Fact-checked by Grok 2 weeks ago

Fly system

A fly system, or theatrical rigging system, is a system of ropes, pulleys, counterweights, and related devices within a theater that enables a stage crew to hoist scenery, fixtures, curtains, and other elements vertically above the . This mechanism facilitates the rapid, quiet, and safe movement of overhead components to enhance dramatic effects, provide access for maintenance, and mask equipment from the audience view. The origins of fly systems trace back to maritime rigging techniques adapted for , with early hemp-based systems relying on manual pulling of ropes to raise and lower scenery in theaters dating to the 17th and 18th centuries. A pivotal advancement came in with the development of the first true rigging system in an Austro-Hungarian theater, which balanced loads using weighted arbors to reduce physical effort and improve precision. Over the subsequent century, these setups became standard in proscenium-style venues, allowing for versatile operations. Modern fly systems encompass several types to meet diverse production demands: manual counterweight systems, which remain prevalent in community and educational theaters for their cost-effectiveness; and motorized systems, increasingly adopted for enhanced safety, automation, and efficiency in professional settings. Essential components include battens (horizontal pipes or tracks for suspending loads), lift lines for vertical suspension, loft and head blocks to route ropes, and rope locks or brakes to secure positions. Safety remains a core focus, with operations demanding certified for riggers and fly crew, annual inspections compliant with industry standards such as ANSI E1.47 and relevant OSHA regulations, and strict load-balancing protocols to prevent accidents. These measures ensure the system's reliability in supporting loads up to several tons while minimizing risks in high-ceiling fly towers typical of larger venues.

Overview

Definition and Purpose

A fly system, also known as a theatrical fly system or system, is an overhead apparatus installed in theaters, houses, and stages to enable the vertical —commonly referred to as "flying in" or "flying out"—of battens that scenery, , lighting fixtures, or even personnel. This system operates within the fly loft, a spacious area above , allowing elements to transition seamlessly between audience view and concealed storage. The primary purposes of a fly system are to facilitate rapid scene changes during performances, generate illusions of spatial depth and height for dramatic effect, accommodate aerial performances by performers, and handle the positioning and maintenance of and electrical equipment without obstructing ground-level space or sets. By hoisting heavy loads quietly and precisely, it supports dynamic in proscenium-style venues while minimizing disruptions to onstage action. At its core, the mechanics of a fly system depend on a network of pulleys, ropes or cables, s, or motorized hoists to balance and control loads, ensuring smooth and secure vertical travel. Implementations vary, such as traditional systems using sandbags, counterweight setups for balanced manual operation, or automated variants with electric motors for enhanced precision. Key benefits include heightened efficiency through automated or balanced handling of elements, superior compared to manual lifting methods, and versatility across production scales in diverse venues. These attributes make fly systems indispensable for modern theatrical operations, reducing labor demands and risks while enabling complex visual narratives.

Historical Development

The fly system originated in 17th-century European opera houses, with early hemp-based rigging documented in around 1641. Giacomo Torelli, drawing from his experience in naval engineering, developed innovative setups using ropes, , and a sub-stage mechanism known as the pole-and-chariot method at the Teatro Novissimo in . This allowed for the efficient flying of dropcloths and scenery in productions like La finta pazza, enabling seamless scene changes with just one operator pulling ropes to raise or lower elements simultaneously. These manual systems, reliant on sailors' knotting and pulley expertise, became standard across European theaters, facilitating dynamic spectacle in operas and ballets. In the , advancements shifted toward more reliable mechanisms, culminating in the invention of systems. The first documented rigging was installed in 1888 at the (then the Vienna Court Theatre) in , where weights balanced scenery loads on arbors connected via pulleys, replacing strenuous manual hauling with easier operation. This innovation quickly spread to the , with the initial U.S. installation in 1889 at a theater, and widespread adoption post-1880s as cables supplanted hemp ropes for improved strength and fire resistance. American stagehand John R. Clancy contributed significantly by developing heavy-duty pulleys in 1882 and founding J.R. Clancy, Inc. in 1885, which standardized designs for American venues. The brought and to fly systems, enhancing efficiency and safety. Motor-driven hoists emerged in the , automating load movement and reducing reliance on manual fly crews, though full adoption lagged until post-World War II theater booms. In the 1950s, J.R. Clancy introduced double-purchase systems, which used additional pulleys to halve the travel distance of weights, ideal for low-ceiling venues and enabling smoother operations in modern playhouses. By the , motorized hoists proliferated, with J.R. Clancy deploying over 200 such systems, marking a transition from manual to powered rigging. Post-2000 developments emphasize computerized automation for precision and integration with contemporary technologies. Automated systems, controlled via software interfaces, allow synchronized movements of multiple line sets, driven by International Alliance of Theatrical Stage Employees (IATSE) standards that prioritize mechanisms and load monitoring. These advancements, including compatibility with LED lighting and digital cueing by the 2020s, evolved from regulatory updates following theater safety incidents, which mandated enhanced fire-resistant materials and emergency stops in rigging infrastructure.

Types of Fly Systems

Hemp Rigging System

The hemp rigging system, also known as a hemp house or rope-and-sandbag system, is the oldest and simplest form of theatrical fly system, utilizing ropes passed over loft blocks and head blocks for manual operation from a pin rail to raise and lower loads such as scenery or drapes. In this setup, a single operating line—traditionally made of manila hemp rope, now often synthetic polyester double-braid—runs from the batten up through a loft block on the grid, horizontally across the fly loft to a head block above the pin rail, and down to the operator, where it is belayed using friction locks like cleats or pins to secure the position. Sandbags, typically weighing 10 to 100 pounds, are attached to the rope to partially balance heavier loads, allowing crew members to pull and control the line with human effort alone, without fixed counterweights. A defining feature of the hemp system is its single-purchase design, providing a 1:1 ratio of effort to load, which relies entirely on the strength of the fly crew and rope friction for hoisting and holding, making it distinct from balanced systems that use . This manual approach enables spot , where lines can be easily reconfigured for temporary or custom setups, often using a jack line on a secondary pin rail to assist with heavier adjustments. The system's primary advantages include its low cost and straightforward installation, making it suitable for small or historic venues where complex is impractical, as well as its flexibility for handling irregular or soft loads like borders, legs, or lightweight scenery that do not require precise balancing. However, it is labor-intensive, demanding coordinated for safe operation, and susceptible to wear, stretch, and slippage over time, which can compromise reliability. Load capacities are generally limited to 500-1,000 pounds per line set to ensure crew safety and prevent excessive strain. In modern applications, hemp systems persist in community theaters, educational spaces, and as backup mechanisms in larger facilities, with retrofits incorporating synthetic ropes since the to enhance durability and reduce maintenance needs while preserving the manual, human-powered simplicity.

Dead-Hung System

Dead-hung systems, also known as fixed or static , consist of permanently installed battens or pipes suspended from without mechanisms for vertical movement. These are used for hanging fixtures, speakers, or other equipment that remains in a fixed position throughout productions. Unlike dynamic fly systems, dead-hung setups require no counterweights, hoists, or operating lines, simplifying installation and reducing costs in venues where flying scenery is not needed. They are common in smaller theaters, spaces, or multipurpose halls with limited fly loft height. Safety relies on proper and periodic inspections to support static loads up to several tons, compliant with standards like ANSI E1.4-1.

Counterweight Rigging System

The counterweight rigging system utilizes a mechanical balance mechanism where counterweights are loaded onto an arbor to offset the weight of scenery, lighting, or other loads attached to a batten, with ropes or lift lines routed over sheaves in loft blocks and head blocks to connect the two sides. This setup allows operators to raise or lower the batten using a hand line connected to the arbor, with movement controlled by engaging or releasing a rope lock on a locking rail. The system originated in the late 19th century from European stage machinery traditions, with the first true counterweight installation in an Austro-Hungarian theater in 1888. At its core, the mechanics rely on achieving , where the weight of the load on the is approximately equal to the total mass of counterweights on the , enabling smooth manual operation with minimal effort. Trim height—the position at which the is set for a —is adjusted by moving the balanced and securing it with the rope lock, preventing unintended shifts. For single-purchase configurations (1:1 ratio), the load weight equals the weight, and both travel the same vertical distance; the balance is simply W_{\text{load}} \approx W_{\text{arbor}}. In double-purchase setups (2:1 ), lift lines double back over a on the , so the travels twice the distance of the while requiring roughly double the counterweight mass; here, W_{\text{arbor}} \approx 2 \times W_{\text{load}}. Single-purchase systems are suited for heavier loads, where the direct 1:1 balance supports substantial scenery without excessive volume, though they demand greater vertical clearance for full travel. Double-purchase variants facilitate handling of lighter scenery by halving the 's travel distance, making them ideal for venues with constrained height while still providing balanced control, albeit with increased requirements that can simplify operations for frequent adjustments. Compared to hemp systems, counterweight rigging offers advantages in safety for repeated use, as the balanced weights reduce the physical strain and risk of rope slippage during pulls, enabling quicker and more precise adjustments in mid-sized venues. Its economical design and tactile feedback allow operators to sense imbalances intuitively, supporting versatile speeds from subtle to dramatic. Installation typically requires a fly loft height of at least 50-60 feet to accommodate arbor travel in single-purchase setups, ensuring full range for battens to clear the stage . These systems have been common in theaters since the early 1900s, providing reliable performance for professional productions.

Automated Rigging System

Automated rigging systems utilize electric hoists or winches fitted with encoders to provide precise position control, allowing for accurate and repeatable movements in theatrical operations. These components are typically integrated with protocols and specialized theater control software, enabling synchronized operation of multiple line sets for seamless scene changes and effects. Chain hoists are frequently employed in these setups due to their durability and reliability in handling loads such as scenery, , and screens. Key features of automated rigging include variable speed capabilities, often ranging from 0 to 100 feet per minute, which support both slow, dramatic reveals and rapid adjustments. Overload sensors and slack line detectors are standard for , preventing accidents by monitoring load conditions in , while grouping functions allow operators to control several line sets simultaneously from a central console. These systems often incorporate limit switches and secondary brakes to ensure compliance with operational limits. The primary advantages of automated rigging lie in its ability to minimize requirements, as movements can be programmed and executed remotely, reducing manual labor during performances. This technology facilitates complex , including the safe flying of performers or intricate scenic elements, enhancing creative possibilities in modern productions. Compliance with ANSI E1.6-1 (2021) and ANSI E1.6-2 (2020) standards ensures these systems meet rigorous requirements for , , , and of powered hoists in venues. However, automated systems come with significant drawbacks, including high installation and equipment costs, often tens of thousands of dollars per line set depending on capacity and features. They demand substantial electrical to support multiple hoists and require ongoing and to maintain and safety. Automated systems can build on principles in configurations, combining motorized with traditional balancing for cost-effective upgrades in existing venues. Recent advancements include AI-assisted load systems introduced after 2020, which use sensors and algorithms to predict and on potential overloads or imbalances for proactive safety management. integration has also emerged, particularly in high-profile productions, allowing remote and control without extensive cabling. These developments prioritize enhanced safety and operational efficiency in large-scale entertainment environments.

Core Components

Battens and Lines

Battens serve as the primary horizontal load-bearing elements in fly systems, designed to suspend scenery, lighting instruments, , and other stage elements. Typically constructed from or aluminum pipes, battens provide a stable platform for attachments while allowing vertical movement through connection to lift lines. These pipes are engineered to distribute loads evenly, with capacities varying based on material and diameter, often supporting 15-40 pounds per linear foot depending on the application. The most common configuration is the pipe , a round tubular structure usually 1.5 inches in nominal using Schedule 40 steel pipe with an outer of 1.9 inches, though aluminum variants are used for reduction in load-sensitive setups. These battens range in length from 20 to 60 feet to match typical stage widths, ensuring full coverage without excessive overhang. For enhanced stability, lift lines are attached at intervals of 8 to 12 feet along the batten's length, preventing excessive deflection under load. In contrast, track battens employ or T-track profiles rather than round pipes, facilitating the sliding of carriers, whips, or modular scenery elements. These specialized battens maintain similar length ranges but prioritize smooth lateral movement over general-purpose hanging, often integrated into systems requiring frequent repositioning of loads. lines, the s directly suspending battens, are typically 1/4-inch diameter galvanized aircraft composed of 7x19 strands, offering a balance of tensile strength and flexibility for repeated bending over pulleys. This construction provides a minimum breaking strength of around 7,000 pounds, with safe working loads determined by design factors of 5:1 to 8:1 to account for dynamic loads and wear in theatrical environments. Purchase lines, a secondary set of ropes or s, extend from the lines to controls, enabling manual adjustment in non-motorized systems. These lines integrate with blocks and pulleys to route forces efficiently from the batten to arbors or hoists. Customization of battens and lines accommodates venue-specific needs, such as varying trim heights from 40 to 80 feet, which dictate line lengths and attachment points. Swivel clamps, trim chains, or shackles secure scenery and fixtures to the batten, allowing precise leveling and quick changes while maintaining structural integrity. All components adhere to standards like ANSI E1.4 for counterweight systems, ensuring safety through rigorous material specifications and load testing.

Blocks and Pulleys

In theater fly systems, blocks and pulleys serve as essential mechanical guides that redirect and support the lift lines connecting to arbors, ensuring smooth vertical and horizontal movement of scenery and lighting. Loft , mounted overhead on grid irons or structural beams, feature sheaves typically 4 to 6 inches in diameter equipped with precision ball bearings to route lift lines vertically from the batten to the head block. These are available in single-sheave configurations for basic routing in single-purchase systems and multi-sheave designs to accommodate purchase lines in double-purchase setups, where additional reduces the required travel distance. Head blocks, positioned at the fly floor level on a dedicated beam, are larger pulleys with sheaves ranging from 8 to 16 inches in , using tapered roller or ball bearings for efficient horizontal redirection of multiple lines toward pin rails or arbors. Constructed with frames of aluminum or , these blocks often include a central groove for the 3/4- to 1-inch purchase line in multi-line systems. Sheave materials commonly include for durability, for high-load applications, or (such as Nylatron, filled with for self-lubrication) to reduce weight and friction. Many incorporate grease fittings on bearings to maintain smooth operation under repeated use. Load ratings vary by size and configuration, with individual loft block sheaves rated up to approximately 1,000 pounds safe working load and head block sheaves supporting up to 2,000 pounds per sheave, adhering to ANSI E1.4-1 standards with an 8:1 design factor for safety. Proper maintenance is critical to prevent line wear and system failures; blocks must be aligned to maintain fleet angles under 1.5 degrees, avoiding excessive that causes chafe on wire ropes or synthetic lines. Common modes include seized bearings from inadequate or , which can lead to uneven line tension and potential binding during operation. Annual inspections, as required by OSHA 29 CFR 1926.550 and ANSI/ASME B30.16, involve checking bearing integrity, sheave grooves for wear, and mounting hardware for to the grid.

Counterweights and Arbors

In counterweight fly systems, counterweights consist of modular or iron bricks that are stacked to balance the load on a , ensuring smooth manual operation through . These bricks are typically flame-cut with notched edges for handling and slotted ends that fit onto rods spaced at standard intervals, such as 10 inches (254 mm) centers using 3/4-inch (19 mm) rods. Common nominal weights include 14 (6.4 ) for 4-inch by 1-inch units and up to 43 (19.5 ) for 6-inch by 2-inch units, though 50 (22.7 ) bricks are also standard in many installations; they are sold in pallets of 1,000 (453.6 ) for efficient distribution. The total counterweight capacity per line set typically ranges from 1,000 to 3,000 (454 to 1,361 ), depending on the design and venue requirements, allowing for substantial scenery or loads. Arbors serve as the vertical mounting frames for these counterweights, constructed from channels or frames, often 4 by 4 inches (102 by 102 mm) in cross-section for structural integrity, and ranging 6 to 10 feet (1.8 to 3 m) in height to accommodate varying fly loft spaces. In single-purchase systems, the travels the same distance as the , requiring one pound of per pound of batten load for equilibrium. Locking mechanisms, such as rope locks or pins rated to hold up to 50 lb (22.7 kg) of out-of-balance force, secure the in position once balanced. Loading and unloading occur primarily from a dedicated loading , where crew members add or remove bricks to achieve balance, often securing the with chains to prevent accidental drops during adjustments. In double-purchase configurations, the 's travel distance is halved relative to the —meaning the rises twice as far for each foot of movement—necessitating double the mass (e.g., two pounds per one pound of load) to maintain , accounting for minor in the pulley system. Variations include portable arbors for temporary or touring setups, which feature lightweight steel frames that can be disassembled and transported, and fine-adjustment methods using lead shot fillers poured into compartments for precise balancing beyond standard increments. In hybrid systems, arbors may interface briefly with automated hoists for assisted operation.

Hoists and Motors

In automated and semi-automated fly systems, hoists and motors provide the electromechanical drive for raising and lowering battens and scenery, offering greater precision and speed compared to methods. These components typically replace traditional arbors by directly powering lift lines through geared mechanisms that ensure controlled motion and inherent safety features like self-locking brakes. Chain hoists, such as the CM Lodestar NH Entertainment series, are widely used in theater applications with capacities from 1/8 to 2 tons (metric rated), featuring heavy-duty DC brakes for self-locking to prevent unintended descent under load. winches, often employing 1/8-inch to 1/4-inch diameter ropes, support similar or higher capacities while enabling faster lifting speeds—up to 180 feet per minute in variable configurations—due to their drum-winding design that minimizes chain overlap and friction. Control systems incorporate variable frequency drives (VFDs) to manage motor speed and provide smooth ramping for acceleration and deceleration, reducing mechanical stress during operation. Limit switches and absolute encoders ensure precise positioning, with encoder resolutions supporting accuracies down to fractions of an inch for repetitive scenic cues. Power requirements commonly include 3-phase 480V at 60 Hz, selected for compatibility with venue electrical infrastructure and motor demands up to several horsepower. Motor horsepower is determined by load and speed via the formula HP = (load in lbs × speed in ft/min) / (33,000 × efficiency), where efficiency accounts for gear and drive losses—for instance, a ½-ton load at 32 ft/min requires approximately 1 HP (theoretical, near 100% efficiency). System integration often uses programmable logic controllers (PLCs) or Ethernet protocols to synchronize multiple hoists, enabling coordinated multi-line movements for complex scene changes. Emergency stops, mandated by OSHA standards for hoisting equipment, are incorporated at operator stations and panels to immediately halt operations and prevent hazards during tasks.

Infrastructure and Layout

Fly Loft and Grid Deck

The fly loft is the vertical space above the proscenium stage in a theater, extending from the grid deck down to the fly floor or stage level, and serves as the primary enclosure for the fly system's lines, loft blocks, and counterweights. Typical heights range from 50 to 90 feet to allow battens and scenery to be flown completely out of audience view, though larger venues may reach 100 feet or more for complex productions. In proscenium theaters, this height ensures clear vertical travel for multiple line sets, while opera houses like the feature extensive fly towers. The grid deck, positioned at the top of the fly loft, consists of a reinforced steel framework or catwalk that supports access to rigging hardware such as loft blocks and head blocks. It is typically constructed as an open iron or steel grating for walkability and visibility. This structure facilitates maintenance and adjustments while distributing loads from suspended equipment. Key design requirements for the fly loft and grid deck include sufficient clear height to accommodate full batten excursion without obstruction, typically matching or exceeding twice the proscenium opening height. Ventilation systems are incorporated to manage heat generated by motors in automated rigging setups, preventing overheating and ensuring operational safety. Load-bearing capacity is specified at a minimum of 50 pounds per square foot (psf) for the grid deck to handle uniform live loads from personnel and temporary rigging, with higher ratings up to 100 psf in demanding venues to support additional spot loads. Construction of fly lofts evolved post-1900 with the adoption of steel to replace wooden frameworks, enhancing resistance and structural integrity in line with emerging practices. Modern installations incorporate seismic bracing, particularly in earthquake-prone regions, using diagonal cross-bracing or moment-resisting frames integrated into the assembly to withstand lateral forces. The fly loft framework also provides overhead support for arbors positioned below the grid. The fly gallery consists of elevated walkways positioned along the sides of , typically 20 to 40 feet above the stage floor, providing access for the fly crew to head blocks and operating lines in manual rigging systems. These catwalks extend from the proscenium wall to the upstage wall, often at proscenium height, and may be installed on stage left, stage right, or both sides, sometimes connected by crossovers for crew movement. In larger venues, the fly gallery supports operational tasks such as securing lines and monitoring battens during performances. The pin rail is a horizontal steel pipe, usually 3.5 to 6 inches in , mounted along the edge of the fly gallery and drilled with holes to accommodate pins, which are typically 1-inch or wooden rods. These pins allow fly crew to secure hemp or purchase lines through friction wraps, preventing unintended movement of scenery or equipment in rope-based systems. The extends the full length of the gallery, from to upstage, and is essential for tying off spot lines or temporary . Adjacent to the pin rail, the locking rail is a or positioned approximately 6 to 8 feet away, equipped with locks or cleats designed for systems. This rail secures operating lines by clamping them in place, capable of holding up to 50 pounds of out-of-balance load for balanced systems while preventing slippage during static holds. It is commonly mounted at mid-height levels on the fly gallery or at stage level, facilitating quick adjustments by the crew. Safety features on the fly gallery include 42-inch high guardrails compliant with OSHA standards for elevated platforms, non-slip grating flooring to reduce fall risks, and dedicated lighting to illuminate low-visibility areas during operations. These elements ensure crew safety while accessing and manipulating rigging components at height. In extensive fly lofts, the layout may incorporate multiple levels, such as double-tiered pin rails or rails at varying heights (e.g., stage level, mid-height, and grid level), to accommodate complex line sets. However, in modern fully automated venues, traditional fly galleries and associated rails are increasingly phased out in favor of motorized controls. The pin rail, in particular, sees primary use in hemp rigging operations for manual line securing.

Loading Bridge and Arbor Pit

The loading bridge, also known as the loading gallery, serves as a critical elevated in counterweight fly systems, providing technicians with safe access to add or remove counterweights from to maintain with the load on the batten. This elevated, load-bearing walkway is typically narrow, measuring 3 to 4 feet in width, and spans the full width of the stage to align with multiple line sets, allowing efficient handling of weights without obstructing stage operations. Positioned at the fly floor level, often 70 to 75 feet above the stage deck in standard venues, it enables workers of average height to reach the when the batten is at low . Directly below the loading bridge lies the arbor pit, a recessed opening in the stage designed to accommodate the lowered s and extend their travel range beyond the stage level, preventing trip hazards from protruding components. Typically 4 to 6 feet deep, the houses arbors side-by-side for systems supporting 20 or more line sets, with minimum clearances of 36 inches from the pit wall to the guide rails to ensure safe maneuvering. The of the pit features a minimum 24-inch to the top of the bottom arbor stop, often equipped with bumpers to cushion descents and absorb impacts during operation. Both the loading and incorporate robust design elements for durability and , including steel bar grating flooring that enhances visibility, allows drainage, and supports heavy loads without deformation. OSHA-compliant railings with 4-inch minimum toe plates surround the bridge to prevent falls, while the arbor-access side may feature removable sections for unobstructed loading; pits deeper than 5 feet require lockable access doors with to restrict entry. These components must be engineered by a licensed to withstand the system's full capacity, typically up to 2,000 pounds per arbor. Note that references to ANSI E1.4-1 standards in this section are based on the version; the standard was revised in 2022 (ANSI E1.4-1-2022) with updates to protocols. In operation, crews transport using dedicated trolleys or carts to the loading bridge, where at least two trained personnel stack plates onto the —often with spreader plates for heights exceeding 24 inches—while a monitors from . Safety protocols include clearing the area below, wearing gloves, and employing proper lifting techniques to avoid imbalances that could lead to runaways, with railings or temporary gates isolating the workspace during transfers. This process directly supports balancing by allowing precise adjustments to match loads. Modern adaptations in some venues enhance and precision, such as hydraulic lifts integrated into the loading for elevating to ergonomic heights, reducing physical strain on technicians. Additionally, wireless load monitoring systems with integrated scales, like load cells rated up to 3 tons, provide verification of arbor weights to ensure with design capacities and prevent overloads.

Operation and Procedures

Line Set Functions and Movement

Line sets in theater fly systems serve specialized roles tailored to production needs, with each type dedicated to supporting particular elements of the stage environment. Drapery line sets, including borders and legs, are primarily used for masking offstage areas and controlling sightlines for the , ensuring seamless visual transitions during . Scenery line sets handle drops and cycloramas, which provide painted backdrops or neutral rear projections to establish settings and depth on . Electrical line sets support pipes, allowing for the suspension and adjustment of instruments to illuminate the effectively. Orchestra shell line sets accommodate acoustic enclosures that enhance projection for musical by reflecting and directing audio toward the . Each line set is assigned a unique number for identification and scheduling, such as #1 for the first or #2 for the initial electric , facilitating quick reference during rehearsals and shows. To ensure stability and even load distribution, particularly for longer spanning up to 50 feet, most line sets employ 3 to 4 lift lines attached at intervals along the batten, preventing twisting or uneven ascent. theaters typically feature 20 to 100 line sets, depending on the venue's size and complexity, with color-coding on ropes or tags (e.g., yellow for standard pipe battens and red for track systems) aiding rapid visual identification and counterweighting. Movement of line sets follows standardized techniques to transition elements into and out of view. To "fly in," the is lowered to the stage level for setup or , while "fly out" raises it toward to conceal it overhead. Pre-show trim positions are established at heights such as 12 to 18 feet above the , marked with "deads" (ribbons or tape on ropes) for consistent placement across scenes. In systems, coordination involves pulling sets of 6 to 8 lines simultaneously from the pin rail to maintain balance, often requiring a to synchronize efforts. systems use spot lines for precise trimming, adjusting the arbor's position to align the batten parallel to the stage floor. Modern setups may incorporate for smoother, programmed movements in complex productions.

Loading and Unloading Procedures

Loading and unloading procedures in fly systems ensure safe and balanced operation by matching the weight of the to the load on the , preventing uncontrolled movements or runaways. Pre-loading begins with calculating the total load, including the 's inherent weight (typically around 100 pounds for a standard ) plus attached scenery, lights, or other elements (e.g., a 400-pound scenic flat), to determine the equivalent needed for balance. Accurate measurement often involves using scales or load cells to weigh components precisely, allowing riggers to select steel bricks (commonly 10, 20, or 50 pounds each) that approximate the load while allowing for slight overbalance on the side for manual control. The loading process requires at least three trained personnel: two loaders on the loading bridge or gallery and one supervisor on stage to coordinate and test. First, the batten is lowered to its lowest position (often to the stage floor) using the purchase line, and the scenery or equipment is securely attached by the stage crew. Next, the arbor is lowered to the pit or bridge level, where loaders stack counterweights evenly along the vertical rods, starting from the bottom and using spreader plates or bars every two feet to prevent shifting; stacks are secured with pins, keeper nuts, or thumbscrews to maintain stability. Balance is then tested by hand-lifting the arbor and batten midway; adjustments are made in small increments until the system floats neutrally or with minimal arbor overbalance (typically under 50 pounds for control), after which the rope lock is engaged and a safety ring applied. All operations must follow established rigging practices, such as those outlined in industry handbooks, with spotters positioned below to monitor for falling objects. Unloading reverses the loading sequence to safely dissipate , prioritizing the removal of counterweights before detaching the load. The is lowered to , and weights are removed in pairs or symmetrically to maintain interim , with one person handing bricks to another for ; heavy stacks require spotters and proper lifting techniques ( at the knees, keeping the back straight). Once the holds only the permanent weight, the is brought to low , and the scenery is unloaded by the stage crew. Throughout, verbal commands like "clear the " ensure the area below is evacuated, and gloves are worn to handle the weights safely. Tools such as digital scales or load cells enhance accuracy in weight calculations, while spreader plates and securing pins are essential for stable stacking per recommended standards. Procedures align with guidelines from certified programs like ETCP, emphasizing proper balancing with a slight overbalance on the side to facilitate safe and avoid strain on the system, and all changes are logged for tracking. In automated systems, sensors may enable auto-adjustments, differing from methods by reducing hands-on intervention.

Calling Shows and Safety Protocols

In theater fly system operations, the flyman or rail receives cues from the stage manager via a headset communication system to ensure precise and safe movement of line sets. Typical cues specify the line set number, direction, and distance, such as "Fly #5 in at 20 feet," prompting the operator to confirm readiness with a response like "Standing by" before execution. This verbal acknowledgment verifies that the operator has heard the instruction and the stage area is clear, reducing the risk of errors during live performances. Safety protocols mandate the involvement of at least two trained personnel for all fly system movements, with additional spotters required for heavier or complex operations to maintain oversight and prevent accidents. Pre-show checks are essential, involving verification of rope locks, balances, and clear flight paths, often including a call for "quiet on stage" to ensure no personnel are beneath moving line sets. For heavier loads approaching the system's rated capacity (often 1000 pounds or more per line set), enhanced protocols like visual inspections by a are enforced to confirm system integrity. Cue sheets serve as detailed operational logs that outline each line set's trim height—the standard position for scenery or —along with estimated load weights and the sequence of movements integrated with and cues. These sheets, derived from the production's line set , enable coordinated timing, such as flying in a backdrop simultaneously with a change, and are reviewed by the fly prior to rehearsals. Accurate documentation of weights ensures proper counterbalancing, preventing imbalances that could lead to unsafe conditions during shows. Training for fly system operators emphasizes certification through the Entertainment Technician Certification Program (ETCP) under the Entertainment Services and Technology Association (ESTA), which validates skills in theater rigging for experienced fly-persons aged 21 and above. The Rigger – Theatre certification exam assesses knowledge of safe practices, including clear communication protocols to avoid collisions between moving elements or with performers. Programs focus on hands-on techniques and adherence to standards like those from the International Code of Practice for Entertainment Rigging, promoting verbal confirmations and team coordination as core to preventing operational hazards. In automated fly systems introduced more prominently since the , digital aids such as interfaces have streamlined cue calling by allowing operators to program and execute sequences with precise speed and position controls. These systems, often integrated with hoist motors, enable recording of up to hundreds of cues for multi-line set operations, reducing reliance on manual calls while maintaining safety through built-in interlocks and visual feedback.

Safety Considerations

Fire Safety and Curtains

In theater fly systems, the fire safety curtain serves as a critical barrier to contain flames, heat, and smoke originating on , preventing their spread to the and protecting occupants during evacuation. These curtains are typically constructed from asbestos-free materials, a shift necessitated by health regulations following the widespread recognition of hazards, with phase-out beginning in the late 1970s and continuing into the 1980s when its use in fire-resistant applications like theater curtains was progressively restricted and replaced . Modern fire safety curtains are either fabric-based or steel-framed assemblies, with fabric types classified under standards such as Type E1 in ANSI E1.22-2022 for fire safety curtain systems, ensuring they meet performance criteria for fire resistance and deployment. They are flown using a dedicated line set within the fly system, often designated as the #0 or #1 position to prioritize accessibility and isolation from other scenery movements. The primary materials for fabric fire safety curtains include high-temperature coated or cloth, which provide exceptional —capable of withstanding exposure up to 2000°F (1093°C) without significant degradation or toxic . These materials are coated with substances like or for enhanced durability and sealing properties, forming a robust barrier tested to standards such as ASTM E-119 for fire endurance. Steel-framed variants incorporate rigid panels for larger openings exceeding 930 square feet, where fabric alone may not suffice for structural integrity. To facilitate rapid deployment, curtains are counterweighted systems that rely on for a controlled , typically completing closure in 10 to 30 seconds, with the final descent slowed to prevent damage or injury. Regulatory frameworks mandate fire safety curtains in proscenium theaters, as outlined in the International Building Code (IBC) Section 410.2.5 and NFPA 80, which require a 20-minute for the curtain when a wall demands protection. Compliance involves annual inspections by qualified professionals to verify operational integrity, material condition, and sealing effectiveness, per ANSI E1.22-2022 guidelines. For automatic release, fusible links integrated into the melt at 165°F (74°C), triggering the curtain's descent independently of manual intervention. Historically, the transition from asbestos-based curtains—common from the mid-20th century until phased out beginning in the late due to carcinogenic risks—led to the adoption of these synthetic alternatives, improving both safety and environmental compliance. Contemporary systems often integrate with building-wide fire controls, such as rooftop smoke vents that activate concurrently with curtain deployment to exhaust heat and fumes upward, enhancing overall compartmentation.

Runaways and Unbalanced Loads

Unbalanced loads in fly systems occur when the counterweights on the do not match the load on the , typically exceeding a variance of 50 pounds (23 kg), leading to unintended rapid ascent or descent of the line set. This imbalance can cause the to drift even when the rope lock is engaged, creating hazardous conditions during or . Symptoms include creeping of the or strain in the purchase line, which operators must monitor to prevent escalation. Runaways represent a more severe failure mode in which the line set experiences uncontrolled movement, often due to failed locks, snapped lines, or excessive overloads beyond the system's capacity. In systems, this can propel the or at high velocities, potentially damaging structural components like guide rails upon impact with stops. Such events are exacerbated in motorized hoists if primary controls fail, though redundant safety features help mitigate risks. Historical incidents in the theater industry, though rare, have underscored the severity of runaways, prompting the evolution of safety standards like ANSI E1.4-1, the first comprehensive American National Standard for manual rigging systems, approved in 2016 following earlier recognition of hazards by organizations such as USITT in the . Prevention strategies emphasize pre-use verification and mechanical safeguards to maintain equilibrium and control. Operators must conduct by checking for balance before flying any set, ensuring s equal the load plus a safety margin, and avoiding reliance on locks for out-of-balance conditions exceeding 50 pounds. In systems, compensating mechanisms adjust for self-weight in long-travel setups, while blocks prevent slack in the purchase line. For motorized hoists, redundant brakes such as centrifugal devices activate automatically to halt motion during overloads or failures. During , arbors should be secured with tie-offs to eliminate drift risks, and all nel require to identify imbalances through visual and tactile cues. Annual inspections by a competent , as mandated by ANSI E1.4-1, further ensure system integrity. In the event of a or detected imbalance, immediate response protocols prioritize personnel by evacuating the fly gallery, loading bridge, and stage area below the affected line set. Emergency stops on motorized systems should be engaged if available, followed by securing the rope lock or manual braking to halt movement. Post-incident, a by qualified riggers is essential to identify failures like improper loading or worn components, informing corrective actions. During live shows, crews apply spotting techniques to monitor and manually intervene in potential imbalances, adhering to established calling procedures for rapid handling.

Maintenance and Regulations

Routine maintenance for fly systems involves regular visual inspections and operational checks to ensure component integrity and safe operation. Weekly procedures typically include operating each line set to detect unusual noises or movements, while monthly tasks encompass examining ropes and cables for fraying, kinking, or , lubricating sheaves and pulleys as per manufacturer guidelines, and tightening fittings such as clips and bolts. Quarterly load tests, often conducted to 125% of rated capacity, verify balance and structural performance, particularly for arbors and lift lines. Inspections are critical for identifying wear and documenting compliance, with annual third-party certifications recommended by organizations like the Entertainment Technician Program (ETCP) following ASME B30.16 standards for overhead hoists. These evaluations cover all components, including ropes, blocks, locks, and guide wires, with records maintained for repairs such as cable replacements, which are required based on condition assessments like broken strands or deformation during inspections, with replacement intervals varying (typically 5-7 years under normal use depending on load and environmental factors). OSHA general industry standards, such as 29 CFR 1910.184 for slings and equipment, require inspections prior to use on each shift and periodic evaluations to ensure safety, with defects addressed promptly by qualified personnel. Key regulations governing fly systems include OSHA standards for general industry , which require preventive maintenance programs and inspections to mitigate hazards, and NFPA 701 for flame-retardant testing of textiles used in curtains and flown scenery to prevent fire propagation. In the , the 2006/42/EC applies to automated stage through harmonized standards like EN 17206:2020 (with a draft revision prEN 17206 as of 2025), mandating risk assessments, safe design, and conformity declarations for machinery safety. Recent updates emphasize sustainable materials, such as high-strength fabrics and recycled components in , to reduce environmental impact while maintaining load capacities. Annual maintenance costs for mid-sized venues, encompassing inspections, lubrication, and minor repairs, typically range from $5,000 to $20,000, with basic ETCP-certified inspections starting at around $1,000 for systems up to 35 line sets. Vendor-specific manuals, such as those from J.R. Clancy or Theatre Projects Consultants, provide tailored schedules and tie into broader safety protocols for regulatory compliance.

References

  1. [1]
    None
    ### Definition and Key Components of a Theatrical Fly System/Rigging System
  2. [2]
    The Genesis of the Counterweight Rigging System in Theatre
    Aug 14, 2025 · As historian, he has rewritten the history of the counterweight rigging system with irrefutable evidence of its origins. Add The Genesis of ...
  3. [3]
    FLIES or FLY SPACE | AACT
    A system of ropes, pulleys, counterweights and related devices within a theater that enables a stage crew to fly (hoist) quickly, quietly and safely components.
  4. [4]
    [PDF] Theatrical Carpentry Handbook - Iatse Local 4
    Theatrical Carpentry pg. 3. FLY SYSTEMS. A fly system, flying system, or theatrical rigging system is a system of lines (e.g. ropes), blocks. (pulleys) ...Missing: definition | Show results with:definition
  5. [5]
    Theatre Beyond the Ground: Staging a Defiance of Gravity from ...
    Nov 15, 2016 · To begin this examination into the use of fly-type systems in theatre ... A theatre's flying system is a vital way of effecting quick scene ...<|control11|><|separator|>
  6. [6]
    [PDF] Performer Flying and Aerial Stunts - Actsafe Safety Association
    In the case of manually operated or mechanical fly systems, ensure movement and control of the performer considers their physical abilities and limitations,.
  7. [7]
    [PDF] Theatrical Rigging System Design Guide - Sweets Construction
    rigging allows you to raise and lower the stage lighting and other onstage equipment for adjustment, replacement of lamps and gels, and to perform essential ...
  8. [8]
    Fly Systems
    Fly systems allow safe support and quick change of scenery and lighting in proscenium theatre, and are run by flymen.
  9. [9]
    How a 17th-Century Naval Engineer Revolutionized Set Design
    Sep 5, 2017 · In 1660, the stage designer Gaspare Vigarani came into an unexpected windfall. The Louvre was expanding, and the Grande Salle du ...
  10. [10]
    Nobody Looks Up: The History of the Counterweight Rigging System ...
    In this first ever written history of the counterweight rigging system, author Rick Boychuk upends two core theatre myths. Stage rigging did not grow from a ...
  11. [11]
    Seven Things You Should Know About Stage Rigging
    Nobody Looks Up: The History of the Counterweight Rigging System: 1500 to 1925, Richard William Boychuk, 2015, 9-12, 94. Thern Staging Equipment - Footer ...<|control11|><|separator|>
  12. [12]
    About Us | History - JR Clancy
    In 1885 John Clancy left the opera house to found JR Clancy, Inc., which would rise to become the leading theatrical rigging company in the United States.Missing: adoption | Show results with:adoption
  13. [13]
    Behind the Curtain: The Evolution of Theater Construction and Rigging
    Jul 14, 2025 · By the mid-19th century, societal views started to shift, ushering in a new era of rapid theatre construction. Opera houses and performance ...
  14. [14]
    About Local One (Copy)
    Local One merged with Local 366 IATSE, the stagehands in Westchester and Putnam, in 2000. The year before, Local One merged with Local 922 IATSE, Theatrical ...
  15. [15]
    [PDF] Elementary Stagecraft - Swamp Meadow Community Theatre
    o Rigging systems are equipment used to fly or support scenery or drapes ... modern systems use synthetic rope. Page 4. Hemp System. • Rope is attached to a ...Missing: structure features disadvantages
  16. [16]
    Hemp Houses: Know the Ropes - American Theatre
    Dec 18, 2017 · When the Victory was renovated as part of the New 42nd Street project, the hemp system was replaced with a counterweight fly system. The theatre ...
  17. [17]
    Theatre Production Booklist
    Counterweight rigging emerged from a European tradition of 17th century Torellian stage machinery. Hemp rigging was a side-show. In documenting the evolution ...
  18. [18]
    None
    ### Summary of Single and Double Purchase Systems
  19. [19]
    Counterweight Systems - Theatrecrafts.com
    The cradle of a double purchase system needs twice as many counterweights as that of a single purchase system balancing the same weight.
  20. [20]
    ETC - Theatre, Film, Studio and Architectural Lighting
    ### Summary of Electric Hoists from ETC Connect
  21. [21]
    [PDF] Automated Rigging - Sweets Construction
    Automated rigging systems eliminate the need to keep counterweight sets properly balanced, and do not require use of loading galleries. History. In the early ...Missing: encoders DMX
  22. [22]
    Published Documents - ESTA TSP
    This standard establishes requirements for the design, manufacture, installation, inspection, and maintenance of manually operated hoist systems for lifting and ...
  23. [23]
    Types of Motorized Stage and Theatre Rigging Equipment
    You can program fly systems to move scenery, lighting, curtains and backdrops for a seamless visual display. That allows for faster set changes and less labor, ...
  24. [24]
    Automated Fly System cost? - ControlBooth
    Jan 30, 2010 · Automated winches are not cheap. You do have one advantage, there is competition out there. I would HIGHLY suggest that you get bids from J.R. ...automatic/motorized fly systems | ControlBoothfly space versus dead hung | ControlBoothMore results from www.controlbooth.comMissing: disadvantages | Show results with:disadvantages
  25. [25]
  26. [26]
    Ron StageMaster™ | Wireless Load Monitoring System for Stage ...
    Real-time stage rigging load monitoring trusted by NASA & Cirque du Soleil. Fatigue-rated, wireless & wired systems for concert tours, venues & more.Missing: AI assisted 2020
  27. [27]
    Automation at Resorts World Theatre Las Vegas - Tait Towers
    TAIT's involvement with automation, rigging and staging the Las Vegas Resorts World Theatre was a creative feat. Learn more about our live entertainment storyMissing: wireless | Show results with:wireless
  28. [28]
    Understanding Pipe Dimensions in Theatre Rigging Systems
    May 10, 2025 · The most common pipe used in theatrical rigging systems is Schedule 40 steel pipe, specifically 1.5-inch nominal diameter (NPS 1½), which has an ...
  29. [29]
  30. [30]
    Design Factors in Theater Rigging - Entertaining Safety
    Jul 19, 2025 · A design factor is a multiplier reducing a component's breaking strength to a safe working load, accounting for unpredictable conditions.Missing: lines | Show results with:lines
  31. [31]
    Breaking Strength in Theater Rigging: Applying the Fundamentals ...
    Jul 19, 2025 · Wire rope ... OSHA 1926.251: Outlines safe practices for rigging, slings, and hardware in construction and performance environments.Missing: lines | Show results with:lines
  32. [32]
    Reference | Glossary - JR Clancy
    Double Purchase, A rope or cable that passes from a lifting device (arbor ... In this system the curtain and counterweight are balanced so that the ...
  33. [33]
    loft rigging blocks - Thern® Stage Equipment
    Most importantly, these blocks are engineered with an 8:1 design factor and conform to ANSI standards for manual and motorized rigging, which guarantees they ...Missing: fly | Show results with:fly
  34. [34]
    Stage Head Rigging Blocks
    Thern's head blocks are heavy-duty, high-quality, with an 8:1 design factor, conform to ANSI standards, and have 6 or 8 grooves with Nylatron or Steel sheave ...Missing: fly | Show results with:fly
  35. [35]
    [PDF] RIGGING GUIDE - Wenger Corporation
    This guide is an education resource for theatre rigging technology, covering types of rigging, safety, and the importance of proper installation and operation.
  36. [36]
    Counterweight Rigging Systems - JR Clancy
    Features · 13-3/4" (349 mm) length, with slotted ends for 3/4" (19 mm) diameter arbor rods spaced on 10" (254 mm) centers · Sold in 1,000 lb (453.6 kg) pallets ...
  37. [37]
    Double-purchase fly system question - ControlBooth
    Nov 15, 2016 · With a normal, double purchase, counter-weighted fly system; if you have a 1,000 pound load, you add 2,000 pounds of counter-weight (which is ...Missing: equilibrium | Show results with:equilibrium
  38. [38]
    [PDF] Rigging – Counterweight Fly Systems
    There are many variations and combinations of rigging systems including hemp, counterweight, and motorized. Each theater will have unique design features ...Missing: structure advantages disadvantages modern
  39. [39]
    Manual Stage & Theatre Rigging Equipment - Tiffin Scenic Studios
    The pipe battens move two feet for every foot the arbor travels, requiring twice the counterweight ballast as pipe batten weights. Compound Arbor Assembly. Wire ...
  40. [40]
    Lodestar NH Entertainment Electric Chain Hoist | Columbus McKinnon
    Capacities: 1/8 to 2 tons Metric Rated Legendary in performance, professional riggers around the world have come to rely on the CM Lodestar® for the most ...
  41. [41]
    VFDs for Theatre Applications - KEB America
    Jul 23, 2015 · KEB VFDs are ideal for Theatre applications. With 16kHz frequency they are virtually silent. They also include STO, brake control, ...
  42. [42]
    Automatic positioning of hoisting walls for theater stage sets - SICK AG
    ATM60 SSI absolute encoders (multiturn) provide for highly accurate moving and positioning of hoisting walls for stage sets using hoisting winch drives. ...Missing: limit switches
  43. [43]
    [PDF] Functional safety in orchestra lift control systems:
    Dual encoders replaced antiquated limit switches for lift positioning. a purpose built control enclosure replaces an aging elevator controller. The new system ...
  44. [44]
    Power Requirements - Vortek NXT Hoists
    Jan 26, 2022 · ETC Prodigy & Vortek NXT hoists require 208 volt, 60 Hz, 3-phase (3 wire + ground) and/or 480 volt, 60 Hz, 3-phase (3 wire + ground) power ...
  45. [45]
    Understanding Horsepower Ratings on Hoists | Columbus McKinnon
    ½ ton unit with a lifting speed of 16 fpm is ½ hp; ½ ton unit with a lifting speed of 32 fpm is 1 hp; ½ ton unit with a lifting speed of 64 fpm is 2 hp. We ...
  46. [46]
    Control Techniques | Drives in theatres - Nidec Motors
    Feb 28, 2019 · Programmable drives are now the standard way of controlling how far, how quickly, how precisely and how safely all visible components of a stage set move.
  47. [47]
  48. [48]
    E-stop code requirements? - ControlBooth
    May 27, 2022 · The ESTA ansi standards for hoists, motorized rigging, and automation all have e-stop requirements. Downloadable for free here. TSP. The ESTA ...
  49. [49]
    7 things you need to know to build a better stage
    Aug 20, 2009 · It is possible to design a theater with a fly loft roof deck at 50 feet and still provide excellent performances and teaching opportunities at a ...
  50. [50]
    IN STORE FOR THE OPERA - The Washington Post
    Aug 17, 1996 · The total height of the stage apparatus at the new theater is more than 150 feet, measured from the bottom of the trap room beneath the main ...
  51. [51]
    What happens on the grid of the theatre?
    Jul 8, 2020 · A grid deck is indispensable in all theatres with a fly tower, as it provides flexible and invaluable access to those fly systems.
  52. [52]
    2022 New York City Building Code - 1607.2.1 Stage areas using ...
    Gridirons over stages shall be designed to support a uniformly distributed live load of 50 psf (2.40 kN/m2) in addition to the rigging loads indicated. 2022 New ...Missing: steel bars capacity
  53. [53]
    Introduction of the Rolled I-Beam in the U.S.A. in the 1850s, Revisited
    Embraced as a replacement for wooden beams, iron (and later steel) I-beams played a central role in the advent of “fireproof” building construction, favored by ...
  54. [54]
    None
    ### Summary of Fly Gallery, Pin Rail, and Locking Rail in Theater Rigging and Fly Systems
  55. [55]
    Pin Rail & Accessories - Rigging Components - JR Clancy
    Pin rails are designed to allow the user to insert belaying pins to tie-off rope rigging; The pin rail is made of 3-1/2″ (89 mm) pipe with holes for belaying ...Missing: fly | Show results with:fly
  56. [56]
    Fly System - HSTech High School Technical Production
    Here we see the locking rail, aka, the pin rail (see note below.) Behind the arbor is a set of tracks. These tracks guide the arbors during their travel up and ...Missing: specifications mechanisms<|separator|>
  57. [57]
    [PDF] Van Duzer Rigging
    Fly System. • Single purchase counterweight system. • Fly rail located stage right: Lock rail at stage level: Pin rail at mid-height: Loading gallery at grid-.<|control11|><|separator|>
  58. [58]
    Safety - USITT
    USITT offers safety training on topics like OSHA, welding, fall protection, fire safety, and backstage safety for stage weaponry.Missing: gallery features
  59. [59]
    Gallery Mounted Locking Rail - JR Clancy
    The Gallery Mounted Locking Rail mounts to the edge of a counterweight pit or gallery and supports rope locks as well as the index cards used to identify sets.Missing: theater fly pin
  60. [60]
    [PDF] E1.4 Manual Counterweight Rigging - NU Wirtz Center
    The purpose of this standard is to establish minimum performance requirements for manual counterweight rigging systems. This standard establishes a basis for ...
  61. [61]
    Rigging System Design Guide - JR Clancy
    Our design guide provides an overview of rigging system design and the major decisions made during the design process.Missing: bridge | Show results with:bridge
  62. [62]
    [PDF] Technical Specifications – MAIN STAGE THEATRE
    May 8, 2025 · Stage right can also serve as a mid-level loading rail. 69- 1.5” Schedule 80 pipe battens 60'-0” length. All arbors capable of 1600#. 60,000 ...Missing: typical | Show results with:typical
  63. [63]
    [PDF] Fly System Loading & Unloading
    Always wear gloves when operating, loading or unloading the counterweight system. • See also the companion sheet “Fly System Operation”. FOR FURTHER STUDY. Page ...
  64. [64]
    None
    ### Summary of Fly Loft and Grid Deck from Guide to Theatre Fly Systems
  65. [65]
    Fly System / Soft Goods - Leach Theatre - Missouri S&T
    Batten length: 62'-0" (except lineset 6 which is 66'-0") ; Locking-rail location: stage-left at stage level ; Loading gallery height: 45'-0".<|separator|>
  66. [66]
    Fly system revamp - ControlBooth
    Jan 14, 2010 · to fly a batten with hemp you would have 4-6 lines at a single pin plus a clew/trimclamp with a sandbag to balance the load. I replaced the ...Hemp set. - ControlBoothCreative Cable Picking | ControlBoothMore results from www.controlbooth.comMissing: coordination | Show results with:coordination<|separator|>
  67. [67]
    [PDF] Interested in learning more about High School Theatre Safety?
    When you add weight, you load the sets or lights first; when you remove weight, you unload the arbor first. Fly systems are usually built with safety locks that ...
  68. [68]
    Examination Content: Rigger - Theatre - ETCP
    Examination Content: Rigger - Theatre ; e. Bring load to controlled stop ; f. Identify inspection and maintenance requirements ; 2. Counterweight system, including ...
  69. [69]
    The Counterweight Argument - ETC Blog
    Mar 6, 2025 · The self-contained weight stack allows for weight balancing at stage level using a series of pins that engage and disengage weight to match what ...
  70. [70]
    Stage Management - Calls and Cans and Comms - Theatrecrafts.com
    "Standby LX Q 11" operator responds : "Standing By"; "LX Q 11 Go" operator may respond "Running" if its a cue which is not obvious, or is a long fade.
  71. [71]
    A Beginner's Guide to Cans Etiquette | The View From Prompt Side
    Jan 2, 2017 · The general rule of thumb is that if the SM is only standing one operator by, you can say 'Standing By'. If the SM is calling multiple operators ...
  72. [72]
    CALLING: Fly cues - SMNetwork.org
    Aug 28, 2011 · When actually calling a fly cue, you would do it much like any other cue. You may want to give warnings early enough so that the fly operator ...Missing: system protocols ETCP
  73. [73]
    [PDF] Technical Safety Manual - Harvard
    Sep 18, 2012 · The Technical Supervisor is the ONLY person who can train and certify operators of the counterweight fly system. Training will cover the use of ...Missing: IATSE history
  74. [74]
    Line Set Schedule and Rail Cue Sheets - Google Sites
    A theatre package should include the weight of the show if you plan on being the presenter. RAIL CUE SHEETS: From the line set schedule you also begin to layout ...Missing: trim height
  75. [75]
    examples of good calling sheets for shows with fly cues
    May 30, 2008 · While I assume there are basics that I am not gonna worry abt, I would love to see a couple of examples of call sheets for rail cues with (or ...
  76. [76]
    ETCP
    ### Summary of ETCP Rigging Certification
  77. [77]
    Frequently Asked Questions - ETCP
    Rigging Certifications are designed for highly experienced riggers (rigging supervisors, high steel riggers, fly-persons). Arena Certification encompasses ...Missing: cues | Show results with:cues
  78. [78]
    [PDF] International Code of Practice for Entertainment Rigging - PLASA
    6.5 Safety Protocols ... Supervisor and operator must perform a visual check of the system and flight path.
  79. [79]
    automatic/motorized fly systems | ControlBooth
    Mar 20, 2007 · One other note, on the Vortek, the speed is variable. With ours, the slowest is 0.29ft/sec; the fastest is 2.9ft/sec (174ft/min) - that's ...Missing: 0-100 | Show results with:0-100<|separator|>
  80. [80]
    Fire Safety Curtain Systems | Fire Curtains - JR Clancy
    Provides a fire rated barrier between the stage and auditorium, as required by the International Building Code (IBC) and other building codes.
  81. [81]
    How Georgia-Pacific Knowingly Published Fake Science on the ...
    Oct 10, 2017 · From the turn of the century through the 1970s, asbestos was inescapable. The so-called “magic mineral” was in fireproof theater curtains ...
  82. [82]
    [PDF] ANSI E1.22 - 2016 Entertainment Technology – Fire Safety Curtain ...
    2 Sprinkler system flow detection devices shall be installed in accordance with NFPA 13-2013. 11.4 Manual release systems shall include a minimum of two ...
  83. [83]
    Fire curtain replacement | ControlBooth
    Aug 24, 2018 · It's a double sided on a metal frame with dedicated line set, counterweight with motor drive. It also needs an upgrade and tie in to the fire ...Fire Curtain Question | ControlBoothFire Curtains. What dictates whether one should be in a space?More results from www.controlbooth.com
  84. [84]
    [PDF] ZetexPlus® Proscenium Fire Curtains - Newtex Industries
    • Resistant to molten metal burn through. • Withstands temperatures up to 2000°F (1095°C). • Will not produce toxic outgassing. Fabric Specifications Fire ...
  85. [85]
    Stage & Theatre Fire Curtains | Tiffin Scenic Studios
    Our stage and theatre fire curtains are made of fiberglass fabric and meet all standards for ASTM E-119 & E-84. Improve the safety of your space today.Missing: modern ceramic
  86. [86]
    Fire Curtains - IWEISS
    Fire curtains are a fiberglass fabric that can be supplied in black or tan material that passes all standards for ASTM E-119, ASTM E-84. IWEISS has designed, ...Missing: modern ceramic
  87. [87]
    2018 International Building Code (IBC) - 410.2.5 Proscenium curtain.
    Where a proscenium wall is required to have a fire-resistance rating, the stage opening shall be provided with a fire curtain complying with NFPA 80.
  88. [88]
    What You Don't Know - Spaces4Learning
    May 1, 2010 · The governing standard, ANSI E1.22 requires that a qualified professional inspect the fire curtain annually. Austin notes that even the fire ...Missing: mandatory | Show results with:mandatory
  89. [89]
    JR Clancy | Fire Safety Curtain Systems | Automatic Release Options
    Used to connect the fire curtain system to fire ... Fusible Link. Placed in the fire line to release the fire curtain; Link separates at a temperature of 165°F ( ...Missing: theater | Show results with:theater
  90. [90]
    History of Asbestos | Production, Use, and Regulations
    In the early 1970s, after employees filed lawsuits, asbestos companies began listing warnings and regulations on asbestos-laden products. The United States ...
  91. [91]
    Fire Suppression in the Theatre | Scenic Solutions
    Oct 17, 2018 · The smoke vent is designed to open as the fire curtain is dropped, giving the fire a path away from the audience with the intention of ...
  92. [92]
    [PDF] Operation and Maintenance Manual - The Monument
    ‚ A counterweight system enables the theatre technician to raise and lower theatrical lighting and scenic elements with minimum effort. When the arbor is in ...
  93. [93]
    Understanding Dynamic Load in Theatre Rigging - Entertaining Safety
    Jul 4, 2025 · Practice smooth hand-line techniques, and teach proper use of rope locks, line tensioning, and spotting hazards. This knowledge helps ...
  94. [94]
    Maintenance Tips for Stage and Theatre Rigging Equipment
    Schedule Regular Inspections · Learn to Spot Signs of Wear · Lubricate and Clean Regularly · Keep a Detailed Maintenance Log · Implement Ongoing Training · Rigging ...Missing: fly | Show results with:fly
  95. [95]
    OSHA & ANSI Inspections Your Theater Requires for Rigging Safety
    Jun 24, 2022 · All of your theatrical and entertainment rigging systems must have annual inspections to maintain warranties and meet the code of the Occupational Safety and ...Missing: emergency | Show results with:emergency
  96. [96]
    1910.179 - Overhead and gantry cranes. | Occupational Safety and Health Administration
    ### Summary: Applicability to Theater Fly Systems and Relevant Maintenance/Inspection Rules
  97. [97]
    NFPA 701 Standard Development
    This standard establishes test methods to assess the propagation of flame of various textiles and films under specified fire test conditions.Missing: theater fly
  98. [98]
  99. [99]
    Sustainable Stage and Theatre Equipment for Eco-Friendly Venues
    Discover how sustainable rigging solutions reduce waste, boost efficiency, and allow you to create greener performance spaces.
  100. [100]
    FAQ - Entertainment Rigging Services, LLC
    Pricing for Entertainment Rigging Services to conduct an inspection of your theatre begins at $1000 for the typical mid-size theatre (up to roughly 35 line sets) ...