Fact-checked by Grok 2 weeks ago

Tadami Line


The Tadami Line is a 135-kilometre railway line in Japan operated by East Japan Railway Company (JR East), connecting Aizu-Wakamatsu Station in Fukushima Prefecture to Koide Station in Niigata Prefecture. The route traverses rugged mountainous terrain paralleling the Tadami River, renowned for its dramatic scenery including deep gorges, seasonal foliage, and a series of iron truss bridges that cross the river valley. Constructed in stages beginning in 1928, the line serves primarily local communities and tourists seeking remote natural vistas, with limited daily services reflecting its rural character. Following severe damage from torrential rains associated with the 2011 Tōhoku disaster, a 27-kilometre section remained out of service for over a decade until full operations resumed on 1 October 2022 after extensive repairs. This revival has bolstered regional connectivity and tourism, highlighting the line's role in preserving access to isolated areas amid Japan's depopulation trends.

Overview

Route Description

The Tadami Line extends 135.2 kilometers from Aizu-Wakamatsu Station in to Koide Station in , traversing predominantly rural and mountainous landscapes along the Tadami River valley. The route winds through deep gorges, dense forests, and steep valleys, emphasizing the line's path through Japan's remote interior with limited and heavy reliance on natural topography for alignment. Single-track construction dominates the entirety, facilitating passage via passing loops at stations amid challenging terrain that includes frequent river crossings via iron truss bridges, such as the prominent No. 1 Tadami River Bridge and others like Nos. 3, 4, and 5. The line serves 36 stations, many unstaffed and situated in sparsely populated areas that underscore its isolation from major urban centers, with the Fukushima segment covering the bulk of the distance through the region's forested highlands and riverine lowlands. Notable environmental features include proximity to Lake Tagokura, an artificial reservoir formed by the Tagokura Dam on the Tadami River, providing vistas of dammed waters amid surrounding peaks accessible near former station sites. The path highlights ecological diversity, from summer greenery and autumn foliage along the riverbanks to winter snow accumulations on bridges and tracks, shaped by the valley's and elevation changes up to several hundred meters. Transitioning into near the upstream reaches, the route maintains its valley-hugging profile, paralleling tributaries and escarpments en route to Koide, where it interfaces with broader regional networks amid continued rural sparsity and forested cover. This northern extension reinforces the line's role as a conduit through inter-prefectural , with bridges like No. 8 exemplifying engineering adaptations to seismic and fluvial hazards inherent to the .

Technical Characteristics

The Tadami Line employs the standard Japanese 1,067 mm (3 ft 6 in) narrow gauge track, consistent with conventional lines operated by East. The line is non-electrified, relying on diesel-powered rolling stock for operations across its rural and mountainous terrain. It consists entirely of single track, with passing loops provided at select stations to facilitate train meets. Engineering constraints arise from the line's alignment through rugged , featuring numerous sharp curves and a maximum of approximately 3% (30‰), which collectively restrict operational speeds to a maximum of 65 km/h. These design elements adapt to the steep valleys and river gorges but impose limitations on and braking, prioritizing safety over velocity in this seismically active and flood-prone region. The infrastructure includes extensive bridging, with at least eight notable spans crossing the Tadami River alone, many of which are iron truss structures vulnerable to scour and debris during heavy rainfall due to the line's riverside routing. Total bridge count exceeds 300 across the 135 km route, reflecting the necessity of elevated crossings over valleys and waterways, while tunnels such as the 6.359 km Rokujurigoe Tunnel address mountainous barriers. This configuration heightens susceptibility to , as evidenced by repeated flood-induced damage to bridges and embankments, stemming from the causal interplay of hydrological proximity and inadequate historical reinforcement against events.

Operations

Current Services

The Tadami Line provides local all-stations passenger services operated by ( East), with trains connecting Aizu-Wakamatsu Station—where transfers are available to the Ban-etsu West Line—and Koide Station on the . Full end-to-end operations resumed on 1 October 2022, following repairs to damage from 2011 torrential rains, enabling continuous service across the 135 km route. Train frequency is limited, with approximately three full-route round trips per day in each direction, supplemented by additional services on sectional segments such as between Aizu-Wakamatsu and Tadami. Services operate daily under normal conditions, though the single-track layout and extensive curves preclude or trains. Operations integrate with regional efforts highlighting scenic gorges and seasonal foliage, but remain focused on standard runs without dedicated tourist charters as of 2025. Winter disruptions are common due to heavy snowfall in the mountainous terrain; for example, service between Aizu-Wakamatsu and Aizu-Bange was suspended all day on 14 February 2025, and between Aizu-Bange and Ōshirakawa on 26 February 2025, with replacement buses provided where feasible. These suspensions reflect the line's vulnerability to , typically affecting northern and central sections from late winter into early spring.

Passenger Usage and Economics

Prior to the floods, the Tadami Line exhibited chronically low passenger volumes, with the most vulnerable central section between Aizu-Kawaguchi and Tadami averaging only 370 passengers per day in 2010, reflecting broader trends of rural depopulation and automobile preference that halved ridership over the preceding three decades. This figure underscored the line's marginal viability even before disruption, as daily passengers per kilometer in the suspended stretch hovered around 47, far below thresholds for self-sustaining operations without external support. Restoration efforts, culminating in full reopening on October 1, 2022, incurred approximately 9 billion yen in costs, shared among national government subsidies, East contributions, and prefectural funds under a scheme that separated infrastructure ownership from operations to mitigate financial burdens on the . Despite this investment, ongoing economics remain precarious, with no freight services to bolster revenue and persistent deficits covered by East alongside targeted tourism promotions leveraging the line's scenic appeal amid declining local demand in and Niigata's remote districts. Passenger counts post-reopening have shown seasonal upticks from enthusiasts and , yet daily averages likely persist below 500, prioritizing regional and preservation over profitability in an era of demographic contraction.

Stations

Station List and Features

The Tadami Line includes 36 stations over its 135.2 km length, with the vast majority unmanned to reflect sparse passenger traffic and ongoing rural depopulation in and Niigata prefectures. Unmanned stations feature basic amenities such as waiting shelters, automated ticket vending machines compatible with one-man train operations, and platforms often positioned alongside the Tadami River for enhanced natural views. Progressive de-staffing since the , accelerated by post-privatization cost controls at East and demographic shifts, has left only terminal stations like Aizu-Wakamatsu and Koide with full-time personnel; intermediate halts rely on self-service procedures for boarding and fare payment. Key stations include Aizu-Wakamatsu (km 0), a staffed hub facilitating transfers to the Ban-etsu West Line; Tadami (approximately km 98), the line's namesake in Tadami Town with riverside platforms overlooking bridges and gorges; and Koide (km 135.2), enabling connections to the Joetsu Line toward Niigata.
Station Name (Romanized)Approximate km from Aizu-WakamatsuNotable Features
Aizu-Wakamatsu0.0Staffed; transfer hub to Ban-etsu West Line; full facilities including ticketing and waiting areas.
Nanukamachi1.4Unmanned; basic shelter.
Nishi-Wakamatsu3.1Unmanned; local access point.
Aizu-Hongō6.5Unmanned; near Aizu-Hongō town.
Aizu-Takada11.3Unmanned; regional stop with waiting room.
... (intermediate unmanned stations including Aizu-Bange, Aizu-Tajima, Aizu-Kawaguchi, Yagoshima, Aizu-Yanaizu, Aizu-Nishine, Aizu-Sakamoto, Ashinomaki-Onsen, Higashi-Yama, Yudaira, Irihirose, Aizu-Miyashita, Aizu-Kosugawa, Aizu-Takatsue, Nozawa, Aizu-Yokota, Aizu-Ōshio, Aizu-Nakagawa, Yunokami-Onsen, Tō-no-Hetsuri, Aizu-Mizunuma, Aizu-Kōgen-Ozeguchi, Aizu-Kōgen-Oze-Nokuni, Honna, Aizu-Yoshida, Aizu-Sakae, Aizu-Iwasaki)Varies (up to ~130)Predominantly unmanned with minimal facilities; riverside locations at several for scenic appeal; low usage leading to simplified operations.
Koide135.2Staffed; transfer to Joetsu Line; end of line with bus connections.

History

Pre-Construction and Planning

The Tadami Line's development was conceived in the early to facilitate access to remote mountainous areas in the and Tadami regions, primarily for transporting resources such as timber and minerals. Initial planning and surveys were conducted in the by the Japanese Railways, focusing on linking Aizu-Wakamatsu with inland communities to support local economic activities amid Japan's post-World War I push toward industrialization and expansion in underdeveloped prefectures like and Niigata. This initiative reflected broader state priorities under the Imperial Japanese Railways to integrate peripheral territories into the national economy, even where projected passenger volumes and profitability were marginal, as evidenced by the decision to proceed with of the initial segment despite the challenging terrain. Political support emphasized long-term regional cohesion and over short-term fiscal critiques from advocates of private-sector-led projects, which often highlighted cost-benefit imbalances in rural rail extensions. The rationale centered on enabling freight haulage for outputs, mineral ores, and materials tied to emerging like , underscoring causal links between rail access and extractive industries in snow-prone, isolated valleys.

Construction and Openings

The Tadami Line's construction originated with the eastern segment in , initially developed as the Aizu Line to connect regional centers and support local industries such as agriculture and forestry. The first section, spanning 21.6 km from Aizu-Wakamatsu to Aizu-Sakashita, opened on October 15, 1926. This initial phase facilitated basic freight and passenger transport amid Japan's expanding rural rail network during the . Subsequent extensions on the Fukushima side proceeded intermittently. The line reached Aizu-Yanaizu, 14.5 km further, on November 10, 1928, incorporating additional stations to serve Aizu's mountainous terrain. Progress slowed due to economic constraints and then priorities; the next segment to Aizu-Miyashita opened on October 15, 1941, just before wartime disruptions halted further work. resumption faced acute labor shortages and material scarcities, delaying extensions until September 20, 1956, when the 15.4 km to Aizu-Kawaguchi opened, followed by the 27.6 km to Tadami Station on August 20, 1963. These phases involved navigating steep gradients and river valleys, requiring basic earthworks and short tunnels typical of non-electrified rural lines. On the Niigata Prefecture side, construction began in 1935 from Koide Station toward the Tadami River basin to link with power generation infrastructure and remote communities. Wartime exigencies limited the initial opening to the 26.6 km segment from Koide to Oshirakawa on November 1, 1942, designated as the Tadami Line. Full connection to Tadami remained stalled postwar, with a temporary dedicated freight line built by the Electric Power Development Company between Aizu-Kawaguchi and Tadami in 1957 for dam construction support, later integrated into the national network by 1963. The final and most arduous phase, the 20.8 km "Tadami Midssection" from Tadami to Oshirakawa, was undertaken by the Railway Construction Public Corporation starting in the late , overcoming the formidable Rokujūri Pass with its 13.8 km of tunnels and 10 major bridges spanning the Tadami River gorge. This engineering effort addressed severe topography, including gradients up to 33‰ and flood-prone valleys, at a time when national rail investment prioritized urban corridors over peripheral routes. The section opened on August 29, 1971, integrating the former Line portions and completing the 135.2 km continuous Tadami Line from Aizu-Wakamatsu to Koide. Commemorative through-services marked the achievement, enhancing inter-prefectural access despite Japan's accelerating shift to and declining reliance on rail for bulk commodities like lumber.

Major Disruptions and Closures

In July 2011, torrential rains triggered severe flooding and landslides along the Tadami Line, washing out approximately 27.6 kilometers of track, multiple bridges, and sections of the line between Aizu-Kawaguchi and Tadami stations. This damage stranded trains and immediately suspended rail services on the affected single-track segment, isolating communities and disrupting connectivity across and Niigata prefectures. The event, occurring just months after the Great East Japan Earthquake, compounded vulnerabilities in the line's remote, river-adjacent routing, where steep terrain amplified erosion and structural failures. Prior to 2011, the Tadami Line experienced intermittent suspensions from typhoon-induced heavy rains and seasonal snow avalanches, owing to its narrow corridors through avalanche-prone slopes and flood valleys. These earlier incidents, including storm damage in the late , highlighted the line's exposure to but were typically shorter in duration compared to the 2011 catastrophe. JR East responded to the 2011 disruptions by deploying substitute bus services to bridge the gap, though coverage was limited by the rugged and incomplete parallel roads, underscoring the risks of the unelectrified, single-track . Such measures provided partial for passengers but could not replicate rail capacity, exacerbating isolation for low-density rural areas reliant on the line.

Post-2011 Restoration

Following severe damage from torrential rains in July 2011, which caused landslides and washed out sections of track between Aizu-Kawaguchi and Tadami stations, efforts on the Tadami Line commenced in 2012 under East's oversight, prioritizing slope stabilization to prevent further and the rebuilding of affected bridges over the Tadami River. These works addressed over 100 sites of instability, including reinforcement of embankments and installation of protective netting, with phased testing to ensure structural integrity amid the line's mountainous terrain. JR East initially proposed replacing rail services with permanent bus operations due to high repair costs and low ridership projections, estimating ongoing maintenance challenges in the remote area. Local governments in and Niigata prefectures, along with community advocates, opposed this, arguing that rail restoration was essential for regional connectivity and economic viability, particularly with rising domestic tourism interest in scenic routes during the and early . In 2017, an agreement was reached between JR East and , with the latter and municipalities committing to subsidize portions of the work to facilitate full reopening. The total restoration cost approximated 9 billion yen, funded through a combination of JR East investments, prefectural contributions, and national government support tied to post-disaster recovery initiatives. Full rail services resumed on , 2022, restoring the 27 disrupted and enabling end-to-end operations from Aizu-Wakamatsu to Tadami for the first time in 11 years, following successful test runs in . Post-reopening, passenger numbers surged due to promoted scenic tours, with the line's bridges and river views drawing visitors; by October 2023, marking the one-year anniversary, reports indicated heightened usage from tourism campaigns emphasizing the route's natural appeal. However, the infrastructure remains vulnerable to extreme weather, as evidenced by periodic suspensions from heavy snowfall and rainfall, underscoring the challenges of maintaining service in a high-precipitation region prone to natural disruptions.

Rolling Stock

Active Fleet

The active fleet of the Tadami Line comprises KiHa 110 series and KiHa E120 series single-car diesel multiple units (DMUs), providing reliable service on this non-electrified rural route operated by JR East. These vehicles, typically operated singly or coupled in pairs to match demand, are constrained by short platform lengths that limit formations to a maximum of two cars in most cases. Following in , the KiHa 110 series was introduced in the as part of efforts to standardize and lower operational costs on low-traffic lines through efficient, lightweight designs with acceleration performance rivaling electric s. Equipped with semi-cross seating for comfort, these DMUs support consistent service despite the line's challenging terrain and weather conditions. The KiHa E120 series, introduced to the Tadami Line in 2019, enhances fleet modernity with features like wider doors for improved accessibility and a more spacious interior, further bolstering reliability for scenic rural operations. In September 2023, one KiHa 110 unit (car 135) received a heritage paint scheme to mark the first anniversary of the line's full reopening, aiding tourism promotion without altering core operational efficiency. Maintenance occurs at regional depots including those in the Koriyama and Niigata areas to ensure uptime on this isolated route.

Retired Equipment

The Tadami Line utilized steam locomotives, such as the C11 class, for freight and passenger services until the mid-1970s, after which diesel multiple units (DMUs) were introduced as part of Japanese National Railways' (JNR) nationwide shift away from steam power on rural, non-electrified routes to reduce operational costs and improve reliability. This transition culminated in the full dieselization of the line by the early 1980s, coinciding with the deployment of KiHa 40 series DMUs around 1980, which became the primary rolling stock for local services. Following the partial of the line due to flood damage in July 2011, East accelerated the retirement of older equipment during restoration efforts, withdrawing the KiHa 40 and paired KiHa 47 series DMUs in March to modernize the fleet and align with post-privatization efficiency mandates established after JNR's 1987 into the Group. These DMUs, which had operated for approximately 40 years, were largely replaced to cut maintenance expenses on aging infrastructure amid ongoing financial pressures on unprofitable rural lines. Withdrawn units faced scrapping or repurposing, with examples like KiHa 40-2021 and KiHa 40-2026 transferred to the Kominato Railway for continued use. The JR 110 series DMUs underwent trials on the Tadami Line in the late 2010s as potential interim replacements during the hiatus, but were ultimately not adopted for long-term service, reflecting JR East's prioritization of newer, specialized low-capacity designs for post-restoration operations. This phase-out underscored broader cost-cutting strategies, including selective scrapping of non-viable equipment to streamline operations under JR's privatized structure.

Significance

Scenic and Tourism Role

The Tadami Line earns acclaim for its dramatic natural vistas, traversing a rugged 135-kilometer route parallel to the through deep valleys, over 32 bridges, and via 28 tunnels, which frame views of terraced rice fields, forested mountains, and seasonal changes. This scenic profile has led to its designation as the "most romantic railway in the world" in international media and social platforms, emphasizing the unspoiled rural charm absent in Japan's more urbanized rail corridors. Autumn foliage peaks from mid-October to early November, drawing photographers and hikers to spots like the No. 1 Tadami River Bridge viewpoint, where crimson leaves contrast with the river's flow below. Winter operations reveal snow-laden bridges and iced gorges, voted in as Japan's top local line for snowy scenery, preserving access to landscapes that might otherwise erode from neglect as seen in depopulated urban fringes elsewhere. Post- full reopening, NHK's Japan Railway Journal featured the line's restoration, spotlighting its river-hugging path and role in revitalizing amid recovery from 2011 flood damage. Local initiatives, including seasonal charters and viewpoint trails, channel visitors to riverside vendors and trails, sustaining cultural continuity in Oku-Aizu's remote hamlets without relying on mass transit infrastructure.

Regional Impact and Challenges

The Tadami Line serves as a vital link for isolated communities along its route, enabling access to healthcare facilities and employment centers in larger towns like for residents in areas with limited road alternatives. Despite this role, annual ridership has fallen by more than half since the 1990s, paralleling severe depopulation and demographic shifts in the region, where the proportion of residents aged 65 and older exceeds 44% in municipalities such as Shimogo and approaches 46% in Tadami Town itself. This aging profile, higher than Prefecture's overall rate of 32%, underscores the line's diminishing local utility amid widespread outmigration driven by and youth exodus. Operational challenges are compounded by the line's rugged terrain, featuring over 30 bridges spanning the Tadami River gorge and exposure to frequent heavy rains and landslides, which elevate per-kilometer maintenance expenses to approximately ¥300 million annually for the full 135 km route. Competition from expanded bus services and personal vehicles has further eroded demand, as rural motorization rates rise in tandem with population sparsity. The July 2011 floods, which destroyed multiple bridges and tracks, suspended rail service between Aizu-Kawaguchi and Tadami for over a decade, forcing reliance on substitute buses that proved inadequate for reliable connectivity and likely intensified outmigration, evidenced by Tadami Town's 23.9% population drop from 2010 to . Restoration efforts culminating in full reopening on October 1, 2022, generated short-term employment through bridge reconstructions and track repairs, supported by prefectural outsourcing arrangements where Fukushima covers 70% of segmented maintenance costs totaling ¥200 million yearly. Yet, empirical assessments indicate persistent fiscal strain, with the line's low patronage—among Japan's lowest for non-suspended routes—necessitating sustained subsidies from JR East and local entities without documented offsets from alternative revenue streams like freight or expanded local partnerships.

Debates on Viability

The viability of the Tadami Line, particularly the flood-damaged Aizu-Kawaguchi to Tadami section, has sparked ongoing debates since the Niigata-Fukushima heavy rains rendered it inoperable, with JR East initially advocating for permanent closure due to persistently low ridership and high operational costs. In fiscal , the line generated only ¥8 million in revenue, reflecting its marginal contribution to JR East's network amid declining rural populations and competition from automobiles. Local governments and residents countered with petitions emphasizing regional connectivity and cultural significance, overriding JR East's position through subsidies and a 2014 agreement for restoration under vertical separation, where assumed infrastructure ownership to distribute financial burdens. Proponents of sustaining the line highlight potential tourism-driven benefits and broader economic spillovers in a low-density region lacking alternatives. Restoration costs totaled approximately ¥9 billion, shared equally among the national government, Fukushima Prefecture, 17 Aizu municipalities, and JR East, with full reopening achieved in October 2022 after 11 years. Post-reopening estimates suggest annual maintenance of ¥550 million yields ¥610 million in economic effects, including visitor spending of about ¥8,700 per daily rail tourist (projected at 130 persons) multiplied by regional multipliers for lodging, dining, and promotion. Advocates argue these intangible gains—such as advertising Aizu's scenic assets—justify intervention, framing the line as a lifeline for depopulating communities where bus replacements alone fail to preserve rail-specific tourism appeal. Critics, however, contend the line exemplifies uneconomic subsidies amid Japan's fiscal strains, with annual upkeep escalating to ¥670 million from an initial ¥300 million projection due to aging bridges and tunnels requiring ongoing safety investments. Ridership remains below 1% of East's system total, questioning the cost-benefit ratio when local taxes fund deficits without proportional demand growth, potentially diverting resources from higher-return infrastructure. Alternatives like enhanced bus services are dismissed by supporters as redundant for , but detractors view government mandates—evident in the 2022 vertical separation model—as distorting market signals for closure, prioritizing political preservation over fiscal realism in a network where rural lines collectively strain operators.

References

  1. [1]
    [PDF] Tadami Line
    Mar 22, 2023 · The Tadami Line is 135 km long, connecting Aizu-Wakamatsu in Fukushima to Koide in Niigata. It fully reopened on October 1, 2022, after damage ...
  2. [2]
    Tadami Line | TOHOKU x TOKYO (JAPAN)
    A 135.2-km-long train line that runs from Aizuwakamatsu Station in Fukushima Prefecture to Koide Station in Niigata Prefecture.<|separator|>
  3. [3]
    Tadami-Line Travel Useful Information
    A route renowned for taking visitors off the beaten path. The Tadami Line is celebrated for its spectacular scenery, woven together by the nature of Oku ...
  4. [4]
    A Railway Journey Through History and Spectacular Scenery
    From here, you can see the Tadami Line train cross the First Tadami River Bridge, framed by mountains and mirrored in the river below. It's one of Japan's most ...
  5. [5]
    Tadami train from Fukushima to Niigata goes through one of Japan's ...
    Sep 12, 2023 · Opened in 1928, this magnificent railway spans a total of 135 kilometres from Niigata's Koide Station to Fukushima's Aizu-Wakamatsu Station.
  6. [6]
    Tadami Line Resumes Full Operation After 11 Years
    Nov 2, 2022 · As of October 1st 2022, the Tadami Line has resumed full service, after 11 years of repair efforts brought about by torrential rains in 2011. ...
  7. [7]
    The Tadami Line in Winter - Japan National Tourism Organization
    One of the most scenic railways in Tohoku, the Tadami Line extends approximately 135km from Aizu-Wakamatsu Station in Fukushima Prefecture to Koide Station in ...
  8. [8]
    Tadami Line that runs through picturesque scenery seen from ...
    Aug 26, 2023 · The Tadami Line is a 135.2 km long local train line that links Aizu Wakamatsu in Fukushima to Koide in Niigata, the neighboring prefecture.
  9. [9]
  10. [10]
    Tadami Line - GaijinPot Travel
    Known as “the most romantic railway in the world,” the Tadami Line (只見線) winds through Japan's mountainous heartland, connecting Fukushima and Niigata ...
  11. [11]
    The Tadami Line - allrite
    Jan 19, 2023 · It's a single track line, though with passing loops at most stations. Dry reeds line the tracks, waving the train through. Houses, factories ...
  12. [12]
    Tadami Line: 5 Sights You Shouldn't Miss - Fukushima Travel
    The Tadami Line is an incredibly scenic railway that runs across the Aizu region. Connecting the bustling samurai city of Aizu-Wakamatsu with the serene, ...
  13. [13]
  14. [14]
    Take the Tadami Line Train [Tickets, What to See & Itinerary ]
    Mar 28, 2024 · The Tadami Line is a scenic railway line that travels 135 kilometers (84 miles) from Aizuwakamatsu to Koide Station.<|separator|>
  15. [15]
    Lake Tagokura and Snow Carved Mountains from Rokujurigoe ...
    Viewpoint information ; Car: 20 minutes from Tadami Station on the Tadami Line · April-Early / Mid-November / Best Shot: Mid-October / Late October (Autumn leaves).
  16. [16]
    Echigo Sanzan Tadami Quasi National Park Okuaizu Visitor Center
    This is an artificial lake created at the time of the construction of Tagokura Dam, whose hydroelectric power output is among the largest in Japan. In spring, ...
  17. [17]
    Guide to Visiting the Famous Tadami River Bridge Viewpoint
    The JR Tadami Line crosses approximately 135 km of beautiful Japanese countryside, passing through 36 stations along the way. See here for more information ...
  18. [18]
    Tadami Line: Ride One of the Most Romantic Train Rides in Japan
    Mar 8, 2023 · The Tadami Line is a 135-kilometre-long train line from Fukushima's Aizuwakamatsu Station to Niigata Prefecture's Koide Station.
  19. [19]
    Tadami Line - Japan Travel Planner - ANA
    Most of the sections on the Tadami Line have been restored owing to the tremendous recovery efforts; however, the line between Aizu-Kawaguchi and Tadami ...Missing: abandoned isolation<|separator|>
  20. [20]
  21. [21]
    Tadami Line scenic train journey photos - Facebook
    May 26, 2023 · However, the 3% inclines were a little too steep for a single locomotive without traction tires(double heading/banker engine necessary). Both ...Train In Japan The Jr Tadami... · The Jr Tadami Line Is A... · Tadami Line, FukushimaWhat is the Tadami line timetable and cost from Aizu-Wakamatsu to ...️ Japan ‼️ The Tadami Line (只見線) is a picturesque railway in ...More results from www.facebook.comMissing: gradient | Show results with:gradient
  22. [22]
    Tadami Line - NamuWiki
    Aizukawaguchi - Tadami 27.6km. Section: Aizuwakamatsu – Koide 135.2km. Gauge: 1,067mm. Number of stations: 36. Double track section: none. Telephone section: ...
  23. [23]
    The Best Guide to Where to Photo Tadami Line's Eight Bridges
    Oct 18, 2025 · Trains on the Tadami Line cross the Tadami River eight times. Seven of these bridges connect the train from one side of the riverbank to the ...
  24. [24]
    Rokujurigoe Tunnel - Wikipedia
    Line length, 6,359 m (20,863 ft). No. of tracks, 2. Rokujurigoe Tunnel on Tadami Line. See also. edit · List of tunnels in Japan · Seikan Tunnel undersea tunnel ...Missing: count | Show results with:count
  25. [25]
  26. [26]
    JR Tadami Line - Guides, Transit Search and Itinerary Planner
    The JR Tadami Line is a railroad line in the Fukushima, Japan. You can check the list of all 36 stations on the JR Tadami Line and the JR Tadami Line map.
  27. [27]
    JREast【Tohoku area】info(official) on X: "02/14/2025 at 04:01 ...
    Feb 13, 2025 · 02/14/2025 at 04:01, Tadami Line (between Aizu-Wakamatsu and Aizu-Bange stations) will be suspended all day 15th due to Heavy snow.
  28. [28]
    JREast【Shin-etsu area】info(official) on ... - X
    Feb 26, 2025 · 02/26/2025 at 15:51, Tadami Line (between Aizu-Bange and Ōshirakawa stations) will be suspended all day 27th due to Heavy snow.
  29. [29]
    Tadami Line transfer brings vertical separation to Japanese ...
    Dec 3, 2021 · Part of the storm-damaged Tadami Line in central Honshu has been transferred from JR East ownership to management by the local prefecture.
  30. [30]
  31. [31]
    All aboard one of Japan's most scenic train lines
    Oct 12, 2022 · The rain-wrecked JR Tadami Line came back into full operation from Oct. 1, for the first time since 2011. Locals and locomotive fans alike are glad it's back.
  32. [32]
    Picturesque Japan railway line fully reopens after 11 years
    Oct 1, 2022 · The roughly 9 billion yen ($62 million) in restoration expenses was partly subsidized by the national government, with JR East and the ...
  33. [33]
    Japan: Rural railways struggle against a changing climate | In depth
    Dec 23, 2023 · Agreement was reached to try and rebuild the line by taking advantage of the Disaster Restoration Subsidy scheme, with costs shared by the ...
  34. [34]
    JR東日本 只見線 路線図・停車駅 | レイルラボ(RailLab)
    JR東日本 只見線の路線図、駅一覧、停車駅、乗換案内です。会津若松〜小出間を結ぶ営業距離(営業キロ)135.2Kmの運行路線・系統です。また、乗換案内、鉄道ニュース ...
  35. [35]
    [PDF] 只見線について - JR東日本
    延長 約135.2km ○駅数 37駅. ○沿 革. ・1926年10月 会津若松~会津坂下間が会津線として開業. ・1928年11月 会津線 会津坂下~会津柳津間開業. ・1941年10月 会津線 会津 ...
  36. [36]
    只見線
    Jan 11, 2016 · 只見線 ; 西若松, にしわかまつ, 一般駅, 3.1 ; 会津本郷, あいづほんごう, 無人駅, 6.5 ; 会津高田, あいづたかだ, 旅客駅, 11.3 ...
  37. [37]
    I go on a land of mystery! JR Tadami Line | Uonuma city tourist ...
    With JR Tadami Line. The line of about 135 km of linear full length with which Aizu-wakamatsu Station in Aizuwakamatsu-shi, Fukushima is tied from Koide Station ...
  38. [38]
    The Picturesque Tadami Line that Runs Between Fukushima and ...
    Jul 9, 2019 · Note that the section between Aizu-Kawaguchi and Tadami that has been closed since July 2011 due to rainstorm damage and is bypassed. That ...Missing: isolation | Show results with:isolation
  39. [39]
    Tadami Line - Wikipedia
    The Tadami Line (只見線, Tadami-sen) is a 135-kilometre (84 mi) scenic railway line in Japan operated by East Japan Railway Company (JR East).
  40. [40]
    Development of Large Cities and Progress in Railway Transportation
    Finally, in 1920 a master plan for developing subways lines totalling 80 km in length was adopted as part of the Tokyo Metropolitan City Plan. Generally ...<|control11|><|separator|>
  41. [41]
    只見線の歴史
    JR只見線は、福島県の会津若松駅と新潟県の小出駅を結ぶ全長約135kmの路線です。 会津若松駅を起点とした「会津線」と、小出駅を起点とした「只見線」、また電源開発に伴 ...
  42. [42]
    [PDF] 只見線について - JR東日本
    ・1928年11月 会津線 会津坂下~会津柳津間開業. ・1941年10月 会津線 会津柳津~会津宮下間開業. ・1942年11月 大白川~小出間が只見線として開業. ・1956年9月 会津線 ...
  43. [43]
    [PDF] 只見中線の建設と只見線の全通 - 鉄道・運輸機構
    一方、 新潟県側は、 1935 年に只見. 線として小出・只見間 (46.8km) の. 建設に着手したが 1942 年に小出・. 大白川間を開業させた時点で、 やはり. 戦争の影響により工事 ...
  44. [44]
    只見線(JR東日本)奇跡の復活を果たした絶景の秘境路線 - トレたび
    Sep 13, 2023 · 開業 : 会津若松駅を起点とした「会津線」は1926年10月15日開業。小出駅を起点とした「只見線」は1942年11月1日開業。 全通 : 延伸開業し1971年8月 ...
  45. [45]
    Rain-wrecked Tadami line reopens in full after 11 years
    Oct 1, 2022 · ... torrential rains rendered a 27.6-kilometer stretch unusable ... Rain-wrecked Tadami line reopens in full after 11 years. TADAMI ...
  46. [46]
    JR Tadami Line: Back After 11 Years - Japan Railway Journal
    However, in July 2011, heavy rain washed away the bridges and tracks, resulting in the suspension of service on a section of the line.Missing: causes natural
  47. [47]
    Scenic Tadami Line reopens after storm damage - Railway Gazette
    Oct 5, 2022 · After 11 years of closure following storm damage, the Tadami Line in central Honshu was reopened on October 1. One of Japan's most scenic railways.Missing: regional | Show results with:regional<|control11|><|separator|>
  48. [48]
    JR Tadami Line Draws Fans 1-Year After Reopening
    Oct 2, 2023 · The day marked one year since the JR Tadami Line resumed operation along its entire route after being partially closed due to damage caused by torrential rain ...
  49. [49]
    Rain-wrecked Tadami line reopens in full after 11 years
    Oct 2, 2022 · A popular rail line stretching across Fukushima and Niigata prefectures that is renowned for its breathtaking natural views resumed full operations 11 years ...
  50. [50]
    JR conducts test-run on restored section of Tadami Line
    Sep 7, 2022 · From Oct. 1, services will be operating on the entire line, which connects Aizu-Wakamatsu in Fukushima Prefecture and Uonuma in Niigata ...Missing: East | Show results with:East<|separator|>
  51. [51]
    【只見線】失敗しない秘境路線の旅。どうやって乗る? 何を見る?
    Mar 28, 2025 · さて、只見線の列車は4番ホームから発車します。車両はキハ110系またはキハE120形。どちらも向かい合わせのクロスシートとロングシートを組み合わせた ...
  52. [52]
    キハ100系・キハ110系 - JR東日本
    電車並みの加速性能を持っているため、ローカル線のスピードアップに大きく寄与しました。車内はセミクロスシートが基本ですが、ロングシート、リクライニングシート、展望 ...
  53. [53]
    [PDF] 只見線全線運転再開 1 周年を記念したキハ 110 系車両の塗色変更 ...
    1.キハ 110 系車両の塗色変更概要 ・対 象 車 両:キハ 110-135 号機(1 両) ・運用開始時期:2023 年 9 月 ・区 間:只見線 会津若松-小出間 ・内 容:かつて只見線で活躍して ...
  54. [54]
    只見線にキハE120形導入 既存8両をデザイン変更 鉄道復旧工事は ...
    Nov 28, 2019 · JR東日本仙台支社は2019年11月28日(木)、キハE120形ディーゼルカーを只見線に導入すると発表しました。 車両は現在、新潟地区の羽越本線や米坂線、信越本 ...
  55. [55]
    Tadami Line: Out-of-the-Way Local Railway with Splendid Scenery
    And the No. 1 Tadami River Bridge along the line in particular is constantly ranked as one of the best three bridges in Japan.Missing: single | Show results with:single
  56. [56]
  57. [57]
    Goodbye to the Old Diesel Rail-cars in the JR East Area
    Mar 20, 2020 · The JR East KiHa 40 series was retired from the tracks one after another in the past few years. For instance, it was replaced by the state-of- ...<|separator|>
  58. [58]
  59. [59]
    Tadami Line Kiha 110 train photos - Facebook
    Mar 20, 2024 · Oigawa Railway (大井川鐵道) ex-Japanese National Railways 2-6-4T steam locomotive C11. ... operation was ended on 21 March 2022. Photos ...Japanese Class C11 tank engines history - FacebookHisatsu Line railway restoration in Japan - FacebookMore results from www.facebook.com<|separator|>
  60. [60]
    'World's most romantic railway' in Japan and its sudden change in ...
    Feb 8, 2021 · The Tadami railway line runs for 135km (84 miles) through the Tohoku region, the northernmost part of Japan's main Honshu island, connecting the ...<|separator|>
  61. [61]
    Tadami Line Autumn Tour - Nature - Aizu Area - Fukushima Travel
    The Tadami Line Autumn Tour offers an immersive journey through the scenic and cultural heart of the Oku-Aizu region, famous for its gorgeous autumn colours.Missing: foliage NHK
  62. [62]
    The Role of Hometown-Visiting Family Members in Shimogo, Japan
    Shimogo, situated in Minami–Aizu, is particularly relevant to this study, exhibiting an exceptionally high aging rate of 44.8% in 2020, exceeding both the ...
  63. [63]
    Local trains in Fukushima 1 (Abukuma Express, Iizaka Line)
    Jun 25, 2023 · On the other hand, the population aging rate (percentage of the population aged 65 and over) in Fukushima Prefecture is 32%, higher than the ...
  64. [64]
    Recommendations to save Japan's rural railways issued
    Jul 28, 2022 · JR East's Koumi Line is estimated to be the least used railway in Japan, carrying on average 978 passengers per day on the 18 km section ...
  65. [65]
    Comparative analysis of the socioeconomic changes in biosphere ...
    Fig. 3 shows annual population decline rates among six BR municipalities ranged from −1.2 % (Hakusan city) to −23.9 % (Tadami town) in the target years: 2010− ...
  66. [66]
    [PDF] Fukushima Today
    JR Tadami Line resumed full operations. On 1 Oct. 2022, the track between Aizu-Kawaguchi station and Tadami station, which was severely damaged by the ...
  67. [67]
    The end of the line? | Spike Japan
    May 20, 2012 · Most accounts say there were seven passengers and two crew—astoundingly the line was never converted to driver-only operation—on board at the ...
  68. [68]
    [PDF] JR East Group Report INTEGRATED REPORT 2022
    Status of the Tadami Line (between Aizu Kawaguchi and. Tadami) which was damaged by the Niigata-Fukushima torrential rains in July 2011. In response to requests ...
  69. [69]
  70. [70]
    JR只見線、地方鉄道再生の試金石 11年ぶり全通へ - 日本経済新聞
    Sep 29, 2022 · ... 費用対効果の議論はいずれ必ず起きる」と指摘。「運賃だけでなく、只見線による地域の広告宣伝など経済波及効果を数字で示すべきだ」と話す。 運行 ...
  71. [71]
    「鉄道維持費5.5億円に対し経済効果6.1億円」のJR只見線、増便と接続 ...
    May 21, 2024 · 復活後1年間の只見線については、福島県の推計結果を単純に365で割ると1日約130人が鉄道で沿線を来訪して、福島県内で約8,700円を消費、それが波及して約 ...Missing: 論 | Show results with:論
  72. [72]
    只見線の維持費用 - 新島八重顕彰会
    2025年からの維持費を当初予想年間3億円としていたようだが、老朽化したトンネルや橋梁の安全対策のため年平均6億7000万にのぼるらしい。管理者の県や沿線17市町村が ...
  73. [73]
    [PDF] 奇跡の全線運転再開を遂げたJR只見線の経緯と課題
    誰のための黒字化なのか、鉄路存続だけを目的化し費用対効果があまりみられないことや、鉄路の維持. のため福島県や周辺市町村が実質赤字部分を税金で補填し続けても ...