Fact-checked by Grok 2 weeks ago

National Wealth Fund (United Kingdom)

The National Wealth Fund (NWF) is a government-owned policy bank in the , established on 14 October 2024 through the rebranding and statutory empowerment of the UK Infrastructure Bank, with £7.3 billion in public seed capital to de-risk and mobilize private investment into high-impact sectors such as clean energy, advanced manufacturing, ports, and gigafactories. Headquartered at 2 Quay in , the NWF operates as a limited company under the oversight of , prioritizing projects that align with national priorities like , , and net zero transitions while accepting elevated risks to crowd in private capital wary of long-term, capital-intensive ventures. In its initial months, the fund reported unlocking £1.6 billion in private and supporting 8,600 jobs, primarily through partnerships in clean power and , with ambitions to leverage its public allocation into over £70 billion total by focusing on sectors where market failures hinder private funding. Critics have highlighted the NWF's origins as a of the pre-existing UK Infrastructure Bank—launched in 2021 with a £22 billion lending capacity under the prior government—arguing that the fanfare obscures limited new fiscal commitments and risks inefficient allocation of taxpayer funds to politically favored green initiatives amid fiscal constraints.

History

Origins and Precursor Institutions (2020–2023)

The origins of the National Wealth Fund trace to the establishment of the UK Infrastructure Bank (UKIB), announced by Chancellor Rishi Sunak on 25 November 2020 within the government's Spending Review and National Infrastructure Strategy. This initiative aimed to catalyze private investment in infrastructure projects supporting net zero emissions, regional development, and economic recovery post-COVID-19, with an initial commitment of £22 billion in public funding—£12 billion for general infrastructure and £10 billion for green initiatives. The UKIB was formally incorporated as a government-owned entity and launched operationally on 17 June 2021, headquartered in to promote regional economic balance. Modeled partly on predecessors like the Green Investment Bank (established 2012 and privatized in 2017), it focused on providing loans, equity, and guarantees to de-risk participation in large-scale projects, rather than direct public spending. By mid-2021, the began issuing financing to local authorities and private partners, prioritizing areas such as clean energy, transport, and digital infrastructure. From 2021 to 2023, the UKIB expanded its activities amid scrutiny over its setup speed and governance. A 2022 National Audit Office report highlighted the rushed creation, noting the bank operated initially without full adherence to the UK Corporate Governance Code, though it established investment processes aligned with strategic objectives. By 2023, it had committed funds to projects like offshore wind and flood defenses, but faced parliamentary criticism for limited deal flow and questions on its additionality beyond existing private finance. These early years laid the institutional groundwork, with the UKIB's policy bank model directly evolving into the broader mandate of the National Wealth Fund in 2024.

Establishment and Rebranding (2024)

The National Wealth Fund (NWF) was formally established on 14 October 2024 through the rebranding of the UK Infrastructure Bank (UKIB), a policy bank created in June 2021 to support infrastructure projects with an initial capital endowment of £22 billion. The transformation, announced by , expanded the institution's mandate beyond traditional infrastructure to prioritize mobilization of private capital into high-impact sectors such as clean energy, advanced manufacturing, and initiatives, aiming to address perceived market failures in long-term investment. This rebranding followed Labour's pre-election pledge in July 2024 to create a £7.3 billion NWF as a permanent institution for long-term growth, though the actual setup leveraged the existing UKIB structure headquartered in rather than starting anew. The NWF inherited the UKIB's operational framework, including its focus on additionality—providing finance where private markets fall short—while introducing new strategic priorities aligned with goals for net zero and . By late 2024, the fund's total deployable capital reached £27.8 billion, enabling it to act as the 's principal investor in transformational projects. The shift was positioned as building on the UKIB's track record of £4.7 billion in investments by that point, which had supported job creation and but faced criticism for limited leverage and bureaucratic hurdles. Official statements emphasized the NWF's role in de-risking investments to attract private funds, with an initial focus on sectors like gigafactories and carbon capture, though skeptics questioned whether the rebrand alone would overcome prior challenges in scaling impact without additional fiscal commitments.

Operational Expansion and Key Milestones (2025)

In March 2025, Chancellor issued the Statement of Strategic Priorities for the National Wealth Fund, outlining its focus on accelerating , clean energy transitions, and , while increasing the fund's economic capital limit from £4.5 billion to £7 billion to enable larger-scale investments. This directive emphasized additionality in crowding in private capital, targeting sectors such as carbon capture, , gigafactories, and port infrastructure, with an aim to unlock over £70 billion in total private investment by partnering with institutional investors and local authorities. By July 2025, the fund committed to investing at least £5.8 billion by 2030 in priority clean energy and industrial projects, including support for a major carbon capture initiative projected to create or sustain 3,500 jobs, alongside allocations for , enhancements, , and port expansions. Operational progress included backing upgrades to the through partnerships like that with , aimed at facilitating integration and reducing transmission bottlenecks. The in 2025 allocated up to £27.8 billion in for the fund's deployment, prioritizing job creation and in underserved regions, with the fund announcing more than 60 decisions and committing approximately one-quarter of its available by mid-year. In , a proposed £5.8 billion from was referred for review, expanding the fund's overall financial capacity to £27.8 billion without a fixed deployment timeline, enabling flexible responses to high-impact opportunities in and economic productivity. October marked further milestones with the publication of the fund's inaugural Impact Report on October 14, detailing support for over 64,000 jobs across nations and regions through its portfolio, alongside two projects reaching operational status and three additional ones slated for commercial operation later in the year. This expansion reflected the fund's shift from establishment to active deployment, with equity, loans, and guarantees mobilizing participation in projects emphasizing long-term returns and national priorities like .

Mandate and Objectives

Strategic Priorities and Sector Focus

The National Wealth Fund pursues two principal strategic objectives: fostering regional and local throughout the and mitigating . These objectives, formalized in the Statement of Strategic Priorities issued by Chancellor on 19 March 2025, integrate with the government's missions for overall and clean energy development. The Fund deploys public capital to remedy market gaps in high-risk, capital-intensive ventures, aiming to leverage private investment at a 1:3 ratio and unlock up to £70 billion in total commitments while targeting portfolio-level positive financial returns. Priority investments concentrate on four sectors—clean energy, advanced manufacturing, digital and technologies, and —selected for their potential to drive productivity, innovation, and infrastructure upgrades across the . This focus addresses deficiencies in late-stage project development and commercialization, where private financing often falls short due to perceived risks. The Fund commits at least £5.8 billion over the parliamentary term to targeted sub-areas, including , , gigafactories, supply chains, green steel, ports, and related logistics.
  • Clean energy: Emphasizes technologies essential for net zero transitions, such as (CCUS), production, and renewable projects like and onshore , with initial allocations supporting job-intensive developments in regions like and .
  • Advanced manufacturing: Targets through investments in gigafactories for battery production, components, and low-carbon steel processes to reduce import dependencies and enhance industrial competitiveness.
  • Digital and technologies: Prioritizes scalable innovations, including dual-use applications for and purposes, to bolster technological and economic multipliers in and emerging tech ecosystems.
  • Transport: Focuses on port expansions and enhancements to improve freight , energy import capabilities, and regional connectivity, aligning with broader needs.
All investments require demonstrable additionality—enabling viable projects unattainable via private means alone—and must distribute benefits across nations through partnerships with devolved administrations and local entities. The strategy permits future broadening to sectors like life sciences or if they advance the core objectives, but maintains discipline via an elevated £7 billion limit to accommodate higher-risk profiles without compromising fiscal prudence.

Investment Principles and Additionality

The National Wealth Fund (NWF) evaluates investments against four core principles, which guide to align with government objectives while ensuring fiscal prudence and market enhancement. These principles require that investments support the government's missions on and clean energy; target capital-intensive projects, businesses, or assets such as facilities, carbon capture , ports, gigafactories, or green production; deliver positive financial returns to the by balancing risk and return targets; and crowd in significant private capital over time. Additionality, embedded as the fourth principle, mandates that NWF interventions generate outcomes—such as accelerated timelines, scaled deployments, or enhanced environmental, , , and (ESRG) factors—that would not occur without public support, thereby addressing market failures like financing gaps in nascent sectors. This draws from HM Treasury's definition of additionality as a real increase in value absent the intervention, but the NWF adapts it to emphasize sector-level crowding-in rather than solely -specific effects, targeting a 1:3 public-to-private to unlock approximately £70 billion in total from its £7.3 billion base. Assessments involve counterfactual analysis, evaluating alternatives like delays or reduced scope without NWF involvement, supported by evidence from market data, stakeholder consultations, and expert judgment by the Investment Committee. To demonstrate additionality, the NWF requires deal-specific evidence, rating investments on criteria such as filling undersupplied financing, pioneering innovative structures unavailable from private lenders, or catalyzing follow-on private commitments in priority areas like net-zero transitions. This approach, refined from its predecessor the , prioritizes catalytic roles in high-impact deals with minimum ticket sizes of £25 million, while allowing flexibility for £25-50 million investments demonstrating transformative potential. The framework includes ongoing review and iteration, with metrics tracked via an encompassing private co-investment ratios, job creation, CO2 abatement, and productivity gains to verify realized additionality post-investment.

Governance and Operations

Organizational Structure and Leadership

The National Wealth Fund operates as a wholly owned by , functioning at arm's length from the government to maintain operational independence in day-to-day activities and investment decisions, while aligning with a framework of investment principles and strategic priorities set by the . Its governance structure emphasizes accountability to the shareholder through board oversight, with the board responsible for providing leadership, establishing strategic direction, evaluating management performance, and fulfilling obligations to stakeholders. The Board of Directors, chaired by Chris Grigg, comprises executive directors, a representative, a senior , and several non-executive directors to ensure balanced expertise in finance, investment, and . Executive directors include as Interim CEO and Annie Ropar as , alongside Elena Ciallie as the representative from . Non-executive directors encompass Bridget Rosewell CBE (Senior and Chair of the and Risk Committee), Tania Songini (Chair of the Remuneration Committee), Nigel Topping, Marianne Økland, Muriel Dube, and three appointees announced on October 2, 2025: Catherine Cripps ( specialist and chair of Polar Capital Technology Trust), Tom Riordan (experienced in central and , currently Second at the Department for Health and Social Care), and Joseph Schull (co-founder of Corten Capital with a background in technology investments). These appointments, made by Chancellor , aim to bolster the board's capacity to execute the fund's mandate, as noted by Chair Grigg in welcoming their "vital expertise and perspective." Leadership at the executive level is transitioning, with John Flint having previously led the entity's evolution from the Infrastructure Bank, and Oliver Holbourn appointed as the incoming CEO effective November 1, 2025, bringing experience from roles including CEO of RBS International and Financial Investments. currently serves as Interim CEO, supported by an Executive that manages operational functions such as risk, strategy, oversight, and impact measurement. members include Peter Knott (), Patricia Galloway (Chief People Officer), Kate McGavin and Helen Williams (co-Chief Strategy and Policy Officers in a job-share arrangement), Davinder Mann ( and ), Stuart Nivison (Head of Management), Sheer Khan (Chief Impact Officer), and Lorna Pimlott (Managing Director for Local Authority Advisory and Lending). This structure, inherited and expanded from the Infrastructure Bank, prioritizes commercial decision-making with oversight limited to high-level strategic alignment.

Funding Sources and Capital Allocation

The National Wealth Fund (NWF) draws its primary funding from a £7.3 billion allocation by , announced by on 8 July 2024 as part of the government's economic programme. This capital is intended for deployment over the parliamentary term, sourced from specific budgetary provisions including £1.8 billion for port upgrades, £1.5 billion for gigafactories, £2.5 billion for clean steel initiatives, and £1.5 billion for and carbon capture projects. The allocation represents new public expenditure commitments rather than transfers from existing departmental budgets, though it leverages the fund's role in crowding in private investment estimated at three times the public input. In addition to the £7.3 billion, the NWF inherits the full deployable capital of the UK Infrastructure Bank (UKIB), its predecessor , amounting to approximately £22 billion in lending and guarantees as of mid-2024. This inherited portfolio stems from UKIB's original £22 billion authorization under prior legislation, enabling immediate deployment without awaiting fresh appropriations. Combined, these sources provide the NWF with up to £27.8 billion in total public capital for investment, subject to parliamentary approvals and fiscal rules. Capital allocation prioritizes "additionality," targeting projects where private finance alone is insufficient due to high risks or long timelines, with at least £5.8 billion of the new funding directed to the five manifesto-specified sectors: , , ports, gigafactories, and clean steel. The fund's instruments include direct stakes, subordinated loans, and guarantees, allowing flexibility across the stack to de-risk private participation; for instance, is used for early-stage ventures, while guarantees back in . An expanded economic limit of £7 billion—up from UKIB's £4.5 billion—supports higher-risk allocations, calibrated to maintain financial sustainability under oversight. Allocations are governed by a requirement to achieve commercial returns where feasible, with decisions informed by independent board assessments rather than political directives.

Investments and Portfolio

Major Commitments and Projects

The National Wealth Fund has prioritized investments in clean energy infrastructure, battery storage, and critical minerals extraction to catalyze private capital and support . By October 2025, the fund had deployed £3.6 billion across over 20 new projects in its first operational year, committing approximately a quarter of its total capital while mobilizing £16.2 billion in private finance and supporting over 64,000 jobs nationwide. A flagship commitment is the £28.6 million equity investment in the world's largest cement decarbonization project in the , spanning , , and the North West, involving partners such as , , and Progressive Energy. This initiative, part of a £59.6 million total equity package, aims to capture and store over 3 million tonnes of CO2 annually under the , sustaining over 2,000 existing jobs, creating 300 new manufacturing positions, and generating 1,200 temporary construction roles. In , the fund provided a £15 million loan to for the Great Yarmouth Offshore , an operations and maintenance center enhancing capacity for major offshore developments. Complementary projects include a loan for the Orkney Islands Council's six-turbine community at Quanterness and financing for the Heat Network to deliver low-carbon heating to urban buildings. storage features prominently, with up to £445 million in equity for the Thorpe Marsh project in —the UK's largest such system—and a £500 million platform investment with Equitix and to develop and operate multiple assets nationwide. Additionally, a £50 million stake in AMP Clean Energy, alongside Asterion, targets grid flexibility through distributed . Further commitments address resource security and resilience, including a £31 million allocation to Cornish Lithium for advancing geothermal lithium extraction in and a £300 million guarantee for the Haweswater Aqueduct Programme to replace aging tunnel sections serving millions in . The fund also launched a Regional Project Accelerator to assist local authorities in fast-tracking clean energy and growth initiatives.

Financial Instruments and Risk Management

The National Wealth Fund deploys a diversified set of financial instruments designed to crowd in private by addressing gaps in high-impact sectors, with a minimum threshold of £25 million per transaction. instruments include ordinary , preferred , and convertible loan notes, primarily for later-stage projects at technology readiness levels (TRL) 7-9, where the Fund acts as a lead or investor without pursuing controlling stakes; smaller opportunities below £25 million may be accessed via third-party fund managers. Debt products encompass , debt, and bridge financing, tailored with fixed or floating rates to mitigate specific project risks such as overruns or shortfalls, thereby expanding overall capacity and enabling lenders to participate on more favorable terms. Guarantees form another core offering, including financial guarantees, credit enhancements, first-loss protections, and performance bonds, all backed by the 's sovereign Infrastructure Guarantee and structured to deliver positive financial returns; concessional pricing may apply where compliant with subsidy control requirements. These instruments collectively support approaches, emphasizing additionality by taking on risks that investors avoid, while requiring projects to demonstrate commercial viability and alignment with the Fund's investment principles of financial return and capital mobilization. Risk management at the NWF is governed by a formal , approved annually by the Board, which integrates risk processes into all activities to align with objectives such as regional and climate transition. Risk identification and assessment draw on a structured Risk Taxonomy comprising six top-level categories (e.g., strategic, financial, operational) and 24 sub-categories, with Key Risk Indicators (KRIs) monitored through the CAMMS system to track deviations from the Board's defined . Mitigation employs a three lines of defence model: front-line teams handle primary risk controls and ownership, the second line (led by the Chief Risk Officer) delivers independent oversight, policies, and challenge, while the third line (internal audit) verifies framework effectiveness; this is augmented by stress testing, scenario analysis, and an Economic Capital model to quantify and limit potential losses against the Fund's £7 billion economic capital limit, increased from £4.5 billion in March 2025 to enable greater catalytic risk-taking without compromising taxpayer returns. Governance involves the Audit & Risk Committee for high-level supervision, the Risk Committee for detailed reviews, and the Executive Committee for operational execution, ensuring risks are escalated and addressed proportionally to their potential impact on portfolio performance and mandate delivery. This framework prioritizes financial sustainability, with investments required to generate portfolio-level returns that offset risks, reflecting the Fund's mandate to balance higher risk exposure for additionality against prudent capital preservation.

Economic Rationale and Debates

Theoretical Justifications for State-Led Investment

State-led investment, as embodied in institutions like the United Kingdom's National Wealth Fund established in 2024, is theoretically justified by the presence of market failures that lead private capital to underallocate resources toward long-term, illiquid projects with high upfront costs and distant payoffs. Private investors often apply high discount rates reflecting short-term horizons, , and liquidity preferences, resulting in suboptimal funding for , clean transitions, and strategic industries where returns accrue over decades. Governments, with mandates spanning generations and access to coercive taxation or borrowing at lower costs, can employ lower discount rates to bridge this gap, enabling investments that enhance national productivity and competitiveness without relying solely on market signals. A core rationale centers on positive externalities and the public goods nature of such investments, where benefits like improved transport networks or grids spill over to the broader economy but are not fully internalized by actors due to non-excludability and non-rivalry. For instance, state funds can catalyze "additionality" by de-risking projects—through equity stakes, guarantees, or patient capital—that markets avoid, thereby crowding in supplementary rather than displacing it. This addresses and information asymmetries, particularly in emerging sectors like net-zero technologies, where due diligence falters amid technological uncertainty. Theoretical models, including those from , posit that such interventions align with Pareto improvements by correcting underinvestment that hampers aggregate growth. Furthermore, sovereign entities like wealth funds serve as countercyclical stabilizers, deploying capital during downturns when private risk appetite wanes, thus smoothing economic cycles and preserving through sustained project pipelines. In the UK context, the Fund's £27.8 billion endowment, including reallocations from existing bodies like the UK Infrastructure Bank, is framed as a mechanism to pursue national missions in and clean energy, leveraging public resources to overcome coordination failures among fragmented private investors. Proponents draw on , arguing that state-directed allocations into human capital-intensive yield compounding returns via enhanced labor productivity and innovation spillovers, outpacing pure market outcomes in patient, high-fixed-cost domains.

Criticisms of Efficacy and Market Distortions

Critics have questioned the efficacy of the National Wealth Fund (NWF) in meaningfully boosting and , citing its limited relative to the economy's needs and historical precedents of underperformance in similar state-led initiatives. A September 2024 survey of economists by the Centre for Macroeconomics found the panel roughly divided, with approximately 30% agreeing the NWF would be effective, 30% disagreeing, and 30% neutral; when weighted by confidence, opposition rose to about 45%, with dissenters highlighting risks of centralization, insufficient , and governance flaws that could hinder impact. The NWF's predecessor, the Infrastructure Bank, disbursed only £1.7 billion in the 2023-24 financial year against a £5.5 billion annual capacity, raising doubts about its ability to accelerate deployment at the pace required to address the 's gap, estimated at 2-3% of GDP annually. Furthermore, parliamentary evidence submitted in April 2025 emphasized that reliance on budget transfers constrains the fund's firepower, as only 29% of comparable public development banks depend on such funding, limiting its potential to mobilize the trillions needed for net-zero and objectives. Skepticism extends to the NWF's catalytic role, with concerns that its £7.3 billion in new borrowing-backed capital—bringing total deployable resources to around £27.8 billion including UK Infrastructure Bank assets—remains dwarfed by private markets and unlikely to generate additionality without robust project pipelines, which have historically proven challenging for UK state entities. Economists have drawn parallels to past UK interventions, such as the 1970s , which incurred losses amid inefficient allocations, and broader evidence from sovereign wealth funds where political interference has led to suboptimal returns, as documented in analyses of global funds' macroeconomic impacts. The Committee's March 2025 inquiry into the NWF explicitly probes whether it can "move the dial on ," reflecting apprehensions that operational errors or misjudged risks could result in value destruction rather than enhancement, particularly given the fund's mandate to accept higher risks in unproven sectors like and gigafactories. Regarding market distortions, detractors argue the NWF risks crowding out private investment by competing for deals or offering subsidized terms that undermine market pricing, potentially displacing efficient private capital allocation. The Office for Budget Responsibility's October 2024 outlook noted broader fiscal risks of public spending crowding out private activity through higher borrowing costs, a concern amplified for targeted interventions like the NWF that could signal favoritism toward specific sectors, distorting flows away from consumer-driven signals. Written submissions to the Treasury Committee have highlighted the need for safeguards to ensure "crowding in" rather than out, as state equity or guarantees might foster , encouraging riskier private behavior or deterring independent investment in viable projects. Globally, analyses reveal instances where state involvement has amplified or inefficient "picking winners," as seen in funds with weak leading to asset transfers without value addition, underscoring the NWF's vulnerability to political pressures over commercial discipline. The fund's rebranding from the UK Infrastructure Bank has been labeled misleading by academics and former officials, potentially masking these distortions under a veneer of novelty while perpetuating institutional inertia.

Performance and Impact

Measurable Outcomes and Early Metrics

The National Wealth Fund's inaugural Impact Report, released on October 14, 2025, reported £7.5 billion committed across 62 projects since 2021, with £16.2 billion in private finance mobilised and over 64,000 jobs enabled nationwide, including 21,900 directly linked to its financing. These figures encompass activities from the entity's prior incarnation as the UK Infrastructure Bank, which rebranded to the NWF on October 14, 2024, following a capital increase to £27.8 billion. Early post-rebranding metrics indicate accelerated mobilisation, with £1.6 billion in private capital unlocked in the six months preceding 2025. One of the NWF's initial commitments was a £150 million financial guarantee issued on February 28, 2025, to The Housing Finance Corporation (THFC) for unsecured loans targeting social housing retrofits, potentially benefiting up to 25,000 homes. This structure unlocked equivalent private investment from , a pensions insurer, at pricing typically reserved for secured lending, thereby reducing borrowing costs for registered providers and supporting upgrades aligned with net zero objectives. While direct job creation from this deal remains unspecified, it contributes to broader retrofit sector employment, building on an estimated 6,500 jobs anticipated industry-wide. In regional terms, the NWF's first Scottish investment, announced February 19, 2025, provided £43.5 million to Pulpex for a Glasgow-area facility producing fibre-based bottles from sustainable wood pulp, supplemented by £10 million from the Scottish National Investment Bank and existing investor funds for a total of £62 million. This project is projected to generate 35 direct jobs, produce 50 million bottles annually, and enhance rates while advancing alternatives to and . Such early deployments underscore the fund's focus on catalytic instruments like guarantees and equity to leverage private capital in priority sectors, though comprehensive return-on-investment data awaits fuller portfolio maturation.

Long-Term Projections and Uncertainties

The National Wealth Fund aims to achieve a long-term mobilization ratio of 1:3 public-to-private capital, targeting the unlocking of over £70 billion in private finance through its deployment of public funds. This projection builds on early performance, where £16.2 billion in private capital has already been mobilized against public investments, with expectations of higher ratios in mature sectors like clean energy as projects scale. Financial returns are targeted below commercial banking levels to prioritize additionality in underinvested areas, succeeding the Infrastructure Bank's 2.5-4% portfolio return benchmark, though the exact figure remains under finalization to accommodate a higher . Projections for broader impacts include supporting sustained job creation beyond the initial 64,000 positions identified in early commitments, enhancing , and delivering such as 113 million tonnes of CO2e savings over asset lifetimes from current pipelines. To meet net zero goals by 2050, the fund anticipates contributing to the £50 billion in additional annual investment required by 2030, focusing on capital-intensive sectors like clean energy where private markets exhibit undersupply due to long timelines and externalities. Uncertainties surround the fund's ability to avoid crowding out private investment, with critics noting that without strict additionality tests, public capital could subsidize projects viable under conditions, distorting allocation efficiency. Governance risks include potential political interference undermining investor and the fund's , which is essential for credible crowding-in. Portfolio risks are elevated by exposure to sub-investment-grade assets (average B+ rating) and nascent technologies, where execution delays, cost overruns, or technological failures could erode returns below benchmarks like long-term gilt yields. External factors, such as geopolitical trade tensions or fiscal constraints, further cloud long-term efficacy, as evidenced by IMF assessments of subdued GDP growth impacts from similar interventions amid global uncertainty.

References

  1. [1]
    Has the government established a National Wealth Fund? - Full Fact
    A National Wealth Fund was set up on 14 October 2024, with the formal rebranding of the UK Infrastructure Bank (UKIB) and an announcement that the new fund will ...
  2. [2]
    Boost for new National Wealth Fund to unlock private investment
    Jul 9, 2024 · The Government announces new plans to align key institutions under the National Wealth Fund that will boost growth and unlock investment.
  3. [3]
    Government announces £7.3 billion National Wealth Fund
    Jul 24, 2024 · The National Wealth Fund Bill, announced in the King's Speech on 17 July 2024, will put the fund on a permanent statutory footing. Reeves ...
  4. [4]
    About us - National Wealth Fund
    The registered office address is 2 Whitehall Quay, Leeds, LS1 4HR. The National Wealth Fund Limited is not a banking institution and does not operate as such.Missing: establishment date
  5. [5]
    National Wealth Fund: Mobilising Private Investment (accessible)
    Oct 14, 2024 · It will mobilise private sector capital into investments across the UK, while aligning with our shared goals of economic growth and tackling ...
  6. [6]
    Chancellor's National Wealth Fund to deliver growth and boost ...
    Mar 19, 2025 · The National Wealth Fund will unlock over £70 billion in private investment to help deliver economic growth, make Britain a clean energy superpower, and ...
  7. [7]
    Chancellor's National Wealth Fund fuels 8,600 jobs in six months
    Jan 15, 2025 · The National Wealth Fund has fuelled 8,600 jobs in the last six months, unlocking almost £1.6 billion of private investment, driving growth ...
  8. [8]
    Labour's National Wealth Fund slammed for 'completely misleading ...
    Mar 24, 2025 · The Labour government is under fire for its 'completely misleading' rebrand of the UK Infrastructure Bank to a National Wealth Fund.
  9. [9]
    National Wealth Fund - Institute for Government
    Feb 12, 2025 · The National Wealth Fund (NWF) is a policy bank set up by the UK government to partner with the private sector and local authorities to finance infrastructure ...
  10. [10]
    A National Wealth Fund for the UK - CEPR
    Oct 24, 2024 · Over 60% of the panel thinks an NWF is either probably or definitely affordable. Only over 30% of the panel members think that a publicly-funded ...
  11. [11]
    the steady launch of state bank UKIB - The Guardian
    Sep 8, 2023 · UKIB was unveiled in November 2020 by the then chancellor, Rishi Sunak, alongside a £100bn infrastructure plan meant to help revive the ...
  12. [12]
    UK Infrastructure Bank opens for business - GOV.UK
    Jun 17, 2021 · From 17 June the Bank will be able to issue loans, equity, or guarantees to private projects. The Bank will start lending to local authorities ...Missing: date | Show results with:date
  13. [13]
    Budget 2021/22 - UK Infrastructure Bank (UKIB): GIB2.0? - Operis
    Mar 11, 2021 · In summary, the UKIB will provide financing support to infrastructure projects across the UK, to help meet government objectives on climate ...<|separator|>
  14. [14]
    [PDF] The creation of the UK Infrastructure Bank - National Audit Office
    Jul 1, 2022 · As part of the accountability process, the Bank has established clear investment and due diligence processes for individual investment decisions ...
  15. [15]
    “Rushed” UK Infrastructure Bank operated outside UK Corporate ...
    Jan 25, 2023 · The predecessor Green Investment Bank was also sold to the public as an 'enduring institution' and then sold off to the Australian private ...Missing: precursor | Show results with:precursor
  16. [16]
    UK Infrastructure Bank becomes the National Wealth Fund
    Oct 14, 2024 · The UK Infrastructure Bank (UKIB) is becoming the National Wealth Fund (NWF), as announced by the Chancellor, Rachel Reeves, today.
  17. [17]
    National Wealth Fund: Mobilising Private Investment - GOV.UK
    Oct 14, 2024 · The National Wealth Fund will mobilise billions of pounds of investment in the UK's world-leading clean energy and growth industries.
  18. [18]
    Rachel Reeves launches £7.3bn national wealth fund - The Guardian
    Jul 9, 2024 · The NWF will soon be established formally in UK law, making it a “permanent institution at the heart of the country's long-term growth and ...
  19. [19]
    National Wealth Fund
    We can provide a range of financing tools across the capital structure, including loans, guarantees and equity investments for projects which align with our ...Missing: origins precursors 2020-2023
  20. [20]
    The story behind the data | National Wealth Fund
    Nov 26, 2024 · The NWF has invested £4.7B, creating 17,000+ jobs, with a £66m loss due to ECLs. Success is measured by broader impact, not just numbers.
  21. [21]
    Statement of Strategic Priorities to the National Wealth Fund (HTML)
    Mar 19, 2025 · The NWF's economic capital limit will be increased from £4.5 billion to £7 billion in its Financial Framework to support its greater financial ...Missing: milestones | Show results with:milestones
  22. [22]
    Chancellor's National Wealth Fund investment in major carbon ...
    Jul 7, 2025 · The National Wealth Fund will commit at least £5.8 billion by 2030 in hydrogen, carbon capture, ports and supply chains, gigafactories and EV ...<|control11|><|separator|>
  23. [23]
    [PDF] MAXIMISING THE IMPACT OF THE NATIONAL WEALTH FUND
    This plan will set out how the Fund aims to deliver on its mission of tackling climate change and supporting economic growth across the regions and nations of.
  24. [24]
    Spending Review 2025 (HTML) - GOV.UK
    Up to £27.8 billion capital to be invested through the National Wealth Fund (NWF), which will drive growth and create jobs across the UK. The NWF prioritises ...
  25. [25]
    Referral of the proposed subsidy to National Wealth Fund by HM ...
    Sep 29, 2025 · The £5.8 billion subsidy will expand the NWF's total financial capacity to £27.8 billion. There is no fixed duration for deployment of this ...
  26. [26]
    Laying the foundations for long-term growth - National Wealth Fund
    Oct 14, 2025 · From tin mining in Cornwall to port infrastructure near Inverness, flood defence schemes in Wales and broadband in Northern Ireland, the NWF is ...Missing: origins precursors 2020-2023
  27. [27]
    Impact, additionality and ESRG | National Wealth Fund
    Financing growth, powering change: our 2025 Impact Report. We have announced more than 60 investments and committed a quarter of our capital - that's more than ...
  28. [28]
    Our strategy | National Wealth Fund
    Our shareholder, HM Treasury, has asked us to prioritise investment in four sectors: clean energy, advanced manufacturing, digital & technologies and transport.
  29. [29]
    Investment principles - National Wealth Fund
    Private sector projects must meet our four investment principles. Investment principle 1: The investment supports the government's growth and clean energy ...Missing: additionality | Show results with:additionality
  30. [30]
  31. [31]
    Additionality in focus: our approach - National Wealth Fund
    We are publishing our approach today to provide more detail on how we understand, test and demonstrate the additionality of our private deals.
  32. [32]
    Additionality of UKIB investments: Our approach
    Oct 31, 2022 · UKIB's framework document defines the operating principle “Additionality: The Company will prioritise investments where there is an undersupply ...
  33. [33]
    The Board of Directors | National Wealth Fund
    The Board of Directors is responsible for providing leadership, setting strategic direction, reviewing the performance of management.Missing: structure | Show results with:structure
  34. [34]
    Appointment of three new Non-Executive Directors to the National ...
    Oct 2, 2025 · Catherine Cripps, Tom Riordan, and Joseph Schull have been appointed as new Non-Executive Directors by the Chancellor Rachel Reeves as the ...Missing: organizational structure
  35. [35]
    New Incoming CEO of the National Wealth Fund - GOV.UK
    Jul 15, 2025 · The Chancellor of the Exchequer has today announced the appointment of Oliver Holbourn as the new Chief Executive Officer of the National Wealth Fund.Missing: members | Show results with:members
  36. [36]
    Our Executive Committee | National Wealth Fund
    Our Executive Committee · Ian Brown · Annie Ropar · Peter Knott · Patricia Galloway · Kate McGavin · Helen Williams · Davinder Mann · Stuart Nivison.Missing: structure | Show results with:structure
  37. [37]
    How much capital has the government committed to the National ...
    The manifesto also said £7.3 billion of capital would be allocated to the fund over the course of the parliament, consisting of: £1.8 billion to upgrade ports ...Missing: sources | Show results with:sources
  38. [38]
    National Wealth Fund - Hansard - UK Parliament
    Oct 14, 2024 · The NWF will have a total capitalisation of £27.8 billion to catalyse investment that would not have otherwise taken place. It will inherit ...
  39. [39]
    UK Infrastructure Bank's statement on the National Wealth Fund
    Jul 10, 2024 · The Chancellor of the Exchequer has announced details of the National Wealth Fund and confirmed £7.3bn of additional funding will be allocatedMissing: initial billion sources
  40. [40]
    'Take a little more risk,' says the UK's National Wealth Fund
    May 12, 2025 · UK Infrastructure Bank's successor is bigger, more ambitious and expects some projects to fail, says Ian Brown, head of banking and investments at NWF.Missing: controversies criticisms
  41. [41]
    [PDF] Financing growth, powering change | National Wealth Fund
    Oct 1, 2025 · Two projects are now operational, with three more expected to reach commercial operation in 2025. Created 35 permanent jobs and supported 80+ ...
  42. [42]
  43. [43]
    Our products and terms | National Wealth Fund
    The National Wealth Fund offers corporate and project finance, including equity, debt, and various guarantees, with a minimum investment of £25 million.
  44. [44]
    [PDF] Risk Management Framework | National Wealth Fund
    This document details NWF's approach towards risk management, forming the guiding reference framework for all risk policies and guidelines in NWF. NWF Purpose & ...
  45. [45]
    Statement of Strategic Priorities to the National Wealth Fund - GOV.UK
    Mar 19, 2025 · The Chancellor has issued the Statement of Strategic Priorities to the National Wealth Fund, setting its strategic direction and priorities for this Parliament.
  46. [46]
    Sovereign wealth funds: A potential solution to market failure and ...
    Jun 21, 2021 · These funds have a useful role even in those countries lacking abundant natural resources, as they can address several significant failures of both private ...
  47. [47]
    Explainer: Economic Effects of Infrastructure Investment
    Jun 15, 2021 · Public infrastructure investment boosts the productivity of private capital and labor, leading to higher output.
  48. [48]
    Effects of Physical Infrastructure Spending on the Economy and the ...
    Aug 6, 2021 · Increases in physical infrastructure spending would boost private-sector productivity in the coming decades, contributing to economic growth ...
  49. [49]
    The vital role of infrastructure in economic growth and development
    Nov 19, 2021 · Eisenhower predicted that government investment in infrastructure had the power to stimulate the economy in the short-term and create the conditions for longer ...
  50. [50]
    The potential macroeconomic benefits from increasing infrastructure ...
    Jul 18, 2017 · This brief assesses the effectiveness of an increase in the nation's investment effort in infrastructure as a means to close the aggregate demand shortfall.
  51. [51]
    The Rationale for the Fund - UK Parliament Committees
    Apr 3, 2025 · The rationale for the Fund. A well-functioning Fund is an essential tool for driving up investment levels in key sectors of the economy, ...Missing: led | Show results with:led
  52. [52]
    Can the National Wealth Fund move the dial on growth? New ...
    Mar 24, 2025 · Can the National Wealth Fund move the dial on growth? New inquiry launched. 24 March 2025. Image representing news article. The Treasury ...<|separator|>
  53. [53]
    How to make Labour's National Wealth Fund work - LSE Blogs
    Feb 12, 2025 · The proposed National Wealth Fund aims to invest in 5 strategic sectors – in green hydrogen, steel, industrial decarbonisation, gigafactories and ports.Missing: controversies | Show results with:controversies
  54. [54]
    Economic and fiscal outlook – October 2024 - OBR
    Oct 30, 2024 · ... crowding out of private investment. The supply-side impacts ... (59) The National Wealth Fund includes existing UK Infrastructure ...<|separator|>
  55. [55]
    [PDF] Investment Association's written evidence to the Treasury ...
    The Chancellor has given the National Wealth Fund two strategic objectives: (i) supporting regional and local economic growth and (ii) tackling climate change.
  56. [56]
    Sovereign Wealth Funds: Corruption and Other Governance Risks
    Jun 26, 2024 · Failure to understand these risks will lead to SWFs failing to deliver on their promise of economic security and generational citizen wealth.<|separator|>
  57. [57]
    Labour's National Wealth Fund a misnomer, MPs told - City AM
    Jun 18, 2025 · Labour's National Wealth Fund is under sustained scrutiny following its confusing rebrand from the UK Infrastructure Bank.
  58. [58]
    National Wealth Fund makes first investment in Scotland - GOV.UK
    Feb 19, 2025 · Scottish Secretary welcomes £43.5m boost for sustainable packaging firm that will encourage growth, creating jobs and prosperity.
  59. [59]
    National Wealth Fund and The Housing Finance Corporation launch ...
    Feb 28, 2025 · NWF announces an initial £150m financial guarantee to support THFC to make long-term, unsecured loans to help registered providers retrofit ...
  60. [60]
    £150m commitment for social housing retrofit - Rothesay
    Feb 28, 2025 · This new partnership will unlock £150m in private investment and create further jobs, building on the 6,500 jobs already expected in the ...
  61. [61]
    None
    ### Summary of National Wealth Fund Impact Report 2025
  62. [62]
    [PDF] Financing the Future - National Wealth Fund
    The National Wealth Fund aims to increase UK investment for growth and clean energy, acting as the UK government's principal investor, and has mobilized over £ ...
  63. [63]
    None
    ### Summary of National Wealth Fund Impact Framework
  64. [64]
    United Kingdom: Staff Concluding Statement of the 2025 Article IV ...
    May 27, 2025 · The forecast assumes that global trade tensions lower the level of UK GDP by 0.3 percent by 2026, due to persistent uncertainty, slower activity ...