Single-wire earth return (SWER), also known as single-wire ground return, is a single-phase electrical distribution system that employs a single overhead conductor to transmit power, with the acting as the conductive return path for the current, thereby eliminating the need for a dedicated wire. This approach isolates the system from the main via an isolating at the source to prevent and ensure safety, typically operating at medium voltages such as 12.7 kV or 19.1 kV before stepping down to (e.g., 240 V) at distribution transformers for end users. Invented by engineer Lloyd Mandeno in the early 1920s while serving as Tauranga's Borough Engineer, SWER was first implemented in 1925 by the Tauranga Electric Power Board, marking the world's inaugural commercial use of the technology. Mandeno's design, initially nicknamed "Mandeno’s clothesline" for its minimalist appearance, addressed the challenges of extending electricity to remote rural areas with low population densities, where traditional multi-conductor lines proved economically unviable. The system gained traction post-World War II, with widespread adoption in New Zealand's Northland and central regions, and later internationally in countries including , , , and parts of and Africa. SWER systems are engineered for cost efficiency in low-demand scenarios, requiring approximately 2.5 poles per kilometer compared to seven for conventional lines, resulting in construction costs about 50% lower than two-wire single-phase setups and 70% lower than three-phase systems. Power delivery is limited to under 0.5 kVA per kilometer, with a maximum of around 3.5 kVA per , making it ideal for sparse agricultural or residential loads but unsuitable for three- applications without additional phase converters. Maintenance is also reduced by roughly 50% due to the simplified , though challenges include higher outage rates—such as four times more minutes of supply interruption in some regions—and potential risks like surface potential gradients that could affect humans or near grounding points, as well as increased bushfire ignition risk in dry areas if not properly maintained. Today, SWER remains a vital tool for , for example, operates about 64,000 km serving approximately 4% of its customers (around 26,000), with a national total exceeding 200,000 km in as of the early 2020s, and ongoing exploration of its potential in developing regions like to accelerate power access via policy adaptations. In recent years, some networks have begun transitioning parts of SWER to stand-alone power systems for better reliability, while enhancements continue to address safety and integration with renewables. Despite limitations in capacity and reliability, its economic advantages continue to make it a preferred solution for extending grid reach in underserved areas, often complemented by modern enhancements like improved grounding and monitoring to mitigate interference with .

Overview and History

Definition and Basic Concept

Single-wire earth return (SWER) is a single-phase electrical system that employs one overhead conductor to carry the active current, with the serving as the return path to complete the . This design minimizes infrastructure requirements by eliminating the need for a dedicated wire, making it distinct from conventional multi-wire systems that use separate conductors for both active and phases. Unlike early ground-return telegraph lines, which operated on low-power for signaling, SWER is an (AC) power method adapted for modern electrical supply. The primary purpose of SWER systems is to facilitate cost-effective rural electrification in sparsely populated areas, particularly for isolated loads such as water pumps, irrigation systems, and small communities where traditional grid extension would be uneconomical. These systems are best suited for low load densities, typically below 0.5 kVA per kilometer of line, with individual customer demands rarely exceeding 3.5 kVA. By leveraging the earth's , SWER reduces material and installation costs, enabling power delivery over long distances in regions with minimal expected load growth. Key components of a SWER include a single insulated overhead wire, typically made of aluminum steel-reinforced (ACSR), earth electrodes or stakes at locations to ensure low-resistance (often ≤5 ohms), and isolating transformers at the supply end to separate the SWER line from the main and prevent current loops. , rated at common sizes like 5 kVA, 10 kVA, or 25 kVA, step down the voltage for end-user consumption, while the isolating transformer—often up to 300 kVA—provides and voltage adjustment. SWER lines typically operate at medium-voltage levels such as 12.7 kV or 19.1 kV line-to-earth, derived from connections to 22 kV or 33 kV three-phase grids, respectively, supporting power ratings up to 300 kVA per isolating depending on line length and soil resistivity. This configuration allows for efficient delivery in low-density environments but requires careful earthing to maintain performance and safety.

Historical Development

The concept of single-wire earth return originated in the 1840s with systems, where a single overhead wire transmitted signals and the earth served as the return path to complete the circuit, enabling efficient long-distance communication without a second wire. The modern single-wire earth return (SWER) distribution system for electrical power was developed in the early 1920s by engineer Lloyd Mandeno to address the high costs of conventional wiring in sparsely populated rural areas. The first practical installations occurred in 1925 near , , marking the initial application of SWER for rural power supply. Post-1920s expansion saw SWER gain traction in and , where it proved ideal for extending to remote farms and communities. In , adoption accelerated in the 1950s as part of initiatives, leading to extensive deployment in regions. By the late 20th century, over 200,000 km of SWER lines were operational, predominantly in , underscoring its role in cost-effective grid extension. Key milestones included a prototype in , where an 8.5-mile high-power SWER line at 80 kV connected a diesel plant in Bethel to Napakiak, validating the system's viability on terrain with lightweight infrastructure. SWER's economical design influenced mid-20th-century global standards, promoting its use in developing regions for low-density power distribution.

Technical Principles

Operating Principle

In a single-wire earth return (SWER) system, electrical power is distributed using a single overhead to carry the active from the source to the load, while the return flows back through the , leveraging the 's as the path. This return path is facilitated by grounding electrodes at key points, such as the isolating transformer and distribution transformers, which connect the to the to complete the . The acts as a conductive medium due to its ionic content, particularly influenced by moisture and mineral composition, enabling the to spread radially from the electrodes toward the source grounding point. To prevent interference with the grounded utility grid, SWER systems employ isolating transformers at the point of connection, which provide between the multi-phase supply (typically 11-33 kV) and the single-phase SWER line (often 12.7 kV or 19.1 kV). These transformers ensure that no neutral is shared with the grid, thereby avoiding circulating earth currents that could arise from potential differences and compromise system stability or safety. Effective operation requires low earth resistance to minimize losses and ensure adequate current return, typically targeting 1-2 Ω at the isolating transformer and 5-10 Ω at distribution transformers. This is achieved using deep earth electrodes, such as driven or boreholes extending 3-5 m or more into the , often backfilled with conductive materials like to enhance contact with the and reduce impedance. The earth resistance R_{\text{earth}} varies significantly with —ranging from low values in clay (10-100 Ω·m) to higher in (100-1000 Ω·m)—necessitating site-specific . Voltage regulation in SWER lines is challenging due to the combined impedance of the conductor and earth path, leading to drops that can affect load performance over long distances. The approximate voltage drop can be expressed as: \Delta V = I \times (R_{\text{line}} + R_{\text{earth}}) where I is the load current, R_{\text{line}} is the resistance of the single wire, and R_{\text{earth}} accounts for the variable earth path resistance influenced by soil conditions. In extended lines, capacitive coupling between the conductor and earth introduces charging currents, exacerbating the Ferranti effect where receiving-end voltage rises above sending-end levels under light loads. To mitigate these issues, load balancing across multiple SWER spurs—often derived from a three-phase source—is essential to minimize unbalanced earth return currents and maintain system efficiency.

Mechanical Design

The mechanical design of single-wire earth return (SWER) systems emphasizes robust, cost-effective components suited to remote and harsh rural environments, prioritizing and minimal maintenance. Conductors typically consist of galvanized wires, valued for their high tensile strength that supports spans up to 400 meters, reducing the overall number of support structures required. In modern installations, aluminum-clad conductors are often employed to balance enhanced electrical with mechanical durability, particularly in longer or higher-load lines. Insulators in SWER infrastructure are selected for their ability to handle medium voltages (typically 11–33 ) while resisting environmental degradation from moisture, UV exposure, and temperature extremes. insulators, known for their rigidity and resistance, are commonly used in pin or post configurations on overhead lines. (composite) insulators offer advantages in weight reduction and flexibility, making them suitable for areas prone to mechanical stress, with both types engineered to maintain integrity over decades in rural settings. Support poles are predominantly made of to withstand , damage, and seismic activity common in rural terrains, with designs allowing for spans of 300–500 meters to minimize infrastructure density at approximately 2–3 poles per kilometer. This spacing optimizes material use while ensuring stability under typical wind loads up to 40 m/s. Wooden poles may be used in less demanding areas but are less prevalent due to shorter lifespans. Grounding at transformer sites relies on multiple deep-driven earth rods, typically 3–5 meters in length and 16 mm in diameter, made of copper-plated and arranged in a triangular configuration to achieve low resistance (under 5 ohms). These rods are driven at intervals around the transformer base to facilitate reliable current return through the , with additional horizontal conductors connecting them for uniform potential distribution. Design adaptations address local environmental challenges, such as elevating insulators by 1–2 meters above standard heights in flood-prone regions to prevent submersion and short-circuiting. In wind- and bushfire-vulnerable zones, structures incorporate bases and guy wires for added stability, while conductors may include vibration dampers to mitigate aeolian effects. These modifications enhance resilience without significantly increasing costs, aligning with SWER's emphasis on economical rural deployment.

Performance Characteristics

Safety Considerations

One primary safety concern in single-wire earth return (SWER) systems is ground potential rise (GPR) during fault conditions, where fault currents flowing through the earth can create hazardous voltage gradients on the ground surface. To mitigate this, earth electrodes at transformer sites and line ends must achieve a low resistance, typically 5-10 ohms, to limit touch and step voltages to below 50 V, preventing electric shock to personnel or livestock. Protection against faults and overvoltages relies on specialized devices tailored to SWER's single-phase design. Automatic circuit reclosers detect and interrupt earth faults or short circuits, often reclosing briefly to distinguish transient issues from persistent ones, thereby isolating problems within seconds to minimize exposure time. arrestors installed at transformers and key points divert lightning-induced , protecting and reducing the risk of failure. fault detectors, including rapid earth fault current limiters, enhance sensitivity to low-level imbalances in the earth return path, enabling quicker isolation than standard relays. In fire-prone regions, SWER lines pose a bushfire ignition from fallen contacting dry vegetation, exacerbated by high winds or aging infrastructure. During Australia's 2009 , a fatigued SWER on the Kilmore East line broke and arced for 3.6 seconds after recloser operation, igniting grass that led to a killing 119 people; similar failures contributed to the and . Human safety protocols emphasize access controls and signage around high-risk areas. must be posted near earth electrodes and transformer sites to alert the public of potential step and touch potentials, while restricted access zones prevent unauthorized entry within 10-20 meters of grounding points. Designs comply with IEC 60479-1 standards, which limit permissible touch voltages to 50 V AC for durations over 0.5 seconds to avoid . Environmentally, SWER systems produce minimal due to the earth return path's natural screening, but stray currents from unbalanced loads can induce low-level electrolytic in nearby buried metallic pipes or structures. involves maintaining balanced loads and using insulating joints in pipelines to interrupt stray current paths.

Economic Advantages

Single-wire earth return (SWER) systems offer substantial capital cost reductions compared to conventional lines, typically achieving approximately % of the costs of an equivalent two-wire single-phase line. This savings stems primarily from the use of only one overhead instead of two, halving the amount of or aluminum required, and the need for about 60% fewer poles—around 2.5 poles per kilometer versus 7 for standard lines—due to longer spans enabled by the design. Material and installation savings further enhance economic viability, with simplified insulators and pole-top fittings reducing overall setup expenses by 40-60% relative to three-phase systems in rural settings. For instance, SWER requires minimal hardware like crossarms and devices, allowing by less specialized labor and over varied , with reported line costs as low as $5,344 per kilometer in low-density applications compared to $15,400 per kilometer for three-phase equivalents. These factors make SWER capital costs around 30-40% of three-phase systems, particularly beneficial for sparse rural networks. Operational efficiencies contribute to long-term financial benefits, including maintenance costs roughly 50% lower than conventional lines due to fewer components and reduced exposure to faults. In low-density rural areas, these savings often yield payback periods under 5 years for loads below 100 kVA, as seen in deployments where SWER supports isolating transformers up to 200 kVA and distribution units of 25 kVA. Comparative metrics highlight SWER's edge, with significantly lower delivery costs per kVA compared to three-phase alternatives in optimized rural setups, enabling economical supply over distances exceeding 100 kilometers.

Reliability and Maintenance

Single-wire earth return (SWER) systems exhibit high reliability due to their inherent simplicity, featuring a single overhead conductor with earth return, which minimizes the number of components prone to failure compared to multi-wire networks. This design reduces potential fault locations, such as joints and connections, contributing to lower overall outage rates in rural settings where SWER is predominantly deployed. Common failure modes in SWER systems include insulator breakage from mechanical stress or environmental factors, vegetation contact leading to short circuits, and corrosion of earth electrodes in areas with high soil resistivity or acidic conditions. Vegetation encroachment, particularly in dry or overgrown rural areas, accounts for a significant portion of faults, often resulting in arcing and potential fire ignition. Earth electrode corrosion can degrade grounding effectiveness, increasing fault currents and touch voltages. In Victoria, Australia, SWER powerlines are implicated in 30-40 annual fires, exacerbated during high-risk periods like total fire ban days when ignition probability rises 10-20 times. As of late 2024, Victoria's SWER networks achieved 100% coverage with high-speed protection devices through the SWER Automatic Circuit Recloser (ACR) program, further reducing fire risks. Maintenance practices for SWER emphasize preventive measures to sustain reliability, including annual visual inspections of lines, insulators, and transformers to detect wear or damage early. Earth electrode resistance must be tested regularly using methods like the Wenner four-electrode technique, with limits typically set at 5 ohms or less at distribution transformers to ensure safe fault clearing and limit touch voltages to 40 volts. Vegetation clearing is conducted every 2-3 years along rights-of-way to prevent contact faults, often guided by aerial surveys in remote areas. These routines contribute to the system's low upkeep demands, with designs allowing remote monitoring and firmware updates to minimize on-site interventions. Outage statistics for SWER reflect its linear or radial , where a single-point failure—such as a downed conductor or faulty —can cause extended blackouts affecting all downstream customers, with average incident durations around 1-2 hours for repairs in accessible areas. Mitigation strategies include installing sectionalizers and reclosers to isolate faults and restore partial service quickly, reducing overall system average interruption duration index (SAIDI). Safety devices like surge arresters further enhance reliability by diverting lightning-induced surges. In harsh conditions, SWER demonstrates resilience to strikes when equipped with proper arresters at transformers and line ends, which clamp overvoltages and prevent insulation breakdown. However, remote installations remain vulnerable to animal-related damage, such as impacts from on poles or conductors in ungrazed areas, necessitating reinforced designs or in high-risk zones.

Upgrade and Expansion Options

One effective method to enhance existing SWER networks involves voltage upgrades, typically increasing the operating voltage from the standard 12.7 to 19.1 or 22 , which can extend the effective reach of the line by approximately 2-3 times due to reduced and associated resistive losses. These upgrades necessitate the replacement or reconfiguration of isolating transformers at the substation and customer ends to handle the higher voltage while maintaining from ground. In Australian contexts, such as Queensland's remote networks operated by , voltage enhancements have been implemented to support growing loads without full infrastructure overhauls. Adding parallel conductors represents another upgrade pathway, converting the single-wire configuration to a two-wire return system while preserving the earth as a backup path, thereby boosting capacity to up to 500 kVA per line. This approach doubles the current-carrying capability compared to the original single-wire setup, allowing for greater power delivery to dispersed rural loads without extensive new construction. Utilities in , including those in regions, have adopted this method to address capacity constraints on lines spanning hundreds of kilometers. Integration of renewable energy sources, such as solar photovoltaic arrays and wind turbines, into SWER networks has gained traction post-2010, particularly in remote Australian grids, through the use of grid-tied inverters that synchronize with the single-phase supply. For instance, in South Australian rural installations beyond Ceduna, hybrid systems combining 12 kW solar inverters with battery storage have been connected via Selectronic SP PRO units, effectively augmenting the limited 5 kW export capacity of SWER lines and providing surge support up to 12 kW for equipment like welders. These integrations reduce daytime loading on the earth return path, mitigate voltage drops, and enable larger renewable installations without immediate line reinforcements. Hybrid expansions that incorporate three-phase spurs into existing SWER lines offer a scalable solution for accommodating growing loads in targeted areas, such as agricultural or community hubs, while minimizing service disruptions. In Victoria's Powercor network, for example, a proposed upgrade of 606 km of 12.7 kV SWER lines across 44 systems to 22 kV three-phase configurations is planned, which would benefit 1,310 customers by adding short three-phase extensions for high-demand spurs without replacing the entire radial . This phased approach allows seamless , with the original SWER serving as a fallback during . From a cost-benefit perspective, these upgrade options typically represent 20-30% of the expense associated with constructing entirely new distribution lines, while delivering up to a 50% increase in overall network through combined voltage and conductor enhancements. In the Powercor initiative, the $63.1 million investment over 2026-2031 for SWER-to-three-phase conversions would add 4,800 kVA of at an average cost far below developments, supporting economic growth in regional with minimal annual bill impacts of about $3 per customer.

Limitations and Power Quality Issues

One significant limitation of single-wire earth return (SWER) systems is the substantial experienced over long transmission lines, primarily due to the high of the return path. This arises from the inductive and resistive components of the , leading to drops of up to 10-15% under typical operating conditions, which can impair and affect end-user equipment performance. The can be approximated by the formula V_{\text{drop}} = I \cdot X_{\text{line}} \cdot \sin(\theta), where I is the load current, X_{\text{line}} is the line reactance, and \theta is the phase angle between current and voltage; this equation highlights how reactive power demands exacerbate the issue in extended rural networks. In steady-state analysis, such drops can reach 9.4% (0.094 per unit) in base-case scenarios without mitigation, limiting effective power delivery over distances exceeding 50 km. Power quality in SWER systems is further compromised by harmonic distortion, particularly from unbalanced loads that introduce triplen harmonics (multiples of the third harmonic), which propagate through the return and distort waveforms. These imbalances, common in rural settings with sporadic single-phase loads, can elevate levels, while capacitive charging currents along the line contribute to overvoltages via the , potentially exceeding 10% above nominal voltage at light loads. Such issues degrade equipment lifespan and require careful load balancing to keep distortion below 5%. The performance of SWER heavily depends on soil conductivity, with poor results in rocky or dry areas where high resistivity (often >1000 Ω·m) increases I²R losses in the path, potentially causing up to 20% reductions compared to low-resistivity soils (<400 Ω·m). In such terrains, the earth return resistance can rise significantly due to low and content, amplifying overall system losses and necessitating deeper grounding electrodes. is also constrained, rendering SWER unsuitable for loads exceeding 300 kVA or applications involving large inductive motors without additional compensation, as the isolating transformer's rating typically caps at 300 kVA and voltage instability worsens under high reactive demands. Mitigation strategies include the experimental deployment of series capacitors to compensate for line and reduce voltage drops, though adoption remains limited due to cost and complexity; low-voltage switched capacitors have shown promise in field trials by improving voltage support and releasing network capacity in Queensland's SWER grids. Load management techniques, such as scheduling inductive loads to avoid imbalances, help maintain distortion under 5% and enhance overall stability without widespread changes.

Applications and Uses

Rural Electrification in Developed Countries

Single-wire earth return (SWER) systems have played a key role in rural electrification across developed countries, particularly where low population densities and vast distances make conventional three-phase distribution uneconomical. In Australia and New Zealand, SWER is widely used to supply power to outback farming communities and remote rural areas, leveraging its cost-effectiveness for sparse loads. Australia alone features over 200,000 km of SWER lines, enabling reliable electricity access in arid and isolated regions. Ergon Energy, a major utility in Queensland, manages approximately 65,000 km of these networks, supporting agricultural operations and small communities across expansive territories. In New Zealand, SWER remains a staple for rural supply, originating from early 20th-century innovations tailored to the country's dispersed settlements. In the United States, SWER deployment is limited primarily to Alaska's remote villages, where harsh terrain and isolation necessitate specialized solutions. European adoption is rare due to denser . Modern adaptations enhance SWER's viability in these settings, such as integrating technologies for real-time monitoring and fault detection. In , the OtagoNet system—spanning approximately 1,000 km—incorporates smart meters and reclosers to improve reliability and power quality on SWER lines, allowing utilities like PowerNet to proactively manage outages in rural networks. These implementations have been driven by policy frameworks emphasizing universal access, including government subsidies and incentives for rural grid extension. In and , such measures facilitated near-complete electrification, reaching 99% coverage in targeted rural areas by the 2000s through state-funded programs that prioritized affordable technologies like SWER. SWER's general cost advantages, often 50-70% lower than traditional lines for low-demand scenarios, aligned well with these goals.

Use in Developing Nations

In , SWER systems have played a key role in efforts, particularly in through the World Bank-supported ProEnergia project, which promotes the use of single-wire earth return and shield wire schemes to extend power from major sources like the [Cahora Bassa](/page/Cahora Bassa) hydroelectric dam to remote, low-load areas. In , pilot projects and studies during the have explored SWER for grid extensions and mini-grids, aiming to lower the overall costs of bringing to dispersed rural populations by minimizing material and installation expenses in low-density regions. These initiatives leverage SWER's economic advantages, such as reduced conductor requirements, to make feasible in areas where conventional three-phase lines would be prohibitively expensive. In , SWER has been implemented in remote village networks, notably in through successive World Bank-funded rural electrification programs post-2010, which have incorporated single-wire earth return systems to connect isolated communities efficiently. Similar applications in Thailand's rural areas have utilized SWER for low-cost distribution to underserved villages, supporting broader access in topographically challenging terrains. These projects demonstrate SWER's scalability in poverty contexts, where budget constraints prioritize affordable technologies over high-capacity infrastructure. Recent developments from 2012 to 2020 include studies in and evaluating SWER-based mini-grids for standalone rural supply, highlighting potential cost savings of up to 70% compared to traditional overhead lines through simplified designs and earth return utilization. To address operational challenges, programs in these nations have emphasized community training for SWER maintenance, equipping local technicians with skills for routine inspections and fault repairs to enhance system longevity in resource-limited settings. Additionally, integration with off-grid hybrids has been tested, combining SWER distribution with photovoltaic inputs to improve reliability and reduce dependence on distant sources in hybrid mini-grid configurations.

Specific Installations and Case Studies

One notable implementation of single-wire earth return (SWER) systems in is operated by PowerNet Limited in the , where reclosers have been deployed along rural SWER lines to enhance reliability. Installed starting in the early , these electronic reclosers replaced older hydraulic models, enabling faster fault detection and isolation, which reduced momentary outages for rural customers by up to 50% in some feeders. This upgrade has maintained high uptime for thousands of remote users, demonstrating SWER's adaptability to modern protection technologies in challenging terrains. In , manages one of the world's largest SWER networks, spanning over 65,000 km across rural and remote , including extensions serving mining and agricultural loads. A key case involves the integration of battery energy storage systems (BESS) on SWER lines to address voltage fluctuations, where a 1 MWh BESS coupled with an advanced stabilized voltages within regulatory limits for loads up to 100 kVA, preventing blackouts during . This 2018 pilot project highlighted SWER's role in supporting isolated industrial applications, with the system operating at 22 kV and extending service to previously unelectrified areas. A pioneering SWER occurred in , , connecting the city of to the village of Napakiak in 1980. This 8.5-mile (13.7 km), 14.4 kV single-phase line, constructed at a cost of $280,000, demonstrated the feasibility of SWER for by linking a plant to remote loads, initially providing reliable power to approximately 200 residents. However, around , the line was upgraded due to structural deterioration, excessive line losses exceeding 10%, poor reliability from conductor failures, and escalating maintenance costs, leading to its replacement with a conventional three-phase system budgeted at $2.8 million. In , SWER holds significant potential for from major sources like the hydropower plant, though specific large-scale spurs remain limited; a conceptual proposes 100-200 km extensions at 11-22 kV to connect 30-50 villages, delivering 100-300 kVA capacities via earth-return paths to overcome grid extension costs in low-density areas. Post-2000 efforts have integrated similar low-cost distribution in , electrifying dispersed communities and supporting small agro-processing loads, with initial pilots achieving 20-30% access gains in targeted zones. Across these installations, key lessons include the efficacy of shunt capacitors for in SWER networks, where strategic placement along feeders has reduced voltage drops by 5-10% under varying loads, improving power quality without full line reconductoring. Energy's implementations, for instance, used switched capacitor banks rated at 50-150 kVAR to counteract inductive effects, maintaining end-of-line voltages above 90% of nominal and extending asset life in long rural spans.

Applications in HVDC Systems

In (HVDC) transmission, single-wire earth return principles are adapted for monopolar configurations, where the return path utilizes the or sea instead of a dedicated metallic , thereby reducing costs for long-distance or links. This approach is particularly suited to asymmetric loads or operations in systems, allowing continued power flow at reduced capacity when one pole fails. The DC current flows out through the or and returns via ground or sea electrodes connected to the converter stations, leveraging the 's as the neutral path. The core principle involves strategically placed earth electrodes to facilitate low-resistance return while minimizing environmental impacts. Electrodes are typically designed as deep-buried rings, linear arrays, or meshes, with materials like for to ensure durability against electrolytic degradation and silicon-chromium-iron alloys for . In monopolar setups, the and electrodes are positioned at opposite ends of the , often separated by hundreds of kilometers to distribute and reduce localized voltage gradients that could exacerbate . For applications, sea water's higher enables shallower electrode placements, further simplifying design. This adaptation offers significant economic advantages in HVDC systems, primarily by eliminating the need for a parallel return conductor, which can account for a substantial portion of total line costs in remote or installations. Earth return also lowers transmission losses compared to metallic paths due to the earth's parallel resistance pathways, making it viable for high-power links over 100 km. Electrode designs incorporating enhance longevity, with some installations demonstrating operational stability over decades without replacement. Notable examples include the Baltic Cable, commissioned in 1994, which spans 250 km submarine from to at ±450 kV in monopolar mode with sea return via a mesh anode (800 m²) in Sweden and cable cathode (5,620 m) in Germany, enabling 600 MW transfer while avoiding additional cabling costs. Similarly, the in the , operational since 1970, employs partial earth return in monopolar fallback mode across 1,360 km at ±500 kV, using a ring (3.2 km circumference with 1,067 ) at the Celilo station and a linear array of 24 silicon-iron rods at Sylmar, supporting up to 3,100 MW with as the neutral during single-pole operation. Proposed Asian supergrids, such as the GOBITEC initiative, incorporate HVDC links with potential monopolar earth return elements for interconnecting renewable sources across vast distances, though many designs favor metallic returns for environmental compliance. Despite these benefits, electrolytic poses a key limitation, as the unidirectional current can accelerate degradation of nearby buried pipelines, structures, or components through electrochemical reactions. Mitigation strategies include periodic reversal to neutralize , installation of metallic paths as backups, and ensuring electrodes are at least 30 km from sensitive to limit interference. Continuous monitoring of soil resistivity and current distribution is essential to maintain system integrity and comply with environmental regulations.

References

  1. [1]
    What is Single Wire Earth Return (SWER)? | Wilken Pty Ltd
    SWER is fundamentally different from conventional power distribution systems in that it uses only a single conductor to supply single-phase electric power.
  2. [2]
    An analysis of single wire earth return (SWER) system for rural ...
    The primary objective of this investigation was to determine the general applicability of Single Phase Earth Return(SWER) system for rural electrification.
  3. [3]
    Mandeno, Lloyd | Dictionary of New Zealand Biography | Te Ara
    His involvement with electric-power generation began in 1910–11 with the installation of the first alternating-current plant in Auckland, a 6,600-volt link ...Missing: Sparge SWER
  4. [4]
    Lloyd Mandeno (1888–1973) | Engineering NZ
    While he was in Tauranga, Mandeno devised and patented the single-wire earth-return (SWER) system of electrical reticulation which is now in use in many parts ...Missing: Sparge invention
  5. [5]
    Single Wire Earth Return Distribution Grids: A Panacea for Rapid ...
    The Single Wire Earth Return (SWER) system was developed in the 1920s to provide a low-cost means of electricity distribution to sparsely populated rural ...Missing: electrical | Show results with:electrical
  6. [6]
  7. [7]
    [PDF] Distributing Alaska's Power: - Denali Commission
    5.1.4.3 Single Wire Earth Return (SWER). Single wire earth return (SWER), also referred to single wire ground return (SWGR), is a technology that was ...
  8. [8]
    [PDF] Low Cost Grid Electrification Technologies - WAME
    The Single Wire Earth Return (SWER) system is basically a single phase distribution system at MV using the earth as the return conductor. There are two basic ...
  9. [9]
    None
    ### Summary of Single Wire Earth Return (SWER) Application Guide
  10. [10]
    ELECTRIC TELEGRAPH HISTORY & CONSTRUCTION
    Over long distances, only 1 wire was used on the telegraph poles with the ground return to complete the circuit being actual earth ground. Although the ...
  11. [11]
    US645576A - System of transmission of electrical energy.
    NIKOLA TESLA, OF NE\V YORK, N. Y.. SYSTEM OF TRANSMISSION OF ELECTRICAL ENERGY;. SPECIFICATION forming part of Letters Patent No. 645,576, dated March 20, 1900.
  12. [12]
    Rural Single Wire Earth Return distribution networks
    Single Wire Earth Return (SWER) systems are used for supplying electricity at low cost, where electricity supply is required for small populations of people ...
  13. [13]
  14. [14]
    [PDF] Planning Models for Single Wire Earth Return Power ... - DiVA portal
    Dec 10, 2012 · In Single Wire Earth Return. (SWER) power distribution networks, the earth itself forms the current return path of the single phase system ...
  15. [15]
    [PDF] Feasibility of Remote Earth Monitoring for SWER Systems
    Single Wire Earth Return (SWER) is an example of engineering brilliance which is elegant in its simplicity. The design involves one high voltage conductor with ...
  16. [16]
    (PDF) Power flow in distribution networks with earth return
    Aug 10, 2025 · ... paper proposes Single Wire Earth Return (SWER) electrification scheme. This is because SWER's installation costs are about one third of ...
  17. [17]
    [PDF] Overhead Conductor Condition Monitoring
    Dec 12, 2018 · High-strength and extra-high-strength galvanised steel conductors are commonly used on. Single Wire Earth Return (SWER) lines in distribution ...
  18. [18]
    United Energy in Australia Takes Action to Minimize Bushfire Risk
    May 18, 2022 · ... wire earth return (SWER) overhead lines. The latter are ... aluminum clad steel conductor with a cross-sectional area of 25 mm2(0.038 ...
  19. [19]
    [PDF] Section 5: SWER system installed - practical considerations - piesa
    SWER protection - SWER. “recloser” with fused “by pass”. Page 13. Protection ... Comparison between typical 22 and 33 kV line post insulators (porcelain).
  20. [20]
    Polymer Strain Insulators at Summit Power
    SWER Constructions · Railway Crossing · Concrete Pole Constructions · Low Voltage ... Polymer Strain Insulators, also referred to as polymer long rod insulators ...
  21. [21]
    [PDF] Overhead Design Manual - Ausgrid
    Oct 7, 2020 · Reinforced concrete poles shall have a maximum total ... 10.3 Intercircuit spacing. 10.3.1 Clearance to interspan pole. Minimum ...
  22. [22]
    [PDF] Single Wire Earth Return (SWER)
    Single Earth Wire Return (SWER). 3. SWER System. • Line to ground voltages typically 12.7kV or. 19.1kV. Page 4. Single Earth Wire Return (SWER). 4. SWER - ...
  23. [23]
    Recloser Fundamentals | NOJA Power
    Single Phase Reclosers are used on Single Wire Earth Return networks, or alternatively as a protection method for laterals in a North American style ...Missing: arrestors | Show results with:arrestors
  24. [24]
    fundamentals of surge arresters - Eaton
    A surge arrester is a protective device for limiting voltage on equipment by discharging or bypassing surge current.
  25. [25]
    [PDF] FireSafe SWER EFD Trial Final report - Energy
    Jun 18, 2022 · SWER: Single Wire Earth Return – a powerline technology that uses a single high-voltage wire to carry current to remote customers, the current ...
  26. [26]
    2009 VBRC - Final Report - Vol 2 - Electricity-Caused Fire
    The SWER and 22-kilovolt distribution networks constitute a high risk for bushfire ignition, along with other risks posed by the ageing of parts of the ...
  27. [27]
  28. [28]
    Stray Current Corrosion and Preventive Measures - Corrosionpedia
    Aug 18, 2017 · Stray current can cause serious damage if left unchecked. However, there are methods for detecting and combating it.Missing: single | Show results with:single
  29. [29]
    SWER still going strong - Energy Source & Distribution
    May 18, 2014 · Presently, Australia operates a total of about 200,000km of SWER lines, at 19.1kV and 12.7kV. New South Wales and the ACT operate about 30,000 ...Missing: century | Show results with:century
  30. [30]
    [PDF] SWER (Single Wire Earth Return) systems User applications
    The introduction of SWER (Single Wire Earth Return) technology has significant merits regarding cost effectiveness to supply electricity to remote areas.
  31. [31]
    Single Wire Earth Return (SWER) system for Rural Electrification
    TECHNICAL OVERVIEW The Single Wire Earth Return (SWER) system is a unique method of power distribution used primarily for rural electrification.
  32. [32]
    New Generation of SWER-Line Reclosers Reduces Outages for ...
    Mar 22, 2022 · PowerNet decided TripSaver II reclosers were a better option than hydraulic reclosers to reduce outages along SWER lines for its New Zealand customers.Missing: km | Show results with:km
  33. [33]
    [PDF] S&C Improves Power Quality in Australia's Outback
    the use of maintenance-intensive refrigeration-based cooling systems. Twin Grid Utility Support System units providing extra support along a SWER line.
  34. [34]
    Power lines on rural properties - WorkSafe
    Sep 4, 2017 · Another incident resulted when a single wire ('Single Wire Earth Return' or SWER) line dropped to within 1.5 metres of the ground when a fault ...Missing: damage outage
  35. [35]
    None
    Summary of each segment:
  36. [36]
    How To Reinforce Skinny Rural SWER Connections With Solar ...
    Apr 4, 2024 · Reinforcing a SWER supply using a battery hybrid system to stiffen up what's already available will be the most economical.
  37. [37]
    Rural power upgrade to deliver benefits for the bush - Powercor
    Feb 24, 2025 · “Upgrading the SWER network in targeted areas will support regional businesses grow and invest in larger facilities and operations, driving ...Missing: earth return strategies
  38. [38]
    A Look into Steady State and Transient Performance of Power Lines Integrating Single Wire Earth Return Circuits
    **Summary of Steady State Performance, Voltage Drop, Reactance, and Power Quality in SWER Lines:**
  39. [39]
    A Heuristic Model for Planning of Single Wire Earth Return Power ...
    ... Single Wire Earth Return (SWER) networks into the planning of such systems ... loads are highly unbalanced or have considerable triplen harmonic current content.
  40. [40]
    Deployment of low voltage switched capacitors on single wire earth ...
    Ergon Energy operates over 64,000 kilometres of Single Wire Earth Return (SWER) networks to supply electricity in rural and remote regions of Queensland.
  41. [41]
    Single Wire Earth Return (SWER) | Engineering NZ
    It is also present in remote areas of Australia where more than 150,000 kilometres of SWER lines are in service.Missing: expansion | Show results with:expansion
  42. [42]
    [PDF] OtagoNet Joint Venture (OJV) - PowerNet
    OtagoNet Joint Venture (OJV). OJV, through SmartCo, are working with Meter Equipment Provider. (MEP) to retrieve smart meter data to develop and improve ...
  43. [43]
    Access to electricity (% of population) - Australia | Data
    Access to electricity, urban (% of urban population) · Access to electricity, rural (% of rural population) · Electricity production from oil sources (% of total).Missing: 99%
  44. [44]
    Australia Electricity Access | Historical Chart & Data - Macrotrends
    Australia's electricity access was 100% in 2023, 2022, 2021, and 2020, with no increase from 2022 to 2023.
  45. [45]
    [PDF] MOZAMBIQUE ENERGY FOR ALL (ProEnergia) PROJECT
    Mar 7, 2019 · This technique promotes the use of single-wire earth return (SWER) and shield wire schemes when the load and the geographic conditions are ...
  46. [46]
    [PDF] THE USE OF SINGLE WIRE EARTH RETURN (SWER) AS A ...
    Single wire earth return systems are to be supplied from double-wounded transformers (isolating transformers). These circuits are to supply only double- wound ...Missing: principle | Show results with:principle
  47. [47]
    [PDF] THE USE OF SINGLE WIRE EARTH RETURN (SWER) AS A ...
    SWER requires an under-strung earth wire for safety reasons whenever the line comes close to a village, children play-grounds, sport facilities, trading ...
  48. [48]
    [PDF] Lao PDR - Documents & Reports - World Bank
    Single Wire Earth Return (SWER) network reticulation, pioneered and widely ... Several more SWER projects are planned for implementation in the near term.
  49. [49]
    [PDF] MINIGRIDS IN THE MONEY - RMI
    Our analysis has identified one pathway by which minigrid costs can be reduced by 60%. This cost reduction would rapidly accelerate market growth for minigrids ...
  50. [50]
    [PDF] Impact Assessment of Rural Electrification | Norad
    Oct 8, 2013 · • Applying Single wire earth return (SWER). Because this technique involves the stringing of only one wire, the construction techniques are ...
  51. [51]
    [PDF] Five government approaches to promote solar hybrid mini grids in ...
    The bottom line. Different private sector-led and government-led approaches to the development of solar hybrid mini grids are found around the world.Missing: SWER | Show results with:SWER
  52. [52]
    [PDF] Development of advanced SWER models for the Ergon Energy ...
    Ergon Energy has over 65 000 km of Single Wire Earth Return (SWER) networks operating within rural and remote localities of Queensland, Australia. SWER ...
  53. [53]
    [PDF] Small-Scale High Voltage Direct Current - Stanford
    Single-Wire Earth. Return (SWER). A system by which the earth is used as the return portion of a circuit. Single-Wire Ground. Return (SWGR). Synonymous with “ ...
  54. [54]
    Potential for Increased Rural Electrification Rate in Sub-Saharan ...
    Aug 7, 2025 · Therefore, this paper undertakes a review of a single wire earth return (SWER) network as a RER improvement solution. The paper undertakes ...
  55. [55]
    Economics of upgrading swer distribution systems - ResearchGate
    In the Australian setting, voltage regulation is becoming the determining factor for older SWER systems. In long systems, directly connected shunt reactors ...
  56. [56]
    [PDF] HVDC Power Transmission Electrode Siting and Design
    Unbalanced currents associated with the New. Zealand hybrid HVDC arrangement have caused earth currents that caused interference with underground facilities; ...<|separator|>
  57. [57]
    None
    ### Summary of SwePol and Baltic Cable HVDC Systems (Monopolar Earth/Sea Return)
  58. [58]
    [PDF] GOBITEC AND ASIAN SUPER GRID FOR RENEWABLE ENERGIES ...
    Because of the extensive electricity transport distances in the ASG project, the use of HVDC transmission lines is strongly recommended. High voltage direct ...