Fact-checked by Grok 2 weeks ago

Comcast Technology Center

The Comcast Technology Center is a 60-story located in , , that serves as the primary headquarters for Corporation's technology, engineering, and software development operations. With construction beginning in 2014 and the building opening in stages from 2018 to 2019, the tower rises to a height of 1,121 feet (342 meters), establishing it as the tallest structure in and the of . Designed by the internationally renowned architectural firm Foster + Partners under the direction of , the tower features a sleek, modern glass facade and integrates mixed-use spaces, including office floors for approximately 4,000 employees, a luxury Hotel occupying floors 48 through 60 (the top 13 stories) with 219 guest rooms, and public amenities such as high-end restaurants and a 500-seat known as the Ralph J. Roberts Forum. Rising adjacent to the original (completed in 2008), the Technology Center forms part of a larger five-building urban corporate campus that emphasizes innovation and sustainability, achieving certification for its energy-efficient design, including advanced climate control systems. Notable interior features include an 80,000-square-foot broadcast center for NBC10 and Telemundo62, as well as LIFT Labs—a venture studio supporting Comcast's and . The building's ground level connects to the existing via a pedestrian connector, enhancing pedestrian accessibility and integrating with Philadelphia's urban fabric while providing panoramic views of the city skyline from its upper levels.

Overview

Location and Specifications

The Comcast Technology Center is located at 1800 Arch Street in , , with geographic coordinates of 39°57′18″N 75°10′13″W. The building rises to a of 1,121 feet (342 meters) at the roof, establishing it as the tallest structure in and the 15th-tallest in the United States as of 2025. It comprises 60 stories above ground, supplemented by below-ground levels. The total floor area measures 1,566,000 square feet (145,500 m²), allocated primarily to at 1,334,000 square feet, facilities at 230,112 square feet, and areas at 2,682 square feet. Construction reached completion on November 27, 2017, with the public opening occurring in October 2018. Ownership is shared jointly between Corporation and , following Prologis's 2020 acquisition of the original developer Liberty Property Trust.

Significance and Role

The Comcast Technology Center serves as a pivotal facility in Corporation's operations, acting as the North American for its divisions and housing key teams focused on , , and . Initially accommodating over 1,500 employees upon opening, the building provides loft-like workspaces for approximately 4,000 technologists, engineers, and architects in total, with flexible designs allowing for future expansion as 's needs evolve. This centralization supports the company's core functions in , , and media services, positioning the center as a dynamic hub for within its global network. Rising 1,121 feet, the Comcast Technology Center has redefined Philadelphia's since its completion in , becoming the tallest building in and the tallest structure in the outside and . This landmark status not only elevates the city's architectural profile but also symbolizes urban revitalization in Center City, drawing attention to Philadelphia as a growing tech and media epicenter. By integrating seamlessly with the adjacent —opened in —the two towers create a cohesive four-million-square-foot campus that combines corporate infrastructure with public-accessible elements, fostering a blended environment of work and community engagement. Funded primarily by Comcast at an approximate cost of $1.5 billion through a , the center embodies the corporation's strategic emphasis on technological advancement and media convergence, featuring state-of-the-art broadcast studios for NBC10 and Telemundo62 alongside R&D spaces for emerging innovations. This investment highlights 's long-term commitment to , where the company has been headquartered for over 60 years, and reinforces its role in bridging traditional media with cutting-edge digital technologies to drive industry-wide progress.

History

Planning and Announcement

In October 2013, began internal planning for a major expansion of its Philadelphia headquarters to accommodate the company's rapid growth, particularly following its $30 billion acquisition of a controlling stake in in 2011, which significantly increased its workforce and operational needs. The acquisition integrated 's broadcast, , , and theme park assets, necessitating consolidated facilities to foster innovation and efficiency in and technology sectors. On January 15, 2014, Chairman and CEO Brian Roberts formally announced the project during a press event, unveiling plans for a new to serve as the company's expanded global headquarters and a hub for affiliates like NBC 10/WCAU and Telemundo 62. The selected site was the southwest corner of 18th and Arch Streets in , directly adjacent to the existing 58-story completed in 2008, allowing for seamless integration of operations. Liberty Property Trust, Comcast's development partner, had acquired the 1.5-acre parcel in August 2011, positioning it as an ideal location to centralize over 1,500 employees initially while supporting future expansion. The $1.2 billion project, jointly owned by and Liberty, aimed to create thousands of jobs and stimulate economic activity in the region. Initial zoning and permitting processes advanced swiftly in 2014, with introducing bills in January to amend height and density regulations, enabling the proposed 59-story tower without additional variances. Public hearings and planning commission reviews addressed concerns over the building's 1,121-foot height and increased density in the Logan Square East neighborhood, but the proposals passed with broad support by April, clearing the way for construction permits. The project was initially named the "Comcast Innovation and Technology Center" to emphasize its role in advancing and tech development, but it was later streamlined to the "Comcast Technology Center" in official communications and branding.

Construction Timeline

Construction of the Comcast Technology Center began with groundbreaking in the summer of 2014, following the project's announcement earlier that year. Site preparation and foundation work advanced rapidly in the initial months, setting the stage for the erection of the 60-story structure in the heart of . The L.F. Driscoll Company served as the general contractor, overseeing the complex build in a dense urban setting. Throughout the build, several key milestones marked progress amid notable challenges. The steel superstructure approached topping out by mid-2017 but faced a brief halt in due to cracks discovered in the upper , which were investigated and repaired without long-term disruption. A summer 2017 union involving crane operators further delayed the topping out ceremony, pushing it to 2017, when the final beams were welded and a miniature Billy Penn statue was placed atop the spire. Structural completion followed shortly thereafter in late 2017, transitioning the project to interior phases. The construction team addressed urban impacts, including traffic rerouting and noise barriers, to minimize disturbances in the bustling neighborhood. Post-structural work focused on fit-out and occupancy through 2018. The first wave of Comcast employees relocated to the building starting July 30, 2018, as systems testing and interior installations concluded. NBC10 and 62 completed their move from Bala Cynwyd to the dedicated broadcast spaces on October 21, 2018, marking a major operational milestone for the tower.

Architecture

Design Team and Philosophy

The Comcast Technology Center was designed by the internationally renowned architecture firm Foster + Partners, led by , serving as the lead architect responsible for the overall vision and aesthetic. Kendall/Heaton Associates acted as the architect of record for the shell and core, ensuring compliance with local building codes and facilitating coordination with regulatory authorities. The interior design was handled by , in close collaboration with Foster + Partners, focusing on creating dynamic, flexible spaces that blend corporate functionality with public accessibility. Structural engineering was provided by , which developed the building's robust framework to support its supertall height and complex form, while mechanical, electrical, and plumbing (MEP) engineering was led by Bala Consulting Engineers to integrate efficient systems throughout the structure. The design philosophy centered on reimagining the urban office tower as a "vertical ," promoting a seamless integration of work, leisure, and public realms to encourage collaboration and innovation among Comcast's employees and visitors. This approach features a stepped that optimizes penetration and panoramic views of Philadelphia's skyline, fostering an environment reminiscent of Silicon Valley's open, tech-driven campuses adapted to a high-rise context. The building's form responds to the city's historic Beaux-Arts architectural heritage—characterized by grand civic structures like City Hall—by employing a modern glass curtain wall that introduces transparency and lightness, allowing visual connections between interior spaces and the surrounding urban fabric while contrasting the solidity of traditional stone facades. A key aspect of the philosophy was the deliberate choice of height at 1,121 feet (342 meters), which positioned the tower as Philadelphia's tallest structure, surpassing previous buildings and contributing to the evolving skyline beyond the longstanding "gentlemen's agreement," originally broken in 1987 by One Liberty Place, which had kept buildings below the statue of William Penn atop City Hall. This elevation was calibrated to harmonize with the evolving skyline, creating a landmark that enhances the city's vertical profile without overwhelming its historic core, while accommodating diverse programming from lower-level public amenities to upper-floor hospitality. Construction on this vision began in 2014, realizing Foster's intent to blend cutting-edge technology with community-oriented design.

Structural and Exterior Features

The Comcast Technology Center exhibits a vertically stepped profile characterized by three distinct setbacks, which create expansive, loft-like floor plates that promote flexible workspaces and maximize natural daylight. This form divides the 60-story tower into broader lower sections that taper upward, integrating seamlessly with the urban fabric while accommodating varied uses from broadcast studios at the base to accommodations higher up. The emphasizes structural efficiency, with the stepped configuration reducing wind loads on upper levels and enhancing the building's aesthetic as a crystalline addition to Philadelphia's skyline. At the base, A-shaped steel braces are strategically embedded between hotel rooms on the east and west facades, providing critical stiffening against prevailing winds without compromising interior views or aesthetics. These mega-braces form part of a hybrid structural system combining a central core with perimeter framing, ensuring stability for the 1,121-foot (342-meter) height. This approach allows for open floor plans while resisting lateral forces in a seismically moderate and windy . The exterior facade features a unitized curved glass curtain wall system, employing low-iron glazing to achieve high and minimal coloration , which aligns with the design's emphasis on . Covering 812,600 square feet (75,500 square meters), the curtain wall incorporates low-emissivity coatings for thermal performance and stainless-steel diagonal panels that accentuate the building's dynamic lines. These elements create a reflective yet non-reflective surface that integrates the tower visually with its surroundings during day and night. The roof culminates in a sloped profile housing a mechanical , deliberately omitting a to prioritize occupied usable height over architectural ornamentation, reaching an architectural height of 1,121 feet (342 m) to the top of the mechanical , with the highest occupied floor at 876 feet (267 m). This configuration accommodates essential building systems while maintaining the clean, vertical emphasis of the overall form, topped by a that houses observation spaces and enhances the . Key engineering solutions include five tuned sloshing dampers, each containing to total 125,000 gallons (473,000 liters), installed on the 57th beneath the lobby to counteract wind-induced sway and improve occupant comfort. The system relies on drilled caissons combined with a mat under the core, providing robust anchorage into the underlying schist to support the tower's mass and loads. An integrated exterior LED system illuminates the facade and , syncing with building operations for dynamic effects and .

Facilities and Use

Corporate and Broadcast Spaces

The Comcast Technology Center dedicates approximately 1.3 million square feet of its lower floors to corporate office space for employees, encompassing open-plan workspaces, conference rooms, and executive suites designed to foster and . These areas, spanning floors 6 through 44 in three-floor "loft" configurations grouped by department or function, feature large, daylight-filled floor plates equivalent in scale to twelve courts, with acoustic materials, vertical sound barriers, and flexible partitioning to accommodate dynamic team structures. The building's broadcast facilities occupy floors 12 through 14, comprising an 80,000-square-foot center for and Telemundo62 (WWSI) that includes three studios—two news sets with LED screens and automated cameras, plus a 1,500-square-foot production studio—along with three control rooms and eight editing bays. A prominent 12-story digital media wall enhances the immersive environment for media and public viewing. This setup supports the stations' operations in delivering and programming, marking the first IP-based network for local TV stations in the U.S. Technology integration throughout the corporate and broadcast spaces includes over 60 miles of high-speed fiber optic cabling, more than 1,100 wireless access points, and secure networking infrastructure that underpins Comcast's cable, , and divisions. These elements enable advanced collaboration tools and capabilities, with the overall design supporting a capacity of over 4,000 workers through adaptable, open layouts suited to hybrid work models adopted post-2020.

Hotel and Public Amenities

The occupies floors 48 through 56 of the Comcast Technology Center, offering 219 guest rooms including 39 suites designed with modern aesthetics and panoramic city views. Each accommodation features high-end furnishings, advanced such as room controls for and curtains, and amenities like complimentary and 65-inch flat-screen televisions. The hotel includes facilities such as a world-class with treatment rooms incorporating crystals, a state-of-the-art fitness center, and an infinity-edge pool on the 57th floor overlooking the skyline. Additionally, as of 2025, the hotel's event spaces—following a remodeling completed in October 2025 that combined the Arch Ballroom, Grand Terrace Ballroom, and foyer into a 9,257-square-foot venue with an outdoor —accommodate up to 400 guests for seated dinners (a 60% capacity increase from prior configurations), with larger capacities for other setups, supported by dedicated concierge and business services. Dining options within the building emphasize luxury and variety for hotel guests and visitors. Jean-Georges Philadelphia, located on the 59th floor, provides fine dining by Michelin-starred chef , featuring seasonal with skyline views from its elevated perch. Complementing this, The Market on floors 27 and 28 serves as a vibrant with multiple service islands offering freshly prepared international and American dishes, artisan cuisines, and a central bar area designed for social gatherings. Public access to the Comcast Technology Center begins at the ground-level lobby, which features retail spaces, interactive art installations, and seamless connections to the adjacent campus for enhanced visitor experiences. Notable artworks include installations by artists and , integrated into the lobby's design alongside live trees and natural wood elements to create an inviting atmosphere. The building also houses the Forum, a two-floor, 500-seat amphitheater in the heart of the structure, used for public events, presentations, and gatherings. The building also includes a multi-level parking garage to support public and guest arrivals.

Sustainability and Innovation

Environmental Design Elements

The Comcast Technology Center incorporates passive environmental design elements aimed at minimizing ecological impact, contributing to its LEED Platinum certification under the LEED BD+C: Core and Shell v3 - LEED 2009 rating system, achieved on December 19, 2019. This certification reflects the building's emphasis on sustainable site development, , energy performance, and , positioning it as one of Philadelphia's greenest skyscrapers. A key feature is the high-performance , consisting of a unitized curtain wall system with screen cladding that provides shading from summer sun while allowing in winter, helping to reduce overall energy use by approximately 30% compared to conventional designs. Complementing this, the structure maximizes natural daylight through large floor plates and extensive glazing, further lowering lighting demands and supporting passive thermal regulation. Water management strategies focus on and onsite reuse, including green roofs that capture rainwater for and needs, as well as waterless urinals and low-flow fixtures installed throughout all restrooms to significantly cut potable water consumption. These measures align with credits for innovative wastewater technologies and reduced potable water use. Sustainable materials play a central role, with recycled content integrated into elements like end-grain in public and spaces, alongside low-emitting interior finishes to improve . The use of such materials, combined with biophilic elements like sky gardens, enhances environmental responsibility without relying on energy-intensive processes. Natural ventilation is facilitated by the building's stepped form and integrated sky gardens on setbacks and upper levels, which promote airflow through atria and open spaces, reducing reliance on mechanical systems. Site integration prioritizes and alternative mobility, preserving and enhancing green space via the elevated winter garden and podium-level landscaping that connects to surrounding public areas, while providing 179 secure bike racks to support and reduce vehicle dependency.

Technological Integrations

The Comcast Technology Center employs advanced smart building technologies to enhance and occupant comfort. At its core is a centralized system, often referred to as the building's "central brain," which monitors occupancy levels in and incorporates weather prediction algorithms to dynamically adjust environmental controls. This system integrates sensors across the facility to optimize resource allocation, contributing to the tower's designation as one of the most technologically advanced buildings in the United States. Energy optimization is achieved through innovative HVAC solutions, including an active chilled beam system that circulates chilled water through embedded ceiling tubes to provide radiant cooling without traditional air ducts, thereby reducing overall energy consumption by minimizing fan and pump usage. The building achieves approximately 50% greater energy efficiency compared to its predecessor, the , through these active systems and high-performance mechanical designs. Complementing this, the facility features extensive LED lighting integrated with occupancy detection to further lower power demands while maintaining illumination standards. High-speed connectivity underpins the tower's operations, with a robust fiber optic backbone enabling seamless data transfer throughout the 1.8 million square feet of space, including and cellular coverage in elevators to ensure uninterrupted . Security measures include advanced controls and systems tailored for a high-profile corporate , supporting secure entry for over 4,000 occupants. Dedicated innovation spaces within the building foster , housing Comcast's R&D labs equipped with cutting-edge tools for media technology experimentation, alongside LIFT Labs, an accelerator program that provides startups with resources for prototyping in areas like and . Following the shift to hybrid work models post-2020, the center has integrated enhanced video conferencing infrastructure across conference rooms, featuring systems to support remote collaboration and maintain productivity in a distributed .

Impact and Legacy

Awards and Recognition

The Comcast Technology Center has received several prestigious awards recognizing its architectural innovation, sustainability, and urban integration. In 2021, it was honored by the Council on Tall Buildings and Urban Habitat (CTBUH) with the Best Tall Building by Region award in the category, highlighting its exemplary design among supertall structures across the continent. Additionally, it earned the CTBUH Award of Excellence in the Best Tall Building by Height category for buildings between 300 and 399 meters, acknowledging its technical and aesthetic achievements in high-rise development. Earlier, in 2019, the project won the (ULI) Global Award for Excellence, one of the real estate industry's most respected honors, for demonstrating superior , execution, and in . This accolade underscores the building's role in revitalizing Philadelphia's skyline while incorporating public amenities and sustainable features. The center was also shortlisted for the Building Awards 2020 International Project of the Year, further affirming its global standing in . The building has been prominently featured in professional architecture portfolios and publications, reflecting critical acclaim for its innovative office design that blends corporate functionality with public accessibility. Foster + Partners, the lead architects, showcase the project in their official portfolio as a landmark example of adaptive, technology-driven workspaces topped by a luxury hotel. Similarly, highlighted the structure in a detailed project profile, praising its vertical stepping and integration of broadcast facilities with communal spaces. In 2020, the Four Seasons Hotel within the center received a Gold award from the LONDON Design Awards in the Architecture - Mixed Use International category, recognizing the seamless fusion of hospitality and office elements. Media coverage has lauded the center's ability to harmonize private corporate needs with public realms, often citing its role in enhancing Philadelphia's urban fabric.

Economic and Cultural Contributions

The Comcast Technology Center has significantly contributed to Philadelphia's through job creation and broader fiscal stimulus. During its phase, the generated over 20,000 temporary jobs across the Commonwealth of , with approximately 6,300 of those in alone. Upon completion, it supports nearly 2,800 net new permanent jobs annually in the city, primarily in , , and sectors. An independent economic analysis projected that the building's ongoing operations would generate $720 million in annual GDP impact for , while Comcast's official estimates place the annual economic contribution at $500 million, encompassing direct and indirect effects from the expanded campus. The structure has anchored urban revitalization efforts in the Logan Square neighborhood, transforming a key Center City block into a vibrant commercial node. By filling a full at 18th and Arch Streets, it has spurred adjacent developments and elevated the area's appeal for corporate tenants, leading to increased office leasing and business district vitality. This has indirectly boosted property values in surrounding areas through heightened and foot traffic, while enhancing tourism by drawing visitors to its public lobby and skyline prominence, contributing to Philadelphia's status as a destination for and enthusiasts. The project's development faced challenges, including structural cracking discovered in the building's frame in August 2017, which temporarily halted for repairs and inspections, and subsequent lawsuits in 2020 between developer Liberty Property Trust and contractor LF Driscoll over approximately $103 million each in disputed costs and delays related to overruns totaling $67 million. These issues were resolved, allowing completion in 2018 without long-term setbacks. Culturally, the center serves as a hub for and events, integrating over 40 works by local and international artists into its spaces, including installations like Jenny Holzer's LED text projections and Conrad Shawcross's sculptural pieces in the lobby. It hosts rotating exhibits, performances, and community gatherings that engage thousands annually, fostering creative expression in a corporate setting. As home to broadcast studios and Comcast's innovation labs, the building amplifies Philadelphia's role as a tech-media nexus, positioning the city as a "vertical " for content creation and digital advancement. In 2025, amid corporate restructuring that involved job reductions elsewhere, Comcast reaffirmed its long-term dedication to by centralizing regional operations under its headquarters at the Technology Center, ensuring sustained investment and stability for the local economy. This commitment underscores the building's enduring legacy as a of the company's presence in the city. The center also exemplifies Comcast's broader initiatives, particularly through ties to the Lift Zones program, which provides free and digital skills training at over 50 Philadelphia sites to promote digital equity. As a flagship of Comcast's technological infrastructure, the building models inclusive access to advanced tech resources, aligning with the company's $1 billion Project UP effort to bridge the for underserved residents.

References

  1. [1]
    Our Home | Comcast Center Philadelphia Campus
    Our Comcast Technology Center was completed in October of 2019 with the opening of Four Seasons Hotel Philadelphia at Comcast Center. The extraordinary ...Missing: facts | Show results with:facts
  2. [2]
    Comcast Technology Center | Projects - Foster + Partners
    View the 360 tour. Located next to the existing Comcast Center, the Comcast Technology Center rises 1,121 feet (341 meters) as the city's tallest building.
  3. [3]
    Comcast Technology Centre / Foster + Partners - ArchDaily
    Oct 24, 2019 · Architects: Foster + Partners · Area of this architecture project Area: 167225 m² · Completion year of this architecture project Year: 2019.
  4. [4]
    The Comcast Technology Center, Among the Tallest Buildings ...
    Feb 22, 2019 · PROJECT: Comcast Technology Center LOCATION: Philadelphia SIZE: 1.8 million square feet COMPLETION: 2018 LEAD ARCHITECT: Foster + Partners ...
  5. [5]
    Comcast Technology Center: History, Architecture, and Facts
    The Comcast Technology Center, designed by Foster + Partners, is a Contemporary skyscraper built 2014-2019, with 61 floors, 1112ft tall, and mixed-use with a 5 ...
  6. [6]
    [PDF] Comcast Technology Center
    office space; more than 200,000 square feet of hotel space; and approximately 3,770 square feet of retail space. • Featuring 200+ room luxury Four Seasons ...
  7. [7]
    Foster + Partners completes Philadelphia's tallest building - Dezeen
    Oct 24, 2019 · Foster + Partners' Comcast Technology Center skyscraper in Philadelphia contains "Silicon Valley-style" work spaces topped with a 12-storey Four Seasons hotel.
  8. [8]
    Comcast Technology Center - LF Driscoll - STO Building Group
    In 2008 LF Driscoll completed the Comcast Center, succeeding Liberty Place as the city's tallest building. The skyline will be redefined again with the Comcast ...Missing: facts | Show results with:facts
  9. [9]
    Comcast Technology Center - Philly's Newest Skyscraper Gets a ...
    ... square feet of office space, 230,112 square feet of hotel space, and 2,682 rentable square feet of retail space. Eventhough the building is large, it doesn ...Missing: total | Show results with:total
  10. [10]
    A Look Back At How The Comcast Technology Center Changed The ...
    Nov 7, 2020 · In October 2018, the 1,121-foot-tall, 60-story Comcast Technology Center at 1800 Arch Street opened as Philadelphia's tallest building, ...
  11. [11]
  12. [12]
    Comcast to Expand Philadelphia Presence with State-of-the-Art ...
    Jan 15, 2014 · Comcast to Expand Philadelphia Presence with State-of-the-Art, $1.2 Billion 'Comcast Technology Center'. Jan 15, 2014.Missing: Prologis | Show results with:Prologis
  13. [13]
    Step Inside the Comcast Technology Center, Philadelphia's New ...
    Nov 28, 2018 · Down the street is the Comcast Center, the 58-story, 297-meter (974 ft) tower that is the second-tallest building in Philadelphia. No need ...
  14. [14]
    Comcast-NBC Universal Merger Approved - The New York Times
    Jan 19, 2011 · Comcast received government approval Tuesday to acquire NBC Universal, emerging from a lengthy review with a list of conditions.Missing: motivations expansion
  15. [15]
    Comcast plans $1.2 billion building to be tallest in Philly - WHYY
    Jan 16, 2014 · Comcast will relocate some employees from other buildings in the region and create new jobs in Philadelphia, said CEO Brian Roberts. “I ...
  16. [16]
    Designing the Comcast Technology Center, The Tallest Skyscraper ...
    Mar 21, 2021 · The skyscraper was unveiled in 2014, just six years after the completion of the first Comcast Center tower. Designed by Foster and Partners and ...
  17. [17]
    Making way for Comcast, Council to tweak zoning regulations - WHYY
    Jan 24, 2014 · During its first meeting of 2014, City Council began making preparations for the tallest building in Philadelphia, the proposed 59-story, ...Missing: approvals | Show results with:approvals
  18. [18]
    New Comcast tower cleared for takeoff - WHYY
    Apr 10, 2014 · All that's left is to pull the permits, and the developers say they expect to begin construction this summer. After the meeting, John Gattuso of ...Missing: hearings | Show results with:hearings
  19. [19]
    Comcast development bills breeze through Planning Commission
    Feb 19, 2014 · The bills make various zoning changes to allow the new tower to be built without further approvals, such as raising the maximum density bonuses ...Missing: permitting | Show results with:permitting
  20. [20]
    Comcast Technology Center nearly 150 feet away from topping off
    Jul 28, 2017 · With less than 200 feet to go, the 60-story Comcast Technology Center is so close to reaching the major construction milestone of topping off.
  21. [21]
    Comcast Technology Center Delays Topping To Investigate ...
    Aug 23, 2017 · Possible cracks found in the steel in the top portion of the Comcast Innovation & Technology Center require more investigation before the ...Missing: challenges traffic noise
  22. [22]
    The Comcast Technology Center Is Philly's Tallest Building and Yes ...
    Nov 30, 2017 · On Monday, crews topped off Philadelphia's newest and tallest skyscraper by welding lateral beams into place on the Comcast Technology Center's ...Missing: exact | Show results with:exact
  23. [23]
    When will the Comcast Technology Center open? A construction ...
    Jul 24, 2018 · The Comcast Technology Center has been four years in the making. Though the skyscraper's target completion date has shifted a bit since it was first announced.
  24. [24]
    NBC10 Airs First Newscasts From Comcast Technology Center
    Oct 21, 2018 · NBC10 and Telemundo62 began moving out of our Bala Cynwyd, Pennsylvania, facility to our new 80,000 square-foot broadcast center in CTC on 18th ...<|control11|><|separator|>
  25. [25]
    Comcast Technology Center | Thornton Tomasetti
    Jan 1, 2018 · The Comcast Technology Center houses office, research and development spaces in addition to a television studio and a luxury hotel.Missing: MEP Syska Hennessy
  26. [26]
    Comcast Innovation and Technology Center: Philadelphia's Tower ...
    Mar 28, 2016 · But the most significant innovation is inside the building, where it will offer a high-rise alternative to the suburban horizontal campuses that ...
  27. [27]
    Foster On Process And Influence At New Comcast Tower
    Jun 10, 2015 · Foster, who turned 80 last week, won the award for his firm's design of the Comcast Innovation & Technology Center (CITC), currently under ...
  28. [28]
    Comcast Technology Center | Tekla
    Comcast Technology Center. Winner icon. Steel Winner. About the project. Project ... The five dampers - holding 125,000 gallons of water - will act as a ...
  29. [29]
    Comcast Technology Center (1800 Arch St) - Enclos
    ... Technology Center (1800 Arch St) contains 812600 square feet of facade area and is 1121 feet high. It was completed in 2018 and is located in Philadelphia, PA.Situation · Challenge · ResultsMissing: facts | Show results with:facts
  30. [30]
    Foundation Design Case Study—Comcast Technology Center ...
    Mar 21, 2019 · This paper outlines the design of the foundation system and provides a summary of the geotechnical investigation, laboratory testing of soil and ...
  31. [31]
    Comcast Technology Center - ZLEDLighting
    The Comcast Technology Center is a super tall skyscraper in Center City, Philadelphia. The 60-floor building, with a height ... Address · 20-B Roland Avenue ...
  32. [32]
    An inside look at the new Comcast Technology Center
    Jan 9, 2019 · Five 125,000-gallon water tanks embedded in the 57th floor work as a stabilizing counterweight to minimize building sway during high winds. FOUR ...Missing: dampers | Show results with:dampers
  33. [33]
    Welcome to the Home of NBC10 and Telemundo62 at the Comcast ...
    Spanning three floors and 80,000 square feet, our facility includes two news sets that feature 4K LED screens, automated cameras, three control rooms, eight ...Missing: broadcast | Show results with:broadcast
  34. [34]
    With 4K and IP, NBC 10 and Telemundo 62 Philadelphia debut ...
    Oct 25, 2018 · With 4K and IP, NBC ... technology, NBCUniversal's duopoly in Philadelphia has completed its on-air move into the Comcast Technology Center.
  35. [35]
    Frequently Asked Questions - MoveToWin
    Where will I sit within the Comcast Technology Center? NBC10 / Telemundo 62 will occupy floors 12 – 14. Details on where you will be sitting will be provided to ...
  36. [36]
    Completion of the new Comcast Technology Center
    This included 60 miles of fiber optic cabling, more than 1100 wireless access points and communications technology for 900,000 square feet of ...
  37. [37]
    Stepping inside the new Comcast Technology Center - Curbed Philly
    Sep 25, 2018 · When the $1.5 billion project is completed in the spring, it will have around 4,000 Comcast employees and 500 hotel employees. Hotel officials ...
  38. [38]
    Four Seasons Hotel Philadelphia at Comcast Center
    39 of them suites — on floors 48 to 56 of the Comcast Technology Center, each equipped with top-notch amenities and sleek, modern ...
  39. [39]
    Four Seasons Hotel Philadelphia At Comcast Center: Lord Norman ...
    Oct 31, 2019 · ... Comcast Technology Center ... Occupying the top twelve tower floors, the property's 219 rooms, 39 of ...
  40. [40]
    Downtown Philadelphia Hotel Amenities | Fitness Centre
    Peruse our list of luxurious on site amenities including an infinity pool, Spa, boutique hair salon & nail bar as well as James Beard award-winning dining ...
  41. [41]
    Four Seasons Hotel Philadelphia At Comcast Center - DiscoverPHL
    Amenities. Min Capacity: 51; Max Capacity: 500; Business Center; Concierge; Dry ... Four Seasons Hotel Philadelphia At Comcast Center - DiscoverPHL Image 4 ...
  42. [42]
    Dine | Comcast Center Philadelphia Campus
    Elevated food and drink, exceptional service and inspired design are the hallmarks of our five signature dining establishments around the Comcast CenterThe Concourse · Vernick Coffee Bar · JG SkyHigh · Jean-Georges
  43. [43]
    The Market at Comcast Technology Center - NELSON Worldwide
    The 27th floor features food service islands, offering a variety of freshly prepared food and artisan cuisines. The 28th floor is a gathering center around ...
  44. [44]
    Art Installations Unveiled at Comcast Technology Center
    Oct 17, 2018 · Today, Brian Roberts, Jenny Holzer and Conrad Shawcross unveiled two installations in the Comcast Technology Center lobby.
  45. [45]
    Comcast Technology Center - Southland Industries
    Southland Industries provided mechanical and plumbing services for the Comcast Technology Center in Pennsylvania, Philadelphia.Missing: MEP | Show results with:MEP
  46. [46]
  47. [47]
    60-Story Comcast Innovation and Technology Center Achieves ...
    Aug 2, 2019 · Primera's 60-story Comcast Innovation and Technology Center project in Philadelphia has earned LEED Platinum certification.Missing: features | Show results with:features
  48. [48]
    Projects that moved the dial - Atelier Ten
    The active and passive energy approaches are predicted to provide a 30% reduction in energy ... The Comcast Technology Center redefines sustainability for a high- ...
  49. [49]
    Comcast Technology Center - The Skyscraper Center
    The Comcast Technology Center is 341.4m tall to tip, has 59 above-ground floors, 2 below-ground floors, and is 104th tallest in the world.
  50. [50]
    Lobby poetry, elevator games and a giant orb: Inside the Comcast ...
    the 1000th is moving in next Monday to some fanfare, Roberts said. A date for when ...Lobby Poetry · Vernick Coffee Bar · Themed Floors With Local Art<|control11|><|separator|>
  51. [51]
    15 things to expect when Comcast Technology Center opens this year
    Jan 8, 2018 · 1. Sidewalk newsstands: The tower plans for a pair of newsstand-style kiosks on the sidewalks of the tower that will be 16-feet-by-7.6-feet and ...
  52. [52]
    New Comcast Technology Center Is a Smart Building
    Dec 26, 2017 · It's the most technologically advanced building in the U.S. and it's being built in Philadelphia. NBC10's Keith Jones takes us inside the ...Missing: systems | Show results with:systems
  53. [53]
    Comcast Technology Center, Philadelphia, PA - STO Building Group
    In 1987 LF Driscoll built the landmark One Liberty Place, the tallest building in Philadelphia. In 2008 LF Driscoll completed the Comcast Center, succeeding ...
  54. [54]
    Comcast Technology Center | Bala Engineering
    The Comcast Technology Center is designed to bring together technology, art ... Bala was the select MEP/FP engineer for the core & shell and interior ...
  55. [55]
    Comcast Innovation and Technology Center
    Daylight sensors assist in modulating light levels to improve consistency between the front and rear of the space. The lower half of the tower, primarily ...
  56. [56]
    30 Fascinating Things I Learned on a Tour of the New Comcast ...
    Sep 20, 2018 · When I entered the new Comcast Technology Center on Thursday morning for the first time, I had no doubt that I'd stepped into the year 2070.
  57. [57]
    Comcast Technology Center - Diversified
    The Comcast Technology Center was conceived as a vertical enterprise campus to serve diverse uses including; Comcast's research and development departments.
  58. [58]
    Comcast employees react to change in new hybrid schedule
    Jul 2, 2023 · Comcast's hybrid work policy since September has asked employees to be in the office on Tuesdays, Wednesdays and Thursdays, with the option to work remotely on ...Missing: Technology 2020
  59. [59]
    Comcast Technology Center wins global ULI award
    Sep 9, 2019 · Comcast Technology Center was a recipient of this year's Urban Land Institute's annual Global Awards for Excellence.
  60. [60]
    Big names make shortlist for the 2020 Building Awards | News
    Oct 2, 2020 · Building Awards 2020 shortlist · Comcast Technology Center, Philadelphia – Foster + Partners · Kita Aoyama, Tokyo – Conran + Partners · The Twist, ...
  61. [61]
    Categories - LONDON Design Awards 2020
    Nominations in Category. LONDON Design Awards 2020 Gold · [DRAFT] - Four Seasons Hotel at Comcast Technology Center · Foster + Partners Architecture - ...
  62. [62]
    Top 10 Big-Ticket Buildings | 2015-05-16 | Architectural Record
    Project: Comcast Innovation and Technology Center;. Cost: $931 million;. Architects: Foster + Partners, Kendall/Heaton Associates, Gensler, Daroff Design ...
  63. [63]
    [PDF] THE ECONOMIC AND FISCAL IMPACT WITHIN THE CITY OF ...
    Jan 14, 2014 · Construction of the Comcast Innovation and Technology Center would include 1.285 million rentable square feet of office space as well as a 200- ...
  64. [64]
    West Market Street business district gobbled up Comcast Tech ...
    Aug 10, 2019 · Brokers and analysts say the Comcast Technology Center tower has made its corner of Center City a more inviting place for companies to set up shop.
  65. [65]
    The positive impact of Philadelphia's new Comcast building
    May 1, 2014 · The most unexpected outcome of the construction of the new Comcast center is its boost to the city's tourism sector. While the building alone ...
  66. [66]
    The Comcast Center Campus | Visit Philadelphia
    Designed by architect A.M. Stern Associates, the 58-story flagship Comcast Center was the tallest building in Philadelphia when it opened in 2008. The 60-story ...
  67. [67]
    Comcast Doubles Down on Philadelphia Headquarters, Commits to ...
    Oct 25, 2025 · Comcast, which is moving forward with its restructuring plans, is strengthening its commitment to its Philadelphia headquarters.
  68. [68]
    Lift Zones: Empowering Communities by Bridging the Digital Divide
    Jan 29, 2024 · Lift Zones are spaces in neighborhood community centers that provide free Internet access for students and families.
  69. [69]
    Comcast's Lift Zone opens in North Philadelphia with renovations
    Oct 7, 2025 · Comcast's flagship Lift Zone reopened in North Philadelphia on Tuesday reopened with around $700,000 invested in the facility that provides ...<|separator|>