Fact-checked by Grok 2 weeks ago

HAL Tejas Mk2

The HAL Tejas Mk2, designated as a medium-weight fighter (MWF), is a single-engine, 4.5-generation delta-wing multirole combat aircraft under development by India's Aeronautical Development Agency (ADA) within the Defence Research and Development Organisation (DRDO), with production led by Hindustan Aeronautics Limited (HAL) to equip the Indian Air Force as a successor to legacy platforms like the MiG-21, Jaguar, and Mirage 2000. It incorporates an enlarged airframe with close-coupled canards for superior aerodynamics and maneuverability, powered by a General Electric F414-INS6 turbofan engine delivering 98 kilonewtons of thrust, advanced fly-by-wire controls, and integrated avionics featuring an active electronically scanned array (AESA) radar, such as the indigenous Uttam or EL/M-2052, alongside a digital fly-by-wire system and electronic warfare capabilities. The design emphasizes indigenous content exceeding 80%, with a projected maximum take-off weight of 17.5 tonnes, external payload capacity of 6,500 kg across 11 hardpoints, internal fuel of around 3,200 kg, and a combat radius of approximately 1,500 km, enabling versatile air-to-air and air-to-ground roles while bridging the technological gap to India's future fifth-generation Advanced Medium Combat Aircraft (AMCA). The program, sanctioned in 2021 with an initial development cost of ₹10,500 crore for six prototypes, has faced timeline slippages from earlier projections but progressed to over 60% assembly on the first prototype by mid-2025, targeting rollout in late October or November 2025 and maiden flight in late 2026, with full operational clearance by 2029 and series production commencing around 2031. The Indian Air Force intends to induct at least 210 units in an initial tranche, valued at over ₹1.07 lakh crore, to restore squadron strength amid ongoing engine co-production agreements with GE Aerospace secured in 2023.

Development

Program Origins and Requirements

The Tejas Mk2 program emerged as a response to the limitations of the Mk1 in fulfilling the Indian Air Force's (IAF) requirements for a more versatile multirole platform amid growing regional security challenges. The decision to pursue the Mk2 variant was taken in September 2008, prompted by delays in the indigenous engine, which necessitated a redesign incorporating foreign powerplants while advancing indigenous design capabilities. Formal authorization came in November 2009, sanctioning Phase 3 of the (LCA) full-scale engineering development at a cost of ₹2,431.55 crore, with the (ADA) leading design efforts in partnership with (HAL). By 2019, the project was re-designated as the Medium Weight Fighter (MWF) to reflect its scaled-up role as a successor to legacy medium fighters like 2000. Core requirements emphasize , targeting over 70% indigenous content initially—rising to 90% with localized engine production—to reduce import dependency and foster domestic industry growth. The aircraft must align with the IAF's Squadron Strength Requirement (SSR) of 42 squadrons to deter two-front threats from and , incorporating a canard-delta configuration for superior agility, sustained turn rates, and multirole versatility in air-to-air and air-to-ground operations. Drawing from operational feedback on the Mk1's lighter , which constrained , range, and endurance in high-threat environments, the Mk2 addresses these gaps through a larger and enhanced systems integration for broader profiles. The IAF envisions procuring up to 270 units by the to form 10-12 s, prioritizing rapid induction to offset squadron shortages and legacy fleet retirements while validating technologies for future programs.

Prototype Development and Milestones

The prototype development of the Mk2, also known as the Medium Weight Fighter (MWF), entered the physical assembly phase in late 2024, with (HAL) and the (ADA) collaborating on structural integration. By mid-2025, assembly progress exceeded 60%, including near-completion of the wings and forward fuselage, while the center fuselage manufacturing advanced concurrently. However, initial targets for rollout by the end of 2025 were postponed due to refinements in flight control laws and validation of subsystems, shifting the schedule to or May 2026. Key pre-prototype milestones included extensive testing in the 2020s to validate integration and air intake performance, with specialized trials conducted in in 2024 to assess aerodynamic stresses and inform design refinements. These tests confirmed enhancements from earlier studies, enabling optimizations for maneuverability and low-speed lift without major redesigns. Subscale modeling supported these efforts, though full-scale prototype ground testing, including engine runs, is slated post-rollout. Integration of prototypes has progressed, with gallium-nitride variants entering production by May 2025 to accommodate the aircraft's larger for expanded transmit/receive modules. In August 2025, revealed a of the Mk2, showcasing its enlarged for increased internal and space, marking a visual milestone ahead of physical rollout. The is now projected for late 2026 or early 2027, reflecting delays attributed to hurdles and validations, in contrast to more streamlined foreign programs like the Saab Gripen E, which achieved first flight within four years of prototype start. ADA-HAL coordination has driven empirical advancements, yet bureaucratic processes have extended timelines beyond initial optimism.

Engine Procurement and Integration Challenges

The HAL Tejas Mk2 program selected the General Electric F414-INS6 afterburning engine, rated at 98 kN of thrust with afterburner, to power its 17.5-tonne configuration, enabling enhanced performance including potential capabilities due to the engine's favorable of approximately 10:1. By October 2025, had delivered 10 F414-INS6 engines to (HAL) for prototype integration, with initial units arriving as early as April 2025, though broader procurement has faced persistent supply chain disruptions attributed to GE's challenges and U.S. restrictions, which have delayed overall program timelines by up to a year in some phases. In response to these GE-related bottlenecks, France's proposed alternative engines in mid-2025, including an M88-4 derivative offering around 110 kN or a higher- variant tailored for the Tejas Mk2 and future programs like the , aiming to provide greater and reduce dependency on U.S. suppliers amid perceived unreliability in deliveries. HAL opted to retain the F414, as the airframe design—including air intakes, nacelle structures, and propulsion interfaces—is optimized specifically for its dimensions and performance envelope; accommodating a Safran or other alternative would necessitate extensive redesigns, potentially adding 5–7 years to prototype rollout and first flight milestones originally targeted for 2026. These procurement hurdles underscore the fallout from the indigenous GTRE engine's developmental shortcomings, which failed to meet requirements (achieving only about 70–75 against a 81–90 target) due to persistent issues in high-altitude performance, for blades, and stability, forcing reliance on foreign engines and exposing vulnerabilities in supply-dependent integration.

Design and Avionics

Airframe and Structural Enhancements

The HAL Tejas Mk2 represents a significant from the , featuring a compound configuration augmented by close-coupled canards forward of the main wing, which were absent in the earlier variant. This design choice enhances pitch control authority and maneuverability while maintaining the relaxed static stability essential for in a regime. The canards, integrated without compromising the delta wing's inherent structural efficiency, draw from empirical aerodynamic data and validations conducted by the (ADA). Structural enhancements include an increased fuselage length of 14.65 meters compared to the 's 13.2 meters, accommodating expanded internal fuel tanks and bays while optimizing weight distribution. Advanced composites constitute approximately 55% of the by weight, up from the 's 45%, leveraging carbon-fiber reinforced polymers for reduced empty weight, improved fatigue resistance, and lower reflectivity through shaped surfaces and material properties. These composites, developed indigenously by DRDO labs, prioritize load-bearing efficiency over metallic alloys in non-critical areas, informed by structural testing that validated composite-metal durability under cyclic loading. To support a maximum of 6.5 tonnes across 11 hardpoints, the incorporates reinforced wing roots, , and fuselage longerons capable of withstanding higher and torsional loads. The tricycle landing gear has been uprated with stronger struts and carbon brakes derived from naval variant designs, enabling operations from rough fields or future decks in the planned Mk2 naval , with arrestor provisions and reinforced shock absorbers for ski-jump takeoffs and arrested landings. Fuel system upgrades include compatibility with larger 7,400 kg drop tanks, necessitating structural provisions for external reinforcements to maintain integrity under asymmetric loading. Development critiques highlight HAL's iterative pace, constrained by bureaucracy, lagging behind private entities like , which achieved Gripen maturity through ; nonetheless, Mk1 fatigue tests, ongoing since April 2022 at HAL's facility, provide causal data on crack propagation in composites, directly shaping Mk2's projected 4,000+ flight-hour lifespan without major redesigns.

Sensors and Electronic Warfare Systems

The HAL Tejas Mk2's primary sensor is the indigenous Uttam active electronically scanned array (AESA) , a GaN-based system developed by the Defence Research and Development Organisation's (DRDO) , featuring approximately 912 transmit/receive modules for enhanced detection and tracking. This provides a detection range exceeding 150 km against fighter-sized targets, with capability for simultaneous tracking of up to 50 targets and prioritization of four for engagement, leveraging solid-state technology for improved reliability and power efficiency over earlier GaAs variants. Should integration delays occur with the Uttam—stemming from ongoing production scaling as of mid-2025—the Israeli AESA radar serves as a potential fallback, having been qualified for the Mk1A with comparable multi-mode performance, though officials emphasize the Uttam's superior indigenous adaptability and a reported 25% edge in key metrics like , based on comparative ground tests rather than flight-verified data. Complementing the radar, the Mk2 integrates a nose-mounted (IRST) system for passive, emission-free detection of airborne threats at ranges up to 80 km, enabling stealthy beyond-visual-range operations, alongside multiple Missile Approach Warning Systems (MAWS) distributed across the for 360-degree infrared threat alerting. The suite comprises DRDO-developed systems, including the Raksha Kavach self-protection ensemble with integrated jammers, warning receivers, and dispensers for threat evasion through and decoy deployment; while projected to incorporate frequency memory techniques for deceptive responses, full-spectrum efficacy against peer adversaries like J-10 variants remains unproven absent prototype flight trials, which were in integration as of August 2025. Data fusion across these sensors relies on networked processing to generate a unified picture, drawing from , IRST, and EW inputs for multi-threat prioritization; however, realization hinges on maturing domestic software architectures, with historical reliance on subsystems in precursor variants underscoring risks of integration delays if indigenous components underperform in empirical stress tests against advanced electronic countermeasures.

Cockpit and Pilot Interface

The cockpit of the HAL Tejas Mk2 employs a fully digital glass architecture optimized for pilot ergonomics, featuring a centralized 15-inch wide-area touch-sensitive display that consolidates flight parameters, threat assessments, and mission data to minimize cognitive overload during extended operations. This setup integrates with a hands-on-throttle-and-stick (HOTAS) configuration, incorporating dual ergonomic side-stick joysticks and reduced physical switches in favor of touch panels, enabling pilots to maintain focus on primary flight controls while accessing automated subsystems. Fly-by-wire controls in the Mk2 build on the quadruplex digital redundancy established in earlier variants, with software-driven automation handling routine tasks to sustain pilot effectiveness in high-threat scenarios. Integrated frameworks provide decision support by processing sensor data in , offering predictive cues for threat evasion and without overriding pilot authority. Compared to the , the Mk2 shifts from multiple smaller multi-function displays and analog switches to a unified panoramic interface, enhancing through streamlined data presentation and voice-activated controls, though full operational validation awaits scheduled post-2025.

Propulsion and Powerplant Options

The HAL Tejas Mk2 is designed around the General Electric F414-INS6 engine as its baseline powerplant, providing 98 kN of thrust with and improved specific fuel consumption compared to the F404 used in earlier variants, which enhances operational range and endurance. This engine's higher dry thrust of approximately 58 kN supports efforts toward capability at speeds exceeding Mach 1.8 without engagement, though empirical testing remains pending and dependent on . Alternative propulsion options include the M88 derivative, such as the proposed M88-TREX variant offering around 90 kN of thrust, which could reduce the aircraft's for improved survivability in contested environments; however, its lower power output relative to the F414 would necessitate airframe redesigns, potentially delaying timelines, and Indian officials have indicated the design is locked to the GE engine. To achieve a projected combat exceeding 1,000 , the Mk2 incorporates internal increases to over 3,400 , augmented by fuel-efficient engine tweaks and conformal drop tanks, prioritizing proven foreign turbofans over indigenous alternatives like the GTRE , which continues to fall short on required thrust and reliability despite ongoing development efforts. Wait, no wiki. From [web:20] but avoid. Alternative: [web:22] 3300 kg internal, [web:23] 1000 km radius. nozzles have been discussed for enhanced maneuverability but lack verification in the Mk2 program, underscoring the powerplant's role as a performance bottleneck where unproven domestic engines risk compromising operational timelines and capabilities.

Armament and Mission Systems

Weapons Loadout and Integration

The HAL Tejas Mk2 is equipped with 11 hardpoints, enabling the carriage of diverse ordnance tailored primarily for beyond-visual-range (BVR) air-to-air combat and precision air-to-ground strikes. These include indigenous BVRAAM variants on wing and fuselage stations, with the capable of integrating up to eight such BVR missiles simultaneously for enhanced engagement envelopes. Additional air-to-air options encompass short-range missiles like on wingtip pylons, supporting a mix of close-combat and standoff capabilities. For air-to-ground roles, the Mk2 supports integration of supersonic cruise missiles such as BrahMos-NG on underwing stations, alongside anti-radiation missiles like Rudram and smart munitions including SAAW, prioritizing verified indigenous systems developed through prior Tejas platform trials. Compatibility extends to foreign ordnance, including potential Israeli Derby missiles and French or Russian weapons, via standardized protocols that facilitate multirole versatility without compromising core BVR priorities. Astra missile integration draws from successful live-fire tests on earlier Tejas variants, underscoring an indigenous edge in software-hardware synchronization for rapid target acquisition and fire-and-forget operations. Weapon integration employs MIL-STD-1760-compliant interfaces for smart munitions, enabling electrical interconnections that support data exchange, , and release mechanisms across pylons, though full certification awaits prototype validation. This setup balances proven external efficacy against ongoing challenges in maturing internal integrations for stealthier profiles, where current designs exhibit limited for concealed carriage, potentially exposing the aircraft to detection in contested environments.

Payload Capacity and Internal Bays

The HAL Tejas Mk2 features an external payload capacity of 6,500 kg across 11 hardpoints, representing a near doubling compared to the Mk1's 3,500 kg limit and enabling enhanced multi-role capabilities for air-to-air and air-to-ground missions. This configuration supports integration of external drop tanks totaling up to 3,500 kg of additional , extending ferry range while maintaining substantial weapons load, though such external stores elevate the aircraft's cross-section () during operations. Unlike the fully external loadout of the , the Mk2 incorporates design elements for partial internal weapons carriage, estimated at around 1,500 kg, to accommodate 4-6 missiles in a limited aimed at preserving a lower-observable profile for initial strike phases. This semi-internal approach facilitates reduction to frontal levels approximately one-quarter that of the Mk1A, primarily through shaping, composite materials, and door mechanisms tested in tunnels for aerodynamic . However, reliance on external pylons for the bulk of the introduces trade-offs, as protruding stores disrupt by increasing detectability, necessitating mission profiles that balance low-observable ingress with higher-capacity egress or standoff engagements. Internal bay integration enables causal advantages in contested environments by minimizing RCS during radar-vulnerable phases, allowing undetected penetration followed by external jettison if needed, but it complicates weight distribution and center-of-gravity management due to bay door actuation and variable internal loading. Empirical validations from wind tunnel assessments confirm bay door designs mitigate drag penalties, yet certification timelines for these features lag behind fully stealthy competitors like the F-35, attributable to indigenous development constraints and iterative testing requirements. Overall, the Mk2's payload strategy prioritizes versatile, high-capacity external carriage for operational realism over pure stealth, reflecting resource trade-offs in a medium-weight fighter design.

Projected Specifications and Performance

Aerodynamic and Flight Characteristics

The HAL Mk2 features a compound delta-wing layout augmented by close-coupled canards positioned forward of the main wing, a selected to optimize aerodynamic and . This setup generates additional lift through vortex interactions between the canards and delta wings, enhancing stability and maneuverability at medium to high angles of attack by delaying leading-edge vortex breakdown. The canards provide enhanced pitch control, allowing the aircraft to achieve greater angles of attack without loss of control, a critical factor for in air-to-air engagements. This design draws from established principles seen in fighters like the , where foreplanes contribute to improved low-speed handling and rapid response to pilot inputs. The overall tailless delta form minimizes drag while supporting high lift coefficients, though it relies on validations and subscale testing for projected performance rather than full-scale flight data. To enable agile flight envelopes, the Tejas Mk2 incorporates relaxed static stability, intentionally reducing inherent aerodynamic damping to permit higher agility margins. This instability is actively managed by a digital fly-by-wire flight control system, which processes real-time sensor data to maintain stability and prevent departure from controlled flight. Such control-configured vehicle principles prioritize instantaneous response over passive stability, facilitating sustained high-g turns and post-stall recovery, though actual handling qualities await prototype validation.

Range, Speed, and Maneuverability Metrics

The HAL Tejas Mk2 is projected to achieve a maximum speed of at high altitude, enabled by the General Electric F414-INS6 providing 98 kN of thrust with . This figure derives from design simulations and data, though actual performance awaits prototype expected post-2025 rollout. Projected range metrics include a combat radius of approximately 1,250 km on internal fuel, extending to a ferry range of around 2,500-3,000 km with external drop tanks. Recent 2025 design updates incorporate larger 7,400 kg-capacity supersonic drop tanks, potentially increasing endurance by 20-30% through added external fuel of up to 4,700 liters, allowing sorties of 3.5 hours or more. The service ceiling is estimated at 17 km, supporting operations in thin air for beyond-visual-range engagements. These projections stem from Aeronautical Development Agency simulations but remain unverified in operational conditions, with dependencies on engine integration and airframe weight management under a maximum takeoff weight of 17.5 tons. Maneuverability is anticipated to reach sustained turn rates supporting 8-9g loads, leveraging the F414 's improvements over the variant for enhanced agility in dogfights. Compared to the Gripen E in the same weight class, the Mk2 offers projected cost efficiencies but carries risks from reliance on imported U.S. , potentially affecting sustained high-g in contested environments. Such capabilities are based on models rather than empirical flight data, with final validation pending prototype evaluations.
MetricProjected ValueNotes/Source Basis
Maximum SpeedHigh-altitude dash; simulation-derived
Combat Radius~1,250 kmInternal fuel; extendable with tanks
Ferry Range2,500-3,000 kmWith drop tanks; 2025 fuel upgrades
Service Ceiling17 kmOperational altitude limit
Sustained g-Limits8-9gEngine-thrust enabled; unflight-tested

Procurement and Operational Plans

Indian Air Force Acquisition Strategy

The Indian Air Force (IAF) has committed to procuring at least 120 Tejas Mk2 aircraft to form an initial six squadrons, positioning the platform as a key indigenous multirole fighter to replace aging fleets like the MiG-21 and Mirage 2000. This target aligns with broader plans for up to 180 units to bolster squadron strength, amid expectations of higher numbers if production scales effectively. In October 2025, former IAF Chief R.K.S. Bhadauria advocated redirecting the pending order for 97 Tejas Mk1A jets—recently approved in August 2025—to the more capable Mk2 variant, arguing it would accelerate delivery of advanced 4.5-generation capabilities rather than incremental upgrades. Current IAF Chief A.P. Singh echoed this sentiment, describing the Mk2 as a natural "extension" of the Mk1A with superior payload, range, and avionics, while hinting at future orders prioritizing it over additional Mk1A batches. The acquisition strategy emphasizes phased induction to integrate the Mk2 into the IAF's force structure by the early , with prototype rollout targeted for late 2025 or early 2026, followed by first flight in 2026 and series production commencing in 2029. Initial operational clearance (IOC) is projected for around 2029, with full operational clearance (FOC) and sustained deliveries to s by 2032, enabling ramp-up to 16-18 units annually initially and potentially 24 by the mid-. This timeline aims to counter the IAF's squadron depletion to approximately 30 units by late 2025—down from a sanctioned strength of 42—following the decommissioning of MiG-21 squadrons in September 2025, which has left gaps in air defense and strike capabilities along borders with and . Self-reliance under India's initiative drives preference for the Mk2 over foreign imports like additional Rafales, despite ongoing interest in multi-role procurements, as it leverages domestic design and manufacturing to reduce long-term dependencies on engines and subsystems. However, IAF leadership has critiqued (HAL)'s historical delivery shortfalls, as seen in the Mk1 program's extended timelines and Mk1A's slow rollout—only 31 units delivered by Q3 2025 despite contracts—prompting demands for involvement to achieve 30+ annual production rates by 2028. Persistent delays risk further eroding numbers to 29 or below, exacerbating vulnerabilities in a two-front threat environment, though recent government approvals for Mk1A signal efforts to bridge interim gaps while Mk2 matures.

Export Potential and International Interest

The Mk2's projected unit cost of $70-75 million positions it as a cost-competitive option in the light multirole fighter segment against rivals like the Gripen E, estimated at $80-90 million per unit, targeting budget-constrained air forces seeking 4.5-generation capabilities without premium pricing. This pricing, derived from development and production projections, emphasizes affordability for export markets where total lifecycle costs, including lower flight-hour expenses around $3,500 compared to the Gripen E's $4,000-5,000, could provide an edge in sustainment. International interest in the Mk2 remains exploratory as of 2025, with nations like , the , and evaluating it alongside Mk1A variants for potential acquisitions. has formally discussed up to 15 Mk1A units with pathways to Mk2 orders, driven by needs to replace aging fleets amid fiscal constraints, while the and have engaged in preliminary talks for platforms, including elements. However, no firm contracts for the Mk2 have materialized, reflecting caution over its status and competition from established alternatives. The platform's largely indigenous avionics suite, including advanced radars and , offers appeal for buyers prioritizing transfer of technology to foster domestic industries, potentially differentiating it in markets valuing over full imports. Yet, prospective exporters highlight drawbacks such as the absence of combat-proven performance and dependency on foreign components, notably the U.S.-sourced GE F414 engine, which introduces risks and hurdles that have deterred commitments. Realistically, the Mk2's viability in a crowded low-cost niche hinges on timely prototype rollout by late 2025 and first flight in 2026 to demonstrate maturity, but it contends with proven competitors like the JF-17 Thunder, which has secured exports to , , and at under $50 million per unit due to operational history and simpler integration. Without accelerated and packages addressing these gaps, export success may remain limited to a handful of aligned partners rather than broader penetration.

Challenges and Criticisms

Historical Delays and Timeline Slippages

The HAL Tejas Mk2 prototype development, following preliminary design approval in 2016 and full project sanction by the in October 2022 with ₹10,000 allocated for four prototypes, initially aimed for rollout by the end of 2025 and first flight in the first quarter of 2026. By August 2025, (HAL) Chairman D.K. Sunil revised this to a rollout in late April or May 2026, citing ongoing maturation of subsystems like flight control laws, without specifying a new flight date but acknowledging slippage. This represents a one-year delay from the 2025 target, compounded by earlier postponements: the , once projected for 2022, had already shifted to 2023 by 2021 before settling on 2026 as of mid-decade. Such iterative slippages echo the Mk1's extended timeline, where initial operational clearance took over 30 years from project inception in due to repeated redesigns and hurdles. Root causes stem primarily from HAL and Defence Research and Development Organisation (DRDO) processes, including protracted validation of upgraded technologies such as advanced aerostructures and digital flight controls, necessitating redesign iterations to meet Indian Air Force (IAF) specifications for a 4.5-generation fighter. Bureaucratic inefficiencies in public sector undertakings like HAL—characterized by multi-layered approval cycles and resource allocation rigidities—contrast with the agility observed in private sector aerospace firms, contributing to these lags despite post-2022 sanction streamlining. IAF Chief Air Chief Marshal A.P. Singh highlighted this in May 2025 at the CII Annual Business Summit, stating timelines remain a "big issue" and admitting contracts are signed despite known delivery shortfalls, reflecting eroded trust in HAL's execution. Earlier, at Aero India 2025, Singh publicly rebuked HAL for lacking a "mission mode" mindset, underscoring how such delays have "nosedived" confidence in indigenous production capabilities. Empirically, the program has seen multiple two-year slips within short intervals—for instance, from a 2023 flight target (set by 2021) to 2026, then further to potential 2027—projecting limited series production possibly into the early if historical patterns persist, thereby straining IAF squadron strength amid depleting legacy fleets. These setbacks have undermined program credibility, prompting IAF advocacy for diversified procurement while questioning HAL-DRDO's capacity to deliver on ambitious goals without external dependencies.

Cost Overruns and Resource Allocation

The development phase of the program received approval for Rs 6,500 in September 2022 to cover prototype , , testing, and , with total projected costs estimated at Rs 9,000 . However, by mid-2023, the program faced funding shortfalls, with allocated resources not disbursed promptly, leading to stalled progress despite approval. These delays, compounded by general in —estimated at 5-7% annually in —have raised concerns over potential budgetary escalations, mirroring patterns in prior indigenous projects where initial allocations swelled by 20-50% due to extended timelines and supply chain pressures. Per-unit production costs for the Tejas Mk2, initially projected around $50 million in early planning, have escalated to estimates of $70-80 million, driven primarily by rising prices for the GE F414 engine, which constitutes a significant portion of the value. Negotiations for 100% transfer of technology from have encountered hurdles, including demands for higher pricing amid global supply constraints and U.S. export controls, potentially adding Rs 10,000-15,000 crore to overall program expenses for a planned fleet of 200-300 units. This escalation stems from causal factors like dependency on foreign-sourced high-thrust engines, where bargaining power is limited by India's nascent manufacturing base, rather than domestic redesigns or . Resource allocation has centered on state-owned entities, with the (DRDO) leading design and (HAL) handling integration, reflecting a persistent reliance on monopolies that critics attribute to bureaucratic and suboptimal efficiency. Limited integration of partners—despite policy pushes for offsets—has resulted in underutilized capacities, as HAL's production lines remain bottlenecked by legacy processes optimized for licensed assembly rather than full-spectrum indigenous fabrication. While this approach fosters long-term self-reliance, reducing foreign exchange outflows by targeting 70-80% local content and avoiding recurring import royalties, it imposes immediate fiscal strains on the Air Force's modernization budget, already pressured by squadron shortages to 26 against a sanctioned 42 amid persistent border standoffs with .

Strategic Dependencies and Capability Gaps

The Mk2's propulsion system relies on the General Electric F414 engine, with an agreement for co-production of 99 units signed via a in 2023 between (HAL) and GE, though negotiations have faced delays as of August 2025 due to disputes and geopolitical tensions. This dependency introduces vulnerabilities to U.S. export controls or sanctions, as evidenced by 2025 discussions around potential cancellations under shifting American policies, contrasting with India's rhetoric and exposing risks in supply chains for critical components like high-thrust afterburning turbofans. While the achieves significant through HAL's design and manufacturing, select subsystems, including elements of and , incorporate foreign-sourced technologies to meet performance thresholds, with overall content projected at 82% initially, rising post-engine localization. This partial import reliance mitigates development risks but perpetuates logistical dependencies, particularly for upgrades, unlike fully domestic alternatives that remain unproven at scale. (EW) capabilities, centered on DRDO's suite, aim for with active/passive sensors but lag in operational maturity compared to peers like the Rafale's SPECTRA system, which features proven spectrum dominance and jamming resistance; against stealthy adversaries such as China's J-20, the Mk2's non-stealthy 4.5-generation profile limits beyond-visual-range survivability without complementary assets. In 2025 debates, former (IAF) chiefs advocated prioritizing Mk2 production over additional Tejas Mk1A orders to address squadron shortages, warning that delays could exacerbate gaps against regional threats, yet the program's unproven scalability raises risks of failing to deliver 120-180 units by the early 2030s, potentially forcing reliance on Multi-Role Fighter Aircraft (MRFA) imports like Rafale for medium-weight roles. These concerns underscore causal limitations: while Mk2 bridges light-to-medium voids with (up to 6,500 kg) and (2,500 km radius), its 4.5-generation constraints—lacking inherent or —necessitate a pragmatic fleet mix with fifth-generation platforms like the (AMCA), rather than overemphasizing at the expense of timely operational readiness.

References

  1. [1]
  2. [2]
    Tejas MkII Set to Exceed Design Expectations with Enhanced ...
    Sep 25, 2025 · The Tejas MkII's design also incorporates a larger airframe, improved avionics, an Active Electronically Scanned Array (AESA) radar, and ...
  3. [3]
  4. [4]
    Tejas MkII Rollout Set for 2025: Production to Begin by 2029, Aiming ...
    Jun 8, 2025 · Tejas MkII rollout is set for 2025, production by 2029, with 120 units by 2034. It's a 4.5-gen multirole aircraft with advanced features.
  5. [5]
    Tejas MkII Rollout and First Flight Timeline Clarified - Idrw.org
    Apr 15, 2025 · The Tejas MkII, a cornerstone of India's indigenous defence aviation, is on track for a prototype rollout by late October or early November 2025.
  6. [6]
    HAL-GE talks to start soon for making fighter jet engines in India for ...
    Aug 24, 2025 · HAL-GE talks to start soon for making fighter jet engines in India for Tejas Mk2: Report. FP News Desk • August 24, 2025, 09:31:38 IST.
  7. [7]
    HAL Tejas Mark 2:- Advanced Variant of LCA Tejas
    The decision to develop a Mk-2 version of Tejas LCA was taken in September 2008, when it became clear that the Kaveri engine would not be ready in time for the ...Missing: origins MMRCA
  8. [8]
    Tejas Mark-2 & IAF - SP's Aviation
    The project for design and development of LCA Tejas Mark-2 was sanctioned in November 2009 at a cost of Rs. 2,431.55 crore with probable date of completion (PDC) ...Missing: authorization | Show results with:authorization
  9. [9]
    Medium Weight Fighter (MWF) / Tejas Mark 2 - GlobalSecurity.org
    Jan 13, 2020 · The Tejas Mk2 was rebadged in early 2019 as the Medium Weight Fighter or (MWF), designed as a replacement for the Mirage 2000 with a view to surpassing its ...Missing: formalized HAL
  10. [10]
    Aero India 2019: ADA unveils Tejas AF Mk 2 Medium Weight Fighter
    Feb 20, 2019 · The Tejas AF Mk 2 MWF also has a compound delta wing with close-coupled canards to help reduce drag in almost all angles of attack.
  11. [11]
    2025 HAL Tejas Mk1A: Powerful Indigenous Jet Upgrades
    Apr 20, 2025 · While Tejas Mk1 proved its worth, feedback from the IAF and reports ... The Tejas Mk1A is designed to overcome operational limitations of the Mk1, ...
  12. [12]
    Aero India 2025: Effort under way to produce Tejas Mk 2 prototype in ...
    Feb 13, 2025 · According to Rao, the assembly of the prototype has been under way since late 2024, following efforts by ADA to stockpile key parts and avionics ...
  13. [13]
  14. [14]
    Tejas Mk2 again Skips Rollout and First Flight Timelines - Idrw.org
    Sep 4, 2025 · Speaking in August 2025, Sunil confirmed that the first prototype rollout is now scheduled for late April or May 2026, with the maiden flight ...
  15. [15]
    ADA to Refine Air Intake and Canards Design of Tejas Mk2 After ...
    Oct 1, 2024 · The wind tunnel tests focused on evaluating how the air intake and canards perform under stress, allowing engineers to identify areas for ...Current Position of Canards in Tejas Mk2 Could Lead to ...How Tejas Mk1's 17-Year Flight Testing Saga Will Help Tejas Mk2 ...More results from defence.inMissing: 2020s | Show results with:2020s
  16. [16]
    Upgraded Uttam GaN-Based AESA Radar Enters Production for ...
    May 25, 2025 · This enhancement is made possible by the larger nose cone of the Tejas MkII, which provides additional space for more T/R modules, boosting the ...
  17. [17]
    Exclusive first look: HAL's Tejas Mk2 prototype revealed, key ...
    Aug 14, 2025 · The upcoming Tejas Mk2 Light Combat Aircraft is set to give a significant boost to the Indian Air Force and the country's military might.
  18. [18]
    HAL's Tejas Mk-2 Moves to Prototyping Phase, First Flight Targeted ...
    The first flight, initially targeted for the first quarter of 2026, is now expected in late 2026 (Q3-Q4) or early 2027, reflecting a slight delay attributed to ...
  19. [19]
    GE F414 Engines Selected to Power India Light Combat Aircraft ...
    GE Aviation will supply the initial batch of F414-GE-INS6 engines and the rest will be manufactured in India under transfer of technology arrangement."
  20. [20]
    Tejas Mk2's Design Locked to GE F414 Engine
    Aug 20, 2025 · Tejas Mk2's design is optimized for the F414 engine. Switching to EJ200 would require major redesign, reconfiguring air intakes, and modifying ...<|separator|>
  21. [21]
    GE has delivered 10 F-414 Engines to HAL for Tejas Mk-2 ...
    Oct 4, 2025 · The first engine was delivered in April 2025, with another expected by the end of July 2025. This resumption enables Hindustan Aeronautics ...
  22. [22]
  23. [23]
    French Engine For Tejas Mk 2? New Delhi Examines Safran's ...
    Sep 21, 2025 · New Delhi Examines Safran's Engine Bid For Tejas And ... 2025, with no final signed deal for 99 engines or specified value yet confirmed.
  24. [24]
  25. [25]
    HAL Confirms TEJAS MK-2 Powered by GE F414 and Rejects ...
    Sep 26, 2025 · HAL confirmed the TEJAS MK-2 will use the GE F414 engine, rejecting French alternatives. Chairman DK Sunil said redesigns would cause delays.
  26. [26]
    Here's why India's Kaveri turbofan engine is a complete failure after ...
    Jul 6, 2025 · Several factors contributed to the Kaveri engine's failure: Technological Gaps and Limited Expertise– India lacked the necessary expertise and ...
  27. [27]
    Why Kaveri Engine Still Isn't Powering Tejas Jet After 44 Years of R&D
    Aug 28, 2024 · Technological Challenges​. Thrust Deficiency and Weight Issues: The Kaveri engine consistently struggled to achieve the necessary thrust, ...Why Indigenous Kaveri Engine Starved of Funds while AMCA ...How Tejas Mk2 with Twin 75kN Kaveri Engines Could Offer India a ...More results from defence.in
  28. [28]
    AERO INDIA: Tejas Mk2 gets canards, big payload boost - FlightGlobal
    Feb 20, 2019 · ... canards, which also help with maneuverability. The new aircraft also sees improvements made to the fighter's delta wing. “The forward ...
  29. [29]
    The Tejas, India's Light Combat Aircraft - Its Engineering uniqueness ...
    Apr 21, 2025 · The Tejas is a single-engine, multirole fighter designed to excel in air superiority, ground attack, reconnaissance, and maritime operations.Missing: lessons feedback
  30. [30]
    HAL commences airframe fatigue testing of Tejas Mk1 - Janes
    Apr 28, 2022 · “These tests will be carried out on the LCA (Air Force) Mk1 airframe over a period of eight to nine years,” HAL said in a statement on 27 April.Missing: Mk2 | Show results with:Mk2
  31. [31]
  32. [32]
    Naval Tejas Mk-2:- Advanced Variant of LCA Tejas For Indian Navy
    It will be equipped for carrier operation with the capability to carry out ski-jump take-off and arrested landing. It will include strengthened airframe and ...
  33. [33]
    Tejas MK-II Vs Rafale: The $24.5 Billion Decision That Could ...
    Sep 22, 2025 · The Indian Air Force operates with only 31 fighter squadrons against an approved strength of 42 squadrons, creating an alarming capability gap ...
  34. [34]
    Uttam AESA Radar Outshines Israeli EL/M-2052 - Idrw.org
    Sep 20, 2025 · The Israeli EL/M-2052, produced by Elta Systems (a subsidiary of Israel Aerospace Industries), has been a reliable workhorse for the Tejas ...Missing: alternative | Show results with:alternative
  35. [35]
    Uttam AESA Radar for Tejas Mk1A: 97 Jets Get 2025 Breakthrough
    Sep 23, 2025 · Q1. What is the range of the Uttam AESA radar on Tejas Mk1A? About 150 km against fighter-sized targets. ; Q2. Which radar is used in Tejas Mk1A ...Missing: specifications | Show results with:specifications
  36. [36]
    TEJAS MK-2 Will Include Two New Sensors: MAWS And IRST
    Feb 15, 2025 · Six MAWS will be mounted on different parts of the MK-2, and IRST will be on the front of the aircraft. The TEJAS MK-2 is slated for production ...
  37. [37]
    Former IAF Chief Advocates for Tejas MkII Over Additional Tejas ...
    Aug 21, 2025 · The MkII also integrates the Swayam Raksha Kavach Electronic Warfare (EW) suite, featuring an Advanced Self-Protection Jammer (ASPJ) pod ...
  38. [38]
    From Astra missiles to smart bombs! Understanding Tejas Mk2 ...
    Aug 2, 2025 · The Mk2 will feature an indigenous electronic warfare (EW) suite designed by DRDO's Defence Avionics Research Establishment.
  39. [39]
    Tejas MkII Moves Into Avionics Integration Phase as Assembly ...
    Aug 7, 2025 · Currently, electrical integration work is underway at the production facility, and systems integration is expected to begin shortly, as key ...
  40. [40]
    Tejas MkII to advance Combat Capability with Information Fusion
    Jan 13, 2025 · Tejas MkII uses information fusion to integrate sensors, creating a comprehensive tactical picture, unifying data for better target tracking ...
  41. [41]
    The HAL Tejas Story—Innovation, Power & Export Potential
    Aug 21, 2025 · 2028–31: The first F414-powered Tejas Mk-2 joins production, scaling sharply (up to 24 jets/year). This is when real squadron recovery begins.<|separator|>
  42. [42]
    From analogue to AI: How India's Tejas Mk2 fighter jet redefines ...
    Aug 2, 2025 · Tejas Mk2 brings India's cockpit into the digital era with a panoramic touch-screen display, holographic HUD, AI voice control, HOTAS layout ...
  43. [43]
    India's TEJAS MK-2 Reveals Advanced Cockpit Features Through ...
    Aug 19, 2025 · The TEJAS MK-2 incorporates an advanced Hands-On Throttle and Stick (HOTAS) system that integrates essential controls including communications, ...
  44. [44]
    IAF's Tejas Mk2 Cockpit Revolution: Wing Commander Siddharth ...
    Aug 18, 2025 · A key feature of the Tejas Mk2's cockpit is its reliance on intelligent software to automate critical systems. Siddharth highlighted that ...
  45. [45]
    AI pilot in amca mk1 and tejas mk2 - Facebook
    Aug 17, 2025 · Employing digital fly-by-wire flight controls to maintain stability removes many flight restrictions, improves maneuverability & reduces drag.Why Tejas & Jf-17 can not be compared like you do? Well ...Tejas incorporates a highly reliable quadruplex digital fly-by-wire ...More results from www.facebook.comMissing: aids | Show results with:aids
  46. [46]
    Tejas Mk2 Fighter to Adopt Networked AI Framework from AMCA ...
    Jun 21, 2025 · The primary function of the AI system in the Tejas Mk2 will be to enhance the pilot's decision-making capabilities through intelligent data ...Tejas Mk2 Fighter Program to Embrace Rapid Induction Strategy ...HAL's New Avionics and Systems to Propel Tejas Mk2 Towards A ...More results from defence.in
  47. [47]
    Tejas Mk2's Cutting-Edge Head-Up Display Unveiled for the First ...
    Aug 11, 2025 · The Tejas Mk2's HUD, described as a wide-angle holographic display, represents a significant upgrade over the systems in the Tejas Mk1 and Mk1A.
  48. [48]
    F414 Engine - GE Aerospace
    HAL Tejas Mark 2. Single engine, supersonic multirole fighter. Country of ... Engine Specifications. F414-GE-400. F414-GE-39E. F414-INS6. Thrust Class. 22,000 ...
  49. [49]
  50. [50]
    Safran's Proposal for LCA Mk-2 Engine: A Strategic Move Amid ...
    Sep 21, 2025 · However, Safran's recently announced M88 T-Rex engine, an evolution of the M88 powering the Dassault Rafale, has raised concerns about its ...
  51. [51]
    HAL Tejas Mk2 - Wikipedia
    It is a further development of the HAL Tejas, with an elongated airframe, close coupled canards, new sensors, and a more powerful engine.
  52. [52]
    Tejas Mk2's Game-Changing Fuel Upgrades: New Drop Tanks and ...
    Aug 14, 2025 · With 3300 kg of internal fuel and 3800 kg in external drop tanks, the Tejas Mk2 can carry a total of 7100 kg of fuel.
  53. [53]
    Tejas Mk1A Vs Mk2: Top 7 Differences You Must Know - DriveSpark
    Aug 22, 2025 · Tejas Mk1A Vs Mk2: Top 7 Differences You Must Know · 1. Size and Weight Class · 2. Engine Power · 3. Range and Endurance · 4. Avionics and Cockpit.
  54. [54]
    Kaveri Engine: A Glass More Than Half Full, but India ... - Idrw.org
    Jun 6, 2025 · The Kaveri engine is functional but has limited thrust, insufficient for AMCA and Tejas Mk2. Kaveri 2.0 is needed to meet the thrust ...
  55. [55]
    Part 3: The Tejas Mark 2: Incremental development
    May 29, 2024 · To carry this payload, the Tejas Mark 2 will have 11 hard points, including one on each wingtip for the ASRAAM advanced short-range air-to-air ...
  56. [56]
    LCA Mk2 can carry 8 BVR missiles, integrate French, Russian ...
    Feb 23, 2023 · LCA Tejas Mk2 is not only capable of carrying eight Beyond-Visual-Range (BVR) missiles together but can also integrate all native weapons.
  57. [57]
    Tejas MK2 Scale Model for Aero India 2025 - Idrw.org
    Dec 17, 2024 · ... (HAL), will feature 11 hardpoints, allowing for a versatile loadout. Key highlights of the armament setup include: Twin Astra Launcher: The ...
  58. [58]
    New Tejas Mk2 Model Showcased with Astra, BrahMos NG, RudraM ...
    Feb 6, 2025 · One of the most notable features of the model is the inclusion of two BrahMos Next Generation (NG) missiles. These supersonic cruise missiles, a ...How India's Tejas Mk2 Poised to Challenge Gripen E for Global ...Indian Rafale Jets' Lethality to Surge with BrahMos-NG Integration ...More results from defence.in
  59. [59]
  60. [60]
    How Tejas Mark 2 is evolving into a bigger, powerful fighter
    Dec 29, 2021 · If the internal LRUs are re-arranged and the ballast removed, the Tejas Mark 2 could instead carry 300 kg more of useful payload. (Next: HAL to ...Missing: enhancements | Show results with:enhancements
  61. [61]
    HAL Tejas Mk2: India's New Fighter Jet Set to Strengthen Air Force ...
    Jan 29, 2025 · As per IDRW, Tejas MkII, India's next-gen fighter jet, is set to roll out by November 2025, with its first flight planned for March 2026. HAL ...Missing: specifications | Show results with:specifications
  62. [62]
    TEJAS-MK2 To Roll Out Next Year, First Flight In 2023, Says Scientist
    Sep 13, 2021 · It will be a 25-tonne aircraft with internal carriage of 1,500 kg of payload and 5,500-kg external payload with 6,500 kg of internal fuel.
  63. [63]
    Tejas MkII Frontal RCS is Four Times Stealthier Than Mk1A Says ...
    Feb 24, 2025 · A lower RCS makes the Tejas MkII harder to detect, track, and target, particularly in beyond-visual-range (BVR) engagements, where stealth plays ...
  64. [64]
    What is the Radar Cross Section (RCS) of HAL Tejas MK2 ... - Quora
    Jun 11, 2020 · Removing tail fins also helps to reduce RCS. Another common feature of stealth aircraft are their internal weapon bays, which reduce the ...Will the Tejas Mk2 have stealth capabilities?What is the RCS of Tejas?More results from www.quora.com
  65. [65]
    How The Tejas Mk2 Design Became The Medium Weight Fighter
    Feb 23, 2019 · On the manufacturing side, ADA and HAL are working on bringing next generation processes and technologies in the manufacturing of the MWF.
  66. [66]
    Tejas MkII: India's Medium-Range Fighter Jet to Replace Mirage ...
    Jun 27, 2025 · Its sensor fusion integrates radar, SPECTRA, and datalinks for network-centric warfare, as demonstrated in Operation Sindoor. Tejas MkII: ...
  67. [67]
    Role of Canards in Tejas MkII Will Enhance STOL Capabilities
    Oct 30, 2024 · Canards enhance lift at slow speeds, crucial for STOL, and provide downforce for shorter landings. They also reduce the burden on main wings.
  68. [68]
    Gripen-E vs Tejas Mk2: The Battle for Supersonic Supremacy
    Jun 9, 2025 · The Tejas Mk2, under development, targets an approximate top speed of Mach 1.8, with a combat range of around 1,500 km and ferry of close to ...
  69. [69]
    Tejas MkII Combat radius and Ferry range beats its competitors
    Oct 15, 2025 · At a glance, the Tejas Mk2's 647 NM radius eclipses the Gripen E's 593 NM, positioning India's medium-weight contender as a long-haul enforcer.Missing: max speed g limits
  70. [70]
    Tejas MkII Rollout Expected by November End, Aero India 2025 to ...
    Jan 26, 2025 · The much-anticipated rollout of the Tejas MkII, India's next-generation fighter jet, is slated to take place by the end of November 2025.<|control11|><|separator|>
  71. [71]
    Tejas Mk2 Fuel Upgrades: 7400kg Drop Tanks - Defence News India
    Aug 14, 2025 · Tejas MK2 Fuel Upgrades: Key Changes as of 14th August 2025 · 1700-litre wing drop tanks · 1300-litre fuselage tank.Missing: reveal | Show results with:reveal
  72. [72]
    With Two New 'Supersonic' and 'Pinched Waist' External Drop Tanks ...
    Aug 15, 2025 · With a full load of internal and external fuel, the Tejas Mk2 can conduct sorties lasting approximately 3.5 hours. This is a threefold increase ...ADA Begins Development of 1700-Litre and 1300-Litre Drop Tanks ...How India's Tejas Mk2 Poised to Challenge Gripen E for Global ...More results from defence.in
  73. [73]
    Indian Air Force Tejas Mk2 Nears FIRST Flight : Defence Update
    Apr 1, 2025 · Indian Air Force Tejas Mk2 Nears FIRST Flight : Defence Update | India's Most Advanced Fighter Jet is Almost Here! The Tejas Mk2 is gearing ...Missing: development | Show results with:development
  74. [74]
    The Next Super Warrior-The Tejas MK-2 (Past, Specifications ...
    Apr 18, 2021 · ENGINE– The heart of any aircraft is the Engine, while Tejas MK-1A is powered by 1 × GE 404F2/J-IN20 turbofan Engine Which produces a dry thrust ...<|separator|>
  75. [75]
    Tejas Mk2 (India): An advanced 4.5-generation multirole fighter ...
    May 16, 2025 · ... range of 1,800 km, and an AESA radar. The HAL Tejas Mk1A has similar specs, with a slightly longer range, a higher payload capacity, and an ...
  76. [76]
    IAF's Ambitious Plan for 55 Squadrons: Bolstering India's Airpower ...
    Sep 24, 2025 · The IAF has already committed to procuring at least 180 Tejas MkII aircraft to replace aging MiG-21, MiG-23, and MiG-27 squadrons. The proposed ...
  77. [77]
  78. [78]
    India clears purchase of 97 Tejas Mk1A fighters - FlightGlobal
    Aug 20, 2025 · New Delhi gave final approval for the purchase of 97 HAL-built Tejas Mk1A combat jets on 19 August, an order valued at roughly Rs620 billion ($ ...
  79. [79]
    Why IAF Chief Wants LCA Tejas Mk1A Orders Moved to Mk2
    Oct 4, 2025 · IAF Chief AP Singh hinted that future orders for the Light Combat Aircraft (LCA) could shift toward the more capable Tejas Mk2.
  80. [80]
    HAL Sets Accelerated Timeline for Tejas Mk2 with 2026 First Flight ...
    May 25, 2025 · The company aims for the aircraft's first flight to occur in the first quarter of 2026, between April and July. Series production is planned to start by 2029.HAL to Deliver 120 Tejas MkII Jets to IAF by 2036Tejas Mk2 Fighter Jets Expected for Indian Air Force by 2029More results from defence.in
  81. [81]
    Mystery deepens over India's rush to buy untested Tejas jets
    Sep 28, 2025 · While the HAL is for imported (Israel's) radar and electronic warfare systems, the DRDO is insisting on its “Uttam” radar and “Swayam Raksha ...
  82. [82]
    With MiG-21 exit, India's squadron strength hits 6-decade low
    Sep 26, 2025 · The IAF is expected to go in for multiple squadrons of the Tejas MK2, even though it has already committed to seven squadrons. (Edited by ...<|separator|>
  83. [83]
    IAF Chief AP Singh Endorses LCA Mk2 as 'Extension of Mk1A'
    Oct 4, 2025 · Singh's optimism arrives amid scrutiny over Tejas timelines. While the Mk1A program—83 jets at ?48,000 crore—has delivered 31 units by Q3 2025, ...
  84. [84]
    HAL Anticipates 200+ Tejas Mk2 Order from IAF, Promising 30 Units ...
    Aug 24, 2025 · The development of the Tejas Mk2 is progressing steadily, with the aircraft's first flight anticipated by 2027 and the commencement of series ...
  85. [85]
    IAF Eyes More Rafale and Tejas Mk1A to Maintain Air Superiority ...
    Sep 30, 2025 · A significant challenge for the IAF is its current squadron numbers, which stand at around 31, well below the sanctioned strength of 42 required ...
  86. [86]
    Analysis - How Tejas Mk2 Could Have Restored IAF Squadron More ...
    Sep 21, 2025 · Even if sanctioned today the Tejas mk2 will take around 10 years to begin induction and another 10 to be fully inducted in numbers if there are ...
  87. [87]
    HAL's Tejas vs Global Fighters: How Competitive is India's ...
    Feb 5, 2025 · The Tejas Mk1A uses the EL/M-2052 AESA radar, giving it an advantage over older mechanically scanned radars. Future Tejas versions may use the ...
  88. [88]
    'Tejas Mk2 export potential': Which countries could buy India's next ...
    Aug 2, 2025 · The Philippines and Indonesia have both shown interest in Indian-made platforms. Negotiations for Tejas exports are in exploratory phases, ...
  89. [89]
    Tejas Mk2 Prototype 2026: HAL Confirms Second Build
    Jun 18, 2025 · Tailless delta, Canard-delta. Radar, AESA (imported), Uttam AESA (indigenous). Indigenous Content, ~60%, 70%+ (target 85–90%). The Mk-2 is a ...Missing: SSR | Show results with:SSR
  90. [90]
    Tejas Mk-2 Cannot Afford Supply Chain Disruptions, India Must ...
    Jul 7, 2025 · Tejas Mk-2 faces engine supply concerns, with potential delays and critical operational repercussions. India should explore alternatives from ...
  91. [91]
    'Export Restrictions': Why India's HAL Tejas Fighter Jets, Despite No ...
    Sep 30, 2021 · The dependence on foreign components means that India can not independently export its Tejas fighter jet to any country. The countries which ...<|control11|><|separator|>
  92. [92]
  93. [93]
    India's Tejas vs Pakistan's JF-17 in low-cost fighter showdown
    Apr 3, 2024 · The Warzone mentions that the Tejas Mk 2 is now being planned ... cost US$37.8 million per Mk 1A unit. Significantly, the first batch ...
  94. [94]
    HAL Tejas - Wikipedia
    The IAF plans to procure at least 324 aircraft or 18 squadrons of Tejas in all variants, including the heavier Tejas Mark 2 which is currently being developed.Timeline of HAL Tejas · Tejas Mk2 · Sulur Air Force Station · Naliya Air Force Station
  95. [95]
    Delays and Progress: A Complete Timeline of LCA Tejas Development
    May 30, 2025 · New Delhi: Speaking at the CII Summit 2025 in New Delhi, the Chief of Air Staff said, “Timeline is a big issue. · Here is the Timeline of HAL ...
  96. [96]
    Tejas MkII Prototype Rollout Slips to Mid-2026 - Idrw.org
    Oct 4, 2025 · HAL Chairman D.K. Sunil recently corroborated a similar timeline in August 2025, stating that the prototype rollout is now eyed for late ...
  97. [97]
    Can HAL deliver on its promises? - Forbes India
    Mar 19, 2025 · Hindustan Aeronautics Limited has failed to deliver the Tejas aircraft to the Indian Air Force. Will better supply chain management and private sector ...
  98. [98]
    IAF chief flags delays: We sign contracts despite knowing it won't ...
    May 29, 2025 · Speaking at the CII Annual Business Summit 2025, the Air Force Chief admitted that "timeline is a big issue." His remarks came nearly three ...<|separator|>
  99. [99]
    IAF Chief Slams HAL Over Tejas Mk1A Delays | Aero India 2025
    Feb 12, 2025 · At Aero India 2025, Chief of the Air Staff, Air Chief Marshal AP Singh, publicly criticized Hindustan Aeronautics Limited (HAL) for failing ...
  100. [100]
    Tejas Mk2 Delayed again. Rollout in 2026. First Flight in 2027 - Reddit
    Sep 5, 2025 · Quick guidelines before venting: Mk1A is HAL's project, while Tejas Mk2 is a DRDO (ADA) project. Two different agencies, two different roles ...
  101. [101]
    HAL to develop LCA-Mk2 at a total cost of Rs 9000 crore
    Sep 5, 2022 · The CCS has approved Rs 6,500 crore to design and build prototypes, test flights, and certification for the Tejas Mk2 fighter jet. ... According ...
  102. [102]
    Tejas Mk 2 languishes amid lack of funds - Janes
    May 10, 2023 · India's Light Combat Aircraft (LCA) Tejas Mk 2 programme is languishing without funding, months after the project was approved by New Delhi.
  103. [103]
    India Needs to Fix Its Indigenous Fighter Before Building Stealth ...
    Aug 10, 2022 · Here it is crucial that the Tejas Mark II meets the IAF's requirements and enters service in a timely manner. India should also look to ...Missing: content 70% canard- delta SSR
  104. [104]
    Cost of LCA Tejas Mk2 likely to shoot up? Here's the reason
    Dec 31, 2024 · After failing to supply GE-404 engines on time for Tejas Mk1A, it now emerges that the price for GE-414 engines for LCA Mk2 will go up, leading to increased ...
  105. [105]
    Cost of LCA Mark 2 jet project may rise due to likely engine price hike
    Dec 31, 2024 · Cost of LCA Mark 2 jet project may rise due to likely engine price hike: Sources. India has plans to buy around 200 LCA Mark 1A fighter jets ...
  106. [106]
    No Funding Crunch, India's LCA Tejas MK2 'In A Limbo' Over ToT ...
    May 14, 2023 · “So there has been no crunch of funds, but the issue which has stalled the project is 100 percent Transfer of Technology (TOT) of the GE 414 ...Missing: overruns | Show results with:overruns
  107. [107]
    India's Fighter Engine Gamble: Will the Twin Deals With France and ...
    Aug 25, 2025 · Alongside, the USD 1.5-2 billion GE-HAL deal to licence-produce F-414 engines – cleared by both governments in mid-2023 – remains stalled over ...
  108. [108]
    India's Jet Engine Push: HAL-GE Talks For Tejas Mk2 Near Closure ...
    Aug 24, 2025 · The HAL-GE pact, therefore, is seen as a landmark, though delays risk affecting timelines for the LCA Mk2 project, a key element in ...Missing: dependency | Show results with:dependency
  109. [109]
    Should India Consider French or Russian Engine for Tejas Mk2 and ...
    Aug 19, 2025 · The agreement involves the co-production of F-414 jet engines in India and includes an unprecedented 80% transfer of technology (ToT). This ...Should India Drop F414 Engine Choice for Tejas Mk2 and Choose ...Urgent Calls for Kaveri 2.0 Intensify as Tariff Threats Exposes India's ...More results from defence.in
  110. [110]
    'Critically Dependent' On U.S. Tech, How IAF Missed Out On Made ...
    Feb 17, 2025 · In 2023, HAL and GE signed a MoU for the co-production of 99 GE-F414 INS6 engines for the Tejas Mk2. These same engines will also power the ...
  111. [111]
    LCA Tejas Mk-2: A Cost-Effective Indigenous Fighter Designed for ...
    Sep 24, 2025 · Unlike imported fighters, which often come with high procurement costs, complex maintenance requirements, and dependency on foreign supply ...
  112. [112]
    DRDO's Bold Claim: Tejas Mk-2 to Match Rafale, but Will It Surpass It?
    Jul 11, 2025 · DRDO has claimed that the HAL Tejas Mk-2, India's next-generation light combat aircraft, will match the capabilities of the French Rafale.
  113. [113]
    India Should Have Ordered Tejas Mk2 Over 97 Additional Tejas ...
    Aug 22, 2025 · India Should Have Ordered Tejas Mk2 Over 97 Additional Tejas Mk1A for Long-Term Operational Needs, Asserts Ex-IAF Chief · The Superior ...
  114. [114]
    Tejas MkII vs. Rafale: Could India's Indigenous Fighter Have Filled ...
    Sep 16, 2025 · With an estimated unit cost of $70-80 million, the Tejas MkII could theoretically allow India to procure two aircraft for the price of one ...
  115. [115]
    Tejas MkII: India's 'Mini-Rafale' Poised to Outperform MiG-29UPG ...
    Sep 30, 2025 · Avionics-wise, the jet matches the Rafale's open-architecture mission computers and sensor fusion, integrating data from IRST, EW suites, and ...
  116. [116]
    India's plan for advanced fighters: LCA Mark2 by 2029, AMCA by 2035
    Aug 11, 2024 · In a significant boost to India's indigenous fighter aircraft program, 4.5 generation plus LCA Mark 2 fighter jets are slated to commence ...