H-1 upgrade program

The H-1 Upgrade Program is a initiative to remanufacture its legacy AH-1W Super Cobra attack helicopters into the advanced AH-1Z Viper configuration and UH-1N Huey utility helicopters into the UH-1Y , aiming to enhance battlefield survivability, mission performance, and logistics efficiency while reducing long-term costs through approximately 85% commonality in key systems such as engines, rotors, drive trains, and . Initiated in late 1996 with a contract awarded to Bell Helicopter Textron, the program leverages Integrated Product Teams and Cost As An Independent Variable methodologies to deliver 189 AH-1Z Vipers and 160 UH-1Y Venoms, with initial production deliveries commencing in 2006 and full operational capability achieved for the UH-1Y in 2016 and the AH-1Z in 2020. Key upgrades include the General Electric T700-401C engines providing increased power and range, four-bladed composite rotor systems for improved lift and reduced maintenance, and an Integrated Avionics System featuring glass cockpits, multifunction displays, and helmet-mounted cueing to lower pilot workload. For the AH-1Z, enhancements encompass a third-generation Targeting Sight System, compatibility with advanced munitions like the AIM-9 Sidewinder and AGM-114 Hellfire missiles, ballistic-tolerant structures, infrared suppression, and self-sealing fuel tanks to bolster survivability in contested environments. The UH-1Y, meanwhile, doubles the payload and range of its predecessor, enabling transport of up to eight Marines over 118 nautical miles without refueling, alongside improved crashworthiness and shipboard operability features like marinized components for carrier operations. The program has proven operationally effective, with flight operational testing of software upgrades like SCS 6.0 in 2012-2013 demonstrating an 83% mission success rate through better , enhanced cockpit lighting, and efficient sensor integration, though challenges such as display blanking and parts delays impacted availability rates. Following the program's completion as a Program of Record in November 2022, ongoing modernization efforts include the Structural Improvement Electrical Power Upgrade (SIEPU), initiated in March 2024, which boosts electrical capacity to support next-generation weapons, long-range kinetic munitions, and non-kinetic effects, ensuring the H-1 fleet remains viable through the 2040s per Marine Corps plans. These upgrades collectively provide the Marines with a tandem-rotor, multi-role helicopter family that maintains maritime expeditionary capabilities while addressing evolving threats; the platform has also been exported to international operators including and the .

Development

Origins and Planning

The H-1 upgrade program originated in the mid-1990s as part of the ' (USMC) aviation modernization strategy to address the obsolescence of its legacy helicopter fleet. The UH-1N utility helicopters, introduced in the 1960s, and the AH-1W attack helicopters, fielded in the 1980s, had reached the limits of their service life, prompting the need for replacements that could extend operational capability into the . This initiative followed the cancellation of earlier programs like the Integrated Weapon System (IWS) in the early 1990s, leading to a focused upgrade approach formalized by 1995. Key drivers for the program included enhancing through ballistic-tolerant designs and suppression systems, while improving performance for littoral and expeditionary missions, such as increased , speed, and maneuverability. A primary goal was to achieve high commonality between the upgraded variants—targeting 84% in parts and maintenance-significant components—to lower lifecycle costs, burdens, and requirements. These shared systems, including engines and rotor assemblies, would enable cost-effective production and sustainment across the fleet. Initial planning outlined the remanufacture of 100 UH-1N aircraft into UH-1Y Venom utility helicopters and 180 AH-1W aircraft into AH-1Z Viper attack helicopters, with production envisioned over a decade starting in the early . Early cost projections estimated the total program acquisition at approximately $5.6 billion in 2004 dollars.

Contract Award and Design

In December 1996, the U.S. awarded Bell Helicopter a contract for the engineering and manufacturing development () phase of the H-1 upgrade program, aimed at modernizing the U.S. Marine Corps' fleet of UH-1N utility and AH-1W attack helicopters. This initiative sought to enhance operational capabilities while maximizing parts commonality between the resulting UH-1Y Venom and AH-1Z Viper variants, building on the original manufacturer's expertise with the UH-1 and AH-1 families. The program's initial approach focused on remanufacturing existing airframes, but in 2007–2008, it transitioned to new-build fuselages for later production lots to better integrate advanced composite materials and upgraded avionics systems. This shift was prompted by the degraded condition of legacy airframes from intensive combat operations in Iraq and Afghanistan, allowing for improved structural integrity and reduced long-term maintenance costs without compromising the core upgrade architecture. By fiscal year 2012, the first new-build AH-1Z airframes entered procurement under Lot 7, following a similar transition for the UH-1Y that began with low-rate initial production in 2006. Key design decisions emphasized commonality and performance, including the adoption of twin General Electric T700-GE-401C engines, each rated at 1,940 shaft horsepower for takeoff. Both variants incorporated a four-bladed composite main rotor system, derived from the UH-1Y design, which provided enhanced , reduced , and improved through damage-tolerant materials. The cockpits featured a fully integrated suite from , including dual mission computers, glass displays, and common software for 84% parts commonality across the fleet. Development progressed with the AH-1Z prototype achieving its first flight on , , at Bell's facilities in , demonstrating the upgraded rotor and engine integration. The UH-1Y prototype followed with its maiden flight on December 21, 2001, validating the shared dynamic components and utility-focused modifications. These milestones confirmed the foundational architecture, paving the way for low-rate initial production while prioritizing for future enhancements.

Testing and Production Timeline

The H-1 upgrade program's developmental testing phase concluded in early 2006 at , , where five prototype aircraft—three AH-1Z and two UH-1Y—underwent extensive evaluations, including expansion to verify performance across various speeds, altitudes, and maneuvers. These tests accumulated over 3,000 flight hours since the first upgraded H-1 flight in December 2000, confirming the upgraded four-bladed system's stability and the integration of new and engines. Survivability assessments, including preparations for live-fire testing, were also conducted, with the initial AH-1Z prototype advancing to destructive live-fire trials at the in , , to evaluate to ballistic threats. A significant setback occurred in May 2009 when a manufacturer's defect in the main gearbox grounded multiple UH-1Y and AH-1Z helicopters, prompting inspections and temporary suspension of operations for affected units, including those deployed with the . The issue necessitated component redesign and testing, contributing to program delays; by February 2010, contract modifications addressed related cost overruns, increasing one key agreement to $67.9 million. Resolution of the defect enabled resumption of full testing and production activities later that year. Low-rate initial production (LRIP) began in 2006 with contracts for the first new-build UH-1Y aircraft, transitioning from prototypes to limited manufacturing runs. Full-rate production (FRP) approval followed in September 2008 for the UH-1Y via an Acquisition Decision Memorandum, with the AH-1Z achieving FRP shortly thereafter in late 2008. The UH-1Y reached initial operational capability (IOC) in August 2008, while the AH-1Z attained IOC in February 2011; full operational capability (FOC) was declared for the UH-1Y in March 2016 and for the AH-1Z in 2020. Production ramped up efficiently post-FRP, exceeding the original program of record (POR) of 280 aircraft (100 UH-1Y and 180 AH-1Z) due to cost savings and expanded requirements, culminating in a final POR of 349 units (160 UH-1Y and 189 AH-1Z). Deliveries to the U.S. Marine Corps completed for the UH-1Y in 2018 and for the AH-1Z with the final aircraft handed over in November 2022 at Bell's Amarillo facility. The total program acquisition cost reached approximately $12.3 billion in then-year dollars by December 2019, with average procurement unit costs around $28 million per aircraft in base-year 2008 dollars, though estimates in 2019 dollars placed the AH-1Z at about $31 million and the UH-1Y at $27 million per unit.

Technical Specifications and Upgrades

Commonality and Shared Systems

The H-1 upgrade program emphasizes high parts commonality between the and the , achieving 84% commonality by parts count to streamline logistics and reduce operational burdens for the (USMC). This design philosophy incorporates shared dynamic systems, including a common four-bladed composite main system—with the UH-1Y featuring a slightly larger of 48 feet 10 inches compared to the AH-1Z's 48 feet—, , and , as well as a unified tail boom structure. Flight controls and wiring architectures are also identical, enabling seamless and simplifying field repairs across both variants. Both aircraft are powered by two T700-GE-401C engines, each rated at 1,800 shaft horsepower, which provide enhanced performance while maintaining commonality in powerplant maintenance and integration. The suite features the Integrated Avionics System (IAS), a configuration with four multifunction displays, dual-redundant mission computers, and an open-architecture software framework that supports shared data processing and interface standards. Additionally, both helicopters employ the Thales TopOwl helmet-mounted display system for pilots and crew, which integrates binocular capabilities with overlaid targeting and flight symbology for 24-hour operations. This extensive commonality extends to similar empty weights near 12,000 pounds (AH-1Z: 12,300 pounds; UH-1Y: 11,840 pounds), though the UH-1Y features an extended forward fuselage for greater internal volume while sharing the tail boom structure, facilitating some in , , and processes. The shared components significantly lower life-cycle costs by reducing spares inventory requirements, enabling a unified for USMC squadrons, and minimizing the need for variant-specific training and procedures. Overall, these design choices enhance operational efficiency, allowing Marine aviation units to maintain higher readiness rates with fewer resources dedicated to logistics support.

AH-1Z Viper Features

The AH-1Z Viper incorporates attack-oriented enhancements that emphasize precision strike capabilities and , leveraging a redesigned with two stub wings featuring six hardpoints for external stores. These wings support a weapons payload of up to 5,764 pounds, enabling configurations such as a chin-mounted 20mm M197 three-barreled Gatling cannon with 750 rounds for , up to 16 air-to-ground missiles for anti-armor roles, four air-to-air missiles for , and 70mm Hydra rockets in pods for area suppression. An optional can be integrated on a wingtip station, allowing targeting with missiles in adverse weather. Performance characteristics prioritize agility and endurance in contested environments, with uprated T700-GE-401C engines each producing 1,800 shaft horsepower driving a four-bladed composite main rotor system. This configuration achieves a cruise speed of 139 knots , a maximum speed of 200 knots , a maximum range of 310 nautical miles, and a service ceiling of 20,000 feet, while providing enhanced maneuverability with load factors from -0.5 to +2.5 g. The rotor and transmission upgrades contribute to improved hot-and-high performance and rapid response for armed reconnaissance. Survivability features are tailored for high-threat operations, including a ballistic-tolerant fuel with self-sealing crashworthy tanks, the Hover Infrared Suppression (HIRSS) to reduce exhaust signatures, redundant hydraulic systems for flight reliability, and an electronic countermeasures (ECM) suite comprising radar warning receivers, missile approach warners, and / dispensers. The and rotor components are designed to withstand hits from 23mm projectiles, enhancing operational resilience in fire environments. Unique support advanced targeting, including the third-generation Target Sight System (TSS) with electro-optical/ sensors, a /designator for precision-guided munitions, and integration compatibility with the radar for all-weather target acquisition. The AH-1Z shares a fully integrated with multi-function displays and common architecture from the UH-1Y Venom, facilitating pilot familiarity across the H-1 fleet. The aircraft accommodates a of two in seating—a pilot and co-pilot/gunner—with the Thales TopOwl system providing 24-hour day/, binocular imagery overlay, and an enhanced field of regard exceeding 200 degrees through head-tracking integration with the . This setup enables intuitive weapon cueing and without requiring aircraft maneuvers.

UH-1Y Venom Features

The UH-1Y features a side-by-side seating configuration for two pilots, providing dual controls for flexible single- or dual-pilot operations, along with space for up to 8-10 troops or 6 litters in a cabin that accommodates or roles. A 21-inch extension forward of the main door enhances internal volume, enabling greater troop or equipment capacity while maintaining a compact footprint for shipboard operations. This design emphasizes utility in multi-role missions, with crashworthy energy-attenuating seats for all occupants rated to withstand 20g impacts and self-sealing fuel cells for survivability. Payload capacity represents a 170% increase over the UH-1N, supporting internal loads up to approximately 6,600 lb and external sling loads of 4,000-5,000 lb via a cargo hook, allowing transport of combat-equipped , supplies, or underslung equipment. Performance enhancements include a 50% greater range of about 325-335 nautical miles (depending on configuration and auxiliary fuel) and maximum speeds up to 160-170 knots, powered by two GE T700-GE-401C engines shared with the AH-1Z Viper for logistical efficiency. The achieves hover in ground effect (IGE) up to 16,000 ft at reduced weights, supporting operations in demanding environments like high-altitude insertions. Armament options focus on defensive and light support roles, including door-mounted 7.62 mm miniguns (GAU-17A) or .50 caliber machine guns (GAU-21) for , with optional stub wings enabling carriage of 2.75-inch rockets or missiles in escort configurations to protect convoys or provide . Additional systems include a four-axis automatic flight (AFCS) with stability augmentation for low-level, flight in adverse conditions, and auxiliary fuel tanks adding up to 154 gallons for extended loiter times beyond 3 hours. The UH-1Y's multi-role versatility prioritizes troop transport and assault support as primary functions, while enabling (CAS), (SAR), and command/control operations through upgraded digital communications, multifunction displays, and infrared sensors for day/night coordination with ground forces. This configuration, with 85% commonality in rotors, engines, and to the AH-1Z, reduces maintenance demands across the H-1 fleet.

Operational Deployment

US Marine Corps Integration

The integration of the H-1 upgrade program into the (USMC) began with initial deliveries of the UH-1Y Venom to Marine Light Attack Helicopter Training Squadron (HMLAT) 303 in 2008, marking the start of fleet transition from legacy UH-1N and AH-1W aircraft. The UH-1Y achieved Initial Operational Capability (IOC) in August 2008 and Full Operational Capability (FOC) in 2016, enabling early operational use in mixed . The AH-1Z Viper followed with first deliveries to operational such as Marine Light Attack Helicopter Squadron (HMLA) 267 in 2010, achieving IOC in 2011 and FOC in 2020, which facilitated the phased replacement across operational units. By 2015, the transition had progressed to multiple , including active, reserve, and training units, with full fleet replacement of legacy AH-1W and UH-1N aircraft completed by 2020. Training for H-1 aircrews leverages a common pipeline at HMLAT-303 in Camp Pendleton, California, supplemented by facilities at Marine Helicopter Squadron One (HMX-1) for specialized operations, with extensive use of simulators for transition and proficiency. This shared approach, enabled by 85% parts commonality between the UH-1Y and AH-1Z, streamlines qualification for pilots and crew chiefs, with over 4,000 personnel trained by 2022 through integrated curricula covering flight, maintenance, and mission rehearsal. Advanced flight training devices and full-motion simulators at key sites support realistic scenario-based instruction, reducing live-flight costs while maintaining readiness. The structure incorporates the H-1 aircraft into 10 HMLA squadrons equipped with mixed fleets of AH-1Z Vipers and UH-1Y Venoms for light attack and utility roles, alongside 4 HMH squadrons utilizing UH-1Y primarily for assault support. By 2022, the total fleet reached the program of record with 160 UH-1Y and 189 AH-1Z aircraft, distributed across active and reserve components to support Marine Air-Ground Task Force operations. Logistical integration benefits from the program's design emphasis on commonality, achieving approximately 85% shared components by weight and reducing overall maintenance man-hours by around 30% compared to legacy fleets. Primary basing occurs at Marine Corps Air Station (MCAS) New River, North Carolina, for East Coast units under the , and MCAS Miramar, , for West Coast operations under the , optimizing sustainment and deployment efficiency.

Performance in Exercises and Conflicts

The H-1 upgrade program's aircraft, the AH-1Z Viper and UH-1Y Venom, entered early operational deployments with the U.S. Marine Corps (USMC) in starting in 2009 for the UH-1Y and 2010 for the AH-1Z, supporting (CAS), medevac, and utility missions amid the demands of . By December 2010, the combined UH-1Y/AH-1Z fleet had accumulated over 28,000 operational flight hours, with detachments averaging 3,134 flight hours each and a deployed mission-capable readiness rate of 85 percent. These initial rotations demonstrated the platforms' reliability in austere environments, logging thousands of sorties for troop transport, , and , while the shared commonality between the two variants reduced maintenance burdens and enhanced sustainment. By 2015, the fleet had surpassed 100,000 total flight hours, reflecting sustained operational maturity despite the high-tempo demands of operations through 2014. In major exercises, the H-1 aircraft integrated effectively into joint and multinational scenarios, showcasing enhanced amphibious and fires capabilities. During Bold Alligator 2012, the largest U.S.-led amphibious exercise on the East Coast, AH-1Z and UH-1Y helicopters from Marine Light Attack Helicopter Squadrons participated in maneuver warfare simulations off and , providing rapid assault support and to expeditionary units, which validated their role in distributed operations and sea-based . The platforms' advanced and four-bladed rotors enabled superior low-level flight in contested littoral environments compared to legacy H-1 variants. Similarly, in Rim of the Pacific () 2018, the world's largest multinational maritime exercise, UH-1Y and AH-1Z units from conducted joint fires training and live-fire evolutions at , , integrating with naval and allied forces to simulate multi-domain strikes, including missile engagements against ground targets. These exercises highlighted the H-1's twice the payload and of the UH-1N predecessor, allowing for eight combat-ready transported 118 nautical miles without refueling. The H-1 series contributed to combat operations in from 2014 to 2020, where AH-1Z Vipers conducted precision strikes using missiles against targets in and , often in support of Marine expeditionary units aboard amphibious ships like USS Boxer. Paired with UH-1Y Venoms for troop insertion and coordination, the enabled close coordination with ground forces, delivering kinetic effects while minimizing through the Integrated Helmet and Display Sighting System (IHADSS). Through 2025, no H-1 have been lost to enemy fire in USMC operations, underscoring their survivability enhancements, including upgraded self-protection suites and low-observable features. In simulations and live-fire tests tied to these deployments, the AH-1Z achieved high accuracy with missiles against moving and stationary targets, while the UH-1Y's increased lift capacity supported up to 50 percent more sorties per cycle compared to legacy models in high-density assault scenarios. Early challenges with the Integrated Avionics System (IAS), including software integration delays stemming from management issues in the early 2000s, impacted initial testing and led to a one-year program slip, but these were resolved by 2012 through rigorous updates and validation, enabling full operational capability declarations. Post-2020, the H-1 fleet has maintained high operational tempo in the Pacific theater, supporting distributed maritime operations and freedom of navigation missions amid great power competition, with detachments routinely deploying from bases like Marine Corps Air Station Kaneohe Bay to exercises and patrols across the Indo-Pacific. The armament systems, including the Hellfire integration, have proven pivotal in these scenarios for standoff precision fires.

Ongoing Modernizations and Exports

Post-Production Upgrades

The post-production upgrade phase for the H-1 fleet, comprising the AH-1Z Viper and UH-1Y helicopters, commenced following the completion of initial production deliveries in late , with efforts centered on enhancing survivability, electrical capacity, and of advanced systems to address evolving threats in contested environments. A of this phase is the Structural Improvement Electrical Power Upgrade (SIEPU) program, initiated in 2024, which modifies the to increase onboard electrical power and reinforce the for compatibility with next-generation weapons, including kinetic long-range munitions and air-launched effects. The first AH-1Z arrived at Bell Textron's Amarillo facility in March 2024 for SIEPU modifications, marking the beginning of fleet-wide implementation on production lots such as Lot 12. These upgrades optimize mission capabilities, , and by enabling the of power-intensive systems without compromising structural integrity. Avionics enhancements form a critical component of the post-production efforts, with Northrop Grumman awarded contracts in 2024 and 2025 to supply advanced mission computers for the H-1 platform, including upgrades to support enhanced processing and data fusion. Digital interoperability improvements are a funding priority, as outlined in the U.S. Marine Corps' 2025 Aviation Plan. Complementing these are weapon system integrations, such as the AGM-179A Joint Air-to-Ground Missile (JAGM), which achieved initial operational capability on the AH-1Z in 2022 and continues to be refined for expanded roles in precision strikes during post-production modifications. In October 2025, received a $26.7 million contract for time-critical structural improvements and electrical power upgrades, supplying components such as rotorcraft station control units to further bolster the for long-range kinetic engagements. These efforts are integrated into the broader H-1 modernization roadmap, with fleet-wide upgrades projected to continue through the next decade, aiming for completion by approximately 2030 and extending service life into the 2040s. Overall, these upgrades prioritize and , enabling the H-1 fleet to operate effectively in high-threat scenarios while bridging to future platforms like H-1 Next, with costs incorporated into ongoing Marine Corps sustainment budgets.

International Sales and Operators

The H-1 upgrade program's international sales began with export approvals in the late , focusing on the AH-1Z Viper while the UH-1Y saw its first foreign customer in the early 2020s. By 2025, contracts had been awarded to three nations, with a combined value exceeding $2 billion for paid acquisitions, emphasizing enhancements to regional security and counter-insurgency operations. These exports feature the core H-1 design, including twin GE T700 engines and shared , adapted for diverse operational environments through standard marinized and ruggedized components suitable for hot and high-altitude conditions. Bahrain became the first international operator of the AH-1Z Viper, signing a $912 million contract in November 2018 for 12 aircraft, along with munitions, training, and support equipment. Deliveries commenced in 2022, with the full fleet completed by early 2023, enabling the Royal Bahraini Air Force to modernize its capabilities for and missions in the region. The Vipers have been integrated into frontline operations, participating in exercises like the Bahrain International Airshow in 2022, where they demonstrated advanced targeting systems and missile integration. The followed as the second export customer, finalizing a $646 million government-to-government agreement in December 2019 for four AH-1Z Vipers and eight UH-1Y Venoms to replace aging Mi-24/35 helicopters. In August 2022, the U.S. donated an additional six AH-1Z and two UH-1Y, expanding the total fleet to 10 attack and 10 utility variants at no cost to . Initial deliveries arrived in July 2023, with the final two UH-1Y accepted in June 2024, marking full in-country completion of the original 12-aircraft order; the donated helicopters began arriving in 2025, with operational training ongoing at Náměšt nad Oslavou Air Base. These platforms enhance the Czech Air Force's multi-role capabilities, including troop transport, , and armed escort, as showcased at NATO Days 2025. Nigeria secured its AH-1Z order in March 2024 under a $455 million U.S. contract for 12 Vipers, approved by in 2022 after addressing human rights concerns, to bolster counter-insurgency efforts against groups like . Production is underway at Bell Textron's Amarillo facility, with deliveries scheduled to begin in 2026 and complete by the end of the decade; officials confirmed in June 2025 that timelines remain on track during reviews. The acquisition includes integrated mission systems for strikes and advanced sensors, significantly enhancing the 's combat effectiveness in hot, high-altitude environments across the . Interest in the H-1 series extends beyond confirmed sales, with signing a in October 2025 to explore acquisitions of AH-1Z and UH-1Y helicopters, potentially including local production and maintenance partnerships to support ongoing defense needs. Earlier inquiries, such as South Korea's 2013 evaluation of 36 AH-1Z under a $1.6 billion program, ultimately favored the AH-64E , while expressed past interest in Viper variants during regional modernization efforts in the but pursued other platforms. As of November 2025, operational H-1 exports are limited to Bahrain's 12 AH-1Z Vipers and the Republic's incoming fleet of 12 mixed variants, with the UH-1Y seeing no additional foreign operators beyond these and the U.S. Marine Corps.

References

  1. [1]
    First Cobra arrives for H-1 upgrade - NAVAIR
    The “Z” model is the attack helicopter component of the U.S. Marine Corps' H-1 upgrade program to remanufacture the existing AH-1W Super Cobra and the UH-1N ...
  2. [2]
    [PDF] The H-1 Update Program: Affordable War Fighting Capability ... - DTIC
    ABSTRACT. This paper summarizes the H-1 Upgrade Program. The. Marine Corps modernization plan is described and the. In late 1996, Bell Helicopter Textron ...
  3. [3]
    [PDF] U.S. Marine Corps Upgrade to AH‑1Z Attack Helicopter and UH-1Y ...
    The upgrade includes SCS 6.0 software enhancing pilot awareness, improved lighting, and more efficient sensor zoom. The upgrade also had some issues with ...
  4. [4]
    The Next Chapter for Bell's H-1 Helicopters Begins
    Mar 28, 2024 · With SIEPU, H-1s will be able to upgrade to current weapons systems with next generation capabilities, including kinetic long-range munitions ...
  5. [5]
    [PDF] Military Helicopter Modernization - DTIC
    Jun 24, 2004 · The Marine Corps plans to upgrade its H-1 helicopters to last beyond 2020 and the Air Force will sustain its H-1 fleet until planned ...
  6. [6]
    [PDF] DIRECTOR FY2001 - DOT&E
    Feb 14, 2002 · The H-1 Upgrade Program has a comprehensive, robust LFT&E plan that ... August 1995, and the Raytheon Corporation was awarded a ...
  7. [7]
    [PDF] united states marine corps h-1 upgrades program n88-ntsp-a-50 ...
    The goal of the USMC H-1 Upgrades Program is to achieve a platform that meets the growing needs of the Marine Corps. The 4BW and 4BN will be an upgraded ...
  8. [8]
    Bell AH-1Z upgrade to switch to new airframes | News | Flight Global
    Bell says the AH-1Z and UH-1Y are not yet being actively promoted for export, but it expects the availability of new-build airframes to improve prospects on the ...
  9. [9]
    H-1 Upgrade LRIP III and Lot 3 Contract Awarded - NAVAIR
    Jul 21, 2006 · The Naval Air Systems Command (NAVAIR) subsequently signed the Lot 3 aircraft contract for $137.4 million with Bell Helicopter Textron, Inc., ...Missing: December 1996 $2.4
  10. [10]
    T700 Turboshaft Engine - GE Aerospace
    The T700 is a superior, proven design with advanced technological updates. The engine is an advanced, powerful, fully modular, and affordable turboshaft engine.Missing: 1940 | Show results with:1940
  11. [11]
    AH-1W/AH-1Z Super Cobra Attack Helicopter - Naval Technology
    Nov 7, 2000 · ... new build of 40 of the proposed 189 AH-1Z helicopters. Four ... The first production AH-1Z helicopter was delivered to the USMC in January 2007.
  12. [12]
    First flight for re-engined UH-1Y | News - FlightGlobal
    Dec 31, 2001 · Bell's first remanufactured UH-1Y utility helicopter made its maiden flight on 21 December at the firm's flight research centre in Texas.
  13. [13]
    The H-1 helicopter upgrade | Aviation Week Network
    Mar 6, 2006 · The H-1 helicopter upgrade program has completed developmental testing. It is to replace aging U.S. Marine Corps UH-1N transports and AN-1W ...
  14. [14]
    New H-1s hit 3K hours, prep for OpEval | NAVAIR
    Since the first upgraded H-1 made its maiden flight Dec. 7, 2000, the H-1 Upgrades program has more than 3,000 flight test hours tallied since Dec. 7, 2000 and ...
  15. [15]
    AH-1Z/UH-1Y complete developmental testing | NAVAIR
    The first new build UH-1Ys will start production in 2006 as part of the third lot of low-rate initial production aircraft. First deliveries of the new ...
  16. [16]
    H-1 upgrade program - Wikipedia
    The H-1 upgrade program is the United States Marine Corps's program to develop the AH-1Z Viper and UH-1Y Venom military helicopters to replace its aging fleets ...Development · Upgrades · Common Elements · UH-1Y
  17. [17]
    UH-1Y Venom - NAVAIR
    Initial Operational Capabilities (IOC) date: August 2008. Projected Full Operational Capabilities (FOC) date: March 2016. Updated: February 2023. PMA-276 ...
  18. [18]
    AH-1Z Viper - NAVAIR
    Initial Operational Capabilities (IOC) date: Feb 2011. Full Operational Capabilities (FOC) date: 2020. Updated May 2023. PMA-276. Related News. PEO(A) Takes ...
  19. [19]
    None
    **Summary of H-1 Upgrades SAR (December 2019):**
  20. [20]
    Bell Completes U.S. Marine Corps AH-1Z Program of Record
    Nov 2, 2022 · Bell completed the UH-1Y POR of 160 aircraft in 2018 bringing the combined H-1 POR to 349 aircraft. ... “Completing the AH-1Z and UH-1Y deliveries ...
  21. [21]
    [PDF] POCKET GUIDE
    84% of the maintenance significant parts which make up the UH-1Y are interchangeable with the AH-1Z attack helicopter. For the USMC H-1 Upgrade Program, ...
  22. [22]
    AH-1Z Viper and UH-1Y Venom Helicopters - Navy.mil
    Oct 22, 2021 · The AH-1Z reached full rate production in 2010, with US domestic production concluding in 2022. The AH-1Z and UH-1Y are fielded in Marine Light ...Missing: IOC FOC 2015
  23. [23]
    UH-1Y flies with new helmet-mounted display - NAVAIR
    Oct 14, 2003 · 9. Coming out of the last major scheduled modification period that incorporated a moveable elevator and the Thales “Top Owl” helmet-mounted ...
  24. [24]
    Bell AH-1Z - Attack and Reconnaissance Helicopter Engineered for ...
    The Bell AH-1Z is an attack helicopter with air-to-air missiles, high-tech sensors, and versatile weapons, designed for extreme environments.Missing: IOC 2008 FOC 2015<|separator|>
  25. [25]
    AH-1Z Viper - Military.com
    Manufacturer: Bell Helicopter. Service: USMC Speed: 200 knots Range: 370 nm Crew: two -- Pilot and co-pilot/gunner Armament: 1 x 20 mm M197 3-barreled ...
  26. [26]
    AH-1Z Viper SuperCobra - GlobalSecurity.org
    Jul 7, 2011 · Ceiling, 6,100 m (20,013 ft), ; Cruise Speed, 69 mps (248 kph), ; Max Range, 420 km (227 nm), ; Speed limit (Vne), 114 mps (410 kph) (222 kts).Missing: sources | Show results with:sources<|control11|><|separator|>
  27. [27]
    BELL AH-1Z VIPER - Key Aero
    Jan 18, 2018 · In July 1995, the US Navy launched the H-1 upgrades programme which was intended to increase the commonality between two new attack and utility ...
  28. [28]
    TopOwl, Helmet-mounted Sight & Display for Helicopters
    As a helmet, TopOwl Digital Display replaces conventional night vision googles, with easy and seamless switch between natural vision and night vision.
  29. [29]
    Bell UH-1Y - The Ultimate Utility Helicopter
    The Bell UH-1Y shares 85% commonality with the Bell AH-1Z components ... 388 gal. Powerplant. Model: T700-GE-401C; Output, Uninstalled, Each Engine: 1,800 shp ...
  30. [30]
    [PDF] Decomposition of the Marine Light Attack Helicopter ... - DTIC
    1Y Pocket Guide, the UH-1Y will increase the payload by 170%, while increasing the speed and range by almost 50% as compared to the UH-1N.7. These ...
  31. [31]
    Marine Light Attack Helicopter Squadron 269
    In July, the first series conversion pilots finished Marine Light Attack Helicopter Training Squadron (HMLAT) 303 and the squadron received its first two UH-1Ys ...
  32. [32]
    [PDF] U.S. Marine Corps Concepts and Programs 2010_3
    Mar 8, 2010 · nm single aerial refueling range, the air- craft also has a ... The UH-1Y (“Venom”) and AH-1Z. (“Viper”) are approximately 84 percent.
  33. [33]
    [PDF] U.S. Marine Corps Upgrade to AH-1Z Attack Helicopter and UH-1Y ...
    H-1 Upgrade aircraft are not suitable due to unsatisfactory measures of availability based on Full Mission Capable. (FMC) and Mission Capable (MC) rates. OT- ...
  34. [34]
    [PDF] MARINE AVIATION PLAN 2015
    Jan 4, 2017 · Marine aviation is integral to MAGTFs, aiming for 15-18 hours of monthly flight time per aircrew, and maintaining T-2.0 readiness.
  35. [35]
    Marine Light Attack Helicopter Training Squadron 303
    Based at Marine Corps Air Station Camp Pendleton, California, HMLAT-303 conducts an extensive training syllabus on the UH-1Y, AH-1Z and AH-1W helicopters.Missing: HMTD- 301 simulators
  36. [36]
    New H-1 Mission Rehearsal Trainer improves capability, readiness
    May 2, 2023 · The new simulator provides on-site mission rehearsal training, increasing opportunities for pilots to maintain combat skills while deployed. ... H ...Missing: HMX- HMT- 302 4000 2022
  37. [37]
    [PDF] 2022 Marine Corps Aviation Plan
    Apr 6, 2022 · An AH-1Z Viper and UH-1Y Venom with Marine Light Attack. Helicopter ... Increase EW capacity for the MAGTF through the integration of payloads on.
  38. [38]
    US Marine Corps Receives Final Viper Helicopter, Completes H-1 ...
    Nov 4, 2022 · Bell Textron Inc. has delivered the 189th and final AH-1Z Viper attack helicopter for the US Marine Corps at Amarillo Assembly Center in Texas.
  39. [39]
    [PDF] USMC Aviation Maintenance and Repair Cost for the H-1 Upgrade
    8. At the current stage of the UH-1Y process, the post-production support decision process of providing sufficient spares and repair parts for the H-1 Upgrade ...Missing: gearbox defect<|separator|>
  40. [40]
    Marine Corps Air Station New River
    Marine Corps Air Station New River provides aviation support, force protection, infrastructure, and community services to promote the readiness, sustainment ...Welcome Aboard · MCAS New River Photos · Leaders · UnitsMissing: Miramar | Show results with:Miramar
  41. [41]
    3MAW Brings UH-1Y Venom Helicopters to Afghanistan - Marines.mil
    Package of the deployment of the fisrt UH-1Y Venom helicopter to Afghanistan. Produced by Cpl. Melissa Tugwell.Missing: sortie rate<|separator|>
  42. [42]
    Back to the Sea: The Contribution of the USMC H-1 Family
    Apr 8, 2020 · The two aircraft share significant key elements of commonality which enhances supportability of the H-1, whether on land at FOBs, or at sea. 85% ...Missing: 30%
  43. [43]
    [PDF] U.S. Marine Corps Upgrade to AH-1W Attack Helicopter and UH-1N ...
    • This program upgrades two Marine Corps H-1 aircraft: - The AH-1W attack helicopter becomes the AH-1Z. - The UH-1N utility helicopter becomes the UH-1Y.Missing: 303 HMLA- 773
  44. [44]
    180714-M-ZE445-0001 - 3d Marine Division
    Jul 16, 2018 · A U.S. Marine Corps UH-1Y Huey and AH-1Z Viper helicopter fly toward ... (RIMPAC) exercise at Pohakuloa Training Area, Hawaii, July 14, 2018.
  45. [45]
    Bell AH-1Z Viper: The US Marine Corps' Secret (and Powerful ...
    Sep 9, 2024 · The AH-1Z Viper was developed to meet the ever-changing needs of the US Marine Corps. The service sought a more advanced and capable attack helicopter.Missing: no losses
  46. [46]
    spmagtf-cr-cc 16.2 mrx - Marines.mil
    ... Viper helicopterIndo-Pacificdock landing ship USS Germantown (LSD 42)Strike ... 15th MEU's Logistics Combat Element provides support to Operation Inherent Resolve.
  47. [47]
    Boxer ARG Departs US 5th Fleet
    Jul 22, 2016 · An AH-1Z Viper helicopter, assigned to the 13th Marine Expeditionary Unit (MEU), patrols waters near the amphibious assault ship USS ...<|separator|>
  48. [48]
    New avionics delay Marines helicopter upgrade by a year
    Apr 16, 2001 · Development of the H-1 is "in the order" of $100-150 million over budget following IAS management problems (Flight International, 12-18 December) ...
  49. [49]
    Upgraded Marine Choppers Finally Begin to Take Flight
    Nov 1, 2002 · The H-1 program, however, is running about two years behind schedule, and costs have been skyrocketing. According to a recent Defense Department ...Missing: $5.6 | Show results with:$5.6
  50. [50]
    [PDF] First AH-1Z to Receive SIEPU Upgrade Arrives at Bell Amarillo ...
    Mar 26, 2024 · SIEPU marks the start of the next chapter in the life of domestic H-1 helicopters, following the completion of the U.S.. Marine Corps Program of ...
  51. [51]
    Northrop Grumman awarded $80M contract for USMC UH-1Y and ...
    Sep 6, 2024 · Northrop Grumman awarded $80M contract for USMC UH-1Y and AH-1Z upgrades. 6-Sep-2024 Source: US DoD. Northrop Grumman Systems Corp.Missing: FlightPro Gen H-
  52. [52]
    Northrop Grumman awarded $20M Contract for H-1 Mission ...
    May 7, 2025 · Northrop Grumman awarded $20M Contract for H-1 Mission Computers ... Work will be performed in Salt Lake City, Utah (60%); Baltimore, Maryland (25 ...Missing: FlightPro Gen 2024
  53. [53]
    [PDF] 2025 Marine Aviation Plan - DoD
    Mar 12, 2025 · The H-1 program's modernization plan over the next ten years ... Strike Munition (PASM), Aerial Logistics Connector. (ALC), and H-1 Next.Missing: Miramar | Show results with:Miramar<|control11|><|separator|>
  54. [54]
    Marine Corps Joint Air-to-Ground Missile achieves Initial ... - NAVAIR
    Mar 4, 2022 · JAGM provides improved lethality, operational flexibility, and a reduced logistics footprint to the H-1 platform. It is part of an effort to ...Missing: integration | Show results with:integration
  55. [55]
    Bell wins $26.7M Contract for H-1 Structural and Electrical Upgrades ...
    This order provides H-1 structural improvements and electrical power upgrades time critical parts, to include 19 rotorcraft station control units; 18 ...
  56. [56]
    Czech Republic receives final H-1 delivery - NAVAIR
    Aug 1, 2024 · The Czech Republic accepted the last two UH-1Y helicopters in June of 2024 marking the successful completion of in-country deliveries of twelve H-1 helicopters.
  57. [57]
    Bell Completes Bahrain AH-1Z Program of Record
    Feb 20, 2023 · The completion of the Bahrain AH-1Z program of record comes on the heels of Bell completing the U.S. Marine Corps program of record, signifying ...Missing: exports | Show results with:exports
  58. [58]
    Bahrain Becomes Second AH-1Z Export Customer - Aviation Week
    Nov 16, 2018 · Bahrain has become the second export customer for the Bell AH-1Z Viper attack helicopter after firming up a $916 million Foreign Military Sale ...
  59. [59]
    Bell completes AH-1Z programme for Bahrain | News | Flight Global
    Feb 20, 2023 · Bell has completed the programme of record for Bahrain's acquisition of 12 AH-1Z attack helicopters.
  60. [60]
    Bahrain's Viper attack helo makes debut at BIAS 2022, whole fleet ...
    Nov 16, 2022 · The gulf nation will get 12 birds, munitions and related parts in a $911 million deal.
  61. [61]
    U.S. Embassy in The Czech Republic
    Dec 13, 2019 · The sale is valued at 14.8 billion Czech crowns ($646 million). The Czech armed forces will buy eight UH-1Y Venom multi-purpose helicopters and ...
  62. [62]
    U.S. to give Czechs eight attack, utility helicopters | Reuters
    Aug 19, 2022 · The transfer means the Czech Republic will have 10 AH-1Z Viper attack and 10 UH-1Y Venom utility helicopters. The previously ordered ...<|separator|>
  63. [63]
    US Confirms $1 Billion Viper Attack Helicopter Sale to Nigeria
    Feb 1, 2024 · The contract is expected to be completed in June 2024. Following the contract award, the US State Department stated in January that Nigeria had ...
  64. [64]
    Bell Textron to Supply 12 AH-1Z Viper Helicopters to Nigeria
    Mar 13, 2024 · The U.S. Navy has awarded Bell Textron a $455 million contract to deliver 12 AH-1Z Viper helicopters to Nigeria under the Foreign Military ...
  65. [65]
    PMA-276, Nigerian Air Force Collaborate on AH-1Z Viper Acquisition
    Aug 1, 2025 · “The acquisition of the AH-1Z Viper helicopters will significantly enhance the Nigerian Air Force's combat effectiveness, operational efficiency ...
  66. [66]
    Ukraine exploring purchase of Bell AH-1Z and UH-1Y helicopters
    Oct 20, 2025 · Ukraine has signed a letter of intent with rotorcraft manufacturer Bell exploring the purchase of combat helicopters.Missing: airframes | Show results with:airframes
  67. [67]
    Bell AH-1Z Viper - Wikipedia
    In 1996, the USMC launched the H-1 upgrade program by signing a contract with Bell Helicopter for upgrading 180 AH-1Ws into AH-1Zs and upgrading 100 UH-1Ns ...Missing: value | Show results with:value<|control11|><|separator|>
  68. [68]
    South Korea to buy $1.6 billion worth of Boeing helicopters | Reuters
    Apr 17, 2013 · South Korea said on Wednesday it would buy attack helicopters worth 1.8 trillion won ($1.6 billion) from Boeing Co. <BA.