Lechmere station

Lechmere station is an elevated Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station located at 3 North First Street in East Cambridge, Massachusetts, serving as the northern terminus of the E branch. The station connects to multiple MBTA bus routes and provides level boarding platforms for accessibility. Originally constructed as a surface-level facility and opened in 1922 to facilitate transfers between streetcars and elevated trains, it functioned as a key transit hub in Lechmere Square for nearly a century. The existing station replaced the original site, which closed on May 24, 2020, amid construction of the Green Line Extension (GLX), a major infrastructure project that relocated the terminal northward and elevated the tracks to integrate with new viaducts and branches extending to Medford and Somerville. The GLX, completed in phases through 2022, added over four miles of track, six new stations beyond Lechmere, and enhanced regional connectivity while addressing longstanding capacity constraints on the Green Line.

Station Design and Features

Architectural and Structural Elements

The new Lechmere station consists of an elevated island platform supported by a modern concrete viaduct spanning O'Brien Highway (Massachusetts Route 28). This viaduct structure transitions southward to connect with the historic Lechmere Viaduct, facilitating the extension of Green Line service. The platform features a full-length canopy constructed from simple grey structural elements, providing overhead protection along most of its extent but excluding the end areas adjacent to entrances. Access to the elevated platform is achieved via dedicated headhouses and concourse areas, which incorporate a unified design language to integrate with the surrounding urban environment and connect to nearby vehicular bridges. The northern headhouse provides entry through a staircase and two elevators to First Street, with gated access points and proximity to an integrated bus loop on Water Street. The southern entrance includes a single staircase and elevator on the south side of East Street, accompanied by a bicycle parking facility designated as Pedal and Park. Supporting infrastructure enhancements include carbon fiber wrapping applied to reinforce the 12 spans of the connected viaduct, enhancing structural integrity to accommodate increased loads and train frequencies while preserving original aesthetics. Artistic integrations, such as laminated glass panels displaying "Field Notes" by artist Randal Thurston on elevator shafts and platform surfaces, add visual elements to the concrete and steel framework.

Platform and Accessibility Improvements

The relocated Lechmere station, opened on March 21, 2022, features a single elevated serving inbound and outbound Green Line trains, elevated on a over O'Brien . This configuration supports level boarding with low-floor vehicles, reducing the step gap to approximately 3 inches and improving efficiency for all passengers. Accessibility enhancements include elevators within north and south headhouses connecting street level to the platform, ensuring compliance with Americans with Disabilities Act (ADA) standards for vertical circulation. Ramps, tactile edge strips, and high-contrast paving further aid navigation for visually impaired users and those with mobility challenges. These improvements addressed limitations of the prior ground-level station, which depended on portable lifts added around 2000 and lacked full ADA accessibility. The elevated design integrates with the Green Line Extension's goal of providing six fully accessible stations, enhancing equitable transit access in the area.

Integration with Surrounding Infrastructure

The relocated Lechmere station occupies an elevated structure east of Monsignor O'Brien Highway () near the intersection with First Street, positioned adjacent to the NorthPoint in East . This placement facilitates direct access from surrounding residential, commercial, and industrial areas, with the station's design incorporating three ground-level headhouses at 19 Water Street, 1 North First Street, and 1 East Street to connect pedestrians from key approach roads. Integration with bus services centers on a dedicated loop north of the Water Street headhouse, allowing transfers to MBTA routes such as the , , , and , which provide local connectivity to neighborhoods in , Somerville, and . During construction and transitional periods, temporary shuttle buses utilized exclusive lanes on Route 28 to maintain service links to . Pedestrian safety enhancements include signalized crossings with audible pedestrian signals and median refuges at Water Street, North First Street, and East Street, bridging O'Brien Highway to improved street connections like the reconstructed Cambridge Street linkage opened on June 12, 2023. Bicycle infrastructure ties into the Somerville Community Path extension, a shared-use trail operational since June 10, 2023, that links the station to North Point, Cambridge Crossing, and broader networks extending toward Bedford, promoting multimodal access while reducing reliance on adjacent roadways. The station also features an on-site bike facility between headhouses to support commuter cycling.

Historical Development

Origins as East Cambridge Station

The origins of what became lie in the East Cambridge station, an early stop on the Boston and Lowell Railroad (B&L) that provided passenger rail service to the East Cambridge neighborhood. The B&L completed construction of its 26-mile line from to Lowell and initiated passenger operations on June 24, 1835, marking the first rail access to the area along the route through East Cambridge near the Millers River banks. This line facilitated transport of passengers and freight, supporting industrial growth in East Cambridge by connecting it to and beyond. East Cambridge station emerged as one of the intermediate stops on the B&L mainline, with evidence of its infrastructure documented by at least the early . A photograph shows a two-story wooden depot typical of period facilities, underscoring its role in local commuting before the dominance of street railways. Timetables from 1906 confirm regular service, with the station handling arrivals and departures amid the B&L's integration into the () system by the late . The station's operations reflected the era's rail-centric transport, but faced pressures from competing streetcar lines and urban expansion. Passenger service at East Cambridge ended with its closure in early 1927, as part of efforts to rationalize stops and reduce unprofitable facilities, amid local opposition reported in contemporary accounts. This closure preceded the opening of the nearby Lechmere Square transfer station in July 1922 for streetcar and elevated services, shifting the site's transit focus from to urban . The original rail alignment influenced subsequent developments, including the Lechmere Viaduct opened in 1912 to link East Cambridge across the .

Establishment of Surface Operations (1922)

The Boston Elevated Railway (BERy) opened the Lechmere Square transfer station on July 10, 1922, establishing surface operations as a dedicated prepayment terminal in East Cambridge to separate local streetcar services from subway routes entering the Tremont Street tunnel. This configuration addressed chronic scheduling disruptions where delays on surface lines propagated into the rapid transit system, enabling passengers to prepay fares and transfer efficiently without impeding tunnel operations. The facility spanned approximately two acres at a construction cost of about $1,000,000, reflecting BERy's modernization efforts amid growing ridership demands in the early 20th century. Surface operations centered on a loop track layout for streetcars originating from the elevated structure, facilitating cross-platform transfers to terminating lines from northwest routes such as and Clarendon Hill. Local streetcars from and surrounding areas ended at dedicated platforms, while subway-bound vehicles bypassed these to maintain schedule adherence, with a large signaling departures on the inaugural day. Wooden canopies provided shelter over tracks, and the design prioritized pedestrian flow across multiple streetcar lines under BERy management. This terminal served as the endpoint for what would become the Green Line's northern extension, handling peak-hour volumes that underscored the shift toward integrated urban transit hubs.

Mid-Century Modifications and Service Shifts

During the mid-20th century, Lechmere station saw primarily service-oriented adjustments rather than extensive structural overhauls, reflecting broader transitions in Boston's transit system from the Boston Elevated Railway (BERy) to the Metropolitan Transit Authority (MTA) in 1947 and then to the Massachusetts Bay Transportation Authority (MBTA) in 1964, which rebranded the light rail network as the Green Line. The terminal continued to function as a key transfer point for streetcars terminating via the Lechmere Viaduct, with PCC cars forming the backbone of Green Line operations through the 1950s and into the 1960s, alongside trackless trolleys on feeder routes until their phase-out. A significant infrastructural addition impacting service flow occurred in August 1955 with the opening of Science Park station on the viaduct between and , introducing an intermediate stop that facilitated access to the complex and slightly redistributed passenger loads at the terminal. This did not alter 's core layout but enhanced connectivity along the corridor. Service shifts emphasized conversions from electric to diesel vehicles on connecting routes, reducing reliance on overhead wiring at the station. Route 69 saw weekend service switched to buses in June 1958, with full conversion by March 1963; Route 80 followed in March 1962; and trackless trolley operations on Routes 81, 87, and 89 ended in March 1963, all terminating or transferring at . These changes streamlined bus integrations but diminished the multimodal electric character of the terminal, as captured in period imagery showing PCC streetcars and trackless trolleys coexisting in 1960. Additionally, the June 1960 discontinuation of the Haymarket-Central Square owl bus via marked the end of late-night supplemental service. Green Line branch routings to also evolved amid systemwide pressures. In November 1961, Cleveland Circle and lines (precursors to modern B branch configurations) were temporarily cut back from Lechmere extensions, reflecting operational efficiencies or disruptions. By December 1966, the Riverside line was redesignated as the D branch serving , formalized in 1968, solidifying its role as a primary while other branches adjusted frequencies or endpoints. These shifts prioritized reliability over expansive terminal operations, aligning with the /MBTA's focus on core amid declining streetcar patronage elsewhere in the region.

MBTA Era and Pre-Extension Upgrades

The (MBTA) assumed operational control of the regional transit system, including Lechmere station, on August 3, 1964, succeeding the Transit Authority which had managed the facility since acquiring the Boston Elevated Railway's assets in 1947. Under MBTA oversight, Lechmere continued as the surface-level terminus for service, primarily serving the E branch to Heath Street in Boston's neighborhood, with inbound and outbound operations utilizing the existing loop tracks and platforms established in 1922. Service patterns evolved with systemwide shifts, including the phase-out of streetcars by the late 1950s (predating full MBTA control) and introduction of Vertical Intermediate Capacity Transit Vehicles (Type 5 LRVs) in the 1970s, followed by Type 7 and Type 8 cars for improved reliability on the branch. Routine maintenance addressed wear on the aging infrastructure, but the station saw limited structural modifications through the late , maintaining its role as a key transfer point for local bus routes amid growing ridership in East Cambridge's industrial and residential areas. By the , as for the advanced, focus shifted to preparatory enhancements rather than overhauls of the terminal itself, which remained incompatible with modern standards and extension alignments. Busway facilities were expanded incrementally to accommodate transfers, supporting integration with routes like the 69 Harvard-Lechmere and others extended through the station. A significant pre-extension upgrade targeted the Lechmere Viaduct, the elevated structure spanning the and approaching the station from . Contracted in December 2019 with a $87.4 million budget, the reinforced all 12 spans using carbon fiber wrapping for enhanced structural integrity, renewed over 3,500 feet of and 70,000 feet of signaling, replaced the overhead system, and incorporated improvements to accommodate heavier loads and higher train frequencies required for the extension. The project reached substantial completion on March 16, 2022, enabling seamless integration with the relocated station. These works extended the viaduct's service life, originally dating to 1912, while preparing the corridor for expanded operations without disrupting ongoing planning for the station's relocation. In advance of construction, rail service at Lechmere ceased on May 24, 2020, with shuttle buses substituting for trains between the station and to minimize impacts during viaduct and track works. Bus transfer areas at the existing terminal persisted as a hub for replacement service and local routes until the extension's partial opening.

Green Line Extension Project

Early Proposals and Planning Phase

Proposals to extend the MBTA Green Line northward from Lechmere station emerged in the 1970s, driven by planners' recognition of the line's asymmetrical configuration, which terminated at Lechmere while other branches reached further into suburban areas. In the late 1980s, the MBTA's Program for Mass Transportation, a series of 10-year investment plans, incorporated extensions from Lechmere to locations such as Ball Square in Arlington, emphasizing integration with existing commuter rail rights-of-way. The project gained momentum in 1990 when state officials announced the Boston 2020 mass-transit plan, which included the Green Line extension as a mitigation measure for environmental impacts from the Central Artery/Tunnel Project (Big Dig). However, funding shortfalls from Big Dig cost overruns led to the initiative's suspension in the mid-1990s, delaying substantive progress until the mid-2000s. Planning resumed around 2005, with formal environmental review and stakeholder engagement intensifying by 2007 through the establishment of the Green Line Extension Advisory Group, comprising civic organizations, advocates, and local representatives to refine alignment options and station placements, including the relocation of Lechmere to an elevated structure north of its original site to facilitate connectivity to new branches. This phase focused on alternatives analysis, securing federal funding commitments under the Federal Transit Administration's New Starts program, and addressing community concerns over routing along the Lowell and Fitchburg commuter rail corridors.

Design Evolution and Redesigns

Early proposals for relocating Lechmere station as a precursor to Green Line northward extension date to the late 1970s, with 1978 plans envisioning an elevated structure featuring a peanut-shaped loop track configuration and an integrated wide deck for a busway with a ground-level ramp. These concepts aimed to support multimodal transit integration amid urban redevelopment of the Lechmere Canal area but were not implemented at the time. By the mid-2000s, as part of the () planning, initial designs for the relocated Lechmere station emphasized basic open-air platforms at an estimated $535,000 per station, positioning it as the new northern terminus with elevated infrastructure east of the original surface-level site on North First Street. However, subsequent iterations around 2010 introduced more elaborate elements, including headhouses, escalators, and additional elevators, contributing to and escalating costs from an initial $1.12 billion project estimate in 2012 to projections nearing $3 billion by 2015. This overrun prompted a project suspension and comprehensive reevaluation, driven by factors such as overly ambitious station amenities and ancillary features like the Community Path , initially budgeted at $100 million for Lechmere integration. The 2016 redesign simplified the station configurations across , including , by reverting to spartan open-air designs with uniform materials, signage, and lighting, eliminating headhouses and redundant elevators to slash -related costs from $409.5 million to $121.2 million—a 70% reduction—while cutting total square footage by 91%. For specifically, the Community Path was realigned and shortened from 3,000 to 2,150 meters, reducing its cost to $20 million, and soil instability issues led to abandoning mechanically stabilized earth walls in favor of a traditional raised using pre-fabricated beams. These changes coincided with a shift to a design-build delivery model under Constructors, achieving a 25% and enabling construction to proceed with tight urban tolerances, such as quarter-inch precision at the junction amid curving geometries and minimal pier clearances. The final elevated features level boarding platforms integrated with the extended line, opening in March 2022 after the old surface facility closed in May 2020.

Construction Timeline and Execution

The design-build contract for the , including the relocation and reconstruction of station, was awarded in November 2017 to a led by Constructors. Site preparation and initial construction activities in the Lechmere area commenced in March 2018, focusing on utility relocations, track realignments, and groundwork extending from the existing station toward Union Square. The original surface-level Lechmere station closed to Green Line service on May 22, 2020, enabling full-scale demolition of its platforms and associated structures, which was substantially completed by late 2020 to clear the site for the new elevated configuration. Concurrently, the Lechmere Viaduct—critical for accessing the relocated station—was rehabilitated under a separate December 2019 contract, involving structural reinforcements, deck replacements, and seismic upgrades, with work accelerating after the May 2020 closure and concluding in March 2022. This phase included temporary operations at the site to maintain connectivity. Major station execution followed, encompassing erection of steel frameworks for the elevated extension, installation of two platforms with canopies, and integration of a dedicated busway beneath the structure to support transfers. Track laying, signaling systems, and accessibility features such as elevators and were installed progressively from mid-2020 through 2021, with testing phases overlapping viaduct completion. The new Lechmere station, positioned approximately 500 feet north of the original site along O'Brien Highway, opened to revenue service on March 21, 2022, alongside the Union Square Branch, marking the end of primary construction execution for this segment.

Opening and Transition from Old Station

The new Lechmere station opened to revenue service on March 21, 2022, marking the start of Phase 1 of the , which included the Union Square Branch. This elevated facility, positioned approximately 700 feet north of the original surface-level station across the McGrath Highway (now Monsignor O'Brien Highway), became the northern terminus for trains extending to Union Square in Somerville. The opening followed nearly two years of rail service suspension at the site, with inbound trains from now routing directly onto the new viaduct and into the relocated station. The preceding surface station, operational since 1922, had closed on May 24, 2020, to enable demolition of its infrastructure and rehabilitation of the Viaduct as part of the extension project. During the closure period, the MBTA provided replacement shuttle bus service from Science Park station to the old Lechmere busways, which remained active as a temporary transfer point for bus routes despite the absence of rail platforms. These bus facilities supported interim connectivity to local routes, including the and buses, until rail resumption at the new site. Transition to the new station involved a seamless shift for passengers, as the elevated structure connected directly to the upgraded , eliminating the need for continued shuttles to the old location. Green Line D and E branch service patterns adjusted to incorporate the extension, with the new serving as a key interchange for the initial phase. Post-opening, the old station's busways and remaining structures were transferred to developer DivcoWest in June 2022 for and potential , fully severing operational ties to the historic site. Initial service on featured regular headways, though the full extension to Medford via the Community College Branch did not commence until December 12, 2022.

Project Challenges and Controversies

Cost Overruns and Fiscal Mismanagement

The (GLX) project, encompassing the relocation of Lechmere station northward to a new elevated configuration, experienced substantial cost overruns stemming from initial planning and execution flaws under the (MBTA). Originally budgeted at approximately $1.12 billion in 2012 for the full extension including six stations, the estimate escalated to nearly $2 billion by 2015, with projections reaching as high as $3 billion before construction was paused. These overruns, totaling around $1 billion beyond early forecasts, were attributed to —such as added community paths and more elaborate station designs—and inadequate contingency planning during the early design phases. Fiscal mismanagement was evident in the MBTA's understaffed and ineffective implementation of the Construction Manager at Risk (CM/RC) delivery method, which failed to provide timely cost controls or open-book accounting for subcontractors. For specifically, the station's redesign to an elevated structure with integrated busways and viaducts contributed disproportionately to escalations, as initial low-cost surface concepts ballooned due to late-stage modifications for and urban integration, pushing station-related expenditures from under $1 million per unit to hundreds of millions across the project. Critics, including independent analyses, highlighted a lack of expertise in managing large-scale procurements and excessive deference to input processes that inflated scopes without corresponding adjustments. In response to these issues, Governor Charlie Baker's administration imposed a construction halt in late 2015, appointing a Fiscal and Management Control Board to oversee reforms, which shifted to a design-build model and scaled back the initial to the Square branch—including the new —reducing projected costs by about $800 million through simplified stations and tighter contractor oversight. The revised $2.3 billion for this was ultimately met without further major escalations, enabling partial of $75 million in local contributions from and Somerville, though the total taxpayer burden remained far above original commitments. This episode underscored systemic challenges in MBTA project governance, including deferred maintenance backlogs exceeding $7 billion that strained resources and amplified overrun risks.

Delays Due to Contractor and Regulatory Issues

The project, including the relocation of Lechmere station to a new elevated structure, faced initial delays from contractor terminations in December 2015, when the MBTA ended agreements with four firms—including White-Skanska-Traylor—over escalating costs and inadequate progress controls, effectively halting fieldwork until a restructured design-build was awarded to Constructors in August 2017. This restart added roughly two years to the timeline, as the new (comprising Enterprises, The Corporation, and Contracting) required time to mobilize and redesign elements to address prior deficiencies. Regulatory requirements compounded these setbacks, with the project navigating Massachusetts Environmental Policy Act (MEPA) processes that included an Environmental Impact Report filed in 2012 and subsequent Notices of Project Change, such as one approved in November 2017 for modifications to the Medford branch, which prolonged environmental certifications and permit acquisitions from agencies like the Massachusetts Department of Environmental Protection for wetlands, waterways, and stormwater management. Federal oversight added further scrutiny, as the withheld full funding grant authorization until April 2017 following revisions to scope and budget, delaying full-scale construction commencement. Ongoing contractor execution issues under Constructors contributed to slippage during the core construction phase from 2018 onward, including coordination challenges with utility relocations and freight rail operator CSX over shared trackage, which a 2022 state legislative review identified as key engineering uncertainties exacerbating schedule risks for the 4.7-mile extension, including Lechmere's and platform buildout. These factors pushed the closure of the original Lechmere station from late 2019 to May 2020 and deferred the new station's operational debut until March 2022, despite the design-build model's intent to accelerate delivery. Post-substantial completion, contractor persisted as deficiencies in —such as improper gauging—necessitated remediation, prompting the MBTA to grant Constructors a minimum seven-day extension in December 2023 for corrective re-gauging along the extension, including segments tied to Lechmere approaches, while directing accelerated resource deployment to mitigate service disruptions. Such warranty-period interventions underscored persistent execution gaps, though the MBTA reported no alterations to the core project agreement for the primary delays.

Community and Environmental Disputes

The relocation of Lechmere station prompted an environmental review under the , culminating in an Environmental Assessment published in October 2011 and a Finding of No Significant Impact from the in July 2012. This process evaluated impacts on air quality, water resources, historic structures including the adjacent Lechmere Viaduct, and noise levels, determining that mitigation measures—such as dust control and erosion prevention—would suffice without substantial adverse effects. Project proponents highlighted long-term environmental gains, projecting approximately 45,000 fewer daily vehicle trips and corresponding reductions in upon completion. No major environmental litigation specific to the Lechmere segment emerged, unlike challenges to the broader extension in Medford. Community opposition centered on construction disruptions and transit interruptions in East . Residents reported severe quality-of-life issues, including persistent noise, vibration, dust, and from and site preparation starting in 2020, which transformed the neighborhood into what locals termed a "construction site." The full closure of the original Lechmere on May 24, 2020, for removal and replacement with shuttle service until the new station's opening in March 2022, amplified these grievances by forcing reliance on buses prone to delays and overcrowding. City Councillor Timothy Toomey introduced a policy order in February 2014 urging opposition to any premature shutdown without the replacement operational, citing risks to commuter access and local businesses dependent on the . Additional concerns involved the new station's integration with Square, where redesigns drew criticism for inadequate crossings and bike access amid growing tech-sector development, potentially exacerbating pressures. fears, while more pronounced along the extension's Somerville segments, extended to 's vicinity, with advocates warning that improved could accelerate housing costs and displace lower-income residents without sufficient affordability safeguards. These issues prompted petitions and calls for enhanced mitigation, though they did not halt the project.

Post-Opening Technical and Operational Problems

The new Lechmere station and the initial phase of the faced persistent speed restrictions due to track alignment, signal, and defects identified post-opening. By September 2023, the extension had accumulated over a dozen slow zones, with trains compelled to reduce speeds to as low as walking pace in affected segments to mitigate risks from construction-related flaws such as uneven and inadequate clearance. These restrictions, which emerged within months of service commencement on March 21, 2022, increased travel times and contributed to operational inefficiencies, prompting the MBTA to open 33 new restrictions while closing only 19 between late August and late September 2023 alone. The agency attributed many to hasty post-construction inspections and lapses by contractors, leading to expedited repairs involving track resurfacing and signal recalibrations. All speed restrictions on the Green Line Extension, including those impacting Lechmere approaches, were eliminated by October 11, 2023, following intensive track and signal upgrades that restored full operational speeds. This resolution came after temporary nightly closures and focused interventions, reducing end-to-end delays on the Union Square branch by several minutes. However, isolated equipment failures persisted, such as a pantograph malfunction on October 20, 2023, that disabled a train near Lechmere station around 3:30 p.m., halting extension service until the vehicle was cleared. A significant operational incident occurred on October 1, 2024, when an eastbound Green Line train (consist 3874-3718) its leading railcar less than a minute after departing Lechmere station during the evening , injuring seven of the approximately 50 passengers and two crew members on board. Preliminary (NTSB) findings indicated the operator exceeded the 25 speed limit by reaching 36 in the immediately east of the station, with no evidence of track or rail defects contributing to the ; the incident prompted a temporary suspension of extension service for investigation and re-railing. Governor emphasized that the was not attributable to failures, aligning with NTSB pointing to human factors over systemic technical shortcomings. Service resumed after assessments, but the event highlighted ongoing training and enforcement needs for speed compliance at the relocated station's egress points. Signal disruptions have occasionally affected Lechmere operations, including a March 29, 2024, failure that suspended service between Union Square and after a train overran a stop, potentially damaging equipment and requiring repairs until late afternoon. Similar issues recurred in April 2024, underscoring vulnerabilities in the extension's newer signaling systems despite pre-opening testing. These incidents, while not unique to Lechmere, have amplified rider complaints about reliability on the viaduct and terminal approaches, prompting MBTA commitments to broader signal modernization under the Green Line Train Protection program.

Operations and Usage

Current Service Patterns and Connections

Lechmere station serves as an intermediate stop on the MBTA , which operates bidirectional service between Heath Street in and Medford/Tufts University in . Inbound trains from Medford/Tufts proceed through Lechmere toward via the main Green Line trunk, while outbound trains from Park Street continue north to the extension branches. Service operates daily from approximately 5:00 AM to 1:00 AM, with headways of 6–8 minutes during peak periods and 7–12 minutes off-peak, subject to scheduled maintenance and disruptions. The station connects to multiple routes via an adjacent busway, enabling transfers for local and express services in and surrounding areas. Key routes include 69 to , 80 to via North , 87 to Center, and 88 to Clarendon Hill via Winter Hill. These buses provide feeder service to residential neighborhoods and link to other MBTA lines at terminals like and Harvard. No direct rail connections exist at Lechmere, though is accessible via a roughly 0.6-mile walk or continuing inbound on the Green Line. Prior to its closure in 2021, the original Lechmere station on the MBTA Green Line recorded an average of 6,421 weekday boardings, positioning it as a moderate-volume surface stop compared to downtown trunk stations. The relocated Lechmere station, integrated into the (GLX) opened in March 2022 for Phase 1 (to Square) and December 2022 for Phase 2 (to Medford/Tufts), was projected to contribute to extension-wide ridership exceeding 45,000 daily one-way trips, with overall usage anticipated at 50,000–52,000 weekday boardings including transfers and new origins. Post-opening data indicate subdued performance relative to forecasts, attributable in part to the project's launch during lingering effects on transit demand, including sustained reducing peak-hour loads. MBTA rail ridership datasets, such as the Fall 2023 counts covering August–December, provide granular boardings and alightings by Green Line branch and stop (including ), revealing patterns of lower-than-pre-pandemic volumes amid system-wide recovery to approximately 70–80% of 2019 benchmarks by 2024.
PeriodKey MetricSource Notes
Pre-2021 (original station)6,421 average weekday boardingsSurface Green Line data; excludes alightings
Projection (full operations)>45,000 daily trips extension-wideMBTA estimates for 2030 horizon, factoring
2023 (post-opening)Below projections; station-level averages available via SDP-period breakdownsFall dataset shows directional flows, with Lechmere as inbound terminus for E branch
These trends reflect broader challenges in light rail systems, where extensions often underperform initial models without corresponding density growth or mode shifts from autos.

Maintenance and Recent Rehabilitation Efforts

The Lechmere Viaduct, providing essential access to the station as part of the MBTA Green Line, underwent a $62 million rehabilitation project initiated in conjunction with the to address deterioration in the 110-year-old structure. Completed elements by 2024 strengthened the viaduct to support heavier loads from modern vehicles and increased service frequency, while extending its operational lifespan and lowering long-term expenses without altering its historic appearance. The work, managed by contractors including SPS , involved reinforcing concrete and steel components to accommodate extension-related demands, preserving structural integrity amid prior deferred upkeep on the aging infrastructure. Post-opening of the relocated elevated station in March 2022, maintenance efforts have focused on with the extension, including a 42-day service suspension from July 18 to August 28, 2023, between and Square branches for signal and switch upgrades essential to reliable operations. These interventions addressed post-construction adjustments rather than major defects, aligning with broader MBTA initiatives to mitigate slow zones and enhance on newly extended trackage. Routine inspections and minor repairs continue under the rehabilitation's extended monitoring, ensuring compatibility with daily service patterns. No large-scale station-specific rehabilitations have been reported as of 2025, reflecting the relative newness of the facility amid ongoing system-wide challenges.

Economic and Social Impacts

Projected vs. Actual Development Benefits

Proponents of the , which relocated and upgraded as its terminus, projected substantial (TOD) benefits, including over 10 million square feet of new offices, laboratories, housing, and retail within a quarter-mile radius of the new stations to stimulate economic growth in underserved areas like East and Somerville. These forecasts emphasized improved access to jobs, reduced vehicle dependency, and spurred private investment, with planning documents from the early 2010s anticipating the extension would transform industrial zones into vibrant mixed-use hubs by leveraging enhanced connectivity to . In practice, large-scale developments have materialized in adjacent areas, notably Union Square in Somerville, where the $2 billion USQ project—a 20-acre including 3.8 million square feet of , lab, residential, and retail space—advanced through groundbreaking in 2021 and continued post-GLX opening in March 2022, aligning with pre-extension planning commitments that tied contributions to transit improvements. However, around the new Lechmere station itself, outcomes have diverged from projections for immediate local revitalization; owners in East reported in 2023 that anticipated surges in foot traffic and patronage failed to materialize, attributing shortfalls to prolonged construction disruptions, high post-pandemic operating costs, and broader economic headwinds rather than transit enhancements alone. Broader assessments indicate mixed realization of TOD goals by 2025, with institutional investments in lab and office space proceeding amid Boston's biotech boom—evident in ongoing North Point-area projects near Lechmere—but residential and retail components lagging due to affordability pressures and market saturation, underscoring that while infrastructure enables development, causal factors like zoning, financing, and regional demand exert stronger influence than transit alone. No comprehensive post-opening economic impact study specific to Lechmere has quantified net benefits against projections, though ridership data indirectly supports usage without confirming induced growth.

Fiscal Implications for Taxpayers

The project, which included the relocation and reconstruction of Lechmere station, had a total of approximately $2.3 billion upon completion in 2022. Of this, federal grants from the U.S. Department of Transportation's covered about $996 million, or roughly 43 percent, leaving the remainder—over $1.3 billion—to be financed by funds through bonds issued by the (MassDOT). These obligations are ultimately borne by taxpayers via the Commonwealth's transportation financing mechanisms, including the gas , allocations, and general obligation bonds repaid from revenues. Cost overruns significantly amplified the taxpayer burden, with initial estimates around $1.9 billion in escalating due to design changes, contractor disputes, and management issues, at one point threatening to exceed $3 billion before interventions stabilized the figure at $2.3 billion. State lawmakers and oversight bodies, including the Fiscal Management and Control Board, approved additional funding to cover these excesses, drawing from taxpayer-supported reserves and borrowing that increased long-term debt service costs estimated in the hundreds of millions over the bonds' lifespan. Critics, such as the Pioneer Institute, have attributed much of the overrun—up to 50 percent beyond contracted guarantees—to flawed models like guaranteed maximum price contracts that failed to subcontractor bids, effectively transferring to public coffers. Beyond capital expenditures, the new Lechmere station and extended line impose ongoing fiscal strain through elevated operating subsidies. The MBTA's financial projections indicate that the Green Line Extension contributes to an annual operating deficit of about $49 million starting in fiscal year 2023, necessitating subsidies from the state operating budget funded by taxpayer revenues, which could pressure future fare hikes or budget reallocations amid the agency's broader $700 million structural shortfall. While ridership growth has partially offset costs, the Massachusetts Taxpayers Foundation has warned that persistent underfunding and rising deficits from expansions like GLX exacerbate the MBTA's reliance on general tax appropriations, projecting gaps that could reach $500 million by fiscal year 2026 without reforms. Local contributions, such as the $75 million pledged by Cambridge and Somerville, were ultimately reimbursed by the MBTA in 2021 using project savings, shifting the full non-federal burden back to statewide taxpayers.

Criticisms of Efficacy and Alternatives

Critics have argued that the relocation and extension of Lechmere station as part of the Green Line Extension (GLX) failed to deliver proportional benefits relative to its escalated costs, which rose from an initial estimate of approximately $814 million in 2012 to over $2.28 billion by completion in 2022. Transit analyst Alon Levy contended that the project's per-km cost exceeded $400 million, far above international benchmarks for light rail, due to factors like excessive station designs and procurement inefficiencies, rendering it a poor value despite improved connectivity to areas like Union Square. Value engineering during construction compromised features such as full accessibility at some points and integrated fare payment systems, leaving the line incomplete upon opening in March 2022 and contributing to operational inefficiencies. Proponents of alternatives, particularly (BRT), have highlighted that enhanced bus services could achieve comparable travel time reductions—up to 45% in select corridors— at a of the outlay required for . A 2016 Barr Foundation analysis of transit options found BRT more cost-effective than rail expansions like for medium-demand routes, citing lower construction expenses and flexibility for dedicated lanes without the need for extensive trackwork or elevated structures. Earlier evaluations, such as the 1990s Beyond Lechmere study, considered busways and combined light rail-bus hybrids but ultimately favored rail; however, retrospective critiques note that BRT's scalability and quicker implementation could have addressed Lechmere-area congestion sooner, avoiding GLX's decade-long delays and taxpayer burden exceeding $2 billion for roughly 4.7 km of extension. These criticisms underscore broader concerns with U.S. megaprojects, where institutional factors like fragmented oversight and work rules inflate costs without commensurate ridership or economic gains, as evidenced by GLX's expenses ballooning to over 100 times initial per- projections in some analyses. While the new Lechmere enhanced terminal operations by eliminating the tight loop at the old surface-level site, detractors argue that simpler upgrades, such as bus integration or partial , would have sufficed for the corridor's demand, preserving funds for higher-impact investments elsewhere in the MBTA network.

References

  1. [1]
    Lechmere | Stations - MBTA
    Information & Support Monday thru Friday: 6:30 AM - 8 PM Main: 617-222-3200 711 for TTY callers; VRS for ASL callers Emergency Contacts 24 hours, 7 days a week.
  2. [2]
    Green Line Extension (GLX) | Projects - MBTA
    The Green Line Extension (GLX) extends the northern end of the Green Line from Lechmere to Union Square in Somerville and College Avenue in Medford.
  3. [3]
    A Century in the Making: The Green Line Extension Opens - Herzog
    Apr 29, 2023 · The original Lechmere station was demolished and rebuilt as an aerial station, and six new stations with headhouses and level boarding platforms ...
  4. [4]
    Trials and triumphs designing Boston's Green Line Extension - ASCE
    Jul 12, 2023 · The extension consists of two separate branches that begin at the Lechmere Station, which itself was relocated and reconstructed, and run ...
  5. [5]
    MBTA Green Line Extension Opens - Railpace Newsmagazine
    Mar 25, 2022 · Seven new stations were constructed as part of the project, including the relocated Lechmere Station, along with a new vehicle storage and ...
  6. [6]
    Lechmere - Green Line 'D' and 'E' Branches - The SubwayNut
    Sep 20, 2024 · The new Lechmere MBTA Station consists of an elevated island platform on a concrete viaduct across O'Brien Highway (MA Highway 28)Missing: details | Show results with:details
  7. [7]
    MBTA Green Line Extension - Boston - Fennick McCredie Architecture
    The seven stations include: a relocated Lechmere Station, six new stations, three traction power substations and a number of infrastructural improvements.Missing: features | Show results with:features
  8. [8]
    Lechmere Viaduct Rehabilitation | Projects - MBTA
    The bridge closed to support work on the Green Line Extension project in May 2020. Crews completed the following work during construction:.Missing: features elements
  9. [9]
    Green Line Extension Project - City of Cambridge, MA
    A commitment to universal access, with new stations that will meet or exceed the Americans with Disabilities Act (ADA) standards. Operation in existing railroad ...
  10. [10]
    MBTA Puts New Green Line Stations On the Map - StreetsBlog Mass
    Apr 8, 2021 · The new map shows the six new stations of the Green Line extension ... ADA-accessible stations with elevated platforms. Meanwhile, a ...
  11. [11]
    Green Line Extension - CDD - City of Cambridge, Massachusetts
    The MBTA also moved Lechmere Green Line station to a new location on North First Street. At the same time, they built an extension of the Somerville Community ...
  12. [12]
    MBTA Green Line Extension - HNTB
    In addition to the Lechmere Station, the design-build project also consists of six new stations along the line. The overall elements of the project include: 3 ...Missing: features | Show results with:features
  13. [13]
    From Boston to Lowell and Nashua by Train in 1850 - LibGuides
    The Boston and Lowell Railroad, 26 miles in length, was opened for passengers in June, 1835. It was one of the earliest, as it has been one of the most ...
  14. [14]
    [PDF] Bicycles and Trains in and around Cambridge
    May 21, 2022 · The first train track on the edge of East Cambridge along the banks of the Millers River was the Boston & Lowell. Railroad, opened in 1835.
  15. [15]
    Transportation - MIT Press Direct
    The railroad chose the first route, and in 1857, after filling more fiats in East Cambridge and throwing a second bridge across the Charles, it opened a new ...Missing: origins | Show results with:origins
  16. [16]
    East Cambridge Station - Massachusetts
    Historical snapshots based on data from available timetables. 1906; 1918; 1923; 1924. Station Details; Routes Served; Departures; Arrivals ...
  17. [17]
    East Somerville station - Wikipedia
    ^ "Oppose Closing East Cambridge Station". The Boston Globe. January 12, 1927. p. 8 – via Newspapers.com. Open access icon. ^ "Five B. & M. Stations Will Be ...
  18. [18]
    Lechmere Viaduct - Wikipedia
    The Lechmere Viaduct is a concrete arch bridge connecting the West End neighborhood of Boston to East Cambridge, Massachusetts. Opened in 1912, the viaduct ...Missing: canopy | Show results with:canopy
  19. [19]
    End of the line for the old Lechmere station | Universal Hub
    May 23, 2020 · In 1921, the El began construction of a new station at Lechmere that would serve as a sort of dual terminal: People coming from Harvard Square ...Missing: facts | Show results with:facts
  20. [20]
    The Green Line turns 100 today - Rails, Roads, and Riverside
    Jul 10, 2022 · The 1922 opening of the new Lechmere transfer station marked this pivot point, after which every single capital exercise carried out on the ...Missing: establishment | Show results with:establishment
  21. [21]
    NEW ELEVATED TERMINAL AT LECHMERE SQUARE
    The new terminal covers npproximntely two acres and will have cost the Elevated company, when it reaches completion, übout .fHKMKIO. Though the Cuinbridge ...Missing: Railway | Show results with:Railway
  22. [22]
    Lechmere Station in East Cambridge, Massachusetts, began as a ...
    May 7, 2025 · Lechmere Station in East Cambridge, Massachusetts, began as a critical transit hub in 1922, reflecting the Boston Elevated Railway's (BERy) ...Missing: facts | Show results with:facts
  23. [23]
    LECHMERE SQUARE TRANSFER STATION OPENED ON MONDAY
    The Elevated on Monday opened the new Lechmere square transfer station ... Th,- ringing of a large gong dispatched the trains on regular schedule to Boston.Missing: Railway | Show results with:Railway
  24. [24]
    #TBT Lechmere Station c.1922. The Boston Elevated Railway Co ...
    May 21, 2020 · Starting May 24, 2020, the current Lechmere Station will be closed permanently. Over the next year, the station's closure will allow for ...Missing: design | Show results with:design<|separator|>
  25. [25]
    The Kenmore Model and the Lechmere Model
    Dec 7, 2024 · In 1922, BERy constructed a transfer terminal at Lechmere Square. Surface cars from the northwest terminated at what became the bus terminal, ...
  26. [26]
    Recent changes, history of MBTA's Green Line - Boston.com
    Aug 31, 2012 · In 1964, the MTA turned into the Massachusetts Bay Transportation Authority. The rail Central Subway System was rebranded the Green Line.
  27. [27]
    [PDF] Changes to Transit Service in the MBTA district 1964-2025 By ...
    -Between April and November 2011, Route 602 Lechmere-North Station operated in place of Green Line service while Science Park station was rebuilt. -In March ...
  28. [28]
    Lechmere Viaduct Ready for Service | Updates - MBTA
    Mar 17, 2022 · On March 16, 2022, the Lechmere Viaduct Rehabilitation project reached substantial completion. The 110-year-old structure is now restored, with ...
  29. [29]
    Historic MBTA Lechmere Viaduct Rehabilitation Progresses - VHB
    Oct 15, 2021 · The Lechmere Viaduct Rehabilitation Project is one of 15 projects that make up the overall Green Line Transformation Program.Missing: architectural | Show results with:architectural
  30. [30]
    MBTA Closing Green Line from Lechmere for One Year, Replacing ...
    May 21, 2020 · Starting May 24, shuttle bus service will replace Green Line trains between Lechmere and North Stations every day, including weekdays and ...
  31. [31]
    Lessons to be learned from Green Line Ext. - CommonWealth Beacon
    Dec 10, 2017 · The proposal to extend the Green line north from Lechmere goes back to at least the 1970s. Planners recognized the asymmetry of a service that ...<|separator|>
  32. [32]
    A history of the Green Line extension to Somerville - Boston.com
    Aug 30, 2017 · 1990 State officials announced a large-scale mass-transit plan for Boston 2020 that included extending the Green Line from Lechmere, in ...
  33. [33]
    The Green Line Extension Project Progress and Finances
    Jul 5, 2022 · The Green Line extension past Lechmere was originally promised during the Big Dig in 1990, but was later put on hold due to going over budget.
  34. [34]
    Boston Green Line Extension (GLX), Massachusetts
    Dec 16, 2014 · Planning activities for the project started in 2005 and the construction is being carried out in four phases. Phase I started in early 2013 and ...
  35. [35]
    [PDF] The Boston Case: - The Story of the Green Line Extension
    Dec 9, 2020 · By 2010, the concept for GLX's stations changed: “The design for each station is envisioned to provide a headhouse with automated fare lines, ...
  36. [36]
    [PDF] The Boston Case: The Story of the Green Line Extension
    comfortably fit, construct six new stations, relocate the existing Lechmere. Station, erect four multi-span viaducts, reconstruct 11 bridges, build two new.
  37. [37]
    File:1978 Lechmere relocation plans.jpg - Wikimedia Commons
    English: 1978 plans for a relocated Lechmere station, prepared as part of redevelopment of the Lechmere Canal area. The massive deck with elevated busway was ...
  38. [38]
    GLX Construction Activities (Through July 2018) | Updates - MBTA
    Mar 19, 2018 · GLX Constructors, the design-build entity for the MBTA Green Line Extension Project, began ... from the Lechmere Station area to Union Square ( ...
  39. [39]
    Green Line Extension (GLX) Union Square Branch Opens March 21
    Mar 18, 2022 · The new branch will extend the northern end of the Green Line from Lechmere in East Cambridge to Union Square in Somerville.
  40. [40]
    Lechmere, Science Park Stations Will Close For 1 Year Amid Green ...
    Jan 28, 2020 · The last two stops on the Green Line will shut down for close to a year amid major work to renovate and expand the subway line, the MBTA announced Monday.
  41. [41]
    A year-long Green Line closure is beginning this weekend. Here's ...
    May 21, 2020 · Say goodbye to the old Lechmere Station. Beginning on Sunday, the Green Line's northern terminus, as well as Science Park Station, will close ...
  42. [42]
    Goodbye, Lechmere | Miles in Transit
    May 24, 2020 · Over seven years ago, I opened up my Lechmere review by saying that it was a station on its last legs. Seven years later, those legs have ...
  43. [43]
    Opening date set for MBTA Green Line's new Medford branch - WCVB
    Nov 17, 2022 · Poftak said the new branch of the Green Line, with five new stations, will open at the start of service on Dec. 12. The final ribbon-cutting on ...
  44. [44]
    Cost Overruns Likely To Delay MBTA's Green Line Extension Project
    Oct 22, 2015 · The future of the project was thrown into question when it was revealed in August that it could end up as much as $1 billion over budget. During ...
  45. [45]
    Cost of 'grossly overpriced' Boston Green Line extension could ...
    Jan 5, 2016 · Critics have said the guaranteed maximum price contract allowed the primary contractor, White-Skanska-Kiewit, too much leeway with the project ...
  46. [46]
    Lechmere MBTA station's move caught up in $1 billion overruns on ...
    Aug 25, 2015 · A rendering looks inside a proposed Lechmere T station redesign. The total expense of the project had been put at $1.992 billion, or $2.3 ...Missing: facts | Show results with:facts
  47. [47]
    The Green Line Extension | Pedestrian Observations
    Mar 23, 2022 · Compared to business as usual, they reduced the project cost by $800M, partly by allowing less elaborate stations, and partly by pressure on ...Missing: redesign simplified
  48. [48]
    Interesting article on the cost overruns of the GLX project (green line ...
    Dec 8, 2021 · Instead, a confluence of factors have contributed, from lack of expertise and ineffective project management, to processes for citizen input. “ ...City can no longer afford Green Line LRT project, Calgary mayor saysWhy are people so opposed to the green line extension? : r/TwinCitiesMore results from www.reddit.com
  49. [49]
    Progress Resumes on Green Line Extension Project
    The first phase would extend the Green Line from Lechmere Station in Cambridge through Somerville to end at College Avenue in Medford, near Tufts University; ...
  50. [50]
    A remarkable turnaround for Green Line extension
    May 25, 2021 · The nearly $2.3 billion Green Line extension project will come in under budget, allowing Somerville and Cambridge to recover the combined $75 million they ...Missing: mismanagement | Show results with:mismanagement
  51. [51]
    MBTA Ending Several Contracts Associated With Green Line ...
    Dec 10, 2015 · The transit agency announced in a press release Thursday that it was ending contracts with four firms, including general contractor White ...
  52. [52]
    Boston-Area's Long-Delayed Green Line Extension Approaches ...
    Apr 4, 2022 · The design-build project is led by GLX Constructors, a joint venture comprised of Fluor Enterprises Inc., The Middlesex Corp., Herzog ...
  53. [53]
    [PDF] November 15, 2017 - EEA Data Portal
    Nov 15, 2017 · RE: MBTA Green Line Extension Notice of Project Change (NPC), MEPA #13886 ... delays and reduced the potential benefits of the Extension.
  54. [54]
    [PDF] Appendix E – MEPA Review Certificates | Mass.gov
    The project requires several permits from the Massachusetts Department of. Environmental Protection (MassDEP) including, but not limited to: a c.91 Waterways ...
  55. [55]
    $$2.3B Boston Green Line extension back on track with FTA approval ...
    Apr 5, 2017 · The FTA withheld its authorization for a $1 billion grant when the Massachusetts Bay Transportation Authority halted work on the rail project ...Missing: MEPA | Show results with:MEPA
  56. [56]
    Legislative audit finds Metro Green Line Extension delayed and over ...
    Sep 2, 2022 · The audit found three main factors driving the project's engineering problems: Uncertainty about conflict with the freight rail along the route; ...Missing: Lechmere | Show results with:Lechmere
  57. [57]
    The Green Line extension is hit with another delay | WBUR News
    Oct 21, 2021 · Poftak said "a variety of challenges" contributed to the latest delay on the Union Square-bound chunk of the project, particularly during work ...Missing: regulatory | Show results with:regulatory
  58. [58]
    Completion of track work along MBTA Green Line Extension ...
    Dec 12, 2023 · ... MBTA Green Line Extension delayed by at least seven days. The MBTA granted the construction extension to GLX Constructors while directing the ...
  59. [59]
    Green Line Extension work delayed to at least Dec. 17, MBTA says
    Dec 8, 2023 · Work on the Green Line Extension was supposed to be done Dec. 11, the MBTA said. The contractor has asked for more time.
  60. [60]
    [PDF] Green Line Extension Cambridge to Medford, Massachusetts
    An. Environmental Assessment of the project was published in October 2011, with a Finding of No Significant. Impact issued in July 2012. Under SAFETEA-LU, FTA ...
  61. [61]
    Somerville and Medford mayors discuss Green Line extension, T's ...
    Dec 10, 2022 · "The environmental impacts? We get cleaner air," she says. "We are anticipating that there will be about 45,000 less vehicle trips per day ...
  62. [62]
    Green Line project faces hurdle - The Boston Globe
    Jan 29, 2013 · Medford residents Bill Wood and Carolyn Rosen have sued the state Department of Transportation and the Federal Transit Administration, ...
  63. [63]
    Living near the Green Line Extension Is Hell - Boston Magazine
    Feb 3, 2020 · In recent days, the MBTA announced the full details of a year-long shutdown of the Lechmere to North Station stretch in order to tear down the ...Missing: integration roads infrastructure<|separator|>
  64. [64]
    MBTA's GLX begins demolition on section of Lechmere Viaduct
    Jun 8, 2020 · The elevated steel and concrete structure between Gilmore Bridge and Lechmere Station will be removed, relocated and reconstructed.Missing: opposition | Show results with:opposition
  65. [65]
    Second 17-month T disruption looms for Lechmere - Cambridge Day
    Feb 26, 2014 · A policy order by Tim Toomey asked fellow city councillors to oppose the closing of Lechmere before its replacement was in place, and for the ...
  66. [66]
    Anybody else pretty disappointed with the Lechmere Sq redesign?
    Sep 15, 2023 · The roads are very difficult and expensive to move. ... You need pedestrian crossings from Lechmere station in every direction - it's surrounded ...r/boston - View of Lechmere Station from the ruins of ... - RedditPlans for Lechmere Square? : r/CambridgeMA - RedditMore results from www.reddit.comMissing: relocation concerns
  67. [67]
    Newly extended Green Line brings gentrification fears - WHDH
    Mar 21, 2022 · Massachusetts originally put a December 2014 deadline on the expansion before a cavalcade of cost overruns and contractor problems nearly ...<|separator|>
  68. [68]
    Petitions about Lechmere – Support Causes & Make a Difference
    Jan 29, 2024 · The petitions under this topic highlight the negative impact that the closure of Lechmere would have on the community, particularly on those who ...
  69. [69]
    MBTA Green Line extension slow zone - NBC Boston
    Sep 27, 2023 · From Aug. 28 through Sept. 26, the MBTA opened 33 speed restrictions, while closing 19, meaning an overall increase of 14 slow zones in a ...
  70. [70]
    MBTA eliminates Green Line extension slow zones, reopens Union ...
    Oct 11, 2023 · The MBTA said Wednesday it eliminated all speed restrictions on the Green Line extension, bringing trains back to full speed across the agency's ...
  71. [71]
    MBTA removes slow zones on the Green Line - The Tufts Daily
    Oct 19, 2023 · The MBTA has restored service to Union Square ahead of schedule and lifted all speed restrictions on the Green Line Extension, Phillip Eng, ...
  72. [72]
    MBTA Shuts Down Green Line Extension After Electrical Issue With ...
    Oct 20, 2023 · T officials said a Green Line train became disabled near Lechmere Station shortly before 3:30 p.m. due to a pantograph failure. No one was ...Missing: post- problems<|control11|><|separator|>
  73. [73]
  74. [74]
    Green Line train derails during Tuesday commute, injuring passengers
    Oct 2, 2024 · The cause of the accident is under investigation. Work crews arrived to assess any damage and get the train back on the rails. Fire officials ...
  75. [75]
    Healey says rails didn't cause Green Line derailment, cites possible ...
    Oct 3, 2024 · Gov. Maura Healey said the Tuesday afternoon derailment on the Green Line is "not attributable to the rail or the track," and suggested that federal ...
  76. [76]
    One year after Green Line derailment, NTSB publishes documents
    Oct 1, 2025 · The trolley derailed during the evening commute on Oct. 1, 2024, shortly after the eastbound train departed from Lechmere Station in Cambridge.
  77. [77]
    Signal problem disrupts MBTA service on Green Line - WCVB
    Mar 29, 2024 · MBTA Green Line disrupted after train failed to stop, possibly causing damage, officials say · Service resumed just before 5 p.m. · HOURLY · DAILY.Missing: issues problems
  78. [78]
    Green Line disrupted by another signal issue in Somerville - WCVB
    Apr 1, 2024 · ... MBTA temporarily suspended service between Union Square and Lechmere on the D Branch. Riders were first notified of the disruption just after ...Missing: post- problems
  79. [79]
    MBTA Announces November Service Changes | News
    Riders can find more information on service changes through in-station signage, in-station public announcements, and at mbta.com/PlannedWork.
  80. [80]
    Green Line E | Subway - MBTA
    MBTA Green Line E Subway stations and schedules, including maps, real-time updates, parking and accessibility information, and connections.
  81. [81]
    Green Line | Subway - MBTA
    MBTA Green Line trolley stations and schedules, including maps, real-time updates, parking and accessibility information, and connections.Green Line D · Green Line B · Green Line E · Schedules & Maps
  82. [82]
    69 | Bus - MBTA
    MBTA bus route 69 stops and schedules, including maps, real-time updates, parking and accessibility information, and connections.
  83. [83]
    Subway / Bus Rapid Transit Ridership - MBTA Realty
    Green Line surface stations - See Green Line Surface Ridership ... LECHMERE. 6,421. Community. College. Maverick. Airport ... BOSTON MARINE. INDUSTRIAL PARK.
  84. [84]
    Fast Facts: The Green Line Expansion Project - Tufts Now
    Dec 9, 2022 · According to the MBTA, GLX is expected to support an increased ridership of more than 45,000 trips per day while significantly reducing vehicle ...Missing: statistics | Show results with:statistics
  85. [85]
  86. [86]
    Lechmere Viaduct MBTA Green Line $62M Rehab
    Apr 15, 2024 · SPS was chosen by the MBTA to rehabilitate the 110-year-old Lechmere Viaduct. This $62M project connects to the new Green Line Extension ...
  87. [87]
    Lechmere Viaduct Upgrades - RailWorks
    The Lechmere Viaduct Rehabilitation supports the MBTA's larger Green Line Extension, as trains will cross the viaduct to access the newly constructed stations.
  88. [88]
    Part of MBTA's new Green Line extension to shut down for 42 days
    Jun 30, 2023 · Starting July 18, service will be suspended between Union Square and Lechmere for 42 days. The closure has nothing to do with the tracks.Missing: post- | Show results with:post-
  89. [89]
    'Temporary' Green Line Slow Zone Approaches 1-Year Anniversary
    Jan 18, 2023 · The viaduct upgrades were done in tandem with Lechmere Station's closure, relocation and reconstruction as part of the Green Line Extension ...<|separator|>
  90. [90]
    Green line extension didn't meet expectations around small ...
    Jul 24, 2023 · ... problems that continue with no end in sight. Business owners say residents using other commuting options could explain the lack of impact ...
  91. [91]
    USQ | Redevelopment of 20 acres in Union Square, Somerville
    The redevelopment of 20 acres in Union Square, Somerville creating 3.8 million square feet of office/lab, residential, retail & green space.
  92. [92]
    Union Sq., Somerville, Master Developer Signs Agreement to ...
    Apr 5, 2017 · Union Sq., Somerville, Master Developer Signs Agreement to Provide GLX Contribution and Add'l Community Benefits; Covenant Brings Total ...
  93. [93]
    Our Cambridge Street
    From fall 2021 through fall 2022, the City led Our Cambridge Street, a planning study for Cambridge Street between Inman Square and Lechmere Station.Missing: post | Show results with:post
  94. [94]
    The Green Line Extension Is Way Over Budget - Boston Magazine
    Aug 24, 2015 · MBTA officials revealed at a board meeting Monday that the much-needed 4.3 mile extension is facing additional costs that could add $1 billion ...Missing: relocation | Show results with:relocation
  95. [95]
    MBTA Experiment Gone Wrong! The Green Line Extension Contract
    Sep 15, 2015 · Recently, an estimated $1 billion cost overrun was announced, on top of the nearly $2 billion original price tag. The project is now 50 percent ...
  96. [96]
    [PDF] JUNE 11,2020 - Massachusetts Taxpayers Foundation
    Jun 11, 2020 · Green Line Extension (GLX) and South Coast Rail services result in an annual operating loss of $49 million in FY 23. 6. The current commuter ...
  97. [97]
    MBTA on course toward 'fiscal calamity,' Massachusetts Taxpayers ...
    Sep 18, 2021 · By fiscal year 2025, the gap grows to $450 million and by fiscal year 2026 it reaches $500 million, requiring substantial fare increases or ...Missing: impact | Show results with:impact
  98. [98]
    Somerville, Cambridge off hook for $75M in Green Line Extension ...
    Nov 18, 2021 · MBTA officials anticipate that the long-awaited $2.3 billion megaproject, which will expand the Green Line from its Lechmere Station terminus ...
  99. [99]
    Green Line Extension Project Nears Completion
    Oct 28, 2021 · From May 2020 to May 2022, the Lechmere and Science Park stations will be shut down for upgrades. During this time, shuttle buses will run along ...
  100. [100]
    [PDF] BETTER RAPID TRANSIT FOR GREATER BOSTON
    Among the findings, a travel time analysis found that imple- menting Gold Standard BRT could reduce trip times up to 45%, varying by corridor. A preliminary ...
  101. [101]
    [PDF] Boston's Light Rail Transit Prepares for the Next Hundred Years
    The Green Line presently rises from subway to elevated structure at North Station. The elevated structure, which is over. 70 years old, has been a blight on ...Missing: details | Show results with:details
  102. [102]
    Transit Costs Study Final Report
    Jul 8, 2024 · As costs creep higher, timelines drag on, and promises aren't kept, as we will see in the Green Line Extension (GLX) case, the public loses ...<|control11|><|separator|>