Interislander

Interislander is a state-owned service operating roll-on/roll-off vessels across New Zealand's , connecting in the to Picton in the . It provides daily passenger, vehicle, and freight transport, with crossings taking approximately 3.5 hours over 92 kilometers, and has been the primary link between the islands since introducing the first purpose-built and , Aramoana, in 1962. Owned and managed by , a New Zealand , Interislander maintains a fleet including Kaiārahi and Kaitaki, which together complete around 4,000 crossings annually, supporting national connectivity by extending State Highway 1 and the Main Trunk Railway. The service evolved from earlier passenger operations dating to 1875 under the Union Steamship Company, transitioning to integrated rail ferries essential for freight valued at up to NZ$14 billion yearly. While praised for scenic voyages and reliability in challenging conditions, the operation has faced scrutiny over aging and occasional disruptions, prompting fleet modernization efforts.

Overview

Service Description and Route

Interislander provides roll-on/roll-off ferry services across , linking in New Zealand's to Picton in the , and functions as an essential extension of State Highway 1 for road vehicles and the railway line for freight wagons. The service accommodates passengers, cars, trucks, and rail cargo, with vessels equipped for seamless loading and unloading to minimize delays. Daily operations include multiple crossings in each direction, typically featuring three to four passenger-oriented sailings plus occasional overnight freight runs, though schedules vary seasonally and are subject to weather disruptions common in the strait. The route covers approximately 92 kilometers (57 miles) of open water, with the journey duration averaging 3.5 hours under normal conditions, though adverse weather such as high swells or strong winds—frequent in due to its position between the and —can extend travel time or lead to cancellations. Departures from Wellington's Aotea Quay terminal head southeast into the strait, navigating turbulent waters before entering Queen Charlotte Sound toward Picton, where arrivals occur at the waterfront terminal adjacent to the town's railway station. The reverse route from Picton follows a northwest trajectory, offering views of ' forested islands before reaching .
This inter-island link supports an estimated 750,000 passengers and over 1 million vehicles annually, underscoring its role in national connectivity despite competition from rival operator Bluebridge on the same route. Operational capacity per vessel varies by ship, with current fleet members like Kaitaki handling up to 1,600 passengers and 650 vehicles simultaneously, prioritizing rail-enabled to integrate with KiwiRail's broader .

Strategic and Logistical Role

The Interislander ferry service serves as the sole provider of rail-enabled crossings across Cook Strait, linking New Zealand's national rail network between the North and South Islands and enabling the seamless transport of freight trains, which constitutes 100% of inter-island rail volume. This capability is essential for maintaining integrated supply chains, as rail wagons loaded with goods such as logs, containers, and bulk commodities can roll on and off without transshipment, reducing handling costs and delays compared to road-only alternatives. By contrast, competing services like Bluebridge lack rail facilities, making Interislander indispensable for KiwiRail's freight operations, which rely on this link to serve regional economies dependent on bulk exports from the South Island. Logistically, Interislander handles approximately 40% of road freight volumes across the , alongside 70% of total passenger traffic, underscoring its dominance in both commercial trucking and personal travel. Annually, the service operates around 3,800 voyages, transporting about 850,000 passengers, 250,000 vehicles, and freight valued at up to NZ$14 billion, including 73,000 trucks in recent years. This volume supports critical sectors like , , and , where disruptions—such as those from vessel groundings or maintenance—have historically caused nationwide shortages, highlighting the service's role as a single point of vulnerability in the national backbone. Strategically, Interislander bolsters New Zealand's economic cohesion by integrating state highways and infrastructure, facilitating the movement of equivalent to a significant portion of the country's GDP contribution from inter-island . assessments emphasize its contribution to secure supply chains and regional , with from freight and passengers reaching NZ$158.3 million in the 2024 financial year, reflecting operational resilience amid aging fleet challenges. As a state-owned asset under , it prioritizes national interests over pure commercial viability, ensuring continuity for essential services despite periodic calls for privatization, which could undermine integration.

History

Passenger ferry services across Cook Strait between Wellington and Picton commenced in 1875, operated by the Union Steam Ship Company of New Zealand, providing a weekly connection that evolved into more frequent sailings as demand grew. These early vessels were conventional steamships designed primarily for passengers and general cargo, navigating the challenging 22-kilometer-wide strait prone to severe weather. The service filled a critical gap in national connectivity, as the North and South Islands' rail networks remained effectively isolated without direct wagon transport, forcing rail freight to be unloaded at ports, shipped as break-bulk cargo, and reloaded onto trains at the destination. By the mid-1920s, the dedicated ferry Tamahine, built in 1925 by in the specifically for the Wellington–Picton route, became the primary vessel under Union Steam Ship Company operation. Measuring approximately 100 meters in length with capacity for around 500 passengers, Tamahine averaged six crossings per week, accumulating an estimated 15,000 voyages over its 37-year service until August 1962. In its final year of 1961, it transported 60,000 passengers and 11,000 cars, alongside limited freight, but lacked facilities for rolling on railway wagons, perpetuating inefficiencies in inter-island rail-dependent logistics. The Railways Department (NZR) did not directly operate ferries during this period, instead relying on commercial shipping arrangements for transshipping rail goods, which hampered competition with coastal shipping and road alternatives. This separation meant the system functioned as two disjointed networks, with acting as a logistical bottleneck that restricted unified freight flows and economic integration between islands until the advent of purpose-built rail ferries. Despite these constraints, the pre-1962 services sustained essential passenger mobility and cargo movement, underscoring the strait's enduring role in 's transport infrastructure.

Establishment of Roll-On/Roll-Off Service (1962–1980s)

The New Zealand Railways Department established roll-on/roll-off (ro-ro) ferry service across Cook Strait in 1962 with the introduction of the GMV Aramoana, the country's first vessel capable of transporting both road vehicles and rail wagons without transshipment. Built by William Denny and Brothers in Dumbarton, Scotland, Aramoana commenced its maiden voyage from Wellington to Picton on 13 August 1962, effectively extending State Highway 1 and the North Island Main Trunk railway line to the South Island. This innovation followed a 1958 report by the Cook Strait Transport Inquiry Committee recommending a combined rail-road ferry to address inefficiencies in prior cargo handling methods. Aramoana's ro-ro design allowed cars, trucks, passengers, and rail freight to load and unload efficiently, transforming inter-island connectivity. In its inaugural year, the ferry carried 207,000 passengers, 46,000 cars, and 181,000 tonnes of cargo, significantly boosting between the islands. The service, initially known as the Inter-Island Rail and Road Service, operated under Railways, providing seamless continuity and competing effectively with existing passenger steamers. To accommodate rising demand through the and , the fleet expanded with the addition of Aranui in 1966, a 4,500-ton to Aramoana launched for similar ro-ro operations. Further reinforcements included Arahanga in 1972, dedicated primarily to freight, and Aratika in 1974, enhancing capacity for both rail and road traffic. By the early , Aramoana had completed over two decades of service before its withdrawal in 1983, by which time the ro-ro system had become indispensable for New Zealand's domestic transport network.

Transition to Privatization and Back to State Ownership (1990s–2000s)

In 1993, the New Zealand National government privatized the state-owned New Zealand Rail Limited, including its Interislander ferry operations, as part of neoliberal economic reforms aimed at reducing public expenditure and improving efficiency. The assets were sold to a consortium led by U.S.-based Wisconsin Central Transportation Corporation for approximately NZ$400 million, rebranding the entity as Tranz Rail Holdings Limited by 1995. This marked the first private ownership of the Cook Strait rail ferry service since its establishment in 1962. Under Tranz Rail, Interislander focused on fleet enhancements to handle growing freight and passenger demands. In 1999, the company introduced the rail-enabled Aratere, a diesel-electric vessel built in , to replace aging ships and increase capacity for wagons and vehicles across the . Despite these investments, private operators faced operational challenges, including labor disputes and maintenance issues, amid criticisms of underinvestment in infrastructure relative to state-era standards. Tranz Rail was acquired by Australian logistics firm Holdings in June for NZ$1 in equity plus assumption of NZ$1.4 billion in debt, integrating Interislander into Toll's broader transport portfolio. Toll maintained services but prioritized profitability, leading to tensions over track access fees and asset maintenance with the government-owned infrastructure entity. By 2008, facing unsustainable losses and strategic divestments, Toll agreed to sell its New Zealand , intercity passenger, urban , and businesses back to the government for NZ$665 million. The transaction, completed on 1 July 2008, transferred Interislander to the newly formed , restoring full public ownership to ensure long-term strategic continuity for national connectivity.

Operational Challenges and Fleet Aging (2010s–Present)

The Interislander fleet, comprising vessels built in the —Aratere (1998), Kaitaki (1994), and Kaiarahi (acquired 2017 but originally built 1998)—has faced escalating mechanical failures attributable to structural fatigue and outdated systems, resulting in diminished reliability on the Wellington-Picton route. By the mid-2010s, routine operations were intermittently disrupted by propulsion and steering malfunctions, with acknowledging that the ships' age exceeded typical design lifespans for high-intensity conditions, including strong currents and frequent docking stresses. Operational challenges intensified from 2023 onward, marked by high-profile incidents that exposed vulnerabilities in , generation, and integrity. On June 21, 2024, Aratere ran aground in Titoko Bay near Picton due to a steering failure while departing for , causing minor damage but no injuries; this followed a breakdown in the earlier that year. Kaitaki experienced a catastrophic loss on June 14, 2023, leaving over 800 passengers adrift for hours in rough seas, prompting Maritime New Zealand to charge with inadequate maintenance under the Health and Safety at Work Act. Gearbox failures sidelined Kaitaki again in March 2024, reducing the fleet to two operational vessels and forcing cancellations that affected thousands of bookings. These events contributed to a pattern of delays, with Interislander services operating at reduced capacity—sometimes as low as one passenger ferry—exacerbating strains for freight across the islands. Efforts to address fleet aging through replacement have been hampered by project delays, cost escalations, and political shifts. KiwiRail's iReX initiative, launched in 2017 to procure two rail-enabled mega-ferries, collapsed in after the National-led government canceled a $1.4 billion contract with South Korea's Mipo Dockyard due to design flaws, infrastructure mismatches, and ballooning expenses exceeding initial estimates by over 50%; a $144 million settlement was paid to terminate the deal. As of October 2025, a revised plan targets delivery of two new ferries by 2029 from an undisclosed , necessitating Aratere's retirement by August 2025 to facilitate Picton port upgrades, though this will temporarily eliminate rail-on-ferry capacity, forcing reliance on road-trucking workarounds for freight. Independent assessments indicate the existing fleet could persist until 2029 with rigorous maintenance, but ongoing audits highlight risks of "catastrophic" disruptions from compounded aging effects.

Operations

Daily Routines and Capacity

The Interislander service conducts up to 16 sailings per day across , comprising eight in each direction between and Picton, including dedicated nighttime freight crossings that carry minimal passengers. These routines encompass loading of wagons, trucks, cars, and passengers at both terminals, with turnarounds optimized for efficiency despite and constraints; daytime sailings prioritize passenger comfort, while overnight operations focus on high-volume freight to minimize disruptions to national supply chains. Each crossing spans approximately 92 kilometers and lasts 3 to 3.5 hours, subject to real-time adjustments for sea conditions reported via onboard monitoring and port coordination. Annual throughput underscores operational scale, with roughly 850,000 passengers, 250,000 cars, and freight valued at NZ$14 billion transported yearly, translating to averages of over 2,300 passengers and substantial vehicle/freight volumes daily across sailings. Peak daily sailings reach 12, as reported by , enabling rail-enabled capacity for up to 160 wagons per direction on enhanced routes, though actual utilization varies with demand and vessel availability. The primary vessels, and , provide core capacity: Kaitaki accommodates 1,000 passengers, 1,780 lane meters of freight, and 600 cars per voyage, while Kaiarahi supports around 550 passengers with comparable but scaled-down freight holds, allowing rotational use to sustain routine throughput amid maintenance cycles. Disruptions from mechanical issues or weather can reduce effective daily capacity, as evidenced by reliability impacts in 2024.

Infrastructure and Terminals

The Interislander ferry service utilizes dedicated terminals at Kaiwharawhara in on the and Waitohi in Picton on the , facilitating roll-on/roll-off operations for passengers, vehicles, and freight across . In , the vehicle check-in terminal is situated on Lagoon Road, accessible via State Highway 1, with facilities designed to handle commercial vehicles, cars, and wagons; check-in closes 60 minutes prior to departure. Foot passengers check in separately at the terminal on Auckland Street, approximately a short walk from the vehicle area, supporting seamless integration with road and networks. Picton's terminal mirrors this setup, with vehicle check-in on Lagoon Road via Kent Street and foot passenger access on Auckland Street, enabling efficient loading onto rail-enabled ferries. The infrastructure encompasses wharves, linkspans, and berthing facilities owned partly by and partly by port authorities such as CentrePort and Port Marlborough, with rail connections linking directly to New Zealand's national rail network for freight continuity. These terminals support daily sailings, accommodating up to several thousand passengers and hundreds of vehicles per crossing, though capacity is constrained by aging structures requiring modern safety enhancements. As part of the Interislander replacement project, significant upgrades are underway to align with new rail-capable ferries entering in 2029. In Picton, Port Marlborough is constructing a new featuring a dual-level and double loading lanes to accelerate vehicle and offloading, with initial works on the existing Aratere wharf scheduled between October 2025 and March 2026 to prevent disruptions. Wellington's facilities will undergo complementary upgrades, reusing current passenger and commercial vehicle terminals while enhancing resilience and interfaces. These developments, agreed upon by and port entities in July 2025, aim to address longstanding decay and seismic vulnerabilities, ensuring operational reliability for an estimated 800,000 annual passengers and critical freight volumes.

Safety Protocols and Environmental Considerations

Interislander vessels adhere to the International Safety Management (ISM) Code under the , implementing a comprehensive that encompasses , crew training, maintenance schedules, and emergency response procedures tailored to the challenging conditions of crossings. Maritime New Zealand conducts mandatory audits, verifying shore-side compliance annually and vessel-specific adherence at intervals prescribed by the ISM Code, including inspections of design, construction, and operational rules under Maritime Rule Part 40B. Protocols include mandatory declarations for transported aboard, requiring submission at least four hours prior to departure for loads exceeding approved limits, with stowage guidelines outlined in KiwiRail's Freight Handling Code to prevent hazards during roll-on/roll-off operations. Following incidents such as propulsion failures, KiwiRail has intensified monitoring of safety-critical equipment like engines and electrical systems, though aging fleet infrastructure has prompted Maritime NZ enforcement actions for lapses in system implementation on older vessels. Environmental considerations for Interislander operations focus on mitigating emissions and impacts amid reliance on , which contributes significantly to in port areas like Picton, where studies identified ferries as the primary source of elevated and levels during a 14-month period from 2019 to 2021. KiwiRail's overarching strategy integrates Interislander efforts toward net-zero carbon by 2050, including trials of cleaner fuels such as (FOE) in 2015, which reduced harmful particulates and improved handling safety compared to standard . Current vessels consume 6.5 to 8 tonnes of fuel per crossing, exacerbating the service's , estimated at levels necessitating a 40% reduction through planned rail-enabled replacements with hybrid electric systems for zero-emission port maneuvers and enhanced efficiency at sea. Operations also align with Annex VI of MARPOL for controls, though delays in fleet renewal have hindered progress on broader emissions intensity targets, such as KiwiRail's 46% improvement in rail-related metrics by 2035.

Fleet

Current Vessels

As of October 2025, Interislander's operating fleet comprises two roll-on/roll-off ferries: Kaitaki and Kaiārahi, which provide passenger, vehicle, and freight services across between and Picton. This follows the retirement of Aratere on 18 August 2025, after its final scheduled departure from Picton at 11:00 a.m. that day. The pair handles approximately 4,000 crossings annually, transporting nearly 800,000 passengers and 250,000 vehicles per year. Kaitaki, meaning "challenger" in te reo Māori, has served as Interislander's largest vessel since joining the fleet in 2005. It accommodates up to 1,400 passengers and offers 1,780 lane metres of vehicle deck space, equivalent to around 600 cars, along with capacity for rail wagons. Amenities include cabins, lounges, and features such as lifts and ramps. Kaiārahi, meaning "leader" or "guardian" in te reo Māori, was introduced to the fleet on a long-term basis starting in 2021 to support operations amid aging vessel challenges. Built in 1998 and sailing under the flag, it carries up to 550 passengers and provides about 1,900 lane metres for vehicles, including options for 525 cars or combinations of trucks and trailers. Like Kaitaki, it supports rail-enabled freight and features passenger facilities with lifts for . Both vessels are integral to maintaining service continuity pending the arrival of two new ferries, expected around , each designed for 1,500 passengers and enhanced freight capacity. However, the current fleet's age and past reliability issues have prompted ongoing safety and maintenance scrutiny.

Historical Vessels and Decommissioning

The Interislander service initially relied on a series of roll-on/roll-off ferries introduced from the 1960s onward to handle increasing freight and passenger volumes across . These vessels, prefixed with "Ara" in denoting a or way, formed the backbone of the fleet until the late , when aging and challenges prompted their sequential retirements. Decommissioning decisions were driven by factors including structural fatigue, inability to accommodate modern gauges and loads, escalating repair costs, and the need for upgrades to support newer replacements. The inaugural vessel, Aramoana, entered service on 13 August 1962 as New Zealand's first purpose-built roll-on/roll-off rail ferry, capable of carrying 650 passengers, 150 cars, and 24 railway wagons. Built by William Denny & Brothers in Dumbarton, Scotland, it revolutionized inter-island connectivity by enabling seamless rail and road transport. Aramoana was withdrawn from service in 1983 following the arrival of the larger Arahura, after completing over 20 years of operations marred by occasional mechanical issues but credited with handling peak loads during economic booms. Subsequent additions included Aranui in 1965, which supplemented Aramoana with capacity for 500 passengers and similar vehicle/rail loads; it underwent a major refit in Singapore in 1977 but was decommissioned in June 1984 due to wear from heavy use and fleet modernization. Arahanga, introduced in 1972 as a freight-focused ferry, operated until 2001, when it was retired amid shifts toward larger passenger-rail hybrids, with its role temporarily filled by chartered vessels. Aratika, commissioned in 1974, provided passenger and vehicle services until 1999, replaced by the more efficient Aratere as part of a privatization-era fleet refresh under Tranz Rail.
VesselEntered ServiceDecommissionedKey Reasons for Decommissioning
19621983Replaced by larger Arahura; end of design life after 21 years.
Aranui19651984Fleet expansion needs; structural aging post-refit.
Arahanga19722001Shift to integrated passenger-rail vessels; maintenance costs.
Aratika19741999Inefficiency versus newbuilds; privatization-driven upgrades.
Arahura1983July 2015Unable to meet growing freight demands; high operational costs exceeding NZ$10 million annually in later years.
Aratere199918 August 2025Port redevelopment requirements; cumulative incidents including groundings and propulsion failures; sold for recycling in .
The Arahura, built in and serving as the fleet for over three decades, was particularly noted for its reliability despite Cook Strait's harsh conditions, carrying billions of tonnes of freight before retirement due to incompatible dimensions with upgraded terminals and seismic standards. Similarly, Aratere, constructed in and lengthened in 2011 to boost capacity to 1,000 passengers and 450 lane meters, faced frequent breakdowns—costing over NZ$50 million in repairs since 2016—leading to its early withdrawal to facilitate Picton harbor expansions for incoming ferries. Post-decommissioning, many vessels were scrapped or repurposed, with artifacts like Arahura's bell gifted to , reflecting cultural significance.

Economic and Strategic Impact

Contribution to National Freight and Connectivity

The Interislander ferry service facilitates the transport of substantial freight volumes across , connecting New Zealand's North and South Islands and enabling the continuity of the and road networks. In the financial year ending June 2024, it carried 1.2 million lane metres of freight through 3,374 sailings, representing a 5% decline from the previous year due to losses and economic conditions. This service supports the movement of up to $14 billion worth of freight annually, including trucks, containers, and rail wagons, as part of the premium domestic route from to . By accommodating rail-enabled vessels, Interislander integrates with KiwiRail's broader freight operations, which handle 17 million tonnes annually and account for 13% of New Zealand's total freight task measured in net tonne-kilometres (NTKs). Approximately 4% of rail freight crossing relies on specialised rail wagons, underscoring the service's role in maintaining a unified network rather than fragmenting it into island-specific systems. Without this link, freight would shift disproportionately to via competing ferries or alternative routes, increasing reliance on trucking, which dominates 93% of domestic freight by tonnage. Interislander's operations enhance national connectivity by bridging State Highway 1 and the Main Trunk Line, supporting efficient logistics for exports and imports that constitute 18% of rail-handled volumes. This reduces road congestion equivalent to avoiding 1 million truck trips yearly across the combined rail system and lowers emissions by 229,000 tonnes of CO2 equivalent in FY24. Projections indicate freight demand across will grow over 40% by 2052, amplifying the service's strategic importance amid rising national tonnage requirements.

Quantifiable Costs of Disruptions

The January 2023 propulsion failure of the , which stranded over 800 passengers and crew for several hours south of , incurred direct costs to estimated at $20–30 million, encompassing repairs, towing, passenger accommodations, and operational disruptions. This incident stemmed from a failed rubber in the , overdue for replacement, highlighting shortfalls in the aging fleet. Subsequent regulatory penalties for the Kaitaki event and related failures added to financial burdens; KiwiRail was fined approximately NZ$440,000 (equivalent to ) in September 2024 for breaches in safety management following a separate 2023 propulsion loss. Similarly, the June 2024 grounding of the DEV Aratere near Picton, caused by a malfunction, prompted Maritime New Zealand charges against KiwiRail, with potential fines up to $2 million under maritime safety laws, alongside undisclosed repair and salvage expenses that contributed to the vessel's eventual retirement. Disruptions have ripple effects on freight , where annual cargo value across exceeds $15–20 billion, including time-sensitive perishable goods and wagons; from mechanical issues, such as those in 2021–2022, force trucking alternatives, idle labor, and bottlenecks, with freight operators reporting unquantified but ongoing losses from stranded drivers and accelerated spoilage. Service reliability declined from 99% in 2018 to 79% in the 2022 financial year, correlating with increased cancellations that exacerbate these economic pressures without comprehensive public tallies of indirect losses like elevated road freight emissions or regional business halts. Passenger claims under the Consumer Guarantees Act have yielded additional payouts; for instance, individuals affected by 2023–2025 breakdowns received reimbursements for alternative flights, hotels, and lost wages, with one case compensating $1,600 in out-of-pocket expenses and others covering multiple domestic flights per rulings. While direct incident costs are documented sporadically, the aging fleet's propensity for failures—exemplified by the December 2019 Kaitaki issue delaying 528 passengers and disrupting subsequent sailings—amplifies cumulative strain on KiwiRail's operations, indirectly fueling escalated maintenance projections from $33 million annually in 2021 to $65 million by 2025–2030 to mitigate further breakdowns.

Debates on Public vs. Private Operation

The over versus operation of Interislander services has intensified amid chronic reliability issues, cost overruns in fleet replacement efforts, and the strategic importance of the crossing for New Zealand's national freight and connectivity. Operated by state-owned since its inception in 1962, Interislander has faced criticism for inefficiencies under management, exemplified by the iReX project, which ballooned from an initial $1.8 billion estimate to over $3 billion including terminal upgrades before its cancellation by the National-led government in December 2023. Proponents of argue that fosters bureaucratic inertia and poor financial discipline, as evidenced by repeated delays and budget escalations that operators might mitigate through incentives. Advocates for private involvement, including the New Zealand Taxpayers' Union, cite a July 2024 Curia poll showing 41% of respondents supporting a sale to a private operator, compared to 32% favoring continued public control, attributing public support to frustration with taxpayer-funded failures. They contend that private entities could introduce innovation and cost controls, drawing parallels to the competitive pressures exerted by private rival Bluebridge, which has operated profitably on the route since 2003 without rail-enabled vessels. The Ministerial Advisory Group, reporting in July 2024, recommended detaching ferry operations from KiwiRail into a new state-owned enterprise and exploring private sector partnerships to avoid repeating past mismanagement. Opponents, including the of New Zealand, warn that risks underinvestment in safety and maintenance to prioritize profits, potentially echoing the 1990s 's infrastructure rundown that necessitated renationalization. A January 2025 Horizons Research poll found 52% of Kiwis preferring retention over operation, emphasizing the route's monopoly-like status and obligations, such as freight integration vital for national . Critics highlight that models could divert profits and elevate freight costs without guaranteed levels, especially given the crossing's exposure to weather disruptions. Government responses have balanced caution with openness; in June 2025, Rail Minister acknowledged part-privatization possibilities but expressed reluctance, while the December 2024 plan established a entity for , explicitly inviting bids for two smaller rail-enabled ferries by 2029. This approach reflects empirical lessons from iReX's public-sector pitfalls while prioritizing state oversight for a asset, though full remains politically contentious amid ongoing disruptions costing millions daily in lost productivity.

Controversies and Criticisms

Major Incidents and Safety Failures

On 28 2023, the Interislander Kaitaki experienced a complete of south of while carrying over 800 passengers and crew, caused by the failure of a rubber in its system that was 18 years old and had exceeded its recommended service life by more than five years. The component, costing approximately NZ$300–500, failed due to inadequate maintenance and inspection protocols, leading to a shutdown of all four main engines to prevent further damage. Power was restored after about two hours with interventions, and the vessel was escorted to port by tugs, but the incident prompted a call and highlighted deficiencies in the aging fleet's reliability. pleaded guilty to charges under the Health and at Work Act and was fined NZ$412,500 in September 2024 for failing to ensure the of those on board. The Aratere ferry grounded north of Picton on 21 June 2024 during a Picton-to-Wellington voyage with 47 people aboard, resulting from a error in disengaging the —a 36-second misconfiguration that prevented manual steering control. No serious injuries occurred, but the incident exposed gaps in and procedural familiarity with the vessel's systems, particularly following recent . An interim factual report by the Transport Accident Investigation Commission (TAIC) in October 2024 detailed the sequence, noting the grounding's avoidability through better operational knowledge. Maritime filed two charges against in June 2025 under health and safety legislation for failures to protect passengers and during the event. Earlier incidents underscore recurring safety challenges with the fleet. In March 2006, heavy weather on Aratere caused and vehicle cargo to shift, injuring four passengers and one crew member minorly. On 12 November 2022, Kaiarahi sustained hull damage, including a 1-meter hole, during berthing in due to navigational error. These events, combined with propulsion and engine issues on Kaitaki involving outdated parts, reflect systemic maintenance and operational shortcomings in KiwiRail's oversight of the aging vessels.

Fleet Replacement Debates and Cancellations

The iReX project, initiated by in 2020, aimed to replace Interislander’s aging fleet with two new rail-enabled ferries capable of handling conditions, alongside landside infrastructure upgrades including new terminals at and Picton. Originally estimated at around NZ$1.4 billion total (with NZ$885 million for the ferries), costs escalated due to design changes for enhanced safety, environmental compliance, and rail freight capacity, reaching NZ$3 billion by late 2023. A for the ferries was awarded to ’s Mipo Dockyard in July 2021, but debates intensified over the project’s scope, including the shift to larger vessels requiring extensive port modifications—such as and berth extensions—that critics argued inflated expenses unnecessarily. Proponents, including and rail unions, emphasized the strategic imperative of rail-enabled ferries to maintain seamless North-South Island freight links, warning that non-rail alternatives would disrupt supply chains and increase reliance. Opponents, particularly fiscal conservatives, questioned the value for money, citing mismanagement and over-specification amid repeated fleet breakdowns like the 2023 Kaitaki , which underscored urgency but also highlighted risks of delay-driven cost overruns. In December 2023, the incoming coalition government declined ’s request for additional funding, effectively canceling the project as stated it could not proceed independently. The decision was justified by the unsustainable budget blowout and perceived flaws in under the prior administration, though documents released in May 2024 revealed internal concerns over design feasibility predating the cancellation. Settlement negotiations with concluded in August 2025 with a NZ$144 million payment to terminate the , bringing total iReX expenditures to NZ$671 million—including NZ$222 million to the shipyard and NZ$449 million on partially completed infrastructure like terminal works. Post-cancellation debates focused on sunk costs versus long-term reliability, with unions and opposition figures claiming the move could add NZ$500 million in indirect expenses from ongoing fleet disruptions, while government supporters argued it averted further fiscal waste and enabled a more pragmatic replacement path. A July 2024 independent assessment by affirmed the existing fleet’s interim viability but reinforced the need for replacements, fueling arguments for rail integration in future procurements. By October 2025, a new process under Ferry Holdings Limited selected China’s Shipyard International to build two rail-enabled ferries for delivery around 2029, at a reported lower cost than iReX, though exact figures remain undisclosed amid ongoing evaluations of retained .

Efficiency and Cost Management Issues

The ageing Interislander fleet has driven escalating maintenance expenses, with projected annual costs nearly doubling to NZ$65 million by 2025 due to the vessels' and frequent mechanical demands. These outlays stem from reactive repairs on ships averaging over 30 years old, exacerbating operational disruptions such as failures and groundings that necessitate unscheduled and regulatory fines, including a NZ$412,500 penalty for the Kaitaki's 2023 engine shutdown. Operational inefficiencies compound these costs, including suboptimal vehicle deck utilization on rail-enabled ferries, where fixed rail configurations leave unused space that cannot be flexibly repurposed for additional freight or passengers, reducing revenue potential compared to non-rail alternatives. Bureaucratic structures within have also hindered responsiveness, with reports highlighting excessive management layers between frontline crew and executives, delaying decision-making during breakdowns and inflating administrative overheads. Financial performance reflects these challenges, as Interislander recorded an NZ$11 million operating loss in the ending June 2025, reversing prior gains amid persistent unreliability and compensation payouts for stranded passengers, including reimbursements for accommodation and alternative travel following 2023 mechanical failures. Such issues have prompted admissions of misleading customers on refund policies, eroding trust and adding legal and reputational costs to the state-owned operator.

Future Developments

2025 Ferry Replacement Procurement

In March 2025, the , through Ferry Holdings Limited (a established for the ), initiated a process to acquire two new rail-enabled ferries to replace the aging Interislander fleet, following the cancellation of the prior iReX project due to escalating costs. On 31 March 2025, Cabinet approved the core specifications for the vessels, emphasizing resilience, safety, and rail compatibility for operations. The adopted a closed tender approach, shortlisting six international shipyards and conducting site visits between 15 and 28 May 2025 to evaluate capabilities. By September 2025, the process advanced to its final stage, with Ferry Holdings securing a preferred supplier under a for delivery in 2029. On 14 October 2025, Rail Minister announced Guangzhou Shipyard International (GSI), a large state-backed firm, as the selected builder for the two 200-meter ferries, capable of carrying 1,500 passengers alongside road and rail freight decks. The accelerated timeline—completing a multi-year in approximately nine months—aimed to minimize costs and address immediate fleet risks, with the vessels intended to serve for 30 years. Supporting infrastructure preparations aligned with the , including geotechnical investigations at terminal starting 20 October 2025 and wharf upgrades at Picton for the retiring Aratere between October 2025 and March 2026. This initiative responds to documented vulnerabilities in the current fleet, prioritizing empirical operational needs over prior design ambitions that inflated expenses.

Terminal and Infrastructure Upgrades

The Interislander ferry terminals at and Picton, constructed in the 1960s, have become obsolete due to deterioration and incompatibility with modern vessel requirements, necessitating comprehensive upgrades independent of new ferry acquisitions. These improvements aim to enhance safety, capacity for and vehicle traffic, and resilience against seismic and weather events in the region. In Picton, Port Marlborough and finalized agreements on July 1, 2025, outlining infrastructure for the incoming 2029 ferries, including a new , for berthing, and upgrades to the existing terminal interface while reusing passenger facilities where feasible. and reconstruction of the aging Aratere wharf are scheduled to commence between October 2025 and March 2026, following the vessel's retirement in 2025 to facilitate site preparation. Additional landside enhancements include a confirmed Dublin Street overbridge to improve and access, integrated into the precinct redevelopment. The Transport Agency is also upgrading the nearby roundabout for better vehicle flow to both Interislander and competitor terminals. At Wellington's Kaiwharawhara , plans encompass new wharves, buildings, linkspans, gangways, expanded railway and vehicle yards, and associated utilities, with geotechnical investigations commencing on October 20, 2025, to assess subsurface conditions. These works address seismic vulnerabilities and support increased freight volumes, estimated at up to 2.4 km of vehicle lanes per new ferry. The projects fall under fast-track consenting processes to accelerate timelines amid prior delays in the iReX initiative.

References

  1. [1]
    Home - Interislander - Cook Strait Ferries
    We are the original Cook Strait Ferry. We sail between the North and South Islands (Wellington and Picton) every day, carrying passengers, cars and freight.Book · Service Alerts · Plan · Experience
  2. [2]
    Interislander - KiwiRail
    We currently operate a two-ship fleet – Kaiārahi and Kaitaki - that cross the strait a combined total of 4000 times a year. Kaitaki (meaning Challenger) can ...
  3. [3]
    The History of the Interislander Ferry - Cook Strait Ferries
    The Interislander service began in 1962 with the Aramoana, after a passenger service since 1875. It was the first 'roll on, roll off' ferry, and has been ...
  4. [4]
    Ferry timetable - Interislander - Cook Strait Ferries
    There are eight daily sailings. Wellington to Picton: 8:45 am, 3:30 pm, 8:30 pm. Picton to Wellington: 9:30 am, 2:15 pm, 9:30 pm, 2:30 am. Allow 3.5 hours for ...
  5. [5]
    [PDF] Interislander Ferries and Terminals - Ministry of Transport
    Jun 3, 2021 · The Cook Strait crossing is a strategic national asset, extending State Highway One and the Main Trunk Railway between the North and South ...
  6. [6]
    IOMSR Chosen to Flag New Zealand's New Interislander Ferries
    The Interislander carries approximately 850,000 passengers, 250,000 cars and up to NZ$14 billion worth of freight annually. The search to find a preferred ...
  7. [7]
    Sailing Conditions - Cook Strait Ferries - Interislander
    Our sailing condition information is indicative and averages swell height over a day. Conditions on your Cook Strait crossing may differ.<|separator|>
  8. [8]
    Interislander Cook Strait Crossing | Great Journeys NZ | Official
    The Cook Strait ferry crossing is 93 kilometers (58 miles) and takes three-and-a-half hours. Two-thirds of that journey is a scenic spectacle.
  9. [9]
    Ferry between New Zealand's North and South Islands
    In Wellington the Interislander ferry passenger terminal is located at Aotea Quay, Pipitea, across the road from the wellington railway station. In Picton ...
  10. [10]
    Interislander Cook Strait ferry – Wellington to Picton - New Zealand
    3.5 hours of astonishing sightseeing. Highlights include the craggy coast and forested hills of Wellington Harbour, the open sea excitement of Cook Strait.
  11. [11]
    [PDF] Official Information Act Response 20250203
    May 19, 2025 · The Interislander has around 40% share of road freight volumes, 100% of rail freight volume and 70% of passengers crossing Cook Strait. Strait ...Missing: importance | Show results with:importance
  12. [12]
    [PDF] KiwiRail Integrated Report 2024
    Sep 25, 2024 · Interislander operating revenue $158.3m - 5% increase on prior year. Interislander passenger volumes were 8 per cent higher with the partial ...
  13. [13]
    [PDF] half year report 2025 - KiwiRail
    Feb 25, 2025 · Together they make around 3,400 sailings a year, providing around 600,000 passenger trips and carrying about 73,000 trucks, which keeps ...Missing: statistics | Show results with:statistics
  14. [14]
    [PDF] Project iReX – Interislander and Ferry Replacement
    Jun 9, 2021 · These ferries and port assets will ensure the Cook Strait connection contributes to secure supply chains for New Zealand and the economic growth ...
  15. [15]
    Cook Strait rail ferries | NZ History
    Jun 12, 2023 · Few ships had as much impact on New Zealand history as the GMV Aramoana, the road/rail ferry that entered service between Wellington and Picton in 1962.
  16. [16]
    Page 2. 'The floating bridge' - Cook Strait rail ferries - NZ History
    May 17, 2017 · Before 1962 rail struggled to compete with ships for inter-island business. If you wanted to send goods between the North and South islands ...Missing: freight across
  17. [17]
    S.S. Tamahine one of the unsung heroes in keeping our islands ...
    Nov 7, 2019 · The Tamahine kept the North and South Island of New Zealand linked for close on 36 years. She was built in Britain in 1925 specifically for the Wellington- ...
  18. [18]
    TAMAHINE 1925-1962 - New Zealand Ship and Marine Society
    Mar 31, 2011 · Built especially for the Wellington Picton service. TAMAHINE made on average 6 crossing of Cook Strait per week compared to the present ARAHURA and ARATERE.
  19. [19]
    the Cook Strait ferry 'Tamahine' - transpress nz
    Feb 6, 2023 · Replacement took the form of the rail ferry Aramoana in August 1962 by which time it was estimated she had made 15,000 crossings of Cook Strait.
  20. [20]
    Interislander - New Zealand Railways - Tranz Rail - Simplon Postcards
    For the first century, the treacherous Cook Strait divided the country's railway system into virtually two independent and unconnected services. As early as ...<|separator|>
  21. [21]
    Aramoana - Interislander - Cook Strait Ferries
    When the Aramoana sailed from Wellington to Picton on 13 August 1962, it become the extension of State Highway 1 and the Main Trunk Railway Line. For the first ...
  22. [22]
    New Zealand Railways | New Zealand Ship and Marine Society
    Apr 23, 2010 · In 1958 a Cook Strait Transport Inquiry Committee issued a report recommending a roll on/roll off rail and road ferry. The Union Company ...
  23. [23]
    Rail history | KiwiRail
    Following years of ownership changes from 1993 when the Government sold New Zealand rail to an international consortium, rail was returned to public ownership ...
  24. [24]
    Aranui (Ferry) | Items - National Library of New Zealand
    GMV 'Aranui' was a New Zealand Railways Department's rail-road ferry vessel and sister ship to the 'Aramoana'. The 4500 ton vessel was launched at ...
  25. [25]
    History - Interislander - Cook Strait Ferries
    Interislander has operated for over 60 years. Aramoana was the first roll-on, roll-off ship. Arahura was built in 1983, and the Lynx was a fast ferry ...Missing: ownership | Show results with:ownership
  26. [26]
    [PDF] PDF File - The Privatisation of New Zealand Rail - Working Papers
    For instance, it cost taxpayers over $1.1 billion to support NZ. Rail between 1983 and 1993, and since the 1880s rail was corporatised five times under state.
  27. [27]
    A brief timeline of Cook Strait ferries | The Spinoff
    Jun 25, 2024 · While a passenger service between Wellington and Picton dates back to 1875, the Aramoana is the first ferry that cars, trucks and railway ...
  28. [28]
    Understanding the battle over the Interislander's new 'mega ferries'
    Apr 4, 2023 · In September 2004, Interislander's Aratere ferry nearly ran aground, with 292 people on board, in the Tory Channel due to poor bridge management ...<|separator|>
  29. [29]
    Strikes and strandings - Cook Strait rail ferries - NZ History
    Jun 19, 2024 · This confrontation involved threats of lockouts or even of contracting out ship management to an international firm, as the privatised ...Missing: 2000s | Show results with:2000s
  30. [30]
    Toll sells rail network back to New Zealand
    May 5, 2008 · The New Zealand government said on Monday it would buy back the country's only rail operator from Australia's Toll Holdings after it could not agree future ...
  31. [31]
    New Zealand buys back rail network from Toll - Reuters
    May 4, 2008 · The New Zealand government said on Monday it was buying back the rail network from Australia's Toll Holdings Ltd. It said it would pay NZ$665 million ($520 ...
  32. [32]
    Buying back KiwiRail | State-owned enterprises
    Apr 16, 2012 · On 1 July 2008 the government spent $665 million buying Toll's rail and ferry operations outright, renaming the company KiwiRail. Using this ...
  33. [33]
    Aratere ferry grounding just the latest problem to hit Interislander's ...
    Jun 22, 2024 · Interislander's three ferries were all built in the 1990s and have been hit by mechanical problems in recent years.
  34. [34]
    Grounded Interislander ferry's 25 years of troubled history - 1News
    Jun 22, 2024 · The Interislander ferry Aratere ran aground near Picton late last night due to a steering issue, marking the latest in a series of incidents that have plagued ...
  35. [35]
    Troubled waters: A brief history of Interislander issues - Stuff
    Jun 21, 2024 · It's been far from smooth sailing for the beleaguered ferries, and the Government rejected a funding request in order to replace them.
  36. [36]
    Timeline: A recent history of Cook Strait ferry woes | RNZ News
    Sep 20, 2024 · A Bluebridge ferry losing power and drifting in the Cook Strait is just the latest in a series of disruptions, delays and issues with ferries.
  37. [37]
    Timeline: The troubled Cook Strait ferries | RNZ News
    Nov 13, 2023 · Damage to the hulls of two vessels during the past week are the latest in a series of disruptions, delays and cancellations to Cook Strait ferries this year.
  38. [38]
    KiwiRail charged after ferry breakdown - Otago Daily Times
    Jan 18, 2024 · Maritime NZ has filed a charge against KiwiRail after its Interislander ferry lost power in the Cook Strait last year.
  39. [39]
    Interislander ferry Kaitaki to return to service tomorrow
    Kaitaki has been out of service since 4 March due to a gearbox issue. ... aging fleet. This includes taking our ships out of service more regularly ...
  40. [40]
    Interislander ferries in better condition than expected, report finds
    Jul 22, 2024 · Norwegian advisers called in by Interislander have found the ferries can operate till 2029 - provided regular maintenance is completed.<|separator|>
  41. [41]
    $$222 million paid to shipyard for canned Interislander replacements
    Aug 14, 2025 · After a year of delays, the government confirmed plans to buy two new Cook Strait ferries but offered few details on their costs, rail ...
  42. [42]
    Aratere to retire as New Zealand's new ferries project gets underway
    Apr 30, 2025 · Aratere will be retired to make way for the port re-development needed in Picton to prepare for the two brand-new ferries arriving in 2029.
  43. [43]
    Shipyard chosen to build two new Cook Strait ferries - Stuff
    Sep 2, 2025 · The Government is preparing to ink a deal to buy two new Interislander ferries, with confirmation due by the end of the year.
  44. [44]
  45. [45]
    [PDF] Simpson Grierson - EPA
    We operate up to 16 sailings per day (8 in each direction), including night time freight sailings with very few passengers. 21. The volume of freight carried in ...
  46. [46]
    Unmissable sights on Cook Strait - Interislander
    Cruise between the North and South Islands in a leisurely 3 - 3.5 hours. The Interislander timetable has five daily sailings scheduled to cross the 92-kilometre ...Missing: routines capacity<|separator|>
  47. [47]
    KiwiRail remains a State-Owned Enterprise
    Oct 7, 2022 · Interislander: Operates 12 daily sailings on the Cook Strait per day at peak, with 2737 sailings in 2021/22. Commuter: Operates New ...
  48. [48]
    Kaitaki - Interislander - Cook Strait Ferries
    Carrying capacity: 1000 passengers / 1780 lane metres freight / 600 cars. Tell us your Interislander story. Most Kiwis have a memory of a trip on the ...
  49. [49]
    New Cook Strait ferry supplier picked - but it's a secret, for now
    Sep 2, 2025 · The existing Interislander ferries, Kaitaki and Kaiārahi, are about 180 metres long and can carry up to about 1000 and 550 passengers ...<|separator|>
  50. [50]
    Wellington Vehicle Check In - Interislander - Cook Strait Ferries
    Follow the pink signs and road markings directly to the vehicle check-in area. Check in closes 60 minutes before departure.Missing: details | Show results with:details
  51. [51]
    Check-in for your Interislander ferry
    Wellington passenger terminal. For passengers travelling without a motor vehicle ; Wellington vehicle terminal. When you are travelling with a vehicle, head ...Wellington Vehicle Check In · Picton Vehicle Check in · Foot passenger check-in
  52. [52]
    Port Marlborough Ready to Progress New Cook Strait Ferry ...
    Jul 1, 2025 · In Picton, this includes the construction of a new wharf and linkspan to accommodate the incoming ferries, alongside upgrades to terminal ...
  53. [53]
    New ferry project - timing announced for Aratere's Picton wharf ...
    Work on the Picton wharf will start between October 2025 and March 2026, with new ferries arriving in 2029. Bookings after September 9, 2025 are paused, ...Missing: delays | Show results with:delays<|control11|><|separator|>
  54. [54]
    Port companies and KiwiRail reach agreements over two new Cook ...
    Jul 1, 2025 · The plan aims to reuse the current passenger and commercial vehicle facilities and the terminal building at both ports. "We are pleased to ...
  55. [55]
    [PDF] KiwiRail's Interislander safety and reliability of existing service - 22 ...
    Mar 31, 2025 · Within SOLAS there is one hugely important Code and that is the 'International Safety. Management' (ISM) Code and is an internationally ...
  56. [56]
    [PDF] Information about safety of ferries in Cook Strait - Maritime NZ
    Jul 21, 2023 · Shore-side compliance with requirements of the Code and safety management system is verified every 12 months, whereas ship board compliance is ...
  57. [57]
    [PDF] Ensuring KiwiRail/ Interislander complies with requirements of its ...
    Kiwirail ferries are required to comply with the following maritime rules in relation to design, construction, survey and maintenance: • Maritime rule part 40B ...
  58. [58]
    Dangerous goods - Interislander - Cook Strait Ferries
    A Dangerous Goods Declaration form needs to be emailed at least four hours before scheduled departure time if you are carrying more than the approved limits.Missing: protocols | Show results with:protocols
  59. [59]
    Freight Handling Code
    KiwiRail's Freight Handling Code contains guidelines and rules to assist with all aspects of the safe stowage, storage and transportation of freight.<|separator|>
  60. [60]
    Interislander sorry for loss of power incident, outlines steps to assure ...
    May 5, 2023 · “Our message to passengers, staff and customers is clear: Our ships are safe and we are closely monitoring all the safety critical equipment on ...Missing: protocols | Show results with:protocols
  61. [61]
    Maritime NZ Files Charges Against KiwiRail Following Cook Strait ...
    Jun 19, 2025 · The investigation examined KiwiRail's implementation of new systems on older vessels and broader safety management practices. According to the ...
  62. [62]
    Inter-island ferries 'most likely' cause of harmful gas emissions, new ...
    Oct 11, 2021 · These ferries will reduce the Interislander's emissions by 40 percent overall compared to existing vessels and eliminate emissions while in ...Missing: sustainability | Show results with:sustainability
  63. [63]
    [PDF] KiwiRail Sustainability Strategy 2022-2025
    We minimise our environmental impacts and enhance environmental quality. Our people return home safe and healthy every day, and are engaged and empowered ...
  64. [64]
    Interislander trials cleaner and more efficient fuel technology
    May 21, 2015 · “FOE has lower harmful emissions compared with normal fuels and this improves Health and Safety for those who have to work with it”. “The trial ...<|control11|><|separator|>
  65. [65]
    What's the lowest-carbon way to cross the cook strait? : r/newzealand
    Sep 13, 2022 · Average fuel consumption of one interislander trip is 6.5 to 8 tonne. Split that between upto around 1400 passengers and lot of freight, and you'd be well on ...
  66. [66]
    [PDF] Biofuel supply to Interislander - IEA Bioenergy
    • Current marine fuels consumption globally estimated to be around 330m tonnes of fuel ... • Annex VI specifically addresses air pollution effects from Sulphur ...
  67. [67]
    [PDF] Carbon Reduction Plan - KiwiRail
    Sep 1, 2025 · To do this, we have set an emissions intensity target to improve our rail freight operations by. 46 per cent by 2035 (against an FY19 base year) ...
  68. [68]
    Aratere's final sailing confirmed - Interislander - Cook Strait Ferries
    Interislander anticipates Aratere's final scheduled Cook Strait sailing will depart Picton at 11am on 18 August 2025. Interislander ferry Kaiārahi is expected ...
  69. [69]
    [PDF] KAITAKI - Cloudfront.net
    Welcome onboard Interislander's Kaitaki ferry. Kaitaki is a te reo Māori ... Car & Truck Capacity. 1,780 lane metres (the equivalent of 600 cars). Flag.
  70. [70]
    Kaitaki - Interislander - Cook Strait Ferries
    ### Factual Details on Kaitaki Vessel
  71. [71]
    Our ferries - Interislander - Cook Strait Ferries
    Kaiārahi is a te reo Māori word meaning 'leader' or 'guardian', carrying up to 550 passengers. See More.
  72. [72]
    KAIARAHI, Passenger/Ro-Ro Cargo Ship - VesselFinder
    Vessel KAIARAHI (IMO 9147291, MMSI 512144000) is a Passenger/Ro-Ro Cargo Ship built in 1998 and currently sailing under the flag of New Zealand.
  73. [73]
    Interislander Kaiarahi ferry review and ship guide
    The vessel can carry up to 550 passengers and contains 1900 metres of vehicle capacity. The ship is spread over nine decks with three open to the public.Missing: specifications | Show results with:specifications
  74. [74]
    Kaiārahi - Interislander - Cook Strait Ferries
    ### Summary of Kaiārahi Vessel Details
  75. [75]
    Govt confirms shipyard for new Cook Strait ferries - 1News
    Oct 14, 2025 · The Government has locked in a Chinese state-backed shipbuilder to construct two new Cook Strait ferries, Rail Minister Winston Peters has ...
  76. [76]
    Aranui - Interislander - Cook Strait Ferries
    The Aranui arrived in Wellington in May 1965 via the Suez Canal. It entered service on 9 June. In 1977, Aranui made the long trip to Singapore for a major refit ...
  77. [77]
    Arahanga - Interislander - Cook Strait Ferries
    Arahanga remained in service and when the ship's service was withdrawn the commercial vehicle cargo role was filled for almost three years by the chartered ...Missing: decommissioning | Show results with:decommissioning
  78. [78]
    Interislander Ferries | The Ferry Wiki - Fandom
    The Cook Strait Inter-Island Rail and Road Service started on 11 August 1962, with the roll-on roll-off ferry GMV Aramoana operating between Wellington and ...Missing: pre- | Show results with:pre-<|separator|>
  79. [79]
    KiwiRail calls time on Arahura ferry | RNZ News
    Dec 9, 2014 · KiwiRail said the Arahura would be decommissioned after 31 years' service because it could not meet future freight demand and it was too costly ...Missing: date | Show results with:date
  80. [80]
    Bell from decommissioned Interislander ferry Arahura presented to iwi
    Dec 15, 2015 · The bell from KiwiRail's decommissioned Interislander ferry Arahura has a new home at a West Coast marae.
  81. [81]
    Aratere Retirement - Interislander - Cook Strait Ferries
    Aug 18, 2025 · Aratere Officially retired on August 18, 2025. The final sailing for Aratere was the 11:00am departure from Picton on that day.
  82. [82]
    Aratere to retire in August - KiwiRail
    May 19, 2025 · KiwiRail has confirmed that its ferry Aratere will retire no later than 30 August, after a quarter of a century's service on Cook Strait.
  83. [83]
    Interislander Aratere ferry sold for scrap - NZ Herald
    Oct 9, 2025 · The ferry, which operated on the Cook Strait for 26 years, made its final voyage in August, withdrawn early to allow for the demolition of ...Missing: decommissioning | Show results with:decommissioning
  84. [84]
    [PDF] Official Information Regarding KiwiRail's Project iReX
    Jul 24, 2023 · KiwiRail has indicated that 4 percent of rail freight (by volume) across Cook Strait is on specialised rail wagons and in its view without a ...
  85. [85]
    Fearful Cook Strait freight transport sector asks what next for $15 ...
    Dec 13, 2023 · The freight industry says more than $15 billion worth of freight crosses Cook Strait on ferries a year.
  86. [86]
    KiwiRail sentenced for Interislander ferry Kaitaki's 2023 loss of ...
    Sep 9, 2024 · The Kaitaki ferry lost propulsion on its approach into Wellington Harbour on 28 January 2023, with more than 800 people on-board.
  87. [87]
    Maritime NZ Charges KiwiRail Over Ro/Ro Grounding
    Jun 18, 2025 · In September last year, the operator was ordered to pay US$266,000 in fines and costs in relation to a January 2023 incident involving its ferry ...
  88. [88]
    KiwiRail charged after Aratere grounding - The Post
    Jun 17, 2025 · KiwiRail could be fined up to $2 million after Maritime NZ filed two charges following the grounding of its Interislander Aratere ferry almost exactly a year ...
  89. [89]
    Charges filed by Maritime NZ against KiwiRail following ...
    Jun 18, 2025 · Maritime NZ has filed two charges against KiwiRail after completing a comprehensive and wide-ranging investigation into the grounding of the Interislander ...
  90. [90]
    Government right to hold KiwiRail to account on Interislander cost ...
    Dec 14, 2023 · “Between $15-20 billion in freight travels across Cook Strait each year, so it's important to put the cost increase in that context. With ...
  91. [91]
    Lost at Sea: Shipping in NZ through a Catastrophic Risk Lens
    Oct 16, 2024 · NZ's interisland and coastal shipping infrastructure is inadequate for global catastrophe scenarios that limit international shipping or liquid ...
  92. [92]
    'Biggest pothole on SH1': Calls for inquiry into Cook Strait ferry failures
    Feb 25, 2023 · Meanwhile, 99 percent​ of Interislander ferries ran in 2018 versus 79 percent​ in the last financial year. A 2021 business case for the ...
  93. [93]
    Disrupted travel leaves Auckland man $1600 out of pocket - Stuff
    Jan 6, 2025 · An Auckland man has found himself $1600 out of pocket as a result of the continued disruptions to the Cook Strait ferry crossings.
  94. [94]
    Ferry breakdown: Interislander passenger wins compensation - Stuff
    Mar 25, 2024 · KiwiRail must pay the cost of three flights the passenger was forced to take due to cancellations.
  95. [95]
    [PDF] Interislander Ferries and Terminals - Detailed Business Case
    Jun 3, 2021 · Climate Change – the new ferries and their operation are designed to give a 40% reduction in the Interislander carbon footprint (16% reduction ...
  96. [96]
    Interislander debacle shows problems with state ownership - The Post
    Jun 25, 2024 · OPINION: The iRex project massively blew out. But the political buck-passing on anything to do with the new ferries points to a bigger ...
  97. [97]
    NZ's ferry farce is proof politicians are out of depth in business
    Dec 17, 2024 · The existing Interislander fleet, with vessels dating from the 1990s and early 2000s, must now soldier on until at least 2029. Recent ...Missing: history | Show results with:history
  98. [98]
    NEW POLL: New Zealanders support sale of Interislander
    Jul 11, 2024 · A new Taxpayers' Union – Curia poll has revealed that a plurality of New Zealanders support selling the Interislander ferry services to a private operator.Missing: debate | Show results with:debate
  99. [99]
    Interislander ferries: Should a new entity be set up to run the vessels?
    Jul 12, 2024 · The advisory group suggested KiwiRail no longer run the ferries, and that a separate entity, like a new State Owned Enterprise, be created.Missing: arguments | Show results with:arguments
  100. [100]
    Ferry privatisation would be a disaster
    Jul 1, 2025 · The Maritime Union of New Zealand (MUNZ) says suggestions of privatisation of the new Cook Strait Interislander ferries would be a dangerous step backwards.
  101. [101]
    New Interislander ferries: Almost 50% of Kiwis want rail-enabled ...
    Jan 9, 2025 · A poll shows 48% of respondents want new Interislander ferries to be rail-enabled. · More people prefer KiwiRail to operate the ferries rather ...Missing: arguments | Show results with:arguments
  102. [102]
    Peters opens door to part-privatisation of ferries, but doesn't want to ...
    Jun 30, 2025 · Winston Peters opens the door to part-privatisation of Interislander ferries, but doesn't want to walk through it. Thomas Coughlan. Political ...
  103. [103]
    Government won't reveal cost of new Cook Strait ferry plan - RNZ
    Dec 11, 2024 · Nicola Willis has not revealed the cost of the project, saying it is commercial confidential while negotiations are underway, but are expected to be much less.Missing: breakdowns | Show results with:breakdowns
  104. [104]
    Kaitaki ferry had many old parts in its engines when one blew out ...
    Jul 20, 2023 · Interislander Kaitaki ferry failure caused by failure to replace safety-critical parts ... The rubber expansion joint that failed on the Kaitaki ...<|separator|>
  105. [105]
    New TAIC inquiry: Interislander ferry Kaitaki loss of power
    Jan 29, 2023 · “At about 5pm, the vessel was in the Cook Strait off Wellington's South Coast when it suffered a main engine failure and loss of propulsion.
  106. [106]
    Interislander Cook Strait ferry mayday: KiwiRail fined ... - NZ Herald
    ... 2023 failure had been in use for five years and eight months. The manufacturer's stamp also showed it was 18 years old when it failed. Court apology.<|separator|>
  107. [107]
    Aratere grounding began with a 36-second autopilot mistake - RNZ
    Oct 31, 2024 · Interislander Aratere ferry grounded near Picton on 21 June 2024. The Interislander ferry only recently underwent wet dock maintenance, which ...
  108. [108]
    Interim factual report on grounding of Interislander ferry Aratere - TAIC
    Oct 31, 2024 · ... grounding of KiwiRail's Interislander ferry Aratere during its Picton to Wellington sailing on the evening of 21 June 2024. The report sets ...
  109. [109]
    MO-2024-204 | TAIC - Transport Accident Investigation Commission
    Oct 31, 2024 · The Commission's Interim Factual Report details the key facts established so far about the grounding of the Interislander ferry Aratere.
  110. [110]
    The Cook Strait ferries saga, explained - Stuff
    Mar 30, 2025 · That included KiwiRail's Interislander operation, of which Peters had been very vocal about during his time on the opposition benches ...
  111. [111]
    Government releases documents behind decision to cancel Cook ...
    May 9, 2024 · The Government has released long-awaited documents behind the decision to cancel KiwiRail's Interislander mega ferries.Missing: RECOVER | Show results with:RECOVER
  112. [112]
    Shipbuilder for new Interislander ferries announced | RNZ News
    Oct 14, 2025 · The government revealed in March it would buy two new Interislander ferries to replace the current ageing fleet. The new ferries are expected to ...
  113. [113]
    Union power wins new Interislander ferries for New Zealand
    Apr 4, 2025 · Interislander ferries have provided a critical lifeline service, connecting New Zealand's North Island and South Island across the Cook Strait, ...
  114. [114]
    Two new rail ferries to replace aging Interislander fleet from 2029
    Mar 30, 2025 · Peters on Monday afternoon confirmed officials will start procurement for two new rail ferries from next month, due to enter service in 2029.
  115. [115]
    Govt declines more funding for Interislander project amid cost blowout
    Dec 13, 2023 · KiwiRail says the iReX project will now be wound down as it cannot afford to proceed without more Government help.Missing: RECOVER | Show results with:RECOVER<|control11|><|separator|>
  116. [116]
    How much it cost to cancel iRex ferry contract - 1News
    Aug 15, 2025 · Genter said the $550 million deal for the two new rail-enabled ferries was one of the best the country had ever signed up to. "This Coalition ...
  117. [117]
    Cancellation of ferry replacement could cost further $500m, union says
    Aug 6, 2024 · A project to replace the Interislander ferry fleet will now not go ahead as the coalition government has declined KiwiRail's request for ...
  118. [118]
    DNV report - Interislander media statement - KiwiRail
    Jul 19, 2024 · We will need new ferries, but the assessor's findings mean that we can continue delivering reliable services for passengers and our freight ...Missing: debates | Show results with:debates
  119. [119]
    Shipbuilder for new Interislander ferries announced | RNZ News
    Oct 14, 2025 · Guangzhou Shipyard International will build the two new Interislander ferries, set arrive in four years time, the government has announced.
  120. [120]
    Maintenance costs double for KiwiRail's ageing Cook Strait ...
    Jun 18, 2024 · Estimated annual maintenance costs to keep KiwiRail's three ageing Interislander ferries running could almost double to $65 million by next year.Missing: disruptions | Show results with:disruptions
  121. [121]
    NZ will soon have no real interisland rail-ferry link - The Conversation
    Jul 3, 2025 · The Cook Strait ferry fiasco is just another symptom of a wider malaise: an inability to deliver, on time and at cost, the infrastructure ...
  122. [122]
    A Cook Strait ferry solution - by David Greig - Asymmetric Information
    Feb 3, 2024 · Since 1962, the Interislander ferry service has been owned and operated by a series of government departments, government-owned corporations, ...
  123. [123]
    KiwiRail has 'too many layers' between ship crew and CEO ...
    Mar 3, 2025 · Interislander operator KiwiRail has “too many layers” between ship crew and chief executive, the Government has been warned.
  124. [124]
    KiwiRail targets earnings jump in 'sluggish' economy - BusinessDesk
    Oct 1, 2025 · Where most other sectors reported positive earnings, KiwiRail's Interislander ferry service turned in an $11m operating loss for the year, a $17 ...
  125. [125]
    Interislander paying additional costs of passengers caught up in ...
    Jan 24, 2025 · Passengers are being compensated for travel and accommodation expenses incurred when the Interislander had mechanical issues in early 2023.Missing: freight | Show results with:freight
  126. [126]
    Interislander admits it likely misled customers - Consumer NZ
    Apr 17, 2025 · Interislander customers now have greater certainty about refunds and compensation following ferry cancellations due to mechanical failure.
  127. [127]
    [PDF] KiwiRail's Interislander Ferry Service to Sponsoring Ministers
    Ministerial Advisory Reports regarding Ferry Procurement. Information Release. March 2025. This document has been proactively released by the Minister of ...
  128. [128]
    Rail ferries enter final procurement stage | Beehive.govt.nz
    Sep 3, 2025 · The new ferries will be designed to safely transport passengers, cars, trucks and rail wagons across the Cook Strait. The new vessels will work ...
  129. [129]
    [PDF] 31 July 2025 Official information request for Ferry Holdings Limited ...
    Aug 1, 2025 · In March 2025, the Minister for Rail announced plans for the procurement of two new ferries that will serve people, cars, trucks, and rail ...
  130. [130]
    New Cook Strait ferries to be built by large Chinese shipbuilding ...
    Oct 13, 2025 · Chinese company Guangzhou Shipyard International (GSI) has been selected to build two large ferries as part of its national ferry replacement ...
  131. [131]
    Service Alerts - Interislander - Cook Strait Ferries
    From 20 October 2025, geotechnical investigation works will be underway at the Wellington terminal for approximately two weeks. This includes the use of a large ...Missing: project | Show results with:project
  132. [132]
    [PDF] Interislander and Terminals Replacement
    Jun 9, 2021 · Port infrastructure in Wellington and Picton developed in 1960s, now obsolete. • Needs replacing and upgrading, regardless of new ferries.
  133. [133]
    Waitohi Picton Ferry Precinct redevelopment | EPA
    This project is for the redevelopment of the Picton Ferry terminal precinct and involves upgrades to the terminal precinct and the surrounding infrastructure.
  134. [134]
    Cook Strait ferry Aratere to be retired ahead of Picton port upgrade
    Apr 30, 2025 · Aratere will be retired this year to make way for required Picton port re-development in preparation for the two brand-new Cook Strait ferries arriving in 2029.Missing: Aratika | Show results with:Aratika
  135. [135]
    Dublin St overbridge confirmed in post-iReX Picton plans | The Press
    Jun 30, 2025 · A port infrastructure upgrade in Picton to accommodate new ferries will include building a Dublin St overbridge, Rail Minister Winston Peters confirmed on ...
  136. [136]
    Picton road network improvements project
    We will be upgrading the existing roundabout to improve access to and from the Bluebridge and Interislander ferry terminals for all vehicles. The roundabout ...
  137. [137]
    Kaiwharawhara Wellington Ferry Terminal Redevelopment | EPA
    An application for the redevelopment of the Interislander facilities at Kaiwharawhara, Wellington and surrounding infrastructure, including works on land and in ...
  138. [138]
    New details of Cook Strait ferry replacement plan unveiled | RNZ News
    Mar 31, 2025 · The new Interislander ferries being delivered in 2029 will be about 200m long, 28m wide, and will have rail decks, Minister for Rail Winston Peters says.<|separator|>
  139. [139]
    KiwiRail looks to future for Interislander
    May 10, 2024 · KiwiRail is working with all parties to find an integrated ferry and terminal solution that continues to deliver a reliable service to move freight and people ...Missing: facilities details