The dielectric withstand test, commonly referred to as the hipot (high potential) test, is a nondestructive electrical that applies a specified across the of electrical devices or components to verify their ability to withstand transient overvoltages without experiencing breakdown or excessive leakage current. This test simulates extreme electrical stress conditions to ensure the acts as an effective barrier, preventing electric shock, arc faults, or equipment failure under normal operating transients. The primary purpose of the dielectric withstand test is to confirm the and adequacy of materials, detecting defects such as nicks, inadequate spacing, or that could compromise . It is widely applied in the evaluation of electrical and products, including , medical devices, and industrial equipment, often as part of routine production line testing or after environmental stress like exposure. By monitoring leakage current during the test, typically ensuring it does not exceed limits such as 5 at the high test voltage, the verifies and ensures with regulations. In practice, the test involves connecting one terminal to the device's conductors and the other to a ground, then ramping up to a test voltage—often calculated as twice the operating voltage plus 1000 V for applications—for a of about one minute, while monitoring for any sudden current surge indicative of . Both and methods are used, with voltages typically set at 1.414 times the equivalent to account for peak stress differences. Key international standards governing the test include IEC 62368-1 for audio/video, information, and communication technology equipment, IEC 61010-1 for measurement, control, and laboratory equipment, and UL 62368-1, which specify voltage levels, , and pass/fail criteria to promote uniform practices.

Overview

Definition

The dielectric withstand test is an electrical safety test that applies a across the of a device or component to verify its ability to withstand specified voltage levels without experiencing dielectric breakdown or excessive leakage current. This test evaluates the integrity of insulating materials by subjecting them to electrical stress beyond normal operating conditions, ensuring no arcing, , or insulation failure occurs during the application. Commonly known as the hipot (high potential) test or dielectric strength test, it is a standard method for assessing insulation quality in electrical equipment. The test typically targets insulation between conductors, between conductors and ground, or across live parts, confirming that these barriers can isolate electrical potentials effectively. Intended as a nondestructive procedure, the dielectric withstand test stresses the insulation to detect potential weaknesses without causing permanent damage if the component passes, thereby validating its suitability for safe operation under transient overvoltages.

Purpose

The dielectric withstand test, also known as a hipot test, primarily aims to qualify the in electrical devices and components for safe under their rated voltage conditions and anticipated overvoltages, ensuring the can handle stresses without . It detects defects such as nicks or cuts in materials, contaminants like or foreign particles, and inadequate spacing between conductive parts that could compromise electrical . By applying a for a short duration, the test verifies that the maintains its integrity, thereby confirming its adequacy against transient overvoltages arising from switching s or strikes. A key benefit of the test is its role in preventing electrical hazards, including shocks to users, potential fires from arcing, and catastrophic equipment failure due to insulation collapse. It provides critical assurance of compliance with established safety regulations and standards, such as those from UL and IEC, which mandate such before products enter the market or are commissioned in service. This proactive evaluation enhances overall product reliability and user protection by identifying latent flaws that might not manifest under normal operating conditions. In the , the dielectric withstand test is essential during final assembly and stages, serving as a gatekeeper to ensure insulation performance aligns with design specifications throughout the device's expected . Historically, it has evolved as a fundamental safety check in since the early , coinciding with the development of standardized practices for appliances, wiring systems, and industrial equipment to address growing demands.

Underlying Principles

Dielectric Strength

is defined as the maximum that an insulating material can withstand without experiencing , typically expressed in kilovolts per millimeter (kV/mm). This property quantifies the material's ability to act as an under stress, serving as a critical in evaluating reliability for electrical equipment. The measurement of , often referred to as intrinsic dielectric strength, represents the value under ideal conditions with uniform fields and defect-free samples. It is influenced by inherent properties and thickness, as thinner samples may exhibit higher apparent strengths due to fewer defects. In practice, the intrinsic strength is determined by applying a gradually increasing voltage across the material until occurs, with the result normalized by thickness to yield the field strength. The dielectric strength E is calculated using the formula E = \frac{V}{d}, where V is the in kilovolts and d is the thickness of the in millimeters. This equation derives from the uniform approximation in a parallel-plate , where the field E is the potential difference V divided by the distance d between electrodes; breakdown occurs when E exceeds the material's intrinsic limit, leading to conduction or arcing. For example, if a 1 mm thick sample breaks down at 20 kV, the dielectric strength is 20 kV/mm. This simple relation allows prediction of breakdown voltage for a given thickness but assumes conditions without or impurities. Several key factors influence dielectric strength, including temperature, which generally decreases it as thermal agitation increases charge mobility and reduces insulation integrity; humidity, which can lower strength by introducing conductive paths through moisture absorption; frequency of the applied field, where higher frequencies may reduce strength in some materials due to increased dielectric losses; and material composition, which determines baseline resistance to breakdown. For instance, polymers like polyethylene typically exhibit dielectric strengths in the range of 20-50 kV/mm, while ceramics such as alumina can range from 10-30 kV/mm, reflecting differences in molecular structure and density. These variations underscore the need for material-specific testing to ensure reliable performance in applications.

Insulation Breakdown Mechanisms

Insulation breakdown in dielectrics occurs through several distinct mechanisms that compromise the material's ability to withstand electric fields, ultimately leading to failure. These mechanisms are critical to understanding the vulnerabilities in insulating materials used in high-voltage applications. Intrinsic breakdown represents a pure material failure driven by electronic processes, where an electron avalanche initiates within the homogeneous dielectric under high electric stress, typically in times on the order of 10^{-8} seconds. This mechanism is temperature-independent and occurs when the applied field exceeds the material's inherent threshold, around 10^7 to 10^8 V/m. Thermal breakdown arises from heat accumulation due to dielectric losses or conduction currents, which increases the material's and leads to a process if generated exceeds . In solids, this can result in under prolonged stress, where localized overheating degrades the into conductive paths. Electrical breakdown often involves partial discharges in voids or defects, which erode the and propagate as —dendritic channels that grow under sustained high fields, eventually bridging electrodes and causing complete failure. These partial discharges occur in localized regions where the field is intensified, such as gas-filled voids within solid dielectrics, and their magnitude and frequency increase as approaches. In gases, avalanches contribute to in air gaps, ionizing the medium and creating conductive channels. Surface breakdown manifests as creepage or tracking along the insulation's exterior, where charge conduction follows the interface between the and surrounding medium, often under or contaminated conditions. This reduces the effective to about 45% of bulk values in oil-immersed setups and can lead to . An example is tracking on (PCB) surfaces, where contaminants facilitate carbonized paths between conductors, resulting in short circuits. Several factors accelerate these breakdown mechanisms, including moisture absorption, which lowers the dielectric strength by enhancing conductivity in voids or surfaces; aging, which introduces defects through repeated stress and partial discharges; mechanical stress, causing electromechanical compression failure in thin films; and contaminants like particles or impurities that initiate discharges or tracking.

Test Methods

AC Testing

The AC dielectric withstand test applies a sinusoidal alternating current voltage, typically at power frequencies of 50 or 60 Hz, to assess the integrity of electrical devices under dynamic conditions. This method subjects the to voltages elevated above the rated level—often 1.5 to 2 times the operating voltage or, under legacy standards like the now-obsolete IEC 60950, calculated as 2 × operating voltage + 1000 V (e.g., 1240 V for a 120 V device)—to simulate real-world overvoltages and transients without causing permanent damage. Current standards such as IEC 62368-1 (4th edition, 2025) specify test voltages in tables based on working voltage, type, and pollution degree (e.g., 1500 Vrms for basic insulation at common working voltages). The test ensures the can endure these stresses, verifying its ability to prevent and maintain margins. A primary advantage of AC testing lies in its replication of operational environments, where voltage alternates and peaks at approximately 1.414 times the (RMS) value, thereby stressing the material more realistically than steady-state methods. This approach excels at revealing capacitive charging currents and dielectric losses, which are inherent in AC systems and can indicate weaknesses such as partial discharges or material degradation. Consequently, it is particularly effective for detecting faults in components exposed to alternating fields, enhancing reliability in AC-powered applications. In the procedure, the sinusoidal voltage is gradually ramped up to the specified level over a short period (e.g., 10-20 seconds) to avoid transient shocks, then held constant for a defined , commonly 1 minute, while monitoring for stability. Total is measured throughout, comprising leakage through the insulation and capacitive due to the device's ; allowable limits are set slightly above baseline values (e.g., up to 5-20 mA depending on the equipment) to accommodate these components without false trips. A sudden in signals , prompting immediate termination. This method is especially preferred for wound components, such as transformers and , because the alternating field distributes evenly across windings, mimicking in-service conditions and leveraging readily available 50/60 Hz test equipment for efficient implementation.

DC Testing

The DC dielectric withstand test, also known as DC hipot testing, applies a constant unidirectional to the of electrical equipment to evaluate its ability to maintain steady-state integrity under , primarily by detecting leakage currents that indicate defects such as voids, contaminants, or damage. This method is particularly suited for assessing in high-capacitance components, where the voltage is ramped up gradually to the test level and held to monitor for . Unlike dynamic testing approaches, DC testing focuses on the resistive component of leakage current once initial capacitive charging stabilizes, providing a clear measure of quality without ongoing transient effects. Key advantages of DC testing include its simplicity for field applications, as it requires less powerful and more portable equipment compared to alternatives that generate high currents. It avoids persistent capacitive charging currents, allowing precise of true resistive leakage after the initial transient phase, which enhances detection sensitivity for subtle weaknesses. Additionally, DC testing is less likely to cause damaging discharges in good insulation, making it safer for repeated use on sensitive devices like cables, motor windings, and DC-powered systems. In procedure, the test begins with a controlled ramp-up of DC voltage—typically at a rate of 100-500 V/s to prevent voltage surges that could mask defects or damage the sample—reaching the specified level within seconds to minutes depending on the equipment's capacitance. Once at full voltage, the primary measurement is the steady-state leakage current, which should remain below a predefined threshold (often set 1.5-2 times the expected normal leakage) to indicate pass/fail; this focuses on ohmic conduction rather than displacement currents. To achieve equivalent stress to an AC test, the DC voltage is set to the root mean square (RMS) AC voltage multiplied by √2 (approximately 1.414), ensuring the constant DC level matches the peak voltage of the AC , which is the maximum stress point for . This factor arises because the peak of a sinusoidal AC voltage is V_RMS × √2, and DC provides uniform stress at that peak equivalent without oscillation. For example, if an AC RMS test voltage is 1000 V, the equivalent DC voltage is 1000 × √2 ≈ 1414 V; similarly, for a 5000 V AC RMS specification, DC would be approximately 7071 V. This equivalence is standard in practices aligned with current guidelines like IEC 62368-1 (superseding IEC 60950) for safety verification.

Test Procedures

Equipment and Setup

The dielectric withstand test, commonly known as a hipot test, requires specialized to apply high voltages safely and accurately while measuring . Essential tools include hipot testers capable of generating or voltages, typically ranging from 500 V to 100 depending on the application and standard, with common models supporting up to 5 or 6 for production testing. High-voltage probes are used to connect the tester to the device under test (DUT), ensuring safe and precise voltage application without direct operator contact. Current-limiting resistors, integrated into the tester or added externally, restrict output current to prevent damage to the DUT or excessive arcing, often capping at 5 peak (3.5 ). Safety interlocks are mandatory features that automatically disable if the test enclosure is opened or if abnormal conditions are detected, complying with electrical safety protocols. Proper setup begins with isolating the DUT from all external power sources and circuits to avoid interference or hazards, ensuring all internal switches are activated to expose the insulation paths under evaluation. The high-voltage lead from the tester is connected to the specific insulation path being tested, such as between live conductors and , while all non-tested conductive parts of the DUT are securely ed to the tester's (RTN) or low terminal, which is also tied to . Shielded, short-length test leads minimize and capacitive effects during connection. Environmental controls are critical, with tests typically conducted at a controlled ambient of 23°C and 50% relative to ensure consistent results, as variations can influence performance. Calibration of the must be verified prior to testing to guarantee accuracy in voltage output and current measurement, often following manufacturer specifications or standards like those from UL or IEC, with energy limits such as 350 mJ to mitigate arc hazards during faults. A key aspect of the setup involves the use of return and guard terminals on the hipot tester: the return terminal captures total leakage current, while the guard terminal diverts capacitive and surface leakage currents away from the measurement circuit, allowing precise isolation of true leakage for reliable assessment. This configuration enhances test sensitivity and reduces false indications from non-insulation currents.

Performing the Test

The dielectric withstand test is executed following verification of the equipment setup and connections to the device under test (DUT), ensuring all leads are securely attached and the test area is prepared. The process begins by applying the test voltage gradually from zero to the specified level, typically ramping at a rate of 500 V/s for AC tests or in controlled increments for DC tests to allow capacitive charging currents to stabilize and prevent false indications of failure. Once the target voltage is reached, it is held constant for a typical duration of one minute to stress the insulation adequately. Throughout the application and hold phases, leakage current is continuously monitored using the tester's instrumentation. Operators observe for signs of insulation distress, including sudden current spikes, arcing, or excessive noise, which may signal impending ; advanced testers can detect high-frequency energy from arcs lasting longer than 10 microseconds. Upon completion of the hold period or if limits are approached, the voltage is ramped down gradually to zero. The DUT is then discharged to for a sufficient to safely dissipate residual charge and mitigate hazards from capacitive storage, typically several multiples of the of the DUT. Test variations include the step-up method, where voltage is increased in discrete increments with pauses for stabilization—particularly useful for DC testing on capacitive loads—and the timed hold method, which applies the full voltage directly after ramping and maintains it for the fixed duration without steps. These approaches are selected based on the DUT's characteristics and applicable standards, such as IEC 60243 for insulating materials.

Acceptance Criteria

The dielectric withstand test is considered passed if the under test endures the specified voltage without experiencing , such as or puncture, and the measured remains below the predetermined , typically ranging from 0.5 to 5 mA depending on the device and applicable standard. For instance, standards like /WHMA-A-620 recommend a 1 mA limit at 1000 VDC for Class 2 assemblies. The total current monitored during the test encompasses leakage current (resistive), capacitive charging current, and (in AC tests), with the test automatically terminating if the aggregate exceeds the set limit to prevent damage. Excessive current in any component signals potential insulation weakness, prompting failure declaration. Additional failure indicators include the absence of audible arcing or , no visible physical to the , and negligible temperature rise beyond normal operational levels. events, such as arcing, are immediately disqualifying as they indicate dielectric failure. In production environments, acceptance may involve statistical sampling plans to verify batch , with borderline results often requiring retesting to confirm integrity. Specific limits are outlined in relevant standards, such as those from IEC and UL.

Standards and Regulations

International Standards

The (IEC) standard 60243 series specifies methods for determining the electric strength of insulating materials under power frequency conditions. IEC 60243-1 outlines procedures for short-time tests, where voltage is applied at a uniform rate until breakdown occurs, typically at frequencies between 48 Hz and 62 Hz, to assess the of solid insulators. The series also incorporates stepwise procedures, in which voltage is increased in discrete steps with specified dwell times at each level until failure, allowing for evaluation under controlled incremental stress. For equipment, IEC 62368-1 (replacing the withdrawn IEC 60950-1 from December 2020) defines dielectric withstand requirements to ensure integrity against overvoltages under a approach. The test voltage for or reinforced is calculated as 2 × working voltage + 1000 V (or equivalent ), applied for a duration of 1 minute, with working voltage referring to the highest voltage in the equipment's normal operation. For example, equipment with a 120 V working voltage would require a test voltage of (2 × 120) + 1000 = 1240 V for 1 minute. This formula applies to working voltages between 50 V and 300 V, with adjustments for higher ranges to simulate functional, , or supplementary performance. IEEE Standard 95-2002 (inactive) provides guidelines for insulation testing in AC electric machinery rated at 2300 V and above, focusing on high-potential (hipot) methods using high direct voltage () to verify winding integrity. It recommends DC hipot testing for stators to detect weaknesses in slot and endwinding regions, often as an alternative to AC testing for more uniform stress distribution. ASTM D149 establishes procedures for measuring the breakdown voltage and strength of solid electrical insulating materials at commercial power frequencies, typically 60 Hz. The standard includes short-time, step-by-step, and slow rate-of-rise methods, where is recorded and calculated as volts per unit thickness (e.g., kV/mm), applicable to both through-thickness puncture and surface tests under specified environmental conditions. IEC 61010-1 specifies safety requirements for measurement, control, and laboratory equipment, including dielectric withstand tests based on installation categories ( I-IV). For basic in low-voltage devices (e.g., <50 ), test voltages range from 500 V to 2500 V , applied for 1 minute, with higher levels for categories to ensure protection against transient overvoltages.

Industry-Specific Requirements

In the industry, particularly for equipment, Underwriters Laboratories (UL) UL 62368-1 (replacing the UL 60950-1) specifies dielectric withstand test voltages calculated as 2 times the working voltage plus 1000 V , ensuring integrity under operational conditions. This approach, derived from the peak working voltage, typically results in test levels such as 1240 V for devices rated at 120 V , with the test conducted at 60 Hz for one minute. Acceptable leakage current during the test is limited to 0.25 mA for applications to prevent hazardous touch currents. For industrial equipment such as electric motors, the (NEMA) standard MG 1 outlines factory dielectric withstand tests at voltages of 2 times the rated voltage plus 1000 V (minimum 1500 V), applied for one minute to verify winding . In field maintenance scenarios, (OSHA) guidelines and associated practices, including those aligned with NEMA recommendations, mandate reduced test voltages—typically 75% of the factory level—to minimize risk of damage during in-service evaluations of aged equipment. This conservative approach prioritizes worker safety while assessing ongoing reliability in harsh industrial environments. Cable testing in the power distribution sector follows IEEE Std 400, which guides evaluations of shielded systems, recommending hipot tests for in-service checks at approximately 80% of the equivalent factory test voltage to detect insulation weaknesses without excessive stress on aged materials. For example, if the factory test is 28 , a test might employ 22 , ramped gradually over five minutes, with leakage current monitored to identify defects in extruded dielectrics like XLPE. This method balances diagnostic accuracy with the need to avoid premature failure in operational networks. Medical devices, governed by IEC 60601-1, incorporate lower dielectric withstand test voltages compared to general industrial applications, emphasizing through means of patient protection (MOPP). For instance, equipment with a 250 V working voltage may require only 4000 V for two MOPP insulation, tested for one minute at frequencies up to 100 Hz, to ensure minimal risk of leakage to patient-contacting parts. These reduced levels, specified in the standard's tables based on pollution degree and creepage distances, reflect the heightened sensitivity to electric shock in clinical settings.

Applications

Manufacturing and Quality Control

In manufacturing environments, the dielectric withstand test plays a crucial role in ensuring the reliability of electrical products by verifying integrity during . For high-risk items such as power supplies, 100% testing is typically performed on assembly lines to detect potential failures that could lead to electrical hazards, applying high voltages (often 1000 V or more) to stress the beyond normal operating conditions. This comprehensive approach confirms that every unit meets safety standards before shipment, as partial testing or sampling may suffice for lower-risk components where statistical allows for representative verification. The test effectively identifies assembly errors, such as improper potting that leaves voids in or inadequate wire spacing that reduces , by measuring leakage current during voltage application; if excessive current flows, it indicates a defect requiring rework. In , these detections prevent downstream issues, ensuring workmanship quality in devices like transformers where insulation between windings must withstand specified voltages without breakdown. Integration into production processes often involves automated systems, such as hipot testers linked to conveyor lines via programmable logic controllers (PLCs) and software for sequential testing, which enhances efficiency and supports traceability through data logging. Barcode tracking can be incorporated to associate test results with specific units, facilitating quality audits and compliance documentation. A key application occurs post-repair in factories, where the test verifies after processes like winding to confirm no voids or damage compromise , typically reapplying the production voltage level for a short duration. This step ensures repaired items match the reliability of new assemblies before integration into final products.

Maintenance and Field Testing

In maintenance and field testing, the dielectric withstand test is applied periodically to installed electrical systems, such as medium-voltage cables and , to detect degradation caused by aging, environmental exposure, or operational stress. This nondestructive evaluation helps identify potential weaknesses before they lead to failures, ensuring system reliability in power distribution networks. Dielectric withstand testing is an optional procedure for routine of per ANSI/NETA MTS-2023 Section 7.1.B.3, with maintenance intervals typically ranging from 6 months to 3 years depending on equipment criticality and condition. Field procedures commonly employ portable DC hipot testers for their accessibility and ease of use in on-site conditions, contrasting with the higher-voltage AC setups often used in manufacturing . For medium-voltage cables, the test involves isolating the cable section, connecting the tester's high-voltage lead to the and ground to or , and gradually ramping the voltage—either continuously at about 1 per second or in steps—to a derated level, such as 65% of the original acceptance voltage (e.g., 16.25 DC for a 5 cable rated at 25 DC acceptance), held for 5 minutes while monitoring leakage current. For , the test applies voltage phase-to-ground for 1 minute per section, with untested phases grounded, using manufacturer-specified or NETA Table 100.2 values, ensuring no evidence of distress. Post-test, thorough discharge is essential due to residual DC charge, particularly in environments near live high-voltage lines, to prevent hazards during reconnection. The primary benefit of these field tests is extending equipment by preemptively spotting deterioration, thereby reducing unplanned outages and costs in utility and industrial settings. Leakage current measurements during the test provide diagnostic insights into condition, allowing targeted repairs. For instance, OSHA 1910.67 mandates dielectric testing for vehicle-mounted elevating and rotating work platforms used near energized high-voltage conductors, conforming to ANSI A92.2 standards, which typically require annual periodic tests to verify insulating components.

Safety Considerations

Hazards and Precautions

Performing a dielectric withstand test involves exposure to high voltages, which can lead to severe hazards including electrical shock from residual stored charge in capacitive components, arc flash incidents that cause burns or eye damage, and potential explosions due to rapid energy release during breakdown. To mitigate these risks, safety standards impose strict limits on stored energy, such as a maximum charge of 45 µC for voltages up to 15 kV and 350 mJ for higher voltages, calculated as the stored energy in a capacitor given by E = \frac{1}{2} C V^2, where C is capacitance and V is voltage. Precautions begin with the use of appropriate (PPE), including insulated gloves rated for the test voltage, safety glasses to protect against , and non-conductive footwear, while avoiding conductive jewelry or tools that could bridge circuits. Test areas must be isolated with physical barriers, indicating high-voltage dangers, and enclosures equipped with interlocks that automatically disable power if accessed, ensuring operators remain at ground potential through remote controls or extended handles. Post-test procedures require immediate discharge of stored energy using bleed resistors or insulated discharge tools to verify a zero-energy state before handling equipment, preventing residual voltage shocks. Operators must be trained and qualified, following protocols to isolate energy sources, conduct periodic safety reviews, and confirm deenergization through grounding and voltage checks. These measures, aligned with standards like OSHA 1926.963, ensure safe execution by qualified personnel only.

Limitations

The dielectric withstand test serves as a evaluation for under elevated voltage but exhibits significant limitations in detecting subtle or progressive defects. It cannot identify partial discharges (), which are localized electrical sparks within or on the surface of that erode material over time without causing immediate full failure. PD activity often signals impending long-term aging due to chemical degradation, erosion, or , yet the test's focus on gross dielectric overlooks these precursors, potentially allowing faulty components to pass initial qualification. Similarly, the test does not assess cumulative deterioration from operational factors like thermal cycling or contamination, necessitating additional diagnostic methods for ongoing . Environmental conditions further compromise the test's reliability, as dielectric strength varies with temperature and . High , for example, can reduce the breakdown voltage of polymeric dielectrics by up to 43% at 90% relative compared to dry conditions, leading to understated insulation performance if ambient controls are inadequate. Moisture in hygroscopic materials exacerbates this, altering and potentially masking true material capabilities. The test is unsuitable for certain applications, including energized electrical systems, where applying superimposed risks or system disruption; it must be performed on de-energized equipment to ensure safety. Thin or fragile , such as those in or fine wires, are particularly vulnerable, as the applied stress may induce micro-cracks or permanent weakening. Moreover, over-testing—through repeated applications or extended dwell times—can degrade insulation integrity, accelerating aging and shortening by introducing unintended stress concentrations. To address these gaps, the dielectric withstand test should be complemented by insulation resistance measurements, which evaluate steady-state leakage, or partial discharge testing, which quantifies localized activity for a fuller insulation health profile. In AC configurations, false positives arise from capacitive charging currents that exceed trip thresholds without indicating breakdown, often requiring slower voltage ramps to distinguish legitimate failures. DC testing circumvents this capacitive issue but fails to replicate AC-specific stresses, such as peak voltage effects in capacitive circuits, potentially missing operational vulnerabilities.

References

  1. [1]
    What is HIPOT Testing (Dielectric Strength Test)?
    Oct 25, 2024 · The hipot test is a nondestructive test that determines the adequacy of electrical insulation for the normally occurring over voltage transient.
  2. [2]
    [PDF] The Dielectric Voltage Withstand Test
    This white paper seeks to clarify the theory of dielectric breakdown and the objective of the dielectric voltage withstand test. It explores the applications ...
  3. [3]
  4. [4]
    The Dielectric Withstand (Hi-pot) Test - In Compliance Magazine
    Aug 1, 2017 · The hi-pot test applies high voltage to check if insulation can withstand normal overvoltages, testing its dielectric withstand voltage.
  5. [5]
    None
    ### Summary of Hipot/Dielectric Withstand Test Purpose
  6. [6]
    Dielectric Strength - an overview | ScienceDirect Topics
    Dielectric strength is defined as the maximum voltage required to produce a dielectric breakdown through a material, expressed as Volts per unit thickness.
  7. [7]
    Dielectric Strength: Unit, Formula & Test Methods of Materials
    Jul 10, 2025 · Dielectric strength reflects the electric strength of insulating materials at various power frequencies. It measures the dielectric breakdown ...<|control11|><|separator|>
  8. [8]
    Dielectric Breakdown - Penn State Materials Research Institute
    The mechanisms governing the dielectric breakdown of any given insulator include intrinsic electrical (electronic), thermal, and electromechanical breakdowns.
  9. [9]
    Breakdown Mechanism of Solid Insulation | High Voltage Engineering
    Five Primary Breakdown Mechanisms · Intrinsic Breakdown - Electronic avalanche in pure materials · Electromechanical Breakdown - Mechanical compression failure.
  10. [10]
    Partial discharge characteristics of electrical trees prior to breakdown
    Electrical treeing is an electrical prebreakdown phenomenon commonly found in solid dielectrics. It is a damaging process due to partial discharge (PD).
  11. [11]
    Dielectric behaviour of particle-contaminated air-gaps in the ...
    The presence of corona discharge affects the movements and the charge of the particles, and hence modifies the breakdown threshold. The numerical analysis of ...
  12. [12]
    DC creepage breakdown characteristics of oil-immersed insulation
    Dec 28, 2009 · The dielectric strength is dependent on the creepage distance of surface insulation and decreases to about 45% in case of surface insulation ...
  13. [13]
    Effects of low pressure on tracking failure of printed circuit boards
    Oct 31, 2008 · In this paper, studies of tracking failure of PCBs in a low-pressure chamber, are reported for an electrode configuration comprising a pointed ...
  14. [14]
    Effect of contaminant particles, temperature, and humidity on the ...
    The study emphasizes the critical role of controlling temperature, humidity, and contaminant levels in transformer oils to preserve their dielectric strength.
  15. [15]
    [PDF] Aging of Components Due to Partial Discharge Degradation ...
    Failures in rotating machines can both cause and result from. PD, including insulation defects, contamination, and aging. These factors can create stress ...
  16. [16]
    IEC 60950 Hipot Testing: Requirements, Test Setup, and Compliance Guidelines
    ### Summary of Dielectric Withstand Test Voltage Formula in IEC 60950
  17. [17]
    AC vs. DC Dielectric Withstand Testing
    ### Summary of AC Dielectric Withstand Test
  18. [18]
  19. [19]
    [PDF] Guide to Electrical Safety Testing - HIPOT.pl
    AC and DC Hipot tests have advantages and disadvantages that become evident depending on the characteristics of the DUT. The table below lists the advantages ...
  20. [20]
    [PDF] MIL-STD-202G - NASA NEPP
    Feb 8, 2002 · Reference conditions as a base for calculations shall be 25°C (77°F) for temperature, or an alternate temperature of 20°C (68°F), 760 ...
  21. [21]
    Dielectric Strength ASTM D149, IEC 60243 - Intertek
    The step-by-step method starts at 50% of the short-time-test then voltage is increased at equal increments for a specified time period until breakdown. The test ...<|control11|><|separator|>
  22. [22]
    [PDF] Electrical Safety Testing Reference Guide
    A dielectric withstand test (dielectric strength test) appears in nearly every product safety standard and is a fundamental test employed to check a fully ...
  23. [23]
    Product FAQs - Chroma Systems Solutions
    According to the below chart,“5 times RC constant time” can achieve stable status on Capacitive loading. ... Because hipot test will cause DUT discharge, thus ...
  24. [24]
    Dielectric Withstanding Voltage Leakage Current Limit - Cirris Inc
    Nov 14, 2024 · The test accomplishes this by applying high voltage across the insulation (a dielectric), to ensure it has sufficient strength to withstand ...Missing: procedure | Show results with:procedure
  25. [25]
    [DOC] Discussion paper regarding dielectric strength test - IECEx
    The applied voltage shall remain constant during the test. The current flowing during the test shall not exceed 5 mA r.m.s.
  26. [26]
    IEC 60243-1:2013
    Mar 26, 2013 · IEC 60243-1:2013 provides test methods for the determination of short-time electric strength of solid insulating materials at power frequencies between 48 Hz ...
  27. [27]
  28. [28]
    D149 Standard Test Method for Dielectric Breakdown Voltage and ...
    Sep 10, 2025 · This test method covers procedures for the determination of dielectric strength of solid insulating materials at commercial power frequencies, under specified ...
  29. [29]
    Dielectric Withstand (Hi-pot) test spec? - CR4 Discussion Thread
    Jul 29, 2009 · For form wound stator windings, IEEE 95 gives guidance. It suggests that the maintenance hipot should be 75% of the acceptance hipot level.
  30. [30]
    [PDF] ANSI/NEMA MG 1-2016 (Revision 1, 2018) Motors and Generators
    Nov 20, 2007 · High-Potential Test Voltages for Universal, Induction, and Direct- Current Motors. Corrections to Effective Test Voltage. Corrections to Note ...
  31. [31]
    Guidelines for high potential (Hi-Pot) DC testing of medium voltage ...
    Feb 20, 2017 · IEEE Std 400 provides additional information on DC testing and evaluation of the insulation of shielded power cable systems.
  32. [32]
    [PDF] HIGH POTENTIAL CABLE TESTING - Vertiv
    The IEEE 400 standard does recommend DC hipot testing of field aged. PILC cable types. VLF Hipot Testing. VLF hipot test has the same advantages as DC hipot ...
  33. [33]
    Conducting Production Line Testing of Medical Electronics
    Sep 18, 2014 · To determine a possible dielectric-withstand voltage, test personnel can rely on the values shown in Tables 6 and 7 in IEC 60601-1:2005, ...
  34. [34]
    Identify IEC 60601-1 insulation requirements for electrical medical ...
    Mar 2, 2021 · The dielectric strength of solid insulation is tested by applying a high voltage across the insulation. If the peak working voltage is ...Missing: withstand | Show results with:withstand
  35. [35]
    [PDF] Ultimate Guide to Electrical Safety Testing | Electrometric
    Most independent and government safety agencies require a Dielectric Voltage Withstand test to verify that a product's design meets their standards (known as a ...
  36. [36]
    [PDF] Ultimate Guide to Electrical Safety Testing
    This test is used to verify the resistance of a product's insulation by applying a DC voltage and measuring the resulting leakage current. GROUND CONTINUITY ...
  37. [37]
    Switchgear and Switchboard Inspection and Testing Guide - Articles
    Oct 28, 2016 · Dielectric Withstand is an optional test when performing routine maintenance per ANSI/NETA-MTS 2019 Section 7.1.B.3. Control Wiring Electrical ...
  38. [38]
    1910.67 - Vehicle-mounted elevating and rotating work platforms. | Occupational Safety and Health Administration
    ### Dielectric Testing Requirements for Vehicle-Mounted Elevating and Rotating Work Platforms
  39. [39]
    IEEE Safety Recommendations For High Voltage Testing
    Excerpts from IEEE Standard 510-1983 have been listed in this section in order to caution all personnel dealing with high voltage applications and ...
  40. [40]
    [PDF] Best Methods for Safe Hipot Testing - TEquipment
    Dielectric Withstand test equipment must be connected to a good ground. The grounding system of dielectric withstand test equipment is essential in providing ...
  41. [41]
    None
    ### Summary of Safety Guidelines for Hipot Testing
  42. [42]
    1926.963 - Testing and test facilities. | Occupational Safety and Health Administration
    ### Summary of OSHA Requirements for Testing and Test Facilities (1926.963)