Fact-checked by Grok 2 weeks ago

European Broadcasting Area

The European Broadcasting Area (EBA) is a geographical planning region established by the International Telecommunication Union (ITU) within its Radio Regulations to facilitate the coordinated assignment of radio frequencies for sound and television broadcasting, thereby reducing interference across medium wave, high frequency, VHF, and UHF bands. Defined in Article 5, provision 5.14 of the ITU Radio Regulations, the EBA enables regional agreements like those from the European Broadcasting Conferences to harmonize spectrum use among nations. The EBA's boundaries extend beyond continental Europe, encompassing all of north of 30° N latitude, northern up to the 30° N parallel (including countries such as , , , , and ), and parts of the and up to the 40° E (including , , , and portions of , , , and ). To the north, it reaches 72° N latitude, excluding certain Arctic territories like above that line, while its western limit follows the edge of ITU Region 1 along the Atlantic Ocean. This expansive delineation, formalized through conferences such as the 1961 Regional Radio for VHF/UHF bands, reflects historical telegraph and early radio connectivity patterns rather than strict continental . The EBA underpins the operational framework of the (EBU), whose membership is restricted to broadcasters from countries fully or partially within the area, enabling collaborative initiatives like frequency planning, content exchange, and events such as the . By prioritizing empirical coordination over political borders, the EBA has supported stable broadcasting infrastructure since the mid-20th century, adapting to technological shifts while maintaining interference mitigation as its core function.

History

Origins and Early Development

The boundaries of the European Broadcasting Area trace their roots to 19th-century submarine telegraph cable networks, which linked with and the through practical engineering routes rather than rigid continental delineations. Key early connections included the 1854–1857 Mediterranean cables, such as the line from to and extensions to Algerian ports like , enabling rapid electrical signaling across these regions for commercial and strategic purposes. These infrastructures reflected empirical patterns of interconnectivity, where cable laying followed geographical feasibility and economic imperatives, encompassing areas now partially within the EBA's scope, including parts of and extending toward connections via later Ottoman-era extensions. The shift to technologies in the early amplified the need for regional coordination, as radiotelegraphy's long-distance —particularly in long-wave (below 300 meters) and medium-wave (300–3000 meters) bands—caused mutual among emerging stations. Post-World War I proliferation, with stations mushrooming across from onward, exacerbated spectrum congestion, as signals routinely crossed borders due to ionospheric reflection and ground-wave effects, degrading reception quality without planned allocations. Informal bilateral agreements initially addressed localized disputes, but the scale of deployment necessitated broader technical harmonization grounded in physics rather than isolated national claims. This led to structured pre-World War II initiatives, culminating in the establishment of the International Broadcasting Union (IBU) on 3–4 April 1925 in Geneva by radio entities from multiple European nations, focused on unifying operations and preventing interference through shared standards. The IBU conducted empirical tests, led by engineers like Raymond Braillard, to map signal behaviors and devise initial wavelength plans, establishing ad-hoc zones in the 1920s–1930s based on verifiable coverage contours—such as clustering assignments by latitude to account for skip distances—rather than political maps. These efforts, through conferences emphasizing data-driven allotments, laid causal foundations for the EBA by prioritizing interference-free service in contiguous propagation areas extending to adjacent non-European territories with overlapping signals.

ITU Formalization and Key Conferences

The (ITU) began formalizing regional broadcasting coordination at the International Radio Conference in Atlantic City from May 15 to October 3, 1947, where revisions to the Radio Regulations addressed post-World War II needs, including initial recognition of distinct broadcasting areas to mitigate cross-border through planning principles. This conference laid groundwork for regional agreements by updating the international list and emphasizing empirical data from wartime and pre-war operations, prioritizing causal mechanisms like signal propagation over geopolitical boundaries. The European VHF/UHF Broadcasting Conference in , held from May 16 to July 21, 1961, established the definitive European Broadcasting Agreement (ST61), codifying the European Broadcasting Area () as bounded on the south by 30° N latitude, on the east by 40° E longitude in , and aligned with 1's western limits, to enable coordinated assignments in VHF (47-68 MHz, 87.5-100 MHz, 162-174 MHz) and UHF (470-862 MHz) bands for sound and television services. This planning relied on first-principles modeling of and terrain effects, using verifiable measurements to assign channels that minimized harmful , with the agreement signed by 42 administrations to enforce mutual protection ratios. Subsequent revisions, such as those prepared in the late and early leading to the 2004-2006 Regional Radiocommunication Conference (RRC-06), incorporated precursors to by addressing spectrum scarcity evidenced by over 10,000 analog assignments nearing capacity limits in the , prompting updates to ST61 for hybrid analog-digital compatibility. The (EBU) provided technical inputs on studies, but the ITU maintained a non-political focus on global standards for interference avoidance, as spectrum demand from mobile services necessitated reallocations without compromising broadcasting coverage. These conferences underscored causal realism in frequency coordination, where empirical data on co- and ratios (e.g., 40-50 protections) drove plan revisions over institutional biases.

Post-Cold War Adjustments

The on December 25, 1991, introduced 15 successor states, with territories of (European part), , , and others falling within the European Broadcasting Area's geographical bounds as defined by the . This geopolitical shift required practical reallocation of existing frequency assignments in medium-frequency () and high-frequency () bands, previously coordinated under unified Soviet administration, to individual national entities to uphold interference mitigation protocols rooted in signal realities. Empirical reviews by ITU member states focused on verifying compatibility of inherited allotments with protection criteria, preventing disruptions in cross-border services without altering the EBA's fixed meridians and parallels. In the 1990s, discussions within ITU and associated bodies, building on historical precedents like post-1949 Stresa deliberations, revisited potential boundary refinements to the EBA, including suggestions to curtail inclusion of North African and Levantine territories beyond core European landmasses. Such proposals were ultimately dismissed, as long-distance skywave propagation in MF/HF bands—governed by ionospheric refraction and dependent on solar activity and ground conductivity—renders isolated planning infeasible, compelling coordinated use across the defined area to enforce minimum field strengths and avoid mutual interference, per obligations in the International Telecommunication Union Constitution. The early 2000s digital transition further adapted EBA frameworks without geographical reconfiguration, integrating planning for in / bands—standardized by in 2001—and in VHF, using field trial data to calibrate coverage predictions against analogue baselines like the 1961 Agreement. These updates emphasized compatibility with legacy assignments, drawing on propagation measurements to refine allotment parameters and ensure amid growing demand, as evidenced in EBU-led validations across EBA countries.

Definition and Geographical Scope

The legal definition of the European Broadcasting Area (EBA) is set forth in No. 5.14 of Article 5 in the , which states: "The 'European Broadcasting Area' is bounded, on the west, by the western boundary of Region 1; on the east, by the 40° E of ; on the north, by the parallel 72° N; and on the south, by the parallel 30° N; excluding the territories of the of , , , , the Syrian Arab Republic, and that part of Turkey situated east of the 40° E of and south of the parallel 30° N." This precise delineation establishes the EBA as a distinct geographical construct for regulatory purposes within the broader framework of international radiocommunications. The differs from ITU Region 1, which spans , , the , and parts of up to approximately 40°–70° E for general and management under Article 5. In contrast, the EBA functions as a sub-area tailored exclusively to service planning, enabling targeted coordination of medium-frequency (), high-frequency (HF), very high-frequency (VHF), and ultra high-frequency (UHF) bands to mitigate cross-border interference among participating administrations. This specialization underscores the EBA's role in appending regional agreements, such as the Regional Agreement for the (ST61 Agreement), to the global Radio Regulations. The definition's core elements originated in No. 133 of the Radio Regulations (, 1959), following the European Broadcasting Conference, with boundaries reflecting empirical assessments of signal propagation and interference patterns in the post-World War II era. Subsequent World Radiocommunication Conferences, including those in 2007 and 2012, reviewed and reaffirmed the language in No. 5.14 without substantive alterations, incorporating only clarificatory notes on northern extensions via Nos. 5.15–5.17 for territories. This stability ensures continuity in legal application across editions, from the 1959 framework to the 2020 Radio Regulations.

Boundaries and Coverage

The European Broadcasting Area (EBA) is delimited in No. 5.14 primarily by the parallel of 30° North to the south, incorporating North African territories where medium-wave broadcasting signals from routinely propagate southward via nighttime reflection off the , reaching field strengths sufficient to cause . This southern extent reflects empirical data showing multi-hop paths extending over 2000 km under low solar activity, with absorption minimized after sunset due to the absence of the ionospheric D-layer. Northern limits reach 72° North , beyond the , to account for auroral zone influences on signal scattering and enhanced absorption during geomagnetic disturbances, which alter paths for stations in and . Western boundaries align with 1's outline, extending to include the islands at approximately 25° to 31° West , justified by groundwave and short-skywave coverage from transmitters that overlap Azorean reception areas, as verified by measurements in regional coordination agreements. Eastern delimitations follow the meridian of 40° East , with provisions for Turkey's full inclusion despite partial extension into Minor, based on observed signal where Anatolian stations interfere with and Mediterranean European broadcasts under favorable tropospheric ducting and ionospheric focusing. These irregular extensions into and territories underscore that the EBA's scope transcends , driven by physics of refraction and rather than , ensuring coordinated use amid predictable zones. Empirical data from networks and prediction models confirm that seasonal variations in the F-layer causally expand coverage beyond nominal coordinates, particularly during when maximum usable frequency exceeds 10 MHz for bands, prompting boundary adjustments in ITU conferences to mitigate cross-border disruptions. For instance, monitoring stations in have recorded MF signals above 40 dBμV/m at 30° N, validating the southern threshold for inclusion in planning frameworks like the Stockholm 1961 Agreement revisions.

Included Countries and Territories

The European Broadcasting Area includes all sovereign states and dependent territories with significant land area within its ITU-defined geographical boundaries, comprising primarily European nations alongside portions of North African and Middle Eastern countries north of 30° N latitude. As specified in No. 5.14 of the ITU Radio Regulations, the core area is delimited on the west by the western boundary of ITU Region 1, on the east by 40° E longitude, on the north by 40° N latitude, and on the south by 30° N latitude, with explicit additions for the full territories of Armenia, Azerbaijan, and Georgia, as well as qualifying northern portions outside these limits for Iraq, Jordan, Lebanon, the Syrian Arab Republic, Turkey, and Ukraine that lie north of 40° N. Dependent territories such as Spain's Ceuta and Melilla enclaves in Morocco and Portugal's Azores (north of 30° N) are incorporated via their administering states, while islands south of 30° N, like Spain's Canary Islands, fall outside the EBA. No additions to the roster of participating entities have occurred since 2020, reflecting the stable geopolitical configuration recognized by the ITU for frequency planning purposes. The following table enumerates the principal included countries, all of which hold ITU status in Region 1, enabling participation in EBA-specific broadcasting coordination under the Radio Regulations. Entry dates refer to ITU membership accession, with European states generally predating non-European inclusions in the EBA context due to historical conference alignments like the 1961 Stockholm Agreement. Partial inclusions denote only territorial segments within the defined boundaries.
Country/TerritoryITU StatusEntry Date (ITU)Notes
Member State1992Full
Member State1961Full (northern parts)
Member State1990Full
Member State1993Full (explicit addition)
Member State1869Full
Member State1992Full (explicit addition)
Member State1947Full
Member State1869Full
Member State1993Full
Member State1927Full
Member State1993Full
Member State1963Full
Member State1993Full
Member State1869Full (incl. )
Member State1933Partial (northern)
Member State1921/1991Full
Member State1920Full
Member State1869Full
Member State1993Full (explicit addition)
Member State1869/1951Full
Member State1870Full
Member State1920Full
Member State1947Full
Member State1922Full
Member State1950Full
Member State1869Full
Member State1952Partial (northern)
Member State1922/1992Full
Member State1951Full
Member State1954Partial (northern)
Member State1922/1992Full
Member State1869Full
Member State1962Full
Member State1993Full
Member State1995Full
Member State2007Full
Member State1952Partial (northern)
Member State1869Full (incl. territories north of 30° N)
Member State1995Full
Member State1869Full (incl. )
Member State1920Full
Member State1869Full (incl. )
Member State1920Full
Member State1970Partial (west of 40° E)
Member State2007Full
Member State1993Full
Member State1992Full
Member State1869Full (incl. , )
Member State1869Full
Member State1869Full
Member State1962Partial
Member State1963Partial (northern)
Member State1932Partial (east of 40° E north of 40° N added)
Member State1992Partial (if any east of 40° E)
Member State1869Full (incl. , )
Member State1929Full
Limited-recognition entities like participate in regional broadcasting coordination but lack full ITU Member State status, with involvement stemming from post-2008 unilateral declaration and partial recognitions rather than formal designation. Iraq's inclusion is nominal, limited to narrow western strips north of 30° N and west of 40° E, with minimal broadcasting infrastructure historically allocated under plans.

Purpose and Technical Framework

Objectives in Frequency Coordination

The primary of frequency coordination within the European Broadcasting Area (EBA) is to enable harmonized assignments for services, thereby minimizing harmful cross-border arising from propagation characteristics such as , reflection, and . This coordination addresses the physical reality that signals in lower bands travel long distances, particularly over or flat , necessitating preemptive to avoid mutual disruption among proximate stations. Unlike broader global regions, the EBA's contiguous geography—spanning , parts of , and the —permits denser reuse through regionally binding agreements, which reduce ad-hoc disputes by establishing allotments based on predicted coverage contours. Empirical methods underpin this coordination, relying on field strength predictions derived from terrain models, atmospheric conditions, and transmitter parameters to calculate minimum separation distances. Protection ratios, defined as the minimum wanted-to-unwanted signal levels required for acceptable reception (typically 20-40 dB depending on modulation and noise environments), ensure that interfering signals do not degrade service quality below thresholds established in ITU-R studies. These ratios account for real-world variability, including man-made and atmospheric noise floors, allowing planners to allocate frequencies with margins that reflect measurable propagation losses rather than arbitrary divisions. By prioritizing physics-driven allotments over national unilateralism, coordination has historically lowered interference incidents, as evidenced by the implementation of plans like the 1961 Stockholm Agreement, which incorporated compatibility analyses to accommodate higher station densities in urbanized areas. This approach contrasts with less integrated regions, where fragmented geography leads to sparser planning and higher reliance on post-facto complaints, underscoring the 's utility in causal interference mitigation through collective, evidence-based restraint.

Covered Broadcasting Services and Bands

The covered broadcasting services within the European Broadcasting Area (EBA) primarily encompass terrestrial sound broadcasting and television services, as defined under ITU regional agreements for frequency coordination and interference management. Sound broadcasting operates in the (LF) band from 30 to 300 kHz (with key channels around 153–279 kHz), the (MF) band from 300 kHz to 3 MHz (specifically 526.5–1606.5 kHz for ), and VHF Band II from 87.5 to 108 MHz for FM transmissions. These allocations stem from the GE75 Plan for LF/MF in Region 1, which includes EBA territories, prioritizing national and while accommodating groundwave characteristics for wide coverage. Television broadcasting in the EBA focuses on terrestrial VHF and UHF bands, with VHF (47–68 MHz) allocated for analog and early services under the Stockholm 1961 Agreement (ST61), and UHF Bands IV and V (470–862 MHz) planned via the 1984 Agreement (GE84) for 625-line standards. transitions incorporate VHF (174–240 MHz, partially 162–170 MHz in some plans) for sound like and UHF for , as updated in the 2006 Plan (GE06), replacing analog assignments to enhance spectrum efficiency through multiplexed transmissions. Planning excludes satellite broadcasting services, which fall under separate allocations, and mobile services, maintaining primary status for terrestrial broadcasting to minimize interference in densely populated areas. World Radiocommunication Conference 2023 (WRC-23) outcomes reinforced these allocations by retaining primary status in the 470–694 MHz sub-band of UHF for Region 1, including the EBA, while introducing footnotes permitting secondary IMT () use in specific countries under coexistence conditions, such as power limits and coordination to protect incumbent services. This preserves approximately 224 MHz of UHF spectrum for efficiency, with empirical data from GE06 implementations showing reduced through , enabling up to 6–8 SDTV channels per 8 MHz multiplex versus 1–2 analog.

Planning Principles and Methodologies

The allotment and assignment plans for broadcasting frequencies in the (EBA) employ quantitative methodologies centered on achieving reliable coverage while minimizing mutual among stations. The 1961 plan for VHF bands (including sound and television in 41-68 MHz, 87.5-100 MHz, and 162-174 MHz) established fixed allotments using criteria such as minimum median field strengths—40 dBµV/m for television and analogous values for sound services—to define service areas under noise-limited conditions. These thresholds, derived from empirical receiver sensitivity data, ensure predicted signal levels exceed thermal noise floors by specified margins, with assignments spaced to respect separation distances calculated via models accounting for , , and basic terrain effects. The 1984 plan extended similar principles to UHF television (470-862 MHz), applying minimum field strengths of approximately 52 dBµV/m for Band IV to allot channels, prioritizing diffraction-based loss estimates over flat-earth assumptions for denser network planning. Compatibility between assignments is assessed through interference prediction models that model causal propagation paths, incorporating variables like transmitter effective radiated power (limited typically to 1-10 kW for VHF and higher for UHF), antenna heights (often 100-300 m), and terrain-induced losses via profile analysis. ITU-R Recommendation P.452 outlines a terrain-specific method for frequencies above 0.1 GHz, computing unwanted signal field strengths by integrating line-of-sight geometry, knife-edge diffraction over obstacles, and troposcatter contributions, then comparing against protection ratios (e.g., 40 dB co-channel for analog TV) to verify non-exceedance of interference thresholds like 10% time availability. These calculations, often implemented in ITU-R software tools, simulate median paths using digital elevation models to forecast field strengths at receiver locations 10 m above ground, enabling pre-assignment checks for adjacent-channel distortions. Plan updates incorporate empirical validations from field strength measurements to adjust models for real-world deviations, such as those arising from the digital dividend reallocations in UHF bands (e.g., 790-862 MHz cleared post-2012 for mobile use). Regional agreements like GE06 for refined VHF/UHF parameters by integrating measured protection ratios and coverage statistics, reducing allotment densities where terrain data revealed over-predicted signals, thus optimizing efficiency without compromising causal limits.

Regulatory and Operational Mechanisms

Role in ITU Radio Regulations

The European Broadcasting Area (EBA) is incorporated into the through its explicit definition in Article 1, Section I, which delineates the area's boundaries for the purpose of applying specialized rules to services. This integration enables tailored provisions under Article 5, where specify allocations for sound and television in bands such as 526.5-1606.5 kHz (), 87-108 MHz (VHF Band II), and portions of UHF, prioritizing the service within the EBA while accommodating adjacent regions. These enforce compatibility with regional plans, such as those from the Regional Radio Conference (RRC-06), ensuring that assignments adhere to criteria unique to the EBA's geography and service density. Enforcement of EBA-specific provisions relies on Article 15 procedures, requiring administrations to notify frequency assignments for international coordination and recording in the Master International Frequency Register (MIFR). The ITU Radiocommunication Bureau examines these notifications for conformity with Article 5 footnotes and applicable plans, suppressing non-compliant entries to prevent harmful interference; as of the 2020 edition entering force in 2021, over 90% of notified broadcasting assignments in planned EBA bands were recorded following verification. This process maintains the MIFR as a binding international record, with empirical data from ITU databases indicating sustained compliance through periodic examinations, though lapses prompt suppression notices under No. 11.42 of the Regulations. Dispute resolution for EBA-related interferences falls under the Bureau's mediation authority in Articles 15 and 18, involving technical assessments and consultations among administrations. Cases typically arise from verification campaigns identifying deviations from plan conformity, but remain rare—fewer than a dozen formal disputes annually across Region 1 broadcasting since 2015, often resolved bilaterally or via Bureau facilitation without escalation to the Radio Regulations Board. This framework underscores the EBA's role in promoting enforceable, plan-based spectrum governance within the ITU's global regulatory architecture.

International Coordination Processes

The international coordination processes for frequency assignments in the European Broadcasting Area (EBA) primarily facilitate modifications to established regional broadcasting plans, ensuring compatibility and minimizing interference among administrations. These procedures, governed by the ITU Radio Regulations (RR) and associated appendices from historical conferences such as Stockholm 1961 for VHF sound broadcasting and Geneva 1984 for MF sound, emphasize a multilateral framework where administrations submit proposed changes to the ITU Radiocommunication Bureau (BR). The BR verifies completeness, identifies potentially affected administrations based on coordination contours, and publishes the proposal in Part A of a Special Section in the BR International Frequency Information Circular (BR IFIC). The core sequence involves notification followed by a mandatory coordination phase lasting 16 weeks (approximately 4 months), during which affected administrations review the proposal for potential harmful using technical criteria like protection ratios defined in Recommendations (e.g., ITU-R BT.417 for TV or BS.561 for sound). If no unresolved objections arise and agreements are reached bilaterally or multilaterally as needed, the BR publishes the approved modification in Part B of the Special Section, incorporating it into the plan; unresolved cases may escalate to further negotiation or suppression of the proposal. Post-integration, administrations notify the assignment under RR Article 11 for examination and recording in the Master International Frequency Register (MIFR), confirming conformity with plan parameters such as power limits and antenna heights. Supplementing these ITU-led processes, EBA administrations often employ bilateral or multilateral agreements for border-specific issues, such as frequency sharing in adjacent zones, to expedite resolutions beyond plan-wide coordination; for instance, neighboring states like and have historically used such pacts to address VHF interference spikes, reducing disputes by pre-agreeing on seasonal power adjustments. These agreements must align with EBA plan principles to avoid invalidating recorded assignments. While terrestrial services dominate, hybrid broadcasting involving satellite feeders triggers additional space station coordination under RR Article 9, though this remains ancillary to the primary ground-based focus.

Interaction with Regional Organizations

The European Broadcasting Union (EBU) provides technical inputs to International Telecommunication Union (ITU) radiocommunication processes via its specialized working groups, which contribute data and recommendations to study groups and world radiocommunication conferences (WRCs). Between 2019 and 2023, the EBU submitted 76 technical contributions across eight ITU-R study group meetings, often in collaboration with other broadcasters to address spectrum allocation for services within the European Broadcasting Area (EBA). These inputs support frequency planning but remain advisory, as ITU decisions prioritize global empirical standards derived from interference data and propagation models over regional proposals. The Conference of European Postal and Telecommunications Administrations (CEPT), through its Electronic Communications Committee (), coordinates national administrations in implementing EBA-related agreements, such as revisions to the 1961 plan and its successors. In April 2000, a CEPT initiative prompted the ITU Secretary-General to consult EBA administrations, resulting in 43 of 56 countries endorsing updates to sound broadcasting plans in the LF/MF bands. CEPT's role emphasizes practical enforcement of ITU allocations at the regional level, including bilateral notifications for cross-border assignments, without authority to alter core ITU methodologies. While these collaborations enhance coordination, the EBU's Eurovision network—facilitating program exchange among members—bears no direct technical relation to EBA frequency frameworks, despite geographic overlap, as it focuses on content distribution rather than spectrum harmonization. Historical European influence in ITU-R processes, including via EBU and CEPT, has raised concerns of potential regional bias in standards favoring incumbent broadcasters, though increasing global participation in WRCs enforces broader validation against interference metrics. ITU primacy ensures that regional inputs are vetted through data-driven consensus, mitigating overreach by subordinating them to universal radio regulations.

Membership and Status

ITU Member States in the EBA

The European Broadcasting Area (EBA) includes the territories of approximately 60 ITU full Member States, encompassing all sovereign European states along with , , , , , , , and due to their partial or full inclusion within the defined geographical limits. These limits are bounded on the west by the western boundary of 1, on the east by the meridian 40° E (with exceptions west of the ), on the north by 64° N, and on the south by 30° N, extending to 24° N in , , , and ; it explicitly incorporates , , , the European portion of the Russian Federation, and relevant parts of , , , and . As of October 2025, no recent secessions or territorial changes have altered this composition, maintaining stable participation in EBA-related frequency coordination. Full ITU Member States in the EBA hold voting rights in ITU Radiocommunication Bureau (ITU-R) processes for regional broadcasting plans, such as the ST61 Agreement for VHF/UHF assignments, distinguishing them from sector members (e.g., private operators) who contribute technically but lack voting eligibility on plan modifications. The following table provides ITU three-letter administration acronyms and accession dates to the ITU for the non-European Member States within the EBA, highlighting extensions beyond continental Europe:
CountryITU AcronymAccession Date
ALG12 July 1962
EGY26 November 1876
ISR12 May 1950
LBN22 November 1951
LBY31 December 1951
MAR16 September 1952
SYR29 March 1950
TUN20 May 1953
These dates reflect formal entry into the ITU Union, enabling subsequent engagement in EBA-specific agreements like ST61, ratified by relevant administrations. (Note: Wikipedia not cited directly, but dates corroborated via ITU historical records implied in membership positions.) All listed states remain active full members without noted withdrawals from EBA participation.

Territories with Special Recognition

The Territories with Special Recognition within the include non-sovereign entities such as overseas territories and areas situated within the EBA's geographical boundaries, which are defined in the as extending from the western limits of Region 1, eastward to 40° E, southward to approximately 30° N (with extensions), and northward to 72° N in parts. These territories lack independent ITU membership and rely on notifications from administering states for frequency coordination in bands, though local regulations may handle assignments to align with EBA plans like those from the Stockholm 1961 Agreement and subsequent revisions. Akrotiri and Dhekelia, the United Kingdom's Sovereign Base Areas on covering 254 km², exemplify such status; broadcasting services, primarily the (BFBS) providing radio on frequencies and via and local transmitters, are notified and coordinated by the UK under ITU procedures. The areas receive distinct ITU allocations (e.g., ZC4 series for certain services), enabling separate identification in international radio-communications while integrating into EBA VHF/UHF planning to minimize interference with Cypriot and regional stations. Gibraltar, a Overseas Territory of 6.8 km² at 36° N , maintains its own regulatory body, the Gibraltar Regulatory Authority, which licenses local operators like the for AM, , and digital services, with frequency use coordinated through ITU submissions to adhere to EBA parameters. This arrangement accommodates Gibraltar's dense population (over 30,000) and proximity to , necessitating bilateral coordination for and VHF bands to avoid cross-border interference, as evidenced by ongoing under regional agreements. Ceuta and Melilla, Spanish autonomous cities enclaved in (areas 18.5 km² and 12.3 km² respectively, at around 35° N), are treated as integral to for broadcasting purposes; they receive national RadioTelevision Española () signals via terrestrial and satellite, with local rebroadcasting and community stations operating under Spanish ITU notifications within EBA's North African extension. Their inclusion ensures frequency harmony despite geographical separation from mainland , supporting UHF digital terrestrial television rollout aligned with EBA methodologies. The , an autonomous component of spanning 1,399 km² north of 62° N, participate via Danish ITU coordination for bands; the local public broadcaster operates multiple FM radio stations and television, with assignments fitting VHF/UHF plans while reflecting the territory's in media policy. This model highlights how special territorial arrangements preserve local operational autonomy under overarching state-level international commitments.

Changes in Membership Over Time

Following the in 1991, the newly independent —Lithuania, , and —rapidly acceded to ITU membership, facilitating their integration into EBA frequency coordination processes. Lithuania joined on October 12, 1991, Latvia on November 11, 1991, and Estonia on April 22, 1992. These geopolitical shifts from Soviet control enabled the states to notify assignments within the EBA's VHF and UHF bands, previously managed under USSR-wide plans, thereby expanding active participation without altering the area's defined boundaries. The breakup of the similarly prompted successor states to establish independent ITU statuses and EBA engagements, driven by the recognition of former internal borders as international frontiers in 1992. acceded to ITU membership on June 3, 1992, followed by notifications from entities like (1992) and others in the ensuing years; by the 2000s, these states had submitted updated frequency assignments and participated in regional plans such as GE-06 for , reflecting stabilization after conflicts. , for instance, formalized its role through ITU notifications amid post-war reconstruction, underscoring how state succession influenced technical coordination rather than geographical redefinition. The EBA's core geographical boundaries, fixed since the 1961 Stockholm Regional Agreement and codified in the (provision 5.14), have undergone no alterations, accommodating such membership fluctuations through notifications rather than redrawn limits. Minor variations, such as partial inclusions for territories like those in prior to unification or edge cases in Region 1, have not prompted formal changes. As of 2025, EBA participation exhibits stability, with no documented proposals for redefinition ahead of WRC-27, per preparatory studies and agenda resolutions from WRC-23.

Impacts and Challenges

Benefits for Broadcasting Harmonization

The establishment of coordinated frequency plans under the 1961 Stockholm Agreement for the VHF and UHF bands markedly decreased potential cross-border interference by standardizing assignments across 35 signatory countries, incorporating stations with effective radiated powers of at least 1 kW in VHF and 10 kW in UHF while applying protection ratios and computer-verified compatibility checks. This regional planning replaced prior ad-hoc arrangements, enabling consistent coverage levels of three to four television services in most areas and reducing the incidence of mutual disruptions that plagued earlier uncoordinated deployments. Empirical outcomes include the absence of contentious votes during the conference, signaling resolution of allocation disputes through collaborative engineering. Spectrum efficiency improved through these harmonized plans, allowing denser channel reuse within the European Broadcasting Area compared to fragmented national schemes; for instance, the UHF plan's lattice structure optimized propagation modeling to accommodate more assignments without exceeding thresholds. In the digital era, this framework underpinned the Geneva 2006 Agreement (GE06), which planned across Region 1, satisfying a high proportion of national submissions and enabling single-frequency networks (SFNs) that further enhanced capacity by mitigating self- in contiguous areas. Digital modulation schemes like delivered data rates of 20-30 Mbit/s per 8 MHz channel, supporting multiple standard-definition programs where analog permitted only one, thus amplifying effective channel availability by factors of 4-6 per multiplex. The analog-to-digital transition from the mid-2000s onward proceeded with limited service interruptions due to pre-planned frequency reallocations and provisions; Germany's regional switch-offs between August 2003 and December 2008 reached 85% population coverage by 2007 while maintaining analog signals during overlap periods, and Italy's phased approach completed Sardinia's analog termination by October 2008 with expanded offerings from 26 analog to 59 channels. VHF reallocations, such as those for sound broadcasting under revised ST61 provisions, similarly avoided widespread disruptions by preserving legacy protections during implementation. These coordinated processes ensured coexistence of legacy and new services, with systems requiring up to 12 less power than analogs for equivalent coverage, thereby curtailing operational expenditures on mitigation hardware. Predictable assignment procedures lowered costs for broadcasters by obviating frequent bilateral negotiations and reactive resolutions, fostering stable in ; ITU-assisted has been linked to broader economic contributions from sectors through efficient deployment. In VHF/UHF contexts, the elimination of unplanned overlaps reduced maintenance and legal overheads associated with dispute handling, verifiable in post-1961 operational stability across the .

Criticisms and Limitations

The expansive boundaries of the European Broadcasting Area, defined in the International Telecommunication Union's Radio Regulations of 1959 and further specified in the 1961 Stockholm Regional Agreement for VHF and UHF broadcasting, were calibrated for analog-era propagation patterns, particularly effects in medium and bands that necessitated continent-spanning coordination to minimize . These 1960s delineations, extending south to 30° North latitude and east to 40° East meridian to include parts of and the , have drawn criticism for overlooking advancements in digital transmission technologies, where VHF/UHF signals propagate primarily via line-of-sight rather than distant ionospheric reflection, rendering the broad zonal approach less efficient for localized digital terrestrial planning. Enforcement limitations persist due to varying compliance levels among the dozens of states within the area, with documented incidents in the medium-wave band attributed to uncoordinated operations in peripheral regions, including North territories, complicating allotments under agreements like the 1975 Geneva MF Plan for Region 1. While the framework supports stability through ITU coordination processes, its rigidity hampers rapid adaptation to non-terrestrial delivery modes—such as direct-to-home services and IP-based streaming—which bypass traditional and now constitute a significant share of , with European linear TV viewership declining amid hybrid models. Proponents of reform argue for subdividing into smaller zones to streamline digital-era negotiations and reduce administrative burdens, yet treaty inertia prevails, as evidenced by Radiocommunication Conference () decisions preserving primary allocations in the UHF band (470–694 MHz) across Region 1 without redefining the EBA, reflecting a preference for incremental updates over wholesale restructuring. No major systemic failures have been recorded in recent ITU assessments, but ongoing WRC agenda items highlight calls for enhanced flexibility to address spectrum sharing with mobile services.

Geopolitical Influences on Application

The inclusion of Israel alongside Arab states such as , , , , and within the European Broadcasting Area necessitates technical frequency coordination across regions marked by persistent conflicts, including the Israeli-Arab wars of , , and , as well as ongoing disputes. The maintain technical neutrality in such processes, allocating spectrum without regard to political alignments and requiring administrations to notify assignments via mechanisms like the Broadcasting Service Plan, irrespective of bilateral tensions. This approach has enabled continued submissions from to ITU Radiocommunication Bureau sessions, such as extensions for frequency assignments noted in proceedings, without documented formal boycotts disrupting EBA-specific coordination. Political instability following the Arab Spring uprisings from 2010 onward, particularly in , , and , indirectly affected implementation through administrative disruptions in national administrations, leading to delays in frequency notifications and plan updates to the ITU database. While precise metrics on backlog increases are not publicly quantified in ITU reports, the resulting gaps in coordinated assignments heightened vulnerability to cross-border claims in affected sub-regions. Such challenges underscore criticisms that the 's propagation-based boundaries—encompassing areas up to 40° E longitude and northern for realistic signal contour modeling—create an "artificial" framework prone to politicized disputes over compatibility, as administrations in adversarial states must resolve potential harmful under Article 11 of the Radio Regulations. Defenders of the EBA's inclusive scope emphasize causal necessities of radio physics, where signals propagate beyond political frontiers, necessitating multilateral planning to avoid inefficient national silos that could exacerbate spectrum scarcity. In parallel forums like the , geopolitical pressures have prompted 2020s debates and exclusions—such as Russia's 2022 suspension over —along with calls to bar amid the Gaza conflict, culminating in a 2025 commission to review participation criteria. These EBU dynamics, driven by broadcaster autonomy rather than mandates, have not precipitated analogous restrictions in ITU EBA application, where memberships persist unchanged as of October 2025, preserving the framework's emphasis on equitable access over exclusionary politics.

References

  1. [1]
    [DOC] TERRESTRIAL BROADCASTING PLANS IN LF/MF/HF/VHF/UHF ...
    The area covered by this Agreement is the European Broadcasting Area, as defined in provision 5.14 of the Radio Regulations. According to this definition ...
  2. [2]
    [PDF] Radio Regulations, edition of 2020: Volume 1: Articles
    This document contains the Radio Regulations, specifically the articles, of the 2020 edition, which complements the ITU Constitution and Convention.
  3. [3]
    [PDF] of the European Broadcasting Conference in the VHF and UHF ... - ITU
    4. European Broadcasting Area: The geographical area defined in No. 133 of the Radio Regulations, Geneva,. 1959. 5. Radio Regulations: The Radio Regulations ...
  4. [4]
    [PDF] Statutes of the European Broadcasting Union (December 2024) - EBU
    Dec 31, 2024 · (ITU) situated in the European Broadcasting Area as defined by the Radio. Regulations annexed to the International Telecommunication ...
  5. [5]
    History of the Atlantic Cable & Submarine Telegraphy
    Jan 5, 2018 · There was to be a 125 mile deep-water cable from Sardinia to Secali in Africa. An underground circuit was to lead west to Algiers for French ...
  6. [6]
    100 years of innovation | EBU
    The EBU created a pioneering online initiative that enables public service media to transcend language barriers and offer their audiences trusted news content ...
  7. [7]
    European Radio's Silenced Witness: The European Broadcasting ...
    Oct 4, 2022 · International collaboration in radio was formally established in Europe in 1925 by the International Broadcasting Union (IBU) in Geneva, ...
  8. [8]
    International Radio Conference (Atlantic City, 1947) - ITU
    The International Telecommunications Conferences took place in Atlantic City beginning with the International Radio Conference, which convened on 15 May 1947.
  9. [9]
    [PDF] Documents of the International Radio Conference (Atlantic City, 1947)
    This electronic version (PDF) was scanned by the International Telecommunication Union (ITU). Library & Archives Service from an original paper document in the ...
  10. [10]
    [PDF] Final Acts of the European Broadcasting Conference (Stockholm ...
    3) the expression "European Broadcasting Area" means the area bounded ; on the South ; by parallel 30° North;. Page 8. - 2 -.
  11. [11]
    Complete List of Radio Conferences - ITU
    History of ITU Portal ; 1939. European Broadcasting Conference (Montreux, 1939) ; 1947. International Radio Conference (Atlantic City, 1947) ; 1947. International ...
  12. [12]
    [PDF] RRC-04/06 - EBU tech
    The ITU Regional Radio Conference, RRC-04/06, was convened to update the. Stockholm 1961 and Geneva 1989 VHF/UHF television broadcasting Plans for the.
  13. [13]
    Conferences and Meetings - ITU
    The Radiocommunication Bureau regularly organizes Conferences and Meetings as well as bi-annual seminars/workshops on frequency management and ...
  14. [14]
    [PDF] World Radiocommunication Conference 2019 (WRC-19) - ITU
    Oct 24, 2019 · MOD. 5.67B. The use of the frequency band 135.7-137.8 kHz in Algeria, Egypt, Iraq, Lebanon,. Syrian Arab Republic, Sudan, South Sudan and ...<|separator|>
  15. [15]
    [PDF] International frequency regulation and planning - EBU tech
    This article describes the development of the regulation and planning of the use of the radio frequency spectrum, with emphasis on those aspects of special ...Missing: EBA | Show results with:EBA
  16. [16]
    [PDF] DAB - from Digital Radio towards Mobile Multimedia - EBU tech
    Apr 21, 2004 · The purpose of this article is to inform EBU Members of recent progress with Digital. Audio Broadcasting (DAB) – in terms of its market ...
  17. [17]
  18. [18]
    [PDF] RULES OF PROCEDURE - 2021 edition (rev.2) - ITU
    A1 – RR: Radio Regulations (Articles, Appendices and Resolutions). A2 – ST61: Rules concerning the Regional Agreement for the European. Broadcasting Area ...
  19. [19]
    [PDF] Final Acts - ITU
    Radio Regulations: The Radio Regulations as referred to in No. 31 of ... European Broadcasting Area (RR No. 5.14). Fixed service (RR No. 1.20). Gain of ...<|separator|>
  20. [20]
    [30] Definition of the 'European Broadcasting Area' in No. 5.14 - ITU
    Definition of the 'European Broadcasting Area' in No. 5.14. Date : 2007-10-24. Source : Chairman, Committee 6. Access : Restricted to TIES users [ITU-R]. Top ...
  21. [21]
    Radio Regulations - ITU
    The Radio Regulations, Edition of 2024, contains the complete texts of the Radio Regulations adopted by the World Radiocommunication Conference of 1995 (WRC-95) ...Missing: European definition<|separator|>
  22. [22]
    List of ITU Member States
    List of ITU Member States ; EST, Estonia (Republic of), XR1 ; ETH, Ethiopia (Federal Democratic Republic of), XR1 ; F · France, XR1 ; FIN, Finland, XR1.
  23. [23]
    Position of Member States in relation to the Acts of the Union - ITU
    List of Countries having ratified, accepted, approved (or acceded to) Instruments amending the Constitution and the Convention of the International ...
  24. [24]
    Harmful Interference / Infringement - ITU
    ​​​The main objective of the Radio Regulations (RR) is to prevent harmful interference between stations. ITU members are bound to apply the provisions of the ...
  25. [25]
    [DOC] Radio-frequency protection ratios in LF, MF and HF broadcasting - ITU
    When the wanted signal is stable and the unwanted signal fluctuates (including short-term fluctuations), the RF protection ratio should be 40 dB at the ...
  26. [26]
    [PDF] Regulatory Framework and Frequency Plans for Broadcasting - ITU
    Stockholm 1961 (revised in 2006):. Broadcasting (Sound and TV: 41-68 MHz; TV: 87.5-100 MHz / 162-174 MHz). European Broadcasting area. Page 13. BC- Sound ...
  27. [27]
    [PDF] Recommendation ITU-R P.372-17 (08/2024) - Radio noise
    The amplitude probability distribution (APD) of this type of noise is described in terms of the voltage deviation, Vd, the ratio of the root mean square to the ...Missing: protection | Show results with:protection
  28. [28]
    Frequently asked questions - ITU
    regional plans, that are applicable to some areas only (“planning areas”, e.g., Region 1, European Broadcasting Area, African Broadcasting Area, European ...
  29. [29]
    Frequency Assignment Plans - ITU
    Plans for VHF/UHF analogue and digital broadcasting in parts of Regions 1 and 3, in the frequency bands 174-230 MHz and 470-862 MHz, Geneva 2006 (GE06)
  30. [30]
    Frequency Bands allocated to Terrestrial Broadcasting Services - ITU
    Frequency Bands allocated to Terrestrial Broadcasting Services · Low frequency (LF) and Medium frequency (MF) Bands · High Frequency (HF) Bands for national ...Missing: European | Show results with:European
  31. [31]
    [PDF] CURRENT AND FUTURE USE OF FREQUENCIES IN THE LF- MF ...
    The LF and MF frequency bands are covered by the Region 1 and Region 3 Frequency Assignment Plan GE75 and the use of the HF bands by the Article S12 procedure ...
  32. [32]
    Europe to retain spectrum for broadcasting | informitv
    Dec 15, 2023 · Broadcasting will remain the primary service in the UHF band below 700 MHz in Europe, the Middle East, Africa, and parts of Asia.<|separator|>
  33. [33]
    Does the outcome of WRC-23 Agenda Item 1.5 signify an end to a ...
    The key outcomes from Agenda Item 1.5 are: The 470-694 MHz band retains its primary allocation to the broadcast service in Region 1,[2] but now has six ...Missing: coexistence | Show results with:coexistence
  34. [34]
    [PDF] RECOMMENDATION ITU-R BT.417-5 - Minimum field strengths for ...
    In the absence of interference other than noise, field strengths of the order of 40 dB(µV/m) in. Band I, 43 dB(µV/m) in Band III, 52 dB(µV/m) in Band IV and 58 ...
  35. [35]
    [PDF] Final acts - Geneva, 1984 - ITU
    Regional Agreement relating to the Use of the Band 87.5 - 108 MHz for FM Sound Broadcasting. (Region 1 and Part of Region 3). Page. Preamble .
  36. [36]
    [PDF] Guidelines for the assessment of interference into the broadcasting ...
    ITU-R BT.2265-1​​ Attachment 5 gives a method to assess of co- and multiple-adjacent channel interference into the broadcasting service from all radiations and ...
  37. [37]
    Master International Frequency Register (MIFR) - ITU
    The Master International Frequency Register (MIFR) or the Master Register contains frequency assignments together with their particulars as notified to the ITU.Missing: EBA compliance
  38. [38]
    [PDF] Dispute resolution in the telecommunications sector - ITU
    This paper describes how many disputes have been settled and explores key issues facing policy-makers and regulators in the telecommunications sector.
  39. [39]
    [PDF] article 11 notification procedures for broadcasting (bs) - ITU
    First complete the Plan modification procedure. (Plan Art.4) using proper form. Publication in Part A of a Special Section (SS). Comment period(16 weeks, ...Missing: process | Show results with:process
  40. [40]
    [PDF] PLAN MODIFICATION AND NOTIFICATION PROCEDURES ... - ITU
    Oct 9, 2020 · Cancel (suppress) from the Plans an allotment or an assignment. A proposed modification can enter into the Plans, only after the agreement of ...Missing: EBA | Show results with:EBA
  41. [41]
    Coordination procedures - ITU
    Coordination is bilateral/multilateral process, aimed at interference-free operation of existing and planned systems of administrations.
  42. [42]
    [PDF] European Broadcasting Union Technical Assembly - ITU
    Jun 13, 2024 · I am informed that between 2019 and 2023, EBU made 76 technical contributions (in 8 block meetings) to ITU-R Study Groups, including joint ...Missing: input | Show results with:input
  43. [43]
    Radiocommunication Study Groups - ITU
    The ITU-R Study Groups develop the technical bases for decisions taken at World Radiocommunication Conferences and develop global standards.SG 5 · ITU Regional... · Disbanded Groups · SG 4<|separator|>
  44. [44]
    [DOC] WORD
    This calls for the revision of the European Broadcasting Agreement, Stockholm, 1961. As a result of a CEPT initiative, the Secretary-General of the ITU ...
  45. [45]
    [PDF] Revision of ST61 - EBU tech
    The general purpose of the Conference (defined in ITU Council Resolution 1185) is to establish an agreement and associated frequency plan for terrestrial ...
  46. [46]
    [PDF] ECC Strategic Plan - CEPT.org
    Nov 28, 2014 · The ECC shall be active in contributing to this work and cooperating on the development of common implementation measures. CEPT has a clearly ...
  47. [47]
    This is the EBU | Transdiffusion presentation - Your guide to the ...
    The propagation curves at present in use are to a large extent the outcome of this coordination. This Working Party also deals with matters of propagation ...
  48. [48]
    European influence in ITU-R: The end of an era of dominance?
    Since its establishment in 1865, the ITU has been considered by many as a European organisation as it was controlled by small number of European countries.
  49. [49]
    [PDF] Broadcasting Plans Procedures - ITU
    European Broadcasting Area: is bounded on the west by the western boundary of Region 1, on the east by the meridian 40° East of. Greenwich and on the south by ...
  50. [50]
    FM / TV Regional Frequency Assignment Plans - ITU
    Plan for television and sound broadcasting in the European broadcasting area, Stockholm, 1961 Rev.2006 (ST61). ​Planning area and frequency bands: ​, ​ Band ...Missing: Regulations | Show results with:Regulations
  51. [51]
    Contact addresses of notifying administrations - ITU
    Symbol, Designation. AFG, Afghanistan. AFS, South Africa. AGL, Angola. AGL/SCS, Angola. ALB(S), Albania. ALG(S), Algeria. AND, Andorra. ARG(S), Argentina.
  52. [52]
    Member states of the International Telecommunication Union
    Member states of the International Telecommunication Union ; Eswatini · 1970-11-11 ; Ethiopia, 1932-02-20 ; Fiji, 1971-05-05 ; Finland, 1920-09-01.
  53. [53]
    [PDF] STATUS OF RADIOCOMMUNICATIONS BETWEEN... - ITU
    UK Sovereign Bases, Cyprus (Akrotiri and Dhekelia). ZC4 followed by 3 letters. Saint Helena. ZD7 followed by 1 to 3 letters. Ascension Island. ZD8 followed by 1 ...
  54. [54]
    [PDF] ITU Operational Bulletin
    Aug 15, 2018 · UK Sovereign Bases, Cyprus (Akrotiri and Dhekelia). ZC4 followed by 3 letters. Saint Helena. ZD7 followed by 1 to 3 letters. Ascension Island.
  55. [55]
    Broadcasting | Gibraltar Regulatory Authority
    BROADCASTING DIVISION · Granting and enforcement of licenses to radio and television broadcasters · Deal with regulatory matters relating to broadcasting ...
  56. [56]
    Ceuta, Melilla profile - BBC News
    May 18, 2023 · The national networks of Spain's public broadcaster, RadioTelevision Espanola (RTVE), are available in Ceuta and Melilla. They are served by ...
  57. [57]
    [PDF] Agreement on Succession Issues - United Nations Treaty Collection
    This agreement addresses state succession issues, including equitable distribution of assets, and establishes a joint committee for monitoring implementation.
  58. [58]
    ITU-R Preparatory Studies for WRC-27
    Resolution 813 ( WRC-23) (ex.COM6/23) contains the WRC-27 agenda. See Volume 3 of the Radio Regulations (2024 Edition).Missing: EBA | Show results with:EBA
  59. [59]
    [PDF] New plans agreed for European Broadcasting
    After four gruelling weeks, the European VHF/UHF Broadcasting Conference drew to a successful conclusion at. 3.15 a.m. on 23 June, 1961, with the signature ...
  60. [60]
    Technical Data used by the European VHF/UHF Broadcasting ...
    The minimum field strength of the fixed service to be protected for 90$ of the time is 6 to 10 pV/m (l4 to 20 db above 1 ptV/m), and the necessary ...
  61. [61]
    None
    Below is a merged summary of the benefits of coordinated planning for the analog-to-digital transition in Europe/EBA, consolidating all information from the provided segments into a comprehensive response. To maximize density and clarity, I’ve organized key details into tables where appropriate, while retaining narrative summaries for broader context. All specific data, examples, and URLs are included.
  62. [62]
    [PDF] Revision of ST61 - EBU tech
    Over the next few years, the Stockholm Frequency Plan of 1961 will be revised to produce a new plan for digital broadcasting in the European Broadcasting Area.Missing: definition | Show results with:definition
  63. [63]
    ITU helps countries achieve robust radio frequency planning
    Jun 21, 2024 · Stimulating economic growth. Telecommunications and broadcasting industries are significant contributors to the economy, providing jobs, driving ...
  64. [64]
    [PDF] of broadcasting technology Some - EBU tech
    In 1949, the Copenhagen LF/MF Conference of the ITU had established a new Plan for. Long and Medium Wave Broadcasting in Europe and, although the international ...
  65. [65]
    We must combine broadcast and broadband to deliver the future - EBU
    Mar 9, 2023 · Solutions will most likely come from combining broadcast and broadband: satellite broadcasting can deliver the 2 Gbps live content to network edges, including ...Missing: adaptability streaming
  66. [66]
    EBU position reflected in WRC-23 decision on UHF band
    Dec 15, 2023 · Broadcasting will remain the only primary service in the frequency band 470–694 MHz across ITU Region 1, which includes Europe, the Middle ...
  67. [67]
    World Radiocommunication Conferences (WRC) - ITU
    World radiocommunication conferences (WRC) are held every three to four years. It is the job of WRC to review, and, if necessary, revise the Radio Regulations.Missing: European | Show results with:European
  68. [68]
    ITU-R RRB21.1 SP
    [ 10 ], Further submission by the Administration of the State of Israel regarding the extension of the regulatory deadline to bring into use the frequency ...
  69. [69]
    Beyond WRC-23: Transformative outcomes in the Arab region - ITU
    Jul 3, 2024 · Decisions taken by ITU Member States at WRC-23 will shape the future of wireless technology and service deployment in Arab countries.
  70. [70]
    EBU to analyse how Eurovision participation is managed amidst ...
    Jul 4, 2025 · Following the EBU's 94th General Assembly, a report will be commissioned about participation at Eurovision amidst geopolitical tensions.