The Aerial Lift Bridge is a vertical-lift movable bridge spanning the in , connecting the mainland to Park Point and serving as the gateway to the Port of Duluth-Superior, the largest freshwater port in the world. Originally constructed from 1901 to 1905 as a rare —also known as an aerial ferry bridge—with a suspended carrying vehicles and pedestrians across the canal, it was redesigned and modified between 1929 and 1930 to its current configuration, where the entire 390-foot steel roadway span lifts vertically via counterweights and electric motors. The bridge's two 226-foot-tall riveted steel towers, supported by piers, enable the span to rise approximately 126 feet above its closed position in about 60 seconds, providing up to 141 feet of vertical clearance for large ships during the navigation season. Designed initially by engineer Thomas F. McGilvray and built by the Modern Steel Structural Company at a cost of $111,700, the original structure was inspired by a similar in , , and represented an innovative solution to link the isolated Park Point without obstructing ship traffic in the newly dredged canal. The 1929 modifications, led by engineer C.A.P. Turner and costing $400,000, addressed the growing demand for automobile traffic by replacing the system with a direct roadway lift, preserving the original towers while adding new trusses, counterweights, and machinery powered by batteries with gasoline backup. This upgrade maintained the bridge's span-drive mechanism, where the roadway itself is elevated, distinguishing it from more common bascule or swing bridges in the region. As a element, the bridge opens approximately 25 times per day during the April-to-November shipping season, accommodating approximately 700 vessels annually that transport about 30 million short tons of cargo—including , , and —as of the 2024 season, while handling about 6,000 vehicles daily in its closed position. It has undergone multiple rehabilitations, including major work in 1986, 1999, 2007, and 2009 to replace structural elements, repair machinery, and update lighting, and in 2025 secured funding for a $20 million project to address and structural repairs, ensuring its continued operation as part of the Duluth Ship Canal Historic District. Recognized for its engineering ingenuity, the Aerial Lift Bridge was designated a National Historic Civil Engineering Landmark by the in 2017, highlighting its role as the first U.S. example of a and one of only two such structures ever built in the country. It also holds significance on the for its contributions to transportation, commerce, and the development of Duluth as a key hub, attracting over 500,000 visitors annually who view its dramatic lifts and neoclassical design illuminated at night. The bridge symbolizes the city's maritime heritage and continues to facilitate both industrial and recreational access to the system.

Definition and Design

Overview

An aerial lift bridge is a rare type of movable bridge that originally operates as a , functioning as an aerial ferry that carries vehicles and pedestrians via a suspended across a fixed overhead span, and which can be modified to elevate the entire roadway vertically to permit the passage of tall vessels beneath it. The term 'aerial lift bridge' is most commonly applied to the modified Duluth example, while the transporter is a distinct historical type with no other surviving U.S. examples. This design evolved from early transporter concepts, where the provided an efficient means of crossing waterways without obstructing navigation below. Similar to vertical-lift bridges, which raise their span using wire ropes over tower sheaves connected to counterweights, aerial lift bridges utilize a stiff-trussed overhead structure supported by towers and counterweights to initially facilitate movement, later adapted for vertical deck elevation while maintaining horizontal stability. This hybrid configuration allows for minimal interference with low-lying shorelines and provides a unique balance between transport efficiency and navigational clearance. The basic operational principle involves keeping the bridge span fixed in the horizontal plane while lifting the or to clear ship masts and air drafts, typically spanning navigable waterways such as ship canals. In practice, this elevation is achieved through machinery housed in the towers, enabling the structure to serve both vehicular traffic and maritime needs. bridges are historically rare, with only one true example—the Duluth Aerial Lift Bridge—existing today, having evolved from early 20th-century transporter designs; approximately 8 transporter bridges survive and operate worldwide as of 2024.

Key Components and Mechanism

The primary components of an aerial lift bridge include twin towers, typically 200–300 feet tall, which support the entire structure and house counterweights. An overhead stiff , often 300–400 feet long, the and provides the framework for movement. The suspended or lift deck, designed to carry several vehicles and up to 350 pedestrians in its original configuration, hangs from cables that connect to the truss. or counterweights, totaling thousands of tons, balance the system to facilitate efficient operation. The original mechanism operated in transporter mode, where electric motors propelled the along the to ferry loads across the ; following modification, it operates in mode, where electric winches elevate the entire vertically via counterbalanced sheaves on the towers, providing 100–150 feet of clearance in 1–2 minutes. In the , wire ropes extend over tower sheaves to connect the span to descending counterweights, achieving near-perfect balance with a 1:1 weight ratio that minimizes power requirements. This design, as applied in structures like the Duluth bridge for ship canal , allows seamless adaptation between horizontal transit and vertical clearance. Load-bearing specifics include a deck width of approximately 24 feet to accommodate two lanes of vehicular , with vertical capacity up to 1,000 tons to support heavy loads during . The structure is engineered for loads up to 100 , ensuring against lateral forces, while modern retrofits incorporate seismic considerations through reinforced tower foundations and flexible rope terminations. Engineering innovations feature pin-connected trusses that enhance stiffness and distribute loads evenly across the span, reducing deflection under weight. A four-point system, using ropes attached at the span's corners, minimizes and torsional effects during lifting, improving and in operation.

Historical Development

Origins of the Concept

The concept of the transporter bridge, which laid the foundational principles for bridges, emerged in the mid-19th century as an innovative solution to the challenges of crossing waterways with significant maritime traffic. In 1873, British engineer Charles Smith, manager of an ironworks in , proposed the idea of an "aerial ferry" to span the River Tees without interrupting navigation, publishing his design in the journal . This concept addressed the limitations of traditional movable bridges, such as and bascule types, which required mechanical pivoting or tilting mechanisms that could obstruct deep-water channels and tall-masted ships, often leading to delays in busy industrial ports. Smith's design featured fixed towers connected by a high-level from which a suspended would transport vehicles and passengers across the span, ensuring uninterrupted 24/7 navigation below. The first practical implementation came nearly two decades later, driven by French engineer Ferdinand Arnodin, who patented the "pont transbordeur" in 1887 and refined the system for industrial applications. The earliest transporter bridge constructed was the in , , completed in 1893 to link the industrial towns of and Las Arenas across the Nervión estuary. Designed by Alberto Palacio and Arnodin, this structure featured towers rising to 61 meters with the platform 45 meters above the water and a 160-meter span, with a capable of carrying up to 6 vehicles or 200 passengers, purpose-built to efficiently move heavy loads like and workers in a region booming with mining and shipping. Still operational as of 2025, it remains the oldest surviving example of its kind. Early 20th-century examples further demonstrated the design's adaptability for industrial ports. The in , opened in 1906, featured towers approximately 72 meters tall and a 197-meter span between them, with a accommodating up to 6 cars and 200 pedestrians per crossing. Similarly, the Marseille Transporter Bridge in , completed in 1905, spanned 165 meters across the Old Port with towers reaching approximately 80 meters, facilitating the transport of goods and people amid the city's intense maritime activity. These bridges were engineered to overcome the span and clearance constraints of swing bridges, which pivoted around a central in the , and bascule bridges, which relied on counterweights that limited their length and increased construction complexity in deep channels. By , approximately 20 transporter bridges had been built worldwide, predominantly in to serve ports in , the United Kingdom, Spain, and Germany. This global spread reflected their appeal for efficient, low-disruption crossings in industrial settings, but their popularity waned after due to the rise of vertical-lift bridges, which offered greater capacity for the increasing volume of motorized vehicles without the gondola's throughput limitations. The transporter concept influenced early U.S. adaptations, such as the 1905 Aerial Bridge in .

Evolution and Key Milestones

In the early , engineers began experimenting with conversions of to vertical lift designs, driven by the inherent inefficiencies of the system, such as slow crossing times—often 90 seconds or more per trip—and vulnerability to high winds that frequently halted operations. A pivotal milestone was the construction of the first transporter bridge in the United States at , in 1905, designed by city engineer Thomas F. McGilvray in a span-drive configuration that powered the along stiff trusses spanning 390 feet. This period also saw global innovations in hybrid designs, exemplified by the Rendsburg Transporter Bridge in , completed in 1913 as a suspended beneath a railway to accommodate heavier rail traffic while retaining the suspended for vehicular and pedestrian transport. A major advancement occurred during the 1929–1930 reconstruction of the Duluth bridge by engineer C.A.P. Turner, who transformed it into a full vertical lift span by raising the towers 24 feet to provide a clearance of 135 feet above the water, allowing the entire 390-foot roadway span to elevate efficiently for maritime passage. Engineering standards for such movable spans advanced concurrently, with the publishing specifications for bridge operating machinery in the 1920s to address mechanical reliability and safety. Following , the rise of automotive traffic accelerated the decline of new transporter constructions, as gondolas proved inadequate for high-volume car crossings, leading engineers to favor more versatile bascule and vertical lift bridges that could handle greater loads without weather disruptions. By the , many had been destroyed or replaced, with only a handful remaining operational worldwide, and today approximately 8 survive, marking the transition to modern hybrid designs. The Duluth example stands as the only surviving U.S. instance of this evolutionary path.

The Duluth Example

Initial Construction (1905)

The Duluth Aerial Lift Bridge was constructed across the , which had been excavated between 1870 and 1871 to provide access to the city's harbor on while connecting the mainland to the residential and recreational area of Minnesota Point (now known as Park Point). The bridge addressed longstanding transportation challenges for the growing community, replacing unreliable ferries and seasonal footbridges that limited access during harsh weather. Designed by local engineer Thomas F. McGilvray in collaboration with C.A.P. Turner, the structure was engineered as the first transporter bridge in the United States, drawing inspiration from European examples like the 1889 Rouen Bridge in to avoid obstructing ship traffic in the vital canal. Construction was awarded to the Modern Steel Structural Company of , with the project costing approximately $112,000. Work on the bridge began in 1901, with the inverted steel towers—each rising approximately 150 feet above the —erected progressively through 1905 on piers embedded in the canal banks. The main span measured 390 feet, supporting a suspended that traversed the along overhead cables, enabling efficient crossings without impeding maritime navigation below. The itself, a rectangular platform enclosed for passenger safety, had a capacity of 60 tons, accommodating up to 350 people along with wagons, streetcars, or early automobiles. Powered by electric motors, the system moved the at a steady pace, completing trips in about one minute. The first test crossing occurred on February 23, 1905, carrying around 40 dignitaries and workers, marking the bridge's entry into service as an aerial that operated at intervals of two to three minutes during peak hours. Early development faced hurdles, including the U.S. Army Corps of Engineers' rejection of an initial vertical-lift proposal due to concerns over potential mechanical failure halting canal shipping, which delayed adoption of a transporter design until the early 1900s. By 1910, the bridge had become indispensable to Duluth's economy, facilitating thousands of daily crossings amid the shipping surge that positioned the port as a key hub for commerce, handling millions of tons of cargo annually and supporting the city's rapid population and industrial growth.

Reconstruction and Operation (1929–Present)

In 1929–1930, the Aerial Lift Bridge underwent a major reconstruction to convert it from its original transporter design to a , a project led by engineer Claude Allen Porter (C.A.P.) Turner. The steel towers were lengthened to support the new mechanism, resulting in towers approximately 226 feet tall above the water and providing 135 feet of vertical clearance when raised. The main span was extended to 390 feet to better accommodate larger vessels in the . The lift span, weighing nearly 900 tons, was balanced by two concrete counterweights each at 500 tons, enabling efficient operation powered by four 100-horsepower electric motors. The first full lift for a vessel occurred on March 29, 1930, marking the bridge's transition to its current form. Daily operations involve raising the span to provide 135 feet of clearance for passing ships, a process that takes about 60 seconds from closed to fully open position. The bridge lifts approximately 5,000 times annually, primarily to facilitate over 900 vessel passages through the harbor each year, with operators coordinating via radio and visual signals. Ship captains often signal their approach or appreciation with blasts, such as the common "captain's salute" of one long followed by two short blasts, while the bridge's alerts mariners and motorists during lifts. Vehicle traffic averages more than 6,000 crossings per day, integrating seamlessly with pedestrian and maritime flows to support the port's role as a key gateway. Subsequent upgrades have ensured the bridge's ongoing reliability, including the installation of energy-efficient LED lighting in 2020 to enhance visibility and reduce maintenance needs. In January 2025, over $11 million in federal funding was announced for major repairs to address structural and mechanical wear. In 2025, as part of celebrations for the structure's 120th anniversary since its original 1905 opening, routine maintenance checks were conducted. The City of Duluth highlighted its commitment to the bridge's future by posting job openings for a supervisor role in November 2025, emphasizing the position's responsibilities in operations, electrical systems, and public coordination (applications closed November 16, 2025).

Engineering and Operation

Mechanical Systems

The mechanical systems of the Aerial Lift Bridge enable the vertical elevation of the massive moving span through a combination of , and dynamic balancing mechanisms. The power system relies on dual 500-hp AC motors to drive the lift , supported by backup diesel generators that activate during electrical outages to maintain functionality. hoists, configured with an 8:1 , facilitate the smooth and controlled elevation of the span by distributing the load across multiple cables and sheaves. Control mechanisms are housed in an operator cabin located approximately 100 feet above the , featuring manual levers for direct operation alongside modern () automation integrated in the 1990s to optimize movement sequences and response times. Integrated sensors continuously monitor , load distribution, and structural alignment to prevent unsafe conditions and ensure precise synchronization during lifts. Dynamic forces during operation are primarily managed by a system comprising blocks totaling around 1,000 tons, which balances the approximately 900-ton moving span and reduces the required from the motors. The energy demand for elevating the span follows the basic gravitational potential energy formula: E = m g h where m represents the effective of the span (accounting for balance), g is the (9.8 m/s²), and h is the lift height of roughly 135 feet (41 meters); this configuration demands significant power from the motors to complete the raise in about 60 seconds. These systems integrate seamlessly with the bridge's framework, limiting deflection to no more than 1/1000 of the span length under full load to preserve alignment and stability. Emergency braking employs hydraulic clamps that engage the wire ropes or towers to halt and secure the span against unintended descent or excessive motion. In Duluth, these mechanical systems support routine vessel passages by enabling reliable daily lifts during the navigation season.

Safety and Maintenance

Safety protocols for the Aerial Lift Bridge prioritize the secure passage of vessels, vehicles, and pedestrians, incorporating measures such as restrictions on operations during high winds to prevent instability during lifts. The bridge features a system of 12 wire ropes that provide redundancy in lifting the span, with fail-safe mechanisms including emergency brakes to halt operations if anomalies are detected. Additionally, the structure undergoes annual certifications by the U.S. Coast Guard to ensure compliance with navigation clearance requirements, allowing safe passage for ships up to 1,000 feet in length beneath the raised span. Maintenance routines are essential to the bridge's longevity, with regular inspections conducted by the City of Duluth in coordination with the , including yearly routine evaluations and biennial fracture-critical assessments of the towers and cables to identify structural weaknesses. Cable replacements occur approximately every 18 years to address wear from repeated lifting cycles, as demonstrated by the 2016 overhaul that installed a new set of wire ropes during the winter off-season to minimize disruptions. A $11.2 million federal RAISE grant awarded in January 2025 will fund rehabilitation of the deck, sidewalks, and structural elements to enhance durability, with work scheduled to commence in fiscal year 2025. As of November 2025, routine inspections have been completed in September and October, but major construction is pending. Key challenges in maintaining the bridge stem from environmental factors, particularly corrosion accelerated by the high humidity and salt exposure from , which has led to degradation in submerged and atmospheric components. Operator training emphasizes safety at heights, with roles such as the bridge supervisor requiring candidates to demonstrate comfort working at elevations up to 135 feet, as highlighted in 2025 job postings that stress the demands of the pilot house position. Incident history remains minor, with occasional mechanical issues like the 2017 lift malfunction that caused a brief delay but no injuries, underscoring the effectiveness of preventive measures. The bridge adheres to standards set by the American Association of State Highway and Transportation Officials (AASHTO) for movable bridges, including guidelines for , , and to ensure structural integrity. is kept minimal through advanced systems, such as camera integrated into the operator's station, enabling predictive oversight that supports the bridge's role in approximately 5,000 annual lifts with high reliability.

Significance and Legacy

Historic Designations

The Aerial Lift Bridge in , received designation on the on May 22, 1973, recognizing its exceptional engineering significance as a rare example of early 20th-century movable bridge technology that facilitated maritime commerce on . In 2017, the (ASCE) designated it a National Historic Civil Engineering Landmark, honoring its role as the first constructed in the United States and its innovative adaptation from an aerial ferry to a vertical lift mechanism. These recognitions underscore the bridge's status as a pioneering structure in American history. Preservation efforts for the bridge have been ongoing under the oversight of the Department of Transportation (MnDOT), which documents its maintenance history and coordinates historic bridge initiatives, including multiple rehabilitations since the 1929 modification. Federal grants supported key restorations in the 2010s, such as the 2009 project funded by American Recovery and Reinvestment Act stimulus that addressed repairs and repainting of the 1929 overhead to combat and preserve its integrity. In January 2025, the City of Duluth received a $11.2 million federal grant from the U.S. Department of Transportation's RAISE program to fund over half of a $20 million rehabilitation project, including deck and sidewalk repairs, structural reinforcements, and machinery upgrades, with work planned to begin in 2025. In 2025, commemorative events marked the 120th anniversary of the bridge's original 1905 opening, highlighting its enduring operational history and drawing public attention to ongoing preservation needs. The Duluth bridge stands out as the only preserved example of a stiff-trussed worldwide, retaining its rigid overhead truss from the 1929 conversion, which distinguishes it from lighter, cable-suspended designs elsewhere. These designations were granted based on criteria highlighting the bridge's innovative span-drive configuration, where the lift span is powered directly by motors on the moving section rather than fixed towers, and its adaptive evolution from a 1905 system to a 1929 vertical lift, illustrating key advancements in 20th-century bridge engineering for efficiency and reliability in harsh environments.

Cultural and Economic Impact

The Aerial Lift Bridge serves as an enduring icon of Duluth's maritime heritage, deeply embedded in the city's cultural identity. It frequently appears in local media and artistic expressions, including photography exhibitions and murals that capture its majestic lifts against Lake Superior's horizon. Ship-watching events at Canal Park draw enthusiasts who gather to witness freighters passing beneath, fostering a sense of community and connection to the shipping tradition. A poignant annual ritual underscores its cultural resonance: on , ships like the Arthur M. Anderson deliver a master's —seven long blasts on the —as they pass under the bridge, commemorating the 1975 sinking of the with its 29 lost crew members. This tribute, exchanged with the bridge's own response, has become a solemn tradition observed by residents and visitors alike, symbolizing respect for the perils of lake navigation. As a major tourism magnet, the bridge attracts over 500,000 visitors annually to the surrounding Canal Park area, where live webcams and guided tours offer views of its operations and incoming vessels. In 2025, celebrations marking the bridge's 120th anniversary, including special events at the Harbor Plaza, contributed to heightened interest and local gatherings, enhancing Duluth's appeal as a destination. Economically, the bridge enables the Port of Duluth-Superior's vital role in regional commerce, facilitating the shipment of commodities like and that generated $1.6 billion in total economic activity in 2022. This maritime traffic supports approximately 7,136 jobs across direct, indirect, and induced employment in the bi-state area, underpinning industries from steel production to . The bridge itself operates toll-free for vehicles, ensuring seamless access that bolsters port efficiency without user fees. In 2025, reaching 120 years of service, the bridge stands as a symbol of engineering resilience, continuing to lift for thousands of vessels each year amid ongoing rehabilitation efforts to preserve its functionality. Its enduring presence highlights the value of adaptive infrastructure in supporting sustainable economic corridors along vital waterways.

References

  1. [1]
    Duluth Aerial Lift Bridge - ASCE
    The Duluth Aerial Lift Bridge was the first transfer bridge in the US, later converted to a vertical lift bridge, and is a National Historic Civil Engineering ...
  2. [2]
    Duluth Aerial Lift Bridge (Bridge L6116) - MnDOT
    The Duluth Aerial Lift Bridge is a span-drive configuration movable lift bridge constructed in 1901-1905 and modified in 1929.Missing: definition examples
  3. [3]
    Drawbridge Operation Regulation; Duluth Ship ... - Federal Register
    Oct 29, 2018 · It is a vertical lift type bridge that provides 15 feet of vertical clearance in the down position and up to 141 feet in the open position.
  4. [4]
    Stauber Announces Over $11 Million in Funding for the Aerial Lift ...
    Jan 7, 2025 · The Aerial Lift Bridge isn't just a bridge – it's a cherished Minnesota icon, a significant entryway to the Port of Duluth-Superior, and a ...
  5. [5]
    Tees Transporter Bridge
    It is one of only an estimated twelve surviving transporter bridges in the world. An iconic landmark of Middlesbrough, this beautifully maintained bridge ...
  6. [6]
    None
    ### Summary of Aerial Lift Bridges and Transporter Bridges
  7. [7]
    [PDF] chapter-17-movable-bridges.pdf - NET
    example of a tower driven vertical lift bridge is shown in Figure 17.9. A schematic of a vertical lift bridge and its components is presented in Figure 17.10.
  8. [8]
    [PDF] Newport Transporter Bridge— an historical perspective
    The towers are of lattice construction, giving an open portal, through ... Bridge towers and gondola. Line of the transporter bridge on that of the.Missing: mechanism | Show results with:mechanism
  9. [9]
    Transporter Bridges - Wonders of World Engineering
    The rolling bascule bridge had its advantages, but even a bridge with two bascules, such as the Tower Bridge in London, was subject to limitations of length.
  10. [10]
    1911: The Tees Transporter Bridge opens - Port Of Middlesbrough
    The iconic Tees Transporter Bridge was officially opened on 17 October 1911. It is one of only around 30 ever built and is the longest, operational transporter ...
  11. [11]
    The Tees Transporter Bridge - still hanging on
    The Tees Transporter Bridge, also referred to as the Middlesbrough Transporter Bridge, was built to provide an innovative method of crossing the River Tees.
  12. [12]
    Vizcaya Bridge - UNESCO World Heritage Centre
    The Bridge was opened on 28 July 1893 and has operated continuously ever since, except during the Spanish Civil War from 1937 to 1941, a period when the damage ...
  13. [13]
    Newport Transporter Bridge – ERIH
    Completed in 1906, this unique Grade 1 Listed structure is the essence of industrial development in Newport. Designed by the eminent French Bridge Engineer, ...
  14. [14]
    Marseille Transporter Bridge - Graces Guide
    Oct 26, 2023 · The Pont Transbordeur de Marseille was constructed in 19 months and opened in December 1905. It was the second of two cable-stayed cantilever transporter ...Missing: global spread Europe
  15. [15]
    Transporter Bridges: Useful or Just Beautiful? - Interesting Engineering
    Jan 22, 2014 · The first American transporter bridge was built in 1905 – Aerial Bridge, located in Duluth, Minnesota. After 25 years of existing as transporter ...<|separator|>
  16. [16]
    Transporter Bridges - Google Sightseeing
    Sep 4, 2014 · This bridge was built in 1906, though it was closed from 1985 to 1995 and again from 2008 to 2010 for a restoration and repair work. The towers ...Missing: Bernard 1881<|separator|>
  17. [17]
    The Insane Hanging Bridges That Time Forgot
    Feb 6, 2015 · After World War II, as the middle-class boomed, so did car ownership. The relatively small platforms of the transporter bridges couldn't ferry ...
  18. [18]
    Duluth Aerial Lift Bridge - HistoricBridges.org
    The Duluth Aerial Lift Bridge, built in 1905, was originally a transporter bridge, converted to a lift bridge in 1930, and has two truss spans.
  19. [19]
    Rendsburg - Puentes Transbordadores
    The foundations of the bridge were also reinforced. Modifications were made to the high bridge and the ramps to allow heavier goods trains to pass. The ...
  20. [20]
    Transporter Bridges - Roader's Digest: The SABRE Wiki
    Mar 13, 2025 · Back in the days when cars were rare, and pedestrians could cram into the cradle like sardines it worked well. However, with modern traffic ...Missing: automobile | Show results with:automobile
  21. [21]
  22. [22]
    DNT Extra December 2019 by DuluthNewsTribune - Issuu
    Dec 10, 2019 · Duluth's Aerial Lift Bridge traces its history back to 1905 ... cost of $1 million, Dierckins said. u. 32 DNT Extra • December 2019.
  23. [23]
    Life on Duluth's Aerial Lift Bridge: Lots of ups, few downs | MPR News
    Aug 5, 2016 · Cement counterweights, each weighing 500 tons, slide down on either side of the bridge as the roadway and the pilot house, rise. "Everything on ...Missing: weight | Show results with:weight
  24. [24]
    [PDF] Download Duluth 2000 Guidebook - Society for Industrial Archeology:
    Aerial Lift Bridge .. : ... ::. : .. , ... : ,.:. ~ . , •.. ........... 2 9 ... The lift motors were replaced with four n ew 100 hp motors, which were ...
  25. [25]
    1905,1930 Aerial Lift Bridge over the 1870 Duluth Ship Canal
    Sep 23, 2014 · ... Duluth Aerial Lift Bridge, Lake Avenue, across Duluth Ship Canal, Duluth, St. Louis County, MN. The bridge spans the Duluth Ship Canal, which ...
  26. [26]
    FAQ - Duluth Harbor Cam
    Aerial Lift Bridge. How often does the bridge raise? On average, the bridge lifts about 4500 times/yr. How does the Duluth lift bridge work? ... weight of ...<|control11|><|separator|>
  27. [27]
    Short Cuts: Why do horn signals vary when boats pass under Aerial ...
    May 10, 2023 · Short Cuts: Why do horn signals vary when boats pass under Aerial Lift Bridge? ... captain's salute" of one long, then two short blasts.
  28. [28]
    Two major Duluth tourist attractions need millions in repairs
    Apr 13, 2024 · Average daily traffic crossing the bridge reaches more than 6,000 vehicles, and roughly 900 boats carrying 35 million short tons of freight pass ...
  29. [29]
    [PDF] NORTH STAR PORT - Duluth Seaway Port Authority
    Dec 1, 2020 · Duluth's Aerial Lift Bridge a mere 10 minutes ahead of Whiting's fearless forecast, becoming the first ship of the season to complete a full ...Missing: statistics | Show results with:statistics
  30. [30]
    For 120 years, Duluth's Aerial Lift Bridge has granted safe passage ...
    Sep 10, 2025 · Duluth's Aerial Lift Bridge is celebrating its 120th birthday this year. It helps manage the farthest inland port in the world.
  31. [31]
    Aerial Lift Bridge Supervisor - Duluth - GovernmentJobs.com
    Job Posting Information. SUMMARY/PURPOSE To supervise assigned personnel in order to ensure safe passage of ships, pedestrians, and motorists by operating ...
  32. [32]
    Aerial Lift Bridge closed to vessel traffic today - Duluth News Tribune
    Oct 31, 2012 · The unit will be installed to ensure operation of a backup diesel generator in case normal power is lost. Share. Share this article. Tags. Tags.
  33. [33]
    33 CFR Part 117 -- Drawbridge Operation Regulations - eCFR
    This part prescribes the general and special drawbridge operating regulations that apply to the drawbridges across the navigable waters of the United States ...
  34. [34]
    Don't miss the Point: Maintenance on Duluth lift bridge means delays
    Feb 1, 2016 · They say the bridge typically gets a new set of 12 cables every 18 years. February is the time to do it, since the lack of ship traffic means ...Missing: inspections | Show results with:inspections
  35. [35]
    [PDF] Rehabilitation work on Aerial Lift Bridge to begin February 1
    Jan 28, 2016 · The City of Duluth has contracted with Lakehead Constructors to perform the work Mondays through. Saturdays from 7 AM to 5:30 PM.To facilitate ...Missing: cable interval
  36. [36]
    Duluth's historic Aerial Lift Bridge finally getting a major makeover
    Jan 7, 2025 · More than 6,000 vehicles cross the 500-foot-long bridge daily. Roughly 900 boats carrying 35 million short tons of freight pass underneath ...
  37. [37]
    Delayed repairs to Duluth's Lift Bridge could be 'super-bad'
    Sep 19, 2024 · Corrosion on the Aerial Lift Bridge could soon reach a tipping point if proper maintenance on the structure is not performed.Missing: challenges operator incidents
  38. [38]
    Aerial Lift Bridge Malfunction Causes Brief Delay - Fox21Online
    Dec 7, 2017 · DULUTH, Minn. -The Duluth Aerial Lift Bridge is raised and lowered a lot. But just like any piece of equipment the bridge can malfunction.Missing: corrosion | Show results with:corrosion
  39. [39]
    [PDF] AASHTO GUIDELINES FOR THE OPERATION OF MOVABLE ...
    Current practices employed by bridge owners operating bridges remotely include applying enhanced surveillance systems to monitor topside and navigable channel ...
  40. [40]
    Alternating traffic safely on lift bridge | Axis Communications
    Apr 23, 2025 · The City of Duluth Aerial Lift Bridge operators rely on AXIS Camera Station and cameras to monitor the structure and bay and ensure ...Missing: inspections | Show results with:inspections
  41. [41]
    [PDF] iiiiiiiiiiiiliiiiiiiii - NPGallery
    The bridge has remained unchanged to the present. The Aerial Lift Bridge stands as the western gateway to the Great ... The Aerial Lift Bridge in conjunction with ...
  42. [42]
    Aerial Lift Bridge project a matter of preservation, not cosmetics
    Apr 10, 2009 · Aerial Lift Bridge project a matter of preservation, not cosmetics. When the news broke that Duluth's Aerial Lift Bridge was getting a $5 ...Missing: oversight | Show results with:oversight
  43. [43]
    [PDF] Bulletin 44:Butlletí 35 - TICCIH
    The introduction was first published in the. ICOMOS/TICCIH joint thematic study 'Context of World Heritage Bridges' in 1996, and was used with the permission of ...
  44. [44]
    Duluth's Aerial Lift Bridge: History, Ship Watching & More
    At 138 feet tall (42 meters) and 390 feet wide (119 meters), this steel bridge spans the Duluth Shipping Canal, majestically connecting the sandbar of Park ...
  45. [45]
    How Lake Superior Maritime Visitor Center remembers Edmund ...
    Aug 28, 2025 · The Arthur M. Anderson sails under the Aerial Lift Bridge on its way in to Duluth Harbor in 2019. Clint Austin / File / Duluth Media Group.
  46. [46]
    Arthur M Anderson Master Salute to the Edmund Fitzgerald 11/10 ...
    Nov 11, 2020 · The Arthur M Anderson gave a Master Salute in memory of the Edmund Fitzgerald last night as it arrived in Duluth during a snowstorm.
  47. [47]
    $$3M shoreline project to begin near Maritime Visitor Center in Duluth
    Nov 5, 2024 · More than 500,000 visitors ... Annually, an estimated 1.5 million pedestrians enjoy the Duluth Ship Canal North and South Pier and Duluth Aerial ...
  48. [48]
    [PDF] ECONOMIC IMPACTS OF MARITIME SHIPPING IN THE PORT OF ...
    This report, Economic Impacts of the Port of Duluth-Superior, isolates the economic impacts created by all cargo and vessel activity at the Port of Duluth- ...Missing: Aerial Lift
  49. [49]
    Economic Impact - Duluth Seaway Port Authority
    Port of Duluth-Superior Economic Impacts. This 2023 study assesses contributions made by commercial maritime shipping at the Port of Duluth-Superior. DOWNLOAD ...
  50. [50]
    Klobuchar, Smith Secure Significant Federal Funding for ...
    Jan 7, 2025 · “The Duluth Aerial Lift Bridge is a landmark and a vital part of Duluth's transportation system,” said Klobuchar. “It is not only a critical ...