Track spacing, also known as track center distance, refers to the horizontal distance measured between the centerlines (or axes) of adjacent railway tracks. This parameter is essential in railway infrastructure design to provide sufficient clearance for movements, maintenance equipment, and adjacent structures while minimizing land use and construction costs. Standards for track spacing are determined by national regulations, engineering guidelines, and operational requirements, often varying by line type, speed limits, and geographic region. In conventional lines, minimum spacing is typically 3.50 meters, while new high-speed lines (up to 300 km/h) require at least 4.50 meters to accommodate larger loading gauges and safety buffers. In the United States, the does not mandate specific distances but defers to state agencies and industry standards from the American Railway Engineering and Maintenance-of-Way Association (AREMA); for example, specifies minimums of 14 feet (4.27 meters) for main tracks operating at speeds up to 80 mph, 15 feet (4.57 meters) for speeds of 80-125 mph, and 16 feet (4.88 meters) for speeds of 125 mph and above. On curved sections, spacing is increased based on the degree of curvature and superelevation to account for the wider path of outer rails and vehicle overhang, typically adding several inches (e.g., 1 inch per 0.5° of curvature in U.S. practice) to prevent interference between trains on adjacent tracks. Inadequate track spacing can lead to operational restrictions, such as reduced speeds or prohibited simultaneous use of , and poses risks during loading, unloading, or emergencies; for instance, U.S. regulations (49 CFR 214.7) define adjacent tracks as those less than 25 feet apart, requiring specific procedures for certain maintenance-of-way activities to avoid hazards.

Definition and Fundamentals

Definition

Track spacing in refers to the horizontal distance between the centerlines of adjacent parallel , measured perpendicular to the rails and typically expressed in meters or feet. This measurement, also known as track center distance, ensures sufficient separation for safe train operations on multi-track lines. Key related terminology includes the track center, which denotes the precise distance between these centerlines, and the clear distance, defined as the unobstructed space between the inner edges of the rails or sleepers on adjacent tracks after subtracting the track gauge from the track center distance. Minimum spacing requirements are established to accommodate the physical dimensions of rolling stock, including minimum safe operations that prevent interference between trains. For instance, in metric systems common in Europe, a minimum track center of 3.50 meters provides a safety margin beyond the combined vehicle overhangs, while 4.50 meters is required for new high-speed lines up to 300 km/h, though some agreements like the AGC specify 4.2 meters for new lines. The primary rationale for track spacing is to avert collisions between trains on parallel tracks by accounting for overhang, lateral due to speed or , and potential displacements over time. This separation allows trains to pass safely without structural contact, even under dynamic conditions. In imperial measurement systems, such as those historically used in the UK and , spacings like 13 feet 6 inches have been applied on main lines to achieve similar objectives, though actual values vary by and type.

Historical Development

The historical development of track spacing in railways traces back to the early , when the first public steam-powered lines emerged from horse-drawn s. In these initial systems, spacing between parallel tracks was largely ad-hoc, derived from pre-railway wagonway practices. As proliferated after the , the demands for reliable double-track configurations prompted the evolution toward fixed standards to prevent collisions and facilitate operations; for instance, the , the world's first inter-city steam passenger line opened in 1830, used initial spacings on its double-track route that were later increased for safety. In the 1840s, the saw significant variation with the adoption of broad (7 ft ¼ in) by Isambard Kingdom Brunel's Great Western Railway, which required wider track spacing to accommodate larger while preserving the conventional "six-foot" clearance—the historical interval between the inner rails of adjacent tracks, originally sized for foot traffic and loading. This resulted in broad track centres of roughly 13 feet (3.96 m) to maintain operational safety and stability, contrasting with standard lines (4 ft 8½ in) that typically used 10 feet 6 inches (3.20 m) centres, reflecting the Industrial Revolution's push for efficiency in freight and passenger transport amid competing engineering philosophies. These early discrepancies highlighted the need for uniformity, influencing later national regulations. The brought international standardization efforts, particularly through the (UIC), founded in 1922 but active in during the , when Leaflet 505 began outlining structure gauges and minimum centre calculations based on profiles and margins. in accelerated metric adoption, with many rebuilt lines standardizing on 4.5 m centres by the 1960s to support heavier loads, , and , as seen in the calculation of minimum distances from half- gauges (e.g., 1,575 mm per side plus 400 mm clearance, rounded to 3.50 m for legacy tracks but expanded for modern use). Technological advances in further shifted practices; the , launched in 1964 as the world's first high-speed line, adopted 4.2 m track centres to optimize aerodynamic stability, centrifugal forces on curves, and land efficiency for speeds up to 210 km/h, while allowing wider vehicle bodies than conventional narrow-gauge networks.

Standards and Regulations

International Standards

The (UIC) establishes key guidelines for track centre distances through its technical leaflets, particularly in the 505 series, which define kinematic envelopes for and their implications for clearance and parallel track spacing. For standard-gauge (1,435 mm) tracks on conventional lines operating at speeds up to 200 km/h, the minimum distance between track centres is 4 m to ensure safe passage without structural interference. On high-speed lines exceeding 250 km/h, this increases to at least 4.5 m, and up to 5 m in some configurations, to account for enhanced and aerodynamic effects. In regions with high track density, UIC recommendations may specify a baseline of 4.7 m for standard-gauge s to provide adequate access and against sway, though actual implementation can vary based on local adaptations of these leaflets. Complementing UIC standards, the American Railway Engineering and Association (AREMA) advises a minimum of 14 feet (4.27 m) between track centres for mainline applications, balancing equipment overhang and operational safety on North American networks. These benchmarks are shaped by several critical factors, including operational speeds, which demand wider spacing at higher velocities to mitigate pressure waves between passing vehicles; variations, such as the broader 1,520 mm Russian gauge requiring additional clearance for wider profiles; and requirements, where overhead systems necessitate extra lateral space to avoid entanglement or electrical hazards. Globally, while UIC and AREMA set rigorous minima for dense or high-speed corridors, some networks in developing regions adopt 3.5 m as a cost-effective for low-speed freight lines, contrasting with urban systems that often exceed 5 m to support and .

National and Regional Variations

In , track spacing standards reflect a balance between high-speed operations and legacy infrastructure. For high-speed lines in and , such as the network, centers are typically spaced at 4.5 meters to accommodate aerodynamic effects and safety clearances during high-velocity passes, deviating from narrower urban configurations. In the , the nominal distance between track centers on straight track is 3.4 meters, with urban sidings often employing reduced spacings of approximately 3.35 meters to optimize space in constrained environments. North American practices emphasize freight efficiency alongside passenger needs, with the not mandating specific centers but industry guidelines applying. For freight lines, a minimum of 13 feet (3.96 meters) is common in yards and low-tonnage branches, while passenger routes require at least 15 feet (4.57 meters) to ensure platform access and overhang safety. standards, for instance, specify 14 feet (4.27 meters) between adjacent tracks and 25 feet (7.62 meters) from main lines to new constructions, prioritizing operational separation. In , standards adapt to dense populations and high-speed demands. Japan's Shinkansen lines mandate a minimum track center distance of 4,200 millimeters between main tracks and 4,300 millimeters to sidings, supporting speeds up to 300 km/h while maintaining structural integrity. , handling mixed traffic on broad gauge (1,676 mm), sets minimum center-to-center distances at 4,265 millimeters for existing straight tracks and 5,300 millimeters for new works, allowing flexibility in congested networks. Regional variations often stem from environmental and historical factors. In seismic-prone areas like , track designs incorporate enhanced resilience—such as base isolation and monitoring systems—but maintain standard spacings without additional clearance mandates for effects alone.

Measurement and Geometry

Measurement Methods

Track spacing in railways is typically measured using a combination of direct and indirect methods to ensure precision in determining the distance between track centers, which is essential for and . Direct methods involve manual or semi-automated tools applied at specific points along the s. For instance, steel tape measures are used to the horizontal distance between the inner edges of rail heads on adjacent tracks, often from established reference points like rail centers, achieving accuracies of approximately 10 mm under controlled conditions. s, which combine theodolite functionality with laser rangefinders, allow for non-contact measurements from rail centers, reducing human error and enabling quick assessments in straight sections or yards. These techniques are particularly suited for localized verification during or , where physical access to the track is feasible. Indirect methods employ advanced equipment for broader or more complex layouts, integrating data across extended distances. Total stations, electronic instruments that measure and distances optically, are positioned at control points to compute track center positions via , often combined with (GPS) receivers for in open areas. For large-scale networks, cars—specialized vehicles equipped with inertial measurement units, lasers, and cameras—traverse the rails at operational speeds to capture dynamic data on spacing, , and other parameters, integrating results into digital models for analysis. These systems, such as those using light-section , provide millimeter-level precision while minimizing track disruptions. Verification of track spacing follows established protocols to maintain compliance with safety standards. Periodic inspections are conducted to maintain compliance with safety standards, using automated track recording to measure . Frequencies vary by national regulations and line class. Dynamic assessments during train passes incorporate accelerometers and sensors to evaluate spacing variations in real-time, ensuring that deviations do not exceed allowable limits for vehicle clearance. These protocols often include cross-referencing with historical to detect progressive changes. Measuring track spacing presents several challenges that must be addressed for reliable results. Track wear from wheel- can alter rail profiles, necessitating adjustments in reference points during measurements to avoid inaccuracies in determination. Temperature-induced rail or contraction can cause minor shifts in (typically less than 0.1 mm per °C for gauge-related effects), requiring measurements at standardized temperatures or compensatory calculations based on environmental data. Additionally, uneven settlement may cause lateral track shifts, complicating static surveys and demanding repeated checks or integration with for subsurface stability assessment. Accurate measurement of track centers is vital for these evaluations, as outlined in track center calculations.

Track Center Calculations

Track center calculations in determine the minimum distance between the centerlines of parallel to ensure safe passage of , accounting for dimensions, dynamic movements, and margins. The fundamental approach involves summing the extents of the vehicle envelopes from each track center, including allowances for overhang and clearance, adjusted for the . These calculations align with standards such as UIC loading gauges (e.g., or ), which define maximum cross-sections. This ensures that even under operational conditions, such as or track irregularities, on adjacent maintain adequate separation. For more precise computations, especially at higher speeds, a detailed equation incorporates dynamic effects: \text{Minimum center distance} = (\text{Max vehicle envelope width} + 2 \times \text{dynamic sway factor}) + \text{safety buffer} The maximum vehicle envelope width is the broadest cross-sectional dimension, often around 2.9–3.15 m for standard gauges. The dynamic sway factor accounts for lateral oscillations due to suspension, track geometry, and speed, approximated at 0.3 m for trains operating above 100 km/h. The safety buffer, typically 0.2 m, provides additional contingency for maintenance tolerances and unforeseen movements. This formulation aligns with kinematic gauge standards, where sway is modeled quasi-statically based on vehicle flexibility coefficients around 0.4, adjusted for height and superelevation. Gauge adjustments are essential for ; for the standard of 1,435 mm (1.435 m), the centerline offset is half the (0.7175 m) from each , incorporated into positioning relative to the . This ensures the reference point, centered over the , maintains proper separation without encroaching on adjacent . In non-standard , such as 1,000 mm or 1,520 mm, the adjustment scales proportionally, recalculating the centerline offset based on . Modern calculations often employ software tools like CAD or BIM systems for simulations, integrating these formulas with to visualize envelopes and verify clearances. For instance, high-speed trains at 250 km/h, with enhanced considerations, typically require centers of 4.8 m to accommodate the expanded kinematic profiles under UIC or equivalent standards. These tools allow iterative adjustments, ensuring compliance before field verification.

Design Considerations

Straight Track Applications

In straight track applications, track spacing is primarily determined by the need to ensure safe clearance for passing trains, access, and without compromising structural integrity. For double-track main lines, standard center-to-center distances typically range from 4.2 to 4.5 meters, allowing trains to pass each other at speeds up to 200-300 km/h while maintaining aerodynamic and lateral clearances. This spacing accommodates the overhang of and provides a buffer against dynamic , as seen in high-speed networks where narrower 4.0-meter centers are used for lines operating at 200 km/h, increasing to 4.5-5.0 meters for higher velocities. In conventional main lines, such as those , minimum centers of 4.3 meters (14 feet) are mandated for parallel standard-gauge tracks to prevent interference during operations. For multi-track configurations in straight alignments, spacing is optimized to balance and safety, often with minimums of 3.8 meters between inner tracks in quadruple or greater setups, gradually increasing outward to 4.5 meters or more for outer tracks to account for cumulative clearance needs. This graduated approach, common in high-density corridors like main lines, ensures that inner pairs maintain tight efficiency for bidirectional flows while outer spacings provide additional margin for equipment like maintenance vehicles. , multi-track main lines adhere to at least 4.1 meters (13 feet 6 inches) between centers, with adjustments for or signaling infrastructure. Optimization of track spacing in straight sections weighs economic factors against performance requirements, with closer centers in low-speed areas yielding significant cost savings through reduced land acquisition and earthwork. For instance, in yards and sidings where speeds are limited to 15-25 km/h, centers as narrow as 3.5 meters can be implemented for new double-track lines in conventional networks, minimizing expenses while still permitting shunting operations. Conversely, high-capacity corridors demand wider spacing—often exceeding 4.5 meters—to support frequent high-speed services and future expansions, justifying the premium through enhanced throughput and reduced downtime risks; for example, some high-speed lines use 4.8-5.3 meters for operations up to 350 km/h as of 2023. Base track center calculations, as outlined in standards, inform these decisions by factoring in dimensions and speed profiles. Straight track spacing also integrates essential infrastructure elements to maintain operational flow. Adequate centers allow for signal gantries positioned between tracks, requiring at least 7.62 meters (25 feet) in U.S. electrified territories to avoid fouling points and ensure worker access during maintenance. For passenger , spacing from the track center to the platform edge is typically 2.0-2.5 meters, but the overall track-to-track must exceed 5.0 meters in setups to accommodate bidirectional loading without encroachment. Overhead electrification lines, including supports, necessitate centers of at least 4.2 meters to position masts safely between or adjacent to tracks, preventing interference with pantographs during straight-line travel. These integrations prioritize uniform straight alignments to simplify installation and inspection, enhancing overall reliability.

Curved Track Adjustments

In curved sections of railway tracks, the spacing between parallel track centers must be increased beyond the baseline used for alignments to accommodate , including body overhang and lateral shifts caused by . This widening ensures that the minimum lateral clearance between vehicles on adjacent tracks remains adequate, preventing potential collisions while allowing for safe passage at design speeds. The primary goal is to maintain the same effective clearance as in sections despite the outer path being longer and vehicles tending to swing outward due to centrifugal forces. The curve widening accounts for end-throw and overthrow using versine approximations: end-throw ≈ (L² - C²)/(8R) and overthrow ≈ C²/(8R), where L is , C is , and R is (all in consistent units). For broad gauge (BG, ), empirical values are end-throw = 29,600 / R mm and overthrow = 27,330 / R mm (R in meters), with total extra clearance per ≈ overthrow + end-throw + ( ≈ 1/4 , = h e / G; h=height, e=superelevation, G=). Widening for adjacent tracks is approximately twice this value. For instance, on a 500 m radius with standard BG parameters, the widening adds approximately 0.1 m to the center-to-center distance. For sharp curves with radii less than 300 m, minimum track centers are typically set at 5 m to sufficiently counter amplified centrifugal forces and ensure stability. Empirical standards, such as those in for broad gauge, further specify end throw as approximately 29,600 / R mm and overthrow as 27,330 / R mm, leading to a total widening of about twice their sum for adjacent tracks. Historically, early 19th-century railway designs often used spacings as narrow as 3.5-4.0 m on curves due to smaller vehicles and lower speeds, but 20th-century advancements shifted to 4.5–5.5 m minima to enhance amid larger and higher velocities. In practice, these widenings are implemented gradually through transition spirals, where the track centers ease from straight-track values to the full curved adjustment over lengths of 50–100 m, depending on speed and radius. This gradual change minimizes abrupt shifts in cant and , reducing dynamic forces on wheels and rails while improving ride comfort and track longevity. Spiral lengths are often calculated as L_s = V^3 / (C R), with C a constant (e.g., 800 for metric units), ensuring the rate of change stays within limits like 0.1–0.2 m/s³ for lateral .

Safety and Incidents

Safety Implications

Track spacing plays a critical role in railway safety by providing essential buffers against operational hazards such as vehicle sway, aerodynamic effects from wind gusts, and potential intrusions from derailed equipment. Typical safety margins include dynamic electrical clearances of approximately 220 mm (8.7 inches) for overhead contact systems in high-speed dedicated sections, accounting for pantograph lateral deflection under crosswinds up to 60 mph (26.8 m/s), with minimum clearances of 170 mm (6.7 inches) in shared corridors to prevent arcing or contact failures. These margins, combined with wider track center distances (e.g., greater than 15 feet), reduce the likelihood of adjacent track interference and contribute to overall risk mitigation by limiting the propagation of derailments. Risk assessment models quantify the probability of intrusion into adjacent tracks as a of track spacing, incorporating factors like lateral from and speed. One such model uses a for derailed equipment , where the of intrusion given , P(I|D), is calculated as P(I|D) = P_{CF} \times P(x \geq X), with X representing track center spacing and P_{CF} the crash wall probability (1 without barriers). Intrusion risk scores increase significantly with narrower spacing—for instance, spacings of 15 feet or less yield a factor of 5.0, compared to 1.0 for over 80 feet—highlighting how inadequate spacing elevates the potential for secondary collisions, particularly at higher speeds where amplitude amplifies . Overall adjacent risk is further modeled as R = P(A) \times P(I|A) \times P(T|I) \times C, where spacing directly influences the intrusion term P(I|A), emphasizing its role in preventing close calls and full incidents. Modern systems like the (ETCS) Level 2 enhance safety through continuous radio-based communication between trains and trackside equipment, enabling real-time supervision of train positions and enforcement of speed profiles that account for , including spacing constraints. This level supports shorter train separation distances while maintaining safety margins, indirectly promoting compliance with spacing-related limits by integrating onboard integrity monitoring and automatic braking to avert intrusions. Human factors addresses spacing limits by instructing operators on adjacent-track procedures, such as restricting speeds to 25 when roadway workers are present on nearby tracks, to minimize risks from overspeeding or unexpected movements. These protocols, mandated under federal standards, ensure awareness of how reduced spacing amplifies hazards from sway or misalignment, fostering safer operations through on-the-job and classroom instruction.

Notable Accidents

One notable incident highlighting the risks associated with adjacent track intrusion occurred on March 2, 2024, in , involving three Southern freight trains. The first collision between eastbound intermodal train 268H429 and intermodal train 24XH101 resulted in railcars derailing and fouling the adjacent main track 1, due to the failing to adhere to restricted speed. Less than two minutes later, westbound merchandise train 19GH501 struck the derailed cars at approximately 40 mph, causing further derailments. The NTSB investigation emphasized that the close proximity of parallel tracks amplified the potential for cascading failures, underscoring the need for adequate track center spacing to mitigate intrusion risks. In the United Kingdom, the June 3, 2015, freight train derailment at Angerstein Junction near Charlton, south-east London, demonstrated how derailments can foul adjacent lines when track spacing is constrained by urban infrastructure. An empty freight train from Hoo Junction derailed when the leading wheelset of the 11th wagon passed over trap points, with the incident attributed to uneven wheel loading from a locked suspension and bogie twist. The derailed wagon and subsequent wagons came to rest foul of the adjacent Up North Kent line, halting services for several hours; fortunately, the adjacent line was not operational at the time, preventing a secondary collision. The Rail Accident Investigation Branch (RAIB) report noted that the site's tight track geometry increased the vulnerability to such intrusions, leading to recommendations for improved wagon inspection and track monitoring to prevent escalation in closely spaced corridors. These cases illustrate broader engineering lessons from adjacent track accidents (ATA), where derailed equipment intrudes upon parallel tracks, potentially causing secondary collisions. Research on shared rail corridors indicates that track center spacing is a critical factor in intrusion probability; narrower spacings (e.g., under 4 meters) heighten risks, particularly on curves or in high-density areas, as derailed cars can more easily reach adjacent lines. For instance, analyses of U.S. data show that intrusion rates decrease with wider centers (e.g., 15 feet or more), emphasizing the role of standards like those in AREMA guidelines, which recommend minimums of 13-15 feet for main lines to buffer against such failures. While primary causes often involve derailments from other factors like defects or speed, inadequate spacing can transform isolated events into multi-train disasters, prompting ongoing audits and barrier installations in vulnerable sections.

References

  1. [1]
    Track centreline distance - Trackopedia
    The track spacing e is measured as the distance apart of the track centres (track axis) parallel to the rail heads concerned. The surveying of the distance ...
  2. [2]
    Track spacing - Construction dictionary
    Track spacing - This is the distance measured in a normal tread to the axis between the axes of two adjacent tracks on a double track line, or between the ...Missing: definition | Show results with:definition
  3. [3]
    Track | FRA - Federal Railroad Administration
    Mar 6, 2025 · Track Clearances. What is the required spacing or distance between railroad tracks? With respect to track centers (track separation distances) ...<|control11|><|separator|>
  4. [4]
    [PDF] Amtrak Track Design Specification 63
    The required width at the top of the subgrade for the addition of a track adjacent to an existing track, measured from the centerline of the existing track, is ...
  5. [5]
    EUROPEAN AGREEMENT ON MAIN INTERNATIONAL RAILWAY ...
    A minimum distance between track centres of 4.2 m has therefore been selected. ... This is sufficient for high speeds up to 300 km/h (e.g. the new Paris - south- ...
  6. [6]
    [PDF] Railroad Clearances and Walkways, Chapter 296-860 WAC
    Track clearance. The shortest distance between the centerlines of adjacent railroad tracks. Walkways. Pathways located alongside or in the vicinity of a ...
  7. [7]
    [PDF] MOD UK railways permanent way design and maintencance - GOV.UK
    Standard gauge has traditionally been 1435mm (4' 8½”) and refers to the distance between the inside faces of each running rail. Some track, mainly continuously.
  8. [8]
    Track gauge: Different degrees of separation - Trains Magazine
    Sep 25, 2023 · Standard gauge is 4 feet, 8-1/2 inches. This is the gauge used when steam railroading began. It became the common gauge of Britain, North America, and Western ...
  9. [9]
    Liverpool & Manchester Railway: A Historic Milestone
    The 31 mile Liverpool and Manchester Railway (L&MR) had to go through some very difficult terrain. Constructing the line presented huge challenges.
  10. [10]
    British Track Gauge & Loading Gauge - IGG.org
    The first railway to use what became the 'standard gauge' of four foot eight inches (1.4m) was the Willington Colliery wagonway, built by George Stephenson in ...
  11. [11]
    [PDF] Loading Guidelines-Volume 1-01042025
    Apr 1, 2025 · Compliance with this gauge should be measured from rail level on horizontal track on a straight line. Account must be taken of any restrictions ...
  12. [12]
    [PDF] Technical Regulatory Standards on Japanese Railways
    (2) The distance between track centers of Shinkansen (excluding superconducting magnetic levitation railways) shall be as follows. ① The distance between track ...
  13. [13]
    [PDF] FAST TRACK TO SUSTAINABLE MOBILITY
    Track centre distance: For 200km/h: 4m. For 300km/h: 4.5/5m. Maximum cant: 150/170mm. Minimum curve radius: DEVELOPMENT OF THE WORLD HIGH SPEED NETWORK. 0. 5000.
  14. [14]
    [PDF] High speed rail - UIC - International union of railways
    track centre distance. 200km/h (125mph): 4m (12 feet). 300km/h (185mph): 4.5/5m (13,5/15 feet). Maximum cant. 150/170mm (6/6,8 inches). UIC study on. “ ...
  15. [15]
    [PDF] BNSF RAILWAY COMPANY
    Jul 1, 2023 · At road crossings the set-back distance for storing rail cars on multiple adjacent tracks (track centers less than 25') is 250 feet from the ...<|control11|><|separator|>
  16. [16]
  17. [17]
    European track spacing | RailUK Forums
    Aug 31, 2016 · From 1990 onwards spacing is set at 4,0m up to 2010, and normally grouped in pairs when more than two tracks run alongside. (2+1; 2+2; 2+2+1; ...
  18. [18]
    [PDF] INDIAN RAILWAYS SCHEDULE OF DIMENSIONS 1676mm Gauge ...
    Minimum horizontal distance from centre of track to any structure from rail level to 305mm above rail level. (i) For existing works. 1675mm. (ii) For new works ...
  19. [19]
    Choosing the Right Technique for Surveying Railroads
    Aug 27, 2020 · Various surveying techniques are available to provide railroads with the optimum survey results required to accommodate specific projects.
  20. [20]
    [PDF] Track Geometry Measurement System TGM
    The TGM uses the light section method to generate 3D data, measuring track geometry with millimeter precision at high speed, using a laser and cameras.
  21. [21]
    [PDF] Review of Standards for Track Inspection and Maintenance
    May 20, 2022 · The figure shows that track geometry defects are the leading subgroup, with about 37% of the total, followed by special trackwork, with 3%, and ...
  22. [22]
    Review of factors affecting stress-free temperature in the continuous ...
    This paper reviews and discusses the factors affecting stress-free temperature in ballasted railway track with continuous welded rails (CWR).1. Introduction · 2. Stress-Free Temperature · 3. Factors Affecting...
  23. [23]
    Investigation of the Causes of Railway Track Gauge Narrowing - MDPI
    Aug 10, 2023 · The main objective of the research was to investigate the causes of localized defects of gauge narrowing in railway tracks based on machine and manual track ...1. Introduction · 1.2. Literature Review · 4.2. Loads And Supports
  24. [24]
    Effects of the application of the kinematic gauges defined in the 505 ...
    In stockNov 1, 2007 · ... gauges set out in UIC Leaflet 505-1 can safely negotiate structures and pass other rolling stock (distance between track centre lines).
  25. [25]
    [PDF] Clearances - Railway infrastructure - RISSB's
    Mar 4, 2019 · The lateral clearances and track centres in Table 1 take into account kinematic effects, curve effects for 26 m long vehicles on curves of 150 m ...
  26. [26]
    3739. Clearance Between Parallel Standard Gage Tracks.
    The minimum distance between the center lines of parallel standard gage tracks shall be 14 feet except as hereinafter provided.Missing: double multi-
  27. [27]
    [PDF] Rail Operating Code - Shield
    Oct 6, 2025 · • Restricted clearance: track centre spacing less than 3.8m. • Standard clearance: track centre spacing more than 3.8m. • Foul zone: the ...
  28. [28]
    Clearances | PA PUC
    The minimum distance between the center lines of parallel tracks shall not be less than 13 feet, six inches, (13'6") for main tracks and not less than thirteen ...Missing: multi- | Show results with:multi-
  29. [29]
    Track spacing - Wikipedia
    The track spacing is the distance between the track centres of double-track railway lines. There are standard distances derived from the standard loading gauge ...
  30. [30]
    [PDF] A GUIDE TO OVERHEAD ELECTRIFICATION OCTOBER 2021
    OLE masts might need to be positioned on platforms if there is not sufficient space between tracks for them, and they may have to be punched through ...
  31. [31]
    Railway Engineering: Extra Clearance on Curves - BrainKart
    Aug 3, 2016 · The extra clearance required at the centre of the vehicle, which projects towards the inside of the curve, is called overthrow and is given by ...Missing: indian centers
  32. [32]
    [PDF] Railway Curves - iricen
    The focus, however, is to provide the reader with provisions in the manuals as well as maintenance tips to avoid problems in laying/ maintaining curved tracks.
  33. [33]
    [PDF] TRACK MODERNISATION CHAPTER V CURVES AND ...
    The chord deflection method is one of the most popular methods of laying the curves on the Indian. Railways. The method is particularly suited to confined ...
  34. [34]
    (PDF) On the Planning and Construction of Railway Curved Track
    Aug 5, 2025 · This paper discusses the laying methods of circular, vertical and transition curves. Key aspects in laying a curved track e.g. widening of gauge ...
  35. [35]
    [PDF] OCS Requirements - California High-Speed Rail Authority
    Aug 26, 2010 · ... pantograph sway and pantograph ... for safety under all conditions (including strong winds and slight misadjustments of pantographs),.
  36. [36]
    [PDF] Shared Rail Corridor Adjacent Track Accident Risk Analysis
    There are several safety concerns associated with operating passenger and freight trains on shared-use rail corridors (SRC). Adjacent track accident (ATA) is ...Missing: implications | Show results with:implications
  37. [37]
    [PDF] probabilistic risk assessment of railroad train adjacent track ...
    6.4.2 Conditional Probability of Intrusion. Track center spacing: The current intrusion probability model uses track center spacing as the only quantitative ...
  38. [38]
    [PDF] ERTMS/ETCS LEVELS
    The ERTMS/ETCS “levels” define different uses of ETCS as a train control system, ranging from track to train communications (Level 1) to continuous.Missing: compliance | Show results with:compliance
  39. [39]
    Impact of track discretisation on conflict detection and resolution ...
    Under ETCS Level 2 MB, the train separation is the shorter than under ETCS Level VB due to the independence of track discretisation.
  40. [40]
    49 CFR § 214.336 - On-track safety procedures for certain roadway ...
    Adjacent track means a controlled or non-controlled track whose track center is spaced less than 25 feet from the track center of the occupied track. Inter- ...
  41. [41]
    Railroad Workplace Safety; Adjacent-Track On ... - Federal Register
    Jan 10, 2014 · The Final Rule requires that a non-controlled track whose track center is spaced 19 feet or less from the track center of the occupied track be ...
  42. [42]
    [PDF] Norfolk Southern Railway Multitrain Collision and Derailment - NTSB
    Apr 10, 2025 · 1 As a result of the first collision, train NS268H429 derailed three railcars that then fouled the adjacent main track 1.2 Just over 1 ...
  43. [43]
    [PDF] Rail Accident Report - GOV.UK
    Jun 4, 2016 · 6 The derailment occurred within the length of a set of curved trap points, approximately 50 metres before the line from Angerstein Wharf ...