating daily commuting across the region. Trains achieve end-to-end travel times of approximately 28 minutes, with maximum operating speeds reaching 65 mph on surface sections. The route commences at Lindenwold on an elevated and at-grade alignment through the suburbs, serving Ashland, Woodcrest, Haddonfield, Westmont, Collingswood, and Ferry Avenue before reaching and City Hall stations in urban . This suburban portion allows for higher speeds amid less dense development. From City Hall, the line transitions to a crossing of the on the lower deck of the , spanning the waterway without intermediate stops to maintain efficiency. Upon entering , the Speedline descends into the subway network beneath , serving Franklin Square, 8th & Market, 9/10th & Locust, 12/13th & Locust, and terminating at 15/16th & Locust. In this urban core segment, operations are confined to lower speeds of around 40 mph due to the underground infrastructure and frequent station spacing. The overall path combines elevated suburban running, a signature bridge-integrated river transit, and a subway, providing seamless interstate connectivity.

Stations

The PATCO Speedline serves 14 stations across southern and , providing essential connectivity for commuters traveling between suburban areas and urban centers. Nine stations are located in , primarily in and surrounding suburbs, while five are in , all within 's historic districts. Most stations opened in 1969 with the line's initial service, featuring modernized infrastructure including ADA-compliant elevators at key locations such as Lindenwold, Woodcrest, Haddonfield, and all stops to ensure accessibility for passengers with disabilities. The system accommodated approximately 5.6 million riders in 2024, averaging about 19,400 weekday trips, reflecting a recovery in ridership following the . With the reopening of on April 3, 2025, after a $30 million renovation, all 14 stations are now active, enhancing access near Independence Mall and supporting daily travel for over 12,500 parked vehicles at facilities. In New Jersey, the westernmost station is Lindenwold in Lindenwold, which serves as a major park-and-ride hub with a large parking facility offering thousands of spaces for daily and permit use, along with bicycle racks and full ADA accessibility via elevators. Adjacent is Ashland in Voorhees Township, a smaller suburban stop with free parking options and connections to local bus services. Woodcrest in Cherry Hill provides another key park-and-ride site with gated paid parking in the mornings and free spots afterward, equipped with elevators for platform access and serving as a busy commuter entry point off Interstate 295. Further east, Haddonfield in Haddonfield borough offers metered and gated parking, recent elevator installations for ADA compliance, and proximity to historic downtown shops. Westmont in Haddonfield Township includes free and preferred paid parking lots, with new elevators added in 2024 to improve accessibility. Collingswood in Collingswood borough features similar parking arrangements and elevator upgrades, connecting riders to nearby residential areas and NJ Transit buses. Ferry Avenue in Camden provides free daily parking in multiple lots and paid preferred spots, with elevators ensuring full ADA access near local landmarks. Broadway, also known as the Walter Rand Transportation Center in Camden, acts as a multimodal hub with connections to NJ Transit buses and River Line light rail, offering parking and elevators. The eastern New Jersey terminus is City Hall in Camden, a central hub with elevator access and transfers to regional buses, located near government buildings. Crossing into , the line enters at Franklin Square, reopened on April 3, 2025, after a $30 million renovation that preserved its historic architecture while adding modern elevators, escalators, bike racks, and a for sustainability; situated at 7th and Race Streets near Independence Mall, it lacks on-site parking but improves to tourist sites. 8th & Market in is a busy underground station with elevators, direct access to SEPTA's Market-Frankford Line, and proximity to shopping districts. 9/10th & Locust provides elevator-equipped access to office towers and theaters, serving midtown commuters. 12/13th & Locust connects to SEPTA's Walnut-Locust station and at via elevators, acting as a key transfer point near City Hall. The Philadelphia terminus, 15/16th & Locust, offers ADA-compliant elevators and links to trolleys, positioned near museums and residential areas in Avenue of the Arts.

Tunnels and Bridges

The , a key component of the PATCO Speedline, is a dual-level spanning the , with the lower deck dedicated to the rail tracks. Constructed between January 1922 and July 1926 under the engineering oversight of , the bridge originally measured 9,573 feet in total length, including a central span of 1,750 feet, and was designed to accommodate both vehicular and rail traffic from the outset. The PATCO rail deck, integrated into the lower level, extends approximately 1.75 miles across the river, utilizing the bridge's robust steel framework to support high-speed transit operations. Annual structural inspections, mandated by federal and state regulations, ensure the integrity of the rail infrastructure, with comprehensive maintenance projects addressing corrosion, cable dehumidification, and track replacements to mitigate wear from environmental exposure. The crossing utilizes the bridge's lower deck, engineered for flood resistance through elevated foundations and watertight sealing to withstand tidal surges and events common to the . These features, including caisson foundations sunk to 40 feet below the riverbed, were incorporated during initial to protect against hydraulic forces and debris accumulation. Ongoing tunnel leakage mitigation efforts across the PATCO system further enhance , involving applications and improvements to prevent water ingress during high-water conditions. In , the Locust Street Subway comprises a 2.5-mile underground segment, constructed primarily in the 1930s but opened for service in 1952 after delays due to economic challenges. This twin-tube tunnel system, bored through and reinforced with lining, facilitates seamless transit from central to the bridge approach while minimizing surface disruption. Ventilation systems, consisting of axial fans and exhaust shafts at key intervals, maintain air quality by circulating fresh air and removing heat from train operations, with emergency overrides for smoke extraction in case of fire. Rehabilitation projects in the , such as the $14.3 million Way Interlocking and Subway Structure Rehabilitation initiated in 2020, have focused on structural upgrades including repairs, reinforcements, and replacement of four turnouts and a crossing diamond within the 3,800-foot double-tracked sections, ensuring long-term operational reliability. Additional efforts, including the PATCO and Track Rehabilitation Phase II as part of the FY 2024-2033 Statewide Transportation Improvement Program, continue to address interlockings like Locust, Hall, East/West Ferry, and East Crest. The PATCO Speedline maintains an exemplary safety record, with no major train-related passenger incidents reported since its opening in 1969, encompassing over 2.3 billion passenger miles of operation. This achievement stems from rigorous maintenance protocols and infrastructure investments.

Rolling Stock

Current Fleet

The current fleet of the PATCO Speedline comprises 120 rail cars, all of which underwent a comprehensive refurbishment program completed in 2019 to extend their service life into the 2030s. These vehicles, known collectively as PATCO III cars following the overhaul, trace their origins to two primary procurements: 75 cars built by the Budd Company in Philadelphia in 1968 (74 currently active after the retirement of one car in 1997) and 46 additional cars manufactured by Canadian Vickers under license from Budd in 1980. One Budd car (No. 116) was retired in 1997 due to damage from an arson incident and used for parts. The Budd-built cars consist of 25 single-end units (series 100) and 50 married-pair units (series 200), while the Vickers cars are all married pairs (series 250), enabling flexible train configurations of up to six cars. Constructed with stainless steel bodies for durability and lightweight performance, each car measures 67 feet in length and 10 feet in width, featuring double doors on each side for efficient loading. The cars are equipped with Budd III trucks, which support a maximum operating speed of 70 mph, though line speeds are typically limited to 65 mph on surface and elevated sections. Designed for high-capacity service, each car accommodates approximately 70 seated s plus standing room, prioritizing rapid boarding in urban environments. The $194 million refurbishment, executed by in , from 2011 to 2019, addressed structural, mechanical, and interior upgrades across the entire fleet, including new HVAC systems, improved propulsion controls, enhanced features like flip-up seating for wheelchairs, and modernized communications and systems. This overhaul replaced aging components from the original 1960s and 1980s designs, ensuring reliability and compliance with contemporary safety standards while avoiding the need for full fleet replacement. No have been added to the fleet since 1980, and as of 2025, ongoing maintenance and minor upgrades continue at the Lindenwold Yard and Shop in to sustain operational performance. Technically, the cars operate on a 750 V DC third-rail system with top-contact power collection, compatible with the line's automated cab signaling and () for safe, high-frequency service. This setup allows for precise speed enforcement and collision avoidance, integral to the PATCO Speedline's operations across its 14.2-mile route.
SpecificationDetails
Builder (1968), (1980)
Number of Cars120 (74 Budd, 46 Vickers)
Body Material
Dimensions67 ft length, 10 ft width
Maximum Speed70 mph
Passenger Capacity~70 seated + standing
Power System750 V DC
Control SystemAutomated cab signaling ()

Historical and Retired Vehicles

The Bridge Line, the precursor to the PATCO Speedline, operated from 1936 to 1968 under the Rapid Transit (PRT) and its successor, the Transportation (PTC), using a fleet of 26 rapid transit cars built by the . These B-II class cars, designed with interiors by architect Louis T. Klauder, were tailored for the subway-elevated route across the and measured 67 feet in length, featuring modern amenities like fluorescent lighting for the era. The cars were mechanically compatible with those on Philadelphia's Broad Street Subway, allowing seamless integration into the regional transit network. When the line closed in December 1968 for conversion to automated , the fleet was sold to the City of and repurposed on the Broad Street Subway, where they remained in service until 1984. During the late conversion period, test runs were conducted on the rehabilitated infrastructure to validate the new system, marking one of the earliest implementations of full automation in U.S. . These tests utilized prototype configurations of the incoming cars, ensuring compatibility with the driverless technology before the PATCO Speedline's opening in February 1969. The original PATCO fleet consisted of 75 Budd-built cars introduced in 1969, later expanded with 46 cars in 1980 to a total of 121; all of which underwent a comprehensive overhaul program starting in 2013, with the last non-rebuilt units withdrawn from service in 2018; as of 2025, no additional cars have been permanently retired beyond the one Budd car in 1997, though a small number were temporarily stored during the rebuilding process due to mechanical wear. Several pre-PATCO Bridge Line cars have been preserved for historical purposes, including cars 1018 and 1023 at the in , and car 1009 at the Rockhill Trolley Museum in Rockhill Furnace, Pennsylvania. This transition from the Brill fleet to the automated Budd cars represented a pivotal shift toward modern, high-speed regional transit.

Operations

Service Patterns and Schedules

The PATCO Speedline operates full end-to-end service daily from approximately 5:00 a.m. to midnight, with extended overnight "" service historically providing 24-hour availability on weekends and limited weeknights. However, as of September 1, 2025, weeknight owl service (12:00 a.m. to 4:30 a.m., Monday through Friday) has been suspended through March 1, 2026, to facilitate deep cleaning, maintenance, and safety enhancements across the system, while weekend overnight service remains unchanged. Service frequencies vary by time of day and demand. During weekday peak hours (6:00 a.m. to 9:00 a.m. and 4:00 p.m. to 7:00 p.m.), trains run every 5 minutes, supported by the system's signaling. Off-peak weekday service operates at 15- to 20-minute headways, with weekend and holiday frequencies typically at 20- to 30-minute intervals throughout the day. Train configurations adjust to ridership levels, consisting of 2 during off-peak periods and up to 4 during rush hours, with occasional single-car runs in low-demand overnight service prior to the 2025 suspension. On holidays such as and major observances, PATCO implements reduced special schedules with headways extended to 20-30 minutes all day, aligning with lower expected demand. For special events like parades or holiday festivities, service may be augmented with express patterns or additional trains; for instance, during the 2025 Eagles parade, eastbound service to was prioritized from 1:00 p.m. to 7:00 p.m., accommodating an estimated riders—over four times the typical weekday volume. Average daily ridership stands at approximately 20,000 on weekdays, reflecting post-pandemic recovery trends.

Technical Operations

The PATCO Speedline utilizes a electrification system to power its trains, drawing from a covered top-contact positioned along the route. Substations distributed at intervals along the line convert and distribute commercial power to maintain consistent supply to the , supporting the system's high-speed operations across , surface, and elevated sections. Since its inception in 1969, the Speedline has employed a single-operator crew model for all trains, with one motorman responsible for and no additional conductors required, enabled by the system's configurations and automated features. This enhances efficiency while ensuring passenger safety through integrated controls and monitoring. The system operates as semi-automatic train , where trains follow programmed routes and speeds under the supervision of the onboard operator, who can intervene if needed. Central oversight is provided from the Operations Control Center located at the Lindenwold terminal, allowing dispatchers to monitor train movements, coordinate schedules, and respond to incidents in real time. Maintenance practices emphasize preventive care to sustain reliability, including daily and nightly inspections of , tracks, and electrical components conducted by dedicated teams. Major overhauls and heavy repairs occur at the primary maintenance facility in Lindenwold, where comprehensive refurbishments—such as the recent $194 million program that upgraded 120 cars with new propulsion systems, HVAC, and interiors—ensure the fleet meets modern standards and operational demands.

Safety and Signaling Systems

The PATCO Speedline employs an advanced signaling system featuring (ATC) and (ATO), implemented upon the line's opening in 1969, which enforces speed limits and maintains safe train separation to prevent overspeeding and collisions. The ATC component continuously monitors train speed against cab signals displayed in the operator's cab, automatically applying brakes if limits are exceeded, while ATO handles acceleration, cruising, and precise station stops using track-mounted transponders, allowing for unattended operation in normal . This pulse-code cab signaling system, developed by , supports speeds up to 65 mph and integrates with Automatic Train Supervision (ATS) from the central control tower in , enabling remote oversight of routes, switches, and emergency interventions without traditional wayside signals except at interlockings. The third-rail power supply operates compatibly with these signals, ensuring uninterrupted transmission in both tunnel and elevated sections. PATCO maintains an exemplary safety record, with over 2.3 billion passenger miles traveled since without a single serious train-related passenger injury or fatality. Incidents have been minimal and primarily involved non-passenger events, such as worker strikes in rail yards or on active tracks; for instance, in 2020, a maintenance employee was fatally struck at Lindenwold Yard due to procedural lapses in walkway usage, and in 2022, two subcontractor workers were killed by a train on the amid inadequate right-of-way safety plan adherence. Annual safety reports indicate low incident rates, with 8 reportable accidents in 2020 (including derailments and collisions) and 4 in 2021 (encompassing evacuations and injuries), all addressed through corrective action plans focused on procedural enhancements. Emergency procedures emphasize rapid, coordinated evacuations tailored to tunnel and bridge environments, with passengers instructed to follow public address announcements, staff directions, or signage to exit via station platforms, inter-car doors, or end-car doors. As a last resort, removable windows facilitate egress in stalled trains, while prohibiting elevator use unless directed to avoid hazards like smoke. PATCO conducts annual emergency drills in coordination with local responders, including full-scale simulations of tunnel incidents and familiarization tours since 1982, to refine protocols; recent examples include a 2020 large-group evacuation exercise and a 2021 cybersecurity tabletop drill, both deemed successful in after-action reviews. Recent upgrades have bolstered system resilience, particularly through cybersecurity enhancements following increased threats to transit infrastructure post-2020, including annual exercises simulating attacks on control systems to test response protocols. These measures complement the legacy /ATO framework, ensuring ongoing protection against both physical and digital vulnerabilities without mandating (PTC), as PATCO's operations fall outside federal PTC requirements for freight and intercity lines.

Fare Collection and Accessibility

Fare Media and Payment Systems

The PATCO Speedline initially utilized magnetic stripe tickets as its primary medium when service began on , 1969. These plastic-encoded tickets were inserted into fare gates for validation, marking an early adoption of technology for systems. One-way at launch ranged from $0.30 for short intra-New Jersey trips to $0.60 for longer routes to , reflecting the system's focus on affordable cross-river commuting. This magnetic ticket system remained in use until 2006, when it was gradually supplemented and then replaced by more advanced options. In 2006, PATCO introduced the , a designed for stored-value payments and frequent riders, available for a $5 purchase fee at station vending machines. The card allowed reloading via cash, credit/debit cards (, , or ), or online/app, and was tapped at fare gates for seamless entry. In 2025, PATCO introduced contactless payment options, enabling direct taps with credit/debit cards, , , or mobile wallets at upgraded validators installed across all stations, alongside the continued use of the . As of November 2025, the base one-way remains $1.40 for trips up to certain distances, such as from Camden stations to , with fares scaling to $3 for the full Lindenwold run; round-trip options are available at double the one-way rate. Eligible seniors and riders with disabilities receive a reduced off-peak of $0.70 for any distance, applied via the contactless or vending machines. Payment occurs exclusively at self-service vending machines or directly at fare gates, with no cash accepted on trains to streamline boarding. Vending machines support cash, credit/debit cards, and contactless methods for purchasing single-ride paper tickets or reloading legacy options during the transition. App-based reloads were available for Freedom Cards but have shifted to mobile wallet integrations under the new system. For interoperability, the Freedom Share variant of the card allows transfers to SEPTA services for a flat fee, accepted on SEPTA modes except Regional Rail. Fare revenues from the PATCO Speedline cover approximately 40% of operational costs, with the remainder subsidized by the (DRPA) through bridge toll collections, ensuring amid fluctuating ridership. In 2019, for example, passenger fares generated a record $27 million, highlighting the system's revenue potential when integrated with DRPA's broader infrastructure funding.

Accessibility Features

The PATCO Speedline has implemented extensive upgrades to ensure compliance with the Americans with Disabilities Act (ADA), providing accessible transit services across its network. All 14 stations are now equipped with elevators, enabling seamless access between street, concourse, and platform levels for riders with mobility impairments. These improvements culminated in full ADA compliance by mid-2024, following the installation of eight transit-grade elevators at six previously non-elevated stations in South Jersey and Philadelphia, including Haddonfield, Collingswood, Westmont, Ashland, Camden City Hall, and 12th-13th & Locust. The reopening of the historic Franklin Square station in April 2025 further enhanced accessibility, incorporating a new elevator, escalator, and ramps to make it fully ADA-compliant from the outset. Key station features support inclusive travel for passengers with visual or hearing impairments. Tactile paving is installed along all station platforms to guide visually impaired riders safely to train doors. Audio announcements provide real-time updates on train arrivals, departures, and service alerts both at stations and onboard trains. The system's original design from 1969 incorporated rail cars allowing level boarding without steps or gaps, which remains compatible across the entire fleet for users and those with aids. PATCO offers dedicated programs to assist riders with disabilities. The Reduced Fare Program provides discounted off-peak fares of $0.70 for eligible individuals with physical disabilities, applicable between any two stations. If an is temporarily out of service, PATCO arranges alternative accessible transport to the nearest equipped station.

Connections and Integration

Connections to

The PATCO Speedline integrates with the Southeastern Pennsylvania Transportation Authority (SEPTA) system at several key hubs in , facilitating efficient transfers for regional commuters. The 8th & Market Street station functions as a primary interchange point, offering direct connections to SEPTA's Market-Frankford Line, , Broad-Ridge Spur trolley, and multiple bus routes that serve various parts of the city. This location supports high-volume passenger flows, particularly for those arriving from and continuing onward via SEPTA's surface and subway networks. Further west, the 15th–16th & Locust and 12th–13th & Locust stations provide essential to SEPTA's through a short underground walkway to the adjacent Walnut–Locust station. These connections are complemented by proximity to SEPTA platforms at nearby , allowing riders to access suburban destinations or northern Philadelphia corridors without surface travel. Together, these hubs enable seamless journeys, with station designs emphasizing accessibility between platforms. Integrated ticketing enhances the usability of these connections. Since August 2018, the PATCO Freedom Share Card has been accepted at Key readers for fares on subways, trolleys, and buses—though not —allowing a single card for transfers and reducing the need for multiple payments. Additionally, Key Cards with an enabled feature function as contactless payments at PATCO fare gates, providing reciprocal convenience for select users. These integrations support substantial commuter activity, underscoring the line's role in Center City mobility. During high-demand events like Phillies games, PATCO and coordinate enhanced services, with PATCO trains feeding into Center City stations that connect directly to express routes to the Sports Complex. This collaboration ensures smoother passenger movement and alleviates congestion at shared transfer points.

Connections to New Jersey Transit

The PATCO Speedline maintains essential connections to (NJT) rail and bus services, facilitating regional travel across the and supporting daily commutes between suburbs and . At the Lindenwold Station, the northern terminus of the PATCO line, passengers benefit from a direct platform connection to the NJT , enabling straightforward transfers to services bound for Atlantic City and intermediate stops like Cherry Hill and . This integration positions Lindenwold as a critical hub, with NJT rail platforms adjacent to PATCO tracks for efficient boarding without street-level crossings. In , the links directly to the Walter Rand Transportation , a prominent NJT bus that serves as a gateway for dozens of regional routes. This connection allows PATCO riders to access NJT buses departing from the , which handles high volumes of intra-county and cross-river traffic, including services to , , and counties. The adjacency of the PATCO to the transportation —connected via indoor walkways—streamlines transfers for users heading to destinations like Trenton or local employment . NJT bus routes 400, 413, and 414 provide further integration by stopping at multiple PATCO stations in , such as Ashland, Woodcrest, and Haddonfield, to offer feeder service from residential areas. Route 400 operates between Sicklerville and via PATCO stops, serving Gloucester Township commuters; route 413 links to Mount Holly and Florence, accommodating Burlington County travelers; and route 414 connects Moorestown and Maple Shade to in , passing through Merchantville and intermediate PATCO points. These routes enhance accessibility for suburban riders, with buses timed to align with PATCO frequencies where possible. Transfers between PATCO and NJT services lack integrated fares, requiring separate payments for each leg of the journey, though coordinated schedules at key stations like Lindenwold and help reduce wait times to under during peak hours. NJT tickets and passes are not valid on PATCO, and vice versa, but the systems' proximity encourages seamless use, with annual ridership on connected services exceeding millions collectively. Camden-area stations, including , amplify these NJT linkages by concentrating bus departures in a walkable node. Regional planning in the 2020s has spotlighted potential expansions to bolster PATCO-NJT connectivity, including the , a proposed 18-mile hybrid rail project from Glassboro to that would connect to PATCO at the Broadway station and integrate with NJT's and bus corridors. As of July 2025, the project has gained traction with some final environmental documents and tests completed, though significant hurdles including funding and construction challenges remain, with feasibility and assessments ongoing. This development aims to address growth in Gloucester County and reduce highway congestion on routes like the .

References

  1. [1]
    PATCO Transit Line - Delaware River Port Authority
    PATCO, also known as the PATCO High Speedline, is a rapid transit system which runs between Philadelphia, Pennsylvania, and Camden County, New Jersey.
  2. [2]
    14 Conveniently Located Stations - PATCO | Stations
    14 Conveniently Located Stations. Station. 15/16th & Locust St. •, •, •. 12/13th & Locust St. •, •, •. 9/10th & Locust St. •, •. 8th & Market St. •, •, •.Lindenwold Station · 15/16th & Locust St. · Franklin Square · Haddonfield
  3. [3]
    A History of Commitment - PATCO
    The PATCO Speedline began operation on February 15, 1969, with the first trip from Lindenwold, New Jersey, to Center City Philadelphia. Back then, the 14.2 mile ...
  4. [4]
    PATCO - Encyclopedia of Greater Philadelphia
    The Port Authority Transit Corporation (PATCO) Speedline created a groundbreaking model for regional passenger transportation when it opened in 1969.<|control11|><|separator|>
  5. [5]
    LTS: Delaware River Bridge - Lehigh University
    The Benjamin Franklin Bridge (Delaware River Bridge) was the first of four primary bridges to eventually cross the Delaware River from the City of Philadelphia ...Missing: history origins
  6. [6]
    Bridges - Encyclopedia of Greater Philadelphia
    This initially included a single bridge, which was completed in 1926 and named the Delaware River Bridge (later renamed the Benjamin Franklin Bridge). This ...Essay · Railways Played A Role · Washington-New York Corridor<|control11|><|separator|>
  7. [7]
    Benjamin Franklin Bridge - Modjeski and Masters
    Ralph Modjeski designed the Benjamin Franklin Bridge by applying Moisseiff's “deflection theory” to determine the forces carried by the primary load-bearing ...
  8. [8]
    Ben Franklin Bridge - Delaware River Port Authority
    Began Construction: January 6, 1922; Opened to Traffic: July 1, 1926 ... BEN FRANKLIN BRIDGE TRACK REHAB. A $103 million project to replace the entire ...Missing: origins | Show results with:origins
  9. [9]
    History - DRPA - About Delaware River Port Authority
    Both the New Jersey and Pennsylvania state legislatures approve creation of the Delaware River Bridge Joint Commission. December 12, 1919. The first meeting ...
  10. [10]
    Subways and Elevated Lines - Encyclopedia of Greater Philadelphia
    The tunnels for the Locust Street line, started in 1917, were completed by 1931, but it did not open until after the war. The Delaware River Joint Commission ( ...
  11. [11]
    Philadelphia Transportation Company (PTC) Strike
    Between August 1 and August 6, 1944, white Philadelphia Transit Company (PTC) workers went on strike after the PTC agreed to promote African American employees ...
  12. [12]
    Public Transportation - Encyclopedia of Greater Philadelphia
    The jitneys usually charged lower fares but often only operated during peak hours and on peak routes when they could be assured of heavy ridership. Although ...
  13. [13]
    1917 Philadelphia 'Hole in Ground' Finally to Be a Subway ...
    February 14, 1953, Page 1Buy Reprints ... 13-The Locust Street subway, started in 1917 and ... Excavation work was completed in 1933 at a cost of about $6,000,000.
  14. [14]
    [PDF] PRR1953.pdf - Pennsylvania Railroad Technical & Historical Society
    Apr 13, 2015 · Locust Street Subway opens for revenue service between 8th & Market and. 16th & Locust in Philadelphia as extension of Camden Bridge Line; ...
  15. [15]
    [PDF] Historic Context Report for Transit Rail System Development
    No passenger traffic during World War II (1942-1949). Closed to the public since 2011 due to heightened security. Designated 1996, boundary increase 2011 ...
  16. [16]
    [PDF] Cast Iron Subway Entrances Thematic District 1, 2, 3, 5, 8, 9 1928 ...
    Feb 13, 2019 · In 1919, Pennsylvania and New Jersey had formed the Delaware River Bridge Joint Commission, predecessor to today's Delaware River Port.
  17. [17]
    Philadelphia Judge Rules City Must Ask Bids on Subway Work.
    PHILADELPHIA, July 14.—A court order restraining the city from awarding the $40,000,000 Locust Street subway construction contract to the Philadelphia Rapid ...
  18. [18]
    PENNSYLVANIA: Hole in the Ground - Time Magazine
    February 23, 1953 ... cost of $6,000,000. But what with the Depression and World War II, the city just never got around to putting the Locust Street subway into ...
  19. [19]
    PATCO Speedline | Metro Wiki - Fandom
    A rapid transit system operated by the Port Authority Transit Corporation, which runs between Philadelphia, Pennsylvania, and Camden County, New Jersey.
  20. [20]
    Ben Franklin Bridge Track Rehabilitation Project - PATCO
    The project will also rehabilitate structural elements supporting PATCO tracks, which makes the project more intensive than the mid-1980s project. There ...Missing: Speedline 1990s
  21. [21]
    [PDF] PATCO's Impact on the Philadelphia Metropolitan Region
    Feb 12, 2019 · ▻ SEPTA has implemented ATC & PTC on all. Regional Rail lines. ▻ Funding request will enable SEPTA to complete integration and interoperability ...
  22. [22]
    PATCO Freedom Card Marks 10 Years Of Use Amid General ...
    Sep 23, 2017 · It was 10 years ago that riders along the PATCO line were introduced to the Freedom Card as an alternate way to pay their fare.
  23. [23]
    PATCO Launches Test Pilot for New Fare Collection System
    The FREEDOM card can be replenished using the new automated vending machines at each PATCO station or by setting up an autoload function, which will ...Missing: introduction | Show results with:introduction
  24. [24]
    Corporate Communications - DRPA - News and Media
    Mar 19, 2025 · PATCO Franklin Square Station to Open on April 3 · Past to Present, Tracks to Tomorrow Franklin Square Station, originally opened on June 7, 1936 ...
  25. [25]
    PATCO Franklin Square station reopens after 46 years - WHYY
    Apr 3, 2025 · The newly renovated station costing $29.3 million reopens for regular service on Thursday afternoon, with the first train stopping heading ...Missing: Speedline 2024
  26. [26]
    PATCO's Franklin Square Station in Philly reopens in April 2025
    Mar 17, 2025 · PATCO's Franklin Square Station has not been in use since the late 1970s. The remodeled version opens on April 3, 2025.Missing: Speedline 2024
  27. [27]
    PATCO Hi-Speedline fare tickets changing for 50th anniversary
    Jan 20, 2019 · PATCO will hold events to celebrate its 50th anniversary of operation on Feb. 15 from 7 a.m. to 9 a.m. at all stations. PATCO began its rail ...
  28. [28]
    PATCO celebrates 50th anniversary - Railway Age
    Feb 28, 2019 · According to Vigrass, PATCO operation began on Saturday, January 4, 1969, on the New Jersey side, between City Hall Station in Camden and ...<|control11|><|separator|>
  29. [29]
    PATCO Announces Phased Overnight Weekday Service Changes to ...
    Jun 26, 2025 · Phase Two begins September 1 and includes a complete suspension of overnight weekday service. All PATCO trains will stop running and all ...Missing: Speedline | Show results with:Speedline
  30. [30]
    PATCO phasing in service changes starting Monday for deep cleaning
    Jul 13, 2025 · Phase two will begin Sept. 1, which will completely suspend weekday overnight service on the PATCO Speedline for six months to “address ...
  31. [31]
    Lovin' an Elevator: Collingswood PATCO Gets ADA Upgrade - NJ PEN
    Apr 16, 2019 · Lovin' an Elevator: Collingswood PATCO Gets ADA Upgrade. The $32-million project will install eight elevators at six stations between New Jersey ...
  32. [32]
    Delaware River Port Authority, ADA Accessibility Improvements
    ADA compliance necessitated the addition of eight transit-grade elevators at the following stations: Haddonfield; Collingswood; Westmont; Ashland; Camden City ...Missing: upgrades | Show results with:upgrades
  33. [33]
    State Plan offers Clear Path for PATCO Rail Line Extension
    Mar 18, 2009 · The county has limited public transportation; the nearest rail transit option is the PATCO high-speed line, which was constructed in 1969 and ...
  34. [34]
    Special Schedules - PATCO
    Tuesday, September 2, 2025 ( Stations closed and service suspended weeknights 12 a.m. to 4:30 a.m. for deep cleaning and maintenance. ) Timetable. Effective 8/ ...Missing: overnight | Show results with:overnight
  35. [35]
    Average schedule speed: How does Metro compare?
    Mar 16, 2010 · The PATCO Speedline, which has the highest average schedule speed of US heavy rail systems, has a top speed of 65 mph (reduced from the design speed of 75).
  36. [36]
  37. [37]
    [PDF] DVRPC FY2022 TIP for New Jersey
    Jan 23, 2024 · ... Delaware River are primary causes of the flooding. Approximately 14 ... tunnel leakage mitigation throughout the PATCO High Speed Line System.
  38. [38]
    PATCO High-Speed Line - nycsubway.org
    Overview. The PATCO line is a compilation of old lines, track connections and new construction. The line includes the never finished Locust Street Subway ending ...
  39. [39]
    Way Interlocking and Subway Structure Rehabilitation project - PATCO
    The Way Interlocking and Subway Structure Rehabilitation project began in October of 2020. The work is occurring in the tunnels underneath the City of Camden ...
  40. [40]
    PATCO Way Interlocking and Subway Structure Rehabilitation
    Rehabilitation of the 3,800 ft. double-tracked Camden Subway tunnel. Removal of existing and replacement of a brand new double crossover.Missing: Speedline Locust length
  41. [41]
    [PDF] NJDOT Statewide Transportation Improvement Program FY 2018
    Dec 22, 2020 · decking, seismic retrofitting, security measures, cleaning and repainting of structural steel, substructure repairs and other improvements ...
  42. [42]
    Transit Car Overhaul - PATCO | Projects
    This project refurbishes all 120 rail cars in PATCO's fleet. As part of a $194 million refurbishment project, all 120 PATCO cars will be upgraded by Alstom ...Missing: Speedline specifications
  43. [43]
    PATCO in US completes $194m rail car overhaul project
    Apr 10, 2019 · The Port Authority Transit (PATCO) in the US has completed its $194m rail car overhaul project that involved refurbishing 120 train cars.Missing: Budd specifications refurbishments
  44. [44]
    Alstom will Modernize PATCOs Metro Fleet Operated Between ...
    Feb 7, 2011 · Alstom Transport has won a contract worth $194 million USD to execute the complete overhaul of the Port Authority Transit Corporation (PATCO) metro fleet.Missing: Speedline | Show results with:Speedline
  45. [45]
    PATCO - Philadelphia Transit Vehicles
    PATCO operates a fleet of 121 cars from both Budd and Canadian Vickers. These cars are 67′ 6″ long, 10 ft wide, and have two doors on each side. They also ...
  46. [46]
    Patco High Speed Line: Locust-lindenwold | Dovetail Games Forums
    May 23, 2020 · The PATCO High Speed Line is a 14.2 mile rapid transit route between 15/16th and Locust, and Lindenwold, with 13 stations, and a unique cab ...Missing: total | Show results with:total
  47. [47]
    [PDF] Port Authority Transit Corporation Title VI Program - PATCO
    Mar 15, 2019 · PATCO route is considered a minority route based upon service ... that more participants were recruited in stations with higher ridership).
  48. [48]
    [PDF] Automatic Train Control in Rail Rapid Transit (Part 6 of 18)
    TRAIN LENGTH (cars). Max. 10 “. Min. 2. SPEED (mph). Max,. 80.
  49. [49]
    SEPTA 1018 and 1023 - Seashore Trolley Museum
    SEPTA cars 1018 and 1023, built in 1938, were 'Bridge' cars used on the Ben Franklin Bridge and Broad Street subway. They were acquired by the museum in 1984.Missing: ridership | Show results with:ridership
  50. [50]
    Bridge Line (Delaware River) - Wikipedia
    The commission recommended a rapid transit line between Philadelphia and Camden, New Jersey, running via the lower level of the Delaware River Bridge and ...
  51. [51]
    WATCH: Vintage PATCO cars make final ride - Courier-Post
    Jun 7, 2018 · The last vintage PATCO train cars will take final runs on Sunday before heading for interior and mechanical overhaul.Missing: retired 2010s stored disposed
  52. [52]
    Philadelphia Subway #1009 - Rockhill Trolley Museum
    Mar 16, 2018 · Car 1009 was built in 1936 by hometown builder JG Brill Car Co. It was used on the Benjamin Franklin bridge operating between Philadelphia and Camden, NJ.Missing: rolling stock
  53. [53]
    First Time Rider - PATCO
    Service Frequency, About PATCO ; Weekdays, Sat, Sun. Mornings - 4 am to 6 am, 30, 30, 30. AM Peak - 6 am to 9 am, 3-12, 30, 30. Midday - 9 am to 4 pm, 12, 30, 30.Missing: headways off-
  54. [54]
    PATCO suspending weekday overnight trains for six months starting ...
    Aug 20, 2025 · Sept. 1, 2025: Last day of weekday overnight service. · March 1, 2026: Pilot ends. PATCO and the city will decide whether to restart owl service ...Missing: Speedline | Show results with:Speedline
  55. [55]
    [PDF] NJDOT SSOPS Appendix H
    Oct 1, 2021 · Rail Vehicles. PATCO's transit car fleet consists of 120 fully compatible, multiple unit-type, high performance, electrically propelled vehicles ...Missing: specifications | Show results with:specifications
  56. [56]
    Schedules - PATCO
    Owl Service Changes: No trains will run and stations will be closed weeknights, 12 am to 4:30 am (Monday-Friday). Weekend overnight service remains unchanged.Fares · Travel Alerts & Notices · First Time RiderMissing: length | Show results with:length
  57. [57]
    How to ride PATCO to the Eagles Super Bowl parade in Philly - nj.com
    Feb 11, 2025 · From 1 p.m. to 7 p.m., parade service runs eastbound to New Jersey only. All trains will stop at City Hall, Ferry Ave., Woodcrest and Lindenwold ...
  58. [58]
    Why can't we use DC lines close to ground instead of overhanging ...
    Jun 19, 2022 · 3. PATCO "All PATCO trains are electrically powered. Power comes from a top contact covered third rail at 750 V DC." GrapefruitIsAwesome.
  59. [59]
    Port Authority Transit Corporation Control Center Relocation - GFT
    To maintain customer service and system performance, PATCO needed a new train operations control center. The existing facility was more than four decades ...
  60. [60]
    [PDF] OIG Memorandum - Delaware River Port Authority
    Feb 5, 2019 · The PATCO SSPP is developed to achieve the following purposes: • Establish a System Safety Program for the PATCO High Speed Line transit system.
  61. [61]
    [PDF] NJDOT SSOPS Appendix H
    Oct 1, 2021 · PATCO was one of the first transit systems to incorporate automatic train operation for regular service. The PATCO ATO is an analogue system ...Missing: Speedline ATS
  62. [62]
    [PDF] National Transportation Safety Board The Accident
    Jul 26, 2020 · On Sunday, July 26, 2020, about 8:44 p.m. local time, a Port Authority Transit Corporation. (PATCO) maintenance employee was struck and ...Missing: Speedline | Show results with:Speedline<|separator|>
  63. [63]
    [PDF] Port Authority Transit Corporation Train Strikes Two Subcontractor ...
    May 8, 2024 · On October 14, 2022, a PATCO train struck and killed two subcontractor employees on the Benjamin Franklin Bridge in Camden, NJ, when they ...Missing: Speedline | Show results with:Speedline
  64. [64]
    [PDF] NJDOT SSO Report for Calendar Years 2020 and 2021
    Aug 17, 2022 · PATCO uses the Benjamin Franklin Bridge to provide train service between New Jersey and Pennsylvania. The transit line includes 2.3 miles of ...Missing: supply crew
  65. [65]
    PATCO Emergency Information
    Doors between cars allow for movement through the train. END DOORS Doors of each rail car allow for evacuation of train. WINDOWS Windows are removable as a LAST ...Missing: Speedline drills
  66. [66]
    [PDF] NJDOT SSO Report for Calendar Year 2024
    ... PATCO systems were last audited in 2023. The focus ... passengers to transfer to the PATCO Speedline for expedited access to Philadelphia and other parts.
  67. [67]
    Unlike most railroads, SEPTA and Amtrak on pace to implement ...
    Aug 10, 2015 · PTC works by allowing computer systems to pinpoint the location and speed of a train and then automatically stop a train that was going too fast ...
  68. [68]
    Americans with Disabilities Act (ADA) - PATCO
    If you arrive at a particular station and find the elevator out of service, PATCO will arrange for alternate transportation to the closest station with an ...
  69. [69]
    Accessibility - PATCO
    The new FREEDOM fare collection system includes wide, ADA-compliant fare gates at all PATCO stations. Elevators are located at Lindenwold, Woodcrest, Ferry ...Missing: upgrades | Show results with:upgrades
  70. [70]
    Port Authority Transit Corporation's Speedline Achieves Full ADA ...
    Jun 5, 2024 · The project adds eight transit-grade elevators at six PATCO stations in South Jersey and Philadelphia: Haddonfield; Collingswood; Westmont ...Missing: features | Show results with:features<|separator|>
  71. [71]
    Franklin Square Station Reopening - PATCO | Projects
    Construction phase: February 2022; Completion date: 2025. Franklin Square Station was originally opened in 1936 as part of the Bridge Line operation between ...Missing: Subway | Show results with:Subway<|control11|><|separator|>
  72. [72]
    Reduced Fare Program - PATCO
    PATCO's Reduced Fare Program (RFP) allows eligible individuals to travel between any two PATCO stations during off-peak hours for $0.70, regardless of distance ...Missing: 2025 | Show results with:2025
  73. [73]
    8th & Market Street - PATCO
    PATCO Freedom Connected. 8th & Market Street. Connecting Transportation. SEPTA. Market Frankford Line; Broad Street Subway and Broad-Ridge Spur; Subway Surface ...
  74. [74]
    15/16th & Locust St. Station - PATCO
    The 15/16th & Locust St. station is PATCO's PA terminal in Center City Philadelphia, with access to dining, shopping, and cultural attractions. It is ADA ...Missing: length | Show results with:length
  75. [75]
    Travel Links - PATCO
    SEPTA offers links throughout Philadelphia and Southeastern Pennsylvania. The Broad Street (Orange) Line links to Sports Stadiums in South Philadelphia and ...
  76. [76]
    PATCO FREEDOM SHARE Card
    The FREEDOM SHARE Card is for use at SEPTA Key readers, required for transfers from PATCO to SEPTA, and is account-based. It works on all SEPTA modes except ...Missing: Speedline | Show results with:Speedline
  77. [77]
    SEPTA's Key card readers will soon accept new PATCO fare cards
    May 29, 2018 · About 800 riders transfer from PATCO to SEPTA on a regular basis, said John Rink, PATCO's general manager. A typical weekday sees 37,000 ...
  78. [78]
    DRPA | Projects | PATCO Ticket Collection Enhancement
    Will SEPTA Key be accepted? SEPTA Key Cards with the debit MasterCard feature enabled can be used at PATCO fare gates, as they function like any other ...
  79. [79]
    Public Transportation/SEPTA | Philadelphia Phillies - MLB.com
    You can also travel to Citizens Bank Park via SEPTA Bus Routes 4 and 17. For more information, call 215-580-7800. Inside Citizens Bank Park · Special Events ...Missing: coordination joint
  80. [80]
    Lindenwold Station - PATCO
    Lindenwold is PATCO's New Jersey terminal station, located in Camden County. It serves as a transit hub, offering connections to NJ Transit's Atlantic City Line ...Missing: length | Show results with:length
  81. [81]
    Philadelphia | New Jersey Public Transportation Corporation
    The 414 bus connects Maple Shade, Merchantville, and Moorestown with Philadelphia, The 417 bus provides service between Philadelphia and Cinnaminson, Delran, Mt ...Missing: 400 413<|control11|><|separator|>
  82. [82]
    Broadway Station (Walter Rand Transportation Center) - PATCO
    The station provides direct connections to the Walter Rand Transportation Center, offering convenient transfers to NJ Transit buses and the River LINE light ...
  83. [83]
    Walter Rand Transportation Center - NJ Transit
    Ticket Office Hours: 100 South Broadway Boulevard, Camden, NJ 6:00AM - 9:30PM (Monday-Friday) 6:00AM - 9:30PM on Saturday 6:00AM - 9:30PM on Sunday.Missing: PATCO | Show results with:PATCO<|separator|>
  84. [84]
    Bus Point-to-Point | New Jersey Public Transportation Corporation
    Bus Point-to-Point. For real-time information about buses, visit MyBus to view buses that will be arriving at your selected stop. Select location type.
  85. [85]
    Connecting Services | New Jersey Public Transportation Corporation
    BurLink. BurLink operates shuttle bus service in Burlington County from several stations along the River LINE. For information, call BurLink at 609-883-8891.
  86. [86]
    Fares - PATCO
    The program allows eligible individuals to travel between any two PATCO stations during off-peak hours for $0.70, regardless of distance traveled. The ...Missing: frequency | Show results with:frequency
  87. [87]
    DVRPC > Transportation > Transit > Dots and Dashes > Expansion ...
    PATCO South Jersey Expansion, 9, Rail Line Extension. West Chester Pike ... R3 Regional Rail Line Extension, Wawa to West Chester, 3, Rail Line Extension.Missing: 2020s | Show results with:2020s
  88. [88]
    South Jersey Light Rail to Move Forward
    The Delaware River Port Authority (DRPA) presented its recommendations in May for introducing a PATCO light rail service between Camden and Glassboro.