Fact-checked by Grok 2 weeks ago

Virginia-class submarine

The Virginia-class submarine is a class of nuclear-powered fast attack submarines in service with the United States Navy, designed as a multi-mission platform for intelligence, surveillance, reconnaissance, strike warfare, anti-submarine warfare, and anti-surface ship warfare. The lead ship, USS Virginia (SSN-774), was commissioned in 2004, with the class featuring advanced stealth capabilities, fly-by-wire ship control for improved shallow-water handling, and special features such as a reconfigurable torpedo room to support special operations forces. As of April 2025, 24 submarines have been commissioned, with construction ongoing by General Dynamics Electric Boat and HII-Newport News Shipbuilding to meet fleet requirements. Subsequent blocks of the class, including Blocks IV and V, incorporate enhancements such as the Virginia Payload Module (VPM) in Block V submarines, which extends hull length to approximately 460 feet and adds four large-diameter tubes for increased Tomahawk cruise missile capacity, enhancing long-range strike options. Typical specifications for earlier blocks include a length of 377 feet, a beam of 34 feet, submerged displacement around 7,800 tons, and speeds exceeding 25 knots, powered by a single S9G nuclear reactor. The class supports deployment of MK 48 torpedoes, Tomahawk missiles, and unmanned underwater vehicles, underscoring its role in maintaining undersea superiority amid evolving naval threats. Recent milestones include the forward deployment of USS Minnesota (SSN-783) to Guam in November 2024, bolstering Indo-Pacific presence.

Development and Procurement

Program Origins

The Virginia-class submarine program originated in the mid-1990s as the New Attack Submarine (NSSN) initiative, conceived to provide a cost-effective nuclear-powered fast (SSN) successor to the Los Angeles-class amid post-Cold War shifts toward littoral and multi-mission operations, while avoiding the Seawolf-class's high unit costs exceeding $3 billion per boat. Following the 1993 Bottom-Up Review, which limited Seawolf production to three submarines due to fiscal constraints, the U.S. prioritized an affordable design balancing advanced stealth and acoustic performance akin to Seawolf with broader battlespace dominance for regional threats, including intelligence gathering, strike warfare, and undersea superiority. Core requirements emphasized a versatile platform adaptable to evolving threats without Seawolf-level expenses, incorporating modular construction techniques from the outset to streamline production, enable rapid upgrades, and control lifecycle costs targeted below $2 billion per unit in then-year dollars. This approach drew from first-lead ship experiences and industry partnerships between and , fostering dual-site fabrication for efficiency. The program passed Milestone II in June 1995 with Acquisition Decision Memorandum approval, setting the stage for detailed design refinement. Congress authorized procurement of the , designated SSN-774, in 1998, with the FY1997 allocating $296 million for initial and components. The keel for was laid on September 2, 1999, at Electric Boat's facility, marking the program's transition from concept to construction under a teaming arrangement aimed at sustaining the industrial base. This early emphasis on affordability and addressed congressional mandates for cost caps while ensuring the class's role in maintaining undersea superiority against asymmetric challenges.

Construction and Contractors

The Virginia-class submarines are built under a teaming agreement between (GDEB), the prime contractor and lead design yard based in , and ' (HII) division in . This partnership implements a dual-site to distribute workload and enhance production capacity across the two facilities. Submarines are fabricated using a modular process, where large prefabricated sections are outfitted and then joined together at the assembly sites, reducing overall build time and costs through workflows. GDEB and HII each produce specific modules, which are transported between yards as needed for final integration, supporting the U.S. Navy's requirement for sustained output. The lead ship, USS Virginia (SSN-774), was delivered to the Navy on October 12, 2004, marking the successful execution of the program's initial construction phase. Ongoing contracts, such as the April 30, 2025, modifications awarded to GDEB and HII valued at up to $18.5 billion, continue to fund the production of additional units at these shipyards.

Production Challenges

Supply chain disruptions have significantly hampered Virginia-class submarine production, particularly delays in delivering critical components such as advanced arrays and equipment. These shortages in parts availability represent the primary obstacle to accelerating schedules, resulting in delivery slips of approximately two to three years for several boats since 2022. Workforce shortages and skill gaps at key shipyards, including and , have compounded these issues, with the submarine industrial base operating at about 25 percent below required staffing levels as of September 2022. Competition for skilled labor from the concurrent Columbia-class program has intensified these shortages, limiting overall production capacity and contributing to a reduced output rate of roughly 1.2 submarines per year in recent periods. To mitigate these logistical hurdles, the U.S. has pursued increased funding for long-lead time materials, including a $1 billion contract modification awarded to in March 2025 for Virginia-class Block VI components. Such investments aim to stabilize the and support the goal of sustaining two Virginia-class submarines per year, alongside one Columbia-class boat, by addressing procurement bottlenecks ahead of assembly.

Design Innovations

Propulsion and Stealth Features

The Virginia-class submarines employ the S9G pressurized water reactor, which generates approximately 40,000 shaft horsepower (30 MW) to drive a single shaft connected to a pump-jet propulsor. This reactor, designed for a 33-year core life without refueling, supports extended operational endurance and operates in natural circulation mode at low power levels, reducing reliance on mechanical pumps that could generate detectable noise. The pump-jet propulsor, supplied by BAE Systems, encloses the rotor within a ducted stator to suppress cavitation and propeller-induced turbulence, yielding lower broadband acoustic emissions than traditional screw propellers used in predecessor classes. Stealth enhancements prioritize acoustic superiority through hull-integrated anechoic coatings that absorb pings and scatter returns, combined with vibration-isolated deck structures and advanced mounting systems for machinery. These measures achieve an overall radiated noise level around 95 decibels—marginally above ambient background—rendering the submarines nearly indistinguishable from environmental noise in passive detection scenarios. Compared to the Los Angeles-class, the Virginia-class exhibits superior quieting, particularly at tactical speeds, due to the S9G's pump-free low-speed operation and propulsor design, enabling prolonged undetected transits in contested littorals against adversarial assets.

Sensor and Mast Systems

The Virginia-class submarines employ an advanced suite optimized for detecting submarines and surface vessels in diverse environments, including littoral waters. The primary is a bow-mounted spherical active and passive , which provides initial and capabilities. Complementing this are wide-aperture flank arrays, such as the Lightweight Wide Aperture (LWWAA), enabling passive detection over broad sectors with high resolution against low-noise threats. Towed arrays, including low-frequency systems like the TB-29C and high-frequency variants, extend detection range for quiet acoustic signatures in open-ocean operations. Traditional optical periscopes have been replaced by two non-hull-penetrating masts, which deploy via telescoping mechanisms to minimize structural vulnerabilities and cross-section. These masts, such as the AN/BVS-1(V) system, integrate high-resolution visible-light and cameras for all-weather electro-optical imaging, supporting 360-degree panoramic views and digital data distribution to multiple stations without prism-induced distortions. This design enhances operator and reduces exposure time above the surface, critical for stealthy against modern aerial and satellite threats. The class incorporates universal modular masts (UMM) and multifunction masts (MMM) that consolidate antennas, optronic sensors, electronic support measures (ESM), communications, and satellite links into low-profile, multi-use housings. These systems enable rapid reconfiguration for missions requiring integrated , imaging, or data relay, while preserving the submarine's hydrodynamic and . Upgrades across blocks, including enhanced ESM integration on photonics masts, address evolving threats from advanced adversaries by improving and reducing mast emissions.

Weapons and Payload Capabilities

The Virginia-class submarines feature 12 vertical launch system (VLS) tubes positioned forward, designed primarily for land-attack cruise missiles (TLAM) and tactical anti-ship variants, enabling long-range precision strikes against land and surface targets. These VLS tubes provide a versatile strike capability, with each tube accommodating one missile for rapid salvo launches in anti-surface and scenarios. Complementing the VLS, four 533 mm (21-inch) torpedo tubes support the deployment of Mk 48 Advanced Capability (ADCAP) heavyweight es for engaging enemy submarines and surface vessels, as well as UGM-84 anti-ship missiles launched via swim-out encapsulation. The torpedo room maintains capacity for up to 26 reloadable weapons, allowing sustained operations through multiple engagements without surfacing. Overall payload versatility extends to approximately 38-40 weapons in a typical mixed loadout, incorporating torpedoes, missiles, and mines, which supports multi-mission profiles including gathering and area . An integral lock-in/lock-out chamber facilitates by enabling diver egress for swimmer delivery vehicles or Navy SEAL insertions, while also accommodating unmanned undersea vehicle (UUV) deployment for and delivery. Future enhancements include mast-mounted high-energy (HEL) systems for defensive roles, such as countering unmanned aerial vehicles, small surface craft, or asymmetric threats, with U.S. budget allocations since 2011 funding integration feasibility studies and prototype adaptations for Virginia-class platforms. These directed-energy weapons aim to provide cost-effective, speed-of-light interception without depleting traditional munitions stockpiles.

Virginia Payload Module

The Virginia Payload Module (VPM) consists of a approximately 84-foot hull extension inserted forward of the sail in Block V Virginia-class submarines, incorporating four large-diameter vertical launch tubes designed to expand vertical launch system capacity. Each tube holds up to seven land-attack cruise missiles (BGM-109), yielding 28 additional missiles per submarine and more than tripling the strike capacity relative to earlier Virginia-class configurations without VPM. This enhancement supports long-range precision strikes against land and maritime targets, reconstituting undersea launch capacity amid the phaseout of Ohio-class guided-missile submarines (SSGNs). The VPM addresses limitations in Virginia-class procurement rates, which have averaged two boats annually since 2011, by providing a lower-cost means to sustain fleetwide without requiring proportional increases in submarine hull numbers. The tubes are adaptable for future effectors, including hypersonic weapons like the , with capacity for up to 12 such projectiles in the module. Construction of the lead VPM-equipped boat, USS Arizona (SSN-803), began following keel authentication on December 7, 2022, at , with delivery projected for 2027. As of 2025, contracts for VPM components and integration, including awards to for tube production, are advancing to support the full Block V production run of at least nine submarines.

Technical Specifications

Dimensions and Performance

The baseline Virginia-class submarines (Blocks I–IV) measure 377 feet (115 m) in length, with a of 34 feet (10.4 m) and a draft of 32 feet (9.8 m). Submerged totals approximately 7,800 tons. These dimensions reflect a balance between compactness for littoral access and sufficient volume for multi-mission capabilities, allowing transit through restricted waterways while maintaining blue-water endurance. Operational performance includes a maximum submerged speed exceeding 25 knots, enabling rapid repositioning and pursuit in tactical scenarios. Surfaced speeds surpass 20 knots, though submarines typically prioritize submerged transit for . The test depth exceeds 800 feet (244 m), providing resilience against threats, with actual crush depth significantly deeper but classified. Block V variants extend the length to 460 feet (140 m) to accommodate the Virginia Payload Module, increasing submerged to about 10,200 tons without altering or substantially. This modification preserves core performance metrics while expanding capacity, ensuring compatibility with earlier blocks in fleet operations.

Power Plant and Endurance

The Virginia-class submarines employ the S9G , which generates approximately 210 megawatts of thermal power to drive a single via a and reduction gears. This reactor utilizes high-density fuel cores optimized for long-term operation, eliminating the need for mid-life refueling over the vessel's 33-year service life. A key design feature is the reactor's capability for natural circulation cooling, relying on thermal convection rather than mechanical pumps during low-speed submerged operations, which enhances operational reliability by reducing moving parts prone to mechanical failure. The system maintains core cooling through density differences in the coolant, supporting sustained quiet running without auxiliary pumping noise. The system confers effectively unlimited range and endurance, constrained solely by onboard provisions for the crew of approximately 135 personnel and periodic maintenance requirements. Typical food and supply stores enable deployments lasting up to 90 days, allowing persistent underwater presence without surfacing for fuel. For emergency propulsion and electrical generation, an auxiliary —such as the 3512B V-12 engine—provides backup power when the submarine is at depth or surfaced, charging batteries or supporting non-nuclear systems in the event of reactor scram. This redundancy ensures mission continuity despite the primary reliance on for extended patrols.

Crew and Internal Systems

The Virginia-class submarine accommodates a of approximately 135 personnel, comprising 15 officers and 120 enlisted sailors. This complement reflects a deliberate design emphasis on reduced manning through , enabling efficient operations with fewer personnel than required on Los Angeles-class predecessors by re-engineering processes and minimizing watchstation demands. handles standard tasks such as monitoring and diagnostics, allowing the to focus on mission-critical functions during patrols that can exceed 90 days limited primarily by food supplies. Central to internal command and control is the AN/BYG-1 combat control system, an open-architecture platform that fuses data from , imaging, and other sensors with offboard intelligence for real-time situational awareness and decision-making. This system integrates C4I elements, supporting tactical planning, target tracking, and coordination with joint forces without dedicated weapon interfaces. ship control further enhances automation, utilizing components like gaming controllers for precise maneuvering in shallow waters. Habitability features prioritize crew endurance, including advanced atmospheric control for oxygen generation and contaminant removal to sustain operations in sealed environments. Escape and rescue capabilities incorporate forward and aft escape trunks, enabling individual buoyancy ascents or mating with (DSRV) for crew extraction up to depths of about 1,500 meters. A large lockout trunk supports diver operations and special warfare integration, doubling as an emergency egress point with enhanced compatibility for rescue assets.

Block Variants

Block I

The Block I variant of the Virginia-class submarine includes the initial four vessels: USS Virginia (SSN-774), commissioned on October 23, 2004; USS Texas (SSN-775), commissioned on September 9, 2006; USS Hawaii (SSN-776), commissioned on May 5, 2007; and USS North Carolina (SSN-777), commissioned on May 3, 2008. These submarines represent the baseline configuration that set the foundational standards for the class, including the S9G nuclear reactor, photonic mast systems, and a weapons loadout with 12 vertical launch system tubes for Tomahawk missiles alongside four torpedo tubes. A primary objective for Block I production was cost discipline to succeed the more expensive Seawolf-class, targeting affordability through modular construction techniques that divided the hull into 10 sections for parallel assembly by and . This approach enabled the Block I boats to meet procurement targets at approximately $2.7 billion per unit in then-year dollars, below the program's adjusted $2.8 billion threshold and significantly less than the Seawolf's $3 billion per unit. Operational testing and early sea trials of the Block I submarines uncovered challenges in system integration, notably with the AN/BQQ-10 acoustic arrays, including processing delays and performance shortfalls in certain environments that necessitated software and hardware refinements. These findings informed iterative improvements in subsequent blocks, such as enhanced open-system architecture for faster upgrades, without altering the core Block I design. The experience underscored the value of the class's modular and adaptable framework for addressing real-world acoustic and demands.

Block II

The Block II production phase of the Virginia-class submarines includes eight boats with hull numbers SSN-778 through SSN-785. These vessels revalidated the core design established in Block I while prioritizing manufacturing efficiencies to achieve a targeted reduction in unit procurement costs by approximately 10%, equivalent to savings of roughly $400 million per submarine through optimized processes and larger modular construction units that shortened assembly time to about 60 months. Hardware modifications in Block II were limited to minor adjustments aimed at improving the reliability of key components, such as engineering plant elements and government-furnished equipment, without introducing significant changes to sensors, weapons, or overall capabilities. These refinements built on operational data from Block I to address identified shortcomings in system dependability while maintaining the class's emphasis on multi-mission versatility. Commissioned between 2008 and 2015, Block II submarines provided a transitional production lot that stabilized costs and refined build practices ahead of Block III's photonic mast and reconfigured bow enhancements. This phase demonstrated the viability of incremental block upgrades for sustaining production momentum and incorporating lessons learned into future variants.

Block III

Block III of the Virginia-class submarine program encompasses eight vessels, hull numbers SSN-784 through SSN-791, procured under multi-year contracts from fiscal years 2008 to 2013. These submarines introduced significant design modifications to approximately 20 percent of the , primarily in the bow section, to achieve cost reductions while enhancing performance and operational flexibility. The lead ship, USS North Dakota (SSN-784), was delivered to the U.S. Navy on August 29, 2014, ahead of schedule and more than $30 million under budget. A key upgrade in Block III is the replacement of the Block I and II's air-backed spherical sonar array with a water-backed Large Aperture Bow (LAB) sonar system arranged in a horseshoe . This reconfigurable design improves passive detection ranges and by leveraging the acoustic properties of surrounding water for better signal , while facilitating modular upgrades to and without extensive structural alterations. Complementing the sonar enhancements, Block III incorporates an advanced propulsor that reduces risks through optimized blade geometry and materials, enabling quieter operation at higher speeds and bolstering overall acoustic . These modifications contributed to stabilizing costs at approximately $2.8 billion per unit by 2019, down from earlier blocks through streamlined and shared componentry. The emphasis on modularity in and propulsion systems supports rapid insertion of , such as advanced , ensuring long-term adaptability amid evolving undersea threats.

Block IV

The Block IV variant of the Virginia-class submarine comprises ten vessels procured under a multiyear construction contract signed by the U.S. Navy. These submarines emphasize sustainment enhancements to extend service life and reduce ownership costs, primarily through redesigning maintenance practices to limit major depot-level overhauls to three periods over a 33-year operational lifespan, compared to four in prior blocks. This adjustment aims to increase deployment availability and sortie generation rates, supporting the Navy's goal of expanding the attack submarine fleet amid rising demand for undersea capabilities. Block IV submarines retain the advanced sonar arrays and propulsor technologies introduced in Block III, including the Large Aperture Bow for improved acoustic performance in littoral environments. These features maintain multi-mission proficiency in intelligence gathering, strike warfare, and support without significant hardware changes from the previous block, prioritizing reliability and ease of upkeep. The design also incorporates upgraded battery management systems applicable across Virginia-class blocks to enhance during silent operations. The lead ship, USS Vermont (SSN-792), was administratively commissioned on April 18, 2020, with a full ceremonial commissioning held on August 28, 2021, marking the entry of Block IV into service. Subsequent vessels, such as USS Arkansas (SSN-800), have followed, contributing to the Navy's ongoing transition to a larger, more sustainable SSN force.

Block V

Block V submarines feature the Virginia Payload Module (VPM), an 84-foot midships hull extension housing four large-diameter payload tubes capable of launching up to 28 land-attack cruise missiles or other munitions, thereby tripling the class's vertical launch capacity to approximately 40 missiles compared to earlier blocks. This modular addition, inserted during construction, supports diverse payloads including unmanned underwater vehicles, enhancing long-range strike and multi-domain operations without altering the submarine's core or speed profile of about 25 knots submerged and 7,800-ton submerged . Production of Block V boats commenced around fiscal year 2020, with the initial contract awarded in December 2019 for up to 10 submarines at a ceiling value of $22.2 billion under a fixed-price incentive fee structure. The VPM integration specifically starts with the second boat, SSN-803 (USS Arizona), laid down in December 2022 and currently under construction at General Dynamics Electric Boat's Quonset Point facility, while the lead ship SSN-800 lacks the full module to streamline early testing. To address historical procurement shortfalls amid rising demand for attack submarines, the U.S. modified contracts in April 2025, awarding up to $18.5 billion to and HII for SSN-812 and SSN-813—the 11th and 12th Block V boats funded in 2024—incorporating workforce investments and expansions to sustain two-submarine annual output. These procurements balance growth, estimated at 10-15% over Block IV due to VPM complexity, against heightened capabilities for peer-state competition, such as distributed lethality in contested littorals.

Operational Service

Commissioned Vessels

The Virginia-class attack submarines are supplanting the Los Angeles-class boats as the core of the U.S. Navy's submarine force. As of October 2025, 24 vessels have been commissioned into active service, with hull numbers ranging from SSN-774 to SSN-797. These submarines are operationally assigned to both the Atlantic and Pacific Fleets, with principal homeports at in ; , ; Joint Base Pearl Harbor-Hickam in ; and , facilitating rapid response to global maritime threats. The lead ship of the class, USS Virginia (SSN-774), entered service on 23 October 2004 following construction by General Dynamics Electric Boat and Northrop Grumman Newport News (now HII). USS John Warner (SSN-785), commissioned on 1 August 2015, represents the first of the Block III configuration, incorporating design improvements for increased payload capacity. All commissioned Virginia-class submarines maintain full operational status, undergoing routine maintenance and upgrades to sustain fleet readiness.

Deployments and Missions

Virginia-class submarines execute routine deployments across multiple theaters, emphasizing multi-mission roles including intelligence, surveillance, and reconnaissance (ISR), (ASW), and precision strikes. In the , these submarines conduct patrols to monitor and counter threats from the , supporting U.S. strategic objectives in contested waters. For example, the participated in such operations, arriving at in to bolster regional presence and . Similarly, a Virginia-class submarine conducted a scheduled port visit to , , on August 4, 2023, as part of ongoing patrols. To enhance forward presence, the USS Minnesota (SSN-783) became the first Virginia-class submarine forward-deployed to on November 26, 2023, enabling rapid response and persistent operations in the region. These deployments validate the submarines' stealth capabilities, with vessels achieving undetected transits in high-threat environments. The USS Washington (SSN-787), a Virginia-class submarine, received the Presidential Unit Citation on October 23, 2024, for covert operations against adversaries, demonstrating exceptional operational secrecy. In kinetic operations, Virginia-class submarines provide Tomahawk missile support for land-attack missions. The USS John Warner (SSN-785) marked the class's first combat weapons employment by launching six Tomahawk land-attack missiles from the Eastern Mediterranean. These submarines also integrate with carrier strike groups and unmanned systems to enable distributed lethality, incorporating torpedo tube-launched unmanned underwater vehicles (UUVs) for extended ISR and targeting. Such integration enhances strike group undersea warfare capabilities during exercises like Composite Training Unit Exercise (COMPTUEX).

Incidents and Maintenance

The Virginia-class submarines have maintained a strong safety record with minimal major incidents since the lead boat's commissioning in 2004. One minor operational mishap occurred on , 2024, when became entangled in a Norwegian fisherman's trawl nets off Island during a submerged transit near the surface; the submarine's snagged the netting, dragging the fishing vessel Øygutt for approximately two nautical miles before vessels assisted in disentangling it, with no reported injuries or structural damage to the submarine. Such entanglements, while highlighting risks in shared spaces, are rare and typically resolved without escalation, reflecting effective emergency protocols. Maintenance of the Virginia-class faces challenges stemming from the submarines' advanced, integrated systems, including photonic masts, large-aperture arrays, and components, which demand specialized skills and parts. Depot-level overhauls, such as extended selected restricted (ESRA) periods, often encompass around 8,000 discrete work tasks, contributing to prolonged durations amid industrial backlogs. disruptions, shortages of qualified technicians, reliance on sole-source suppliers, and part obsolescence have exacerbated these issues, leading to fleet-wide maintenance delays that reduce overall operational tempo. Despite these sustainment hurdles, the class demonstrates high reliability post-initial shakedown cruises, with operational and live-fire testing confirming survivability against anticipated threats and underscoring the robustness of its and quality controls. The U.S. Submarine Force's overall safety record, bolstered by rigorous compliance with technical standards since major historical losses like USS Thresher, further supports the Virginia-class's empirical performance in service, even as maintenance capacity strains persist.

Challenges and Criticisms

Cost Overruns and Delays

The Virginia-class submarine program has experienced significant cost overruns totaling approximately $17 billion as identified in a 2024 Navy analysis, driven by factors including inflation, expanded capabilities such as the Virginia Payload Module (VPM), and fluctuating congressional appropriations. Per-unit procurement costs for recent blocks, particularly those incorporating the VPM for additional missile tubes, have escalated to an estimated $4.3 billion each when procured at the targeted rate of two boats per year, compared to earlier blocks averaging under $3 billion adjusted for inflation. These increases reflect scope changes, such as retrofitting designs for enhanced strike capacity, alongside broader economic pressures on material and labor expenses. Delivery timelines have similarly slipped by 24 to 36 months across multiple boats, preventing the program from sustaining the planned production rate of two submarines annually since the early . This shortfall contributed to the Navy's 2025 budget request seeking funding for only one Virginia-class boat, amid ongoing disputes over multiyear stability and partial congressional allocations for additional units. Critics, including lawmakers, have attributed these delays to bureaucratic requirements creep—such as iterative design modifications and testing mandates—and inconsistent funding profiles that disrupt contractor efficiencies, though program managers note that delivered boats have met advanced technological baselines exceeding initial specifications. Despite these challenges, the overruns represent roughly 20-25% of the program's total multibillion-dollar acquisition envelope through 2030, with assessments highlighting persistent risks from unstable budgets rather than inherent design flaws.

Industrial Capacity Limitations

The production of Virginia-class submarines faces significant constraints from workforce shortages at the primary shipyards, and , where skilled labor demands exceed available personnel. By September 2022, the submarine industrial base operated at 25 percent below adequate staffing levels, contributing to Virginia-class output remaining at 60 percent of the planned rate as of June 2024. These shortages are exacerbated by high rates, reaching 20 to 22 percent annually for average workers and higher in critical trades like and . Overlapping priorities with the Columbia-class ballistic missile submarine program further strain capacity, as shipbuilders have redirected personnel originally allocated to Virginia-class work to address Columbia's first-in-class complexities and inexperienced workforce needs. This resource diversion has led to facility bottlenecks, with Virginia-class Block V submarines delayed by two years due to staffing reallocations and of work previously handled in-house. As a result, annual Virginia-class production averaged 1.3 submarines in 2024, falling short of the Navy's target for two per year. Government and industry responses include expanded apprenticeships, workforce development funding, and advanced manufacturing initiatives aimed at scaling output to one Columbia-class and two Virginia-class submarines annually by 2028, with aspirations for 2.33 Virginia-class units thereafter. Despite these efforts, assessments underscore ongoing risks to industrial base sustainability, including insufficient skilled labor growth to meet requirements in a potential wartime . Shipyards continue to outsource tasks to mitigate immediate gaps, but systemic facility and limitations persist, hindering the ability to rapidly expand Virginia-class production beyond peacetime baselines.

Strategic Readiness Impacts

The U.S. Navy's attack force, predominantly composed of Virginia-class vessels, currently numbers 49 boats against a doctrinal of 66, creating operational gaps in undersea and strike capabilities essential for in contested regions like the . shortfalls, with rates consistently below the targeted two boats per year since fiscal year 2022, project a further decline to around 48 operational SSNs by the mid-2030s if trends persist, limiting the fleet's ability to maintain persistent presence against expanding and fleets. This numerical deficit exacerbates vulnerabilities identified in operational , where insufficient SSN inventories hinder the Navy's capacity to secure sea lanes, interdict adversary forces, and support distributed maritime operations, potentially ceding initiative in high-end conflicts. Efforts to enhance individual submarine lethality, such as integrating the Virginia Payload Module (VPM) for additional Tomahawk missile capacity, represent a deliberate trade-off favoring quality over quantity to counter peer threats; however, cascading delays in Block IV and V construction—driven by supply chain disruptions and workforce constraints—amplify deterrence shortfalls by deferring fleet growth and straining maintenance cycles. These production hurdles, totaling over 410 months of cumulative delays across the program as of 2025, reduce overall readiness and force the Navy to extend deployments of aging Los Angeles-class boats, increasing wear and operational risks. In scenarios simulating a Taiwan contingency, such shortfalls erode the U.S. undersea edge, allowing adversaries to achieve local superiority in submarine density and anti-access/area-denial networks. Analyses from defense-focused outlets attribute these persistent delays primarily to instability, including fluctuating congressional funding signals and industrial base constraints, rather than fundamental shortcomings in the Virginia class, arguing that regulatory hurdles on skilled labor and supplier certification have compounded shortages without addressing root causal factors like inconsistent planning. This perspective contrasts with broader institutional critiques but underscores how policy-driven volatility undermines sustained ramps needed for strategic deterrence, as evidenced by the Navy's inability to meet even baseline two-per-year goals despite multi-year contracts.

Future Developments

Ongoing Production

The U.S. Navy's Virginia-class submarine program maintains ongoing production primarily through Block V configurations, which incorporate the Virginia Payload Module for enhanced missile capacity to meet near-term fleet expansion needs. In May 2025, the Navy awarded contracts exceeding $18 billion to and HII Newport News Shipbuilding for the construction of SSN-812 (USS ) and SSN-813 (USS ), designated as fiscal year 2024 procurements but incorporating long-lead materials and productivity investments applicable to subsequent boats. The fiscal year 2025 budget proposes procurement of the 41st Virginia-class submarine, SSN-814, with potential extensions to SSN-815 as the 42nd boat amid multi-year contracting efforts to stabilize the pipeline. Recent milestones include the completion of initial sea trials for USS Massachusetts (SSN-798), the 25th boat in the class and a Block IV variant, in early 2025, validating ongoing build quality and testing processes at HII's Newport News facility. Production rates have averaged 1.2 to 1.4 submarines annually since 2022, constrained by industrial capacity, but the and contractors target a ramp-up to two boats per year by to sustain fleet readiness without deferring to future designs. This Block V emphasis prioritizes deliverable hulls with modular upgrades over speculative overhauls, addressing immediate undersea warfare demands amid global tensions.

SSN(X) Successor

The Navy's Next-Generation Attack Submarine program, designated SSN(X), aims to replace the Virginia-class with a more advanced nuclear-powered fast optimized for operations against peer adversaries. The SSN(X) is envisioned as an "" submarine featuring enhanced stealth, speed, firepower, and adaptability to counter evolving threats from nations like and . Procurement of the lead SSN(X) boat has been deferred from fiscal year (FY) 2035 to FY2040, primarily due to industrial base constraints, budget limitations, and the need to prioritize Columbia-class production. This delay reflects broader challenges, including workforce shortages and issues that have hampered simultaneous construction of multiple submarine classes. The Navy's FY2025 budget submission explicitly cites these factors as necessitating the postponement to maintain overall fleet sustainability. Design requirements for SSN(X) emphasize a larger hull size compared to the Virginia-class to accommodate expanded payloads, including a greater of weapons for deeper strike capabilities against land and sea targets. The submarine is targeted to achieve higher transit speeds under stealth conditions—exceeding the Virginia-class's approximately 25+ knots—while integrating advanced directed-energy weapons, for autonomous systems, and modular architecture to enable rapid technological upgrades. These features are intended to provide undersea dominance in contested environments, with standard 21-inch tubes retained for compatibility with existing munitions like the Mk 48 heavyweight . The deferral poses significant challenges to the submarine industrial base, potentially leading to atrophy in design expertise and skilled labor if not mitigated through sustained investment. To bridge the production gap until SSN(X) enters service, the Navy plans to extend Virginia-class service life and continue building additional blocks, such as Block VIII, while addressing material and sequencing bottlenecks. Critics argue this reliance on extended legacy platforms risks capability shortfalls against accelerating adversary submarine advancements.

Export Prospects

AUKUS Partnership

The security partnership, established on September 15, 2021, between , the , and the , includes Pillar I provisions for Australia to acquire nuclear-powered submarines to enhance its undersea capabilities. Under this pillar, the United States plans to transfer between three and five Virginia-class submarines to Australia, with initial deliveries targeted for the early 2030s. These transfers are intended as an interim measure until Australia fields its own submarines, developed collaboratively with the UK. The agreement encompasses technology transfers to enable to sustain and maintain the Virginia-class submarines, including support for systems and related equipment. has committed significant funding, such as $3 billion toward U.S. submarine industrial base enhancements and additional investments in supporting . However, implementation faces hurdles from U.S. export controls, particularly under the (ITAR), which restrict sensitive technologies despite legislative exemptions passed in 2023 and further reforms in 2024. These controls have delayed integration for nuclear components, as submarine-specific exemptions remain incomplete as of 2025. Strategically, the Virginia-class transfers aim to strengthen collective deterrence in the region by leveraging the submarines' stealth, endurance, and strike capabilities without severely depleting U.S. inventories, which are planned to be backfilled through accelerated domestic production. This approach supports allied undersea superiority amid rising regional tensions, positioning nuclear-powered submarines as key assets for long-range operations and .

References

  1. [1]
    Attack Submarines - SSN > United States Navy > Display-FactFiles
    Jul 1, 2025 · The Navy continues to build the next-generation attack submarine, the Virginia (SSN 774) class. To date, 23 Virginia class have been ...
  2. [2]
    USS Virginia (SSN 774) - Commander, Submarine Force Atlantic
    The Virginia-class, also known as the VA-class or 774-class, is a class of nuclear-powered fast attack submarines in service with the U.S. Navy. The submarines ...
  3. [3]
    Navy Commissions USS Iowa (SSN 797)
    Apr 7, 2025 · The Navy commissioned its 24th Virginia-class fast-attack submarine, USS Iowa (SSN 797), in a traditional ceremony held April 5, at Naval Submarine Base New ...
  4. [4]
    Future USS Iowa Delivered to U.S. Navy
    Dec 23, 2024 · SSN 797 is the 24th Virginia-class submarine (VCS) co-produced by General Dynamics Electric Boat (GDEB) and HII-Newport News Shipbuilding ...
  5. [5]
    Virginia class Attack Submarine SSN US Navy - Seaforces Online
    Displacement: Block I-IV: 7900 tons / Block V: 10400 tons ; Length: Block I-IV: 115 meters (377 feet) / Block V: 140 m (460 ft) ; Beam: 10.36 meters (34 ft)
  6. [6]
    Virginia Class SSN | Submarine Industrial Base Council
    Length: 377 feet ; Beam: 33 feet ; Displacement: Approximately 7,800 tons submerged ; Speed: 25+ knots (28+ miles per hour) ; Crew: 132: 15 officers; 117 enlisted.
  7. [7]
    Virginia Class - General Dynamics Electric Boat
    Displacement: 7,700 tons (submerged) ; Length: 377 feet ; Hull Diameter: 34 feet ; Speed: 25+ knots ; Diving Depth: 800+ feet ...Missing: specifications | Show results with:specifications
  8. [8]
    [PDF] SSN 774 Virginia-Class Submarine
    The Virginia-class submarine is the Navy's latest fast-attack submarine and is capable of targeting, controlling, and launching MK 48 torpedoes and Tomahawk ...
  9. [9]
    First Forward-Deployed Virginia-Class Submarine Arrives in Guam
    Nov 26, 2024 · The Virginia-class fast-attack submarine USS Minnesota (SSN 783) arrived to its new homeport of Naval Base Guam, Nov. 26, as part of the US Navy's strategic ...
  10. [10]
    SSN-774 Virginia-class NSSN New Attack Submarine - Navy Ships
    Oct 15, 2000 · The Secretary of Defense in his October 1993 bottom-up review determined that production of the Seawolf class submarine would cease with the ...Missing: timeline | Show results with:timeline
  11. [11]
    The NSSN: A 21st Century Design | Proceedings - U.S. Naval Institute
    The objective of the New Attack Submarine Program is to produce a multi-mission, easy-to-upgrade submarine with the acoustic performance of the Seawolf (SSN-21) ...
  12. [12]
    SSN-774 Virginia-class Program - GlobalSecurity.org
    The fiscal year 1997 budget requested $296 million for the design and component construction of the first New Attack Submarine in fiscal year 1998. As allowed ...
  13. [13]
    Navy Virginia-Class Submarine Program and AUKUS Submarine ...
    The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines (SSNs) since FY1998, and a total of 40 have been procured through FY2024.
  14. [14]
    Keel laid for first Virginia Class nuclear attack submarine NAVSEA ...
    Sep 9, 1999 · A keel-laying ceremony for the future USS Virginia (SSN 774) was hosted on Sep. 2 by General Dynamics Electric Boat Division at their Quonset ...Missing: date | Show results with:date
  15. [15]
    VIRGINIA (SSN 774) CLASS ATTACK SUBMARINE - FY98 Activity
    The New Attack Submarine (VIRGINIA) is intended to be an affordable submarine, which will support Joint Vision 2010 and the strategy of maintaining maritime ...
  16. [16]
    Nuclear-Powered Submarines - HII
    The Virginia-class submarine program is a model of collaboration and efficiency. Along with our partners at General Dynamics Electric Boat, we are building the ...Missing: approach | Show results with:approach
  17. [17]
    Navy Awards Contract Modification for Two Additional Virginia-Class ...
    Apr 30, 2025 · Naval Sea Systems Command has awarded a two-ship contract modification on the existing Virginia-class submarine Block V contract to General Dynamics Electric ...<|separator|>
  18. [18]
    [PDF] Case-Study-Virginia-Class-Submarine.pdf
    The affordability of Virginia class submarines is due largely to integrated product and process devel- opment (IPPD), modular construction, parts reduc- tion, ...
  19. [19]
    Navy Awards Up to $ 18.5B in Contracts for 2 Virginia-class Attack ...
    Apr 30, 2025 · The Navy has awarded contracts worth up to $18.5 billion to General Dynamics and HII to build the final pair of Block V Virginia-class attack boats.
  20. [20]
    SSN 774 : USS VIRGINIA - combatindex.com
    DELIVERY DATE, 10/12/2004. COMMISSION DATE, 10/23/2004. PLANNING YARD, NEWPORT ... The first ship named Virginia was commissioned in the spring of 1777 and ...
  21. [21]
  22. [22]
    The Nightmare of Virginia-Class Submarines Finally Unveiled
    Dec 13, 2024 · Shortages in critical systems, such as advanced sonar arrays and nuclear propulsion equipment, have significantly impacted production schedules.
  23. [23]
    Submarine Supply Chain Largest Barrier to Improving Virginia ...
    May 8, 2023 · Availability of parts, not people, is the largest barrier right now to catch up with the delays in constructing Virginia-class nuclear attack boats.
  24. [24]
    The Navy's Virginia-Class Submarine Nightmare: Low Numbers ...
    Mar 28, 2025 · Since 2022, shipyard and supplier-firm workforce and supply-chain challenges have limited production to about 1.2 boats per year, resulting in a ...<|separator|>
  25. [25]
    The Submarine Workforce Crisis: Admitting Realities and ...
    Apr 4, 2024 · The Government Accountability Office found that by September 2022, the submarine industrial base was 25 percent below adequate staffing levels ...
  26. [26]
    China–US Submarine Race: Beijing's Drone Sub vs US Navy Delays
    Oct 14, 2025 · The service aims to build one Columbia-class and two Virginia-class submarines per year by 2028. Workforce Challenges. A shortage of skilled ...<|separator|>
  27. [27]
    Shortfalls in U.S. Naval Shipbuilding Capability - RMC Global
    May 9, 2025 · Similarly, the Columbia-class submarine program and the Virginia-class attack submarine program are experiencing delays and cost overruns.
  28. [28]
    General Dynamics Electric Boat awarded $1 billion contract ...
    Mar 25, 2025 · It has been awarded a $1 billion undefinitized contract modification allowing Electric Boat to purchase long lead time materials for Virginia Class Block VI ...
  29. [29]
    Senate Panel Questions Navy Submarine Build Rate, FY2025 ...
    May 3, 2024 · ... Virginia-class submarine in the Fiscal Year 2025 budget. Nickolas ... fund the long lead time material procurement and then construction.
  30. [30]
    Courtney addresses budget 'shortfall' on Virginia-class submarines
    Aug 5, 2025 · Courtney's amendment gives the Virginia-class submarine program a $1 billion boost, keeping up the two-a-year cadence for FY 2026.
  31. [31]
    S9G Next Generation Reactor / High Energy Density Core
    Jul 2, 2016 · The S9G reactor plant was designed for the Virginia-class SSN, which has a 33 ft (10.1 m) diameter hull, the same as USS Narwhal (SSN-671) and ...
  32. [32]
    Nuclear-Powered Ships
    Feb 4, 2025 · The smaller US Virginia-class SSN submarine first commissioned in 2004 has has a S9G reactor of about 210 MWt driving a 30 MW pump-jet ...Nuclear naval fleets · Nuclear power and propulsion... · Marine reactors used for...
  33. [33]
    BAE Systems awarded $92 million U.S. Navy contract for Virginia ...
    Oct 3, 2024 · BAE Systems has been awarded a $92 million U.S. Navy contract to continue building propulsors for the Virginia-class submarine program.
  34. [34]
    NSSN Virginia-Class Attack Submarine - Naval Technology
    Aug 7, 2020 · The hull is 377ft long with a beam of 34ft and the displacement of 7,300t dived, which is smaller than the more expensive Seawolf attack ...
  35. [35]
    Virginia-class submarines boast peerless speed, stealth - Citadel
    Jul 31, 2024 · With an acoustic signature slightly above the ocean's natural level, Virginia-class submarines are virtually undetectable.
  36. [36]
    Virginia-class attack submarine is the new 'backbone' of Navy's ...
    Oct 10, 2025 · When approved by Congress in 1999, the Navy's plans for the Virginia-class subs called for building two to three each year with a price of about ...Missing: origins | Show results with:origins
  37. [37]
    The Technology Behind Virginia-Class Submarines
    Nov 3, 2023 · Acoustic stealth technology uses anechoic coating on the hull. This coating absorbs and scatters sonar signals that reduces the chances of ...
  38. [38]
    Finding the edge: sonar technologies and programmes - Euro-sd
    Apr 10, 2024 · Northrop Grumman's Lightweight Wide Aperture Array (LWWAA) flank array sonar for the US Navy's Virginia class submarines form part of the ...
  39. [39]
    Submarine Sonar Upgrades - Virginias, Collins and Shortfins
    Oct 4, 2016 · Virginia-class submarines are also equipped with a low frequency towed sonar array and a high frequency towed sonar array. TB-16 or TB-34 fat ...
  40. [40]
    towed-array sonar motors Virginia-class attack submarines
    Jun 20, 2024 · The TB-29C towed-array sonar will help Virginia-class submarines detect, track, and classify quiet submarine threats in open ocean and littoral waters.
  41. [41]
    Virginia's New Look - How Photonics Masts Will Work | HowStuffWorks
    Each Virginia-class submarine will have two photonics masts, which do not penetrate (retract into) the ship's hull. The mast will rise like a car antenna ...
  42. [42]
    BVS-1(V) Photonics Mast Review and Forecast - Teal Group
    Mar 17, 2017 · The AN/BVS-1(V) Photonics Mast is a submarine non-hull penetrating multi-sensor periscope providing all-weather visual, IR, and TV imaging for data collection ...
  43. [43]
    The eyes of a submarine - SPIE
    Apr 9, 2021 · Aboard the US Navy's most advanced Virginia-class submarines, high-tech photonics masts have replaced periscopes. Patrolling waters around ...
  44. [44]
    UMM Photonics Mast for Virginia-class Attack Submarines
    Sep 11, 2014 · A non-hull penetrating electronic imaging subsystem with visible light camera, infrared camera, and electronic support measures sensors, as well as stealth ...
  45. [45]
    Multifunction submarine masts for electronic surveillance and ...
    Aug 20, 2025 · Multifunction masts are lifting mechanisms aboard submarines like the Virginia class that do not have traditional periscopes penetrating the ...
  46. [46]
    The VIRGINIA Class--A New Submarine for the 21st Century
    The system will be able to process and distribute data received from its spherical bow array, high-frequency array suite, dual towed arrays, and flank array ...
  47. [47]
    Sensors for attack submarines and undersea warfare
    Jul 15, 2025 · Virginia Block VI submarines will have improvements in stealth, propulsion, and weapons, and should be among the best submarines in the ...
  48. [48]
    Virginia-Class Submarines - General Dynamics Mission Systems
    The Virginia Payload Module adds additional four large-diameter, vertical launch tubes to the submarine which are capable of launching Tomahawk missiles or ...
  49. [49]
    BAE Systems to boost firepower of Virginia-class submarines
    Apr 3, 2025 · The Virginia-class attack submarines are equipped with 12 vertical missile launch tubes and four 533mm torpedo tubes. Since the fiscal year 1998 ...
  50. [50]
    The Navy Is Arming Attack Submarines With High Energy Lasers
    Feb 9, 2020 · The US Navy project will fit high energy lasers (HEL) onto a mast of the Virginia Class attack submarine. This could be used to engage a ...
  51. [51]
    [PDF] Integration of a High Energy Laser into the Virginia Class Submarine
    Background: The Division of Undersea Warfare (OPNAV N97) wants to investigate the feasibility of installing a HEL system on Virginia Class Submarine (VCS) ...
  52. [52]
    Report on Virginia-class Attack Submarine Program - USNI News
    Jul 4, 2023 · Most Virginia-class boats procured in FY2019 and subsequent years are to be built with the Virginia Payload Module (VPM), an additional, 84-foot ...<|separator|>
  53. [53]
    [PDF] VIRGINIA PAYLOAD MODULE (VPM)
    The VPM is a cost-effective way to preserve undersea strike capacity, providing over three times the firepower of current Virginia-class submarines.
  54. [54]
    Virginia Payload Module to Give Subs More Firepower
    Block 1 and Block 2 of the class — feature 12 Vertical Launch System tubes for firing Tomahawk cruise ...
  55. [55]
    Report on Virginia-class Attack Submarine Program - USNI News
    Jan 4, 2022 · When procured at a rate of two boats per year, VPM-equipped Virginia-class SSNs have an estimated procurement cost of about $3.45 billion per ...
  56. [56]
    Hypersonic-Armed Destroyers and Submarines are Relocating to ...
    Oct 11, 2025 · Block V Virginia class SSNs with VPM will be able to deploy a total of 28 additional Tomahawk cruise missiles or 12 Conventional Prompt Strike ...Missing: capacity | Show results with:capacity
  57. [57]
    The Hypersonic Missile Advantage | RealClearDefense
    Mar 6, 2025 · The second phase will utilize the Virginia Payload Module (VPM) to equip Block 5 and Block 6 Virginia-class submarines with either 28 ...
  58. [58]
    Navy Authenticates Keel for Future USS Arizona (SSN 803)
    Dec 7, 2022 · Arizona's Virginia Payload Module will comprise four large-diameter, vertical payload tubes in a new hull section inserted into the existing ...Missing: construction | Show results with:construction<|separator|>
  59. [59]
    Los Angeles-class vs Virginia-class - ArmedForces.eu
    Specifications ; Speed surfaced: 20 knots (23 mph; 37 km/h), - ; Speed submerged: 33 kn (61 km/h), 30–35 knots (56–65 km/h) ; Depth: 290 m (950 ft), 240 m (800 ft).<|separator|>
  60. [60]
    Akula vs. Virginia Class Submarines Max Depth - Naval Technology
    Aug 17, 2012 · ... depth of a Virginia-class submarine is noted as greater than 250 metres. The Virginia-class submarines have a maximum speed in excess of 25 ...
  61. [61]
    Nuclear Naval Propulsion - IntechOpen
    This reactor in the Virginia Class SSN-774 submarines is designed to operate for 33 years without refueling and last the expected 30 year design life of a ...
  62. [62]
    Virginia-class SSN-774 - Attack submarines. - Army Recognition
    May 1, 2025 · The reactor provides virtually unlimited range and endurance, with limitations only imposed by food and crew stamina. This allows the Virginia- ...
  63. [63]
    USN VIRGINIA CLASS SUBMARINE Part I - War History
    Dec 13, 2024 · The modular design of the Virginia class gives the submarine a basic layout comprising the nuclear power plant, ship control functions, and ...
  64. [64]
    Astute vs Virginia: which navy has the best nuclear attack submarine?
    Apr 15, 2019 · However, the amount of provisions carried for the crew typically last up to 90 days. Meanwhile, the Virginia class uses an S9G reactor, a ...
  65. [65]
    Do American nuclear submarines have 'back-up” diesel engines to ...
    Oct 22, 2023 · Subs do have a large diesel engine that can carry electrical loads and charge batteries when the ship is at periscope depth or surfaced.Is the future of the Navy in air-independent propulsion submarines?Have any Diesel/Electric submarines ever actually switched from ...More results from www.quora.com
  66. [66]
    Virginia Class - Military Analysis Network
    Acoustic stealth and high speed were key factors in the 688-class design. At the height of the Cold War, the Soviets began to field SSNs nearly as stealthy ...
  67. [67]
    USS Missouri (SSN 780)
    Virginia-class, fast-attack submarines have a crew of approximately 132, made up of 15 officers and 117 enlisted Sailors. The submarine was put in the water on ...Missing: size | Show results with:size
  68. [68]
    AN/BYG-1 Submarine Combat System
    AN/BYG-1 is an open-architecture submarine combat control system integrating tactical, payload, and weapons control, enabling various missions.
  69. [69]
    [PDF] AN/BYG-1 Combat Control System
    - A combat control system for the Virginia class submarine. - A replacement combat control system back fit into Los. Angeles, Ohio, and Seawolf class submarines.
  70. [70]
    Submarine Life Support and Atmospheric Monitoring Technology
    We supply oxygen generation, atmospheric monitoring and airborne contaminant removal systems for every operational class of US submarines.Missing: Virginia- | Show results with:Virginia-
  71. [71]
    Deep Submergence Rescue Vehicle - Navy Ships
    Mar 8, 1999 · The DSRV's maximum operating depth is approximately 1524 meters (5000 feet). The DSRV can be transported by truck, aircraft, surface ship, or on ...
  72. [72]
    USS Virginia (SSN 774) - Unofficial US Navy Site
    Keel laid: September 2, 1999. Launched: August 16, 2003. Commissioned: October 23, 2004. Builder: General Dynamics Electric Boat Division, Groton, Conn ...Missing: date | Show results with:date
  73. [73]
    SSN 775 Texas - GlobalSecurity.org
    May 7, 2011 · USS Texas, the second ship of the Virginia attack submarine class, was commissioned on Sept. 9, 2006, during a ceremony at the Port of Galveston ...
  74. [74]
    SSN-776 USS Hawaii Virginia class attack submarine US Navy
    She was commissioned on 5 May 2007 with Captain David A. Solms in command. In August 2007, Commander Edward Herrington assumed command. In July 2009, she ...Missing: date | Show results with:date
  75. [75]
    SSN 777 USS North Carolina Virginia class attack submarine
    The ship's official commissioning ceremony was held on 3 May 2008, in Wilmington, North Carolina. The submarine joined the U.S. Navy's Atlantic Fleet based in ...
  76. [76]
    SSN-774 Virginia-class NSSN New Attack Submarine - Ships List
    Ships. #, Name, Number, Builder, Port, Ordered, Laid Down, Launch, Christen, Comm, Strike *, notes. Batch 1. Block I. 1, Virginia, SSN-774, Electric
  77. [77]
    [PDF] Navy Virginia (SSN-774) Class Attack Submarine Procurement
    Oct 25, 2016 · The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since. FY1998. The two Virginia-class boats requested ...Missing: timeline | Show results with:timeline
  78. [78]
  79. [79]
  80. [80]
    [PDF] SSN 774 Virginia Class Submarine
    - Is designed to have sonar capability similar to the Seawolf submarine class with improvements to the electronic support suite and combat control systems.
  81. [81]
    [PDF] SSN 774 Virginia Class Submarine
    The Navy has conducted four major test periods to assess the. Virginia class Block I and Block II submarines. ... to re-evaluate the LAB array sonar. • In ...
  82. [82]
    Navy Considering Mid-Block Virginia-Class Upgrades, SSGN ...
    Nov 2, 2017 · The Virginia class has been upgraded in each block to improve manufacturing, reduce lifecycle costs, and add a mid-body Virginia Payload Module ...
  83. [83]
    The Virginia-Class Submarine Has a Message for the U.S. Navy
    Sep 3, 2025 · Virginia is a multi-mission machine because the ocean keeps handing out different problems. Anti-submarine warfare (ASW): The first job, always.
  84. [84]
    Attack Submarines
    The Navy continues to build the next-generation attack submarine, the Virginia (SSN 774) class. Twelve VIRGINIA's have been commissioned to date and they will ...Missing: details | Show results with:details
  85. [85]
    General Dynamics Delivers Submarine North Dakota To U.S. Navy ...
    Aug 29, 2014 · General Dynamics Electric Boat today delivered the nuclear-powered attack submarine North Dakota (SSN-784) on time and more than $30 million ...
  86. [86]
    Virginia Block III: The Revised Bow - Defense Industry Daily
    Aug 13, 2025 · June 7/21: Propulsors BAE Systems won an $18.7 million delivery order for Virginia Class submarine propulsors. This delivery order does not ...
  87. [87]
    [PDF] SSN 774 Virginia Class Submarine
    Major testing phases included developmental testing of the new Large Aperture Bow (LAB) sonar array, testing of the system to support weapon system accuracy ...
  88. [88]
    [PDF] Modernized Selected Acquisition Report (MSAR) SSN 774 Virginia ...
    Oct 8, 2024 · The VIRGINIA Class Submarine (VCS) Program is at Full Rate Production (FRP). A total of 22. VIRGINIAs have delivered with 16 more under contract ...
  89. [89]
    US Navy increases stealth patrol readiness with new Block IV ...
    Jul 3, 2025 · Block IV was developed with a primary focus on lifecycle cost reduction and improved deployment availability. The class was designed to reduce ...
  90. [90]
    USS New Jersey: The Navy's Block IV Virginia-Class Submarine Is a ...
    Mar 3, 2024 · The main improvement of the Block IV over the preceding Block III is the reduction of major maintenance periods from four to three ...
  91. [91]
    [PDF] UNCLASSIFIED UNCLASSIFIED
    [P40A / VACL Battery Management System Upgrade]: VIRGINIA Class ships (Block I-IV) use legacy Automatic Battery Management / Battery Current Management ...
  92. [92]
    USS Vermont Becomes Latest Virginia-Class Fast-Attack Submarine ...
    Apr 18, 2020 · The U.S. Navy commissioned USS Vermont (SSN 792), the 19th Virginia-class attack submarine, April 18. Although the traditional public ...
  93. [93]
    Navy Celebrates Commissioning of USS Vermont (SSN 792)
    Aug 28, 2021 · Vermont was administratively commissioned on April 18, 2020, but due to restrictions on large gatherings because of the COVID-19 pandemic at the ...
  94. [94]
    Meet Block V: The Most Heavily Armed Virginia-Class Submarine ...
    Aug 21, 2025 · -The centerpiece is the Virginia Payload Module (VPM), a new 83-foot hull section that triples the submarine's Tomahawk cruise missile capacity ...Missing: details | Show results with:details
  95. [95]
    Two more Block V Virginia-class SSNs on the horizon
    May 1, 2025 · The US Navy has procured Virginia-class (SSN-774) SSNs since 1998, and a total of 40 have been procured through to 2024. At present, there are 24 SSNs in ...
  96. [96]
    Navy awards Block V Virginia-class submarine contract
    Dec 2, 2019 · The Naval Sea Systems Command awarded a nine-ship -- eight with Virginia Payload Module (VPM) -- Block V contract to General Dynamics Electric ...
  97. [97]
    USS Arizona (SSN-803)
    Arizona was authorized for construction on December 2, 2019. The keel laying ceremony took place December 7, 2022 at the Quonset Point Facility of General ...Missing: production | Show results with:production
  98. [98]
  99. [99]
    Navy Orders Two More Virginia-Class Submarines - GovCon Wire
    May 1, 2025 · Navy Modifies $18.45B Contract Awarded to GDEB, HII for Virginia-Class Submarines · Elodie Collins · May 1, 2025 · Contract Awards,News.
  100. [100]
    Virginia-Class Block V: It Might Be the Best Navy Submarine Ever
    Nov 28, 2024 · Original Virgnia's could carry up to 37 torpedoes or Tomahawk missiles. Twelve of the slots are known as Virginia Payload Tubes. Virginia-class.
  101. [101]
    [PDF] The United States Naval Nuclear Propulsion Program - Stanford
    The lead ship, USS VIRGINIA (SSN. 774), was commissioned on October 23, 2004. VIRGINIA is the Navy's first major. Page 11. 5 combatant designed with the post- ...
  102. [102]
    Navy Commissions Attack Boat USS John Warner - USNI News
    Aug 3, 2015 · Sailors stand during the commissioning ceremony of the USS John Warner (SSN-785) on Aug. 1, 2015. “This boat is the latest incarnation of ...Missing: date | Show results with:date
  103. [103]
    USS Texas Arrives in Stirling, Australia - 7th Fleet
    Virginia-class submarines are built to dominate the world's littoral and deep waters while conducting anti-submarine warfare; anti-surface-ship warfare ...
  104. [104]
    U.S. Virginia-Class Submarine Visits Perth, Australia
    Aug 4, 2023 · ... patrols in the Indo-Pacific region. The nuclear-powered, Virginia-class vessel, with more than 130 crew members, is docked at HMAS Stirling ...
  105. [105]
    First Forward-Deployed Virginia-Class Submarine Arrives in Guam
    The Virginia-class fast-attack submarine USS Minnesota (SSN 783) arrived to its new homeport of Naval Base Guam, Nov. 26, as part of the U.S. Navy's ...
  106. [106]
    US Submarine Earns Highest Military Honor for Spying on America's ...
    Oct 23, 2024 · The USS Washington, a conventionally armed 7,900-ton Virginia-class fast-attack submarine, was awarded the Presidential Unit Citation for " ...
  107. [107]
    USS John Warner is First Virginia-Class Attack Sub to Fire Missiles ...
    Apr 16, 2018 · USS John Warner (SSN-785) launched six Tomahawk land-attack missiles from the Eastern Mediterranean, it was the first time a Virginia-class submarine fired ...
  108. [108]
    Hybrid navies: Integrating uncrewed capability into carrier strike
    Sep 12, 2025 · The USN has completed integration of a torpedo tube launch-and-recovery UUV capability for its Virginia class SSNs. The capability is ...
  109. [109]
    Gerald R. Ford Carrier Strike Group Completes COMPTUEX
    Apr 3, 2023 · COMPTUEX is a certification exercise to integrate a carrier strike group as a multi-mission force and test their ability to carry out sustained ...
  110. [110]
    A Norwegian Fisherman Accidentally Caught a US Submarine in His ...
    Nov 14, 2024 · A Norwegian fisherman caught a US submarine in his nets this week. The USS Virginia's propellers got tangled in the nets, reports say, dragging ...
  111. [111]
    Norwegian fishermen snagged U.S. nuclear-powered submarine
    Nov 13, 2024 · It was a Virginia-class submarine like this one that sailed into a fishing net north of the island of Senja on November 11. Archive photo ...
  112. [112]
  113. [113]
    Fighting Submarine Maintenance Bottlenecks - U.S. Naval Institute
    For instance, an extended selected docking restricted availability (ESDRA) for a Virginia-class submarine requires something like 8,000 individual work tasks ...
  114. [114]
    The US Navy's Quest for Submarine Spare Parts - Maintenance World
    Oct 4, 2023 · The US Navy faces challenges due to shortage of skilled workers, supply chain issues, sole-source parts, obsolescence, and inadequate funding ...
  115. [115]
    The Navy's Submarine Maintenance Crisis Needs Ready, Affordable ...
    The submarine challenge includes insufficient submarine maintenance capacity and capability, increased submarine demand, and the need for expanded funding.
  116. [116]
    The Pillars of Submarine Safety | Proceedings - U.S. Naval Institute
    The U.S. Submarine Force's outstanding safety record since the Thresher tragedy is a direct result of rigorous compliance with the technical and administrative ...Missing: reliability | Show results with:reliability
  117. [117]
  118. [118]
    An Analysis of the Navy's 2025 Shipbuilding Plan
    Jan 6, 2025 · In this report, the Congressional Budget Office analyzes the Navy's 2025 plan and estimates its costs. Overall, the Navy wants to build a larger ...
  119. [119]
    GDEB delivers Virginia Block VI long lead items in $1.3bn deal
    Aug 6, 2024 · When procured at a rate of two boats per year, VPM-equipped Virginia-class SSNs have an estimated cost of about $4.5bn per boat. However ...
  120. [120]
    US Navy Submarines $17 Billion Over Budget, 'in Crisis': Lawmaker
    Sep 20, 2024 · The Navy's nuclear-powered Virginia class sub, which it's supposed to build two of a year, is facing major delays and ballooning costs.
  121. [121]
    Defense bill has some funding for second Virginia-class submarine
    but with only partial funding for a second submarine after disputes over procurement.<|separator|>
  122. [122]
    Submarine Delays Will Cost Taxpayers
    Oct 4, 2024 · Looking ahead, GAO reports that “delays and cost growth will likely continue and get worse.” Specifically, GAO reported that a failed plan to ...
  123. [123]
    [PDF] GAO-24-107732, COLUMBIA CLASS SUBMARINE
    Sep 30, 2024 · This report assesses (1) the extent to which submarines are on track to meet cost and schedule targets and how risks could affect construction.
  124. [124]
    Block V Virginia-class attack subs delayed 2 years due to staffing ...
    Jun 8, 2023 · GAO also noted that the shipbuilders are starting to outsource certain submarine work that they may have otherwise done in their own yards.
  125. [125]
    Virginia construction languishes as labor is funneled to Columbia
    Jun 8, 2023 · Virginia-class submarine production is struggling with increasingly severe labor shortages, according to the Government Accountability ...Missing: constraints | Show results with:constraints
  126. [126]
    GAO-25-108136, NAVY SHIPBUILDING: A Generational Imperative ...
    Mar 11, 2025 · In June 2024, we found that the Virginia class submarine program's rate of production to meet fleet needs remains at 60 percent of the planned ...
  127. [127]
    Navy, Industry Try to Reverse Course on Workforce Woes (UPDATED)
    Mar 31, 2025 · Currently, the attrition rate for “your average worker” in a shipyard is 20 to 22 percent, and “in some of the critical trades it's as high as ...Missing: limitations | Show results with:limitations
  128. [128]
    GAO Report on Columbia-class Submarine Program - USNI News
    Jan 25, 2023 · The Navy plans to invest roughly $132 billion to acquire 12 Columbia class nuclear-powered ballistic missile submarines. The shipbuilders are ...<|separator|>
  129. [129]
    SECNAV Phelan: Fixing Columbia, Virginia Sub Production Top ...
    May 15, 2025 · As of April 2025, 24 Virginia Class Submarines have been delivered and 14 are under contract. Five Columbia class submarines are in construction ...
  130. [130]
    JUST IN: Navy Hopes to Bump Sub Production to 3 Per Year by 2028
    Nov 13, 2024 · The Navy has a goal to boost its lagging submarine production from an underperforming 1.3 in 2024 to one Columbia-class and two Virginia-class by 2028.
  131. [131]
    Supply Chain, Workforce, Advanced Manufacturing Will Help Navy ...
    Apr 9, 2025 · The Navy wants to be able to build one Columbia-class and two Virginia-class submarines a year and eventually expand that to 2.33 Virginia-class ...
  132. [132]
    Supply chain, workforce, advanced manufacturing will help Navy get ...
    Apr 10, 2025 · The Navy wants to be able to build one Columbia-class and two Virginia-class submarines a year and eventually expand that to 2.33 ...
  133. [133]
    [PDF] GAO-25-106286, SHIPBUILDING AND REPAIR: Navy Needs a ...
    Feb 27, 2025 · In our prior work, we reported on poor conditions at the public shipyards and the challenges the Navy faces in improving them; delays in repairs.
  134. [134]
    U.S. Naval Shipyards Accelerating Outsourcing for New ...
    Sep 12, 2025 · The Navy and the shipbuilders' major stumbling block to expanding capacity for new construction is finding enough workers to build the new hulls ...Missing: limitations | Show results with:limitations
  135. [135]
    [PDF] “The State of U.S. Shipbuilding” - House Armed Services Committee
    Mar 11, 2025 · Industrial base capacity constraints for building Navy ships are present at both shipyards and supplier firms. The most prominent constraints ...<|control11|><|separator|>
  136. [136]
    US Navy's submarine fleet is too small. Here's how selling some ...
    May 9, 2024 · The U.S. Navy's fleet includes 49 attack submarines, despite a formal requirement for 66. It's also facing crewing and maintenance problems.Missing: wargames | Show results with:wargames
  137. [137]
    The Navy's Virginia-Class Submarine Program Is 410 Months Behind
    Apr 2, 2025 · Labor shortages at shipyards and residual inflationary pressures contribute to a staggering 410-month total delay. -The U.S. also promised ...
  138. [138]
    Submarine delays are sinking the American edge in a Taiwan war
    Jul 17, 2025 · A widening gap between US submarine ambitions and industrial capacity is reshaping the undersea balance just as China accelerates its challenge ...
  139. [139]
  140. [140]
    USN Virginia submarine production shortfall worsens - APDR
    Mar 12, 2024 · the US needs to lift submarine production rate to two per year by 2028 - but is nowhere near reaching that target.
  141. [141]
    Navy awards over $18 billion in contracts for two Virginia-class ...
    May 1, 2025 · To date, the Navy has accepted delivery of 24 Virginia-class submarines, with 16 more now under contract. The new submarines are expected to be ...
  142. [142]
    General Dynamics Wins $12B US Navy Deal for Two More Virginia ...
    May 2, 2025 · Most of the work will be carried out in Connecticut and Virginia, with an expected completion date of June 2036. Virginia-Class Submarine ...
  143. [143]
    HII Completes Initial Sea Trials of Virginia-Class Submarine ...
    HII's Newport News Shipbuilding division has successfully completed initial sea trials for Virginia-class attack submarine Massachusetts (SSN 798).Missing: USS | Show results with:USS
  144. [144]
    Virginia-class submarine Massachusetts completes initial sea trials
    October 9, 2025. Virginia-class submarine Massachusetts completes initial sea trials ... The submarine was christened in May 2023 and is part of the ongoing Virginia-class production line, a program designed ...
  145. [145]
    US Navy Ramps Up Virginia-Class Submarine Production - SOFREP
    Oct 15, 2024 · ... production rate to around 1.2 to 1.4 submarines per year since 2022. These delays are creating a growing backlog of submarines that have ...
  146. [146]
    US Navy awards contract modifications to buy another two Block V ...
    May 1, 2025 · US Navy awards contract modifications to buy another two Block V Virginia-class submarines ... SSN 812 and SSN 813 – as well as investments ...Missing: FY2025 | Show results with:FY2025
  147. [147]
    Report to Congress on SSN(X) Next Generation Submarine Program
    Jul 10, 2025 · The Navy's Integrated Enterprise Plan helps balance workloads between the two shipyards and manages supply chain dependencies for both submarine ...
  148. [148]
  149. [149]
    Navy's next-gen attack submarine delayed until 2040 amid rising costs
    Jul 14, 2025 · Production of the SSN(X) submarine has been delayed to 2040 amid budget constraints, as the Navy struggles to meet shipbuilding goals ...
  150. [150]
    Report to Congress on Navy Next-Generation Attack Submarine
    Mar 25, 2025 · The Navy's FY2024 budget submission envisaged procuring the first SSN(X) in FY2035. The Navy's FY2025 budget submission defers the envisaged ...<|separator|>
  151. [151]
    SSN(X) Next Generation Attack Submarine - GlobalSecurity.org
    Apr 13, 2021 · SSN(X) will be designed for greater transit speed under increased stealth conditions in all ocean environments, and carry a larger inventory of weapons and ...
  152. [152]
    Report to Congress on Navy SSN(X) Next-Generation Attack ...
    Dec 10, 2021 · The artificial intelligence level systems that would guide a deployed SSQ are the major cost of these boats, which have been relieved of the ...
  153. [153]
    Report to Congress on SSN(X) Next Generation Submarine
    Jul 17, 2025 · The Navy's envisaged successor to the Virginia-class design is the Next-Generation Attack Submarine, or SSN(X). The Navy's FY2025 budget ...
  154. [154]
    Delays in Navy's next-gen submarine threaten US seapower, report ...
    Jul 11, 2025 · “The delay of SSN(X) construction start from the mid-2030s to the early 2040s presents a significant challenge to the submarine design ...
  155. [155]
    Naval Reactors: Virginia-class Will Extend to Block VIII, SSN(X) Start ...
    Nov 13, 2024 · Rucker cited the industrial base's challenges with materials, which has affected the sequencing order of the boats, as factors that have ...
  156. [156]
  157. [157]
    Australia Pledges $7.9B for Naval Project to Support AUKUS Subs
    Sep 15, 2025 · Australia plans to operate a fleet of eight nuclear-powered attack submarines. The country may purchase three to five Virginia-class submarines ...Missing: details | Show results with:details
  158. [158]
    Australia won't receive Aukus nuclear submarines unless US ...
    Jul 28, 2025 · Under pillar one of the Aukus agreement, Australia is scheduled to buy between three and five Virginia-class nuclear-powered submarines from the ...
  159. [159]
    AUKUS Still Has a Virginia Problem - Foreign Policy Research Institute
    Oct 7, 2025 · Under the current AUKUS plan, Australia will receive between three and five second-hand Virginia-class submarines from the early 2030s to ...
  160. [160]
    AUKUS agreement for cooperation on naval nuclear propulsion
    The agreement will enable the UK and the US to transfer submarine-specific material and equipment for Australia's future nuclear powered submarines.
  161. [161]
    AUKUS exemption to US defence trade controls doesn't cover ...
    Apr 15, 2025 · U.S. controls on sensitive defence exports, relaxed for AUKUS partner Australia last year, still apply to submarines, creating hurdles to ...
  162. [162]
    US approves new ITAR rules for Australia and UK, in order to speed ...
    Aug 15, 2024 · This US ITAR reform would reduce by close to, or slightly over 900 export permits required under our export controls from Australia to the US and the UK.
  163. [163]
    AUKUS exemption to US defence trade controls doesn't cover ...
    Apr 15, 2025 · “Submarine technology is on the excluded technologies list, meaning it is not going under the AUKUS exemption,” said Kylie Wright, assistant ...
  164. [164]
    Deterring at a distance: The strategic logic of AUKUS - Lowy Institute
    Jun 24, 2024 · With regional security anxieties rising, nuclear-powered submarines are the optimal deterrence machines.
  165. [165]
    AUKUS Explained: How Will the Trilateral Pact Shape Indo-Pacific ...
    Jun 12, 2023 · The AUKUS is intended to be a strategic partnership among Australia, the United Kingdom (UK), and the United States to bolster their allied deterrence and ...
  166. [166]
    The AUKUS Inflection: Seizing the Opportunity to Deliver Deterrence
    Aug 25, 2025 · In fact, AUKUS might be the most strategic play yet by the United States to regain advantages in the Indo-Pacific and to inject stability into a ...